{{#Wiki_filter:UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PA OFFICIAL USIi ONLY August 31, 2010 EA-2010-143 Mr. Peter Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093 JAMES A. FITZPATRICK NUCLEAR POWER PLANT -NRC SPECIAL INSPECTION REPORT 05000333/2010403; PRELIMINARY GREATER THAN GREEN FINDINGS
{{#Wiki_filter:ust 31, 2010
 
==SUBJECT:==
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SPECIAL INSPECTION REPORT 05000333/2010403; PRELIMINARY GREATER THAN GREEN FINDINGS


==Dear Mr. Dietrich:==
==Dear Mr. Dietrich:==
On July 23,2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special Inspection at your James A. FitzPatrick Nuclear Power Plant. The enclosed report documents the inspection results, which were discussed on July 23, 2010, with Mr. Brian Sullivan, Plant Manager, and other members of your staff. The special inspection team examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The team reviewed selected procedures and records, observed activities, and interviewed personnel.
On July 23,2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special Inspection at your James A. FitzPatrick Nuclear Power Plant. The enclosed report documents the inspection results, which were discussed on July 23, 2010, with Mr. Brian Sullivan, Plant Manager, and other members of your staff.
 
The attached report documents findings (one or more) that have the potential for significance of greater than very low security significance (I.e., greater than Green as determined by the Baseline Security Significance Determination Process).
 
The number and nature of related violations is considered to be sensitive information, and is not included in this letter, but is described in the non-public enclosure.
 
The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the team arrived onsite. When separated from its Enclosure, this document is DECONTROLLED. SeCURITY ReLATeD INFORMATION SECURITY RELATED The finding(s)
had a cross-cutting aspect in the area of human performance because of insufficient training of personnel
[H.2.(b)].
If you disagree with the cross-cutting aspect assigned to this finding, you should provide a response within 30 days of the date of this report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Resident inspector at FitzPatrick Nuclear Power Plant. Before we make a final significance decision regarding our preliminary "greater than Green" finding(s),we are providing you an opportunity (1) to attend a Regulatory Conference where you can present to the NRC your perspective on the facts and the assumptions the NRC used to arrive at the finding(s)
and assess its significance, or (2) submit your position on the finding(s)
to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective.
 
If a Regulatory Conference is held, it will be closed for public observation because it involves sensitive security information.
 
If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and choose not to submit a written response, the NRC will proceed with its final significance determination.


Please be advised that the characterization of the performance deficiency described in the enclosed inspection report may change as a result of further NRC review. Please contact Mr. James Trapp of my staff at (610) 337-5186 within 10 business days of the date of your receipt of this letter to notify the NRC of your intentions.
The special inspection team examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The team reviewed selected procedures and records, observed activities, and interviewed personnel.


If we have not heard from you within 10 business days, we will continue with our significance determination and enforcement decision.
The attached report documents findings (one or more) that have the potential for significance of greater than very low security significance (I.e., greater than Green as determined by the Baseline Security Significance Determination Process). The number and nature of security related violations is considered to be sensitive information, and is not included in this letter, but is described in the non-public enclosure. The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the team arrived onsite.


Although the NRC has made a preliminary signi'ficance determination regarding the subject performance deficiency, and will make a final significance determination following a Regulatory Conference or a written response (if you choose either), enforcement for any apparent violation will be handled by separate correspondence at a later date. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room). However, bec.ause of the security-related information contained in the enclosure and in accordance with 10 CFR 2.390, a copy of this letter's enclosure and attachments will not be available for public inspection. SI!CURITY RELATED OFFICIAL USi ONLY SiCUR.TV RiLATiD INFORMATION In accordance with 10 CFR 2.390(b )(1 )(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
When separated from its Enclosure, this document is DECONTROLLED. SeCURITY ReLATeD INFORMATION The finding(s) had a cross-cutting aspect in the area of human performance because of insufficient training of personnel [H.2.(b)]. If you disagree with the cross-cutting aspect assigned to this finding, you should provide a response within 30 days of the date of this report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Resident inspector at FitzPatrick Nuclear Power Plant.


Darrell J. Robert, irector Division of Reac r Safety Docket No. 50-333 License No. DPR-59 Non-Public Enclosure:
Before we make a final significance decision regarding our preliminary "greater than Green" finding(s),we are providing you an opportunity (1) to attend a Regulatory Conference where you can present to the NRC your perspective on the facts and the assumptions the NRC used to arrive at the finding(s) and assess its significance, or (2) submit your position on the finding(s) to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will be closed for public observation because it involves sensitive security information. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and choose not to submit a written response, the NRC will proceed with its final significance determination. Please be advised that the characterization of the performance deficiency described in the enclosed inspection report may change as a result of further NRC review.
NRC Inspection Report No. 0500033312010403 Attachments:
Supplemental Information (Attachment A) Special Inspection Team Charter (Attachment B) Chronology of Events (Attachment C) cc wlencl: wIOUO-SRI:
J. LaPlante, Site Security Manager, FitzPatrick Station R. Frazier, Assistant Director, New York State Department of Homeland Security F. Murray, President
&CEO New York State Energy Research and Development Authority cc wlo encl: w/o OUO-SRI: Distribution via ListServ OFFICIAl.


USi ONLY SiCURITV RiLATIiD INFORMATION OFFICIAL USIi ONLY SIiCURITY RIiLATIiD INFORMATION P.
Please contact Mr. James Trapp of my staff at (610) 337-5186 within 10 business days of the date of your receipt of this letter to notify the NRC of your intentions. If we have not heard from you within 10 business days, we will continue with our significance determination and enforcement decision.


3 In accordance with 10 CFR 2.390(b)(1)(iO, the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2. 390(b)( 1).
Although the NRC has made a preliminary signi'ficance determination regarding the subject performance deficiency, and will make a final significance determination following a Regulatory Conference or a written response (if you choose either), enforcement for any apparent violation will be handled by separate correspondence at a later date.


Sincerely, IRA! Darrell J. Roberts, Director Division of Reactor Safety Docket No. License No. Non-Public Enclosure:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room). However, bec.ause of the security-related information contained in the enclosure and in accordance with 10 CFR 2.390, a copy of this letter's enclosure and attachments will not be available for public inspection. SI!CURITY RELATED INFORMATION
NRC Inspection Report No. 05000333/2010403 Attachments:
Supplemental Information (Attachment A) Special Inspection Team Charter (Attachment B) Chronology of Events (Attachment C) cc w/encl: w/OUO-SRI:
J. LaPlante, Site Security Manager, FitzPatrick Station R. Frazier, Assistant Director, New York State Department of Homeland Security F. Murray, President
& CEO New York State Energy Research and Development Authority cc wlo encl: wlo OUO-SRI: Distribution via ListServ SUNSI Review Complete:
bmy (Reviewers Initials)
ML102440661 Non-Public Designation Category:
MD 3.4 Non-Publlc A.3 DOCUMENT NAME: Y:\Division\DRS\Plant Support Branch 1\Security\2010 Draft OUOlnspection Report\Fitz\Fitz
'SIT\2010 Fitz SIT JUL 23 403 Rev6.docx After declaring this document "An Official Agency Record" it will be released to the Public (Letter only). T I t s document, Indicate i n the box; * = COpy without attachment/enclosure "e"C 02l'wit attachment/enclosure
..N" o rece ve a copy 0hi "C' == . h =No copy OFFICE RIIDRS I RI/DRS I RIIDRS I RIIDRS/SRA I RIIDRP I NAME DCaron/DCC*
JCherubini/dcc JTrapp/JMT*
WSchmidtlcgc for* MGray/BB for* for* DATE 08/11/10 08/12110 08/17/10 08/12/10 08/17/10 RIIORAI RIIRC** I HO/OE I HO/NRR I RIIDRS I DHolody/aed for* KFarrarl DFurstlvia email** MAsh ley/via DATE 08/19/10 081 110 08/20/10 08/20/10 OFFICIAL RECORD *see previous concurrence **via email to ADeFrancisco SECURITY RlibATED INFORMATION OFFICIAL USE! ONLY SE!CURITY RELATED Distribution wlo encl; wlo OUO-SRI: SECY CA OEMAIL OEWEB W. Borchardt.


EDO M. Virgilio.
OFFICIAL USi ONLY SiCUR.TV RiLATiD INFORMATION In accordance with 10 CFR 2.390(b )(1 )(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


DE DR L. Trocine, OEDO R. Zimmerman, OE L. Sreenivas, OE A. Campbell, OE N. Hilton, OE M. Ashley, OE L. Lopez,OE N. Hasan, OE E. Leeds, NRR J. Grobe, NRR B. Boger. NRR J. Wiggins, NSIR W. Dean, NSIR P. Holahan, NSIR B. Westrelch, Enforcement Coordinators RII, Rill, RIV (C Evans, S. Orth, W. C. Scott, OGC E. Hayden, C. McCrary, 01 S. Tltherlngton-Buda, OCFO M. Williams, OCFO D. ScrencVN.
Darrell J. Robert, irector Division of Reac r Safety Docket No. 50-333 License No. DPR-59 Non-Public Enclosure: NRC Inspection Report No. 0500033312010403 Attachments: Supplemental Information (Attachment A)
Special Inspection Team Charter (Attachment B)
Chronology of Events (Attachment C)
cc wlencl: wIOUO-SRI:
J. LaPlante, Site Security Manager, FitzPatrick Station R. Frazier, Assistant Director, New York State Department of Homeland Security F. Murray, President & CEO New York State Energy Research and Development Authority cc wlo encl: w/o OUO-SRI: Distribution via ListServ OFFICIAl. USi ONLY SiCURITV RiLATIiD INFORMATION


Sheehan, RI M. Dapas, Acting RA (R1 ORAMAIL RESOURCE)
OFFICIAL USIi ONLY SIiCURITY RIiLATIiD INFORMATION
D. Lew, Acting DRA (R10RAMAIL RESOURCE)
J. Clifford, DRP (R1DRPMAIL RESOURCE)
D. Collins, DRP (R1DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMail RESOURCE)
P. Wilson, DRS (R1DRSMall RESOURCE)
M. Gray, DRP B. Bickett, DRP S. McCarver, DRP E. Knutson, DRP. SRI S. Rutenkroger, DRP, RI K. Kolek, Resident OA D. Bearde, DRS RidsNrrPMFltzPatrick Resource RldsNrrDorlLpl1-1 Resource M. Emstes, DRS, RfJ E. Duncan, DRS, Rill M. Shannon, DRS, RIV ROPreports Resource@nrc.gov K. Farrar, RI D. Holody, RI A. DeFrancisco, RI M. McLaughlin C. O'Danlell, RI R1DRPMailResource Region I OE Files (with concurrences)
Distribution wlencl w/OUO-SRI:
D. Caron, DRS J. Cherubini, DRS J. Trapp, DRS G. Hunegs -Senior Resident Inspector R. Albert, NSIR S. Coker, NSIR OFFICIAL USE ONL.Y SECURITY RELATED
}}
}}

Latest revision as of 13:52, 13 November 2019

IR 05000333-10-403, on 05/12/2010 - 07/23/2010; James A. FitzPatrick Nuclear Power Plant; Inspection Procedure 93812, Special Inspection; Access Control, Without OUO, Dated August 31, 2010
ML102440661
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/31/2010
From: Darrell Roberts
Division of Reactor Safety I
To: Peter Dietrich
Entergy Nuclear Northeast
Roberts D
References
EA-2010-143 IR-10-403
Download: ML102440661 (5)


Text

ust 31, 2010

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SPECIAL INSPECTION REPORT 05000333/2010403; PRELIMINARY GREATER THAN GREEN FINDINGS

Dear Mr. Dietrich:

On July 23,2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special Inspection at your James A. FitzPatrick Nuclear Power Plant. The enclosed report documents the inspection results, which were discussed on July 23, 2010, with Mr. Brian Sullivan, Plant Manager, and other members of your staff.

The special inspection team examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The team reviewed selected procedures and records, observed activities, and interviewed personnel.

The attached report documents findings (one or more) that have the potential for significance of greater than very low security significance (I.e., greater than Green as determined by the Baseline Security Significance Determination Process). The number and nature of security related violations is considered to be sensitive information, and is not included in this letter, but is described in the non-public enclosure. The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the team arrived onsite.

When separated from its Enclosure, this document is DECONTROLLED. SeCURITY ReLATeD INFORMATION The finding(s) had a cross-cutting aspect in the area of human performance because of insufficient training of personnel [H.2.(b)]. If you disagree with the cross-cutting aspect assigned to this finding, you should provide a response within 30 days of the date of this report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Resident inspector at FitzPatrick Nuclear Power Plant.

Before we make a final significance decision regarding our preliminary "greater than Green" finding(s),we are providing you an opportunity (1) to attend a Regulatory Conference where you can present to the NRC your perspective on the facts and the assumptions the NRC used to arrive at the finding(s) and assess its significance, or (2) submit your position on the finding(s) to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will be closed for public observation because it involves sensitive security information. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and choose not to submit a written response, the NRC will proceed with its final significance determination. Please be advised that the characterization of the performance deficiency described in the enclosed inspection report may change as a result of further NRC review.

Please contact Mr. James Trapp of my staff at (610) 337-5186 within 10 business days of the date of your receipt of this letter to notify the NRC of your intentions. If we have not heard from you within 10 business days, we will continue with our significance determination and enforcement decision.

Although the NRC has made a preliminary signi'ficance determination regarding the subject performance deficiency, and will make a final significance determination following a Regulatory Conference or a written response (if you choose either), enforcement for any apparent violation will be handled by separate correspondence at a later date.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room). However, bec.ause of the security-related information contained in the enclosure and in accordance with 10 CFR 2.390, a copy of this letter's enclosure and attachments will not be available for public inspection. SI!CURITY RELATED INFORMATION

OFFICIAL USi ONLY SiCUR.TV RiLATiD INFORMATION In accordance with 10 CFR 2.390(b )(1 )(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Darrell J. Robert, irector Division of Reac r Safety Docket No. 50-333 License No. DPR-59 Non-Public Enclosure: NRC Inspection Report No. 0500033312010403 Attachments: Supplemental Information (Attachment A)

Special Inspection Team Charter (Attachment B)

Chronology of Events (Attachment C)

cc wlencl: wIOUO-SRI:

J. LaPlante, Site Security Manager, FitzPatrick Station R. Frazier, Assistant Director, New York State Department of Homeland Security F. Murray, President & CEO New York State Energy Research and Development Authority cc wlo encl: w/o OUO-SRI: Distribution via ListServ OFFICIAl. USi ONLY SiCURITV RiLATIiD INFORMATION

OFFICIAL USIi ONLY SIiCURITY RIiLATIiD INFORMATION