IR 05000413/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2017005 and 05000414/2017005)
ML17230A254
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/16/2017
From: Frank Ehrhardt
Division Reactor Projects III
To: Simril T
Duke Energy Corp
References
IR 2017005
Download: ML17230A254 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 16, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2017005 AND 05000414/2017005)

Dear Mr. Simril:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Catawba Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in October 2017.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure:

Catawba Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2017005 AND 05000414/2017005)

August 16, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17230A254 OFFICE RII:DRP RII:DRP RII: DRP NAME JWorosilo MToth FEhrhardt DATE 8/15/2017 8/15/2017 8/15/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Catawba 08/14/2017 08:58:11 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-191 - MITIGATING STRATEGIES 4 1, 2 10/16/2017 10/20/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/26/2018 03/30/2018 IP 7111108P Inservice Inspection Activities - PWR EP - EP EXERCISE 6 1, 2 06/04/2018 06/08/2018 IP 7111401 Exercise Evaluation 1, 2 06/04/2018 06/08/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/04/2018 06/08/2018 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 06/04/2018 06/08/2018 IP 71151 Performance Indicator Verification DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 06/25/2018 06/29/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 07/16/2018 07/20/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 07/30/2018 08/03/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

OL RQ - REQUAL INSPECTION 2 1, 2 08/06/2018 08/10/2018 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 10/01/2018 10/05/2018 IP 71152B Problem Identification and Resolution 1, 2 10/15/2018 10/19/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 11/26/2018 11/30/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 1 2 1, 2 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/26/2018 11/30/2018 IP 71124.04 Occupational Dose Assessment 1, 2 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 11/26/2018 11/30/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 2 3 1, 2 12/10/2018 12/14/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Catawba 08/14/2017 08:58:11 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL - WEEK 2 3 1, 2 12/10/2018 12/14/2018 IP 71124.04 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/10/2018 12/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/10/2018 12/14/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP PROGRAM INSPECTION 3 1, 2 03/04/2019 03/08/2019 IP 7111402 Alert and Notification System Testing 1, 2 03/04/2019 03/08/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/04/2019 03/08/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/04/2019 03/08/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 03/04/2019 03/08/2019 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.