| title = 8/18/10, Summary of Telephone Conference Call Held Between the Usnrc and PG&E Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application
| title = 8/18/10, Summary of Telephone Conference Call Held Between the USNRC and PG&E Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application
| author name = Ferrer N B
| author name = Ferrer N
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 5
| page count = 5
| project =  
| project =  
| stage = Response to RAI
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 September 15,2010 LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 15,2010 LICENSEE:       Pacific Gas and Electric Company FACILITY:       Diablo Canyon Nuclear Power Plant, Units 1 and 2 SUB,JECT:      
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Nuclear Power Plant, Units 1 and 2 SUB,JECT:  


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORIVIATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORIVIATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
By letter dated July 7,2010, PG&E sent the staff a response to RAlletter dated June 14,2010, regarding aging management programs.
By letter dated July 7,2010, PG&E sent the staff a response to RAlletter dated June 14,2010, regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response. Enclosure 1 provides a listing of the participants. provides discussions on RAI responses for which the staff requested clarification.
The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response.
PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter.
Enclosure 1 provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Enclosure 2 provides discussions on RAI responses for which the staff requested clarification.
athaniel Ferrer, Project Manager Projects Branch 2 Division of license Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter. The applicant had an opportunity to comment on this summary. athaniel Ferrer, Project Manager Projects Branch 2 Division of license Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323  


==Enclosures:==
==Enclosures:==


As stated cc w/encls: Distribution via listserv TELEPHONE CONFERENCE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND LICENSE RENEWAL LIST OF AUGUST PARTICIPANTS Nate Ferrer Bart Fu Jim Gavula Dwight Diercks Philippe Soenen James Hill Chris Beard Dan Gibbons AI Saunders David Kunsemiller Rye Davis AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC) NRC NRC Argonne National Laboratory Pacific Gas and Electric Company (PG&E) PG&E PG&E PG&E Strategic Teaming And Resource Sharing (STARS) STARS STARS ENCLOSURE Diablo Canyon Nuclear Power Plant, Units 1 and License Renewal Request for Additional Information (Set Aging Management In its July 7, 2010, response to request for additional information (RAI) 82.1.16-2, the applicant described the details of the One-Time Inspection Program inspection techniques.
As stated cc w/encls: Distribution via listserv
However, the staff was not clear if the scope of the program has been defined to include eddy current testing of heat exchanger tubes in an environment comparable to the non-regenerative heat exchangers.
 
TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 18,2010 PARTICIPANTS                       AFFILIATIONS Nate Ferrer                       U.S. Nuclear Regulatory Commission (NRC)
Bart Fu                            NRC Jim Gavula                        NRC Dwight Diercks                    Argonne National Laboratory Philippe Soenen                    Pacific Gas and Electric Company (PG&E)
James Hill                        PG&E Chris Beard                        PG&E Dan Gibbons                        PG&E AI Saunders                        Strategic Teaming And Resource Sharing (STARS)
David Kunsemiller                  STARS Rye Davis                          STARS ENCLOSURE 1
 
Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information (Set 4)
Aging Management Programs RAI82.1.16-2 In its July 7, 2010, response to request for additional information (RAI) 82.1.16-2, the applicant described the details of the One-Time Inspection Program inspection techniques. However, the staff was not clear if the scope of the program has been defined to include eddy current testing of heat exchanger tubes in an environment comparable to the non-regenerative heat exchangers.
Discussion:
Discussion:
Pacific Gas & Electric Company agreed to supplement the response to RAI 82.1.16-2.
Pacific Gas & Electric Company agreed to supplement the response to RAI 82.1.16-2.
RAI 82.1.19-2 In its July 7, 2010, response to RAI B2.1.19-2, the applicant provided justification for the use of the ASME Code Class 1 Small-Bore Piping Program. However, the staff was unclear of the full history of failures in Class 1 small-bore piping. The staff was also unclear about the sampling size and methodology of the program. Discussion:
RAI 82.1.19-2 In its July 7, 2010, response to RAI B2.1.19-2, the applicant provided justification for the use of the ASME Code Class 1 Small-Bore Piping Program. However, the staff was unclear of the full history of failures in Class 1 small-bore piping. The staff was also unclear about the sampling size and methodology of the program.
Discussion:
The staff will issue a follow-up RAI to clarify the relevant plant-specific operating experience and the program's sampling size and methodology.
The staff will issue a follow-up RAI to clarify the relevant plant-specific operating experience and the program's sampling size and methodology.
ENCLOSURE September 15, 2010 LICENSEE:
ENCLOSURE 2
Pacific Gas and Electric Company FACILITY:
 
Diablo Canyon Nuclear Power Plant, Units 1 and 2  
September 15, 2010 LICENSEE:       Pacific Gas and Electric Company FACILITY:       Diablo Canyon Nuclear Power Plant, Units 1 and 2


==SUBJECT:==
==SUBJECT:==
Line 45: Line 50:
==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BE"TWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BE"TWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.
By letter dated July 7, 2010, PG&E sent the staff a response to RAlletter dated June 14, 2010, regarding aging management programs.
By letter dated July 7, 2010, PG&E sent the staff a response to RAlletter dated June 14, 2010, regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response. Enclosure 1 provides a listing of the participants. provides discussions on RAI responses for which the staff requested clarification.
The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response.
PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter.
Enclosure 1 provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Enclosure 2 provides discussions on RAI responses for which the staff requested clarification.
IRA!
PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter. The applicant had an opportunity to comment on this summary. IRA! Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323  
Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323


==Enclosures:==
==Enclosures:==


As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
See next page ADAMS Accession No.: ML 102390093 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR r;;M:RPB2:DLR NAME IKing NFerrer DWrona NFerrer DATE 9/01/10 9/02/10 9/10/10 9/15/10 OFFICIAL RECORD COpy Memorandum to Pacific Gas and Electric Company from N. Ferrer dated September 15.2010  
See next page ADAMS Accession No.: ML102390093 OFFICE     LA:DLR               PM:RPB2:DLR         BC:RPB2:DLR           r;;M:RPB2:DLR NAME       IKing                 NFerrer             DWrona                 NFerrer DATE       9/01/10             9/02/10             9/10/10               9/15/10 OFFICIAL RECORD COpy
 
Memorandum to Pacific Gas and Electric Company from N. Ferrer dated September 15.2010
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18. 2010. BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18.
HARD COPY: DLRRF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck. RIV TBrown. RI GMiller. RIV NO'Keefe, RIV ICouret. OPA VDricks. OPA WMaier, RIV JWeil.OCA EWilliamson, OGC SUttal,OGC RRihm, EDO}}
2010. BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck. RIV TBrown. RI GMiller. RIV NO'Keefe, RIV ICouret. OPA VDricks. OPA WMaier, RIV JWeil.OCA EWilliamson, OGC SUttal,OGC RRihm, EDO}}

Latest revision as of 15:02, 13 November 2019

8/18/10, Summary of Telephone Conference Call Held Between the USNRC and PG&E Concerning Responses to Requests for Additional Information Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application
ML102390093
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/15/2010
From: Ferrer N
License Renewal Projects Branch 2
To:
Pacific Gas & Electric Co
Ferrer, N B, NRR/DLR, 415-1045
References
Download: ML102390093 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 15,2010 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2 SUB,JECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORIVIATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated July 7,2010, PG&E sent the staff a response to RAlletter dated June 14,2010, regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response. Enclosure 1 provides a listing of the participants. provides discussions on RAI responses for which the staff requested clarification.

PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter.

The applicant had an opportunity to comment on this summary.

athaniel Ferrer, Project Manager Projects Branch 2 Division of license Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via listserv

TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 18,2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Bart Fu NRC Jim Gavula NRC Dwight Diercks Argonne National Laboratory Philippe Soenen Pacific Gas and Electric Company (PG&E)

James Hill PG&E Chris Beard PG&E Dan Gibbons PG&E AI Saunders Strategic Teaming And Resource Sharing (STARS)

David Kunsemiller STARS Rye Davis STARS ENCLOSURE 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information (Set 4)

Aging Management Programs RAI82.1.16-2 In its July 7, 2010, response to request for additional information (RAI) 82.1.16-2, the applicant described the details of the One-Time Inspection Program inspection techniques. However, the staff was not clear if the scope of the program has been defined to include eddy current testing of heat exchanger tubes in an environment comparable to the non-regenerative heat exchangers.

Discussion:

Pacific Gas & Electric Company agreed to supplement the response to RAI 82.1.16-2.

RAI 82.1.19-2 In its July 7, 2010, response to RAI B2.1.19-2, the applicant provided justification for the use of the ASME Code Class 1 Small-Bore Piping Program. However, the staff was unclear of the full history of failures in Class 1 small-bore piping. The staff was also unclear about the sampling size and methodology of the program.

Discussion:

The staff will issue a follow-up RAI to clarify the relevant plant-specific operating experience and the program's sampling size and methodology.

ENCLOSURE 2

September 15, 2010 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18, 2010, BE"TWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on August 18, 2010, to obtain clarification on the applicant's response to a request for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated July 7, 2010, PG&E sent the staff a response to RAlletter dated June 14, 2010, regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of PG&E's response. Enclosure 1 provides a listing of the participants. provides discussions on RAI responses for which the staff requested clarification.

PG&E will submit supplemental responses, as necessary, within 30 days of the issuance of this summary. Follow-up RAls, determined to be necessary, will be issued separately by a formal letter.

The applicant had an opportunity to comment on this summary.

IRA!

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No.: ML102390093 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR r;;M:RPB2:DLR NAME IKing NFerrer DWrona NFerrer DATE 9/01/10 9/02/10 9/10/10 9/15/10 OFFICIAL RECORD COpy

Memorandum to Pacific Gas and Electric Company from N. Ferrer dated September 15.2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 18.

2010. BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLRRF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck. RIV TBrown. RI GMiller. RIV NO'Keefe, RIV ICouret. OPA VDricks. OPA WMaier, RIV JWeil.OCA EWilliamson, OGC SUttal,OGC RRihm, EDO