|
|
(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17340A130 | | | number = ML17340A130 |
| | issue date = 12/22/2017 | | | issue date = 12/22/2017 |
| | title = Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson (EPID L-2017-LRM-0050) | | | title = Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson |
| | author name = Galvin D J | | | author name = Galvin D |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000261, 05000324, 05000325, 05000400 | | | docket = 05000261, 05000324, 05000325, 05000400 |
| | license number = DPR-023, DPR-062, DPR-071, NPF-063 | | | license number = DPR-023, DPR-062, DPR-071, NPF-063 |
| | contact person = Galvin D J, NRR/DORL/LPL1 | | | contact person = Galvin D, NRR/DORL/LPL1 |
| | case reference number = EPID L-2017-LRM-0050 | | | case reference number = EPID L-2017-LRM-0050 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
| | page count = 4 | | | page count = 4 |
| | project = EPID:L-2017-LRM-0050 | | | project = EPID:L-2017-LRM-0050 |
| | | stage = Meeting |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: FACILITY: UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 Duke Energy Progress, LLC Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2 SUBJECT: SUMMARY OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17319A257. A list of attendees is enclosed. The licensee presented informational slides at the meeting (ADAMS Accession No. ML 17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs. The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: Duke Energy Progress, LLC FACILITY: Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2 |
| -2 -Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received. Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov. Docket Nos. 50-261, 50-324, 50-325, and 50-400 Enclosure: List of Attendees cc w/Enclosure: Distribution via Listserv Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty
| | |
| * D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman 0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull | | ==SUBJECT:== |
| * participated by phone Enclosure | | |
| -3 -SUBJECT: SUMMARY OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION: PUBLIC RidsNrrPMRobinson RidsNrrPMShearonHarris RidsNrrPMBrunswick RidsNrrDssSrxb RidsNrrDmlrMvib BHartle, NRR PSahay, NRR RidsNrrDssStsb RidsRgn2MailCenter RidsNrrDorlLpl2-2 RidsACRS_MailCTR RidsNrrDraApla RidsNrrDeEeob SDinsmore, NRR EMiller, NRR CSt. Peters, NRR SRuffin, NRR ADAMS A ccess1on N ML 17254A349 o.: OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NAME DGalvin BClayton (LRonewicz for) DATE 12/12/2017 12/12/2017 OFFICE NRR/DSS/STSB/BC(A)* NRR/DORL/LPL2-2/BC NAME JWhitman UShoop DATE 11/30/2017 12/22/2017 OFFICIAL RECORD COPY RidsNrrLABClayton TWertz, NRR JBowen, OEDO OYee, NRR MBiro, NRR FForsaty, NRR ARezai, NRR PM Reading File RidsNrrDeEmib *b *1 v e-ma1 NRR/DRA/APLA/BC* SRosenberg 12/14/2017 N RR/DORL/LPL2-2/PM DGalvin 12/22/2017
| | ==SUMMARY== |
| }} | | OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) |
| | On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR) |
| | Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17319A257. A list of attendees is enclosed. |
| | The licensee presented informational slides at the meeting (ADAMS Accession No. ML17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs. |
| | The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed. |
| | |
| | Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received. |
| | Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov. |
| | Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261, 50-324, 50-325, and 50-400 |
| | |
| | ==Enclosure:== |
| | |
| | List of Attendees cc w/ |
| | |
| | ==Enclosure:== |
| | Distribution via Listserv |
| | |
| | LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty |
| | * D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman |
| | : 0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull |
| | * participated by phone Enclosure |
| | |
| | ==SUBJECT:== |
| | |
| | ==SUMMARY== |
| | OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION: |
| | PUBLIC RidsRgn2MailCenter RidsNrrLABClayton RidsNrrPMRobinson RidsNrrDorlLpl2-2 TWertz, NRR RidsNrrPMShearonHarris RidsACRS_MailCTR JBowen, OEDO RidsNrrPMBrunswick RidsNrrDraApla OYee, NRR RidsNrrDssSrxb RidsNrrDeEeob MBiro, NRR RidsNrrDmlrMvib SDinsmore, NRR FForsaty, NRR BHartle, NRR EMiller, NRR ARezai, NRR PSahay, NRR CSt. Peters, NRR PM Reading File RidsNrrDssStsb SRuffin, NRR RidsNrrDeEmib ADAMS Access1on No.: ML17254A349 *b v e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DRA/APLA/BC* |
| | NAME DGalvin BClayton (LRonewicz for) SRosenberg DATE 12/12/2017 12/12/2017 12/14/2017 OFFICE NRR/DSS/STSB/BC(A)* NRR/DORL/LPL2-2/BC N RR/DORL/LPL2-2/PM NAME JWhitman UShoop DGalvin DATE 11/30/2017 12/22/2017 12/22/2017 OFFICIAL RECORD COPY}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 Project stage: Meeting ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson Project stage: Meeting 2017-11-29
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 2024-06-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: Duke Energy Progress, LLC FACILITY: Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2
SUBJECT:
SUMMARY
OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050)
On November 29, 2017, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the planned license amendment requests (LARs) to implement the requirements of Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.69 at Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. The meeting notice and agenda, dated November 15, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17319A257. A list of attendees is enclosed.
The licensee presented informational slides at the meeting (ADAMS Accession No. ML17331A627). During the meeting, the licensee provided (1) an overview of industry initiatives related to 10 CFR 50.69 and Duke Energy's participation; (2) a summary of issues from previous LAR submittals and how Duke Energy has addressed them; (3) summary statements that each plant will conform with Nuclear Energy Institute (NEI) Report 00-04, "10 CFR 50.69 SSC [Structures, Systems, and Components] Categorization Guideline," dated July 2005 (ADAMS Accession No. ML052910035); and (4) a summary of each plant's probabilistic risk assessment, seismic risk assessment, and external hazards information to be considered in the LARs.
The NRC staff and the licensee discussed the above topics. The NRC staff highlighted the benefit of staggering the LAR submittals from an NRC resource perspective. The NRC staff also discussed some challenges in confirming conformance to NEI 00-04 in current LAR reviews. The NRC staff stated that a LAR should provide a brief summary of how each step in the NEI 00-04 categorization process is being implemented to support an NRC staff conclusion that the the licensee's categorization process conforms to NEI 00-04. For example, the staff recommended that the LARs include a brief summary of the licensee's proposed categorization process that includes the order of the different evaluations, sufficient explanation of the hazard screening process to demonstrate consistency with the general hazard screening steps in NEI 00-04, and an updated history of the probabilistic risk assessment reviews that have been performed.
Several members of the public called into the meeting but none offered comments. No regulatory decisions or commitments were made at the meeting. No public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.
Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261, 50-324, 50-325, and 50-400
Enclosure:
List of Attendees cc w/
Enclosure:
Distribution via Listserv
LIST OF ATTENDEES NOVEMBER 29, 2017, PRE-SUBMITTAL MEETING WITH DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 U.S. Nuclear Regulatory Commission M. Barillas M. Biro S. Dinsmore F. Forsaty
- D. Galvin B. Hartle A. Hon A. Rezai S. Ruffin P. Sahay S. Rosenberg C. St. Peters J. Whitman
- 0. Yee Duke Energy Progress, LLC S. Kimbrough H.Szews J. Varnedoe A. Young A. Zaremba Tennesse Valley Authority T. Hess G. Kindred E. Schrull
- participated by phone Enclosure
SUBJECT:
SUMMARY
OF NOVEMBER 29, 2017, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUESTS TO IMPLEMENT THE REQUIREMENTS OF 10 CFR 50.69 AT BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (EPID L-2017-LRM-0050) DATED DECEMBER 22, 2017 DISTRIBUTION:
PUBLIC RidsRgn2MailCenter RidsNrrLABClayton RidsNrrPMRobinson RidsNrrDorlLpl2-2 TWertz, NRR RidsNrrPMShearonHarris RidsACRS_MailCTR JBowen, OEDO RidsNrrPMBrunswick RidsNrrDraApla OYee, NRR RidsNrrDssSrxb RidsNrrDeEeob MBiro, NRR RidsNrrDmlrMvib SDinsmore, NRR FForsaty, NRR BHartle, NRR EMiller, NRR ARezai, NRR PSahay, NRR CSt. Peters, NRR PM Reading File RidsNrrDssStsb SRuffin, NRR RidsNrrDeEmib ADAMS Access1on No.: ML17254A349 *b v e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DRA/APLA/BC*
NAME DGalvin BClayton (LRonewicz for) SRosenberg DATE 12/12/2017 12/12/2017 12/14/2017 OFFICE NRR/DSS/STSB/BC(A)* NRR/DORL/LPL2-2/BC N RR/DORL/LPL2-2/PM NAME JWhitman UShoop DGalvin DATE 11/30/2017 12/22/2017 12/22/2017 OFFICIAL RECORD COPY