Page 1 of 2 Catawba 08/30/2006 13:39:28 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PB1TI169 - MSPI VERIFICATION 2 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 07/26/2006 09/30/2006 Safety Issues PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/23/2006 10/25/2006 Baseline Inspections OL PREP - INITIAL EXAM PREPARATION 4 1 V23262 CATAWBA/DECEMBER 2006 EXAM AT POWER FACILITIES 11/13/2006 11/17/2006 Not Applicable PSB1-RP - RP OCCUPATIONAL BASELINE - WEEK 1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/17/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/13/2006 11/17/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/13/2006 11/17/2006 Baseline Inspections EB3-ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 11/20/2006 11/24/2006 Baseline Inspections EB3TI150 - 2515/150 U-1: RPV & VHP NOZZLES 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 11/20/2006 11/24/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1, 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/26/2006 12/01/2006 Safety Issues PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/27/2006 12/01/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/27/2006 12/01/2006 Baseline Inspections OL EXAM - INITIAL EXAM 4 1 V23262 CATAWBA/DECEMBER 2006 EXAM AT POWER FACILITIES 12/04/2006 12/08/2006 Not Applicable 60854 - ISFSI DRY RUN OF NAC SYSTEM 4 1 IP 60854 Preoperational Testing Of An ISFSI 01/22/2007 02/02/2007 Other Routine 1 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 01/22/2007 02/02/2007 Other Routine 1 IP 60855 Operation Of An ISFSI 01/22/2007 02/02/2007 Other Routine EB3-MR - MAINTENANCE RULE EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 01/29/2007 02/02/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1, 2 IP 7111121 Component Design Bases Inspection 03/05/2007 03/09/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 03/19/2007 03/23/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 04/16/2007 04/20/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Catawba 08/30/2006 13:39:28 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/14/2007 05/18/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/14/2007 05/18/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/27/2007 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/26/2007 06/28/2007 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 07/30/2007 08/03/2007 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 07/16/2007 07/20/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/30/2007 08/03/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/30/2007 08/03/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/30/2007 08/03/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/30/2007 08/03/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/30/2007 08/03/2007 Baseline Inspections EB3-ISI - UNIT 2 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 09/24/2007 09/28/2007 Baseline Inspections EB3HEAD - REACTOR HEAD EXAM 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/01/2007 10/05/2007 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/07/2007 10/12/2007 Safety Issues EB3SGISI - UNIT 2 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/08/2007 10/12/2007 Baseline Inspections OL PREP - INITIAL EXAM PREPARATION 3 1 V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES 11/05/2007 11/09/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES 12/03/2007 12/07/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.