| issue date = 03/03/2008
| issue date = 03/03/2008
| title = Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant (Report 05000333/2008001)
| title = Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant (Report 05000333/2008001)
| author name = Cobey E W
| author name = Cobey E
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name = Dietrich P T
| addressee name = Dietrich P
| addressee affiliation = Entergy Nuclear Northeast
| addressee affiliation = Entergy Nuclear Northeast
| docket = 05000333
| docket = 05000333
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 3, 2008 Mr. Peter Site Vice President
{{#Wiki_filter:rch 3, 2008


Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant
==SUBJECT:==
 
ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2008001)
Post Office Box 110
 
Lycoming, NY 13093
 
SUBJECT: ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2008001)


==Dear Mr. Dietrich,==
==Dear Mr. Dietrich,==
On February 13, 2008, the NRC staff completed its performance review of the  
On February 13, 2008, the NRC staff completed its performance review of the James A. FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
James A. FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators  
 
for the most recent quarter and inspection results for the period from January 1 through  
 
December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A
 
separate letter designated and marked as "Official Use Only - Security Information" will include
 
the security cornerstone review and resultant inspection plan.
 
Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first
 
three quarters of the assessment cycle, was within the Licensee Response column of the NRC's
 
Action Matrix, based on all inspection findings being classified as having very low safety
 
significance (Green) and all performance indicators indicating performance at a level requiring
 
no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process
 
baseline inspections at your facility. We also plan to conduct an inspection of your independent
 
spent fuel storage installation.
 
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of
 
any scheduling conflicts and personnel availability issues well in advance of inspector arrival
 
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
 
The inspections in the last nine months of the inspection plan are tentative and may be revised
 
at the mid-cycle review.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
 
enclosure will be made available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Avail able Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5171 with any
 
questions you may have regarding this letter or the inspection plan.
 
Sincerely,/RA/ Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects
 
Docket No. 50-333
 
License No. DPR-59
 
===Enclosure:===
FitzPatrick Inspection/ Activity Plan
 
cc w/encl:
 
G. Taylor, Chief Executive Officer, Entergy Operations
 
J. Wayne Leonard, Chairman & CEO, Entergy Operations
 
M. Kansler, President & CEO / CNO, Entergy Nuclear Operations, Inc.
 
J. Herron, Senior Vice President, Engineering Nuclear Operations, Entergy Operations
 
M. Balduzzi, Senior Vice President, Northeastern Regional Operations
 
Senior Vice President of Engineering and Technical Services
 
J. DeRoy, Vice President, Operations Support
 
K. Mulligan, General Manager, Plant Operations
 
O. Limpias, Vice President, Engineering (ENO)
 
J. Ventosa, General Manager, Engineering (ENO)
 
J. McCann, Director, Nuclear Safety and Licensing (ENO)
 
Manager, Licensing (ENO)
 
E. Harkness, Director of Oversight (ENO)
 
Director, Nuclear Safety Assurance
 
J. Costedio, Manager, Licensing


W. Dennis, Assistant General Counsel (ENO)
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.


P. Tonko, President and CEO, New York State Energy Research and Development Authority
Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process baseline inspections at your facility. We also plan to conduct an inspection of your independent spent fuel storage installation.


P. Eddy, New York State Department of Public Service
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.


P. Smith, President, New York State, Energy, Research, and Development Authority
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.


S. Lyman, Oswego County Administrator
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5171 with any questions you may have regarding this letter or the inspection plan.


Supervisor, Town of Scriba
Sincerely,
/RA/
Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 Enclosure: FitzPatrick Inspection/ Activity Plan cc w/encl:
G. Taylor, Chief Executive Officer, Entergy Operations J. Wayne Leonard, Chairman & CEO, Entergy Operations M. Kansler, President & CEO / CNO, Entergy Nuclear Operations, Inc.


C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
J. Herron, Senior Vice President, Engineering Nuclear Operations, Entergy Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations Senior Vice President of Engineering and Technical Services J. DeRoy, Vice President, Operations Support K. Mulligan, General Manager, Plant Operations O. Limpias, Vice President, Engineering (ENO)
J. Ventosa, General Manager, Engineering (ENO)
J. McCann, Director, Nuclear Safety and Licensing (ENO)
Manager, Licensing (ENO)
E. Harkness, Director of Oversight (ENO)
Director, Nuclear Safety Assurance J. Costedio, Manager, Licensing W. Dennis, Assistant General Counsel (ENO)
P. Tonko, President and CEO, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service P. Smith, President, New York State, Energy, Research, and Development Authority S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
}}
}}

Latest revision as of 20:02, 14 November 2019

Annual Assessment Letter - James A. FitzPatrick Nuclear Power Plant (Report 05000333/2008001)
ML080630118
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/03/2008
From: Cobey E
Reactor Projects Branch 2
To: Peter Dietrich
Entergy Nuclear Northeast
References
IR-08-001
Download: ML080630118 (7)


Text

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2008001)

Dear Mr. Dietrich,

On February 13, 2008, the NRC staff completed its performance review of the James A. FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.

Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process baseline inspections at your facility. We also plan to conduct an inspection of your independent spent fuel storage installation.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5171 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 Enclosure: FitzPatrick Inspection/ Activity Plan cc w/encl:

G. Taylor, Chief Executive Officer, Entergy Operations J. Wayne Leonard, Chairman & CEO, Entergy Operations M. Kansler, President & CEO / CNO, Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President, Engineering Nuclear Operations, Entergy Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations Senior Vice President of Engineering and Technical Services J. DeRoy, Vice President, Operations Support K. Mulligan, General Manager, Plant Operations O. Limpias, Vice President, Engineering (ENO)

J. Ventosa, General Manager, Engineering (ENO)

J. McCann, Director, Nuclear Safety and Licensing (ENO)

Manager, Licensing (ENO)

E. Harkness, Director of Oversight (ENO)

Director, Nuclear Safety Assurance J. Costedio, Manager, Licensing W. Dennis, Assistant General Counsel (ENO)

P. Tonko, President and CEO, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service P. Smith, President, New York State, Energy, Research, and Development Authority S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law