ML12346A011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12346A011
| number = ML12346A011
| issue date = 12/04/2012
| issue date = 12/04/2012
| title = Crystal River, Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update
| title = License Renewal Application 10 CFR Part 54.21(b) Annual Update
| author name = Franke J A
| author name = Franke J
| author affiliation = Duke Energy Corp, Florida Power Corp
| author affiliation = Duke Energy Corp, Florida Power Corp
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:ME0274
| project = TAC:ME0274
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:PDukeEnergyCrystal River Nuclear PlantDocket No. 50-302Operating License No. DPR-72Ref: 10 CFR 54December 4, 20123F1212-01U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001Subject: Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b) AnnualUpdate (TAC NO. ME0274)References: (1) CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -Application for Renewal of Operating License"(2) CR-3 to NRC letter, dated December 8, 2011, "Crystal River Unit 3 -License Renewal Application 10 CFR Part 54.21(b)'Annual Update (TACNO. ME0274)"Dear Sir:On December 16, 2008, Florida Power Corporation (FPC) requested renewal of the operatinglicense for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional20 years beyond the current expiration date (Reference 1).Annually during the NRC staff review of the License Renewal Application (LRA) and at leastthree months before the completion of the review, FPC is required by 10 CFR 54.21(b) toamend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) thatmaterially affects the contents of the LRA.FPC has completed a review of CLB changes that have occurred since the previous annualupdate letter (Reference 2) was submitted and has identified no changes to the CLB thatmaterially affect the contents of the LRA, including the Final Safety Analysis Report supplement.Pending changes were identified that are associated with Extended Power Uprate (EPU),Steam Generator Replacement (SGR), and related activities that are being implemented duringthe current outage. These changes are not incorporated into the CLB as of this update period.This letter does not contain any new or revised regulatory commitments.If you have any questions regarding this submittal, please contact Mr. Daniel Westcott,Superintendent, Licensing and Regulatory Programs, at (352) 563-4796.iSin rely,Jo Fran ece PresidentCrystal River Unit 3JAF/dwhxc: NRC CR-3 Project ManagerNRC License Renewal Project ManagerNRC Regional Administrator, Region IISenior Resident InspectorCrystal River Nuclear Plant A q'15760 W. Power Line StreetCrystal River, FL 34428 U. S. Nuclear Regulatory Commission Page 2 of 23F1212-01STATE OF FLORIDACOUNTY OF CITRUSJon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for FloridaPower Corporation; that he is authorized on the part of said company to sign and file with theNuclear Regulatory Commission the information attached hereto; and that all such statementsmade and matters set forth therein are true and correct to the best of his knowledge,information, and belief. 2 Z/ýeA. FrankeVice PresidentCrystal River Nuclear PlantThe foregoing document was acknowledged before me this day of-- ___( ____- ____ ,2012, by Jon A. Franke.Signature of Notary PublicState of Florida'""".CAROLYNE. PORTMANN.Commission # DD937553Expires March 1, 2014Bwd MTmy Fainbiwaice MUMS8-7019(Print, type, or stamp CommissionedName of Notary Public)Personally I/ ProducedKnown V -OR- Identification  
{{#Wiki_filter:PDuke Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 December 4, 2012 3F1212-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
}}
 
==Subject:==
Crystal River Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)
 
==References:==
(1)     CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -
Application for Renewal of Operating License" (2)     CR-3 to NRC letter, dated December 8, 2011, "Crystal River Unit 3 -
License Renewal Application 10 CFR Part 54.21(b)'Annual Update (TAC NO. ME0274)"
 
==Dear Sir:==
 
On December 16, 2008, Florida Power Corporation (FPC) requested renewal of the operating license for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date (Reference 1).
Annually during the NRC staff review of the License Renewal Application (LRA) and at least three months before the completion of the review, FPC is required by 10 CFR 54.21(b) to amend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) that materially affects the contents of the LRA.
FPC has completed a review of CLB changes that have occurred since the previous annual update letter (Reference 2) was submitted and has identified no changes to the CLB that materially affect the contents of the LRA, including the Final Safety Analysis Report supplement.
Pending changes were identified that are associated with Extended Power Uprate (EPU),
Steam Generator Replacement (SGR), and related activities that are being implemented during the current outage. These changes are not incorporated into the CLB as of this update period.
This letter does not contain any new or revised regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Daniel Westcott, Superintendent, Licensing and Regulatory Programs, at (352) 563-4796.
iSin rely, Jo       Fran e ce President Crystal River Unit 3 JAF/dwh xc:       NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Crystal River Nuclear Plant A q' 15760 W. Power Line Street Crystal River, FL 34428
 
U. S. Nuclear Regulatory Commission                                                             Page 2 of 2 3F1212-01 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.                                       2         Z
                                              /ýeA.
Franke Vice President Crystal River Nuclear Plant The    foregoing   document   was   acknowledged     before     me       this           day   of
-- ___( ____-   ____ ,2012, by Jon A. Franke.
Signature of Notary Public State of Florida
                                                      '""".CAROLYNE. PORTMANN
                                                                .Commission # DD937553 Expires March 1,2014 Bwd    Fainbiwaice MUMS8-7019 MTmy (Print, type, or stamp Commissioned Name of Notary Public)
Personally I/                     Produced Known        V       -OR-       Identification}}

Latest revision as of 19:01, 11 November 2019

License Renewal Application 10 CFR Part 54.21(b) Annual Update
ML12346A011
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/04/2012
From: Franke J
Duke Energy Corp, Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1212-01, TAC ME0274
Download: ML12346A011 (2)


Text

PDuke Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 December 4, 2012 3F1212-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - License Renewal Application 10 CFR Part 54.21(b) Annual Update (TAC NO. ME0274)

References:

(1) CR-3 to NRC letter, dated December 16, 2008, "Crystal River Unit 3 -

Application for Renewal of Operating License" (2) CR-3 to NRC letter, dated December 8, 2011, "Crystal River Unit 3 -

License Renewal Application 10 CFR Part 54.21(b)'Annual Update (TAC NO. ME0274)"

Dear Sir:

On December 16, 2008, Florida Power Corporation (FPC) requested renewal of the operating license for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date (Reference 1).

Annually during the NRC staff review of the License Renewal Application (LRA) and at least three months before the completion of the review, FPC is required by 10 CFR 54.21(b) to amend the LRA by identifying any change to the CR-3 Current Licensing Basis (CLB) that materially affects the contents of the LRA.

FPC has completed a review of CLB changes that have occurred since the previous annual update letter (Reference 2) was submitted and has identified no changes to the CLB that materially affect the contents of the LRA, including the Final Safety Analysis Report supplement.

Pending changes were identified that are associated with Extended Power Uprate (EPU),

Steam Generator Replacement (SGR), and related activities that are being implemented during the current outage. These changes are not incorporated into the CLB as of this update period.

This letter does not contain any new or revised regulatory commitments.

If you have any questions regarding this submittal, please contact Mr. Daniel Westcott, Superintendent, Licensing and Regulatory Programs, at (352) 563-4796.

iSin rely, Jo Fran e ce President Crystal River Unit 3 JAF/dwh xc: NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Crystal River Nuclear Plant A q' 15760 W. Power Line Street Crystal River, FL 34428

U. S. Nuclear Regulatory Commission Page 2 of 2 3F1212-01 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief. 2 Z

/ýeA.

Franke Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this day of

-- ___( ____- ____ ,2012, by Jon A. Franke.

Signature of Notary Public State of Florida

'""".CAROLYNE. PORTMANN

.Commission # DD937553 Expires March 1,2014 Bwd Fainbiwaice MUMS8-7019 MTmy (Print, type, or stamp Commissioned Name of Notary Public)

Personally I/ Produced Known V -OR- Identification