ML19208A789: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.~ N .S.i,-..,,, Dy, EE POWER COMPANY R.-, ELECTHIC DENYER, UOI 33180. CitAHLorrE. N. C.
{{#Wiki_filter:.
28242!N oub.($%'] / '' 27 N3
i,                    ~ N .S.
* I 0
        -
..August 21, 1979 Mr. J. P. O'Reilly, Director U< S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Steam Generator Water Level. Measurement System Errors 50.55(e) Report:
  .
IE-79/02-5DD-413/414 Duke File: CN-1412.ll.1
,
                                      .,,, R.
Dy, EE POWER COMPANY
                                              -
ELECTHIC DENYER, UOI 33180. CitAHLorrE. N. C. 28242 oub. !N ($%                   '] / '' 27 N3
* I 0                       .
                                                                                              .
August 21, 1979 Mr. J. P. O'Reilly, Director U< S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Steam Generator Water Level
                        . Measurement System Errors 50.55(e) Report:       IE-79/02-5DD-413/414 Duke File: CN-1412.ll.1


==Dear Mr. j'Reilly:==
==Dear Mr. j'Reilly:==


The referenced 10CFR 50.55(e) reportable item was reported by letter dated June 22, 1979, from Mr. T. M. Anderson, Manager, Nuclear Safety Westinghouse to Mr. Victor Stello, Director, Office of Inspec-tion and Enforcement, U. S. Nuclear Regulatory Commission. Attached is Duke's Power's interim rep 7rt concerning this item. Duke will submit a final report upon resolution of this generic deficiency.
The referenced 10CFR 50.55(e) reportable item was reported by letter dated June 22, 1979, from Mr. T. M. Anderson, Manager, Nuclear Safety Westinghouse to Mr. Victor Stello, Director, Office of Inspec-tion and Enforcement, U. S. Nuclear Regulatory Commission. Attached is Duke's Power's interim rep 7rt concerning this item. Duke will submit a final report upon resolution of this generic deficiency.
Ver truly y rs, f''1I. C. Dail, Vice-President Design Engineering EKM/ cam Attachments cc: W. H. Owen W. O. Henry L. E. Suther h C. J. Wylie T.C..McMeekin R. O. Sharpe J. R. Wells D. G. Owen R. P. Harrall
Ver truly y rs, f'
')\k% .* Hit.7 909170 Y 7 /
                                '
DO ve.m u. c ,nv}}
1I
              . C. Dail, Vice-President Design Engineering EKM/ cam Attachments cc:   W. H. Owen C. J. Wylie W. O. Henry T. C.. McMeekin L. E. Suther R. O. Sharpe h
J. R. Wells         D. G. Owen         R. P. Harrall             ')
                                                                                        \k
                                                                                      % .* Hit
                                                                                            .
7 909170 Y 7 /                   DO ve.m u. c ,nv}}

Revision as of 14:24, 19 October 2019

Forwards Interim Deficiency Rept Re Steam Generator Water Level Measurement Sys Errors
ML19208A789
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/21/1979
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19208A790 List:
References
NUDOCS 7909170471
Download: ML19208A789 (1)


Text

.

i, ~ N .S.

-

.

,

.,,, R.

Dy, EE POWER COMPANY

-

ELECTHIC DENYER, UOI 33180. CitAHLorrE. N. C. 28242 oub. !N ($% '] / 27 N3

  • I 0 .

.

August 21, 1979 Mr. J. P. O'Reilly, Director U< S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station Steam Generator Water Level

. Measurement System Errors 50.55(e) Report: IE-79/02-5DD-413/414 Duke File: CN-1412.ll.1

Dear Mr. j'Reilly:

The referenced 10CFR 50.55(e) reportable item was reported by letter dated June 22, 1979, from Mr. T. M. Anderson, Manager, Nuclear Safety Westinghouse to Mr. Victor Stello, Director, Office of Inspec-tion and Enforcement, U. S. Nuclear Regulatory Commission. Attached is Duke's Power's interim rep 7rt concerning this item. Duke will submit a final report upon resolution of this generic deficiency.

Ver truly y rs, f'

'

1I

. C. Dail, Vice-President Design Engineering EKM/ cam Attachments cc: W. H. Owen C. J. Wylie W. O. Henry T. C.. McMeekin L. E. Suther R. O. Sharpe h

J. R. Wells D. G. Owen R. P. Harrall ')

\k

% .* Hit

.

7 909170 Y 7 / DO ve.m u. c ,nv