12/8/10 Summary of Telephone Conference Call Held Btw the USNRC and Pacific Gas and Electric Company Concerning Requests for Additional Information Response Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Ap
ML103560321
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/10/2011
From: Ferrer N
License Renewal Projects Branch 2
To:
Ferrer, N B, NRR/DLR, 415-1045
References
TAC ME2896, TAC ME2897
Download: ML103560321 (5)


Text

~p..1\ REGu( UNITED STATES i!!:~v" 'i~0'1' NUCLEAR REGULATORY COMMISSION

(; ~ WASHINGTON, D.C. 20555-0001

<I:

~

~

r;;

0 January 10, 2011 Y"/. £'

~<? ~o

        • i<

LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2 SUB..IECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2010, BETWEEN THE U.S. NUGLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on December 8, 2010, to obtain clarification on PG&E's response to the staff's requests for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated November 24, 2010, PG&E sent the staff its response to an RAI regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conf,erence call was useful in clarifying PG&E's response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on the RAI response for which the staff requested clarification.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Project Manager Projects Branch 2 Division o*f License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv

TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 8, 2010 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Cliff Doutt NRC Rui Li NRC Terry Grebel Pacific Gas and Electric Company (PG&E)

Sidney Bowen PG&E Miranda Tan PG&E ENCLOSURE 1

Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Request for Additional Information Aging Management Programs 82.1.26-3 In its November 24, 2010, response to RAI B2.1.26-3, the applicant provided additional details on how the Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Program will manage inaccessible low and medium voltage cables.

Discussion:

The staff was unclear why a 10-year inspection frequency was adequate. The staff was also unclear if the applicant had any cables at a voltage between 400-480V that are within the scope of license renewal. The applicant stated that it would revise its inspection frequency to once every 6 years; it had no in-scope cables at voltages between 400-480 V, and agreed to supplement its response to RAI B2.1.26-3 to address the staff's concerns.

In its response, the applicant stated that event-driven inspections are not performed because significant water ingress and retention in the in-scope pull boxes. The applicant stated that this is because the boxes are designed to drain down-hill toward plant structures/sumps, to automatic pump equipped sumps which pump to structure sumps. However, the staff was not clear on the details of the drainage system, or management of the sump pumps. The applicant agreed to supplement its response to RAI B2.1.26-3 to address the staff's concern.

ENCLOSURE 2

January 10, 2011 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E or the applicant) held a telephone conference call on December 8, 2010, to obtain clarification on PG&E's response to the staff's requests for additional information (RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application.

By letter dated November 24, 2010, PG&E sent the staff its response to an RAI regarding aging management programs. The staff reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying PG&E's response. Enclosure 1 provides a listing of the participants. Enclosure 2 provides discussions on the RAI response for which the staff requested clarification.

The applicant had an opportunity to comment on this summary.

IRA!

Nathaniel Ferrer, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No ..*ML103560321 *concurrence via e-mail OFFICE LA:DLR* PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SFigueroa NFerrer DWrona NFerrer DATE 12/27/10 01/05/11 01/07/11 01/10/11 OFFICIAL RECORD COpy

Memorandum to Pacific Gas and Electric Company for N. Ferrer dated January 10, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING REQUESTS FOR ADDITIONAL INFORMATION RESPONSE RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME2896 AND ME2897)

DISTRIBUTION:

HARDCOPY:

DLR RF E-MAil:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource NFerrer KGreen AStuyvenberg DWrona AWang MPeck, RIV TBrown, RI GMiller, RIV NO'Keefe, RIV ICouret, OPA VDricks, OPA WMaier, RIV JWeil,OCA EWiliiamson, OGC SUttal,OGC RRihm, EDO