| number = ML11343A639
| number = ML11343A639
| issue date = 12/08/2011
| issue date = 12/08/2011
| title = Crystal River, Unit 3 - License Renewal Application 10 CFR Part 54.21(b), Annual Update (TAC No. ME0274)
| title = License Renewal Application 10 CFR Part 54.21(b), Annual Update
| author name = Franke J A
| author name = Franke J
| author affiliation = Progress Energy Florida, Inc
| author affiliation = Progress Energy Florida, Inc
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Progress EnergyCrystal River Nuclear PlantDocket No. 50-302Operating License No. DPR-72Ref: 10 CFR 54December 8, 20113F1211-01U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001
{{#Wiki_filter:Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 December 8, 2011 3F1211-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b) AnnualUpdate (TAC NO. ME0274)
Crystal River Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)


==References:==
==References:==
(1) CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -Application for Renewal of Operating License"(2) CR-3 to NRC letter, dated December 9, 2010, "Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b) Annual Update (TACNO. ME0274)
(1)     CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -
Application for Renewal of Operating License" (2)     CR-3 to NRC letter, dated December 9, 2010, "Crystal River Unit 3 -
License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)


==Dear Sir:==
==Dear Sir:==
On December 16, 2008, Florida Power Corporation (FPC), doing business as Progress EnergyFlorida, Inc. (PEF), requested renewal of the operating license for Crystal River Unit 3 (CR-3) toextend the term of its operating license an additional 20 years beyond the current expirationdate (Reference 1).Annually during the NRC staff review of the License Renewal Application (LRA) and at leastthree months before the completion of the review, PEF is required by 10 CFR 54.21(b) toamend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) thatmaterially affects the contents of the LRA.PEF has completed a review of CLB changes that have occurred since the previous annualupdate letter (Reference 2) was submitted and has identified no changes to the CLB thatmaterially affect the contents of the LRA, including the FSAR supplement. Pending changeswere identified that are associated with Extended Power Uprate (EPU), Steam GeneratorReplacement (SGR), and related activities that are being implemented during the currentoutage. These changes are not incorporated into the CLB as of this update period.This letter does not contain any new or revised regulatory commitments.If you have any questions regarding this submittal, please contact Mr. Mike Heath, Supervisor,License Renewal, at (910) 457-3487, e-mail, at mike.heath@pgnmail.com..,Sri ce rely),,J1n A. FrankeVice PresidentCrystal River Unit 3JAF/dwhxc: NRC CR-3 Project ManagerNRC License Renewal Project ManagerNRC Regional Administrator, Region IISenior Resident InspectorProgress Energy Florida, Inc.Crystal River Nuclear Plant15760 W. Power Line Street 44-Crystal River, FL 34428 IU. S. Nuclear Regulatory Commission Page 2 of 23F1211-01STATE OF FLORIDACOUNTY OF CITRUSJon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for FloridaPower Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized onthe part of said company to sign and file with the Nuclear Regulatory Commission theinformation attached hereto; and that all such statements made and matters set forth therein aretrue and correct to the best of his knowledge, information;and belie.i A. Frankeice PresidentCrystal River Nuclear PlantThe foregoing document was acknowledged before me this 0'9 day ofL 2011, by Jon A. Franke.Signature of Notary PublicState of Florida(Print, type, or stamp CommissionedName of Notary Public)Personally V ProducedKnown -OR- Identification  
 
}}
On December 16, 2008, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc. (PEF), requested renewal of the operating license for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date (Reference 1).
Annually during the NRC staff review of the License Renewal Application (LRA) and at least three months before the completion of the review, PEF is required by 10 CFR 54.21(b) to amend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) that materially affects the contents of the LRA.
PEF has completed a review of CLB changes that have occurred since the previous annual update letter (Reference 2) was submitted and has identified no changes to the CLB that materially affect the contents of the LRA, including the FSAR supplement. Pending changes were identified that are associated with Extended Power Uprate (EPU), Steam Generator Replacement (SGR), and related activities that are being implemented during the current outage. These changes are not incorporated into the CLB as of this update period.
This letter does not contain any new or revised regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Mike Heath, Supervisor, License Renewal, at (910) 457-3487, e-mail, at mike.heath@pgnmail.com.
.,Sri ce rely),
,J1n A. Franke Vice President Crystal River Unit 3 JAF/dwh xc:       NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street                                                                         44-Crystal River, FL 34428
 
I U. S. Nuclear Regulatory Commission                                                     Page 2 of 2 3F1211-01 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information;and belie.
i A. Franke ice President Crystal River Nuclear Plant The foregoing     document     was   acknowledged     before   me this   0'9     day   of L
Y*b,,L*(+/-      2011, by Jon A. Franke.
Signature of Notary Public State of Florida (Print, type, or stamp Commissioned Name of Notary Public)
Personally     V           Produced Known                -OR- Identification}}

Latest revision as of 12:03, 12 November 2019

License Renewal Application 10 CFR Part 54.21(b), Annual Update
ML11343A639
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/08/2011
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1211-01, TAC ME0274
Download: ML11343A639 (2)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 December 8, 2011 3F1211-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)

References:

(1) CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -

Application for Renewal of Operating License" (2) CR-3 to NRC letter, dated December 9, 2010, "Crystal River Unit 3 -

License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)

Dear Sir:

On December 16, 2008, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc. (PEF), requested renewal of the operating license for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date (Reference 1).

Annually during the NRC staff review of the License Renewal Application (LRA) and at least three months before the completion of the review, PEF is required by 10 CFR 54.21(b) to amend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) that materially affects the contents of the LRA.

PEF has completed a review of CLB changes that have occurred since the previous annual update letter (Reference 2) was submitted and has identified no changes to the CLB that materially affect the contents of the LRA, including the FSAR supplement. Pending changes were identified that are associated with Extended Power Uprate (EPU), Steam Generator Replacement (SGR), and related activities that are being implemented during the current outage. These changes are not incorporated into the CLB as of this update period.

This letter does not contain any new or revised regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Mike Heath, Supervisor, License Renewal, at (910) 457-3487, e-mail, at mike.heath@pgnmail.com.

.,Sri ce rely),

,J1n A. Franke Vice President Crystal River Unit 3 JAF/dwh xc: NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street 44-Crystal River, FL 34428

I U. S. Nuclear Regulatory Commission Page 2 of 2 3F1211-01 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information;and belie.

i A. Franke ice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this 0'9 day of L

Y*b,,L*(+/- 2011, by Jon A. Franke.

Signature of Notary Public State of Florida (Print, type, or stamp Commissioned Name of Notary Public)

Personally V Produced Known -OR- Identification