{{#Wiki_filter:July 10, 2018 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: BRAIDWOOD NUCLEAR GENERATING STATION, UNITS 1 AND 2-NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 456/2018013; 05000457/2018013
{{#Wiki_filter:uly 10, 2018
 
==SUBJECT:==
BRAIDWOOD NUCLEAR GENERATING STATION, UNITS 1 AND 2NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000456/2018013; 05000457/2018013


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
Line 25: Line 28:
Based on the results of this inspection, NRC inspectors did not identify any findings or violations of more than minor significance.
Based on the results of this inspection, NRC inspectors did not identify any findings or violations of more than minor significance.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA/ Rober t C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure:
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure:
IR 05000456/2018013; 05000457/2018013 cc: Distribution via LISTSERV
IR 05000456/2018013; 05000457/2018013 cc: Distribution via LISTSERV


Line 34: Line 38:


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensee's performance by conducting a Triennial Fire Protection at Braidwood Nuclear Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a Triennial Fire Protection at Braidwood Nuclear Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.


Licensee-identified non-cited violations are documented under inspection results.
Licensee-identified non-cited violations are documented under inspection results.


List of Findings and Violations No findings or violations were identified Additional Tracking Items None 3
List of Findings and Violations No findings or violations were identified Additional Tracking Items None


=INSPECTION SCOPE=
=INSPECTION SCOPES=


Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -
-rm/doc-collections/insp
Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light
-Water Reactor Inspection Program  
- Operations Phase.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
71111.05 T-Fire Protection
-(Triennial)
The inspectors evaluated the following from May 7, 2018, through June 8, 2018. Fire Protection Inspection Requirements (3 Samples)  The inspectors evaluated Fire Protection Program implementation in the following selected areas:
: (1) Fire Area 11.4C-0 , Radwaste and Remote Shutdown Control Panel Room
: (2) Fire Area 5.2-1 , Division 11 Engineered Safety Feature Switchgear Room
: (3) Fire Area 5.2
-2 , Division 21 Engineered Safety Feature Switchgear Room B.5.b Inspection Activities (2 Samples)  The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:
: (1) Makeup to Refueling Water Storage Tank
: (2) Spent Fuel Pool Spray
-External Strategy


==INSPECTION RESULTS==
===71111.05TFire Protection(Triennial)
71111.05 T-Fire Protection
The inspectors evaluated the following from May 7, 2018, through June 8, 2018.
-(Triennial)
No findings or violations were identified


==EXIT MEETING S AND DEBRIEFS==
Fire Protection Inspection Requirements ===
The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
{{IP sample|IP=IP 71111.05|count=3}}
The inspectors evaluated Fire Protection Program implementation in the following selected areas:
: (1) Fire Area 11.4C-0, Radwaste and Remote Shutdown Control Panel Room
: (2) Fire Area 5.2-1, Division 11 Engineered Safety Feature Switchgear Room
: (3) Fire Area 5.2-2, Division 21 Engineered Safety Feature Switchgear Room


No proprietary information was documented in this report.
===B.5.b Inspection Activities (2 Samples)===
The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:
: (1) Makeup to Refueling Water Storage Tank
: (2) Spent Fuel Pool SprayExternal Strategy


On June 8, 2018 the inspectors presented the Triennial Fire Protection inspection results to Mrs. A. Ferko and other members of the licensee staff.
==INSPECTION RESULTS==
71111.05TFire Protection(Triennial) No findings or violations were identified


4
==EXIT MEETINGS AND DEBRIEFS==
The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.
* On June 8, 2018 the inspectors presented the Triennial Fire Protection inspection results to Mrs. A. Ferko and other members of the licensee staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


  - BRW-97-0339-M; Braidwood Control Room Heat Up Evaluation; Revision 3
- BRW-97-0339-M; Braidwood Control Room Heat Up Evaluation; Revision 3
- BRW-11-0119E; Multiple Spurious Operation Technical Evaluation
- BRW-11-0119E; Multiple Spurious Operation Technical Evaluation; Revision 1
; Revision 1
- IR 04140755; 2018 NRC FP Triennial InspectionFPR References Update; 05/24/2018
- IR 04140755
- IR 00235431; Consider Testing of Remote Shutdown Panel Switches; 07/12/2004
; 2018 NRC FP Triennial Inspection
- IR 00241151; Need ECR for Reset Point for 1/2PSL-IA009; 08/03/2004
-FPR References Update
- IR 02597947; NOS ID: Implementation of Testing for RSP Components; 12/09/2015
; 05/24/2018
- IR 04038523; Box 8 On 2PMO5J Will Not Test; 08/02/2017
- IR 00235431
- AR 02499179; The Installed Relay has the Wrong Coil Voltage Rating; 05/11/2015
; Consider Testing of Remote Shutdown Panel Switches
- AR 02512046; FP Zone 2D-36 Locked in Alarm; 06/09/2015
; 07/12/2004
- AR 02548227; Recurrence of Spurious Alarm in Zone 1D-67; 08/29/2015
- IR 00241151
- 0BwOA PRI-5; Control Room Inaccessibility Unit 0; Revision 101
; Need ECR for Reset Point for 1/2PSL
- 0BwOS PL-R2; Remote Shutdown Panel Control Switch Functional Check (PW Pumps);
-IA009; 08/03/2004
Revision 0
- IR 02597947
- 1BwOA PRI-5; Control Room Inaccessibility Unit 1; Revision 109
; NOS ID: Implementation of Testing
- 1BwOS PL-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER
for RSP Components
Pump); Revision 0
; 12/09/2015
- 1BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps);
- IR 04038523
Revision 0
; Box 8 On 2PMO5J Will Not Test
- 1BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps);
; 08/02/2017
Revision 1
- AR 02499179
- 1BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs);
; The Installed Relay has the Wrong Coil Voltage Rating
Revision 0
; 05/11/2015
- 1BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters);
- AR 02512046
Revision 0
; FP Zone 2D
- 1BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pumps);
-36 Locked in Alarm
Revision 0
; 06/09/2015
- 1BwOSR 5.5.8.AF-2A; Unit One Train A Auxiliary Feedwater Valves Indication Test
- AR 02548227
Surveillance; Revision 17
; Recurrence of Spurious
- 2BwOA PRI-5; Control Room Inaccessibility Unit 2; Revision 106
Alarm in Zone 1D
- 2BwOS PL-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER
-67; 08/29/2015
Pump); Revision 0
- 0BwOA PRI-5; Control Room Inaccessibility Unit 0
- 2BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps);
; Revision 101
Revision 0
- 0BwOS PL-R2; Remote Shutdown Panel Control Switch Functional Check (PW Pumps)
- 2BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps);
; Revision 0
Revision 0
- 1BwOA PRI-5; Control Room Inaccessibility Unit 1
- 2BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs);
; Revision 109
Revision 0
- 1BwOS P L-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER Pump); Revision 0
- 2BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters);
- 1BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps)
Revision 0
; Revision 0
- 2BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pumps);
- 1BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps); Revision 1
Revision 0
- 1BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs)
- 2BwOSR 5.5.8.AF-2B; Unit Two Train B Auxiliary Feedwater Valves Indication Test
; Revision 0
Surveillance; Revision 17
- 1BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters)
- BwOP VC-1; Shutdown of Control Room HVAC System; Revision 11
; Revision 0
- BwOP VC-2; Startup of Control Room HVAC System; Revision 14
- 1BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pumps)
- BwOP VP-5; Reactor Containment Fan Cooler Start-Up; Revision 58
; Revision 0 - 1BwOSR 5.5.8.AF
- BwOP VP-6; Reactor Containment Fan Cooler Shutdown; Revision 57
-2A; Unit One Train 'A' Auxiliary Feedwater Valves Indication Test Surveillance; Revision  
- BwAR 0-37-A4; Alarm No: 0-37-A4; Revision 16
- 2BwOA PRI-5; Control Room Inaccessibility Unit 2
- EDMG 4; External Spent Fuel Pool Spray Strategy; Revision 3
; Revision 106
- EDMG 1; Extensive Damage Mitigation Guideline; Revision 8
- 2BwOS PL-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER Pump); Revision 0
- 00455864 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure
- 2BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps)
Switch; 08/23/2004
; Revision 0
- 01044558 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure
- 2BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps)
Switch; 01/09/2009
; Revision 0
- 01504332 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure
- 2BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs)
Switch; 08/06/2014
; Revision 0
- 01741169 01; Unit 2 Remote Shutdown Panel Control Power Check; 10/21/2015
- 2BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters)
- 01824974 01; Unit 1 Remote Shutdown Panel Control Power Check; 10/24/2016
; Revision 0
- 01872317 01; Unit 2 Remote Shutdown Panel Control Power Check; 05/18/2017
- 2BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pump
- 04680419; Unit 2 Remote Shutdown Panel Control Power Check (PMID/RQ 54750-01; Partial
s); Revision 0
Performance To Verify Box 8 Annunciator Window Lights); 08/02/2017
- 2BwOSR 5.5.8.AF
- 04711799 01; Unit 0 Operations Abnormal Procedures Local Equipment Check Quarterly
-2B; Unit Two Train B Auxiliary Feedwater Valves Indication Test Surveillance
Surveillance; 02/09/2018
; Revision 17
- 04756762 01; Unit 1 Remote Shutdown Instrumentation Monthly Surveillance; 04/06/2018
- BwOP VC-1; Shutdown of Control Room HVAC System
- 04756766 01; Unit 2 Remote Shutdown Instrumentation Monthly Surveillance; 04/13/2018
; Revision 11
- 20E-0-3672; Cable Pans Routing Aux Building; Revision K
- BwOP VC-2; Startup of Control Room HVAC System
- 20E-0-3361 CT1; Conduit Tabulation Aux Building; Revision AD
; Revision 14 - BwOP VP-5; Reactor Containment Fan Cooler Start
- 20E-0-3361; Electrical Installation Aux. Building; Revision DK
-Up; Revision 58 - BwOP VP-6; Reactor Containment Fan Cooler Shutdown
- 20E-1-4111D; External Wiring Diagram, Process I & C Rack Channel 4; Revision Y
; Revision 57 - BwAR 0-37-A4; Alarm No: 0
- 20E-1-4108E; Internal/External Wiring Diagram, Safety Valve Room; Revision 1
-37-A4; Revision 16 - EDMG 4; External Spent Fuel Pool Spray Strategy
- 20E-1-4086; Elevation, Remote Shutdown Panel; Revision W
; Revision 3
- 20E-1-4006A; Key Diagram, 4160V ESF SWGR Bus 141; Revision 1
- EDMG 1; Extensive Damage Mitigation Guideline
- 20E-1-4610A; Elevation, 4160V SWGR Bus 141; Revision 1
; Revision 8 - 00455864 01
- 20E-1-4007A; Key Diagram, 480V ESF Substation Bus 131X; Revision M
; Unit 1 1PSL
- 20E-2-4006A; Key Diagram, 4160V ESF SWGR Bus 241; Revision F
-IA009 Remote Shutdown Control Panel IA Header Pressure Switch; 08/23/2004
- 20E-2-4610A; Elevation, 4160V SWGR Bus 241; Revision G
- 01044558 01
- 20E-2-4007A; Key Diagram 480V ESF Substation Bus 231X; Revision K
; Unit 1 1PSL
5
-IA009 Remote Shutdown Control Panel IA Header Pressure Switch; 01/09/2009
- 01504332 01
; Unit 1 1PSL
-IA009 Remote Shutdown Control Panel IA Header Pressure Switch; 08/06/2014
- 01741169 01
; Unit 2 Remote Shutdown Panel Control Power Check
; 10/21/2015
- 01824974 01
; Unit 1 Remote Shutdown Panel Control Power Check
; 10/24/2016
- 01872317 01
; Unit 2 Remote Shutdown Panel Control Power Check
; 05/18/2017
- 04680419; Unit 2 Remote Shutdown Panel Control Power Check (PMID/RQ 54750
-01; Partial Performance To Verify Box 8 Annunciator Window Lights)
; 08/02/2017
- 04711799 01
; Unit 0 Operations Abnormal Procedures Local Equipment Check Quarterly Surveillance
; 02/09/2018
- 04756762 01
; Unit 1 Remote Shutdown Instrumentation Monthly Surveillance
; 04/06/2018
- 04756766 01
; Unit 2 Remote Shutdown Instrumentation Monthly Surveillance
; 04/13/2018
- 20E-0-3672; Cable Pans Routing Aux Building
; Revision K
- 20E-0-3361 CT1; Conduit Tabulation Aux Building
; Revision AD
- 20E-0-3361; Electrical Installation Aux. Building
; Revision DK
- 20E-1-4111D; External Wiring Diagram, Process I & C Rack Channel 4
; Revision Y
- 20E-1-4108E; Internal/External Wiring Diagram, Safety Valve Room
; Revision 1
- 20E-1-4086; Elevation, Remote Shutdown Panel
; Revision W
- 20E-1-4006A; Key Diagram, 4160V ESF SWGR Bus 141
; Revision 1
- 20E-1-4610A; Elevation, 4160V SWGR Bus 141
; Revision 1
- 20E-1-4007A; Key Diagram, 480V ESF Substation Bus 131X; Revision M
- 20E-2-4006A; Key Diagram, 4160V ESF SWGR Bus 241
; Revision F
- 20E-2-4610A; Elevation, 4160V SWGR Bus 241
; Revision G
- 20E-2-4007A; Key Diagram 480V ESF Substation Bus 231X
; Revision K
}}
}}

Latest revision as of 19:52, 18 December 2019

NRC Triennial Fire Protection Inspection Report 05000456/2018013; 05000457/2018013 (DRS-A. Shaikh)
ML18194A902
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/10/2018
From: Robert Daley
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018013
Download: ML18194A902 (7)


Text

uly 10, 2018

SUBJECT:

BRAIDWOOD NUCLEAR GENERATING STATION, UNITS 1 AND 2NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000456/2018013; 05000457/2018013

Dear Mr. Hanson:

On June 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Triennial Fire Protection inspection at your Braidwood Nuclear Generating Station, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mrs. A. Ferko and other members of your staff. The results of this inspection are documented in the enclosed report.

Based on the results of this inspection, NRC inspectors did not identify any findings or violations of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure:

IR 05000456/2018013; 05000457/2018013 cc: Distribution via LISTSERV

Letter to Bryan

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a Triennial Fire Protection at Braidwood Nuclear Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

Licensee-identified non-cited violations are documented under inspection results.

List of Findings and Violations No findings or violations were identified Additional Tracking Items None

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -

Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.05TFire Protection(Triennial)

The inspectors evaluated the following from May 7, 2018, through June 8, 2018.

Fire Protection Inspection Requirements ===

The inspectors evaluated Fire Protection Program implementation in the following selected areas:

(1) Fire Area 11.4C-0, Radwaste and Remote Shutdown Control Panel Room
(2) Fire Area 5.2-1, Division 11 Engineered Safety Feature Switchgear Room
(3) Fire Area 5.2-2, Division 21 Engineered Safety Feature Switchgear Room

B.5.b Inspection Activities (2 Samples)

The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:

(1) Makeup to Refueling Water Storage Tank
(2) Spent Fuel Pool SprayExternal Strategy

INSPECTION RESULTS

71111.05TFire Protection(Triennial) No findings or violations were identified

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.

  • On June 8, 2018 the inspectors presented the Triennial Fire Protection inspection results to Mrs. A. Ferko and other members of the licensee staff.

DOCUMENTS REVIEWED

- BRW-97-0339-M; Braidwood Control Room Heat Up Evaluation; Revision 3

- BRW-11-0119E; Multiple Spurious Operation Technical Evaluation; Revision 1

- IR 04140755; 2018 NRC FP Triennial InspectionFPR References Update; 05/24/2018

- IR 00235431; Consider Testing of Remote Shutdown Panel Switches; 07/12/2004

- IR 00241151; Need ECR for Reset Point for 1/2PSL-IA009; 08/03/2004

- IR 02597947; NOS ID: Implementation of Testing for RSP Components; 12/09/2015

- IR 04038523; Box 8 On 2PMO5J Will Not Test; 08/02/2017

- AR 02499179; The Installed Relay has the Wrong Coil Voltage Rating; 05/11/2015

- AR 02512046; FP Zone 2D-36 Locked in Alarm; 06/09/2015

- AR 02548227; Recurrence of Spurious Alarm in Zone 1D-67; 08/29/2015

- 0BwOA PRI-5; Control Room Inaccessibility Unit 0; Revision 101

- 0BwOS PL-R2; Remote Shutdown Panel Control Switch Functional Check (PW Pumps);

Revision 0

- 1BwOA PRI-5; Control Room Inaccessibility Unit 1; Revision 109

- 1BwOS PL-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER

Pump); Revision 0

- 1BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps);

Revision 0

- 1BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps);

Revision 1

- 1BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs);

Revision 0

- 1BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters);

Revision 0

- 1BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pumps);

Revision 0

- 1BwOSR 5.5.8.AF-2A; Unit One Train A Auxiliary Feedwater Valves Indication Test

Surveillance; Revision 17

- 2BwOA PRI-5; Control Room Inaccessibility Unit 2; Revision 106

- 2BwOS PL-R2-AB; Remote Shutdown Panel Control Switch Functional Check (AB XFER

Pump); Revision 0

- 2BwOS PL-R2-CC; Remote Shutdown Panel Control Switch Functional Check (CC Pumps);

Revision 0

- 2BwOS PL-R2-CV.1; Remote Shutdown Panel Control Switch Functional Check (CV Pumps);

Revision 0

- 2BwOS PL-R2-MS.2; Remote Shutdown Panel Control Switch Functional Check (PORVs);

Revision 0

- 2BwOS PL-R2-RY; Remote Shutdown Panel Control Switch Functional Check (RY Heaters);

Revision 0

- 2BwOS PL-R2-SX; Remote Shutdown Panel Control Switch Functional Check (SX Pumps);

Revision 0

- 2BwOSR 5.5.8.AF-2B; Unit Two Train B Auxiliary Feedwater Valves Indication Test

Surveillance; Revision 17

- BwOP VC-1; Shutdown of Control Room HVAC System; Revision 11

- BwOP VC-2; Startup of Control Room HVAC System; Revision 14

- BwOP VP-5; Reactor Containment Fan Cooler Start-Up; Revision 58

- BwOP VP-6; Reactor Containment Fan Cooler Shutdown; Revision 57

- BwAR 0-37-A4; Alarm No: 0-37-A4; Revision 16

- EDMG 4; External Spent Fuel Pool Spray Strategy; Revision 3

- EDMG 1; Extensive Damage Mitigation Guideline; Revision 8

- 00455864 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure

Switch; 08/23/2004

- 01044558 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure

Switch; 01/09/2009

- 01504332 01; Unit 1 1PSL-IA009 Remote Shutdown Control Panel IA Header Pressure

Switch; 08/06/2014

- 01741169 01; Unit 2 Remote Shutdown Panel Control Power Check; 10/21/2015

- 01824974 01; Unit 1 Remote Shutdown Panel Control Power Check; 10/24/2016

- 01872317 01; Unit 2 Remote Shutdown Panel Control Power Check; 05/18/2017

- 04680419; Unit 2 Remote Shutdown Panel Control Power Check (PMID/RQ 54750-01; Partial

Performance To Verify Box 8 Annunciator Window Lights); 08/02/2017

- 04711799 01; Unit 0 Operations Abnormal Procedures Local Equipment Check Quarterly

Surveillance; 02/09/2018

- 04756762 01; Unit 1 Remote Shutdown Instrumentation Monthly Surveillance; 04/06/2018

- 04756766 01; Unit 2 Remote Shutdown Instrumentation Monthly Surveillance; 04/13/2018

- 20E-0-3672; Cable Pans Routing Aux Building; Revision K

- 20E-0-3361 CT1; Conduit Tabulation Aux Building; Revision AD

- 20E-0-3361; Electrical Installation Aux. Building; Revision DK

- 20E-1-4111D; External Wiring Diagram, Process I & C Rack Channel 4; Revision Y

- 20E-1-4108E; Internal/External Wiring Diagram, Safety Valve Room; Revision 1

- 20E-1-4086; Elevation, Remote Shutdown Panel; Revision W

- 20E-1-4006A; Key Diagram, 4160V ESF SWGR Bus 141; Revision 1

- 20E-1-4610A; Elevation, 4160V SWGR Bus 141; Revision 1

- 20E-1-4007A; Key Diagram, 480V ESF Substation Bus 131X; Revision M

- 20E-2-4006A; Key Diagram, 4160V ESF SWGR Bus 241; Revision F

- 20E-2-4610A; Elevation, 4160V SWGR Bus 241; Revision G

- 20E-2-4007A; Key Diagram 480V ESF Substation Bus 231X; Revision K