ML20260G120
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
TAC:42916, (Open) | |
Initiation
Administration Questions
Results Other: ML13317A116, ML20133E838, ML20260G116, ML20260G120, ML20260G123, ML20261D620, ML20261D625, ML20261D627, ML20261D631, ML20261D634, ML20261D638, ML20261D641, ML20261D646, ML20261D649, ML20261D653, ML20261D658, ML20261D661, ML20261D666, ML20261D671, ML20261D674, ML20261D678, ML20261D683, ML20261D686, ML20261D691, ML20261D695, ML20261D700, ML20261D703, ML20261D706 | |
MONTHYEARML20260G1161965-06-17017 June 1965
[Table View]Fuel Storage Building Sections & Details. Sheet 1 Project stage: Other ML20260G1231965-08-20020 August 1965 Fuel Storage Building Section & Details. Sheet 7.Field Change Request & Drawing Change Notices Encl Project stage: Other ML20260G1201967-01-31031 January 1967 Fuel Storage Building Sections & Details. Sheet 4 Project stage: Other ML20261D6271980-10-30030 October 1980 Turbine Area Enclosure Wall Plan (Cont):I&E Bulletin 80-11 Details Project stage: Other ML20261D6661980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6711980-10-30030 October 1980 Fuel Storage Build (Sections):I&E Bulletin 80-11 Details Project stage: Other ML20261D6831980-10-30030 October 1980 Fuel Storage Building:I&E Bulletin 80-11 Details Project stage: Other ML20261D6861980-10-30030 October 1980 Ventilation Building Plan:I&E Bulletin 80-11 Details Project stage: Other ML20261D7001980-10-30030 October 1980 Reactor Auxiliary Building Storage Building (Sect & Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D7061980-10-30030 October 1980 Administration Building (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6201980-10-30030 October 1980 Block Wall Key Plan:I&E Bulletin 80-11 Details Project stage: Other ML20261D6251980-10-30030 October 1980 Turbine Area Enclosure Wall (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6311980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6381980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D7031980-10-30030 October 1980 Administration Building (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6951980-10-30030 October 1980 Reactor Auxiliary Building Storage Building (Plan & Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D6911980-10-30030 October 1980 Ventilation Building (Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D6781980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Project stage: Other ML20261D6741980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6611980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6581980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6531980-10-30030 October 1980 Fuel Storage Bldg (Elevs & Sects):I&E Bulletin 80-11 Details Project stage: Other ML20261D6491980-10-30030 October 1980 Fuel Storage Building (Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6461980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6411980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6341980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML13317A1161982-05-0707 May 1982 Forwards 23 Oversize Drawings Showing Safety & nonsafety- Related Items Attached to or in Proximity of Masonry Walls,In Response to NRC Request Re IE Bulletin 80-11, Masonry Wall Design. Aperture Cards Are Available in PDR Project stage: Other ML13324A5591985-02-15015 February 1985 Forwards Drawings Re Fuel Storage Bldg Connection Details, Per NRC 840905 & 06 Meetings Request Concerning Masonry Wall Test Program.W/Three Oversize Drawings.Aperture Cards Available in PDR Project stage: Meeting ML13324A6821985-07-26026 July 1985 Forwards Proprietary TER-C5506-405 Masonry Wall Design Southern California Edison Co,San Onofre Unit 1, Draft Technical Evaluation Rept.Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML20133E8381985-09-20020 September 1985 Forwards Application & Affidavit for Withholding Proprietary Info in Franklin Research Ctr Technical Evaluation Rept Concerning SEP Topic III-6, Seismic Design Considerations, from Public Disclosure (Ref 10CFR2.790) Project stage: Other ML13324A7761985-11-0707 November 1985 Forwards Safety Evaluation Re Util Submittal on SEP Topic III-6 on Seismic Reevaluation of Reinforced Concrete Masonry Walls at Facility,In Response to IE Bulletin 80-11. Sanitized Version of Technical Evaluation Rept Also Encl Project stage: Approval 1982-05-07 |
| ML20260G120 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/31/1967 |
| From: | BECHTEL GROUP, INC. |
| To: | SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13324A560 | List: |
| References | |
| CON-3246 568138-8, TAC-42916, NUDOCS 8502220242 | |
| Download: ML20260G120 (1) | |
Similar Documents at San Onofre | |
|---|---|
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260G120&oldid=3215628"