UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Joseph H. Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2

Dear Mr. Plona:

On August 7, 2012, the NRC completed its mid-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in Inspection Report 05000341/2010201 on October 15, 2010. This change in the Action Matrix from the end-of-cycle assessment is due to security integration into the assessment program.

On April 10, 2012, your staff notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. During the week of August 20, 2012, the NRC conducted a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The results of that inspection are pending review and will be sent via separate correspondence once the review is complete.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should

J. Plona circumstances warrant any changes. The inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. The NRC also plans on performing special and infrequently performed inspections including: IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, IP 60856.1, Review of 10 CFR 72.212 Evaluations, Temporary Instruction (TI) 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9700 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Gary L.Shear, Director (Acting)

Division of Reactor Safety Docket No. 50-341 and 072-071 License No. NPF-43

Enclosure:

Fermi 2 Inspection/Activity Plan cc w/encl:

Distribution via ListServ

J. Plona circumstances warrant any changes. The inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. The NRC also plans on performing special and infrequently performed inspections including: IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants, IP 60855.1, Operation of an ISFSI at Operating Plants, IP 60856.1, Review of 10 CFR 72.212 Evaluations, Temporary Instruction (TI) 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI 2515/188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9700 with any questions you may have regarding this letter.

Sincerely,

/RA/

Gary L. Shear, Director (Acting)

Division of Reactor Safety Docket No. 50-341 and 072-071 License No. NPF-43

Enclosure:

Fermi 2 Inspection/Activity Plan cc w/encl:

Distribution via ListServ See Previous Concurrence DOCUMENT NAME: G:\\DRPIII\\1-Secy\\1-Work In Progress\\2012 MOC Letters\\Fermi MOC 2012 Letter to Licensee.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME PSmagacz:dtp JCameron GShear DATE 08/21/12 08/21/12 08/21/12 OFFICIAL RECORD COPY

Letter to J. Plona from G. Shear dated September 4, 2012.

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2 DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi Inspection / Activity Plan 09/01/2012 - 12/31/2013 TI-187

- TI-187 FLOODING WALKDOWN 2

IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/30/2012 TI-188

- TI-188 SEISMIC WALKDOWN 2

IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/02/2012 12/31/2012 INSP

- OPESS FY2007-03 CRANE & HEAVY LIFT INSP 1

IP Refueling and Other Outage Activities 7111120 08/27/2012 09/14/2012 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 2

IP Occupational ALARA Planning and Controls 71124.02 09/10/2012 09/14/2012 IP Reactor Coolant System Activity 71151-BI01 09/10/2012 09/14/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 09/10/2012 09/14/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 09/10/2012 09/14/2012 BI OLRQ

- REQUALIFICATION PROGRAM INSPECTION 1

IP Licensed Operator Requalification Program - Annual Review 7111111A 10/01/2012 10/05/2012 BI OLRQ

- REQUALIFICATION PROGRAM INSPECTION 1

IP Licensed Operator Requalification Program - Annual Review 7111111A 11/12/2012 11/16/2012 ISFSI

- ISFSI INSPECTION - SCHEDULE DEPENDENT 2

IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 02/01/2013 04/30/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/28/2013 02/01/2013 INSP

- BUILDING STRUCTURE MODS TO SUPPORT ISFSI 2

IP Plant Modifications 7111118 02/11/2013 04/19/2013 BI HS

- TRIENNIAL HEAT SINK INSPECTION 2

IP Heat Sink Performance 7111107T 03/18/2013 03/22/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radiation Monitoring Instrumentation 71124.05 03/25/2013 03/29/2013 BI PI&R

- BIENNIAL PI&R TEAM INSPECTION 5

IP Problem Identification and Resolution 71152B 04/08/2013 04/26/2013 ISFSI

- ISFSI INSPECTION - SCHEDULE DEPENDENT 1

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/01/2013 08/31/2013 STRIKE

- STRIKE CONTINGENCY - OP/MAINT/RP 2

IP Licensee Strike Contingency Plans 92709 05/06/2013 06/06/2013 BI CDBI

- COMPONENT DESIGN BASIS INSPECTION 5

IP Component Design Bases Inspection 7111121 07/08/2013 08/09/2013

Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Fermi Inspection / Activity Plan 09/01/2012 - 12/31/2013 TI 182

- TI 182 BURIED PIPING PHASE 2 2

IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 05/20/2013 05/24/2013 BI EPR

- EP ROUTINE INSPECTION / PI VERIFICATION 2

IP Alert and Notification System Testing 7111402 06/24/2013 06/28/2013 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/24/2013 06/28/2013 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/24/2013 06/28/2013 IP Performance Indicator Verification 71151 06/24/2013 06/28/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/10/2013 06/14/2013 IP Occupational Dose Assessment 71124.04 06/10/2013 06/14/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/08/2013 07/12/2013 IP Reactor Coolant System Activity 71151-BI01 07/08/2013 07/12/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 07/08/2013 07/12/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 07/08/2013 07/12/2013 OL PREP

- FERMI INIT PREP 08/2013 3

OL - INITIAL EXAM - 2013 AUG-SEPT - FERMI 2 W90287 08/12/2013 08/16/2013 ISFSI

- ISFSI INSPECTION 1

IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/01/2013 12/27/2013 IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 09/01/2013 12/27/2013 OL EXAM

- FERMI INIT EXAM - 09/2013 3

OL - INITIAL EXAM - 2013 AUG-SEPT - FERMI 2 W90287 09/09/2013 09/13/2013 ISI BI

- ISI BASELINE INSPECTION 1

IP Inservice Inspection Activities - BWR 7111108G 09/23/2013 10/04/2013 BI OLRQ

- BIENNIAL REQUAL PROGRAM INSPECTION 2

IP Licensed Operator Requalification Program 7111111B 10/21/2013 10/25/2013