Report 22 - Catawba
ML112440350
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II/DRP/RPB1
To:
Shared Package
ML112440341 List:
References
IR-11-006
Download: ML112440350 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2011 08:49:55 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba MODS

- MODS/50.59 INSPECTION 4

1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 10/24/2011 10/28/2011 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/07/2011 11/11/2011 PSB1-RP

- OCCUPATIONAL RADIATION PROTECTION WK1 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/12/2012 03/16/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/12/2012 03/16/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/12/2012 03/16/2012 1, 2 IP Performance Indicator Verification 71151 03/12/2012 03/16/2012 EB3 ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 03/19/2012 03/23/2012 EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 2

2 IP Inservice Inspection Activities - PWR 7111108P 03/26/2012 03/30/2012 PSB1-RP

- OCCUPATIONAL RADIATION PROTECTION WK2 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2012 03/30/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2012 03/30/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/26/2012 03/30/2012 1, 2 IP Occupational Dose Assessment 71124.04 03/26/2012 03/30/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/26/2012 03/30/2012 1, 2 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 04/23/2012 04/27/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 04/23/2012 04/27/2012 1, 2 IP Drill Evaluation 7111406 04/23/2012 04/27/2012 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 07/23/2012 07/27/2012 CDBI

- COMPONENT DESIGN BASES INSPECTIONI 6

1, 2 IP Component Design Bases Inspection 7111121 07/23/2012 07/27/2012 1, 2 IP Component Design Bases Inspection 7111121 08/13/2012 08/17/2012 1, 2 IP Component Design Bases Inspection 7111121 08/27/2012 08/31/2012 1, 2 IP Component Design Bases Inspection 7111121 09/10/2012 09/14/2012 OL EXAM

- INITIAL EXAM PREP 3

1 CATAWBA/AUGUST 2012 EXAM AT POWER FACILITIES V23378 08/13/2012 08/17/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2011 08:49:55 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Catawba OL EXAM

- INITIAL EXAM - WEEK 1 3

1 CATAWBA/AUGUST 2012 EXAM AT POWER FACILITIES V23378 09/03/2012 09/07/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 CATAWBA/AUGUST 2012 EXAM AT POWER FACILITIES V23378 09/10/2012 09/14/2012 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1, 2 IP Problem Identification and Resolution 71152B 10/29/2012 11/02/2012 1, 2 IP Problem Identification and Resolution 71152B 11/12/2012 11/16/2012 EB3 ISI

- UNIT 1 ISI & RPVH EXAMS 2

1 IP Inservice Inspection Activities - PWR 7111108P 12/03/2012 12/07/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.