Report 22 - Inspection/Activity Plan - 09/01/07 - 03/31/09
ML072430310
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/2007
From:
NRC/RGN-II/DRP/RPB1
To:
Shared Package
ML072430293 List:
References
Download: ML072430310 (2)


Text

Page 1 of 2 Catawba 08/31/2007 10:07:37 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3TI150 - U2 TI-150 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 09/23/2007 09/27/2007 Safety Issues EB3-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/24/2007 10/05/2007 Baseline Inspections EB3SGISI - UNIT 2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/01/2007 10/05/2007 Baseline Inspections EB1TI166 - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/07/2007 10/12/2007 Safety Issues OL EXAM - INITIAL EXAM PREP 3 1 V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES 11/05/2007 11/09/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES 12/03/2007 12/13/2007 Not Applicable PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/21/2008 04/23/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 5 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 04/21/2008 04/25/2008 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 04/21/2008 04/25/2008 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 05/12/2008 05/16/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/12/2008 05/16/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/12/2008 05/16/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/12/2008 05/16/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 05/12/2008 05/16/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 05/12/2008 05/16/2008 Baseline Inspections EB3SGISI - U1 SG ISI 2 1 IP 7111108P Inservice Inspection Activities - PWR 05/19/2008 05/23/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/26/2008 05/30/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/26/2008 05/30/2008 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/26/2008 05/30/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 05/26/2008 05/30/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 05/26/2008 05/30/2008 Baseline Inspections EB1-SUMP - TI 2515/166 CONTAINMENT SUMP INSPECTION 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 06/16/2008 06/20/2008 Safety Issues This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Catawba 08/31/2007 10:07:37 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 1, 2 IP 71152B Identification and Resolution of Problems 06/30/2008 07/03/2008 Baseline Inspections PSB1-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 07/28/2008 08/01/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 08/11/2008 08/15/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/25/2008 08/29/2008 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 08/25/2008 08/29/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 1 V23290 CATAWBA/DECEMBER 2008 EXAM AT POWER FACILITIES 11/11/2008 11/14/2008 Not Applicable OL EXAM - INITIAL EXAM 4 1 V23290 CATAWBA/DECEMBER 2008 EXAM AT POWER FACILITIES 12/01/2008 12/12/2008 Not Applicable EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 01/12/2009 01/16/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 01/26/2009 01/30/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/23/2009 02/27/2009 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.