|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML081420753 | | | number = ML081420753 |
| | issue date = 05/20/2008 | | | issue date = 05/20/2008 |
| | title = 05/13/2008 Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2008 Davis-Besse End-of-Cycle Performance Assessment | | | title = Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2008 Davis-Besse End-of-Cycle Performance Assessment |
| | author name = Cameron J | | | author name = Cameron J |
| | author affiliation = NRC/RGN-III/DRP/B6 | | | author affiliation = NRC/RGN-III/DRP/B6 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 20, 2008 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 20, 2008 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station |
| | |
| LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRC's 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293). | | OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293). |
| | The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure. |
| | The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440. |
| | At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| | /RA/ |
| | Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 |
|
| |
|
| The NRC began the meeting with an overview of the NRC, the NRC's Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRC's assessment of Davis-Besse performance in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure.
| | ==Enclosure:== |
| | | As stated DISTRIBUTION: |
| The licensee then provided its perspective on the NRC's assessment. The licensee's meeting presentation handout can be found in ADAMS at ML081410440.
| | See next page |
| At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
| |
| | |
| /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
| |
|
| |
|
| ==Enclosure:==
| | Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008 |
| As stated DISTRIBUTION
| |
| : See next page Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: B. Allen, Site Vice President The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp. Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. O'Claire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO | | OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: B. Allen, Site Vice President The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp. |
| | Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO |
|
| |
|
| LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station | | LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT | | OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293). |
| | | The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure. |
| On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRC's 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293). | | The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440. |
| | | At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. |
| The NRC began the meeting with an overview of the NRC, the NRC's Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRC's assessment of Davis-Besse performance in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure. | | Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 |
| | |
| The licensee then provided its perspective on the NRC's assessment. The licensee's meeting presentation handout can be found in ADAMS at ML081410440. | |
| At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. | |
| | |
| Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated DISTRIBUTION | | As stated DISTRIBUTION: |
| : See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC Cy 2007\EOC Meeting Notices -
| | See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC Cy 2007\EOC Meeting Notices - |
| Letters/Davis-Besse EOC meeting Summary Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp *JLC for JCameron DATE 05/20/08 05/20/08 OFFICIAL RECORD COPY | | Letters/Davis-Besse EOC meeting Summary Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp JCameron |
| | *JLC for DATE 05/20/08 05/20/08 OFFICIAL RECORD COPY |
|
| |
|
| Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008 | | Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE May 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT | | OF THE May 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION: |
| | | TEB RAG1 TJW2 RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 TXN |
| DISTRIBUTION | |
| : TEB RAG1 TJW2 RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 TXN
| |
| | |
| Enclosure PUBLIC MEETING PRINCIPAL ATTENDEES May 13, 2008
| |
| | |
| FirstEnergy B. Allen, Site Vice President, Davis-Besse V. Kaminskas, Director, Site Operations, Davis-Besse D. Moul, Director, Site Engineering, Davis-Besse B. Boles, Director, Site Maintenance C. Price, Director, Site Performance Improvement Nuclear Regulatory Commission J. Cameron, Branch Chief J. Rutkowski, Senior Resident Inspector A. Wilson, Resident Inspector P. Chandrothl, Public Affairs Officer N. Keller, Resident Office Assistant
| |
|
| |
|
| Other Attendees J. Gannon, Office of U.S. Senator Sherrod Brown (OH) C. Koebel, Ottawa County (Ohio) Commissioner S. Arndt, Ottawa County (Ohio) Commissioner J. Sass, President, Ottawa County (Ohio) Commissioners J. Witt, Ottawa County (Ohio) Administrator M. White, Ohio Emergency Management Agency}} | | PUBLIC MEETING PRINCIPAL ATTENDEES May 13, 2008 FirstEnergy B. Allen, Site Vice President, Davis-Besse V. Kaminskas, Director, Site Operations, Davis-Besse D. Moul, Director, Site Engineering, Davis-Besse B. Boles, Director, Site Maintenance C. Price, Director, Site Performance Improvement Nuclear Regulatory Commission J. Cameron, Branch Chief J. Rutkowski, Senior Resident Inspector A. Wilson, Resident Inspector P. Chandrothl, Public Affairs Officer N. Keller, Resident Office Assistant Other Attendees J. Gannon, Office of U.S. Senator Sherrod Brown (OH) |
| | C. Koebel, Ottawa County (Ohio) Commissioner S. Arndt, Ottawa County (Ohio) Commissioner J. Sass, President, Ottawa County (Ohio) Commissioners J. Witt, Ottawa County (Ohio) Administrator M. White, Ohio Emergency Management Agency Enclosure}} |
|
---|
Category:Meeting Summary
MONTHYEARML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks ML12237A0432012-08-24024 August 2012 August 15, 2012 - Summary of Public Meeting to Discuss the Davis-Besse Nuclear Power Station, Unit 1, End-Of-Cycle Plant Performance Assessment ML12165A3502012-07-16016 July 2012 Summary of Conference Call for Stream Generator Tube Inservice Inspections for Spring 2012 Refueling Outage ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12061A2582012-04-0202 April 2012 Summary of Telephone Conference Call Held on July 12,2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML12059A0782012-04-0202 April 2012 Summary of Telephone Conference Call Held on February 9, 2012, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Pow 2024-09-05
[Table view] Category:Memoranda
MONTHYEARML23129A6062023-05-0404 May 2023 Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station ML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML21096A2282021-03-30030 March 2021 FEMA Disapproval of Davis-Besse Exercise Exemption ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19162A0102019-06-0707 June 2019 Memorandum to File Environmental Assessment and Finding of No Significant Impact for Firstenergy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Davis Besse ISFSI ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15205A1692015-08-0707 August 2015 ACRS Review of the Davis Besse Nuclear Plant LRA - Transmittal of the Sser ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis IR 05000334/20004122014-07-0808 July 2014 NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML13280A9062013-10-21021 October 2013 Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Voluntary Risk Informed Fire Protection Amendment for Davis-Besse ML13142A5122013-07-0202 July 2013 Summary of Telephone Conference Call Held on May 21, 2013, Between NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13171A2922013-06-13013 June 2013 LTR-13-0540 - Bill Hawkins and Vinod Arora Email San Onofre Nuclear Generating Station (SONGS) Lessons Learn for Davis-Besse ML13154A4442013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Davis-Besse and Perry ML12199A2072012-07-17017 July 2012 Public Meeting Notice to Discuss the 2011 End-of-Cycle Performance Assessment ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML1206901652012-03-0909 March 2012 Memo - Summary of Public Meeting with Industry Regarding Pwrog'S Boric Acid Corrosion Test Program ML12018A1652012-01-27027 January 2012 Summary of Telephone Conference Call Held on November 9, 2011, Between the NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse, LRA ML14028A5462012-01-25025 January 2012 NRC Telecon Regarding Davis-Besse License Renewal Severe Accident Mitigation Alternatives Analysis Questions ML11363A1712012-01-23023 January 2012 Summary of Telephone Conference Call Held on December 12, 2011 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Request for Additional Information ML11355A0952011-12-29029 December 2011 Summary of Telephone Conference Call Held on December 8, 2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning RAIs Pertaining to the Davis-Besse Nuclear Power Station, LRA ML11348A0212011-12-21021 December 2011 Summary of Telephone Conference Call Held on November 1, 2011 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis Besse Nuclear Pow ML11341A1182011-12-14014 December 2011 Summary of Telephone Conference Call Held on June 15, 2011 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML11339A0862011-12-13013 December 2011 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning RAIs Pertaining to the Davis-Besse Nuclear Power Station LRA ML11327A0082011-12-0202 December 2011 Summary of Telephone Conference Call Held on September 29, 2011, Between the NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse, LRA ML11327A0792011-12-0202 December 2011 Summary of Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis Besse Nuclear Power Station ML11327A0872011-12-0202 December 2011 Summary of Telephone Conference Call Held on July 27, 2011, Between the NRC and Firstenergy Nuclear Operating Company Concerning RAI Pertaining to the Davis-Besse, LRA ML11279A2182011-10-0606 October 2011 Memo - Task Interface Agreement - Evaluation of Compliance with Code for Examination of Flange Stud Holes on the Replacement Vessel Head at the Davis-Besse Nuclear Power Station (TIA 2011-015) ML11242A0032011-09-12012 September 2011 Summary of Conference Call Held on August 4, 2011, Between the NRC and FENOC Concerning Requests for Additional Information Pertaining to the Davis-Besse License Renewal Application ML1122701392011-08-15015 August 2011 Request for Additional Information Response Clarification from Davis-Besse Nuclear Power Station in Support of License Renewal Application Review ML11173A2002011-08-0101 August 2011 Summary of Public Scoping Meetingsconducted Related to the Review of the Davis-Besse Nuclear Power Station, Unit 1, LRA ML11193A2032011-07-26026 July 2011 Final Response to TIA 2011-001, Davis-Besse Nuclear Power Station Safety-Related Batteries Electrical Separation Design and Licensing Bases ML11174A2322011-06-21021 June 2011 for the Record-06-21-2011: NRC Ensures Public Safety Through Rigorous Oversight of Nuclear Power Plant Safety Standards ML1108202762011-06-0303 June 2011 Summary of Site Audit Related to the Review of the License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1 ML11174A2472011-05-31031 May 2011 for the Record-05-31-2011: NRC Chairman Gregory B. Jaczko'S Statement on Nrc'S Commitment to Safety ML1110806902011-04-20020 April 2011 Notice of Meeting with First Energy Nuclear Operating Company (FENOC) to Discuss a Proposed LAR to Delete Technical Specification 5.5.8g, Steam Generator (SG) Program Auxiliary Feedwater Header Inspections ML1028702612010-10-22022 October 2010 11/04/10 Notice of Meeting to Discuss the License Renewal Process and Environmental Scoping for Davis-Besse Nuclear Power Station License Renewal Application Review ML1029106182010-10-14014 October 2010 Documentation of Telephone Conversation Between Mr. David Lochbaum Regarding Follow-Up Questions Related to NRC Letter Dated July 28, 2010 (ML102040807) ML1028503032010-10-12012 October 2010 Acceptance of License Renewal Application, Davis-Besse Nuclear Power Station ML0935101922009-12-14014 December 2009 Completion of Davis-Besse Lessons Learned Task Force Recommendation 3.3.4(8) ML0825606772008-09-15015 September 2008 Presentation Disc ML0814207532008-05-20020 May 2008 Summary of Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2008 Davis-Besse End-of-Cycle Performance Assessment ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0723302222007-08-28028 August 2007 09/12/2007 Notice of Meeting with Firstenergy to Discuss the August 3, 2007 License Amendment Request for Conversion to Improved Technical Specifications for Davis-Besse, Unit 1 ML0722108432007-08-0707 August 2007 Request for Renewal of Deviation to the Reactor Oversight Process Action Matrix for Davis-Besse Nuclear Power Station ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0712803322007-05-18018 May 2007 April 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 Cfr), Section 2.206 2023-05-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 20, 2008 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293).
The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
As stated DISTRIBUTION:
See next page
Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008
SUBJECT:
SUMMARY
OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: B. Allen, Site Vice President The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. OClaire, Chief, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay G. Mortensen, INPO
LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station
SUBJECT:
SUMMARY
OF THE MAY 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT On May 13, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Davis-Besse Nuclear Power Plant's safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600293).
The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Davis-Besse performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML081410432. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided its perspective on the NRCs assessment. The licensees meeting presentation handout can be found in ADAMS at ML081410440.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
As stated DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC Cy 2007\EOC Meeting Notices -
Letters/Davis-Besse EOC meeting Summary Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME GWright:dtp JCameron
- JLC for DATE 05/20/08 05/20/08 OFFICIAL RECORD COPY
Memo to FirstEnergy Nuclear Operating Company from J. Cameron dated May 20, 2008
SUBJECT:
SUMMARY
OF THE May 13, 2008, PUBLIC MEETING TO DISCUSS THE 2007 DAVIS-BESSE END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
TEB RAG1 TJW2 RidsNrrDirslpab JLC1 MAS KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 TXN
PUBLIC MEETING PRINCIPAL ATTENDEES May 13, 2008 FirstEnergy B. Allen, Site Vice President, Davis-Besse V. Kaminskas, Director, Site Operations, Davis-Besse D. Moul, Director, Site Engineering, Davis-Besse B. Boles, Director, Site Maintenance C. Price, Director, Site Performance Improvement Nuclear Regulatory Commission J. Cameron, Branch Chief J. Rutkowski, Senior Resident Inspector A. Wilson, Resident Inspector P. Chandrothl, Public Affairs Officer N. Keller, Resident Office Assistant Other Attendees J. Gannon, Office of U.S. Senator Sherrod Brown (OH)
C. Koebel, Ottawa County (Ohio) Commissioner S. Arndt, Ottawa County (Ohio) Commissioner J. Sass, President, Ottawa County (Ohio) Commissioners J. Witt, Ottawa County (Ohio) Administrator M. White, Ohio Emergency Management Agency Enclosure