February 20, 2019
Mr. James M. Welsch
Vice President Nuclear Generation
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000275/2019002, 05000323/2019002 AND
REQUEST FOR INFORMATION
Dear Mr. Welsch:
From April 8 to April 12, 2019, two inspectors from the U.S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Diablo Canyon Power Plant, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups. The first group (Section A
of the enclosure) identifies information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. The third group (Section C of
this enclosure) identifies the items which are necessary to close out the inspection and are
usually sent a few weeks after the team has left the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Amanda Sorenson of your regulatory
services organization. Our inspection dates are subject to change based on your updated
schedule of examination activities. If there are any questions about this inspection or the
material requested, please contact the lead inspector Nicholas Hernandez (832) 689-9928
(nicholas.hernandez@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
J. Welsch
2
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs "Agency Rules of Practice & Procedure," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-275,05-323
Enclosure:
Request for Information
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: NAH
Yes No
Publicly Available
Sensitive
OFFICE
SOE:OB
C:OB
NAME
NHernandez
GWerner
SIGNATURE
/RA/
/RA/
DATE
02/04/2019
02/13/2019
Enclosure
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
Inspection Report: 05000275/2019002, 05000323/2019002
Inspection Dates:
April 8 to April 12, 2019
Inspection Procedure:
IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector:
Nicholas Hernandez, Operations Engineer
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e. 2.02, 2.04, etc.). Requested materials should be sent either electronically or by
CD/DVD in order to arrive at the Region IV office no later than March 15, 2019. Do not
send USB flash drives.
Electronically:
To:
Nicholas.Hernandez@nrc.gov (lead inspector);
Cc:
Clyde.Osterholtz@nrc.gov (inspector)
CD/DVD:
To:
US Nuclear Regulatory Commission, Region IV
ATTN: Clyde Osterholtz
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
List of licensed operators (SRO & RO) by crew (operating & staff)
Training and Operations Department organization charts (with qualified LOR
evaluators identified)
Procedures that identify process for revising and maintaining LOR continuing training
program
List of outstanding LOR program changes
List of plant events and industry operating experience incorporated into LOR
program since last BRQ
Audits and/or self-assessment reports addressing the LOR training program
Last 2 years of simulator review committee (or equivalent) meeting minutes
Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
2
02.03: Biennial Requalification Written Examination Quality
The current and approved biennial written examination schedule
The current requalification cycle written examination results to date
All written examinations that have been approved for administration up to the date of
submittal. Include password protection if e-mailed or double envelope protection if
mailed per NUREG-1021.
The current requalification cycle examination methodology (sample plan)
02.04: Annual Requalification Operating Test Quality
The schedule for the operating tests to be given the week of April 8, , 2019
All operating tests (password protected) that have been approved for administration
up to and including the week of the onsite inspection
All 2019 NRC-required annual operating tests
Current requalification cycle operating test results
Current requalification cycle operating test methodology (sample plan)
List of time critical operator actions, including USAR references
02.05: Licensee Administration of Requalification Exams
All procedures used to administer the annual operating test
All procedures used to assess operator performance
All procedures that describe conduct of simulator training
All procedures used to test, operate, and maintain the simulator
02.06: Requalification Examination Security
Tracking tools used to prevent excessive overlap on the written examinations and
ensure sampling of required topics on a periodic basis
Tracking tools used to prevent excessive overlap on the operating tests and ensure
sampling of all required malfunctions (major events, instrument/component
malfunctions, TS calls, etc.) on a periodic basis.
All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
02.07: Licensee Remedial Training Program
List of remedial training conducted or planned since last biennial requalification
inspection (includes remedial training for exam failures and training to correct generic
or individual weaknesses observed during previous requalification exam cycle)
Remediation plans (lesson plans, reference materials, and final documentation)
02.08: Conformance with Operator License Conditions
All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
3
02.09: Simulator Performance
For the following cases, send the most recent transient test packages, which may be
electronic or in paper single test packages, and shall be complete with test
procedures for each test, the acceptance criteria, and results. For each transient
test, the reference chart should be included or an equivalent subject matter expert
review versus the simulator results with a write-up for any differences beyond the
ANSI 3.5 standard requirements.
o Transient test 3, Simultaneous closure of all main steam isolation valves
o Transient test 10, Slow primary system depressurization to saturated
condition with pressurizer relief or safety valve stuck open (inhibit activation of
high pressure emergency core cooling system)
o Steady State tests for low power test
- SBT packages for any three scenarios used for the 2018 annual requalification
operating test
All simulator management and configuration procedures if not already provided for
Section 02.05 above
Simulator discrepancy report (DR) summary list for all open DRs. For closed DRs,
summary list for those items closed between April 8, 2017
Two examples of primary parameters tested in order to verify core physics
parameters. The applicable reference graphs from the plant physics data book
(electronic or other means as available) should also be included as well as the test
procedures used and the acceptance criteria with results.
All simulator modification packages that are on hold, delayed, or just not completed
in the last 2-years
A list of simulator modification packages completed in the last 2-year window
02.10: Problem Identification and Resolution
A summary report of all condition reports related to licensed operator actions/errors
in the control room since April 8,2017
Any revised requalification training that was based on licensed operator performance
issues since April 8,, 2017
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on April 8, 2019.
02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality
All approved operating tests (password protected) to be administered subsequent to
the onsite inspection
All results up to the day the team leaves the site.
02.08: Conformance with Operator License Conditions
Access to licensed operators records
Access to licensed operators training attendance records
Access to licensed operators medical records
02.09: Simulator Performance
Simulator discrepancies reports (DRs) since April 8, 2017. This should include all
open and closed DRs, with documentation / justification for closure
4
Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
Documentation that validates current models, including the thermal-hydraulic and
neutronics models, to the actual plant
All current model deficiencies, including USAR vs design differences in the simulator
Summary list of plant modifications since April 8, 2017
Plant modifications (both hardware and software) incorporated onto the simulator
since April 8, 2017.
The complete book of all simulator annual performance test packages (either
hardcopy or electronic), complete with all transient tests, steady state tests, and
malfunction tests. This should also include the test procedures for each test, the
acceptance criteria, and results. For each transient test, the reference chart should
be included or an equivalent subject matter expert review versus the simulator
results with an analysis for any differences beyond the ANSI standard requirements
Simulator reactor core performance test packages used to verify core physics
parameters (ANSI/ANS 3.5 sections 3.4.3.3 / 4.4.3.3), including applicable reference
graphs from the plant physics data book, test procedures, acceptance criteria, and
results
All simulator test, configuration management, and related documents available in the
room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
Current copy of ANSI 3.5 standard you are committed to for simulator testing
02.10: Problem Identification and Resolution
All condition reports related to licensed operator actions/errors in the control room.
All condition reports from the last initial license exam
C. Diablo Canyon Power Plant is required to send the final results and any remaining
written exams and operating tests to the lead inspector for final review and
comparison against the significance determination tools in order to communicate the
exit results for the inspection. Report results in the format below:
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification examination
required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator scenario
failures).
3.a. Number of individual licensed operators who failed written exam
3.b. Number of individual licensed operators who failed JPM exam
3.c. Number of individual licensed operators who failed simulator
scenario exam individually
4. Divide line 3 by line 2 to obtain the individual requalification examination
failure rate.
%
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a)
5
6. Number of crews who performed unsatisfactorily on the simulator
scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate.
%
8. Describe the reason for each licensed operator who was not
administered an NRC-required requalification exam, or who did not pass an
administered requalification exam, and the stations plan to satisfy the
requalification exam requirement for each.