ML19309C990: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:i
    )                          .
  .
TE: .NESE EE V ALLEY A UT'-iCRIT'r
:..a r w cc c e Tcw szz rw 716 Edney Building
                  *9
                    .
APR 0 31980 Mr. James P. O'Railly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 11
                                                                          -
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
 
==Dear Mr. O'Reilly:==
 
TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET No. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/8015 The enclosed report provides details concerning inadequate monitoring of pressure differential across steam generators. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.c.
Very truly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):
Director (3)
Of fice of Management Informatica and Program Control 88 S. Nucles; negulatory Connaission Ummhtneron. DC 70555 l
Director (40)                                                        ,
Office of Inspection and Enforcement                                  l
                                                                                  '
U.S. Nuclear Regulatory Commission                                    i Washington, DC 20555 Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 Mr. W. T. Cottle, NRC Inspector, Sequoyah                        09
                                                                              .s
                                                                            //
l l
i 8004000 t}}

Revision as of 02:49, 1 December 2019

Forwards LER 80-015/03L-0
ML19309C990
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/03/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309C991 List:
References
NUDOCS 8004090453
Download: ML19309C990 (1)


Text

i

) .

.

TE: .NESE EE V ALLEY A UT'-iCRIT'r

..a r w cc c e Tcw szz rw 716 Edney Building
  • 9

.

APR 0 31980 Mr. James P. O'Railly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 11

-

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET No. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/8015 The enclosed report provides details concerning inadequate monitoring of pressure differential across steam generators. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.c.

Very truly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Of fice of Management Informatica and Program Control 88 S. Nucles; negulatory Connaission Ummhtneron. DC 70555 l

Director (40) ,

Office of Inspection and Enforcement l

'

U.S. Nuclear Regulatory Commission i Washington, DC 20555 Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 Mr. W. T. Cottle, NRC Inspector, Sequoyah 09

.s

//

l l

i 8004000 t