Category:E-Mail
MONTHYEARRA-24-0276, EN 57402 - Catawba Nuclear Station Interim Part 21 Report2024-10-28028 October 2024 EN 57402 - Catawba Nuclear Station Interim Part 21 Report ML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24192A3492024-07-10010 July 2024 Acceptance of Requested Licensing Action License Amendment Application to Revise Technical Specification 3.4.3, RCS Pressure and Temperature Limits ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24150A1662024-05-29029 May 2024 Document Request for Catawba Nuclear Station Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-03 ML24066A0142024-03-0505 March 2024 Cat 2024-002 Radiation Safety Baseline Inspection Information Request ML24033A2372024-02-0202 February 2024 Acceptance of Requested Licensing Action Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations (Epids L-2024-LLR-0002 and L-2024-LLR-0003) ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23080A1892023-03-20020 March 2023 RP Inspection Document Request ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22213A0472022-08-0101 August 2022 Document Request for Catawba Nuclear Station - Radiation Protection Inspection - Inspection Report 2022-03 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22174A0802022-06-0101 June 2022 Transmittal External Distribution Notification TR-NUC-CN-014344 - SLC Manual Revision to Loes and SLC 16.7-5 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22041A5312022-02-10010 February 2022 NRR E-mail Capture - Catawba Nuclear Station Unit 2 - Acceptance of Requested Licensing Action Use of Alternative Requirements of ASME Code for Embedded Flaw Repair Method on Reactor Vessel Closure Head Penetration 74 EPID L-2022-LLR-0010 ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22024A1112022-01-0707 January 2022 E-mail Capture- Catawba POV Inspection Information Request (1) ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21189A2502021-07-0202 July 2021 NRR E-mail Capture - Acceptance Review: Duke Energy - Proposed Alternative to Use ASME Code Case N-885 for Catawba Nuclear Station Unit 2 - EPID: L-2021-LLR-0043 ML21117A1292021-04-26026 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request RA-21-0145 ML21117A1222021-04-23023 April 2021 NRR E-mail Capture - (External_Sender) Catawba Nuclear Station Relief Request RA-21-0133 ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21099A0742021-04-0909 April 2021 CAT_2021-02 Document Request for Upcoming RP Inspection ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information 2024-07-15
[Table view] Category:Inspection Plan
MONTHYEARML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24066A0142024-03-0505 March 2024 Cat 2024-002 Radiation Safety Baseline Inspection Information Request IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22213A0472022-08-0101 August 2022 Document Request for Catawba Nuclear Station - Radiation Protection Inspection - Inspection Report 2022-03 IR 05000413/20224032022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML21116A0012021-04-23023 April 2021 Notification of Catawba Nuclear Station, Units 1 & 2 Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000413/2021010 and 05000414/2021010 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A2020-10-15015 October 2020 Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A ML20244A0462020-08-31031 August 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000413/20200052020-08-17017 August 2020 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2020005 and 05000414/2020005) IR 05000413/20190062020-03-0303 March 2020 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2019006 and 05000414/2019006 ML20041D9902020-02-10010 February 2020 EP Exercise Inspection RFI IR 05000413/20190052019-08-26026 August 2019 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - (NRC Inspection Report 05000413/2019005 and 05000414/2019005) ML19221B4782019-08-0909 August 2019 Catawba_2019-03_RP_Inspection_Doc_Request ML19210E8962019-07-29029 July 2019 DBAI RFI ML19148A6362019-05-28028 May 2019 Notification of Inspection and Request for Information IR 05000413/20180062019-03-0404 March 2019 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2018006 and 05000414/2018006 IR 05000413/20180052018-08-20020 August 2018 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2018005 and 05000414/2018005) ML18059A0052018-02-28028 February 2018 EOC Assessment ML18058B2062018-02-27027 February 2018 Notification of Inspection and Request for Information ML18026A6342018-01-25025 January 2018 Information Request Email EB3 RP 2018 002 IR 05000413/20170052017-08-16016 August 2017 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2017005 and 05000414/2017005) IR 05000413/20160062017-03-0101 March 2017 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2016006 and 05000414/2016006 IR 05000413/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2016005 and 05000414/2016005) IR 05000413/20150062016-03-0202 March 2016 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2015006 and 05000414/2015006) IR 05000413/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2015005 and 05000414/2015005) IR 05000413/20140012015-03-0404 March 2015 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2014001 and 05000414/2014001) ML14245A1292014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1402014-03-0404 March 2014 2013 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 ML13246A1682013-09-0303 September 2013 Mid Cycle Assessment Letter ML13217A1172013-08-0505 August 2013 Notification of Inspection and Request for Information IR 05000414/20120012013-03-0404 March 2013 Annual Assessment Letter for Catawba Nuclear Station, Units 1 & 2 (IR 05000414-12-001 and 05000414-12-001) ML12347A0582012-12-0707 December 2012 PSB1 RP Catawba 2013 002 Doc Req Ltr rev1 ML12248A0582012-09-0404 September 2012 Mid Cycle Assessment Letter Catawba 2012 ML12066A0162012-03-0505 March 2012 Inspection/Activity Plan, 03/01/12 - 06/30/2013, Report 22 ML1124403502011-09-0101 September 2011 Report 22 - Catawba ML1115403502011-06-0202 June 2011 Notification of Inspection and Request for Information 05000413 and 05000414 ML1106300792011-03-0404 March 2011 Report 22, Inspection/Activity Plan 03/01/2011 - 06/30/2012 ML1024407352010-09-0101 September 2010 Report 22, Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006208592010-03-0303 March 2010 Inspection/Activity Plan, 03/01/10-06/30/2011, Enclosure - Report 22 ML0924404692009-09-0101 September 2009 Inspection/Activity Plan 07/01/2009 - 12/31/2010 ML0924402792009-09-0101 September 2009 Inspection/Activity Plan 07/01/2009 - 12/31/2010 ML0906300902009-03-0404 March 2009 Enclosure Report 22, for Catawba Inspection Plan 2024-09-19
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24150A1662024-05-29029 May 2024 Document Request for Catawba Nuclear Station Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-03 ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20244A0462020-08-31031 August 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20073F3832020-03-13013 March 2020 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station - SG Report (RA-19-0391) - C2R23 ML20052E4282020-02-21021 February 2020 Notification of NRC Fire Protection Team Inspection (Fpti) (NRC Inspection Report 05000412/2020013 and 05000414/2020013) and Request for Information ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML20003E5372020-01-0303 January 2020 NRR E-mail Capture - Catawba PT Limits LAR - RAIs ML19032A5842019-01-31031 January 2019 Emergency Preparedness Program Inspection Request for Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19009A5412019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Esps LAR ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18068A5052018-03-0909 March 2018 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Nsws Return Pond Header LAR (CACs MG0245 and MG0246, EPID L-2017-LLA-0297) ML18058B2062018-02-27027 February 2018 Notification of Inspection and Request for Information ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17335A0972017-11-29029 November 2017 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Relief Request 17-CN-001 (CACs MF9807 and MF9808, EPID L-2017-LLR-0032) ML17135A0302017-05-12012 May 2017 NRR E-mail Capture - Request for Additional Information - Catawba TSTF-197 ML17115A1422017-04-25025 April 2017 NRR E-mail Capture - Request for Additional Information - Catawba SG Report - RFO 21 ML16337A3322017-01-12012 January 2017 Request for Additional Information Regarding License Amendment Request for Electrical Power System Alignments for Shared Systems ML16355A3922016-12-29029 December 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program ML16292A2252016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML16271A0752016-10-12012 October 2016 Request for Additional Information Regarding License Amendment Request for Electrical Power System Alignments for Shared Systems ML16222A7472016-08-0909 August 2016 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML16205A0022016-07-21021 July 2016 Notification of Inspection and Request for Information ML16187A0662016-07-0707 July 2016 Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (CAC Nos. MF2936 and MF2937) ML16111B2472016-04-28028 April 2016 Request for Additional Information Re. License Amendment Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML16120A0872016-04-27027 April 2016 Notification of Inspection and Request for Information ML16113A0732016-04-22022 April 2016 Draft RAIs License Amendment Request to Revise TS Section 5.5.2 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16014A7102016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme ML16007A1902016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Change the RCS Minimum Required Flow Rates ML15348A2602015-12-17017 December 2015 Request for Additional Information Regarding License Amendment Request to Use an Alternative Fission Gas Gap Release Fraction ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) 2024-07-15
[Table view] |
Text
From: Geoffrey Ottenberg To: Andrews, Sherry E Cc: Geoffrey Ottenberg
Subject:
Catawba Nuclear Station NRC Commercial Grade Dedication Inspection-notification and information request Date: Monday, November 28, 2022 4:54:19 PM Attachments: 2023 CNS - CGD Inspection Information Request.docx
Good afternoon, Sherry,
Thank you for working with me to get the Commercial Grade Dedication inspection started.
As mentioned previously, attached you will find a Word document containing a notification letter with some general details regarding the inspection, including the inspection procedure we will be using, the planned dates of the inspection, and the inspection staffing. The notification letter also contains an information request for general information the inspectors will need to prepare for the inspection, and it also lists specific information that will be requested during the initial site visit week.
Feel free to reach out to me with any questions you may have regarding anything related to the inspection (inspection procedure, information request, etc.) and Ill do my best to address your questions/concerns. This is a new inspection for the NRC, and of course also for Catawba, but Im looking forward to working with you on it. I think if we communicate openly and often, well get through it successfully.
Sincerely,
Geoff Ottenberg Senior Reactor Inspector - Engineering Branch 1 Division of Reactor Safety U.S. Nuclear Regulatory Commission 404-997-4658 Geoffrey.Ottenberg@nrc.gov ML22336A069
Catawba Nuclear Station - Design Bases Assurance Inspection (Programs)
Initial Information Request
Inspection Procedure: 71111.21N, Design Bases Assurance Inspection (Programs),
Attachment 21N.03, Commercial Grade Dedication, dated June 28, 2022 (ADAMS ML22075A251)
Inspection Dates: Information Gathering Visit: January 17-20, 2023 Preparation Week: March 6-10, 2023 Onsite Week 1: March 13 -17, 2023 Onsite Week 2: March 27 -31, 2023
Inspection Report: 05000413/ 2023 011, 05000414/ 2023011 (Standalone Inspection Report)
Inspectors: G. Ottenberg (Lead, Mechanical)
R. Fanner (Electrical)
T. Su (Electrical)
The purpose of this letter is to notify you that three inspectors from Region II will conduct an inspection at your site in accordance with Inspection Procedure 71111.21N, Design Bases Assurance Inspection (Programs), Attachment 21N.03, Commercial Grade Dedication. This is not considered a team inspection. The inspection will evaluate Catawbas process for dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10 of the Code of Federal Regulations (10 CFR) Part 50 (Appendix B), to ensure reasonable assurance is provided that these items will perform their intended safety function. Additionally, this inspection will evaluate implementation of Catawba s procurement process for safety-related components, as required in Appendix B. The inspectors will select samples of components that are risk significant and within the scope of the program.
On January 17, 2023, Mr. Geoff Ottenberg, a Senior Reactor Inspector from the NRCs Region II office, will begin the inspection with an information gathering visit to the site. The purpose of the visit is to become familiar with the process for dedicating commercial-grade items and the process for procuring safety-related components at Catawba. This visit may include a tour of onsite commercial-grade item dedication facilities, receipt inspection facilities, storage facilities, and installed plant components associated with potential inspection samples. During the visit, the team lead will also review the information provided in the initial information request to select a list of potential inspection samples. The team lead may also identify other information needed to support the inspection during this visit.
To minimize the impact on your staff and to ensure a productive inspection, we have enclosed two separate requests for information needed prior to the onsite information gathering visit and offsite inspection preparation week. The first request (Enclosure 1) is generally for information that will be used to choose the inspection samples or information that will be applicable to all inspection samples throughout the inspection. This information should be made available to the team lead prior to the information gathering visit. The second request (Enclosure 2) is for information specific to individual samples and should be made available prior to the offsite preparation week.
Please provide the information requested in Enclosure 1 to the Region II Office or a file sharing site by January 6, 2023. Additional documents may be requested during the information gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information should be provided to the Inspectors in the Region II office or a file sharing site by March 3, 2023.
During the information gathering visit, Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) computer access, (4) working space, (5) arrangements for site access, and (6) other applicable information.
INFORMATION REQUEST FOR CATAWBA NUCLEAR STATION DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)
(COMMERCIAL GRADE DEDICATION)
Prior to the information gathering visit, please provide the information electronically in.pdf files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.
Contact Information: Geoff Ottenberg (404) 997-4 658 Geoffrey.Ottenberg@nrc.gov
Information Gathering Visit: An information gathering visit is currently scheduled the week of January 17, 2023. During this visit, we would like to identify the component samples for this inspection. Wed like to meet with procurement and dedication specialists to discuss the upcoming inspection and our sample selection process. Purposes of the site visit are to: (a) discuss the scope of the planned inspection; (b) obtain advance information to review in preparation for the inspection; (c) ensure that the information to be reviewed is available at the beginning of the inspection; and (d) verify that logistical issues (such as obtaining both site and computer system access and arranging the location of the inspection team working area) will be resolved prior to inspector arrival. Please reserve a room during the scheduled inspection dates. We request the room have a telephone, wireless internet access, and a licensee computer with access to procedures, corrective action program documents, and a printer.
Logistics:
Information gathering visit: January 17 -20, 2023 Onsite inspection weeks: March 13-17, and March 27-31, 2023
Please schedule an entrance meeting for around 2:00 p.m. on Monday, March 13, 2023 (approximately 15 minutes). The date and time of the exit meeting will be discussed at a later date. In addition, Id like to have a daily debrief with your inspection support staff at a convenient time in the afternoons for both onsite inspection weeks (Time TBD, approximately 30 minutes).
We will need a conference room as workspace for the inspectors. We will also need an area available for conducting interviews.
Please provide access to your document system (preferably at least one computer in our conference room), nearby printers, and Wi-Fi access.
During the information gathering visit, please provide info on (1) conference room location &
phone number, (2) cafeteria location/hours, and (3) procurement and engineering staff normal working hours. Also, please let me know if there are any potential resource conflicts during our scheduled inspection weeks (Fridays off, EP drills, management retreats) and well do our best to accommodate.
Team Members: Geoffrey Ottenberg (Inspection Lead, Mechanical)
Rodney Fanner (Electrical)
Teh-Chiun (TC) Suh (Electrical)
Please verify the status of access authorization and requirements for unescorted access for each inspector. Please provide me with a list of exceptions, and I will address them.
PAPERWORK REDUCTION ACT STATEMENT
This letter contains voluntary information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150- 0011). The burden to the public for these information collections is estimated to average 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per response. Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: T6A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the inspection team for the team's use both on-site and off-site during the information gathering visit. Electronic format is the preferred media. If electronic media is made available via an internet-based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office.
Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such, it is not meant to imply that any specific plant is required to have all of the listed documents. In addition, your plant specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by January 6, 2023:
- 1. Licensing basis documents such as the updated final safety analysis report and technical specifications.
- 2. Procedures for dedicating commercial-grade items and for procurement of safety-related components. Procedure controlling counterfeit, fraudulent, and suspect items.
- 3. List of commercial-grade items, with a brief description of application, that have been dedicated for safety-related applications. These items may be dedicated by Catawba Nuclear Station o r dedicated by a vendor (or other licensee) and procured by Catawba Nuclear Station. Please note whether the item has been installed in the plant. The list should encompass the past six years of dedication activities.
- 4. List of any commercial grade-items that failed after completing the dedication process.
The list should encompass the past six years of dedication activities.
- 5. List of components procured as safety-related, with descriptions, if not included above.
Please note whether the item has been installed in the plant. The list should encompass the past six years of procurement activities.
- 6. List of corrective action program documents, with descriptions, related to commercial-grade items, procurement, or storage, including any items that failed after completing the dedication process. The list should encompass the past six years of these activities.
- 7. List of systems, system numbers/designators, and corresponding names.
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below should generally be made available to the inspection team for the team's use both on-site and off-site during the inspection. Electronic format is the preferred media. If electronic media is made available via an internet-based remote document management system, then the remote document access must allow inspectors to download, save, and print the documents in the NRC's regional office. Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of the inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such, it is not meant to imply that any specific plant is required to have all of the listed documents. In addition, your plant specific document titles may vary from the document titles listed below. We also request that the information provided be sorted by the list below for each sample.
Documents requested by March 3, 2023:
- 1. Purchase requisition and purchase orders.
- 2. Other pertinent vendor/licensee correspondence.
- 3. Original and updated design specifications.
- 4. Catalog specifications.
- 5. Procurement basis evaluation such as like-for-like, equivalency, plant design change packages, drawing and specification updates.
- 6. 10 CFR 50.59 documentation, if required.
- 7. Material receiving reports, packing lists/invoices, and other shipping documents.
- 8. Receipt inspection reports and any related test reports.
- 9. Other documents to trace the item from the time it was dedicated to the time it was installed, tested, and accepted.
- 10. Certificates of conformance/compliance/quality.
- 11. Vendor test and inspection reports.
- 12. Third-party or sub-vendor test and inspection reports.
- 13. Shelf-life information.
- 14. Vendor dedication/partial dedication information.
- 15. Design/material/process change history information.
- 16. Completed commercial-grade dedication document, including: safety classification; identification of safety function/application requirements; identification of critical characteristics; identification of verification methods and acceptance criteria for the critical characteristics, evaluation of credible failure modes (if applicable); and identification of the suppliers quality assurance program that meets 10 CFR Part 50, Appendix B.
- 17. Any deviation from design, material, and performance characteristics relevant to the safety function (nonconformance dispositions).
- 18. Documents showing objective evidence such as: special test and inspection procedures and results; commercial-grade survey reports, showing: item, design, material, and specific performance characteristics (relevant to safety function) ; and source inspection reports.
- 19. Completed post-installation test procedure and results.
- 20. Completed stock or material issue forms and installation work orders or reports.
- 21. Historical performance information.