Inspection / Activity Plan Page 1 of 2 09/01/2009 08:09:12 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch ISFSI
- ROUTINE ISFSI LOADING 2
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2009 10/15/2009 PI&R
- PRE INSPECTION 1
1, 2 IP Identification and Resolution of Problems 71152B 08/31/2009 09/04/2009 OL EXAM
- INITIAL EXAM PREP 7
1 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES V23320 10/05/2009 10/09/2009 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
1, 2 IP Exercise Evaluation 7111401 10/12/2009 10/16/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/12/2009 10/16/2009 1, 2 IP Performance Indicator Verification 71151 10/12/2009 10/16/2009 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 3
1, 2 IP Identification and Resolution of Problems 71152B 10/19/2009 10/23/2009 1, 2 IP Identification and Resolution of Problems 71152B 11/02/2009 11/06/2009 OL EXAM
- INITIAL EXAM - WEEK 1 5
1 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES V23320 10/26/2009 10/30/2009 OL EXAM
- INITIAL EXAM - WEEK 2 5
1 HATCH/OCTOBER 2009 EXAM AT POWER FACILITIES V23320 11/02/2009 11/06/2009 PSB1-RP
- RP PUBLIC RADIATION PROTECTION BASELINE 4
1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 01/25/2010 01/29/2010 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 01/25/2010 01/29/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 01/25/2010 01/29/2010 1, 2 IP Performance Indicator Verification 71151 01/25/2010 01/29/2010 EB3ISI
- UNIT 1 ISI 1
1 IP Inservice Inspection Activities - BWR 7111108G 02/15/2010 02/19/2010 EB3 HS
- HEAT SINK INSPECTION 1
1, 2 IP Heat Sink Performance 7111107T 02/22/2010 02/26/2010 PSB1-RP
- RP ACCESS CONTROLS 2
1, 2 IP Access Control to Radiologically Significant Areas 7112101 03/01/2010 03/05/2010 EB1-MODS
- MODIFICATIONS-10CFR50.59 3
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/03/2010 05/07/2010 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/10/2010 05/14/2010 PSB1-RP
- RP GROUNDWATER PROTECTION 1
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/17/2010 05/21/2010 OL RQ
- REQUAL INSPECTION 3
1, 2 IP Licensed Operator Requalification Program 7111111B 07/19/2010 07/23/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 09/01/2009 08:09:12 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Testing 7111402 10/18/2010 10/22/2010 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 10/18/2010 10/22/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/18/2010 10/22/2010 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/18/2010 10/22/2010 1, 2 IP Performance Indicator Verification 71151 10/18/2010 10/22/2010 1
- TFPI 6
1, 2 IP Fire Protection [Triennial]
7111105T 11/15/2010 11/19/2010 1, 2 IP Fire Protection [Triennial]