ML13091A327: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13091A327
| number = ML13091A327
| issue date = 03/29/2013
| issue date = 03/29/2013
| title = 03/20/13 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities
| title = Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Lieb R
| addressee name = Lieb R
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352     March 29, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Generation, LLC Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 29, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Generation, LLC Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
-9760  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MARCH 20, 2013, PUBLIC MEETING TO DISCUSS THE DAVIS BESSE NUCLEAR POWER STATION STEAM GENERATOR REPLACEMENT ACTIVITI ES
OF THE MARCH 20, 2013, PUBLIC MEETING TO DISCUSS THE DAVIS BESSE NUCLEAR POWER STATION STEAM GENERATOR REPLACEMENT ACTIVITIES


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==
On March 20, 2013, the U. S. Nuclear Regulatory Commission (NRC) held a public meeting at the NRC Region III office located in Lisle, IL.
The meeting was between the NRC staff and First Energy Nuclear Operating Company (FENOC) representatives to discuss the licensee's activities pertaining to the replacement of the Davis Besse Nuclear Power Station (DBNPS) steam generators in order to facilitate planning of associated NRC inspection activities
. The NRC staff began the meeting with a discussion of the purpose, agenda, and format of the meeting. The licensee then provided a presentation of its completed, in
-progress, and future activities regarding the replacement of DBNPS's steam generators.
During the presentation, the licensee also discussed plans for removal and disposition of the existing DBNPS steam generators.
In addition, the licensee addressed in detail any applicable operating experience for the new replacement steam generators for DBNPS related to San Onofre Nuclear Generating Station (SONGS), Oconee, Arkansas Nuclear One
, as well as other nuclear power plants. The licensee provided information on the design differences between SONGS, Oconee and other steam generators and the DBNPS replacement steam generators.
The NRC staff asked the licensee questions throughout the licensee's presentation, including questions on the licensee's plans to evaluate the proposed changes to the steam generators to ensure the potential impacts of the changes are thoroughly addressed and the proper regulatory process is used.
R. Lieb      The licensee's presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.
Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned
. Sincerely,  /RA/  David E. Hills , Chief Engineering Branch 1 Division of Reacto r Safety Docket No. 50
-346  License No. NPF
-3 cc w/encl: Distribution via ListServ
Ž Enclosure 1: As stated PUBLIC MEETING PRINCIPAL ATTENDEES March 20, 2013 Davis Besse Nuclear Power Station L. Rushing, Director, DB Special Projects K. Byrd, Director, Site Engineering J. Hook, Manager, Design Engineering D. Petro, Manager, Steam Generator Replacement Project D. Noble, Manager, Site Radiation Protection S. Osting, Design Engineering Lead D. Gerren, Componen t Engineering Lead F. Swanger, Analysis Engineering H. Hegrat, First Energy Nuclear Licensing, Special Assignments Nuclear Regulatory Commission G. Shear, Director, Division of Reactor Safety, Region III D. Hills, Chief, Engineering Branch 1, Division of Reactor Safety, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III E. Sanchez Santiago, Reactor Inspector, Division of Reactor Safety, Region III N. Egan, Security Inspector, Division of Reactor Safety, Region III M. Holmberg, Reactor Inspector, Division of Reactor Safety, Region III V. Meghani, Reactor Inspector, Division of Reactor Safety, Region III J. Neurauter, Reactor Inspector, Division of Reactor Safety, Region III T. Go, Health Physics Inspector, Division of Reactor Safety, Region III J. Rutkowski, Project Engineer, Division of Reactor Projects, Region III J. Steffes, Reactor Engineer, Division of Reactor Projects, Region III V. Mitlyng, Public Affairs Officer, Office of Public Affairs, Region III A. Barker, Regional Government Liaison Officer, Region III H. Logaras, Regional Government Liaison Officer, Region III


R. Lieb     The licensee's presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.
On March 20, 2013, the U. S. Nuclear Regulatory Commission (NRC) held a public meeting at the NRC Region III office located in Lisle, IL. The meeting was between the NRC staff and First Energy Nuclear Operating Company (FENOC) representatives to discuss the licensees activities pertaining to the replacement of the Davis Besse Nuclear Power Station (DBNPS) steam generators in order to facilitate planning of associated NRC inspection activities.
The NRC staff began the meeting with a discussion of the purpose, agenda, and format of the meeting. The licensee then provided a presentation of its completed, in-progress, and future activities regarding the replacement of DBNPSs steam generators. During the presentation, the licensee also discussed plans for removal and disposition of the existing DBNPS steam generators. In addition, the licensee addressed in detail any applicable operating experience for the new replacement steam generators for DBNPS related to San Onofre Nuclear Generating Station (SONGS), Oconee, Arkansas Nuclear One, as well as other nuclear power plants. The licensee provided information on the design differences between SONGS, Oconee and other steam generators and the DBNPS replacement steam generators. The NRC staff asked the licensee questions throughout the licensees presentation, including questions on the licensees plans to evaluate the proposed changes to the steam generators to ensure the potential impacts of the changes are thoroughly addressed and the proper regulatory process is used.
 
R. Lieb                                     The licensees presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.
Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned.
Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned.
Sincerely, /RA/   David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50
Sincerely,
-346 License No. N PF-3 cc w/encl:
                                            /RA/
Distribution via ListServŽ DISTRIBUTION:
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl:     Distribution via ListServ' : As stated
John Cassidy RidsNrrDorlLpl3
-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa


Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak
PUBLIC MEETING PRINCIPAL ATTENDEES March 20, 2013 Davis Besse Nuclear Power Station L. Rushing, Director, DB Special Projects K. Byrd, Director, Site Engineering J. Hook, Manager, Design Engineering D. Petro, Manager, Steam Generator Replacement Project D. Noble, Manager, Site Radiation Protection S. Osting, Design Engineering Lead D. Gerren, Component Engineering Lead F. Swanger, Analysis Engineering H. Hegrat, First Energy Nuclear Licensing, Special Assignments Nuclear Regulatory Commission G. Shear, Director, Division of Reactor Safety, Region III D. Hills, Chief, Engineering Branch 1, Division of Reactor Safety, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III E. Sanchez Santiago, Reactor Inspector, Division of Reactor Safety, Region III N. Egan, Security Inspector, Division of Reactor Safety, Region III M. Holmberg, Reactor Inspector, Division of Reactor Safety, Region III V. Meghani, Reactor Inspector, Division of Reactor Safety, Region III J. Neurauter, Reactor Inspector, Division of Reactor Safety, Region III T. Go, Health Physics Inspector, Division of Reactor Safety, Region III J. Rutkowski, Project Engineer, Division of Reactor Projects, Region III J. Steffes, Reactor Engineer, Division of Reactor Projects, Region III V. Mitlyng, Public Affairs Officer, Office of Public Affairs, Region III A. Barker, Regional Government Liaison Officer, Region III H. Logaras, Regional Government Liaison Officer, Region III


DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress
R. Lieb                                                                    The licensees presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.
\Ltr 03     13 Davis
Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned.
-Besse Meeting Summary EMS.docx
Sincerely,
  -Publicly Available Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII           NAME ESanchezSantiago:ls DHills     DATE 03/29/13 03/29/13     OFFICIAL RECORD COPY}}
                                                                          /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl:                Distribution via ListServ' DISTRIBUTION:
John Cassidy RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 03 13 Davis-Besse Meeting Summary EMS.docx Publicly Available                        Non-Publicly Available                   Sensitive              Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                   RIII NAME               ESanchezSantiago:ls DHills DATE               03/29/13                               03/29/13 OFFICIAL RECORD COPY}}

Latest revision as of 14:45, 5 December 2019

Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities
ML13091A327
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/29/2013
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Lieb R
FirstEnergy Nuclear Generation
Elba Sanchez Santiago
References
Download: ML13091A327 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 29, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Generation, LLC Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

SUMMARY

OF THE MARCH 20, 2013, PUBLIC MEETING TO DISCUSS THE DAVIS BESSE NUCLEAR POWER STATION STEAM GENERATOR REPLACEMENT ACTIVITIES

Dear Mr. Lieb:

On March 20, 2013, the U. S. Nuclear Regulatory Commission (NRC) held a public meeting at the NRC Region III office located in Lisle, IL. The meeting was between the NRC staff and First Energy Nuclear Operating Company (FENOC) representatives to discuss the licensees activities pertaining to the replacement of the Davis Besse Nuclear Power Station (DBNPS) steam generators in order to facilitate planning of associated NRC inspection activities.

The NRC staff began the meeting with a discussion of the purpose, agenda, and format of the meeting. The licensee then provided a presentation of its completed, in-progress, and future activities regarding the replacement of DBNPSs steam generators. During the presentation, the licensee also discussed plans for removal and disposition of the existing DBNPS steam generators. In addition, the licensee addressed in detail any applicable operating experience for the new replacement steam generators for DBNPS related to San Onofre Nuclear Generating Station (SONGS), Oconee, Arkansas Nuclear One, as well as other nuclear power plants. The licensee provided information on the design differences between SONGS, Oconee and other steam generators and the DBNPS replacement steam generators. The NRC staff asked the licensee questions throughout the licensees presentation, including questions on the licensees plans to evaluate the proposed changes to the steam generators to ensure the potential impacts of the changes are thoroughly addressed and the proper regulatory process is used.

R. Lieb The licensees presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.

Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned.

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ' : As stated

PUBLIC MEETING PRINCIPAL ATTENDEES March 20, 2013 Davis Besse Nuclear Power Station L. Rushing, Director, DB Special Projects K. Byrd, Director, Site Engineering J. Hook, Manager, Design Engineering D. Petro, Manager, Steam Generator Replacement Project D. Noble, Manager, Site Radiation Protection S. Osting, Design Engineering Lead D. Gerren, Component Engineering Lead F. Swanger, Analysis Engineering H. Hegrat, First Energy Nuclear Licensing, Special Assignments Nuclear Regulatory Commission G. Shear, Director, Division of Reactor Safety, Region III D. Hills, Chief, Engineering Branch 1, Division of Reactor Safety, Region III J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III E. Sanchez Santiago, Reactor Inspector, Division of Reactor Safety, Region III N. Egan, Security Inspector, Division of Reactor Safety, Region III M. Holmberg, Reactor Inspector, Division of Reactor Safety, Region III V. Meghani, Reactor Inspector, Division of Reactor Safety, Region III J. Neurauter, Reactor Inspector, Division of Reactor Safety, Region III T. Go, Health Physics Inspector, Division of Reactor Safety, Region III J. Rutkowski, Project Engineer, Division of Reactor Projects, Region III J. Steffes, Reactor Engineer, Division of Reactor Projects, Region III V. Mitlyng, Public Affairs Officer, Office of Public Affairs, Region III A. Barker, Regional Government Liaison Officer, Region III H. Logaras, Regional Government Liaison Officer, Region III

R. Lieb The licensees presentation slides can be found at ML#13078A245 in the Agencywide Documents Access and Management System (ADAMS). A list of principal meeting attendees can be found in Enclosure 1.

Members of the public were given an opportunity to ask questions of the NRC staff before the meeting was adjourned.

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc w/encl: Distribution via ListServ' DISTRIBUTION:

John Cassidy RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 03 13 Davis-Besse Meeting Summary EMS.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ESanchezSantiago:ls DHills DATE 03/29/13 03/29/13 OFFICIAL RECORD COPY