IR 05000483/2017501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18022B151
| number = ML18022B151
| issue date = 01/17/2018
| issue date = 01/17/2018
| title = Callaway Plant - NRC Emergency Preparedness Annual Inspection Report 05000483/2017501
| title = NRC Emergency Preparedness Annual Inspection Report 05000483/2017501
| author name = Gepford H J
| author name = Gepford H
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| addressee name = Diya F
| addressee name = Diya F
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ary 17, 2018
[[Issue date::January 17, 2018]]


Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant P.O. Box 620 Fulton, MO 65251
==SUBJECT:==
 
CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2017501
SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2017501


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On December 31, 2017, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This  
On December 31, 2017, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2017. Issuance of this letter closes NRC Inspection Report 05000483/2017501. The inspection results associated with the 2017-501 reports are documented in Integrated Resident Inspection Reports 2017-001, 2017-002, 2017-003, and 2017-004.
 
inspection began on January 1, 2017. Issuance of this letter closes NRC Inspection Report 05000483/2017501. The inspection results associated with the 2017-501 reports are documented in Integrated Resident Inspection Reports 2017-001, 2017-002, 2017-003, and 2017-004.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
 
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/
Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety


Docket No. 50-483 License No. NPF-30
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


cc: Electronic Distribution  
Sincerely,
/RA/
Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 cc: Electronic Distribution


ML18022B151 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: PJElkmann Yes No Publicly Available Sensitive NRC-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann HGepford SIGNATURE /RA/ /RA/ DATE 1/17/18 1/17/18
ML18022B151 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: PJElkmann Yes No Publicly Available Sensitive NRC-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann HGepford SIGNATURE /RA/ /RA/
DATE 1/17/18 1/17/18
}}
}}

Latest revision as of 03:30, 22 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000483/2017501
ML18022B151
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/17/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Diya F
Ameren Missouri
References
IR 2017501
Download: ML18022B151 (2)


Text

ary 17, 2018

SUBJECT:

CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2017501

Dear Mr. Diya:

On December 31, 2017, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2017. Issuance of this letter closes NRC Inspection Report 05000483/2017501. The inspection results associated with the 2017-501 reports are documented in Integrated Resident Inspection Reports 2017-001, 2017-002, 2017-003, and 2017-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket No. 50-483 License No. NPF-30 cc: Electronic Distribution

ML18022B151 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: PJElkmann Yes No Publicly Available Sensitive NRC-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann HGepford SIGNATURE /RA/ /RA/

DATE 1/17/18 1/17/18