ML19208A620: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:g.DUIni,'Pogra COMPANY i e vi f ,;7 /
{{#Wiki_filter:g
'ELECTRIC CENTEH. B0X 33f80,' 'CHAHLOTTE. N. C.
.
28242 l....Ei. L..E..*h.%....
DUIni,'Pogra' COMPANY i                                                       e vi f ,;7 /
?0 l$G l6 A 9: 2g
ELECTRIC CENTEH. B0X 33f80,' 'CHAHLOTTE. N. C. 28242 l
',, i....i!!August 9, 1979 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
'
i
                ,,
              ....Ei.
                  . L..E..*h.%....
                        .  ..                          ?0 l$G l6 A 9: 2g i
!
!
August 9, 1979 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
'


==Subject:==
==Subject:==
Catawba Nuclear Station
Catawba Nuclear Station IE Bulletin 78-12, 12A, 12B Atypical Weld Material in Reactor Pressure Vessel Welds 4
'IE Bulletin 78-12, 12A, 12B Atypical Weld Material in Reactor Pressure Vessel Welds Duke File: CN-1412.ll-1 4
Duke File: CN-1412.ll-1


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


We have received copies of the two revisions made to the generic report," Atypical Weld Material in Reactor Pressure Vessel Welds," submitted to the Commission by Combustion Engineering, Inc.
We have received copies of the two revisions made to the generic report,
It is our understanding
                          " Atypical Weld Material in Reactor Pressure Vessel Welds," submitted to
, that these revisions have already been submitted to the Commission in the form of a revised copy of the generic report.
,
, Please note that the error in Section 4 (page 2) which was brought to
the Commission by Combustion Engineering, Inc. It is our understanding that these revisions have already been submitted to the Commission in
, your attention in our letter of July 2,1979, has been corrected.
  ,
CE contract number 8871 is now correctly reported as Catawba Unit 2.
the form of a revised copy of the generic report.
Very truly yours, ,. C. Dail, Vice-President Design Engineering EKM/ cam cc: U.S. Nuclear Regulatory Conmission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C.
  ,
20555 861232 7 9 0917 0 pf f 190101_ . _ _ _ _. _ _ _ __- , . __..}}
Please note that the error in Section 4 (page 2) which was brought to your attention in our letter of July 2,1979, has been corrected. CE contract number 8871 is now correctly reported as Catawba Unit 2.
Very truly yours,
                                            ,
                            . C. Dail, Vice-President Design Engineering EKM/ cam cc:   U.S. Nuclear Regulatory Conmission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C. 20555 861232 7 9 0917 0 pf f 190101
_ . _ _ _ _                       . _ _ _ _                _
                                                                            - , . _ _.     .}}

Revision as of 14:26, 19 October 2019

Ack Receipt of Two Revisions to C-E Generic Rept Atypical Matl in Reactor Pressure Vessel Welds.
ML19208A620
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/09/1979
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CN-1412.11-1, NUDOCS 7909170085
Download: ML19208A620 (1)


Text

g

.

DUIni,'Pogra' COMPANY i e vi f ,;7 /

ELECTRIC CENTEH. B0X 33f80,' 'CHAHLOTTE. N. C. 28242 l

'

i

,,

....Ei.

. L..E..*h.%....

. .. ?0 l$G l6 A 9: 2g i

!

!

August 9, 1979 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

'

Subject:

Catawba Nuclear Station IE Bulletin 78-12, 12A, 12B Atypical Weld Material in Reactor Pressure Vessel Welds 4

Duke File: CN-1412.ll-1

Dear Mr. O'Reilly:

We have received copies of the two revisions made to the generic report,

" Atypical Weld Material in Reactor Pressure Vessel Welds," submitted to

,

the Commission by Combustion Engineering, Inc. It is our understanding that these revisions have already been submitted to the Commission in

,

the form of a revised copy of the generic report.

,

Please note that the error in Section 4 (page 2) which was brought to your attention in our letter of July 2,1979, has been corrected. CE contract number 8871 is now correctly reported as Catawba Unit 2.

Very truly yours,

,

. C. Dail, Vice-President Design Engineering EKM/ cam cc: U.S. Nuclear Regulatory Conmission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C. 20555 861232 7 9 0917 0 pf f 190101

_ . _ _ _ _ . _ _ _ _ _

- , . _ _. .