Letter Sequence RAI |
---|
EPID:L-2020-LLA-0176, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System (Approved, Closed) |
|
MONTHYEARDCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Request ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G Project stage: RAI DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System Project stage: Response to RAI ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' Project stage: Response to RAI ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' Project stage: Request ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue Project stage: Request ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20231A6522020-08-24024 August 2020 Summary of Teleconference with Pacific Gas & Electric Company Regarding an Exigent Amendment Request to Modify Diablo Canyon Power Plant, Units 1 & 2, Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System EPID L-2020-LLA-017 Project stage: Meeting ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 Project stage: Other ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances Project stage: Approval ML20245E3952020-09-0303 September 2020 Transmittal Letter with Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other ML20245E3122020-09-0303 September 2020 Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other 2020-08-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mother'S for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21124A0612021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML21054A3112021-02-23023 February 2021 NRR E-mail Capture - Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements ML21012A4432021-01-12012 January 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML20328A3002020-11-23023 November 2020 Email from Cgnp to the NRC - Comment Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Dcdep Public Meeting - November 24, 2020 ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20239A9492020-08-26026 August 2020 (External Sender) E-Mail Comment by D. Lochbaum Regarding Diablo Canyon Unit 1 AFW System Piping ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue ML20234A2422020-08-20020 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20233A3222020-08-18018 August 2020 Comment (4) e-mail from D. Lochbaum Regarding Diablo Canyon Exigent LAR ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G 2023-08-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A2072024-01-24024 January 2024 Inservice Inspection Request for Information IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) ML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information ML23159A2382023-07-25025 July 2023 Request for Additional Information for the Technical Review of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2022-RNW-0007) ML23159A2372023-07-25025 July 2023 ISFSI Renewal RAI Transmittal Letter Enclosure ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23047A0062023-02-21021 February 2023 Request for Additional Information Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Public Version) ML23041A1862023-02-17017 February 2023 Request for Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - December 8, 2022, Public Meeting ML22258A1112022-09-14014 September 2022 2022 Diablo Canyon PIR Request for Information ML22200A2572022-07-19019 July 2022 Notification of In-service Inspection (Inspection Report 05000323/2022004) and Request for Information ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22152A1502022-06-21021 June 2022 Request for Additional Information Regarding License Amendment Request for Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22122A1412022-05-0505 May 2022 .02 Doc Request ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21363A1692021-12-29029 December 2021 Inservice Inspection Request for Information ML22019A0412021-12-29029 December 2021 RFI ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) ML19262G7482019-08-0909 August 2019 Request for Information ML19149A6012019-05-28028 May 2019 NRR E-mail Capture - Request for Additional Information (Supplemental) - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19123A2162019-05-0202 May 2019 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant -Request for Exemption from Operator Written Examination and Operating Test - Request for Additional Information ML19084A2572019-03-21021 March 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information ML17306A9382017-11-0202 November 2017 NRR E-mail Capture - Request for Additional Information - Request for Approval for Application of Full Weld Overlay REP-RHR-SWOL, Diablo Canyon Power Plant, Units 1 and 2 ML17152A3192017-06-0101 June 2017 NRR E-mail Capture - Request for Additional Information (RAI)- Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (CAC Nos. MF9386 Through MF9390) ML17102B6072017-04-12012 April 2017 NRR E-mail Capture - Request for Additional Information (RAI) - Revised Emergency Action Level Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16347A0032016-12-0909 December 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Diablo Canyon Power Plant License Amendment Request for Adoption of NEI 94-01 ML16326A3562016-11-21021 November 2016 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Adopt Nuclear Energy Institute (NEI) 94-01, Revision 2-A for Diablo Canyon Power Plant, Units 1 and 2 - CAC Nos. MF7731 and MF7732 ML16048A2322016-02-17017 February 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Met Data Second Round of Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 (TAC Nos. MF6399 and MF640 ML16011A3652016-02-0202 February 2016 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application - Set 39 (TAC Nos. ME2896 and ME2897) ML16011A3172016-01-11011 January 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 ML15358A0022015-12-23023 December 2015 Request for Additional Information Email (Follow-up Pra), Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15357A3822015-12-23023 December 2015 Request for Additional Information, Round 4 - Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review ML15287A1652015-10-23023 October 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review - SAMA ML15267A7742015-10-0101 October 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Evaluations ML15217A4812015-09-24024 September 2015 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application Set-38 TAC Nos. ME2896 and ME2897 ML15238B7742015-08-27027 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML15153A0332015-06-29029 June 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations 2024-01-24
[Table view] |
Text
From: Lee, Samson Sent: Friday, August 14, 2020 7:07 PM To: Richardson, Michael
Subject:
Diablo Canyon request for additional information: Exigent License Amendment Request for Application to provide a new Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G (EPID: L-2020-LLA-0176)
By letter dated August 12, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20225A303), Pacific Gas and Electric Company (PG&E or the licensee) requested changes to the Technical Specifications (Appendix A to Facility Operating License Nos. DPR 80 and DPR-
- 82) for the Diablo Canyon Nuclear Power Plant (Diablo Canyon), Units 1 and 2. The proposed amendments would avoid an unnecessary plant shutdown during the expected time needed to perform potential repairs to the Unit 1 auxiliary feedwater system (AFW) piping that PG&E conservatively anticipates may be identified during Diablo Canyon, Unit 1, Cycle 22, planned upcoming inspections to the AFW system. The NRC staff has reviewed the license amendment request (LAR) and determined that additional information is required to complete the review. The NRC staffs requests for additional information (RAIs) are listed below. The staff may have additional RAIs. The staff held a public teleconference call with PG&E on August 14, 20120, to discuss topics of these RAIs. The PG&E staff requested, and NRC agreed, to a RAI response by August 16, 2020.
The NRC staff considers that timely responses to RAIs help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. Please note that if you do not respond to this request by the agreed-upon date or provide an acceptable alternate date, we may deny your application for amendment under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108. If circumstances result in the need to revise the agreed upon response date, please contact me at (301) 415-3168 or via e-mail Samson.Lee@nrc.gov.
- 1. Corrosion: Please discuss:
- a. Material type of the auxiliary feedwater (AFW) piping (e.g., carbon steel)
- b. Degradation mechanism identified at Unit 2 (e.g., general corrosion)
- c. Corrosion at Unit 2 was on the internal or external surfaces?
- d. Corrosion at Unit 2 was at welds or piping?
- e. Are there any differences between the AFW piping at Units 1 and 2 in terms of material type, corrosion protection (i.e., coatings), or environment (e.g., time of wetness, potential for contaminants such as chlorides to accelerate corrosion)?
- f. Describe the locations of corrosion found in Unit 2 and plan for inspection in Unit 1.
- 2. Please identify the AFW piping design Code and the process that will be followed for the repair consistent with the Code requirements. Is the one-to-one repair/replacement method being utilize?
- 3. License amendment request (LAR), p.7 of 22, states that:
On July 23, 2020, with Diablo Canyon Unit 2 still in Mode 3, a 3.9 gallons per minute calculated through-wall leak was observed coming out of the elbow just downstream of Valve LCV-111 in the discharge line for Unit 2 AFW Pumps 2-1 and 2-2 to SG 2-2.
Describe the configuration of the valves and pumps, for example, which valve is downstream of Pump 2-1.
- 4. LAR, p.8 of 22, states that:
While in Condition G the steam generator (SG) 1-2 related technical specification (TS) required equipment will continue to remain operable.
Please explain what are the related TS required equipment.
- 5. LAR, p.9 of 22, states that Conditions B and GD are modified to add new Condition G as a Condition for which an inoperable Condition is applicable. Please verify the statement.
- 6. LAR p.10 states that:
Loss of Normal Feedwater Transient. The condition 2 event of loss of normal feedwater is addressed in the Final Safety Analysis Report Update (FSARU) Section 15.2.8. This transient is modeled with an assumed single failure of the turbine-driven pump, resulting in the remaining two motor-driven pumps operable and feeding all four SGs with a total of 600 gallons per minute (gpm) flow. The proposed possible isolation of AFW flow to SG 1-2 means that the AFW system will have three available AFW pumps, which can provide well above 600 gpm, but only to the three unaffected SGs. There is an additional FSARU analysis of the loss of normal feedwater transient in Section 6.5.3.7, termed a better-estimate analysis, that is done for AFW reliability demonstration. FSARU Section 6.5.3.7 notes that the FSARU Section 15.2.8 analysis has considerable margin when 4 SGs are credited, and that the better-estimate analysis shows successful event mitigation with just two SGs receiving a total of 390 gpm. Therefore, the proposed SG 1-2 isolation case, with three available SGs, is bounded by the FSARU Section 6.5.3.7 better-estimate case which only credits AFW flow to 2 SGs.
FSARU 6.5.3.7 states that:
A better-estimate analysis is performed to address the reliability of the AFW system. This analysis is similar to that described above for the Chapter 15 analysis, but assuming that only a single motor-driven AFW system pump supplies a minimum of 390 gpm to two of the four SGs.
The cases considered in this additional analysis assume better-estimate conditions for several key parameters, including initial power level, decay heat, reactor coolant system (RCS) temperature, pressurizer pressure, and low-low SG level reactor trip setpoint. The results of this better-estimate analysis demonstrate that there is margin to pressurizer over-filling. While this analysis demonstrates that the AFW system remains highly reliable, the Diablo Canyon licensing basis requires that at least two AFW pumps delivering at 600 gpm to four SGs is required for this event.
The staff requests the licensee to explain the bases that a better-estimate analysis (two DGs receiving 390 gpm) can be used to cover a licensing based event (four SGs receiving 600 gpm).
- 7. The licensee proposed a completion time (CT) of 7 days for TS 3.7.5 Condition G, One or two AFW trains inoperable in MODE 1, 2, or 3 due to inoperable AFW piping affecting the AFW flow path(s) to one steam generator, for Unit 1 during repair of AFW piping. The proposed Condition is modified by a note which identifies that the condition is only applicable to Unit 1 once during Unit 1 Cycle 22 during repair of AFW piping.
In the Enclosure of the LAR on pages 12-13, the licensee provides a list of risk management actions (RMAs) the licensee will implement during the TS 3.7.5 Condition G 7-day CT. It appears that part of the justification for the proposed temporary CTs relies on the RMAs listed in the Enclosure.
Provide further justification for the proposed note language, which does not currently mention the RMAs. Alternatively, consider rewording the proposed note language to indicate that the 7 day CT is contingent on implementation of the RMAs listed in the LAR.
In addition, clarify whether the identified risk management actions will be required to be in place for the duration of the extended completion time.
- 8. In the description of risk management actions, the LAR describes protecting certain equipment during the extended completion time. Clarify whether this includes preventing the protected equipment from being taken out of service for testing and maintenance activities.
- 9. The LAR proposes risk management actions (RMAs) based on insights from the probabilistic risk assessment (PRA) to be implemented during proposed TS 3.7.5 Condition G. These RMAs support the availability of AFW, feed and bleed, and main feedwater. The NRC staff identified additional actions that could potentially support the availability of these systems/functions, which are in alignment with the proposed RMAs in the LAR. Provide a justification for not including the following actions as RMAs in the LAR. Include in this justification, a discussion of relevant risk information associated with the proposed change (e.g., change in risk contribution or importance measures) and defense-in-depth related to system redundancy, independence and diversity. Alternatively, include these actions as RMAs in the LAR.
- Protect the supporting equipment of AFW Pumps 1-1 and 1-2,
- Protect supporting equipment of AFW values (e.g., power, air/nitrogen),
- Ensure the Power-Operated Relief Valves (PORV) block valves remain open to ensure feed-and-bleed availability,
- Protect the residual heat removal (RHR) pumps and centrifugal charging/intermediate head pumps to ensure feed-and-bleed availability,
- Protect RHR sump recirculation valves (and support systems) to ensure feed-and-bleed availability,
- Protect the steam-driven main feedwater pumps and the turbine to ensure feedwater availability.
- 10. The leak and degraded conditions on the Unit 2 AFW system were discovered on July 23rd. The staff is aware that the licensee has performed initial walkdown of Unit 1 AFW piping. The licensee had originally scheduled the Unit 1 AFW extent of condition inspection for the week of August 10th. The staff is aware that the current plan is to perform inspection the week of August
24th. Please discuss, from a safety perspective, why it is acceptable to wait two additional weeks, approximately one month after the Unit 2 leak, was identified?
Hearing Identifier: NRR_DRMA Email Number: 725 Mail Envelope Properties (DM8PR09MB618316FADED70A483A7CD7289A400)
Subject:
Diablo Canyon request for additional information: Exigent License Amendment Request for Application to provide a new Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G (EPID: L-2020-LLA-0176)
Sent Date: 8/14/2020 7:06:53 PM Received Date: 8/14/2020 7:06:53 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients:
"Richardson, Michael" <MJRm@pge.com>
Tracking Status: None Post Office: DM8PR09MB6183.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 9089 8/14/2020 7:06:53 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: