ML15069A576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/13/2015
| issue date = 03/13/2015
| title = Request for Additional Information Regarding the Request to Permanently Extend the Integrated Leak Rate Test Frequency to 15 Years
| title = Request for Additional Information Regarding the Request to Permanently Extend the Integrated Leak Rate Test Frequency to 15 Years
| author name = Orenak M D
| author name = Orenak M
| author affiliation = NRC/NRR/DORL/LPLIV-2
| author affiliation = NRC/NRR/DORL/LPLIV-2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000382
| docket = 05000382
| license number = NPF-038
| license number = NPF-038
| contact person = Wang A B
| contact person = Wang A
| case reference number = TAC MF4727
| case reference number = TAC MF4727
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 March 13, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 13, 2015 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093


==SUBJECT:==
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3-REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS (TAC NO. MF4727)  
WATERFORD STEAM ELECTRIC STATION, UNIT 3- REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS (TAC NO. MF4727)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated August 28, 2014 (Agencywide Documents Access and Management System Accession No. ML 14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) for Waterford Steam Electric Station, Unit 3, to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," to allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years. The U.S. Nuclear Regulatory Commission staff has reviewed the LAR and has determined that additional information is needed to complete the review. Please provide the additional information requested in the enclosure within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael.Orenak@nrc.gov.
 
Docket No. 50-382  
By letter dated August 28, 2014 (Agencywide Documents Access and Management System Accession No. ML14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) for Waterford Steam Electric Station, Unit 3, to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," to allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years.
The U.S. Nuclear Regulatory Commission staff has reviewed the LAR and has determined that additional information is needed to complete the review. Please provide the additional information requested in the enclosure within 30 days of receipt of this letter.
If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael.Orenak@nrc.gov.
Sincerely,
                                                ~Jkiv Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382


==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS ENTERGY OPERATIONS, INC. WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382 By letter dated August 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," for the Waterford Steam Electric Station, Unit 3. The proposed change would allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years. By letter dated February 18, 2015 (ADAMS Accession No. ML 15033A422), the U.S. Nuclear Regulatory Commission (NRC) staff requested that additional information be provided to complete the review of the LAR. After further review, the NRC staff requests the following additional information.
Request for Additional Information cc w/encl: Distribution via Listserv
RAI 13 According to Section 9.2.3 of the Nuclear Energy Institute (NEI) 94-01 Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR 50 [Title 10 of the Code of Federal Regulations Part 50], Appendix J," dated October, 2008 (ADAMS Accession No. ML 100620847), please provide the following information for Type A tests conducted on May 12, 1991 and May 21, 2005: a) As-left minimum pathway leakage rate (MNPLR) for all Type B and Type C pathways that were in service, isolated, or not lined up in their test position (i.e., drained and vented to containment atmosphere) prior to performing the Type A test; b) List all pathways and associated leakage rates that contribute to MNPLR in item (a); c) Performance Leakage Rate (PLR) (= UCL +MNPLR) where UCL is the upper confidence limit; d) Determine if the Type A test meets the performance criterion by showing if, PLR is less than or equal to(::=:;)
1.0 La (allowable leakage rate). Enclosure  Please note that during the above performance determination, the following process must be followed, as quoted from Section 9.2.3 of NEI 94-01, Revision 2-A: "In addition, leakage pathways that were isolated during performance of the test because of excessive leakage must be factored into the performance determination.
If the pathway leakage can be determined by a local leakage rate test, the as-left MNPLR for that leakage path must also be added to the Type A UCL. If the pathway leakage cannot be determined by local leakage rate testing, the performance criteria for the Type A test are not met. If an excessively leaking containment penetration barrier pathway is discovered during the Type A test, and the pathway is neither a Type Bora Type C tested pathway, it shall still be tested to Type B or Type C test requirements after the Type A test and its as-left MNPLR added to the Type [A] test UCL. In this case the Type A test performance criterion is not met unless that pathway is subsequently added to the Type B or Type C test program. If the excessive leakage is from a source that can be tested only during a Type A test, the Type A test performance criterion is not met."
Vice President, Operations Entergy Operations, Inc. March 13, 2015 Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093


==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 -REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS (TAC NO. MF4727)  
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382 By letter dated August 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," for the Waterford Steam Electric Station, Unit 3. The proposed change would allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years.
By letter dated February 18, 2015 (ADAMS Accession No. ML15033A422), the U.S. Nuclear Regulatory Commission (NRC) staff requested that additional information be provided to complete the review of the LAR. After further review, the NRC staff requests the following additional information.


==Dear Sir or Madam:==
===RAI 13===
By letter dated August 28, 2014 (Agencywide Documents Access and Management System Accession No. ML 14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) for Waterford Steam Electric Station, Unit 3, to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," to allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years. The U.S. Nuclear Regulatory Commission staff has reviewed the LAR and has determined that additional information is needed to complete the review. Please provide the additional information requested in the enclosure within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael. Orenak@nrc.gov.
According to Section 9.2.3 of the Nuclear Energy Institute (NEI) 94-01 Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR 50 [Title 10 of the Code of Federal Regulations Part 50], Appendix J," dated October, 2008 (ADAMS Accession No. ML100620847), please provide the following information for Type A tests conducted on May 12, 1991 and May 21, 2005:
Docket No. 50-382
a) As-left minimum pathway leakage rate (MNPLR) for all Type B and Type C pathways that were in service, isolated, or not lined up in their test position (i.e., drained and vented to containment atmosphere) prior to performing the Type A test; b) List all pathways and associated leakage rates that contribute to MNPLR in item (a);
c) Performance Leakage Rate (PLR) (= UCL +MNPLR) where UCL is the upper confidence limit; d) Determine if the Type A test meets the performance criterion by showing if, PLR is less than or equal to(::=:;) 1.0 La (allowable leakage rate).
Enclosure


==Enclosure:==
Please note that during the above performance determination, the following process must be followed, as quoted from Section 9.2.3 of NEI 94-01, Revision 2-A:
        "In addition, leakage pathways that were isolated during performance of the test because of excessive leakage must be factored into the performance determination. If the pathway leakage can be determined by a local leakage rate test, the as-left MNPLR for that leakage path must also be added to the Type A UCL. If the pathway leakage cannot be determined by local leakage rate testing, the performance criteria for the Type A test are not met. If an excessively leaking containment penetration barrier pathway is discovered during the Type A test, and the pathway is neither a Type Bora Type C tested pathway, it shall still be tested to Type B or Type C test requirements after the Type A test and its as-left MNPLR added to the Type [A] test UCL. In this case the Type A test performance criterion is not met unless that pathway is subsequently added to the Type B or Type C test program. If the excessive leakage is from a source that can be tested only during a Type A test, the Type A test performance criterion is not met."


Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
ML15069A576                              *via memo OFFICE       NRR/DORL/LPL4-2/PM       NRR/DORL/LPL4-2/LA           N RR/DSS/SCVB/BC*
PUBLIC LPL4-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl4-2 Resource RidsNrrPMWaterford Resource ADAMS Accession No. ML 15069A576 OFFICE NRR/DORL/LPL4-2/PM NAME MOrenak DATE 3/12/15 OFFICE NRR/DORL/LPLIV-2/BC NAME MKhanna DATE 3/13/15 Sincerely, IRA/ Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDssScvb Resource RidsNrrDorlDpr Resource RidsNrrLAPBlechman Resource RidsRgn4MailCenter Resource SPeng, NRR *via memo NRR/DORL/LPL4-2/LA N RR/DSS/SCVB/BC*
NAME        MOrenak                  PBlechman                   RDennig DATE        3/12/15                  3/12/15                     3/3/15 OFFICE      NRR/DORL/LPLIV-2/BC      NRR/DORL/LPL4-2/PM NAME        MKhanna                  MOrenak DATE        3/13/15                  3/13/15}}
PBlechman RDennig 3/12/15 3/3/15 NRR/DORL/LPL4-2/PM MOrenak 3/13/15 OFFICIAL RECORD COPY}}

Latest revision as of 14:26, 31 October 2019

Request for Additional Information Regarding the Request to Permanently Extend the Integrated Leak Rate Test Frequency to 15 Years
ML15069A576
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/13/2015
From: Michael Orenak
Plant Licensing Branch IV
To:
Entergy Operations
Wang A
References
TAC MF4727
Download: ML15069A576 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 13, 2015 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3- REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS (TAC NO. MF4727)

Dear Sir or Madam:

By letter dated August 28, 2014 (Agencywide Documents Access and Management System Accession No. ML14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) for Waterford Steam Electric Station, Unit 3, to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," to allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years.

The U.S. Nuclear Regulatory Commission staff has reviewed the LAR and has determined that additional information is needed to complete the review. Please provide the additional information requested in the enclosure within 30 days of receipt of this letter.

If you have any questions, please contact me at 301-415-3229 or via e-mail at Michael.Orenak@nrc.gov.

Sincerely,

~Jkiv Michael D. Orenak, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO PERMANENTLY EXTEND THE INTEGRATED LEAK RATE TEST FREQUENCY TO 15 YEARS ENTERGY OPERATIONS, INC.

WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382 By letter dated August 28, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14241A305), Entergy Operations, Inc., submitted a license amendment request (LAR) to change Technical Specification 6.15, "Containment Leakage Rate Testing Program," for the Waterford Steam Electric Station, Unit 3. The proposed change would allow a permanent extension of the Type A primary containment integrated leak rate test frequency from 10 years to 15 years.

By letter dated February 18, 2015 (ADAMS Accession No. ML15033A422), the U.S. Nuclear Regulatory Commission (NRC) staff requested that additional information be provided to complete the review of the LAR. After further review, the NRC staff requests the following additional information.

RAI 13

According to Section 9.2.3 of the Nuclear Energy Institute (NEI) 94-01 Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR 50 [Title 10 of the Code of Federal Regulations Part 50], Appendix J," dated October, 2008 (ADAMS Accession No. ML100620847), please provide the following information for Type A tests conducted on May 12, 1991 and May 21, 2005:

a) As-left minimum pathway leakage rate (MNPLR) for all Type B and Type C pathways that were in service, isolated, or not lined up in their test position (i.e., drained and vented to containment atmosphere) prior to performing the Type A test; b) List all pathways and associated leakage rates that contribute to MNPLR in item (a);

c) Performance Leakage Rate (PLR) (= UCL +MNPLR) where UCL is the upper confidence limit; d) Determine if the Type A test meets the performance criterion by showing if, PLR is less than or equal to(::=:;) 1.0 La (allowable leakage rate).

Enclosure

Please note that during the above performance determination, the following process must be followed, as quoted from Section 9.2.3 of NEI 94-01, Revision 2-A:

"In addition, leakage pathways that were isolated during performance of the test because of excessive leakage must be factored into the performance determination. If the pathway leakage can be determined by a local leakage rate test, the as-left MNPLR for that leakage path must also be added to the Type A UCL. If the pathway leakage cannot be determined by local leakage rate testing, the performance criteria for the Type A test are not met. If an excessively leaking containment penetration barrier pathway is discovered during the Type A test, and the pathway is neither a Type Bora Type C tested pathway, it shall still be tested to Type B or Type C test requirements after the Type A test and its as-left MNPLR added to the Type [A] test UCL. In this case the Type A test performance criterion is not met unless that pathway is subsequently added to the Type B or Type C test program. If the excessive leakage is from a source that can be tested only during a Type A test, the Type A test performance criterion is not met."

ML15069A576 *via memo OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA N RR/DSS/SCVB/BC*

NAME MOrenak PBlechman RDennig DATE 3/12/15 3/12/15 3/3/15 OFFICE NRR/DORL/LPLIV-2/BC NRR/DORL/LPL4-2/PM NAME MKhanna MOrenak DATE 3/13/15 3/13/15