IR 05000341/2016502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 31: | Line 31: | ||
-rm/adams.html (the Public Electronic Reading Room). | -rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely,/RA Joe Maynen Acting for/ | Sincerely, | ||
/RA Joe Maynen Acting for/ | |||
Steven K. Orth, Chief Plant Support Branch | Steven K. Orth, Chief Plant Support Branch | ||
Division of Reactor Safety Docket No. 50 | Division of Reactor Safety Docket No. 50 | ||
-341 License No. NPF | -341 License No. NPF | ||
-43 | -43 Enclosure: | ||
I R 05000 341/20 16 502 cc: Distribution via LISTSERV Enclosure U.S. NUCLEAR REGULATORY COMMISSION | |||
== | ==REGION III== | ||
Docket No: 50-341 License N o: NPF-43 Report No: | |||
05000341/20165 0 2 Licensee: DTE Electric Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: August 8 through 1 1, 2016 Inspectors: | 05000341/20165 0 2 Licensee: DTE Electric Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: August 8 through 1 1, 2016 Inspectors: | ||
G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector J. Kutlesa, Physical Security Inspector F. Tran, Health Physicist Inspector Approved by: | G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector J. Kutlesa, Physical Security Inspector F. Tran, Health Physicist Inspector Approved by: | ||
Line 67: | Line 69: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===Cornerstone:=== | ===Cornerstone: Emergency Preparedness=== | ||
1EP1 Exercise Evaluation (71114.01) | |||
===.1 Exercise Evaluation=== | ===.1 Exercise Evaluation=== | ||
Line 114: | Line 117: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone:=== | ===Cornerstone: Emergency Preparedness=== | ||
{{a|4OA1}} | {{a|4OA1}} |
Revision as of 12:01, 10 May 2019
ML16252A296 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 09/08/2016 |
From: | Orth S K Plant Support Branch II |
To: | Fessler P DTE Energy |
References | |
IR 2016502 | |
Download: ML16252A296 (13) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 September 8, 2016 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2
- BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/201 6 502
Dear Mr. Fessler:
On August 11, 201 6, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Fermi Power Plant, Unit 2. The enclosed report documents the results of this inspection which were discussed on August 11, 201 6, with Mr. M. Caragher and other members of your staff. No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA Joe Maynen Acting for/
Steven K. Orth, Chief Plant Support Branch
Division of Reactor Safety Docket No. 50
-341 License No. NPF
-43 Enclosure:
I R 05000 341/20 16 502 cc: Distribution via LISTSERV Enclosure U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Docket No: 50-341 License N o: NPF-43 Report No:
05000341/20165 0 2 Licensee: DTE Electric Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Dates: August 8 through 1 1, 2016 Inspectors:
G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector J. Kutlesa, Physical Security Inspector F. Tran, Health Physicist Inspector Approved by:
S. Orth, Chief Plant Support Branch Division of Reactor Safety 2
SUMMARY
I R 05000341/2016502
- 0 8/0 8/201 6 - 0 8/1 1/201 6; Fermi Power Plant, Unit 2; Baseline Emergency Preparedness Exercise Evaluation; Exercise Evaluation Scenario Review; and Performance Indicator Verification
. This report covers a 1-w eek period of announced baseline inspection by four Region III inspectors. The U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG
-1649, "Reactor Oversight Process," Revision 5, dated July 2016.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedne
ss No findings were identified.
=
Licensee-Identified Violations===
None 3
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation (71114.01)
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the August 9, 2016, biennial emergency preparedness exercise objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan.
The inspectors also reviewed records of other drills and exercises conducted in 2014, 2015
, and 2016, to verify that those drills' scenarios were sufficiently different from the scenario used in the August 9, 2016 , exercise. The inspectors observed and evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses, in the following emergency response facilities: Control Room Simulator (CRS);
Technical Support Center (TSC); Operation al Support Center (OSC); and Emergency Operations Facility (EOF). The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.
The inspectors attended post
-exercise critiques in the CRS, TSC, OSC, and EOF to evaluate the licensee's initial self
-assessment of its exercise performance.
The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances.
These self
-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance.
Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01.
b. Findings
No findings were identified.
1EP 8 Exercise Evaluati
on - Scenario Review (71114.08)
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in
-office review of the exercise objectives and scenarios submitted to the NRC using IP 71114.08, "Exercise Evaluation
- Scenario Review," to determine if the exercise would test major elements of the Emergency Plan as required by Title 10 of the Code of Federal Regulations 50.47(b)(14).
Documents reviewed are listed in the Attachment to this report.
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
(71151)
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance (DEP) Performance Indicator (PI) for the period from the third quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the Nuclear Energy Institute (NEI) guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre
-designated control room simulator training sessions, and performance during other drills.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one DEP sample as defined in IP 71151.
b. Findings
No findings were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the third quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2015 and 2016 drill, and revisions of the roster of personnel assigned to key emergency response organization positions.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the third quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used.
The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On August 11, 201 6, the inspectors presented the biennial exercise inspection results to Mr. M. Caragher , and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
T Licensee
- M. Caragher, Plant Manager
- W. Colonnello, Work Management
Director
- J. Ford, Recovery Director
- L. Peterson, Engineering Director
- S. Maglio, Licensing Manager
- J. Louwers, Quality Assurance Manager
- G. Piccard, Operations Manager
- N. Avrakatos, Radiological Emergency Response Preparedness (RERP) Manager L. Kantola
, Outage and Work Management Manager
- J. Pendergast, Licensing
- M. O'Connor, Security Manager
U.S. Nuclear Regulatory Commission
- B. Kemker, Senior Resident Inspector
- P. Smagacz, Resident Inspector
LIST OF ITEMS OPENED
, CLOSED, AND DISCUSSE
D Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector
s reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or
any part of it, unless this is stated in the body of the inspection report.
1EP 1 Exercise Evaluation
(71114.0 1) Fermi 2 2016 Emergency Preparedness
Exercise Scenario; Dated August 9, 2016 Fermi 2 Radiological Emergency Response Plan; Revision
EP-101; Classification of Emergencies; Revision 41
EP-102; Unusual Event; Revision 21
EP-103; Alert; Revision 22
EP-104; Site Area Emergency; Revision 21
EP-105; General Emergency; Revision 22
EP-290; Emergency Notifications; Revision 61
EP-301-01; Technical Support Center; Revision
EP-302-01; Operational Support Center; Revision 14
EP-30 3-01; Emergency Operations Facility; Revision 16
EP-542; Computer
-Based Offsite Dose Assessment
- Airborne Release; Revision 13
EP-545; Protective Action Recommendations; Revisi
on 26 Two-Years of Drill and Exercise Corrective Action Program Items; Dated August 2014
- August 2016 Two-Years of Scenario Timelines; Dated August 2014
- August 2016
NQA Audit Report 16
-0101; Quality Assurance Audit Report of the Radiological Emergency Response Preparedness Program; Dated February 9, 2016
CARD 1 5-29766; RERP Blue Team EOF administrator position not backfilled for
out-processed employee
- Dated December 8, 2015
CARD 16-20506; NQA - Security EITER Equipment (OCANS) deficiencies not documented in CAP;
Dated February 16, 2016
CARD 16-2 1437; NQA Audit Deficiency: ERO Positions not in alignment with the RERP Plan; Dated January 20, 2016
CARD 16-26019; RERP Drill 07/26/16
- Follow-up notifications assessed as UNSAT
- Dated July 29, 2016
CARD 16-25598; RERP Drill 07/26/16
- Inadequate Number of Drill Controllers;
Dated July 29, 2016
CARD 16-2623 3; JIC Access Control; Dated August 8, 2016
CARD 16-2623 4; Effective Communications; Dated August 8, 2016
CARD 16-26235; Media Briefings
- Dated August 8, 2016
1EP8 Exercise Evaluation
- Scenario Review
(71114.08)
Fermi 2 201 6 Emergency Preparedness Exercise 60 Day Submittal; Dated June 3, 201 6 4OA1 Performance Indicator Verification
(71151) NRC Performance Indicator Data; Drill/Exercise Performance;
rd Quarter of 2015 - 2 nd Quarter of 2016 NRC Performance Indicator Data; Emergency Response Organization Drill Participation;
rd Quarter of 2015
- 2 nd Quarter of 2016 NRC Performance Indicator Data; Alert and Notification System Reliability;
rd Quarter of 2015 - 2 nd Quarter of 2016 NEI 99-02; Regulatory Assessment Performance Indicator Guideline
- Revision 7
LIST OF ACRONYMS USED
ADAMS Agencywide Documents Access and Management System
ANS Alert and Notification System
CFR Code of Federal Regulations
CRS Control Room Simulator
DEP Drill and Exercise Performance
EOF Emergency Operations Facility
ERO Emergency Response Organization
IP Inspection Procedure
NEI Nuclear Energy Institute
NRC U.S. Nuclear Regulatory Commission
OSC Operational Support Center
PARS Publicly Available Records System
PI Performance Indicator
Mr. Paul Fessler
Chief Nuclear Officer
DTE Energy Company
Fermi 2 - 210 NOC 6400 North Dixie Highway
Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2
- BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/201
502 Dear Mr. Fessler: On August 11, 2016, the
- U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Fermi Power Plant, Unit 2. The enclosed report documents the results of this inspection which were discussed on August 11, 2016, with Mr. M. Caragher and other members of your staff. No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA Joe Maynen Acting for/
Steven
- K. Orth, Chief Plant Support Branch
Division of Reactor Safety
Docket No. 50
-341 License No. NPF
-43 Enclosure:
I R 05000 341/20 16502 cc: Distribution via LISTSERV ADAMS Accession Number: ML16252A296 Publicly Available
Non-Publicly Available
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII NAME GHansen:jw
JMaynen for SOrth DATE 09/07/16 09/08/16 OFFICIAL RECORD COPY
Letter to Mr. Paul Fessler
from Mr. Steven K. Orth
dated September 8, 2016
SUBJECT: FERMI POWER PLANT, UNIT 2
- BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000341/201
502 DISTRIBUTION
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMFermi2 Resource
RidsNrrDirsIrib Resource Cynthia Pederson
Linda Linn DRPIII DRSIII ROPreports.Resource@nrc.gov