IR 05000395/2018011: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 5: | Line 5: | ||
| author name = Sandal S | | author name = Sandal S | ||
| author affiliation = NRC/RGN-II/DRP | | author affiliation = NRC/RGN-II/DRP | ||
| addressee name = Lippard G | | addressee name = Lippard G | ||
| addressee affiliation = South Carolina Electric & Gas Co | | addressee affiliation = South Carolina Electric & Gas Co | ||
| docket = 05000395 | | docket = 05000395 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:April 10, 2018 | ||
==SUBJECT:== | |||
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - NRC TEAM INSPECTION REPORT 05000395/2018011 | |||
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - NRC TEAM INSPECTION REPORT 05000395/2018011 | |||
==Dear Mr. Lippard:== | ==Dear Mr. Lippard:== | ||
Line 41: | Line 40: | ||
Docket No.: 50-395 License No.: NPF-12 | Docket No.: 50-395 License No.: NPF-12 | ||
Enclosure: | ===Enclosure:=== | ||
IR 05000395/2018011 | IR 05000395/2018011 | ||
==Inspection Report== | ==Inspection Report== |
Revision as of 12:55, 17 June 2019
ML18100A270 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 04/10/2018 |
From: | Shane Sandal Division Reactor Projects II |
To: | Lippard G South Carolina Electric & Gas Co |
References | |
IR 2018011 | |
Download: ML18100A270 (13) | |
Text
April 10, 2018
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - NRC TEAM INSPECTION REPORT 05000395/2018011
Dear Mr. Lippard:
On March 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at
your Virgil C. Summer Nuclear Station, Unit 1 facility. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commission's rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station
personnel.
The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/
Shane Sandal, Chief Reactor Projects Branch 6 Division of Reactor Projects
Docket No.: 50-395 License No.: NPF-12
Enclosure:
Inspection Report
Docket Number: 50-395
License Number: NPF-12 Report Numbers: 05000395/2018011
Enterprise Identifier: I-2018-011-0034
Licensee: South Carolina Electric & Gas (SCE&G) Company
Facility: Virgil C. Summer Nuclear Station, Unit 1
Location: Jenkinsville, SC
Inspection Dates: March 5 - 8, 2018
Inspectors: P. McKenna, Senior Resident Inspector (Surry Power Station) (Team Leader) G. MacDonald, Senior Reactor Analyst B. Bishop, Project Engineer E. Hilton, Resident Inspector
Approved By: S. Sandal, Chief Reactor Projects Branch 6 Division of Reactor Projects
2 Enclosure
SUMMARY
The NRC continued monitoring licensee's performance by conducting a Temporary Instruction 2515/191, "Implementation of Mitigation Strategies and Spent Fuel Pool (SFP) Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment
Plans," inspection (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15257A188) at Virgil C. Summer Nuclear Station, Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings and more than minor violations were identified.
Additional Tracking Items Type Issue number Title Report Section Status TI TI 2515/191 Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans Other Activities Closed
TABLE OF CONTENTS
INSPECTION SCOPE
..............................................................................................................
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
INSPECTION RESULTS
............................................................................................................
EXIT MEETINGS AND DEBRIEFS
............................................................................................
DOCUMENTS REVIEWED
.......................................................................................................... 7
Enclosure INSPECTION SCOPE
Inspections were conducted using the appropriate portions of Temporary Instruction (TI)
procedure 2515/191, "Implementation of Mitigation Strategies and Spent Fuel Pool (SFP) Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans," (ADAMS Accession No. ML15257A188)
. Documents reviewed by inspectors are listed in the documents reviewed section of this report. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess
licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
TI 2515/191 - Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans
Inspectors verified plans for complying with NRC Orders EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis
External Events," (Agencywide Document
s Access and Management System (ADAMS) Accession No. ML12056A045) and EA-12-051, "Order Modifying Licenses With Regard to
Reliable Spent Fuel Pool Instrumentation," (ML12054A679) were in place and were being implemented by the licensee. Additionally, the inspection verified implementation of staffing and communications information provided in response to the March 12, 2012, request for
information letter (ML12053A340) and dose assessment information provided per COMSECY-13-0010, "Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons
Learned," dated March 27, 2013 (ML12339A262).
(1) Based on samples selected for review, the inspectors verified that the licensee satisfactorily implemented appropriate el
ements of the Diverse and Flexible Coping Strategies (FLEX) as described in the plant-specific submittals and the associated safety
evaluation (ML17089A617) and determined that the licensee is in compliance with NRC
Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Ex
ternal Events" (ADAMS Accession No. ML12056A045). The inspectors verified the licensee satisfactorily:
a) developed and issued FLEX Support Guidelines (FSGs) to implement the FLEX strategies for postulated external events; b) integrated their FSGs into their existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures; c) protected FLEX equipment from site-specific hazards; d) developed and implemented adequate testing and maintenance of FLEX equipment to ensure their availability and capability e) trained their staff to ensure personnel proficiency in the mitigation of beyond-design basis events; and
Enclosure f) developed the means to ensure the necessary off-site FLEX equipment would be available from off-site locations. (2) Based on samples selected for review, the inspectors verified that the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittals and the associated safety evaluation (ML17089A617) and determined that the licensee was in compliance with NRC Order NRC Order EA-12-
051, "Order Modifying Licenses With
Regard to Reliable Spent Fuel Pool Instrumentation" (ADAMS Accession No. ML12054A679). The inspectors verified that the licensee satisfactorily: a) installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittals and safety evaluation; b) installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittals; c) trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation; and d) developed and issued procedures for maintenance, testing and use of the reliable SFP instrumentation. (3) The inspectors reviewed information provided in the licensee's dose submittal and in response to the NRC's March 12, 2012, request for information letter (ML12053A340), and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force (NTTF) Recommendation 9.3 response to a large-scale natural
emergency event that results in an extended loss of all alternating current (ac) power
(ELAP) to all site units and impedes access to the site The inspectors verified the
following:
a) the licensee satisfactorily implemented required staffing changes to support a
ELAP scenario; b) EP communications equipment and facilities are sufficient for dealing with a ELAP scenario; and c) the licensee implemented dose assessment capabilities (including releases from SFPs) using the licensee's site-specific dose assessment software and approach. The inspectors verified that noncompliances with requirements, and standards identified during the inspection were entered into the licensee's corrective action program as appropriate.
Enclosure INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
No proprietary information was retained by the inspectors or documented in this report.
On March 8, 2018, the inspectors presented the inspection results to Mr. G. Lippard and other members of the licensee's staff.
On April 10, 2018, the lead inspector presented the final inspection results to
Mr.
- M. Moore, Nuclear Licensing Manager.
Enclosure
DOCUMENTS REVIEWED
Condition Reports Initiated as a Result of the Inspection CR-18-00988, FX 4160/7.2 KV Transformer Listed in VCS-ERP-0012 as credited for FLEX CR-18-01018, FLEX SFPLI Primary Remote Transmitter Calibration Frequency Changed
CR-18-01021, SW Pump House Not Evaluated for Heat-up when running FLEX Alternate EFW
Suction Pumps
Procedures AOP-123.1, Decreasing Level in the Spent Fuel Pool or Refueling Cavity during Refueling,
Rev. 6
AOP-123.2, Decreasing Boron Concentration in the Spent Fuel Pool or Refueling Cavity, Rev. 1
AOP-123.3, Potential Fuel Assembly Damage While Handling Fuel, Rev. 3 AOP-123.4, Loss of Spent Fuel Pool Cooling, Rev. 5 AOP-123.5, Decreasing Level in the Spent Fuel Pool with Fuel Transfer Tube Valve Closed,
Rev. 4
AOP-304.4 ARG-4 Loss of ESF AC Power While on RHR Cooling, Rev. 5
EOP-6.0 ECA-0.0 Loss of all ESF AC Power, Rev. 35 ERMP-100.032, FLEX 5500 Watt Diesel Generator Preventative Maintenance, Rev. 0 ERMP-100.021, FLEX Transformer Preventative Maintenance, Rev.0
ERMP-100.016, FLEX RCS Makeup Pump Preventative Maintenance, Rev. 1 Change A
ERMP-100.015, FLEX SG Feed Pump Preventative Maintenance, Rev. 0
ERMP-100.014, FLEX Booster/Transfer Pump Preventative Maintenance, Rev. 0
ERMP-100.012, FLEX Heat Sink Lift and Main Pumps Preventative Maintenance, Rev. 0 ERMP-100.011, FLEX 1MW Combustion Turbine Generator Preventative Maintenance, Rev. 1
Change A
ERTP-100.005, FLEX Hose Test Procedure, Rev. 1
ERTP-100.002, FLEX Combustion Turbine Generator Test Procedure, Rev. 0
ERTP-100.001, FLEX Pump Test Procedure, Rev. 0
EPP-005, Offsite Calculation, Rev. 21
FSP-2.0, Alternate EFW Suction Source, Rev. 0
FSP-4.0 ELAP DC Bus Load Shed Management, Rev. 0
FSP-5.0, Initial Assessment and Flex Equipment Staging, Rev. 2
FSP-6.0, Alternate CST Makeup, Rev. 1
FSP-9.0, Low Decay Heat Temperature Control, Rev. 1
FSP-11.0, Alternate Spent Fuel Pool Makeup and Cooling, Rev. 1 FSP14.0 Shutdown RCS Makeup, Rev. 1
FSP-20.1, Vital Area Emergency Ventilation, Rev.1
FSP-20.3.2, Staging the FX SG Feed Pump Using the West Strategy, Rev. 1
FSP-20.3.1, Staging the FX SG Feed Pump Using the East Strategy, Rev. 1 FSP-20.4.1, Staging the FX UHS Pumps, Rev. 1 FSP-20.5.1, Staging the FX RCS MU Pump, Rev.1
FSP-20.6.1, Staging the FX BSTR XFER Pump, Rev. 1
FSP-20.7, FLEX Combustion Turbine Generator Operation, Rev. 0
ICP-390.012, Spent Fuel Level ILT09780 and ILT09781 Calibration, Rev. 1, Change A
NL-121, Regulatory Commitment Management, Rev. 9 OAP 100.6, Control Room Conduct and Control of Shift Activities, Rev. 4 OAP-106.1, AB Upper Tech SPEC Rounds Attachment IV, Rev. 17f
OAP-109.1 Guidelines for Severe Weather, Rev. 4
SAP-107, Applicability Determination (AD), Attachment 1, Rev. 7
Enclosure SOP-211, Emergency Feedwater, Rev. 14 VCS-EPP-0032, Alternate Emergency Response Facility, Rev. 0
VCS-ERP-0012, BDB Equipment Availability Monitoring, Rev. 1 VCS-ERP-0050, Emergency Response Procedure, ERU Equipment Inventory, Rev. 3 VCS-ERP-0111, ERU BDB Debris Clearing, Rev. 0
VCS-ERP-0112, BDB Equipment Availability Monitoring, Rev. 1
VCS-ERP-0113, ERU BDB Refueling Operations, Rev. 0
VCS-ERP-0114, ERU BDB Lighting and Communications Support, Rev. 0
VCS-ERP-0115, ERU Communications Tower Deployment, Rev. 0 VCS-SAP-0130, BDB Flex Program, Rev. 0
Drawings C-317-322, Sh. 15, Vega Waveguide Isometric Southwest, Rev. 0
C-317-322, Sh. 14, Vega Waveguide Isometric Northwest, Rev. 0 E-215-080, Conduit Layout Aux Building North above Elev. 463', Rev. 48
E-215-161, Conduit Layout Fuel Handling Building above Elev. 435', Rev. 27
E-215-162, Conduit Layout Fuel Handling Building above Elev. 453', Rev. 29
E-811-014, Instrument Location Layout Aux Building Open Floor above Elev. 463', Rev. 21
E-811-033, Instrument Location Layout Fuel Handling Area Mezzanine Floor, Rev. 10 E-811-034, Instrument Location Layout Fuel Handling Area Operating Floor, Rev. 13 Simplified Drawings Depicting FLEX Strategies and Connection Capabilities:
Restoration of DC power
Steam Generator Feed FLEX Lineup
Condensate Storage Tank Makeup FLEX Lineup
RCS Boration and Inventory Control
Containment Integrity
Spent Fuel Pool Makeup/Cooling
Alternate EFW Suction FLEX Lineup
VC Summer Unit 1 FLEX Strategy Simplified Mechanical Diagram
VC Summer Unit 1 FLEX Strategy Simplified Electrical Diagram
Work Orders 1613554-001, Spent Fuel Pool Level ILT09780 Check/Calibration, 1/31/17 1605636-001, Spent Fuel Pool Level ILT09780 Check/Calibration, 8/10/16 1613555-001, Spent Fuel Pool Level ILT09781 Check/Calibration, 1/31/17 1605637-001, Spent Fuel Pool Level ILT09781 Check/Calibration, 8/11/16
1615160-001, FLEX RCS Makeup Pump Annual Preventative Maintenance, 05/04/17
1703946-001, Combustion Turbine Generator Annual Preventative Maintenance, 10/02/17
1705485-001, FLEX Heat Sink Lift and Main Pump Annual Preventative Maintenance, 01/15/18 1706212-001, FLEX Booster/Transfer Pump Annual Preventative Maintenance, 11/25/17 1706461-001, FLEX SG Feed Pump Annual Preventative Maintenance, 01/30/18
Design Changes DC 00080-002 Site Hazard Design Parameters for Flex, Rev. 1
ECR 50890 External Flooding Door Modifications, Excerpts from 60% Design Package ECR 51001, Flex Spent Fuel Pool Level Indication, Rev. 0 ECR 51001 Supporting Documentation Part 1, Rev. 0
ECR 51001 Supporting Documentation Part 2, Rev. 0
ECR 51003B, FLEX EFW Alternate Suction Source, Rev. 2
ECR 51003K, FLEX EFW Alternate Suction Source, Rev. 0
Enclosure Minor Change Form ECR51001B EC02 Minor Change Form ECR51001B EC03
Condition Reports CR-12-01098 CR-12-01102 CR-13-05162 CR-14-01307 CR-14-03196 CR-15-03191 CR-15-03206 CR-15-05662 CR-15-05934 CR-15-06611 CR-15-06858 CR-16-00149
CR-16-02624 CR-16-04082 CR-16-04089 CR-16-04206 CR-16-05260 CR-16-05568
CR-16-05797 CR-16-05957 CR-17-00452 CR-17-00453 CR-17-01273 CR-17-01479
CR-17-01584 CR-17-02287 CR-17-02632 CR-17-04011 CR-17-04379 CR-17-05620 CR-18-00056 CR-18-00546 CR-18-00551 CR-18-00642
Training Documents and Records QA Periodic Reading Flex Response Strategies, ERU Personnel, 9/21/15
ERU FLEX Training Attendance Records, Test Unit FLEX 2 Year Requalification, Q-ERU-BDB- 02, 03, 04, 13 conducted 9/13/17, 9/19/17, 9/20/17, and 9/12/17 Course FLEX-1.0, Introduction to FLEX Fundamentals, training attendance/completion records
for ERU personnel supervisors and ERO leaders
Training attendance records for Operations/Emergency Response Unit personnel for IC-FLEX-
SFPLI Operations Training, FLEX 1.0, Introduction to FLEX Fundamentals Lesson Plan, Rev. 0 Operations Training, FLEX 2.0, FLEX Implementing Procedures Lesson Plan, Rev. 0
Operations Training, FLEX 3.0, FLEX Equipment Procedures Lesson Plan, Rev. 0
Operations FLEX Training Records, Flex Fundamentals, 9/14/15
Operations FLEX Training Records, FLEX for Operators, 6/29/16
Mechanical Maintenance Training Records, Introduction to FLEX Fundamentals, 8/5/15 and
8/11/15 Electrical Maintenance Training Records, Electrical Maintenance-FLEX, 6/12/17
Q-AP-EM-337-Flex, Maintain Disconnect /FLEX Links Disconnect Switch Maintenance, 5/17/17
FLEX-SFPLI-V, Spent Fuel Pool Level Indicator FLEX, Training attendance, 5/27/15
Other AREVA Customer Service Bulletin 15-04, Spent Fuel Pool Level Instrument (SFPLI) Sensor
Mounting Outdoors
AREVA Document No. 38-9238014-001, SAFER Response Plan for Virgil C. Summer Nuclear
Station, Rev.1
Beyond Design Basis Program Manual Virgil
- C. Summer Nuclear Station, Rev. 0 Calculation DC00080-002, Site Hazards Design Parameters For FLEX, Rev. 1 IMS-94B-1752, Through Air Radar Spent Fuel Pool Lev
el Instrument (SFPLI) Instruction Manual for VC Summer, Doc. No. 01-9225772-002
JG40733, FLEX Tornado Study - CR-14-00911 Action 6, 04/29/15
NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Rev. 2 NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities
NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and
Capabilities
PM Revision, RPM Revision 1801928, ICP0390.012 Frequency Change from 6 Months to 18
Months ILT09780 and ILT09781 Calibration per ICP-390.012 Power Point Presentation slides for FLEX Re
sponse and Strategies NRC TI-191 Inspection RC-13-0119, South Carolina Electric and Gas Company's Response to Requests for Additional
Information - Overall Integrated Plan in Response to Commission Order Modifying License
Enclosure Requirements for Reliable Spent Fuel Pool Level Instrumentation (Order Ea-12-051) RC-14-0173, South Carolina Electric and Gas Company's Response to Requests for Additional
Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements For Reliable Spent Fuel Pool Level Instrumentation (Order Ea-12-051) RC-15-0093, Response to Request for Additional
Information Regarding Phase 2 Staffing submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the
Fukushima Dai-ichi Nuclear Power Plant Accident
RC-16-0001, Report of Full Compliance with March 12, 2012 Commission Order Modifying
Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information RC-16-0143, Report of Full Compliance and Final Integrated Plan in Response to March 12,
2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation
Strategies for Beyond-Design-Bases External Events (Order EA-12-049) for Virgil C. Summer
Nuclear Station Unit 1 Regulatory Commitment Evaluation Worksheet for SFP Level Indication and Battery Replacement, 03/28/18
Regulatory Commitment Change Request for SFP Level Indication and Battery Replacement,
03/28/18
SA16-EP-03, FLEX Program - NRC Inspection Manual Self-Assessment, Rev. 1 TR02060-001, Verification Walkdown Report for VCSNS Plant Flood Protective Features,
Rev. 0
TR02060-003, Flood Hazard Reevaluation Report for VCSNS, Rev. 1
TR02060-005, External Flooding Focused Evaluation Summary for VCSNS, Rev. 0
TR00080-001, Engineering Services Technical Report, Guidance for Development of
Specifications for Flex Equipment, Rev. 3 TR00080-003, FLEX Equipment Ventilation and Habitability Assessment, Rev. 2 TR00080-006, FLEX Timeline Constraint Basis, Rev. 1
TR00080-007 VCS Unit 1 Flex Validation Document, Rev. 1
V-100, Vantran Industries Operation and Maintenance Manual for Padmount and Substation
Transformers (Single and Three Phase), 02/12 VC Summer Unit 1 NEI-12-01 Report, Rev. 1, NEI 12-01 Phase 2 Extended Loss of AC Power
(ELAP) ERO Staffing Analysis Report
VCSNS Warehouse Storage Database Information for FLEX SFPLI batteries