ML102660135: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML102660135 | |||
| issue date = 09/22/2010 | |||
| title = IR 05000461-10-003, 08/03/2010, & 09/01/2010 - 09/02/2010, Acknowledgment of Three Disputed Violations - Clinton Power Station | |||
| author name = Ring M | |||
| author affiliation = NRC/RGN-III/DRP/B1 | |||
| addressee name = Pacilio J | |||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | |||
| docket = 05000461 | |||
| license number = NPF-062 | |||
| contact person = | |||
| case reference number = ea-10-185, ea-10-186, ea-10-187 | |||
| document report number = IR-10-003 | |||
| document type = Letter, Inspection Report | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000461/2010003]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE ROAD, SUITE 210 | |||
LISLE, IL 60532-4352 | |||
September 22, 2010 | |||
EA-10-185; EA-10-186; EA-10-187 | |||
Mr. Michael J. Pacilio | |||
Senior Vice President, Exelon Generation Company, LLC | |||
President and Chief Nuclear Officer (CNO), Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - | |||
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003 | |||
Dear Mr. Pacilio: | |||
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission | |||
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which | |||
provide a response to our inspection report issued on August 3, 2010, concerning activities | |||
conducted at Clinton Power Station. The three letters you sent each contested a separate | |||
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: | |||
05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements, | |||
05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS | |||
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation | |||
Call-In Drills. | |||
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be | |||
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform | |||
you as soon as we complete our evaluation. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
available electronically for public inspection in the NRC Public Document Room or from the | |||
Publicly Available Records System (PARS) component of NRC's Agencywide Documents | |||
Access and Management System (ADAMS), accessible from the NRC Website at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Mark A. Ring, Chief | |||
Branch 1 | |||
Division of Reactor Projects | |||
Docket No. 50-461 | |||
License No. NPF-62 | |||
cc: Distribution via ListServ | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE ROAD, SUITE 210 | |||
LISLE, IL 60532-4352 | |||
September 22, 2010 | |||
EA-10-185; EA-10-186; EA-10-187 | |||
Mr. Michael J. Pacilio | |||
Senior Vice President, Exelon Generation Company, LLC | |||
President and Chief Nuclear Officer (CNO), Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - | |||
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003 | |||
Dear Mr. Pacilio: | |||
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission | |||
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which | |||
provide a response to our inspection report issued on August 3, 2010, concerning activities | |||
conducted at Clinton Power Station. The three letters you sent each contested a separate | |||
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: | |||
05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements, | |||
05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS | |||
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation | |||
Call-In Drills. | |||
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be | |||
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform | |||
you as soon as we complete our evaluation. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
available electronically for public inspection in the NRC Public Document Room or from the | |||
Publicly Available Records System (PARS) component of NRC's Agencywide Documents | |||
Access and Management System (ADAMS), accessible from the NRC Website at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Mark A. Ring, Chief | |||
Branch 1 | |||
Division of Reactor Projects | |||
Docket No. 50-461 | |||
License No. NPF-62 | |||
cc: Distribution via ListServ | |||
DISTRIBUTION: | |||
See next page | |||
DOCUMENT NAME: G:\1-Secy\1-Work In Progress\Clinton Contested Violations 9-1-2010.docx | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl | |||
"E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII E RIII N RIII E | |||
NAME MRing:cs HPeterson PLougheed for SOrth | |||
DATE 09/22/10 09/22/10 09/22/10 | |||
OFFICIAL RECORD COPY | |||
Letter to M. Pacilio from M. Ring dated September 22, 2010 | |||
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - | |||
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003 | |||
DISTRIBUTION: | |||
Daniel Merzke | |||
RidsNrrDorlLpl3-2 Resource | |||
RidsNrrPMClinton Resource | |||
RidsNrrDirsIrib Resource | |||
Steven Reynolds | |||
Steven Orth | |||
Patricia Lougheed | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRSIII | |||
DRPIII | |||
Patricia Buckley | |||
Tammy Tomczak | |||
ROPreports Resource | |||
}} |
Latest revision as of 12:56, 13 November 2019
ML102660135 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 09/22/2010 |
From: | Ring M NRC/RGN-III/DRP/B1 |
To: | Pacilio J Exelon Generation Co, Exelon Nuclear |
References | |
ea-10-185, ea-10-186, ea-10-187 IR-10-003 | |
Download: ML102660135 (3) | |
See also: IR 05000461/2010003
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
September 22, 2010
EA-10-185; EA-10-186; EA-10-187
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which
provide a response to our inspection report issued on August 3, 2010, concerning activities
conducted at Clinton Power Station. The three letters you sent each contested a separate
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are:
05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation
Call-In Drills.
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform
you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
cc: Distribution via ListServ
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
September 22, 2010
EA-10-185; EA-10-186; EA-10-187
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission
(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which
provide a response to our inspection report issued on August 3, 2010, concerning activities
conducted at Clinton Power Station. The three letters you sent each contested a separate
Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are:
05000461/2010003-01 Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,05000461/2010003-02 Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS
Procedure 3711.01, and 05000461/2010003-04 Inadequate Emergency Plan Augmentation
Call-In Drills.
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be
thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform
you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-461
License No. NPF-62
cc: Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\1-Secy\1-Work In Progress\Clinton Contested Violations 9-1-2010.docx
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl
"E" = Copy with attach/encl "N" = No copy
OFFICE RIII E RIII N RIII E
NAME MRing:cs HPeterson PLougheed for SOrth
DATE 09/22/10 09/22/10 09/22/10
OFFICIAL RECORD COPY
Letter to M. Pacilio from M. Ring dated September 22, 2010
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS -
CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMClinton Resource
RidsNrrDirsIrib Resource
Steven Reynolds
Patricia Lougheed
DRSIII
DRPIII
Patricia Buckley
ROPreports Resource