ML20262H567
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
Initiation
Questions
| |
MONTHYEARML20262H5581973-12-14014 December 1973
[Table View]Details:1,2,17 & 21 Thru 27,32,33 & 34. Sheet 2 of 3 Project stage: Other ML20262H5611973-12-14014 December 1973 Details:3,13,19,24,28,35 & 36. Sheet 3 of 3 Project stage: Other ML20262H5551973-12-14014 December 1973 Watertight Door Assy. Sheet 1 of 3 Project stage: Other ML20262H5671975-06-18018 June 1975 4 Ft X 8 Ft Opening Lhrb Door & Frame Assembly. Sheet 1 of 3 Project stage: Other ML20262H5691975-06-18018 June 1975 Details 1 & 6. Sheet 2 of 3 Project stage: Other ML20262H5711975-06-18018 June 1975 Details 2,3,4 & 5. Sheet 3 of 3 Project stage: Other ML20054L8131982-07-0101 July 1982 Forwards Supplemental Responses to 10CFR50.48 & App R to 10CFR50 & Engineering Planning & Mgt,Inc Rept, DC Essential Cabinet Analysis, Per NRC 810220 Request (Generic Ltr 81-12) Project stage: Supplement ML20262H5631982-08-20020 August 1982 Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision Date Project stage: Other ML20070V7991983-02-14014 February 1983 Requests Meeting on or After 830329 W/Nrr to Appeal for Reconsideration of NRC Proposed Denial of App R Exemption Request.Addl Info Forthcoming to Clarify 820701 Submittal Project stage: Meeting ML20073S1721983-04-28028 April 1983 Clarifies Requests for Exemptions from 10CFR50.48 & App R Requirements in Response to NRC Request at 830330 Meeting. Rev to 820701 Response to Be Submitted by 830530 Project stage: Meeting ML20071H9241983-05-19019 May 1983 Submits Info on Compliance W/Branch Technical Position 9.5-1 Re Qualification of Fire Protection Engineers. Qualification Requirements Met Through Maint of Staff at Affiliated Svc Company,Southern Co Svcs,Inc Project stage: Other ML20263B9301983-08-18018 August 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 2 of 5 Project stage: Other ML20263B9271983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 3 of 5 Project stage: Other ML20263B9251983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 4 of 5 Project stage: Other ML20263B9321983-11-14014 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 1 of 5 Project stage: Other ML20082D3421983-11-16016 November 1983 Forwards Addl Info Justifying Three Requests for Exemption from 10CFR50.48 & App R as Discussed in 830330 Meeting.Rev to 820701 Response Will Be Submitted by 831130 Project stage: Meeting ML20082J7831983-11-30030 November 1983 Forwards Replacement Pages to Re Clarification of App R Exemption Requests,Reflecting Revised Sections of 820701 Response to 10CFR50.48 Project stage: Other ML20083D7541983-12-20020 December 1983 Forwards Revised Pages for Insertion Into 830701 Request for Exemption from 10CFR50.48 & 10CFR50,App R Requirements Re Sprinkler Head/Nozzle & Detector Placement Project stage: Request ML20083D7721983-12-21021 December 1983 Forwards Payment of Fee Required for Review of 810319 Submittal on Safe Alternate Shutdown & Request for Schedular Exemption from Installation of Emergency Lighting Project stage: Request ML20079P7121984-01-24024 January 1984 Submits Info Documenting Addl Considerations of Projected Phased Improvement in Fire Protection & Mitigating Factors for Areas Unmodified During Extended Implementation Period. Tentative Completion Dates for App R Mods Encl Project stage: Other ML20091B7331984-05-25025 May 1984 Notifies of Commitment to Meet on fire-area-by-fire-area Basis,Either Item 1 or 2 & 3 for Period of Time from Expiration of 10CFR50.48 Schedule Allowance Until Area Complies W/Paragraphs III.G.2 & III.G.3 of 10CFR50,App R Project stage: Other ML20197G5581984-06-0808 June 1984 Requests Addl Info on App R Implementation,Needed to Respond to 840525 Request for Schedular Exemption.Proposed Schedules Appear Acceptable Project stage: Approval ML20096F8121984-09-0404 September 1984 Requests Notification of Determination Re Acceptability of Kaowool as Fire Barrier Project stage: Other ML20096F8381984-09-0404 September 1984 Forwards Proposed Specific Compensatory Measures to Support 840525 Requested 10CFR50.48 Schedular Exemptions for nonoutage-related App R Mods,Per 840608 Request Project stage: Other ML20093E4111984-10-0202 October 1984 Proposes Establishment of Roving Fire Watch to Pass Through Listed Sections of Control & Reactor Bldgs as Compensatory Measures to Support Schedular Extension of App R Mods Project stage: Other ML20106D3531984-10-19019 October 1984 Requests Exemption from 10CFR50.48(c) to Allow Extension Until 861130 of Implementation Schedule for Listed App R Related Mods Which Can Be Implemented During Nonoutage Period Project stage: Other ML20107F1811984-10-26026 October 1984 Provides Basis for Request for Exemption from 10CFR50.48 Requirements Re Implementation of non-outage Related 10CFR50,App R Mods.Fire Protection Enhancement Program Cannot Be Implemented within Expected Time Frame Project stage: Request ML20101E3731984-12-20020 December 1984 Submits Specific Info Re Compensatory Measures for nonoutage-related App R Mods Not Completed within 10CFR50.48 Time Frame,In Support of 841002 Request for Extension of Schedule to Complete Listed Mods Project stage: Request ML20114B4181985-01-17017 January 1985 Responds to 850116 Order & Provides Rev to Interim Mitigation Factors for Nonoutage Related App R Mods,Per 850117 Telcon Project stage: Other 1983-04-28 |
ML20262H567 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 06/18/1975 |
From: | GEORGIA POWER CO., PRESRAY CORP. (SUBS. OF PAWLING RUBBER CORP.) |
To: | |
Shared Package | |
ML20065T836 | List: |
References | |
S-22558, TAC-43754, TAC-43755, TAC-47143, TAC-48071, TAC-48072, TAC-48748, TAC-48749, TAC-54802, TAC-54803, NUDOCS 8211030146 | |
Download: ML20262H567 (1) | |
Similar Documents at Hatch | |
---|---|
Category:DRAWINGS
MONTHYEARML20265F2201995-11-27027 November 1995
[Table view]Nitrogen Inerting System ISI Boundary Diagram ML20265F2691995-11-27027 November 1995 Nuclear Boiler System Sheet 2 ISI Boundary Diagram ML20265F2641995-11-27027 November 1995 Nuclear Boiler System Sheet 1 ISI Boundary Diagram ML20265F2601995-11-27027 November 1995 Standby Liquid Control System ISI Boundary Diagram ML20265F2571995-11-27027 November 1995 Primary Containment Integrated Leak Rate Test ISI Boundary Diagram ML20265F2521995-11-27027 November 1995 Primary Containment Purge & Inerting System ISI Boundary Diagram ML20265F2481995-11-27027 November 1995 Reactor Bldg & Radwaste Bldg Condensate Storage & Transfer System ISI Boundary Diagram ML20265F2431995-11-27027 November 1995 Reactor Building Demineralized Water System Diagram ISI Boundary Diagram ML20265F2381995-11-27027 November 1995 Reactor & Radwaste Buildings Service Air System Diagram ISI Boundary Diagram ML20265F2331995-11-27027 November 1995 Reactor Building Service Water System ISI Boundary Diagram ML20265F2291995-11-27027 November 1995 Reactor Building Closed Cooling Water System ISI Boundary Diagram ML20265F2241995-11-27027 November 1995 Fuel Pool Cooling System ISI Boundary Diagram ML20265F3731995-11-27027 November 1995 Reactor Protection System ISI Boundary Diagram ML20265F2151995-11-27027 November 1995 Diesel Generator 1B ISI Boundary Diagram ML20265F2121995-11-27027 November 1995 Diesel Engine & Skid System ISI Boundary Diagram ML20265F2101995-11-27027 November 1995 Service Water Piping Sheet 4 ISI Boundary Diagram ML20265F2041995-11-27027 November 1995 Service Water Piping Sheet 2 ISI Boundary Diagram ML20265F2011995-11-27027 November 1995 Main & Auxiliary Steam System Sheet 3 ISI Boundary Diagram ML20265F1961995-11-27027 November 1995 Main & Auxiliary Steam System Sheet 2 ISI Boundary Diagram ML20265F1911995-11-27027 November 1995 Service Water for Diesel Generator Sheet 2 ISI Boundary Diagram ML20265F1861995-11-27027 November 1995 Service Water Piping Sheet 1 ISI Boundary Diagram ML20265F1811995-11-27027 November 1995 Main & Aux Steam System Sheet 1 ISI Boundary Diagram ML20265F1791995-11-27027 November 1995 RHR Service Water Outside Building ISI Boundary Diagram ML20265F1721995-11-27027 November 1995 Service Water Piping at Intake Structure Sheet 1 ISI Boundary Diagram ML20265F2781995-11-27027 November 1995 Control Rod Drive System Sheet 2 ISI Boundary Diagram ML20265F3691995-11-27027 November 1995 Neutron Monitoring System ISI Boundary Diagram ML20265F3641995-11-27027 November 1995 RCIC System Sheet 2 ISI Boundary Diagram ML20265F3591995-11-27027 November 1995 RCIC System Sheet 1 ISI Boundary Diagram ML20265F3541995-11-27027 November 1995 HPCI System Sheet 2 ISI Boundary Diagram ML20265F3491995-11-27027 November 1995 HPCI System Sheet 1 ISI Boundary Diagram ML20265F3451995-11-27027 November 1995 Core Spray System ISI Boundary Diagram ML20265F3401995-11-27027 November 1995 RHR System Sheet 2 ISI Boundary Diagram ML20265F3351995-11-27027 November 1995 RHR System Sheet 1 ISI Boundary Diagram ML20265F3311995-11-27027 November 1995 Jockey Pump System ISI Boundary Diagram ML20265F3281995-11-27027 November 1995 Drywell Pneumatic System Sheet 2 ISI Boundary Diagram ML20265F3191995-11-27027 November 1995 Primary Containment Atmosphere H2 & O2 Analyzer System Sh 1 ISI Boundary Diagram ML20265F2741995-11-27027 November 1995 Control Rod Drive System Sheet 1 ISI Boundary Diagram ML20265F2821995-11-27027 November 1995 Reactor Recirculation System ISI Boundary Diagram ML20265F2871995-11-27027 November 1995 Torus Drainage & Purification System ISI Boundary Diagram ML20265F2911995-11-27027 November 1995 Nuclear Boiler System Sheet 3 ISI Boundary Diagram ML20265F2971995-11-27027 November 1995 Drywell to Torus Differential Pressure System ISI Boundary Diagram ML20265F2991995-11-27027 November 1995 Fission Products Monitoring System Sheet 1 ISI Boundary Diagram ML20265F3051995-11-27027 November 1995 Radwaste System Sheet 1 ISI Boundary Diagram ML20265F3101995-11-27027 November 1995 Reactor Water CLEAN-UP System Sheet 1 ISI Boundary Diagram ML20265F3141995-11-27027 November 1995 Drywell Valve & Equipment Drainage System ISI Boundary Diagram ML20265F3241995-11-27027 November 1995 Drywell Pneumatic System Sheet 1 ISI Boundary Diagram ML20260L2301990-01-0303 January 1990 Edwin I Hatch Nuclear Plant Unit No 2 Power Range Neutron Mon Sys 2C51B Elementary Diagram. Sheet 33 of 49.Rev Date Illegible ML20261L5351989-06-30030 June 1989 General Bldg Site Plan ML20265A7961986-09-30030 September 1986 Edwin I Hatch Nuclear Plant - Unit 1 Appendix 'R' Path 1 & Path 2 Raceways Diesel Gen 1A - Sections, as-built.Sheet 2 of 2 ML20265A8371986-08-13013 August 1986 Isometric of Unit II East Cableway 1995-11-27 Category:DRAWINGS-STRUCTURAL & CIVIL-APPLICANT'S MONTHYEARML20262H5631982-08-20020 August 1982
[Table view]Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision Date ML20262H5711975-06-18018 June 1975 Details 2,3,4 & 5. Sheet 3 of 3 ML20262H5691975-06-18018 June 1975 Details 1 & 6. Sheet 2 of 3 ML20262H5671975-06-18018 June 1975 4 Ft X 8 Ft Opening Lhrb Door & Frame Assembly. Sheet 1 of 3 ML20262H5611973-12-14014 December 1973 Details:3,13,19,24,28,35 & 36. Sheet 3 of 3 ML20262H5581973-12-14014 December 1973 Details:1,2,17 & 21 Thru 27,32,33 & 34. Sheet 2 of 3 ML20262H5551973-12-14014 December 1973 Watertight Door Assy. Sheet 1 of 3 1982-08-20 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20262H567&oldid=3215534"