David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear David Rhoades:
In a telephone conversation on January 24, 2024, between Dimitri Mata, Lead Exam Author, and Gregory Roach, U.S. Nuclear Regulatory Commission (NRC) Senior Operations Engineer/Chief Examiner, arrangements were made for the administration of operator licensing examinations at LaSalle County Station during the weeks of September 23, 2024, and September 30, 2024. In addition, the NRC examination team will make an examination validation visit to the facility during the week of August 19, 2024.
As agreed, upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by April 26, 2024. The written examination outline was provided to your staff on August 23, 2023. The written examinations, operating tests, and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by July 1, 2024. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
January 24, 2024
D. Rhoades 2
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) Control Number 3150-0090) at least 60 days before the first examination date (if possible). Contact Gregory Roach to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB Control Number 3150-0090) and medical certifications (OMB Control Number 3150-0024) should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed by Gregory Roach when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering, and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by email to Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018),
Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; email: oira submission@omb.eop.gov.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB Control Number.
D. Rhoades 3
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be available electronically for public inspection through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Dimitri Mata has been advised of the policies and guidelines referenced in this letter. If you have any questions about the NRCs examination procedures and guidelines, please contact Gregory Roach at 630-829-9760 or me at 630-829-9587.
Sincerely, April M. Nguyen, Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Distribution via LISTSERV D. Lyga, Manager Operations Training Signed by Nguyen, April on 01/24/24
D. Rhoades 4
Letter to David P. Rhoades from April M. Nguyen dated January 24, 2024.
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:
Jeffrey Hamman RidsNrrDorlLpl3 RidsNrrPMLaSalle Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis Jared Heck Jefferson Clark R3-DORS Ikeda Betts Maryia Bahdanovich-Kniazkova ADAMS Accession Number: ML24024A133 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME GRoach:gmp ANguyen DATE 1/24/2024 1/24/2024 OFFICIAL RECORD COPY