IR 05000483/2017501
| ML18022B151 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/17/2018 |
| From: | Heather Gepford NRC/RGN-IV/DRS/PSB-2 |
| To: | Diya F Ameren Missouri |
| References | |
| IR 2017501 | |
| Download: ML18022B151 (2) | |
Text
January 17, 2018
SUBJECT:
CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL
INSPECTION REPORT 05000483/2017501
Dear Mr. Diya:
On December 31, 2017, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2017. Issuance of this letter closes NRC Inspection Report 05000483/2017501. The inspection results associated with the 2017-501 reports are documented in Integrated Resident Inspection Reports 2017-001, 2017-002, 2017-003, and 2017-004.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
cc: Electronic Distribution
ML18022B151 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: PJElkmann Yes No Publicly Available Sensitive NRC-002 OFFICE SEPI:PSB2 BC:PSB2
NAME PElkmann HGepford
SIGNATURE
/RA/
/RA/
DATE 1/17/18 1/17/18