Catawba Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:39:28 Report 22 2

PB1TI169

- MSPI VERIFICATION Safety Issues 07/26/2006 09/30/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 10/23/2006 10/25/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 11/13/2006 11/17/2006 1

V23262 CATAWBA/DECEMBER 2006 EXAM AT POWER FACILITIES 2

PSB1-RP

- RP OCCUPATIONAL BASELINE - WEEK 1 Baseline Inspections 11/13/2006 11/17/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/13/2006 11/17/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/13/2006 11/17/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/13/2006 11/17/2006 1, 2 71151 IP Performance Indicator Verification 1

EB3-ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections 11/20/2006 11/24/2006 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3TI150

- 2515/150 U-1: RPV & VHP NOZZLES Safety Issues 11/20/2006 11/24/2006 1

2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 11/26/2006 12/01/2006 1, 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

3 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 Baseline Inspections 11/27/2006 12/01/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/27/2006 12/01/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/27/2006 12/01/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/27/2006 12/01/2006 1, 2 71151 IP Performance Indicator Verification 4

OL EXAM

- INITIAL EXAM Not Applicable 12/04/2006 12/08/2006 1

V23262 CATAWBA/DECEMBER 2006 EXAM AT POWER FACILITIES 4

60854

- ISFSI DRY RUN OF NAC SYSTEM Other Routine 01/22/2007 02/02/2007 1

60854 IP Preoperational Testing Of An ISFSI Other Routine 01/22/2007 02/02/2007 1

60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 01/22/2007 02/02/2007 1

60855 IP Operation Of An ISFSI 2

EB3-MR

- MAINTENANCE RULE EFFECTIVENESS Baseline Inspections 01/29/2007 02/02/2007 1, 2 7111112B IP Maintenance Effectiveness 5

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 03/05/2007 03/09/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/02/2007 04/06/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Catawba Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:39:28 Report 22 1

PS2-EP

- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/14/2007 05/18/2007 1, 2 71151 IP Performance Indicator Verification 1

PSB1-RP

- RP PUBLIC PRE-INSP VISIT Baseline Inspections 06/25/2007 06/27/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 06/26/2007 06/28/2007 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]

2 EB3-HS

- HEAT SINK Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111107B IP Heat Sink Performance 4

PSB1-RP

- RP PUBLIC BASELINE INSPECTION Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/30/2007 08/03/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/30/2007 08/03/2007 1, 2 71151 IP Performance Indicator Verification 2

EB3-ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections 09/24/2007 09/28/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3HEAD

- REACTOR HEAD EXAM Safety Issues 10/01/2007 10/05/2007 2

2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 10/07/2007 10/12/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 EB3SGISI

- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 10/08/2007 10/12/2007 1

7111108P IP Inservice Inspection Activities - PWR 3

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 11/05/2007 11/09/2007 1

V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM Not Applicable 12/03/2007 12/07/2007 1

V23275 CATAWBA/DECEMBER 2007 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.