ML20235Z696
| ML20235Z696 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/17/1975 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Williams J PORTLAND GENERAL ELECTRIC CO. |
| References | |
| TAC-01714, TAC-1714, NUDOCS 8710210266 | |
| Download: ML20235Z696 (3) | |
Text
3
,. &YY
).
g
,o Ng 8
JUN 17 ti75 OD A Dochet'No. 50-344 Portland General Electric Company ATIN:
Mr. Joe L. Williams Vice President, Engineering & Construction 521 Southwest Alder Street Portland, Oregon 97205 1
Gentlemen:
Amend:nents in Title 10, Chapter 1, Code of Federal Regulations, Part 50, concerning Appendix I which sets forth the Nuclear Regulatory Commission's decision regarding numerical guides for design. objectives and limiting conditions for operation to meet the criterion for "as lov as practicable" for radioactive materials in light-water-cooled
]
nuclear power reactors were published by the Commission on May 5, 1975, (40 FR 19439) and became effective on June 4, 1975.
Since your application for a permit to constructhojan.luclear Plant was filed prior to January 2,1971, you must submit to the Commission, within a period of twelve months from June 4, 1975:
' ^
+
1.
Such information as is necessary to evaluate the means employed for keeping radioactivity in effluents to un-restricted areas as low as practicable, including all such information as is required by. 50.34a (b) and (c) d not already contained in your application; and m.;;
125 2.
Plans and proposed ~ technical apccifications developed 95 for the purpose of keeping releases of radioactive materials to unrestricted areas during normal reactor operations. including c:tpected operational occurrences, an lov as practicable.
~he staf f is 'n the process of davoloping specific procedures which will jnclude conaldoration of the Appendin I nuidelines, and expects to have specific guidance available by September, 1973.
8710210266 750617 PDR ADOCK 05000344 P
. "a A w ' &
~
.n.~
,ep ba 0 4 #, M
...u.
m
.-eam s ee..a
I O
Portland General Electric Company 2
In the interim, we recommend that you develop information which would demonstrate that the design of the equipment installed to wiintain control over radioactive catorials in gaseous and liquid effluents expected to be produced during reactor operations will conform to the Appendix I guidelines.
\\.
Our request and schedule for spe'cific informtion will be sent g
to you after development of the specific review procedures. We believe that'the information referred to above.should be submitted as soon as feasible before June 4, 1976.
Sincerely, Daniel R. Muller, Assistant Director for Environmental Projects 7"
4 Division of Reactor I.icensing rM
~
cc:
(see attached list) 9 DISTRIBUTION:
Dockets (ENVIRON)
NRC PDR Local PDR' EP Branch Chiefs EP Licensing Assistants DRMuller ELD
~"
RDeYoung W! core KColler-
.:u,
.e RL:EP, j,
RL:E ELD RL:ADEP
,9, J.Scinto DR/jfffer EPM
\\
BranchCtpef N
.'y (3h 6-11-75 g,y y J
I 3..
O 8
Trojan Nuclear Plant ec:
Dr. Kelley Woods Nuclear and Thermal Energy Coordinator Oregon Nuclear and Thermal Energy Council 4263 Commercial, S. E.
Salem, Oregon 97310
\\
9 4
9 e
e
_ _ _....