IR 05000458/2014501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15012A060
| number = ML15012A060
| issue date = 01/07/2015
| issue date = 01/07/2015
| title = River Bend Station - NRC Emergency Preparedness Annual Inspection Report 05000458/2014501
| title = NRC Emergency Preparedness Annual Inspection Report 05000458/2014501
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Olson E W
| addressee name = Olson E
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 7, 2015
[[Issue date::January 7, 2015]]


Mr. Eric Site Vice President Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
==SUBJECT:==
 
RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501
SUBJECT: RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501


==Dear Mr. Olson:==
==Dear Mr. Olson:==
Line 30: Line 28:
This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000458/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.
This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000458/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-458 License: NPF-47 cc: Electronic Distribution


Docket: 50-458 License: NPF-47
ML15012A060 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/
DATE 1/7/15 1/7/15


cc: Electronic Distribution ML15012A060 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 1/7/15 1/7/15 Letter to Eric from Mark S. Haire, dated January 7, 2015
Letter to Eric from Mark S. Haire, dated January 7, 2015 SUBJECT: RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501 DISTRIBUTION:
 
Regional Administrator (Marc.Dapas@nrc.gov)
SUBJECT: RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501  
 
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)
Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov) Administrative Assistant (Lisa.Day@nrc.gov) Acting Branch Chief, DRP (Jeremy.Groom@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
Administrative Assistant (Lisa.Day@nrc.gov)
Acting Branch Chief, DRP (Jeremy.Groom@nrc.gov)
Senior Project Engineer (Nick.Taylor@nrc.gov)
Senior Project Engineer (Nick.Taylor@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Project Engineer (Michael.Langelier@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Engineer (Michael.Langelier@nrc.gov)
 
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
}}
}}

Latest revision as of 18:06, 31 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000458/2014501
ML15012A060
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/07/2015
From: Mark Haire
Plant Support Branch-1
To: Olson E
Entergy Operations
References
IR 2014002, IR 2014003, IR 2014004, IR 2014005, IR 2014501
Download: ML15012A060 (3)


Text

ary 7, 2015

SUBJECT:

RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501

Dear Mr. Olson:

On December 31, 2014, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the River Bend Station.

This inspection began on January 1, 2014. Issuance of this letter closes NRC Inspection Report 05000458/2014501. The inspection results associated with the 2014-501 reports are documented in integrated Resident Inspector Reports 2014-002, 2014-003, 2014-004, and 2014-005.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-458 License: NPF-47 cc: Electronic Distribution

ML15012A060 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive NRC-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/

DATE 1/7/15 1/7/15

Letter to Eric from Mark S. Haire, dated January 7, 2015 SUBJECT: RIVER BEND STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000458/2014501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Administrative Assistant (Lisa.Day@nrc.gov)

Acting Branch Chief, DRP (Jeremy.Groom@nrc.gov)

Senior Project Engineer (Nick.Taylor@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Michael.Langelier@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)