UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2013 Mr. Kelvin Henderson Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635

SUBJECT:

MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2012006 AND 05000414/2012006)

Dear Mr. Henderson:

On August 13, 2013, the NRC completed its mid-cycle performance review of Catawba Nuclear Station Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

Overall, Catawba Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The NRC determined the performance at Catawba Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix. Unit 1 was in the Regulatory Response Column for the first three quarters of the assessment period based on a White inspection finding in the 2nd quarter related to a modification to Unit 1 generator protective relaying that resulted in an inoperable offsite power supply to Unit 1. Plant performance for Unit 2 for the most recent quarter, as well as for the first three quarters of the assessment period, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green). All PIs for Units 1 and 2 indicated performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to ROP baseline inspections we will conduct reactor operator licensing examinations and TI-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as

K. Henderson 2

possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security-related inspections which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4607 with any questions you have regarding this letter.

Sincerely,

/RA/

Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure:

Catawba Inspection/Activity Plan (09/01/2011 - 12/31/2012) cc: Distribution via Listserv

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CWR /RA/

JHB /RA/

NAME CRapp JBartley DATE 08/21/2013 08/29/2013 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

K. Henderson 3

Letter to Kelvin Henderson from Jonathan H. Bartley dated September 3, 2013

SUBJECT:

MID-CYCLE LETTER FOR CATAWBA NUCLEAR STATION UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000413/2012006 AND 05000414/2012006)

DISTRIBUTION:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource Institute of Nuclear Power Operations (INPO)

ROP Reports

Catawba Inspection / Activity Plan 09/01/2013 - 12/31/2014 Unit Number Page 1 of 2 09/03/2013 07:57:16 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 2

OL EXAM

- INITIAL EXAM WEEK 1 1

09/16/2013 09/20/2013 V23405 CATAWBA/SEPTEMBER 2013 EXAM AT POWER FACILITIES 1

ISI

- UNIT 2 INSERVICE INSPECTION 2

09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR 1

SGISI

- UNIT 2 SG INSERVICE INSPECTION 2

09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR 2

RP

- RAD HAZARD ANALYSIS AND TRANSPORTATION 1, 2 09/23/2013 09/27/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2013 09/27/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2

OL EXAM

- INITIAL EXAM WEEK 2 1

09/23/2013 09/27/2013 V23405 CATAWBA/SEPTEMBER 2013 EXAM AT POWER FACILITIES 1

TI-182

- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 11/12/2013 11/14/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 1

EP

- EP EXERCISE 1, 2 03/17/2014 03/21/2014 IP 7111401 Exercise Evaluation 1, 2 03/17/2014 03/21/2014 IP 71151 Performance Indicator Verification 3

MODS

- PLANT MODIFICATION INSPECTION 1, 2 03/24/2014 03/28/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 04/07/2014 04/11/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 3

OL EXAM

- INITIAL LICENSE EXAM PREP 1

04/14/2014 04/18/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES 1

ISI

- UNIT 1 IN-SERVICE INSPECTION 1

05/12/2014 05/16/2014 IP 7111108P Inservice Inspection Activities - PWR 3

OL EXAM

- INITIAL LICENSE EXAM WEEK 1 1

05/12/2014 05/16/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES 2

RP

- RP OCCUPATIONAL BASELINE 1, 2 05/19/2014 05/23/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/19/2014 05/23/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/19/2014 05/23/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/19/2014 05/23/2014 IP 71124.04 Occupational Dose Assessment 1, 2 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 05/19/2014 05/23/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Catawba Inspection / Activity Plan 09/01/2013 - 12/31/2014 Unit Number Page 2 of 2 09/03/2013 07:57:16 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1

SGISI

- UNIT 1 SG IN-SERVICE INSPECTION 1

05/19/2014 05/23/2014 IP 7111108P Inservice Inspection Activities - PWR 3

OL EXAM

- INITIAL LICENSE EXAM WEEK 2 1

05/19/2014 05/23/2014 V23422 CATAWBA/MAY 2014 INITIAL EXAM AT POWER FACILITIES 3

RP

- RP OCCUPATIONAL BASELINE WEEK2 1, 2 06/02/2014 06/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 06/02/2014 06/06/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 06/02/2014 06/06/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 06/02/2014 06/06/2014 IP 71124.04 Occupational Dose Assessment 1, 2 06/02/2014 06/06/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 06/02/2014 06/06/2014 IP 71151 Performance Indicator Verification 2

OL-RQ

- REQUAL INSP 1, 2 07/14/2014 07/18/2014 IP 7111111B Licensed Operator Requalification Program 4

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 10/06/2014 10/10/2014 IP 71152B Problem Identification and Resolution 1, 2 10/20/2014 10/24/2014 IP 71152B Problem Identification and Resolution Comments:

This report does not include INPO and OUTAGE activities.