Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2016006 and 05000414/2016006
ML17060A173
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/01/2017
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Simril T
Duke Energy Corp
References
IR 2016006
Download: ML17060A173 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000413/2016006 AND 05000414/2016006

Dear Mr. Simril:

The NRC has completed its end-of-cycle performance assessment of Catawba Nuclear Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016 through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Catawba Nuclear Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC will conduct Temporary Instruction (TI) 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition (OPC) Design Vulnerabilities in Electric Power Systems, in March 2017 and TI 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, in October 2017. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure:

Catawba Inspection/Activity Plan (03/01/2017 - 12/31/2018)

cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 - NRC INSPECTION REPORT 05000413/2016006 AND 05000414/2016006 March 1, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17060A173 OFFICE RII:DRP RII:DRP NAME JWorosilo FEhrhardt DATE 2/ 16 /2017 2/17/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Catawba 02/28/2017 06:47:29 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 4 1, 2 03/27/2017 03/31/2017 IP 7111402 Alert and Notification System Testing 1, 2 03/27/2017 03/31/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/27/2017 03/31/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 05/08/2017 05/12/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/08/2017 05/12/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation OL EXAM - INITIAL LICENSE EXAM PREP 3 1 05/29/2017 06/02/2017 V23495 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 06/26/2017 07/07/2017 V23495 CATAWBA/JULY 2017 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 5 1, 2 07/24/2017 07/28/2017 IP 7111105T Fire Protection [Triennial]

1, 2 08/07/2017 08/11/2017 IP 7111105T Fire Protection [Triennial]

RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2 07/31/2017 08/04/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/31/2017 08/04/2017 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/31/2017 08/04/2017 IP 71151 Performance Indicator Verification TI-191 - MITIGATING STRATEGIES 3 1, 2 10/16/2017 10/20/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/26/2018 03/30/2018 IP 7111108P Inservice Inspection Activities - PWR EP - EP EXERCISE 6 1, 2 06/04/2018 06/08/2018 IP 7111401 Exercise Evaluation 1, 2 06/04/2018 06/08/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/04/2018 06/08/2018 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 06/04/2018 06/08/2018 IP 71151 Performance Indicator Verification DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 06/25/2018 06/29/2018 IP 7111121M Component Design Bases Inspection (Teams)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Catawba 02/28/2017 06:47:29 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 07/16/2018 07/20/2018 IP 7111121M Component Design Bases Inspection (Teams)

1, 2 07/30/2018 08/03/2018 IP 7111121M Component Design Bases Inspection (Teams)

OL RQ - REQUAL INSPECTION 2 1, 2 08/06/2018 08/10/2018 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 10/01/2018 10/05/2018 IP 71152B Problem Identification and Resolution 1, 2 10/15/2018 10/19/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 11/26/2018 11/30/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 1 2 1, 2 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/26/2018 11/30/2018 IP 71124.04 Occupational Dose Assessment 1, 2 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 12/03/2018 12/07/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 2 3 1, 2 12/10/2018 12/14/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/10/2018 12/14/2018 IP 71124.04 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/10/2018 12/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/10/2018 12/14/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.