| title = Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2015006 and 05000414/2015006)
| title = Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2015006 and 05000414/2015006)
| author name = Ehrhardt F J
| author name = Ehrhardt F
| author affiliation = NRC/RGN-II/DRP/RPB1
| author affiliation = NRC/RGN-II/DRP/RPB1
| addressee name = Henderson K
| addressee name = Henderson K
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:March 2, 2016
-1257 March 2, 2016 Mr. Kelvin Henderson


Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745
==SUBJECT:==
-9635 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/201 5 00 6 AND 05000414/201 5006)
ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/201 5 00 6 AND 05000414/201 5006)


==Dear Mr. Henderson:==
==Dear Mr. Henderson:==
Line 35: Line 34:
The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 7. Routine inspections performed by resident inspectors are not included in the inspection plan.
The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 7. Routine inspections performed by resident inspectors are not included in the inspection plan.


The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


This inspection plan does not include security related inspections which will be sent via separate, non
This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.
-publicly available correspondence.


In response to the accident at Fukushima, the Commission issued Order EA
In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events."
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events."


This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event.
-design-basis external event.


Additionally, the Commission issued Order EA
Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."


This Order requires licensees to have a reliable means of remotel y monitoring wide
This Order requires licensees to have a reliable means of remotel y monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event.
-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond
-design-basis external event.


The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Catawba Nuclear Station, Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site.
The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Catawba Nuclear Station, Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site.
Line 59: Line 50:
After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.
After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.


Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
-Unit Dose Assessment Plans."


In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4611 with any questions you have regarding this letter.
Please contact me at 404-997-4611 with any questions you have regarding this letter.
Line 79: Line 68:
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)


Page 1 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016
Page 1 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016-12/31/2017 EP-EP EXERCISE INSPECTION 6 1, 2 IP Exercise Evaluation7111401 04/04/2016 04/08/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 04/04/2016 04/08/2016 1, 2 IP Performance Indicator Verification71151 04/04/2016 04/08/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 04/18/2016 04/22/2016OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 05/16/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 08/01/2016 08/05/2016OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/08/2016 08/12/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/12/2016 09/16/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/12/2016 09/16/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/12/2016 09/16/2016 1, 2 IP Occupational Dose Assessment71124.04 09/12/2016 09/16/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification71151 09/12/2016 09/16/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/19/2016 09/23/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/26/2016 09/30/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/26/2016 09/30/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/26/2016 09/30/2016 1, 2 IP Occupational Dose Assessment71124.04 09/26/2016 09/30/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/26/2016 09/30/2016 1, 2 IP Performance Indicator Verification71151 09/26/2016 09/30/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/26/2016 09/30/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 7 1, 2 IP Problem Identification and Resolution71152B 10/24/2016 10/28/2016 1, 2 IP Problem Identification and Resolution71152B11/07/201611/11/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2017 EP-EP EXERCISE INSPECTION 6 1, 2 IP Exercise Evaluation7111401 04/04/2016 04/08/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 04/04/2016 04/08/2016 1, 2 IP Performance Indicator Verification71151 04/04/2016 04/08/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 04/18/2016 04/22/2016OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 05/16/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 08/01/2016 08/05/2016OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/08/2016 08/12/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/12/2016 09/16/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/12/2016 09/16/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/12/2016 09/16/2016 1, 2 IP Occupational Dose Assessment71124.04 09/12/2016 09/16/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification71151 09/12/2016 09/16/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/19/2016 09/23/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/26/2016 09/30/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/26/2016 09/30/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/26/2016 09/30/2016 1, 2 IP Occupational Dose Assessment71124.04 09/26/2016 09/30/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/26/2016 09/30/2016 1, 2 IP Performance Indicator Verification71151 09/26/2016 09/30/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/26/2016 09/30/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 7 1, 2 IP Problem Identification and Resolution71152B 10/24/2016 10/28/2016 1, 2 IP Problem Identification and Resolution71152B11/07/201611/11/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016
Page 2 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016-12/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/23/2017 01/27/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/06/2017 02/10/2017 EP-EP PROGRAM INSPECTION 4 1, 2 IP A lert and Notification System Testing7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/08/2017 05/12/2017 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/15/2017 05/19/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 05/15/2017 05/19/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/15/2017 05/19/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/24/2017 07/28/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification71151 07/24/2017 07/28/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]7111105T 08/07/201708/11/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-12/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/23/2017 01/27/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/06/2017 02/10/2017 EP-EP PROGRAM INSPECTION 4 1, 2 IP A lert and Notification System Testing7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/08/2017 05/12/2017 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/15/2017 05/19/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 05/15/2017 05/19/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/15/2017 05/19/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/24/2017 07/28/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification71151 07/24/2017 07/28/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]7111105T 08/07/201708/11/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 08:51, 20 June 2019

Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2015006 and 05000414/2015006)
ML16062A142
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/02/2016
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Henderson K
Duke Energy Corp
References
IR 2015006
Download: ML16062A142 (6)


Text

March 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/201 5 00 6 AND 05000414/201 5006)

Dear Mr. Henderson:

On February 9

, 201 6, the NRC completed its end-of-cycle performance review of Catawba Nuclear Station

, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 1 5 through December 3 1 , 20 15. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance

, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 7. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events."

This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event.

Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."

This Order requires licensees to have a reliable means of remotel y monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event.

The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Catawba Nuclear Station, Units 1 and 2, and the information gathered will aid staff in development of the Safety Evaluation for the site.

After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.

Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."

In accordance with 10 CFR 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.:

50-413, 50-414 License Nos.:

NPF-35, NPF-52 Enclosure: Catawba Inspection/Activity Plan (0 3/01/201 6 - 12/3 1/201 7)

c c: distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE Via Email/RA/MMT2 JGW1 FJE NAME M. Toth J. Worosilo F. Ehrhardt DATE 2/25/2016 2/25/2016 2/26/2016 3/ /2016 3/ /2016 3/ /2016 3/ /2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated March 2, 201 6 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/201 5 006 AND 05000414/201 5 00 6) DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016-12/31/2017 EP-EP EXERCISE INSPECTION 6 1, 2 IP Exercise Evaluation7111401 04/04/2016 04/08/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 04/04/2016 04/08/2016 1, 2 IP Performance Indicator Verification71151 04/04/2016 04/08/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 04/18/2016 04/22/2016OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS V23469 05/16/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 08/01/2016 08/05/2016OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B 08/08/2016 08/12/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/12/2016 09/16/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/12/2016 09/16/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/12/2016 09/16/2016 1, 2 IP Occupational Dose Assessment71124.04 09/12/2016 09/16/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/12/2016 09/16/2016 1, 2 IP Performance Indicator Verification71151 09/12/2016 09/16/2016 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/19/2016 09/23/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/26/2016 09/30/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/26/2016 09/30/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/26/2016 09/30/2016 1, 2 IP Occupational Dose Assessment71124.04 09/26/2016 09/30/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/26/2016 09/30/2016 1, 2 IP Performance Indicator Verification71151 09/26/2016 09/30/2016 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/26/2016 09/30/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 7 1, 2 IP Problem Identification and Resolution71152B 10/24/2016 10/28/2016 1, 2 IP Problem Identification and Resolution71152B11/07/201611/11/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 03/02/2016 08:15:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteCatawbaInspection / Activity Plan 03/01/2016-12/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/23/2017 01/27/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/06/2017 02/10/2017 EP-EP PROGRAM INSPECTION 4 1, 2 IP A lert and Notification System Testing7111402 03/27/2017 03/31/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/27/2017 03/31/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 03/27/2017 03/31/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/08/2017 05/12/2017 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/15/2017 05/19/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 05/15/2017 05/19/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/15/2017 05/19/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 05/29/2017 06/02/2017OL EXAM-INITIAL LICENSE EXAM 3 1 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES V23495 06/26/2017 07/07/2017 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/24/2017 07/28/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification71151 07/24/2017 07/28/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 1 1, 2 IP Fire Protection [Triennial]7111105T 07/24/2017 07/28/2017 1, 2 IP Fire Protection [Triennial]7111105T 08/07/201708/11/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.