Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant
ML15279A628
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/06/2015
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To: Fessler P
DTE Electric Company
References
Download: ML15279A628 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 October 6, 2015 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT FERMI POWER PLANT

Dear Mr. Fessler:

This letter is to request information to support our biennial problem identification and resolution inspection (PI&R) inspection beginning November 30, 2015, at the Fermi Power Plant. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by November 16, 2015. Mr. John Jandovitz, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jandovitz at 630-829-9763 or John.Jandovitz@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

P. Fessler In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

RFI to Support PI&R Inspection cc w/encl: Distribution via LISTSERV

Requested Information to Support Problem Identification and Resolution Inspection Please provide the information on a compact disc (one for each of three team members);

thumb drives can no longer be used on NRC computers. Please identify the folders on the compact disc following the number system, or heading, of each numbered request, below. Unless otherwise specified, the time frame for requested information is for the period of January 1, 2014, through the time the data request is answered. In cases of condition reports (CRs) requested in a list, the list should be sortable electronically.

In addition, inspectors will require computer access to the corrective action program (CAP) database while on site.

PROGRAM DOCUMENTS

1. Administrative Procedures - Copies of current administrative procedures associated with the corrective action program. This should include procedures related to: (1) corrective action process; (2) operating experience program; (3) self-assessment program; (4) maintenance rule program; (5) operability determination process; (6) degraded/non-conforming condition process (e.g., RIS 2005-20); (7) system health process or equivalent equipment reliability improvement programs; and (8) operational decision making (ODMI) process.
2. ECP Procedures - A current copy of the Employee Concerns Program/Ombudsman administrative procedure.
3. CAP Process Changes - Description of any substantive changes made to the CAP since the last Problem Identification and Resolution (PI&R) Inspection. Please include the effective date with each listed change.

CAP EFFECTIVENESS - PROBLEM IDENTIFICATION

4. OPEN CRs - A list of all open CRs sorted by significance level. Include CR number, the date initiated, a brief description/title, system affected if any, significance level, and anticipated completion date, if available. This list should be grouped by responsible department and listed in order of initiation date (oldest listed first).
5. CORPORATE CRs - A list of CRs generated by the corporate office that involve or affect plant operation, sorted by significance level. Include the date initiated, a brief description/title, site(s) affected, system affected, significance/priority level, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed).
6. CR GENERATION - A data table (or similar format) showing the total number of CRs generated per year since 2010 sorted by department (i.e., operations, engineering, security etc.).
7. EXTERNAL CR NUMBERS - A data table showing the number of issues identified externally (NRC, INPO, other etc.) per year as compared to internally since 2010.
8. PLANT TRANSIENTS - A list of plant trips, unplanned downpowers (greater than 20 percent), limiting condition for operation entries (not scheduled), and licensee event reports, including dates of these events.

Enclosure

9. CONTROL ROOM DEFICIENCIES - A list of current control room deficiencies and operator work-arounds, sorted by priority, with a brief description/title and corresponding CR and/or work order number.

CAP EFFECTIVENESS - PROBLEM PRIORITIZATION AND EVALUATION

10. ROOT CAUSES - A list of completed root cause evaluations with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the root cause package, to the documents and/or CRs directing and tracking the actions.
11. APPARENT CAUSES - A list of completed apparent cause evaluations with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the apparent cause package, to the documents and/or CRs directing and tracking the actions.
12. CLOSED CRs - A list of closed CRs sorted by significance level and then initiation date.

Include CR number, a brief description/title, the significance level, the date initiated and closed, assigned organization, system affected, and whether there was an associated operability evaluation.

13. OPERABILITY EVALUATIONS - A list of operability evaluations. Include a brief description/title of the issue, date initiated, date closed, or date anticipated to be closed.

Include any operability evaluations that are still open that were initiated prior to January 1, 2014.

14. MAINTENANCE RULE - A listing of cause analyses, corrective actions documents, and trend analyses for systems and components considered Maintenance Rule (a)(1).

Provide copies of the applicable system health report sections and maintenance rule action plans for those systems starting 1 year earlier from when the system or component entered (a)(1) status. Include dates when system/components entered (a)(1) status and, if applicable, returned to (a)(2) status. For recurring reports, the most recent and middle-of-year and end-of-year reports are sufficient; monthly reports are not required.

15. IST - A list of test failures (IST or Technical Specifications surveillances) with a brief description of component/system failed. Indicate if the failure was a maintenance preventable failure.
16. TEMPORARY MODS - A list of temporary modifications with a brief description of the modification, installation date, and date closed or anticipated closure date. Include any open temporary modifications that were installed prior to June 1, 2015.

CAP EFFECTIVENESS - CORRECTIVE ACTIONS

17. OPEN ACTIONS - A list of open corrective actions, sorted by significance/priority level, with a brief description/title, initiating date and due date. The list should include the number of due date extension and be grouped by the responsible department.
18. EFFECTIVENESS REVIEWS - A list of completed effectiveness reviews with a brief description of the results. Include a cross-reference to the CRs for which the effectiveness review was conducted and, if applicable, CR numbers documenting any additional follow-up actions.
19. INADEQUATE ACTIONS - A list of CRs initiated for inadequate or ineffective corrective actions. Include the date initiated, a brief description/title, significance/priority level, 2

system affected, assigned organization, and status (if closed, include date closed; if open, include scheduled date to be closed). Include a cross-reference to the CR or evaluation that generated the original corrective action.

20. REWORK - A list of rework items and repeat failures. Include cross-references to applicable Work Orders and CRs.
21. OPEN WORK ORDERS - A list of open work orders/equipment work requests with a brief description. Identify the work order as outage or non-outage, the date of initiation and scheduled or anticipated closure date, if available. If applicable, also provide the classification of the work orders with the recent industry classification scheme. Provide an explanation of the classification scheme and the procedure governing the classification. Work requests/work orders not associated with a degraded equipment condition (e.g., work orders for voluntary plant upgrades) do not have to be included in the list.

CAP ASSESSMENT - PROBLEM IDENTIFICATION

22. CAP QA AUDITS - A copy of Quality Assurance audits of the corrective action program.
23. PI&R ASSESSMENT - A copy of self-assessments and associated condition reports generated in preparation for this PI&R inspection.
24. CAP SELF-ASSESSMENTS - A copy of completed CAP self-assessments and the plan/schedule for future CAP self-assessments.
25. CAP PIs - A copy of any performance reports or indicators used to track CAP effectiveness for the past 24 months. The most recent data and end-of-quarter data will suffice; monthly reports are not required.

CAP ASSESSMENT - CORRECTIVE ACTIONS

26. TREND REPORTS - Copies of any completed trend reports for CRs. Quarterly trend reports are acceptable; copies of all monthly reports are not required.
27. TREND CRs - A list of CRs initiated for trends of conditions adverse to quality. Include the date initiated, a brief description/title, significance/priority level, and status (if closed include date closed; if open, include scheduled date to be closed).
28. WORK ORDER TRENDS - A copy of any trend reports for work orders. The most recent trend reports and those that existed at the end-of-year and middle-of-year are acceptable; copies of monthly reports are not required. Include a copy of a recent (within 2 months of the data submittal) graph or document showing the status of work week planning of work activities.

USE OF OPERATION EXPERIENCE (OP EX)

29. OP EX CRs - A list of CRs initiated to evaluate NRC generic communications (e.g.,

bulletins, information notices, generic letters, etc.). Include date the CR was initiated, a brief description/title, and the status (if closed, include date closed; if open, include scheduled date to be closed).

SELF-ASSESSMENT AND AUDITS

30. NON CAP QA AUDITS - A list of all other QA audits completed with a brief description of areas where findings were identified.

3

31. QA AUDIT SCHEDULE - The schedule of future QA audits.
32. NON CAP SELF-ASSESSMENTS - A chronological list of department and site self-assessments completed (include date completed).
33. SELF-ASSESSMENT CAPS - A list of CRs written for findings or concerns identified in self-assessments and audits. Include a short description/title of the finding, its status, and include a cross-reference to the audit or self-assessment number.

SAFETY CONSCIOUS WORK ENVIRONMENT

34. SCWE ASSESSMENTS - Copy of the results of safety culture and/or safety conscious work environment (SCWE) surveys or self-assessments. Include any organizational effectiveness surveys conducted by internal or external organizations. Include a listing of any action(s) resulting from the survey(s) and the status of the action(s).
35. ECP ISSUES - SCWE issues identified through alternate avenues, such as the employee concerns programs. If issue(s) are considered sensitive, in lieu of describing issue in the data package, provide a paper copy to the lead inspector at the start of the inspection.

REGULATORY ISSUES - REVIEWED FOR ALL ASPECTS OF THE CAP PROGRAM

36. NRC FINDING CAPS - A list of CRs for issues (findings, violations, etc.) documented in NRC inspection reports. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
37. LICENSE IDENTIFIED VIOLATION CAPS - A list of CRs for licensee identified violations that have been documented in NRC inspection reports. Include the CR number, brief description/title, date initiated and the status (if closed, include date closed; if open, include scheduled date to be closed).
38. NRC ISSUES CAPS - A list of CRs associated with NRC-identified issues. Include the CR number, brief description/title, date initiated and the status (if closed, include date closed; if open, include scheduled date to be closed).

5-YEAR REVIEW - REVIEWED FOR ALL ASPECTS OF THE CAP PROGRAM (for the following, please provide the requested information since January 1, 2011)

39. PREVENTIVE MAINTENANCE (PM) Program - A list of CRs regarding the PM Program and its implementation. Include the CR number, brief description/title, level of evaluation (i.e., root cause, apparent cause, common cause etc.), date initiated, and the status (if closed, include date closed; if open, include scheduled date to be closed).
40. PM PROGRAM PROCEDURES - The procedure related to control and implementation of the PM Program.
41. PM PROGRAM ASSESSMENTS - Copies of assessments, Quality Assurance reviews, and other evaluations of the PM Program.

OTHER Top Ten List - A list of the top ten risk significant systems and top ten risk significant components.

4

Documents requested to be available on-site during the inspection

a. Updated Final Safety Analysis Report.
b. Technical Specifications.
c. Procedures and procedure index.
d. A copy of the QA manual.
e. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
f. A list of the codes used in the CAP.
g. A copy of the latest independent/offsite organization review of safety culture/safety conscious work environment and internal equivalent assessments if not provided as part of the requested data package.
h. Hard copy of the mechanical and electrical drawings associated with the instrument air system.
i. A copy of the latest plant organizational chart and phone listing.
j. Scheduled dates, times, and location for all meetings associated with implementing the CAP (e.g., CR screening meetings, corrective action review board meetings). Include work order screening/assessment meetings.

Briefing On the first day of the inspection, or early on the second day, please provide the inspection team a briefing of your corrective action program. Include your expectations for personnel using the program and how the work order system fits into the overall scheme for addressing identified issues.

5

P. Fessler In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

RFI to Support PI&R Inspection cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl: Allan Barker Janelle Jessie Carole Ariano RidsNrrDorlLpl3-1 Resource Linda Linn RidsNrrPMFermi2 Resource DRPIII RidsNrrDirsIrib Resource DRSIII Cynthia Pederson Jim Clay Darrell Roberts Carmen Olteanu Richard Skokowski ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML15279A628 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JJandovitz:mz MKunowski DATE 10/06/15 10/06/15 OFFICIAL RECORD COPY