6 DUKE POWER COMPANY.
Powen Butto No 422 Sourn Cnuncu Srazzi, CnAnwrTz, N. C. 2e242
                                                              !                : 20 wiwam o.Paansasa.                    August 29, 1980 VeCf PRESIO(NT                                                            TELtp=0nt: AngA 704 Sf tau PmC,0vCTsO*e                                                                  373-4083 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:NM 50-413/80-11 50-414/80-11
 
==Dear Mr. O'Reilly:==
 
Please find attached a supplemental response to ir, fraction 413/414/80-11-02 which was identified in the above referenced Inspection Report.
V y truly yours, N
wa            h. U William O. Parker, Jr.
RWO:scs j
Attachment cc: Resident Inspector NRC - Catawba Nuclear Station l
Uk t'ICIAL COPY...
8010010        b7                                                          s
 
DUKE PO\lER COMPANY CATAWBA NUCLEAR STATION Supplemental Response To infraction 413-414/80-11-02
              " inadequate Procedure For The Inspection of Safety Related Electrical Cables"
 
===RESPONSE===
Duke Power Company revised inspection program for electric cables is as follows:
A. OC Random inspection of Inprocess Work.
Inspection surveillance is performed by QC Inspectors of craft activities which include stripping of wires, application of lugs, proper usage of tools, verification of tightness of connections and proper terminations.
B. Surveillance of Circuit Testing.
A construction procedure is used by the electrical craf tsman to give guidelines for checking out electrical circuitry for compliance with Design requirements prior to energizing the systeni. Surveillance is performed to assure compilance.
C. QC Termination Inspection Af ter system checkout QC will inspect all Nuclear Safety Related terminations ( which were not previously checked during installation i.e. stress' conis, plugs and motor connections) for proper installation, Revisions to circuitry af ter checkout will be controlled under Duke Power QA Procedure H-9 1
J
                                                                    .}}

Latest revision as of 14:27, 31 January 2020

Forwards Supplemental Response to NRC 800715 Ltr Re Violations Noted in IE Insp Repts 50-413/80-11 & 50-414/80-11.Corrective Actions:Insp Program for Electrical Cables Revised
ML19337B011
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/29/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19337B003 List:
References
NUDOCS 8010010197
Download: ML19337B011 (2)


Text

-

y

- , , e c ,. . .

6 DUKE POWER COMPANY.

Powen Butto No 422 Sourn Cnuncu Srazzi, CnAnwrTz, N. C. 2e242

!  : 20 wiwam o.Paansasa. August 29, 1980 VeCf PRESIO(NT TELtp=0nt: AngA 704 Sf tau PmC,0vCTsO*e 373-4083 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:NM 50-413/80-11 50-414/80-11

Dear Mr. O'Reilly:

Please find attached a supplemental response to ir, fraction 413/414/80-11-02 which was identified in the above referenced Inspection Report.

V y truly yours, N

wa h. U William O. Parker, Jr.

RWO:scs j

Attachment cc: Resident Inspector NRC - Catawba Nuclear Station l

Uk t'ICIAL COPY...

8010010 b7 s

DUKE PO\lER COMPANY CATAWBA NUCLEAR STATION Supplemental Response To infraction 413-414/80-11-02

" inadequate Procedure For The Inspection of Safety Related Electrical Cables"

RESPONSE

Duke Power Company revised inspection program for electric cables is as follows:

A. OC Random inspection of Inprocess Work.

Inspection surveillance is performed by QC Inspectors of craft activities which include stripping of wires, application of lugs, proper usage of tools, verification of tightness of connections and proper terminations.

B. Surveillance of Circuit Testing.

A construction procedure is used by the electrical craf tsman to give guidelines for checking out electrical circuitry for compliance with Design requirements prior to energizing the systeni. Surveillance is performed to assure compilance.

C. QC Termination Inspection Af ter system checkout QC will inspect all Nuclear Safety Related terminations ( which were not previously checked during installation i.e. stress' conis, plugs and motor connections) for proper installation, Revisions to circuitry af ter checkout will be controlled under Duke Power QA Procedure H-9 1

J

.