ML19120A288: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 9: | Line 9: | ||
| docket = 05000259, 05000260, 05000296 | | docket = 05000259, 05000260, 05000296 | ||
| license number = DPR-033, DPR-052, DPR-068 | | license number = DPR-033, DPR-052, DPR-068 | ||
| contact person = Saba F | | contact person = Saba F, NRR/ DORL/LPL2-2, 301-415-1447 | ||
| case reference number = EPID L-2018-LLA-0048 | | case reference number = EPID L-2018-LLA-0048 | ||
| document type = Meeting Summary | | document type = Meeting Summary |
Revision as of 12:52, 14 June 2019
ML19120A288 | |
Person / Time | |
---|---|
Site: | Browns Ferry ![]() |
Issue date: | 06/06/2019 |
From: | Farideh Saba Plant Licensing Branch II |
To: | Tennessee Valley Authority |
Saba F, NRR/ DORL/LPL2-2, 301-415-1447 | |
References | |
EPID L-2018-LLA-0048 | |
Download: ML19120A288 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 June 6, 2019 LICENSEE:
Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant , Units 1 , 2 , and 3
SUBJECT:
SUMMARY
OF MARCH 19 , 2019 , CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)
By letter dated February 23 , 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180798140), Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Browns Ferry). The proposed amendment would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
operating domain. The purpose of the meeting was for TVA to present to the U.S. Nuclear Regulatory Commission (NRC) staff its submitted LAR to implement MELLLA+. The meeting notice and agenda dated March 7, 2019, are available in ADAMS under Accession No. ML19067A026.
A list of attendees is enclosed. On March 19 , 2019 , a Category 1 closed meeting was held between the NRC staff , representatives of TVA, and TVA's contractor (General Electric Hitachi) at NRC Headquarters, One White Flint North , 11555 Rockville Pike, Rockville , Maryland.
The discussion was focused on the differences between the NRC Office of Research confirmatory calculation limiting results and the limiting results provided by TVA in its LAR. This meeting was closed to the public due to discussion of proprietary information.
During the meeting, TVA representatives discussed th e Anticipated Transient Without Scram with Instability (ATWS-1) analyses performed to support the Browns Ferry MELLLA+ LAR. By letter dated April 24, 2019 (ADAMS Accession No. ML19115A099), TVA submitted Supplement 9 to the LAR, which provided additional information regarding A TWS-1 analyses. No regulatory decisions were made at the meeting. Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
List of Attendees cc: Listserv Far i deh E. Saba , Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REGARDING MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC) Joshua Borromeo NRC Undine Shoop NRC Chris Hoxie NRC Peter Yarsky NRC Andrew Bielen NRC Nathanael Hudson NRC Ian Porter NRC Aaron Wysocki NRC Consultant Pete Donahue TVA Dan Green Tennessee Valley Authority (TVA) Barry Myers TVA Michael Dick TVA Larry King. General Electric Hitachi (GEH) Mike Cook GEH Enclosure
SUBJECT:
SUMMARY
OF MARCH 19 , 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)
DATED MAY 6 , 2019 DISTRIBUTION:
PUBLIC PM File Copy RidsRgn2MailCenter Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLpl2-2 Resource RidsNrrDssSnpb Resource RidsNrrDra Resource RidsNrrDssSrxb Resource JJohnston, NRR AHon, NRR JQuichocho, OEDO CHoxie, RES !Porter, RES MPanicker, NRR ADAMS A ccess1on N ML19120A288 o.: RidsNrrLABClayton Resource RidsACRS_MailCTR Resource RidsNrrDss Resource RidsNrrDorl Resource RidsNrrDssStsb Resource RidsNrrDe Resource MMcCoppin , OEDO JBorromeo, NRR DWoodyatt , NRR PYarsky , RES NHudson, RES ABielen, RES *b 1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SRXB/BC(A)
- DORL/LPL2-2/BC NAME FSaba LRonewicz JWhitman UShoop DATE 05/16/2019 05/15/2019 05/08/2019 06/05/2019 OFFICIAL RECORD COPY DORL/LPL2-2/PM FSaba 06/06/2019