{{#Wiki_filter:May 23, | {{#Wiki_filter:May 23, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 | ||
==SUBJECT:== | ==SUBJECT:== | ||
EXELON GENERATION COMPANY, LLC AND AMERGEN ENERGY COMPANY,LLC - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4098, MB4099, MB4105, MB4106, MB4112, MB4123, MB4124, MB4140, MB4141, MB4142, MB4143, MB4156, MB4161, MB4162, MB4169, MB4170, AND MB4189) | EXELON GENERATION COMPANY, LLC AND AMERGEN ENERGY COMPANY, LLC - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4098, MB4099, MB4105, MB4106, MB4112, MB4123, MB4124, MB4140, MB4141, MB4142, MB4143, MB4156, MB4161, MB4162, MB4169, MB4170, AND MB4189) | ||
==Dear Mr. Skolds:== | ==Dear Mr. Skolds:== | ||
On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an | On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating license for the Braidwood Station, Units 1 and 2; Byron Station, Units 1 and 2; Clinton Power Station; Dresden Nuclear Power Station, Units 2 and 3; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Oyster Creek Generating Station; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and Three Mile Island Nuclear Station, Unit 1 (TMI-1) to require compliance with the specified interim safeguards and security compensatory measures. The interim compensatory measures (ICMs) were listed in Attachment 2 to the Order. When issuing the Order, the Commission recognized that Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, but in light of the continuing generalized high-level threat environment, the Commission concluded that the security measures should be embodied in an Order consistent with the established regulatory framework. | ||
Section III.B of the Order required licensees to notify the Commission: | The Order required responses and actions within specified timeframes. Section III.A of the Order required licensees to immediately start implementation of the requirements listed in to the Order and to complete implementation no later than August 31, 2002. | ||
J. Skolds | Section III.B of the Order required licensees to notify the Commission: (1) if they are unable to comply with the requirements described in Attachment 2, (2) if compliance with any of the requirements is unnecessary in their specific circumstances, (3) if implementation of any of the requirements would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license, or (4) if implementation of any of the requirements described in would adversely impact the safe operation of the facility. Section III.C.1 of the Order required licensees to submit to the Commission, within 20 days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order. Section IV of the Order noted that in accordance with 10 C.F.R. § 2.202, the licensee must submit an answer to the Order and may request a hearing on the Order within 20 days of the date of the Order and, where good cause is shown, consideration would be given to extend the time to request a hearing. | ||
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters.The NRC staff has reviewed the response and finds that Exelon and AmerGen have | |||
J. Skolds In letters dated March 15, 2002, (letter nos. RS-02-055 and RS-02-056), Exelon and AmerGen submitted a response to the Orders for the aforementioned power plants. The letters are being treated as a request for an extension of time until June 20, 2002, to respond to ICMs B.2.a(1), | |||
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters. | |||
The NRC staff has reviewed the response and finds that Exelon and AmerGen have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2), | |||
B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1), | B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1), | ||
B.2.a(2), B.2.b and B.4.i.There are two instances in which the responses to ICMs are still under review. The first issue | B.2.a(2), B.2.b and B.4.i. | ||
The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response.The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require | There are two instances in which the responses to ICMs are still under review. The first issue is the response to ICM B.4.e which will require additional correspondence from you to resolve. | ||
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters.The NRC staff has reviewed the response and finds that Exelon and AmerGen have | The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response. | ||
The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require additional communication between the NRC and AmerGen staffs. Because there are the two unresolved issues for TMI-1, the staff will send a separate letter addressing the response to the Order for TMI-1. | |||
The NRC will determine the effectiveness of Exelons and AmerGens implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, Exelon and AmerGen are to report to the Commission when full compliance with the requirements described in Attachment 2 to the Order has been achieved. Furthermore, continued communications and review of the two open issues discussed above will not be a basis for an extension of, or relief from, the requirement to achieve full compliance with all requests of the Order no later than August 31, 2002. | |||
Please contact George Dick at 301-415-3019 if you have any other questions on these issues. | |||
Sincerely, | |||
/RA/ | |||
John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-461, 50-237, 50-249, 50-373, 50-374, 50-352, 50-353, 50-219, 50-277, 50-278, 50-254, 50-265, and 50-289 cc: See next page | |||
J. Skolds In letters dated March 15, 2002, (letter nos. RS-02-055 and RS-02-056), Exelon and AmerGen submitted a response to the Orders for the aforementioned power plants. The letters are being treated as a request for an extension of time until June 20, 2002, to respond to ICMs B.2.a(1), | |||
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters. | |||
The NRC staff has reviewed the response and finds that Exelon and AmerGen have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2), | |||
B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1), | B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1), | ||
B.2.a(2), B.2.b and B.4.i.There are two instances in which the responses to ICMs are still under review. The first issue | B.2.a(2), B.2.b and B.4.i. | ||
The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response.The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require | There are two instances in which the responses to ICMs are still under review. The first issue is the response to ICM B.4.e which will require additional correspondence from you to resolve. | ||
The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response. | |||
The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require additional communication between the NRC and AmerGen staffs. Because there are the two unresolved issues for TMI-1, the staff will send a separate letter addressing the response to the Order for TMI-1. | |||
The NRC will determine the effectiveness of Exelons and AmerGens implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, Exelon and AmerGen are to report to the Commission when full compliance with the requirements described in Attachment 2 to the Order has been achieved. Furthermore, continued communications and review of the two open issues discussed above will not be a basis for an extension of, or relief from, the requirement to achieve full compliance with all requests of the Order no later than August 31, 2002. | |||
Please contact George Dick at 301-415-3019 if you have any other questions on these issues. | |||
Sincerely, | |||
/RA/ | |||
John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-461, 50-237, 50-249, 50-373, 50-374, 50-352, 50-353, 50-219, 50-277, 50-278, 50-254, 50-265, and 50-289 cc: See next page DISTRIBUTION: See next page ADAMS Accession Number: ML021300216 *See previous concurrence OFFICE PD3-2/PM PD3-2/LA DLPM/PM IRSB/SC NSIR/SC SPSB DIPM NAME GDick CRosenberg RMartin* KGibson* AMadison* MRubin* WDean* | |||
DATE 05/22/02 05/28/02 05/21/02 05/14/02 05/15/02 05/17/02 05/20/02 OFFICE PDI-1/SC PDI-2 PDIII-2/SC PDI/PD PDIII/PD OGC DLPM/D NAME RLaufer* JClifford* AMendiola SRichards SBajwa JGoldberg* JZwolinski DATE 05/21/02 05/21/02 05/22/02 05/22/02 05/22/02 05/21/02 05/23/02 OFFICIAL RECORD COPY | |||
DISTRIBUTION: | |||
PUBLIC PD3-2 r/f S. Collins/J. Johnson B. Sheron W. Borchardt J. Zwolinski B. Boger S. Richards G. Tracy R. Laufer V. Ordaz G. Dick R. Martin S. Bajwa A. Mendiola R. Albert R. Sullivan V. Dricks J. Shea, EDO H. Miller, R-I B. Platchek, R-I R. Palla J. Belanger R. Crlenjak, R-I OGC ACRS SECY J. Dyer, R-III G. Grant, R-III M. Chawla J. Hopkins L. Rossbach W. Macon C. Gratton P. Tam J. Clifford J. Boska C. Lyon T.Colburn C. Rosenberg T. Harris S. Little M. OBrien | |||
Service List for ALL Exelon/AmerGen Plants Mr. John L. Skolds, President Exelon Nuclear Byron and Braidwood, Units 1 and 2 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 cc: Site Vice President - Byron Manager Licensing - Byron & Braidwood Exelon Generation Company, LLC Exelon Generation Company, LLC 4450 N. German Church Road 4300 Winfield Road Byron, IL 61010-9794 Warrenville, IL 60555 Byron Station Plant Manager Senior Counsel, Nuclear Exelon Generation Company, LLC Mid-West Regional Operating Group 4450 N. German Church Road Exelon Generation Company, LLC Byron, IL 61010-9794 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC Document Control Desk-Licensing 4450 N. German Church Road Exelon Generation Company, LLC Byron, IL 61010-9794 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Nuclear Services Exelon Generation Company, LLC Ms. C. Sue Hauser, Project Manager 4300 Winfield Road Westinghouse Electric Corporation Warrenville, IL 60555 Energy Systems Business Unit Post Office Box 355 Senior Vice President Pittsburgh, PA 15230 Mid-West Regional Operating Group Exelon Generation Company, LLC Joseph Gallo 4300 Winfield Road Gallo & Ross Warrenville, IL 60555 1025 Connecticut Ave., NW, Suite 1014 Washington, DC 20036 Vice President Mid-West Operations Support Howard A. Learner Exelon Generation Company, LLC Environmental Law and Policy 4300 Winfield Road Center of the Midwest Warrenville, IL 60555 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 Vice President - Licensing and Regulatory Affairs U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Byron Resident Inspectors Office 4300 Winfield Road 4448 N. German Church Road Warrenville, IL 60555 Byron, IL 61010-9750 Director Licensing Regional Administrator, Region III Mid-West Regional Operating Group U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC 801 Warrenville Road 4300 Winfield Road Lisle, IL 60532-4351 Warrenville, IL 60555 | |||
Byron/Braidwood (contd) Clinton Power Station, Unit 1 cc: | |||
Ms. Lorraine Creek Site Vice President - Braidwood RR 1, Box 182 Exelon Generation Company, LLC Manteno, IL 60950 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Chairman, Ogle County Board Post Office Box 357 Braidwood Station Manager Oregon, IL 61061 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Mrs. Phillip B. Johnson Braceville, IL 60407-9619 1907 Stratford Lane Rockford, IL 61107 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC George L. Edgar 35100 S. Rt. 53, Suite 84 Morgan, Lewis and Bockius Braceville, IL 60407-9619 1800 M Street, NW Washington, DC 20036-5869 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety Attorney General 1035 Outer Park Drive 500 S. Second Street Springfield, IL 62704 Springfield, IL 62701 Site Vice President - Clinton Power Station U.S. Nuclear Regulatory Commission AmerGen Energy Company, LLC Braidwood Resident Inspectors Office Clinton Power Station 35100 S. Rt. 53, Suite 79 RR 3, Box 228 Braceville, IL 60407 Clinton, IL 61727-9351 Illinois Emergency Management Clinton Power Station Plant Manager Agency AmerGen Energy Company, LLC Division of Disaster Assistance & Clinton Power Station Preparedness RR 3, Box 228 110 East Adams Street Clinton, IL 61727-9351 Springfield, IL 62701-1109 Regulatory Assurance Manager - Clinton Chairman AmerGen Energy Company, LLC Will County Board of Supervisors Clinton Power Station Will County Board Courthouse RR 3, Box 228 Joliet, IL 60434 Clinton, IL 61727-9351 Ms. Bridget Little Rorem Resident Inspector Appleseed Coordinator U.S. Nuclear Regulatory Commission 117 N. Linden Street RR #3, Box 229A Essex, IL 60935 Clinton, IL 61727 | |||
Clinton Power Station, Unit 1 (contd) LaSalle, Units 1 and 2 Dresden, Units 2 and 3 cc: | |||
R. T. Hill Chairman Licensing Services Manager Grundy County Board General Electric Company Administration Building 175 Curtner Avenue, M/C 481 1320 Union Street San Jose, CA 95125 Morris, IL 60450 Chairman of DeWitt County Site Vice President - LaSalle County Station c/o County Clerks Office Exelon Generation Company, LLC DeWitt County Courthouse 2601 North 21st Road Clinton, IL 61727 Marseilles, IL 61341-9757 J. W. Blattner Site Vice President - LaSalle Project Manager Exelon Generation Company, LLC Sargent & Lundy Engineers 22710 206th Avenue N. | |||
55 East Monroe Street Cordova, IL 61242-9740 Chicago, IL 60603 LaSalle County Station Plant Manager Site Vice President - Dresden Nuclear Power Exelon Generation Company, LLC Station 2601 North 21st Road Exelon Generation Company, LLC Marseilles, IL 61341-9757 6500 N. Dresden Road Morris, IL 60450-9765 LaSalle Nuclear Power Station Plant Manager Exelon Generation Company, LLC Dresden Nuclear Power Station 710 206th Avenue N. | |||
Plant Manager Cordova, IL 61242-9740 Exelon Generation Company, LLC 6500 N. Dresden Road Regulatory Assurance Manager - LaSalle Morris, IL 60450-9765 Exelon Generation Company, LLC 22710 206th Avenue N. | |||
Regulatory Assurance Manager - Dresden Cordova, IL 61242-9740 Exelon Generation Company, LLC 6500 N. Dresden Road Manager Licensing - Clinton and LaSalle Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road Dresden Resident Inspectors Office Warrenville, IL 60555 U.S. Nuclear Regulatory Commission 6500 N. Dresden Road U.S. Nuclear Regulatory Commission Morris, IL 60450-9766 LaSalle Resident Inspectors Office 2605 N. 21st Road Manager Licensing - Dresden & Quad Cities Marseilles, IL 61341-9756 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 | |||
LaSalle, Units 1 and 2 (contd) Limerick Generating Station, Units 1 and 2 cc: | |||
Phillip P. Steptoe, Esquire Sidley and Austin Senior Vice President One First National Plaza Mid-Atlantic Regional Operating Group Chicago, IL 60603 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Assistant Attorney General Kennett Square, PA 19348 100 W. Randolph St. Suite 12 Chicago, IL 60601 Vice President, Mid-Atlantic Operations Support Exelon Generation Company, LLC Chairman 200 Exelon Way, KSA 3-N LaSalle County Board Kennett Square, PA 19348 707 Etna Road Ottawa, IL 61350 Director - Licensing Mid-Atlantic Regional Operating Group Chairman Exelon Generation Company, LLC Illinois Commerce Commission Correspondence Control Desk 527 E. Capitol Avenue, Leland Building P.O. Box 160 Springfield, IL 62706 Kennett Square, PA 19348 Robert Cushing, Chief, Public Utilities Div. Illinois Manager Licensing - Limerick and Peach Bottom Attorney General's Office Exelon Generation Company, LLC 100 W. Randolph Street Nuclear Group Headquarters Chicago, IL 60601 Correspondence Control P.O. Box 160 Site Vice President Kennett Square, PA 19348 Limerick Generating Station Exelon Generation Company, LLC Vice President, General Counsel and Secretary P.O. Box 2300 Exelon Generation Company, LLC Sanatoga, PA 19464 300 Exelon Way Kennett Square, PA 19348 Limerick Generating Station Plant Manager Exelon Generation Company, LLC Correspondence Control Desk P.O. Box 2300 Exelon Generation Company, LLC Sanatoga, PA 19464 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Regulatory Assurance Manager Limerick Generating Station Regional Administrator, Region I Exelon Generation Company, LLC U.S. Nuclear Regulatory Commission P.O. Box 2300 475 Allendale Road Sanatoga, PA 19464 King of Prussia, PA 19406 | |||
Limerick, Units 1 and 2 (contd) Oyster Creek Nuclear Generating Station cc: | |||
Senior Resident Inspector Site Vice President U.S. Nuclear Regulatory Commission Oyster Creek Generating Station P.O. Box 596 AmerGen Energy Company, LLC Pottstown, PA 19464 P.O. Box 388 Forked River, NJ 08731 Chairman Board of Supervisors Oyster Creek Generating Station Plant of Limerick Township Manager 646 West Ridge Pike AmerGen Energy Company, LLC Linfield, PA 19468 P.O. Box 388 Forked River, NJ 08731 Chief-Division of Nuclear Safety PA Dept. of Environmental Resources Regulatory Assurance Manager - Oyster P.O. Box 8469 Creek Harrisburg, PA 17105-8469 AmerGen Energy Company, LLC P.O. Box 388 Library Forked River, NJ 08731 U.S. Nuclear Regulatory Commission Region I Kevin P. Gallen, Esquire 475 Allendale Road Morgan, Lewis, & Bockius LLP King of Prussia, PA 19406 1800 M Street, NW Washington, DC 20036-5869 Dr. Judith Johnsrud National Energy Committee Kent Tosch, Chief Sierra Club New Jersey Department of 433 Orlando Avenue Environmental Protection State College, PA 16803 Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 | |||
Oyster Creek (contd) Quad Cities, Units 1 and 2 Peach Bottom, Units 2 and 3 cc: | |||
J. Rogge, Region I Chief-Division of Nuclear Safety U.S. Nuclear Regulatory Commission PA Dept. of Environmental Protection 475 Allendale Road P.O. Box 8469 King of Prussia, PA 19406-1415 Harrisburg, PA 17105-8469 Manager Licensing - Oyster Creek and Board of Supervisors Three Mile Island Peach Bottom Township Exelon Generation Company, LLC 575 Broad Street Ext. | |||
Nuclear Group Headquarters Delta, PA 17314-9203 Correspondence Control P.O. Box 160 Mr. Richard McLean Kennett Square, PA 19348 Power Plant and Environmental Review Division Site Vice President Department of Natural Resources Peach Bottom Atomic Power Station B-3, Tawes State Office Building Exelon Generation Company, LLC Annapolis, MD 21401 1848 Lay Road Delta, PA 17314 Manager-Financial Control & Co-Owner Affairs Peach Bottom Atomic Power Station Plant Public Service Electric and Gas Company Manager P.O. Box 236 Exelon Generation Company, LLC Hancocks Bridge, NJ 08038-0236 1848 Lay Road Delta, PA 17314 Site Vice President - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Peach Bottom Exelon Generation Company, LLC Exelon Generation Company, LLC 22710 206th Avenue N. | |||
1848 Lay Road Cordova, IL 61242-9740 Delta, PA 17314 Quad Cities Nuclear Power Station Plant Resident Inspector Manager U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Peach Bottom Atomic Power Station 22710 206th Avenue N. | |||
P.O. Box 399 Cordova, IL 61242-9740 Delta, PA 17314 Regulatory Assurance Manager - Quad Cities Mr. Roland Fletcher Exelon Generation Company, LLC Department of Environment 22710 206th Avenue N. | |||
Radiological Health Program Cordova, IL 61242-9740 2400 Broening Highway Baltimore, MD 21224 | |||
Quad Cities, Units 1 and 2 (contd) Three Mile Island, Unit 1 cc: | |||
Quad Cities Resident Inspectors Office Chairman U.S. Nuclear Regulatory Commission Board of County Commissioners 22712 206th Avenue N. of Dauphin County Cordova, IL 61242 Dauphin County Courthouse Harrisburg, PA 17120 William D. Leech Manager - Nuclear Chairman MidAmerican Energy Company Board of Supervisors P.O. Box 657 of Londonderry Township Des Moines, IA 50303 R.D. #1, Geyers Church Road Middletown, PA 17057 Vice President - Law and Regulatory Affairs MidAmerican Energy Company Senior Resident Inspector (TMI-1) | |||
One River Center Place U.S. Nuclear Regulatory Commission 106 E. Second Street P.O. Box 219 P.O. Box 4350 Middletown, PA 17057 Davenport, IA 52808 David J. Allard, Director Chairman Bureau of Radiation Protection Rock Island County Board of Supervisors Pennsylvania Department of Environmental 1504 3rd Avenue Protection Rock Island County Office Bldg. P.O. Box 8469 Rock Island, IL 61201 Harrisburg, PA 17105 Site Vice President - Three Mile Island Nuclear Michael A. Schoppman Station Unit 1 Framatome ANP AmerGen Energy Company, LLC Suite 705 P. O. Box 480 1911 North Ft. Myer Drive Middletown, PA 17057 Rosslyn, VA 22209 Three Mile Island Nuclear Station Unit 1 Eric Epstein Plant Manager TMI Alert AmerGen Energy Company, LLC 4100 Hillsdale Road P. O. Box 480 Harrisburg, PA 17112 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057}} | |||
Cordova, IL | |||
Rock Island, IL |
Latest revision as of 05:21, 24 November 2019
ML021300216 | |
Person / Time | |
---|---|
Site: | Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle |
Issue date: | 05/23/2002 |
From: | Zwolinski J NRC/NRR/DLPM |
To: | Skolds J Exelon Generation Co, Exelon Nuclear |
Hopkins J, NRR/DLPM, 301-415-3027 | |
References | |
TAC MB4098, TAC MB4099, TAC MB4105, TAC MB4106, TAC MB4112, TAC MB4123, TAC MB4124, TAC MB4140, TAC MB4141, TAC MB4142, TAC MB4143, TAC MB4156, TAC MB4161, TAC MB4162, TAC MB4169, TAC MB4170, TAC MB4189 | |
Download: ML021300216 (11) | |
Text
May 23, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
EXELON GENERATION COMPANY, LLC AND AMERGEN ENERGY COMPANY, LLC - REPLY TO RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES (TAC NOS. MB4098, MB4099, MB4105, MB4106, MB4112, MB4123, MB4124, MB4140, MB4141, MB4142, MB4143, MB4156, MB4161, MB4162, MB4169, MB4170, AND MB4189)
Dear Mr. Skolds:
On February 25, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued an Order modifying the operating license for the Braidwood Station, Units 1 and 2; Byron Station, Units 1 and 2; Clinton Power Station; Dresden Nuclear Power Station, Units 2 and 3; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Oyster Creek Generating Station; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and Three Mile Island Nuclear Station, Unit 1 (TMI-1) to require compliance with the specified interim safeguards and security compensatory measures. The interim compensatory measures (ICMs) were listed in Attachment 2 to the Order. When issuing the Order, the Commission recognized that Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) have voluntarily and responsibly implemented additional security measures following the events of September 11, 2001, but in light of the continuing generalized high-level threat environment, the Commission concluded that the security measures should be embodied in an Order consistent with the established regulatory framework.
The Order required responses and actions within specified timeframes.Section III.A of the Order required licensees to immediately start implementation of the requirements listed in to the Order and to complete implementation no later than August 31, 2002.
Section III.B of the Order required licensees to notify the Commission: (1) if they are unable to comply with the requirements described in Attachment 2, (2) if compliance with any of the requirements is unnecessary in their specific circumstances, (3) if implementation of any of the requirements would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license, or (4) if implementation of any of the requirements described in would adversely impact the safe operation of the facility.Section III.C.1 of the Order required licensees to submit to the Commission, within 20 days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.Section IV of the Order noted that in accordance with 10 C.F.R. § 2.202, the licensee must submit an answer to the Order and may request a hearing on the Order within 20 days of the date of the Order and, where good cause is shown, consideration would be given to extend the time to request a hearing.
J. Skolds In letters dated March 15, 2002, (letter nos. RS-02-055 and RS-02-056), Exelon and AmerGen submitted a response to the Orders for the aforementioned power plants. The letters are being treated as a request for an extension of time until June 20, 2002, to respond to ICMs B.2.a(1),
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters.
The NRC staff has reviewed the response and finds that Exelon and AmerGen have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2),
B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1),
B.2.a(2), B.2.b and B.4.i.
There are two instances in which the responses to ICMs are still under review. The first issue is the response to ICM B.4.e which will require additional correspondence from you to resolve.
The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response.
The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require additional communication between the NRC and AmerGen staffs. Because there are the two unresolved issues for TMI-1, the staff will send a separate letter addressing the response to the Order for TMI-1.
The NRC will determine the effectiveness of Exelons and AmerGens implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, Exelon and AmerGen are to report to the Commission when full compliance with the requirements described in Attachment 2 to the Order has been achieved. Furthermore, continued communications and review of the two open issues discussed above will not be a basis for an extension of, or relief from, the requirement to achieve full compliance with all requests of the Order no later than August 31, 2002.
Please contact George Dick at 301-415-3019 if you have any other questions on these issues.
Sincerely,
/RA/
John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-461, 50-237, 50-249, 50-373, 50-374, 50-352, 50-353, 50-219, 50-277, 50-278, 50-254, 50-265, and 50-289 cc: See next page
J. Skolds In letters dated March 15, 2002, (letter nos. RS-02-055 and RS-02-056), Exelon and AmerGen submitted a response to the Orders for the aforementioned power plants. The letters are being treated as a request for an extension of time until June 20, 2002, to respond to ICMs B.2.a(1),
B.2.a(1), B.2.a(2), B.2.b and B.4.i and as a request for a comparable extension of time to file a request for hearing for those matters.
The NRC staff has reviewed the response and finds that Exelon and AmerGen have satisfied the 20-day reporting requirements of the Order, with the exception of ICMs B.2.a(1), B.2.a(2),
B.2.b, and B.4.i. An extension of time is hereby granted until June 20, 2002, for submission of the required response to the four remaining ICMs. An extension of time is hereby granted until June 20, 2002, for Exelon and AmerGen to file a request for hearing related to ICMs B.2.a(1),
B.2.a(2), B.2.b and B.4.i.
There are two instances in which the responses to ICMs are still under review. The first issue is the response to ICM B.4.e which will require additional correspondence from you to resolve.
The issue applies to each of the operating sites. We understand that you intend to submit such correspondence within several weeks. Accordingly, we will continue our review of the response to ICM B.4.e upon receipt of the supplemental response.
The second issue (B.1.c) applies to TMI-1 only. Resolution of the issue will require additional communication between the NRC and AmerGen staffs. Because there are the two unresolved issues for TMI-1, the staff will send a separate letter addressing the response to the Order for TMI-1.
The NRC will determine the effectiveness of Exelons and AmerGens implementation of the ICMs through on-site inspections. I would like to remind you that, pursuant to Section III.C.2 of the Order, Exelon and AmerGen are to report to the Commission when full compliance with the requirements described in Attachment 2 to the Order has been achieved. Furthermore, continued communications and review of the two open issues discussed above will not be a basis for an extension of, or relief from, the requirement to achieve full compliance with all requests of the Order no later than August 31, 2002.
Please contact George Dick at 301-415-3019 if you have any other questions on these issues.
Sincerely,
/RA/
John A. Zwolinski, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-461, 50-237, 50-249, 50-373, 50-374, 50-352, 50-353, 50-219, 50-277, 50-278, 50-254, 50-265, and 50-289 cc: See next page DISTRIBUTION: See next page ADAMS Accession Number: ML021300216 *See previous concurrence OFFICE PD3-2/PM PD3-2/LA DLPM/PM IRSB/SC NSIR/SC SPSB DIPM NAME GDick CRosenberg RMartin* KGibson* AMadison* MRubin* WDean*
DATE 05/22/02 05/28/02 05/21/02 05/14/02 05/15/02 05/17/02 05/20/02 OFFICE PDI-1/SC PDI-2 PDIII-2/SC PDI/PD PDIII/PD OGC DLPM/D NAME RLaufer* JClifford* AMendiola SRichards SBajwa JGoldberg* JZwolinski DATE 05/21/02 05/21/02 05/22/02 05/22/02 05/22/02 05/21/02 05/23/02 OFFICIAL RECORD COPY
DISTRIBUTION:
PUBLIC PD3-2 r/f S. Collins/J. Johnson B. Sheron W. Borchardt J. Zwolinski B. Boger S. Richards G. Tracy R. Laufer V. Ordaz G. Dick R. Martin S. Bajwa A. Mendiola R. Albert R. Sullivan V. Dricks J. Shea, EDO H. Miller, R-I B. Platchek, R-I R. Palla J. Belanger R. Crlenjak, R-I OGC ACRS SECY J. Dyer, R-III G. Grant, R-III M. Chawla J. Hopkins L. Rossbach W. Macon C. Gratton P. Tam J. Clifford J. Boska C. Lyon T.Colburn C. Rosenberg T. Harris S. Little M. OBrien
Service List for ALL Exelon/AmerGen Plants Mr. John L. Skolds, President Exelon Nuclear Byron and Braidwood, Units 1 and 2 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 cc: Site Vice President - Byron Manager Licensing - Byron & Braidwood Exelon Generation Company, LLC Exelon Generation Company, LLC 4450 N. German Church Road 4300 Winfield Road Byron, IL 61010-9794 Warrenville, IL 60555 Byron Station Plant Manager Senior Counsel, Nuclear Exelon Generation Company, LLC Mid-West Regional Operating Group 4450 N. German Church Road Exelon Generation Company, LLC Byron, IL 61010-9794 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC Document Control Desk-Licensing 4450 N. German Church Road Exelon Generation Company, LLC Byron, IL 61010-9794 4300 Winfield Road Warrenville, IL 60555 Senior Vice President, Nuclear Services Exelon Generation Company, LLC Ms. C. Sue Hauser, Project Manager 4300 Winfield Road Westinghouse Electric Corporation Warrenville, IL 60555 Energy Systems Business Unit Post Office Box 355 Senior Vice President Pittsburgh, PA 15230 Mid-West Regional Operating Group Exelon Generation Company, LLC Joseph Gallo 4300 Winfield Road Gallo & Ross Warrenville, IL 60555 1025 Connecticut Ave., NW, Suite 1014 Washington, DC 20036 Vice President Mid-West Operations Support Howard A. Learner Exelon Generation Company, LLC Environmental Law and Policy 4300 Winfield Road Center of the Midwest Warrenville, IL 60555 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 Vice President - Licensing and Regulatory Affairs U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Byron Resident Inspectors Office 4300 Winfield Road 4448 N. German Church Road Warrenville, IL 60555 Byron, IL 61010-9750 Director Licensing Regional Administrator, Region III Mid-West Regional Operating Group U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC 801 Warrenville Road 4300 Winfield Road Lisle, IL 60532-4351 Warrenville, IL 60555
Byron/Braidwood (contd) Clinton Power Station, Unit 1 cc:
Ms. Lorraine Creek Site Vice President - Braidwood RR 1, Box 182 Exelon Generation Company, LLC Manteno, IL 60950 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Chairman, Ogle County Board Post Office Box 357 Braidwood Station Manager Oregon, IL 61061 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Mrs. Phillip B. Johnson Braceville, IL 60407-9619 1907 Stratford Lane Rockford, IL 61107 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC George L. Edgar 35100 S. Rt. 53, Suite 84 Morgan, Lewis and Bockius Braceville, IL 60407-9619 1800 M Street, NW Washington, DC 20036-5869 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety Attorney General 1035 Outer Park Drive 500 S. Second Street Springfield, IL 62704 Springfield, IL 62701 Site Vice President - Clinton Power Station U.S. Nuclear Regulatory Commission AmerGen Energy Company, LLC Braidwood Resident Inspectors Office Clinton Power Station 35100 S. Rt. 53, Suite 79 RR 3, Box 228 Braceville, IL 60407 Clinton, IL 61727-9351 Illinois Emergency Management Clinton Power Station Plant Manager Agency AmerGen Energy Company, LLC Division of Disaster Assistance & Clinton Power Station Preparedness RR 3, Box 228 110 East Adams Street Clinton, IL 61727-9351 Springfield, IL 62701-1109 Regulatory Assurance Manager - Clinton Chairman AmerGen Energy Company, LLC Will County Board of Supervisors Clinton Power Station Will County Board Courthouse RR 3, Box 228 Joliet, IL 60434 Clinton, IL 61727-9351 Ms. Bridget Little Rorem Resident Inspector Appleseed Coordinator U.S. Nuclear Regulatory Commission 117 N. Linden Street RR #3, Box 229A Essex, IL 60935 Clinton, IL 61727
Clinton Power Station, Unit 1 (contd) LaSalle, Units 1 and 2 Dresden, Units 2 and 3 cc:
R. T. Hill Chairman Licensing Services Manager Grundy County Board General Electric Company Administration Building 175 Curtner Avenue, M/C 481 1320 Union Street San Jose, CA 95125 Morris, IL 60450 Chairman of DeWitt County Site Vice President - LaSalle County Station c/o County Clerks Office Exelon Generation Company, LLC DeWitt County Courthouse 2601 North 21st Road Clinton, IL 61727 Marseilles, IL 61341-9757 J. W. Blattner Site Vice President - LaSalle Project Manager Exelon Generation Company, LLC Sargent & Lundy Engineers 22710 206th Avenue N.
55 East Monroe Street Cordova, IL 61242-9740 Chicago, IL 60603 LaSalle County Station Plant Manager Site Vice President - Dresden Nuclear Power Exelon Generation Company, LLC Station 2601 North 21st Road Exelon Generation Company, LLC Marseilles, IL 61341-9757 6500 N. Dresden Road Morris, IL 60450-9765 LaSalle Nuclear Power Station Plant Manager Exelon Generation Company, LLC Dresden Nuclear Power Station 710 206th Avenue N.
Plant Manager Cordova, IL 61242-9740 Exelon Generation Company, LLC 6500 N. Dresden Road Regulatory Assurance Manager - LaSalle Morris, IL 60450-9765 Exelon Generation Company, LLC 22710 206th Avenue N.
Regulatory Assurance Manager - Dresden Cordova, IL 61242-9740 Exelon Generation Company, LLC 6500 N. Dresden Road Manager Licensing - Clinton and LaSalle Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road Dresden Resident Inspectors Office Warrenville, IL 60555 U.S. Nuclear Regulatory Commission 6500 N. Dresden Road U.S. Nuclear Regulatory Commission Morris, IL 60450-9766 LaSalle Resident Inspectors Office 2605 N. 21st Road Manager Licensing - Dresden & Quad Cities Marseilles, IL 61341-9756 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
LaSalle, Units 1 and 2 (contd) Limerick Generating Station, Units 1 and 2 cc:
Phillip P. Steptoe, Esquire Sidley and Austin Senior Vice President One First National Plaza Mid-Atlantic Regional Operating Group Chicago, IL 60603 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Assistant Attorney General Kennett Square, PA 19348 100 W. Randolph St. Suite 12 Chicago, IL 60601 Vice President, Mid-Atlantic Operations Support Exelon Generation Company, LLC Chairman 200 Exelon Way, KSA 3-N LaSalle County Board Kennett Square, PA 19348 707 Etna Road Ottawa, IL 61350 Director - Licensing Mid-Atlantic Regional Operating Group Chairman Exelon Generation Company, LLC Illinois Commerce Commission Correspondence Control Desk 527 E. Capitol Avenue, Leland Building P.O. Box 160 Springfield, IL 62706 Kennett Square, PA 19348 Robert Cushing, Chief, Public Utilities Div. Illinois Manager Licensing - Limerick and Peach Bottom Attorney General's Office Exelon Generation Company, LLC 100 W. Randolph Street Nuclear Group Headquarters Chicago, IL 60601 Correspondence Control P.O. Box 160 Site Vice President Kennett Square, PA 19348 Limerick Generating Station Exelon Generation Company, LLC Vice President, General Counsel and Secretary P.O. Box 2300 Exelon Generation Company, LLC Sanatoga, PA 19464 300 Exelon Way Kennett Square, PA 19348 Limerick Generating Station Plant Manager Exelon Generation Company, LLC Correspondence Control Desk P.O. Box 2300 Exelon Generation Company, LLC Sanatoga, PA 19464 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Regulatory Assurance Manager Limerick Generating Station Regional Administrator, Region I Exelon Generation Company, LLC U.S. Nuclear Regulatory Commission P.O. Box 2300 475 Allendale Road Sanatoga, PA 19464 King of Prussia, PA 19406
Limerick, Units 1 and 2 (contd) Oyster Creek Nuclear Generating Station cc:
Senior Resident Inspector Site Vice President U.S. Nuclear Regulatory Commission Oyster Creek Generating Station P.O. Box 596 AmerGen Energy Company, LLC Pottstown, PA 19464 P.O. Box 388 Forked River, NJ 08731 Chairman Board of Supervisors Oyster Creek Generating Station Plant of Limerick Township Manager 646 West Ridge Pike AmerGen Energy Company, LLC Linfield, PA 19468 P.O. Box 388 Forked River, NJ 08731 Chief-Division of Nuclear Safety PA Dept. of Environmental Resources Regulatory Assurance Manager - Oyster P.O. Box 8469 Creek Harrisburg, PA 17105-8469 AmerGen Energy Company, LLC P.O. Box 388 Library Forked River, NJ 08731 U.S. Nuclear Regulatory Commission Region I Kevin P. Gallen, Esquire 475 Allendale Road Morgan, Lewis, & Bockius LLP King of Prussia, PA 19406 1800 M Street, NW Washington, DC 20036-5869 Dr. Judith Johnsrud National Energy Committee Kent Tosch, Chief Sierra Club New Jersey Department of 433 Orlando Avenue Environmental Protection State College, PA 16803 Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731
Oyster Creek (contd) Quad Cities, Units 1 and 2 Peach Bottom, Units 2 and 3 cc:
J. Rogge, Region I Chief-Division of Nuclear Safety U.S. Nuclear Regulatory Commission PA Dept. of Environmental Protection 475 Allendale Road P.O. Box 8469 King of Prussia, PA 19406-1415 Harrisburg, PA 17105-8469 Manager Licensing - Oyster Creek and Board of Supervisors Three Mile Island Peach Bottom Township Exelon Generation Company, LLC 575 Broad Street Ext.
Nuclear Group Headquarters Delta, PA 17314-9203 Correspondence Control P.O. Box 160 Mr. Richard McLean Kennett Square, PA 19348 Power Plant and Environmental Review Division Site Vice President Department of Natural Resources Peach Bottom Atomic Power Station B-3, Tawes State Office Building Exelon Generation Company, LLC Annapolis, MD 21401 1848 Lay Road Delta, PA 17314 Manager-Financial Control & Co-Owner Affairs Peach Bottom Atomic Power Station Plant Public Service Electric and Gas Company Manager P.O. Box 236 Exelon Generation Company, LLC Hancocks Bridge, NJ 08038-0236 1848 Lay Road Delta, PA 17314 Site Vice President - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Peach Bottom Exelon Generation Company, LLC Exelon Generation Company, LLC 22710 206th Avenue N.
1848 Lay Road Cordova, IL 61242-9740 Delta, PA 17314 Quad Cities Nuclear Power Station Plant Resident Inspector Manager U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Peach Bottom Atomic Power Station 22710 206th Avenue N.
P.O. Box 399 Cordova, IL 61242-9740 Delta, PA 17314 Regulatory Assurance Manager - Quad Cities Mr. Roland Fletcher Exelon Generation Company, LLC Department of Environment 22710 206th Avenue N.
Radiological Health Program Cordova, IL 61242-9740 2400 Broening Highway Baltimore, MD 21224
Quad Cities, Units 1 and 2 (contd) Three Mile Island, Unit 1 cc:
Quad Cities Resident Inspectors Office Chairman U.S. Nuclear Regulatory Commission Board of County Commissioners 22712 206th Avenue N. of Dauphin County Cordova, IL 61242 Dauphin County Courthouse Harrisburg, PA 17120 William D. Leech Manager - Nuclear Chairman MidAmerican Energy Company Board of Supervisors P.O. Box 657 of Londonderry Township Des Moines, IA 50303 R.D. #1, Geyers Church Road Middletown, PA 17057 Vice President - Law and Regulatory Affairs MidAmerican Energy Company Senior Resident Inspector (TMI-1)
One River Center Place U.S. Nuclear Regulatory Commission 106 E. Second Street P.O. Box 219 P.O. Box 4350 Middletown, PA 17057 Davenport, IA 52808 David J. Allard, Director Chairman Bureau of Radiation Protection Rock Island County Board of Supervisors Pennsylvania Department of Environmental 1504 3rd Avenue Protection Rock Island County Office Bldg. P.O. Box 8469 Rock Island, IL 61201 Harrisburg, PA 17105 Site Vice President - Three Mile Island Nuclear Michael A. Schoppman Station Unit 1 Framatome ANP AmerGen Energy Company, LLC Suite 705 P. O. Box 480 1911 North Ft. Myer Drive Middletown, PA 17057 Rosslyn, VA 22209 Three Mile Island Nuclear Station Unit 1 Eric Epstein Plant Manager TMI Alert AmerGen Energy Company, LLC 4100 Hillsdale Road P. O. Box 480 Harrisburg, PA 17112 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057