ML19317E678

From kanterella
Jump to navigation Jump to search
Corrected Page to Monthly Operating Rept for Mar 1977
ML19317E678
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/10/1977
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML19317E649 List:
References
NUDOCS 7912180840
Download: ML19317E678 (1)


Text

~

e

. CORRECTED PAGE UNIf Oconna Unit 1

)' DATE 6-10-77 DOCKET NO. 50-269 j PREPARED BY J. A. Reavis j OPERATING STATUS

1. REPORTING PERIOD: March 1 THROUGH March 31, 1977 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 860
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 236.45 1251.13 23366.93
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 230.21 1230.57 21194.56
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 521612 3065709 49451420
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 181570 1057780 17181210
11. NET ELECTRICAL ENERGY GENERATED (MWH) 168820 1002696 16235229
12. REACIOR SERVICE FACTOR 31.78 57.92 71.85
13. REACTOR AVAIIABILITY FACTOR 35.72 58.62 67.61
14. UNIT SERVICE FACTOR 30.94 56.97 65.17
15. UNIT AVAILABILITY FACTOR 30.94 56.97 65.26
16. UNIT CAPACITY FACTOR (Using Net 26.38 53.98 58.05 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 25.58 52.33 56.28
18. UNIT FORCED OUTAGE RATE 69.06 43.03 19.78 l
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - June 5, 1977 - 6 weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: l April 2, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT,X 100 HOURS IN REPORTING PERIOD ^

REACTOR AVAILiBILI'lY FACTOR = H0f'RS REACTOR WAS AVAllant.E TO OPERATE X MO Il0URS IN REFORTING PERIOD UNIT SERVICE TACTOR = HOUP5 CCMERATOR ON LINE '

X 100 1 HOURI ih REPORTING Pr?RIOD UNIT AVAILABILITY FACTOR = 110URS l'NTT WAS AVA11 AOLE TO GENERATE X 100 HOURS IN REPukTING PERIOD l

UNIT CAPACITY FACTCR = NET ELECTRTCAL POWER GENERATFD s. y I

(N.it Capability or Design (Wepj;c 1 X !!OUnb LN S+ h PERIOD UNIT 70RCED OUTACE RATE - FORCFD OUTAGE HOURS 3 )12180 3

H0l'RS GENERATOR ON !.INE + FORCED OUlAGE HOURS l l

1