ML23355A062

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
ML23355A062
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/18/2023
From: Henry D
Constellation Energy Generation
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CCN: 23-71
Download: ML23355A062 (5)


Text

SAFEGUARDS INFORMATION Constellation,.

CCN: 23-71 December 18, 2023.

10 CFR 50.90 10 CFR 50.54(p)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2, 3, and Independent Spent Fuel Storage Installation (ISFSI).

Subject:

Facility Operating License No. DPR-12 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR 56 NRC Docket Nos. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 23 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Constellation Energy Generation, LLC (CEG) is submitting Revision 23 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). This revision was implemented on December 18th, 2023. In accordance with 10 CFR 50.54(p)(2),

PBAPS is submitting this change within 60 days of implementation (i.e., no later than February 16th, 2024).

The PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program have been revised:

1. Figure 1: UpdatedNBS
2. Section 11; Compensatory Measures (refer to attachment 2)
3. Section 21; Compensatory Measures - NEI 03-12 (refer to attachment 2)

CEG has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. and Attachment 2 contain Safeguards Information. Therefore, CEG requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(1 )(i), and 10 CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1)(i).

SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 56°/

/lM5Jj_{;

/U/l (2..

{1/Vl.~'J

SAFEGUARDS INFORMATION

~** Constellation, U.S. Nuclear Regulatory Commission

  • December 18.,.2023 Page2 There are no commitments in this letter.

If you have any questions or require additional information, please contact Mr. Ray Moye Jr.,

Senior Manager Site. Security at 717-456-3025.

Respectfully,

  • .,'):..> --r,c~

David Henry Site Vice President Peacti Bottom Atomic Power Station Constellation Generation Company, LLC

  • Attachments: 1. Peach Bottom At0mic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 23 (Contains Safeguards*

Information) including Figures 1, 2, and 3 (Non-Safeguards Information)

2. SY-AA-1'01-104-F-03, Table of Clianges for Site Security Plan Change Submittals-(Contains Safeguards Information) cc:

Regional Administrator-NRC Region I w/attachments CCN: 21-95 SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

~

SAFEGUARDS INFORMATION

..&-**** Constellation.

U.S. Nuclear Regulatory Commission December 18,.2023

. Page 2 There are no commitments in this letter.

If you have any questions or require* additional information, please contact M,r. Ray Moye Jr.,

Senior Manager Site Security at 717-456-3025.

Respectfully, * *

~*-._.

    • ,i> '"#"~./

David Henry Site Vice President Peacti Bottom Atomic Power Station -

Constellation Generation Company, LLC *

  • Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training*and Qw:1lificati9n Plan, and Safeguards.Contingency Plan, antj lndepende.nt Spent Fuel Storage Installation Security Program, Revision 23 (Contains Safeguards*

Information) inclu_ding Figures 1, 2, and 3 (Non-Safeguards Information) 2~ SY-M-1'01-104.:F-03, Table of Ctianges for Site Security Plan Change Submittals-(Contains Safeguards Information) cc:

Regional Administrator - ~RC Region I w/attachments CCN: 21-95

  • SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic *Power *station Security Plan, Training and Qualification Plan, and* Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revisi~n 23 (Includes Figures 1, 2, and 3)

SAFEGUARDS INFORMATION ATTACHMENT t CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 2 Peach Bottom Atomic Power Station, Units_ 1, 2 and 3

  • Docket No. 50-171, 50-277, 50-278 and 72-29

.SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change _Silbmittals SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED *