{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:rch 5, 2012


==REGION III==
==SUBJECT:==
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 5, 2012 Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 SUBJECT: ANNUAL ASSESSMENT LETTER FOR FERMI NUCLEAR POWER PLANT UNIT 2 (REPORT 05000341/201 1 00 7)
ANNUAL ASSESSMENT LETTER FOR FERMI NUCLEAR POWER PLANT UNIT 2 (REPORT 05000341/2011007)


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On February 15, 2012 , the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 , through December 31 , 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On February 15, 2012, the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs)
in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.


This performance review and enclosed inspection plan do not include security information.
The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013.


The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. We also plan on performing special and infrequently performed inspections: Temporary Instruction (TI) 2515/177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, TI 2515/182 Phase I, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Inspection Procedure (IP) 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, IP 92709, Licensee Strike Contingency Plans, IP 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications, IP 71111.21, Component Design Basis Inspection, and IP 71114.01, Exercise Evaluation.


Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 3 0 , 201 3. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.


We also plan on performing special and infrequently performed inspections
Sincerely,
: Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," TI 2515/182 Phase I , "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," Inspection Procedure (IP) 60854.1
/RA/
, "Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI)
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-341 and 072-071 License No. NPF-43 Enclosure: Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ
at Operating Plants ," IP 60855.1
, "Operation of an ISFSI at Operating Plants
," IP 92709, "Licensee Strike Contingency Pl ans ," IP 71111.17, "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications," IP 71111
.21, "Component Design Basis Inspection," and IP 71114.01, "Exercise Evaluation."
 
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 630-829-9 833 with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Page 1 of 2      Fermi Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates        No. of Staff Start End Inspection Activity    Title  on Site BI MODS - TRIENNIAL PERM MODS / 50.59      3 01/16/2012 02/03/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TI-182 - TI-2515/182 PHASE I - BURIED PIPING      1 02/13/2012 02/15/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION      2 02/13/2012 02/17/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 02/13/2012 02/17/2012 IP 71124.07 Radiological Environmental Monitoring Program OL PREP - FERMI 2 INIT PREP 02/2012      3 02/27/2012 03/02/2012 W90230 OL - INITIAL EXAM - 2012 MAR - FERM ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT      2 03/01/2012 05/31/2012 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 05/01/2012 07/31/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - FERMI 2 INITIAL EXAM - 03/2012      3 03/19/2012 03/23/2012 W90230 OL - INITIAL EXAM - 2012 MAR - FERM BI ISI - INSERVICE INSPECTION      1 03/24/2012 04/12/2012 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION      2 04/02/2012 04/06/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls INSP - OPESS FY2007-03 CRANE & HEAVY LIFT INSP      1 05/07/2012 05/25/2012 IP 7111120 Refueling and Other Outage Activities TI-177 - TI-2515/177 - GAS VOIDING IN ECCS PIPING      1 05/21/2012 06/08/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION      2 08/20/2012 08/24/2012 IP 7111401 Exercise Evaluation 08/20/2012 08/24/2012 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION      2 09/10/2012 09/14/2012 IP 71124.02 Occupational ALARA Planning and Controls 09/10/2012 09/14/2012 IP 71151-BI01 Reactor Coolant System Activity 09/10/2012 09/14/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/10/2012 09/14/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent BI OLRQ - REQUALIFICATION PROGRAM INSPECTION      1 10/01/2012 10/05/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review
/RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-341 and 072-071 License No. NPF-43 Enclosure:
Fermi 2 Inspection/Activity Plan cc w/encl:
Distribution via ListServ


Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi Inspection / Activity Plan 01/01/2012-06/30/2013 BI MODS-TRIENNIAL PERM MODS / 50.59 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/16/2012 02/03/2012 TI-182-TI-2515/182 PHASE I - BURIED PIPING 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/13/2012 02/15/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/13/2012 02/17/2012 IP Radiological Environmental Monitoring Program 71124.07 02/13/2012 02/17/2012 OL PREP-FERMI 2 INIT PREP 02/2012 3 OL - INITIAL EXAM - 2012 MAR - FERM W90230 02/27/2012 03/02/2012 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 03/01/2012 05/31/2012 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2012 07/31/2012 OL EXAM-FERMI 2 INITIAL EXAM - 03/2012 3 OL - INITIAL EXAM - 2012 MAR - FERM W90230 03/19/2012 03/23/2012 BI ISI-INSERVICE INSPECTION 1 IP Inservice Inspection Activities - BWR 7111108G 03/24/2012 04/12/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/02/2012 04/06/2012 INSP-OPESS FY2007-03 CRANE & HEAVY LIFT INSP 1 IP Refueling and Other Outage Activities 7111120 05/07/2012 05/25/2012 TI-177-TI-2515/177 - GAS VOIDING IN ECCS PIPING 1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 05/21/2012 06/08/2012 BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 IP Exercise Evaluation 7111401 08/20/2012 08/24/2012 IP Performance Indicator Verification 71151 08/20/2012 08/24/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 2 IP Occupational ALARA Planning and Controls 71124.02 09/10/2012 09/14/2012 IP Reactor Coolant System Activity 71151-BI01 09/10/2012 09/14/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 09/10/2012 09/14/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 09/10/2012 09/14/2012 BI OLRQ-REQUALIFICATION PROGRAM INSPECTION 1 IP Licensed Operator Requalification Program - Annual Review 7111111A 10/01/2012 10/05/2012 Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi Inspection / Activity Plan 01/01/2012-06/30/2013 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 02/01/2013 04/30/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/28/2013 02/01/2013 INSP-BUILDING STRUCTURE MODS TO SUPPORT ISFSI 2 IP Plant Modifications 7111118 02/11/2013 04/19/2013 BI HS-TRIENNIAL HEAT SINK INSPECTION 2 IP Heat Sink Performance 7111107T 03/18/2013 03/22/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiation Monitoring Instrumentation 71124.05 03/25/2013 03/29/2013 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2013 08/31/2013 STRIKE-STRIKE CONTINGENCY - OP/MAINT/RP 2 IP Licensee Strike Contingency Plans 92709 05/06/2013 06/06/2013 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 2 IP A lert and Notification System Testing 7111402 06/24/2013 06/28/2013 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/24/2013 06/28/2013 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/24/2013 06/28/2013 IP Performance Indicator Verification 71151 06/24/2013 06/28/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/10/2013 06/14/2013 IP Occupational Dose Assessment 71124.04 06/10/2013 06/14/2013
Page 2 of 2     Fermi Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates        No. of Staff Start End Inspection Activity    Title  on Site ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT     2 02/01/2013 04/30/2013 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION     1 01/28/2013 02/01/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls INSP - BUILDING STRUCTURE MODS TO SUPPORT ISFSI     2 02/11/2013 04/19/2013 IP 7111118 Plant Modifications BI HS - TRIENNIAL HEAT SINK INSPECTION     2 03/18/2013 03/22/2013 IP 7111107T Heat Sink Performance BI RP - RADIATION PROTECTION BASELINE INSPECTION     1 03/25/2013 03/29/2013 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT     1 05/01/2013 08/31/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants STRIKE - STRIKE CONTINGENCY - OP/MAINT/RP     2 05/06/2013 06/06/2013 IP 92709 Licensee Strike Contingency Plans BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION     2 06/24/2013 06/28/2013 IP 7111402 Alert and Notification System Testing 06/24/2013 06/28/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 06/24/2013 06/28/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/24/2013 06/28/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION    1 06/10/2013 06/14/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/10/2013 06/14/2013 IP 71124.04 Occupational Dose Assessment
}}
}}

Latest revision as of 08:13, 12 November 2019

Annual Assessment Letter for Fermi Nuclear Power Plant, Unit 2 (Report 05000341/2011007)
ML12065A127
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 03/05/2012
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To: Jennifer Davis
Detroit Edison, Co
References
IR-11-007
Download: ML12065A127 (6)


Text

rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR FERMI NUCLEAR POWER PLANT UNIT 2 (REPORT 05000341/2011007)

Dear Mr. Davis:

On February 15, 2012, the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs)

in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. We also plan on performing special and infrequently performed inspections: Temporary Instruction (TI) 2515/177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, TI 2515/182 Phase I, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Inspection Procedure (IP) 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, IP 92709, Licensee Strike Contingency Plans, IP 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications, IP 71111.21, Component Design Basis Inspection, and IP 71114.01, Exercise Evaluation.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-341 and 072-071 License No. NPF-43 Enclosure: Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ

Page 1 of 2 Fermi Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI MODS - TRIENNIAL PERM MODS / 50.59 3 01/16/2012 02/03/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications TI-182 - TI-2515/182 PHASE I - BURIED PIPING 1 02/13/2012 02/15/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 02/13/2012 02/17/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 02/13/2012 02/17/2012 IP 71124.07 Radiological Environmental Monitoring Program OL PREP - FERMI 2 INIT PREP 02/2012 3 02/27/2012 03/02/2012 W90230 OL - INITIAL EXAM - 2012 MAR - FERM ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 03/01/2012 05/31/2012 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 05/01/2012 07/31/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - FERMI 2 INITIAL EXAM - 03/2012 3 03/19/2012 03/23/2012 W90230 OL - INITIAL EXAM - 2012 MAR - FERM BI ISI - INSERVICE INSPECTION 1 03/24/2012 04/12/2012 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 04/02/2012 04/06/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls INSP - OPESS FY2007-03 CRANE & HEAVY LIFT INSP 1 05/07/2012 05/25/2012 IP 7111120 Refueling and Other Outage Activities TI-177 - TI-2515/177 - GAS VOIDING IN ECCS PIPING 1 05/21/2012 06/08/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION 2 08/20/2012 08/24/2012 IP 7111401 Exercise Evaluation 08/20/2012 08/24/2012 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 09/10/2012 09/14/2012 IP 71124.02 Occupational ALARA Planning and Controls 09/10/2012 09/14/2012 IP 71151-BI01 Reactor Coolant System Activity 09/10/2012 09/14/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/10/2012 09/14/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent BI OLRQ - REQUALIFICATION PROGRAM INSPECTION 1 10/01/2012 10/05/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review

Page 2 of 2 Fermi Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 02/01/2013 04/30/2013 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 01/28/2013 02/01/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls INSP - BUILDING STRUCTURE MODS TO SUPPORT ISFSI 2 02/11/2013 04/19/2013 IP 7111118 Plant Modifications BI HS - TRIENNIAL HEAT SINK INSPECTION 2 03/18/2013 03/22/2013 IP 7111107T Heat Sink Performance BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/25/2013 03/29/2013 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 1 05/01/2013 08/31/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants STRIKE - STRIKE CONTINGENCY - OP/MAINT/RP 2 05/06/2013 06/06/2013 IP 92709 Licensee Strike Contingency Plans BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 06/24/2013 06/28/2013 IP 7111402 Alert and Notification System Testing 06/24/2013 06/28/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 06/24/2013 06/28/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/24/2013 06/28/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/10/2013 06/14/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/10/2013 06/14/2013 IP 71124.04 Occupational Dose Assessment