IR 05000341/2018503: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18260A330
| number = ML18260A330
| issue date = 09/17/2018
| issue date = 09/17/2018
| title = Fermi Power Plant, Unit 2 - Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000341/2018503
| title = Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000341/2018503
| author name = Orth S K
| author name = Orth S
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Polson K
| addressee name = Polson K
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 17, 2018
[[Issue date::September 17, 2018]]


Mr. Keith Polson, Senior VP and Chief Nuclear Officer DTE Energy Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166
==SUBJECT:==
FERMI POWER PLANT, UNIT 2BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/2018503


SUBJECT: FERMI POWER PLANT, UNIT 2-BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/201 8 50 3
==Dear Mr. Polson:==
On August 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at your Fermi Power Plant, Unit 2. The NRC inspectors discussed the results of this inspection with Mr. M. Caragher and other members of your staff. The results of this inspection are documented in the enclosed report.


==Dear Mr. Polson:==
The NRC inspectors did not identify any finding or violation of more-than-minor significance.
On August 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at your Fermi Power Plant, Unit 2. The NRC inspectors discussed the results of this inspection with Mr. M. Caragher and other members of your staff. The results of this inspection are documented in the enclosed report
. The NRC inspectors did not identify any finding or violation of more-than-minor significance.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Steven K. Orth , Chief Plant Support Branc h Division of Reactor Safety Docket No. 50
Sincerely,
-341 License No. NPF
/RA/
-43  
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43


===Enclosure:===
===Enclosure:===
IR 05000341/20 18 50 3 cc: Distribution via LISTSERV
IR 05000341/2018503


Letter to Keith Polson from Steven K. Orth dated September 17, 2018
REGION III==
 
Docket No: 50-341 License No: NPF-43 Report No: 05000341/2018503 Enterprise Identifier: I-2018-503-0008 Licensee: DTE Energy Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: June 15, 2018; August 27, 2018, through August 30, 2018 Inspectors: G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector R. Ng, Project Engineer E. Fernandez, Reactor Inspector Approved by: S. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUBJECT: FERMI POWER PLANT, UNIT 2-BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/201 8 50 3 DISTRIBUTION
: Christopher Cook RidsNrrDorlLpl3 RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov ADAMS Accession Number: ML18260A330 OFFICE RIII RIII NAME JKutlesa for GHansen:jw SOrth DATE 09/14/18 09/17/18 OFFICIAL RECORD COPY
 
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-341 License N o: NPF-43 Report No:
05000341/20185 0 3 Enterprise Identifier:
I-2018-503-0008 Licensee: DTE Energy Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: June 15, 2018; August 27, 2018, through August 30, 2018 Inspectors:
G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector R. Ng, Project Engineer E. Fernandez, Reactor Inspector Approved by:
S. Orth, Chief Plant Support Branch Division of Reactor Safety 2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission continued monitoring licensee's performance by conducting an Emergency Preparedness Inspection at Fermi Power Plant, Unit 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission continued monitoring licensees performance by conducting an Emergency Preparedness Inspection at Fermi Power Plant, Unit 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


List of Findings and Violations No findings or violations were identified.
List of Findings and Violations No findings or violations were identified.


Additional Tracking Items None.
Additional Tracking Items None.
3


=INSPECTION SCOPES=
=INSPECTION SCOPES=


Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -
-rm/doc-collections/insp
Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light
-Water Reactor Inspection Program  
- Operations Phase.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==


==71114.01 - Exercise Evaluation==
===71114.01Exercise Evaluation ===
{{IP sample|IP=IP 71114.01|count=1}}
{{IP sample|IP=IP 71114.01|count=1}}
The inspectors evaluated the August 28, 2018, Biennial Emergency Plan Exercise.


The inspectors evaluated the August 28, 2018 , Biennial Emergency Plan Exercise.
The exercise scenario simulated an event at Fermi 2 Power Plant, Unit 2 that initiated with the declaration and notification of an Unusual Event in response to an event associated with an accident that resulted in a fire in the plant. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of an Alert, a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.


The exercise scenario simulated an event at Fermi 2 Power Plant , Unit 2 that initiated with the declaration and notification of an Unusual Event in response to an event associated with an accident that resulted in a fire in the plant
===71114.08Exercise EvaluationScenario Review ===
. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of a n Alert, a Site Area Emergency
{{IP sample|IP=IP 71114.08|count=1}}
, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
 
==71114.08 - Exercise Evaluation==
 
-Scenario Review (1 Sample)
The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on June 15,
The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on June 15,


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
-BASELINE 71151-Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below. (3 Sample s)
BASELINE
: (1) EP01: Drill/Exercise Performance
 
- 1 Sample (3 rd Quarter of 2017 through 2 nd Quarter of 201 8);
===71151Performance Indicator Verification     The inspectors verified licensee performance indicators submittals listed below. ===
: (2) EP02: Emergency Response Organization Drill Participation
{{IP sample|IP=IP 71151|count=3}}
- 1 Sample (3 rd Quarter of 2017 through 2 nd Quarter of 201 8); and
: (1) EP01: Drill/Exercise Performance - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018);
: (3) EP03: Alert and Notification System Reliability
: (2) EP02: Emergency Response Organization Drill Participation - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018); and
- 1 Sample (3 rd Quarter of 2017 through 2 nd Quarter of 201 8).
: (3) EP03: Alert and Notification System Reliability - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018).


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 100: Line 80:
==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.
The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.
 
* On August 30, 2018, the inspectors presented the Emergency Preparedness inspection results to Mr. M. Caragher, Plant Manager, and other members of the licensee staff.
On August 30 , 2018, the inspector s presented the Emergency Preparedness inspection results to Mr. M. Caragher, Plant Manager, and other members of the licensee staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71114.01-Exercise Evaluation
71114.01Exercise Evaluation
- Fermi 2 201
- Fermi 2 2018 Emergency Preparedness Exercise Scenario; 06/28/2018
Emergency Preparedness Exercise Scenario;
- Fermi 2 Radiological Emergency Response Plan; Revision 47
06/28/2018 - Fermi 2 Radiological Emergency Response Plan; Revision 4
- EP-101; Classification of Emergencies; Revision 42B
- EP-101; Classification of Emergencies; Revision 4
- EP-290; Emergency Notifications; Revision 61
2B - EP-290; Emergency Notifications; Revision 61
- EP-301-01; Technical Support Center; Revision 22
- EP-301-01; Technical Support Center; Revision 22
- EP-302-01; Operational Support Center; Revision 14
- EP-302-01; Operational Support Center; Revision 14
- EP-303-01; Emergency Operations Facility; Revision 17
- EP-303-01; Emergency Operations Facility; Revision 1
- EP-530; Assembly and Accountability and On-site Protective Actions; Revision 27A
- EP-530; Assembly and Accountability and On
- EP-542; Computer-Based Offsite Dose Assessment - Airborne Release; Revision 14
-site Protective Actions; Revision 27A
- EP-545; Protective Action Recommendations; Revision 26
- EP-542; Computer
- Two-Years of Drill and Exercise Corrective Action Program Items; August 2016 - August 2018
-Based Offsite Dose Assessment  
- Two-Years of Scenario Timelines; August 2016 - August 2018
- Airborne Release; Revision  
- CARD 17-21282; RERP Drill 02/14/2017 - Unexpected (and inaccurate) Initial Notification
- EP-545; Protective Action Recommendations; Revision 26
- CARD 17-21382; RERP Drill 02/14/2017 - Failure of Follow-up Notifications Objective
- Two-Years of Drill and Exercise Corrective Action Program Items; August 201
- CARD 17-21385; Negative Trend Seen in Follow-up Notifications of Performance
- August 201 8 - Two-Years of Scenario Timelines; August 201
- CARD 17-21692; RERP Drill 02/14/2017 - Observation of OSC Team Briefings and Dispatch
- August 201
- CARD 17-21858; Red Team Drill Failure
- CARD 17-21282; RERP Drill 02/14/
- CARD 17-24873; Adverse Trend in Emergency Classifications
17 - Unexpected (and inaccurate) Initial Notification
- CARD 17-25278; RERP Drill 060617 - TSC Adjusting and Communication of Priorities
- CARD 17-21382; RERP Drill 02/14/
- CARD 17-25291; RERP Drill 060617 - OSC Coordinator Did Not Effectively Use Operations
17 - Failure of Follow-up Notifications Objective
Resources
- CARD 17-21385; Negative Trend Seen in Follow
- CARD 17-29789; RERP Drill 12/5/2017 - Drill Attendance - Trend
-up Notifications of Performance
- CARD 18-21955; Advers Trend Identified in Fire Drill Performance
- CARD 17-21692; RERP Drill 02/14/
- CARD 18-23883; RERP Drill 05/05/2018; Classification Discrepancy
17 - Observation of OSC Team Briefings and Dispatch
- CARD 18-23975; RERP Drill 05/05/2018; Off-Site RET Drill Comments
- CARD 17-21858; Red Team Drill Failure
71114.08Exercise EvaluationScenario Review
- CARD 17-24873; Adverse Trend in Emergency Classifications
- Fermi 2 2018 Emergency Preparedness Exercise Scenario 60 Day Submittal; 06/28/2018
- CARD 17-25278; RERP Drill 060617  
71151Performance Indicator Verification
- TSC Adjusting and Communication of Priorities
- NRC Performance Indicator Data; Drill/Exercise Performance; 3rd Quarter of 2017 -
- CARD 17-25291; RERP Drill 060617  
2nd Quarter of 2018
- OSC Coordinator Did Not Effectively Use Operations Resources - CARD 17-29789; RERP Drill 12/5/
- NRC Performance Indicator Data; Emergency Response Organization Drill Participation;
17 - Drill Attendance  
3rd Quarter of 2017 - 2nd Quarter of 2018
- Trend - CARD 18-21955; Advers Trend Identified in Fire Drill Performance
- NRC Performance Indicator Data; Alert and Notification System Reliability; 3rd Quarter
- CARD 18-23883; RERP Drill 05/05/
of 2017 - 2nd Quarter of 2018
18; Classification Discrepancy
- NEI 99-02; Regulatory Assessment Performance Indicator Guideline; Revision 7
- CARD 18-23975; RERP Drill 05/05/
4
2018; Off-Site RET Drill Comments
71114.08-Exercise Evaluation
-Scenario Review
- Fermi 2 201 8 Emergency Preparedness Exercise Scenario 60 Day Submittal; 06/28/201 8 71151-Performance Indicator Verification
- NRC Performance Indicator Data; Drill/Exercise Performance;
rd Quarter of 2017 - 2 nd Quarter of 2018 - NRC Performance Indicator Data; Emergency Response Organization Drill Participation;
rd Quarter of 2017
- 2 nd Quarter of 2018 - NRC Performance Indicator Data; Alert and Notification System Reliability;
rd Quarter of 2017 - 2 nd Quarter of 2018 - NEI 99-02; Regulatory Assessment Performance Indicator Guideline; Revision 7
}}
}}

Latest revision as of 17:12, 18 December 2019

Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000341/2018503
ML18260A330
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/17/2018
From: Steven Orth
Plant Support Branch II
To: Polson K
DTE Energy Services
References
IR 2018503
Download: ML18260A330 (6)


Text

ber 17, 2018

SUBJECT:

FERMI POWER PLANT, UNIT 2BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/2018503

Dear Mr. Polson:

On August 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at your Fermi Power Plant, Unit 2. The NRC inspectors discussed the results of this inspection with Mr. M. Caragher and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43

Enclosure:

IR 05000341/2018503

REGION III==

Docket No: 50-341 License No: NPF-43 Report No: 05000341/2018503 Enterprise Identifier: I-2018-503-0008 Licensee: DTE Energy Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: June 15, 2018; August 27, 2018, through August 30, 2018 Inspectors: G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector R. Ng, Project Engineer E. Fernandez, Reactor Inspector Approved by: S. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission continued monitoring licensees performance by conducting an Emergency Preparedness Inspection at Fermi Power Plant, Unit 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations were identified.

Additional Tracking Items None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -

Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01Exercise Evaluation

The inspectors evaluated the August 28, 2018, Biennial Emergency Plan Exercise.

The exercise scenario simulated an event at Fermi 2 Power Plant, Unit 2 that initiated with the declaration and notification of an Unusual Event in response to an event associated with an accident that resulted in a fire in the plant. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of an Alert, a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.

71114.08Exercise EvaluationScenario Review

The inspectors reviewed and evaluated the proposed scenario for the Biennial Emergency Plan Exercise on June 15,

OTHER ACTIVITIES

BASELINE

71151Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below.

(1) EP01: Drill/Exercise Performance - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018);
(2) EP02: Emergency Response Organization Drill Participation - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018); and
(3) EP03: Alert and Notification System Reliability - 1 Sample (3rd Quarter of 2017 through 2nd Quarter of 2018).

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. No proprietary information was documented in this report.

  • On August 30, 2018, the inspectors presented the Emergency Preparedness inspection results to Mr. M. Caragher, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

71114.01Exercise Evaluation

- Fermi 2 2018 Emergency Preparedness Exercise Scenario; 06/28/2018

- Fermi 2 Radiological Emergency Response Plan; Revision 47

- EP-101; Classification of Emergencies; Revision 42B

- EP-290; Emergency Notifications; Revision 61

- EP-301-01; Technical Support Center; Revision 22

- EP-302-01; Operational Support Center; Revision 14

- EP-303-01; Emergency Operations Facility; Revision 17

- EP-530; Assembly and Accountability and On-site Protective Actions; Revision 27A

- EP-542; Computer-Based Offsite Dose Assessment - Airborne Release; Revision 14

- EP-545; Protective Action Recommendations; Revision 26

- Two-Years of Drill and Exercise Corrective Action Program Items; August 2016 - August 2018

- Two-Years of Scenario Timelines; August 2016 - August 2018

- CARD 17-21282; RERP Drill 02/14/2017 - Unexpected (and inaccurate) Initial Notification

- CARD 17-21382; RERP Drill 02/14/2017 - Failure of Follow-up Notifications Objective

- CARD 17-21385; Negative Trend Seen in Follow-up Notifications of Performance

- CARD 17-21692; RERP Drill 02/14/2017 - Observation of OSC Team Briefings and Dispatch

- CARD 17-21858; Red Team Drill Failure

- CARD 17-24873; Adverse Trend in Emergency Classifications

- CARD 17-25278; RERP Drill 060617 - TSC Adjusting and Communication of Priorities

- CARD 17-25291; RERP Drill 060617 - OSC Coordinator Did Not Effectively Use Operations

Resources

- CARD 17-29789; RERP Drill 12/5/2017 - Drill Attendance - Trend

- CARD 18-21955; Advers Trend Identified in Fire Drill Performance

- CARD 18-23883; RERP Drill 05/05/2018; Classification Discrepancy

- CARD 18-23975; RERP Drill 05/05/2018; Off-Site RET Drill Comments

71114.08Exercise EvaluationScenario Review

- Fermi 2 2018 Emergency Preparedness Exercise Scenario 60 Day Submittal; 06/28/2018

71151Performance Indicator Verification

- NRC Performance Indicator Data; Drill/Exercise Performance; 3rd Quarter of 2017 -

2nd Quarter of 2018

- NRC Performance Indicator Data; Emergency Response Organization Drill Participation;

3rd Quarter of 2017 - 2nd Quarter of 2018

- NRC Performance Indicator Data; Alert and Notification System Reliability; 3rd Quarter

of 2017 - 2nd Quarter of 2018

- NEI 99-02; Regulatory Assessment Performance Indicator Guideline; Revision 7

4