Line 2: Line 2:
| number = ML17151B018
| number = ML17151B018
| issue date = 03/09/2017
| issue date = 03/09/2017
| title = Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements.
| title = Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements.
| author name =  
| author name =  
| author affiliation = Wolf Creek Nuclear Operating Corp
| author affiliation = Wolf Creek Nuclear Operating Corp
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:WOLF CREEK                           TABLE OF CONTENTS CHAPTER 18.0 RESPONSE TO NUREG-0737                      CLARIFICATION OF TMI ACTION                          PLAN REQUIREMENTS Section                                                    Page 18.0 RESPONSE TO NUREG-0737, "CLARIFICATION OF  18.0-1  TMI ACTION PLAN REQUIREMENTS"  18.0.1 COMPLIANCE WITH REVISED REGULATIONS 10.0-1  10CFR50 AND 10CFR52 (NRC 2008-0122) RIN  3150-A I10, "ENHANCEMENTS TO EMERGENCY  PREPAREDNESS REGULATIONS" [EFFECTIVE  12/23/2011] AFFECTING RESPONSE TO  NUREG-0737 18.1        OPERATIONAL SAFETY                          18.1-1 18.1.1      SHIFT TECHNICAL ADVISOR (I.A.1.1)            18.1-1 
{{#Wiki_filter:WOLF CREEK TABLE OF CONTENTS  


18.1.2      SHIFT SUPERVISOR'S ADMINISTRATIVE            18.1-5 DUTIES (I.A.1.2)   
CHAPTER 18.0
 
RESPONSE TO NUREG-0737 CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS
 
Section                                                    Page
 
18.0 RESPONSE TO NUREG-0737, "CLARIFICATION OF  18.0-1 TMI ACTION PLAN REQUIREMENTS" 18.0.1 COMPLIANCE WITH REVISED REGULATIONS 10.0-1  10CFR50 AND 10CFR52 (NRC 2008-0122) RIN 3150-A I10, "ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS" [EFFECTIVE 12/23/2011] AFFECTING RESPONSE TO NUREG-0737
 
18.1        OPERATIONAL SAFETY                          18.1-1 
 
18.1.1      SHIFT TECHNICAL ADVISOR (I.A.1.1)            18.1-1 
 
18.1.2      SHIFT SUPERVISOR'S ADMINISTRATIVE            18.1-5
 
DUTIES (I.A.1.2)   


18.1.3      SHIFT MANNING (I.A.1.3)                      18.1-7   
18.1.3      SHIFT MANNING (I.A.1.3)                      18.1-7   


18.1.4      IMMEDIATE UPGRADING OF REACTOR OPERATOR      18.1-10 AND SENIOR REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1)  
18.1.4      IMMEDIATE UPGRADING OF REACTOR OPERATOR      18.1-10  
 
AND SENIOR REACTOR OPERATOR TRAINING  
 
AND QUALIFICATIONS (I.A.2.1)  


18.1.5      ADMINISTRATION OF TRAINING PROGRAMS          18.1-12 (I.A.2.3)
18.1.5      ADMINISTRATION OF TRAINING PROGRAMS          18.1-12  


18.1.6      REVISE SCOPE AND CRITERIA FOR                18.1-13 LICENSING EXAMINATIONS (I.A.3.1)  
(I.A.2.3)  


18.1.7       EVALUATION OF ORGANIZATION AND               18.1-14 MANAGEMENT (I.B.1.2)
18.1.6       REVISE SCOPE AND CRITERIA FOR                18.1-13


18.1.8      GUIDANCE FOR EVALUATION AND                  18.1-17 DEVELOPMENT OF PROCEDURES FOR TRANSIENTS AND ACCIDENTS (I.C.1)  
LICENSING EXAMINATIONS (I.A.3.1)  


18.1.9       SHIFT RELIEF AND TURNOVER PROCEDURE          18.1-22 (I.C.2)
18.1.7       EVALUATION OF ORGANIZATION AND               18.1-14


18.1.10      SHIFT SUPERVISOR'S RESPONSIBILITIES          18.1-24 (I.C.3)  
MANAGEMENT (I.B.1.2)
 
18.1.8      GUIDANCE FOR EVALUATION AND                  18.1-17
 
DEVELOPMENT OF PROCEDURES FOR
 
TRANSIENTS AND ACCIDENTS (I.C.1)
 
18.1.9      SHIFT RELIEF AND TURNOVER PROCEDURE          18.1-22
 
(I.C.2)
 
18.1.10      SHIFT SUPERVISOR'S RESPONSIBILITIES          18.1-24  
 
(I.C.3)  


18.1.11      CONTROL ROOM ACCESS (I.C.4)                  18.1-24  
18.1.11      CONTROL ROOM ACCESS (I.C.4)                  18.1-24  


18.1.12      PROCEDURES FOR FEEDBACK OF OPERATING        18.1-26 EXPERIENCE TO PLANT STAFF (I.C.5)
18.1.12      PROCEDURES FOR FEEDBACK OF OPERATING        18.1-26  


18.1.13      VERIFY CORRECT PERFORMANCE OF                18.1-28 OPERATING ACTIVITIES (I.C.6)  
EXPERIENCE TO PLANT STAFF (I.C.5)  


18.0-i                      Rev. 29 WOLF CREEK                     TABLE OF CONTENTS (Continued)  
18.1.13      VERIFY CORRECT PERFORMANCE OF                18.1-28
 
OPERATING ACTIVITIES (I.C.6)
 
18.0-i                      Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)  


Section                                                    Page  
Section                                                    Page  


18.1.14      NSSS VENDOR REVIEW OF PROCEDURES            18.1-30 (I.C.7)
18.1.14      NSSS VENDOR REVIEW OF PROCEDURES            18.1-30  


18.1.15      PILOT MONITORING OF SELECTED EMERGENCY      18.1-31 PROCEDURES FOR NEAR-TERM OPERATING LICENSE APPLICANTS (I.C.8)  
(I.C.7)
 
18.1.15      PILOT MONITORING OF SELECTED EMERGENCY      18.1-31  
 
PROCEDURES FOR NEAR-TERM OPERATING  
 
LICENSE APPLICANTS (I.C.8)  


18.1.16      CONTROL ROOM DESIGN REVIEW (I.D.1)          18.1-32  
18.1.16      CONTROL ROOM DESIGN REVIEW (I.D.1)          18.1-32  


18.1.17      PLANT SAFETY PARAMETER DISPLAY SYSTEM        18.1-36 (I.D.2)  
18.1.17      PLANT SAFETY PARAMETER DISPLAY SYSTEM        18.1-36  
 
(I.D.2)  
 
18.1.18      SPECIAL LOW POWER TESTING AND                18.1-39
 
TRAINING (I.G.1)
 
18.2        SITING AND DESIGN                            18.2-1 
 
18.2.1      POSTACCIDENT REACTOR COOLANT SYSTEM          18.2-1 


18.1.18      SPECIAL LOW POWER TESTING AND                18.1-39 TRAINING (I.G.1)  
VENTING (II.B.1)


18.2         SITING AND DESIGN                            18.2-1 18.2.1       POSTACCIDENT REACTOR COOLANT SYSTEM          18.2-1 VENTING (II.B.1)  
18.2.2      DESIGN REVIEW OF THE PLANT SHIELDING        18.2-6  


18.2.2      DESIGN REVIEW OF THE PLANT SHIELDING        18.2-6 (II.B.2)   
(II.B.2)   


18.2.3      POSTACCIDENT SAMPLING SYSTEM (II.B.3)        18.2-19   
18.2.3      POSTACCIDENT SAMPLING SYSTEM (II.B.3)        18.2-19   


18.2.4      TRAINING FOR MITIGATING CORE DAMAGE          18.2-25 (II.B.4)  
18.2.4      TRAINING FOR MITIGATING CORE DAMAGE          18.2-25  
 
(II.B.4)
 
18.2.5      PERFORMANCE TESTING OF BOILING-WATER        18.2-27
 
REACTOR AND PRESSURIZED-WATER REACTOR
 
RELIEF AND SAFETY VALVES (II.D.1)
 
18.2.6      DIRECT INDICATION OF RELIEF AND SAFETY      18.2-30
 
VALVE POSITION (II.D.3)
 
18.2.7      AUXILIARY FEEDWATER SYSTEM                  18.2-32
 
EVALUATION (II.E.1.1)  


18.2.5       PERFORMANCE TESTING OF BOILING-WATER        18.2-27 REACTOR AND PRESSURIZED-WATER REACTOR RELIEF AND SAFETY VALVES (II.D.1)
18.2.8       AUXILIARY FEEDWATER AUTOMATIC                18.2-33


18.2.6      DIRECT INDICATION OF RELIEF AND SAFETY      18.2-30 VALVE POSITION (II.D.3)
INITIATION AND FLOW INDICATION  


18.2.7      AUXILIARY FEEDWATER SYSTEM                  18.2-32 EVALUATION (II.E.1.1)  
(II.E.1.2)  


18.2.8       AUXILIARY FEEDWATER AUTOMATIC                18.2-33 INITIATION AND FLOW INDICATION (II.E.1.2)
18.2.9      EMERGENCY POWER SUPPLY FOR PRESSURIZER       18.2-36


18.2.9      EMERGENCY POWER SUPPLY FOR PRESSURIZER      18.2-36 HEATERS (II.E.3.1)  
HEATERS (II.E.3.1)  


18.0-ii                    Rev. 29 WOLF CREEK                     TABLE OF CONTENTS (Continued)  
18.0-ii                    Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)  


Section                                                    Page  
Section                                                    Page  


18.2.10      DEDICATED HYDROGEN PENETRATIONS              18.2-39 (II.E.4.1)  
18.2.10      DEDICATED HYDROGEN PENETRATIONS              18.2-39  
 
(II.E.4.1)  
 
18.2.11      CONTAINMENT ISOLATION DEPENDABILITY          18.2-40


18.2.11      CONTAINMENT ISOLATION DEPENDABILITY          18.2-40 (II.E.4.2)  
(II.E.4.2)  


18.2.12      ACCIDENT MONITORING INSTRUMENTATION          18.2-44 (II.F.1)
18.2.12      ACCIDENT MONITORING INSTRUMENTATION          18.2-44


18.2.13      INSTRUMENTATION FOR DETECTION OF            18.2-59 INADEQUATE CORE COOLING (II.F.2)  
(II.F.1)  


18.2.14     EMERGENCY POWER FOR PRESSURIZER              18.2-92 EQUIPMENT (II.G.1)
18.2.13     INSTRUMENTATION FOR DETECTION OF            18.2-59 


18.2.15      REQUEST BY NRC INSPECTION AND                18.2-94 ENFORCEMENT BULLETINS (II.K.1)  
INADEQUATE CORE COOLING (II.F.2)  


18.2.16     ORDERS ON FACILITIES WITH BABCOCK            18.2-95 AND WILCOX NUCLEAR STEAM SUPPLIER SYSTEMS (II.K.2-SERIES)
18.2.14     EMERGENCY POWER FOR PRESSURIZER              18.2-92


18.2.17      RECOMMENDATIONS FROM THE BULLETINS          18.2-97 AND ORDERS TASK FORCE (II.K.3-SERIES)   
EQUIPMENT (II.G.1)
 
18.2.15      REQUEST BY NRC INSPECTION AND                18.2-94
 
ENFORCEMENT BULLETINS (II.K.1)
 
18.2.16      ORDERS ON FACILITIES WITH BABCOCK            18.2-95
 
AND WILCOX NUCLEAR STEAM SUPPLIER
 
SYSTEMS (II.K.2-SERIES)
 
18.2.17      RECOMMENDATIONS FROM THE BULLETINS          18.2-97
 
AND ORDERS TASK FORCE (II.K.3-SERIES)   


18.2.18      REFERENCES                                  18.2-113  
18.2.18      REFERENCES                                  18.2-113  


18.3        EMERGENCY PREPARATION AND RADIATION          18.3-1               PROTECTION 18.3.1      UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1)  18.3-1
18.3        EMERGENCY PREPARATION AND RADIATION          18.3-1 PROTECTION


18.3.2       UPGRADE EMERGENCY SUPPORT FACILITIES        18.3-1 (III.A.1.2)  
18.3.1       UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1)   18.3-1


18.3.3       IMPROVING LICENSEE EMERGENCY                 18.3-7 PREPAREDNESS-LONG TERM (III.A.2)
18.3.2       UPGRADE EMERGENCY SUPPORT FACILITIES        18.3-1


18.3.4      INTEGRITY OF SYSTEMS OUTSIDE OF              18.3-10 CONTAINMENT (III.D.1.1)
(III.A.1.2)  


18.3.5      IMPROVED INPLANT IODINE INSTRUMENTATION      18.3-12 UNDER ACCIDENT CONDITIONS (III.D.3.3)   
18.3.3      IMPROVING LICENSEE EMERGENCY                18.3-7
 
PREPAREDNESS-LONG TERM (III.A.2)
 
18.3.4      INTEGRITY OF SYSTEMS OUTSIDE OF              18.3-10 
 
CONTAINMENT (III.D.1.1) 
 
18.3.5      IMPROVED INPLANT IODINE INSTRUMENTATION      18.3-12
 
UNDER ACCIDENT CONDITIONS (III.D.3.3)   


18.3.6      CONTROL ROOM HABITABILITY (III.D.3.4)        18.3-14  
18.3.6      CONTROL ROOM HABITABILITY (III.D.3.4)        18.3-14  


18.4 ENHANCEMENTS TO EMERGENCY 18.4-1   PREPAREDNESS REGULATIONS 18.4.1 EMERGENCY FACILITIES AND EQUIPMENT 18.4-1   
18.4 ENHANCEMENTS TO EMERGENCY 18.4-1 PREPAREDNESS REGULATIONS
 
18.4.1 EMERGENCY FACILITIES AND EQUIPMENT 18.4-1   


Appendix A  AGING MANAGEMENT PROGRAMS & TIME LIMITED    18 A-1          AGING ANALYSES   
Appendix A  AGING MANAGEMENT PROGRAMS & TIME LIMITED    18 A-1          AGING ANALYSES   


18.0-iii                    Rev. 29 WOLF CREEK                     TABLE OF CONTENTS (Continued)  
18.0-iii                    Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)  
 
LIST OF TABLES


LIST OF TABLES 
Table No.                      Title


Table No.                      Title 18.1-1    ISEG FUNCTION CROSS REFERENCE   
18.1-1    ISEG FUNCTION CROSS REFERENCE   


18.2-1    Mitigating Core Damage Course   
18.2-1    Mitigating Core Damage Course   
Line 123: Line 223:
18.2-2    Essential/Nonessential Containment Penetrations  
18.2-2    Essential/Nonessential Containment Penetrations  


18.2-3    Details for the Thermocouple/Core Cooling Monitor System  
18.2-3    Details for the Thermocouple/Core Cooling Monitor  
 
System  


18.2-4    Narrow Range Measurement Uncertainty for Reactor Vessel Level Instrumentation System
18.2-4    Narrow Range Measurement Uncertainty for Reactor  


18.0-iv                    Rev. 29 WOLF CREEK  CHAPTER 18 - LIST OF FIGURES *Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference. Figure # Sheet Title Drawing #* 18.2-1 0 Reactor Head Vent System  18.2-2 0 Post-Accident Radiation Zones Elevation 1974'  18.2-3 0 Post-Accident Radiation Zones Elevation 1988'  18.2-4 0 Post-Accident Radiation Zones Elevation 2000'  18.2-5 0 Post-Accident Radiation Zones Elevation 2026'  18.2-6 0 Post-Accident Radiation Zones Elevation 2047'-6"  18.2-7 0 Post-Accident Radiation Zones Control Building and Communications Corridor Elevations 1974' and 1984'  18.2-8 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor Elevations 2000' and 2016'  18.2-9 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor Elevations 2032' and 2047'-6"  18.2-10 0 Normalized Dose Rate Decay Curves for Airborne Source (Source A)  18.2-11 0 Normalized Dose Rate Decay Curves for Sump Source (Source C) with 1 Percent Cs and 50 Percent Cs  18.2-12 0 Functional Diagram (Reactor Core Subcooling  Monitor)  18.2-13 0 Reactor Vessel Level Instrumentation System 18.2-14 0 PORV Opening Band - Turbine Trip with Condenser Unavailable  18.2-15 0 Nuclear Sampling System M-12SJ04 
Vessel Level Instrumentation System  


18.0-v    Rev. 29 WOLF CREEK CHAPTER 18.0 18.0  RESPONSE TO NUREG-0737, "CLARIFICATION OF TMI ACTION PLAN       REQUIREMENTS" The following discussion of the SNUPPS response to NUREG-0737 is subdivided into three sections:  18.1, Operational Safety; 18.2, Siting and Design; and 18.3, Emergency Preparations and Radiation Protection. Unless otherwise noted, the subsections presenting the NRC guidance are verbatim quotes from NRC documents.  
18.0-iv                    Rev. 29
 
WOLF CREEK CHAPTER 18 - LIST OF FIGURES
*Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.
Figure # Sheet Title Drawing #* 18.2-1 0 Reactor Head Vent System 18.2-2 0 Post-Accident Radiation Zones Elevation 1974'  18.2-3 0 Post-Accident Radiation Zones Elevation 1988'  18.2-4 0 Post-Accident Radiation Zones Elevation 2000'  18.2-5 0 Post-Accident Radiation Zones Elevation 2026'  18.2-6 0 Post-Accident Radiation Zones Elevation 2047'-6"  18.2-7 0 Post-Accident Radiation Zones Control Building and Communications Corridor Elevations 1974' and 1984' 18.2-8 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor
 
Elevations 2000' and 2016' 18.2-9 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor
 
Elevations 2032' and 2047'-6"  18.2-10 0 Normalized Dose Rate Decay Curves for Airborne Source (Source A) 18.2-11 0 Normalized Dose Rate Decay Curves for Sump Source (Source C) with 1 Percent Cs and 50 Percent
 
Cs  18.2-12 0 Functional Diagram (Reactor Core Subcooling Monitor) 18.2-13 0 Reactor Vessel Level Instrumentation System  18.2-14 0 PORV Opening Band - Turbine Trip with Condenser Unavailable 18.2-15 0 Nuclear Sampling System M-12SJ04 
 
18.0-v    Rev. 29 WOLF CREEK CHAPTER 18.0  
 
18.0  RESPONSE TO NUREG-0737, "CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS" The following discussion of the SNUPPS response to NUREG-0737 is subdivided  
 
into three sections:  18.1, Operational Safety; 18.2, Siting and Design; and  
 
18.3, Emergency Preparations and Radiation Protection. Unless otherwise noted, the subsections presenting the NRC guidance are verbatim quotes from NRC  
 
documents.
 
Information in the sections listed below is historical and reflects conditions
 
at the time of plant licensing. This material will not be updated as a whole
 
as it establishes the conditions relevant to initial plant siting and design. 
 
Changes to facilities or conditions will be reviewed and updated only when
 
potential hazards not previously analyzed are identified.
 
18.2.5 18.2.12 18.2.13.2 paragraph 2  2.d.
 
18.2.13.2 paragraph 2  3.
 
18.2.13.2 paragraph 2  4.d.
 
18.2.13.2 paragraph 2  4.e. 1)
 
18.2.13.2 paragraph 2  4.e. 2)
 
18.2.13.2 paragraph 2  7.
 
18.2.13.2 paragraph 2  8.  


Information in the sections listed below is historical and reflects conditions at the time of plant licensing. This material will not be updated as a whole as it establishes the conditions relevant to initial plant siting and design.
Changes to facilities or conditions will be reviewed and updated only when potential hazards not previously analyzed are identified.
18.2.5 18.2.12 18.2.13.2 paragraph 2  2.d.
18.2.13.2 paragraph 2  3.
18.2.13.2 paragraph 2  4.d.
18.2.13.2 paragraph 2  4.e. 1) 18.2.13.2 paragraph 2  4.e. 2) 18.2.13.2 paragraph 2  7.
18.2.13.2 paragraph 2  8.
18.2.13.2 paragraph 2  9.  
18.2.13.2 paragraph 2  9.  


18.0.1 COMPLIANCE WITH REVSED REGULATIONS 10CFR50 AND 10CFR52 (NRC-2008-0122) RIN 3150-AI10, "ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS" [EFFECTIVE 12/23/2011] AFFECTING RESPONSE TO NUREG-0737 Section 18.4 provides a discussion for compliance with revised regulations 10CFR50 and 10CFR52 pertaining to "Enhancements to Emergency Preparedness Regulations" applicable to the Emergency Operations Facility (EOF) and Alternate Technical Support Center (TSC). The compliance with the revised regulations may enhance or supersede previous information provided in section 18.3 applicable to the EOF and Alternate TSC for the response to NUREG-0737. The comprehensive emergency plan provides the implementation of the revised objectives and requirements of 10CFR50, Appendix E, applicable to the EOF and Alternate TSC. 
18.0.1 COMPLIANCE WITH REVSED REGULATIONS 10CFR50 AND 10CFR52 (NRC-2008-0122)
RIN 3150-AI10, "ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS" [EFFECTIVE 12/23/2011] AFFECTING RESPONSE TO NUREG-0737  


18.0-1    Rev. 28 WOLF CREEK 18.1  OPERATIONAL SAFETY 18.1.1  SHIFT TECHNICAL ADVISOR (I.A.1.1)
Section 18.4 provides a discussion for compliance with revised regulations 10CFR50 and 10CFR52 pertaining to "Enhancements to Emergency Preparedness Regulations" applicable to the Emergency Operations Facility (EOF) and Alternate Technical Support Center (TSC). The compliance with the revised regulations may enhance or supersede previous information provided in section 18.3 applicable to the EOF and Alternate TSC for the response to NUREG-0737.
The comprehensive emergency plan provides the implementation of the revised objectives and requirements of 10CFR50, Appendix E, applicable to the EOF and Alternate TSC.  


18.1.1.1  NRC Guidance Per NUREG-0737 Position
18.0-1   Rev. 28 WOLF CREEK 18.1  OPERATIONAL SAFETY


Each licensee shall provide an on-shift technical advisor to the shift supervisor. The shift technical advisor (STA) may serve more than one unit at a multiunit site if qualified to perform the advisor function for the various units.
18.1.1  SHIFT TECHNICAL ADVISOR (I.A.1.1)  


The STA shall have a bachelor's degree or equivalent in a scientific or engineering discipline and have received specific training in the response and analysis of the plant for transients and accidents. The STA shall also receive training in plant design and layout, including the capabilities of instrumentation and controls in the control room. The licensee shall assign normal duties to the STAs that pertain to the engineering aspects of ensuring safe operations of the plant, including the review and evaluation of operating experience.  
18.1.1.1  NRC Guidance Per NUREG-0737
 
Position
 
Each licensee shall provide an on-shift technical advisor to the shift supervisor. The shift technical advisor (STA) may serve more than one unit at
 
a multiunit site if qualified to perform the advisor function for the various
 
units.
 
The STA shall have a bachelor's degree or equivalent in a scientific or  
 
engineering discipline and have received specific training in the response and  
 
analysis of the plant for transients and accidents. The STA shall also receive  
 
training in plant design and layout, including the capabilities of  
 
instrumentation and controls in the control room. The licensee shall assign  
 
normal duties to the STAs that pertain to the engineering aspects of ensuring safe operations of the plant, including the review and evaluation of operating experience.  


Clarification  
Clarification  


The staff letter of October 30, 1979 from H. R. Denton to All Operating Nuclear Power Plants clarified the short-term STA requirements. The letter indicated that the STAs must have completed all training by January 1, 1981. This paper confirms these requirements and requests additional information.  
The staff letter of October 30, 1979 from H. R. Denton to All Operating Nuclear  
 
Power Plants clarified the short-term STA requirements. The letter indicated  
 
that the STAs must have completed all training by January 1, 1981. This paper  
 
confirms these requirements and requests additional information.  
 
The need for the STA position may be eliminated when the qualifications of the
 
shift supervisors and senior operators have been upgraded and the man-machine
 
interface in the control room has been acceptably upgraded. However, until
 
these long term improvements are attained, the need for an STA program will
 
continue.
The staff has not yet established the detailed elements of the academic and
 
training requirements of the STA beyond the guidance given in its October 30, 1979 letter. Nor has the staff made a decision on the level of upgrading
 
required for licensed operating personnel and the man-machine interface in the
 
control room that would be acceptable for eliminating the need of an STA. 
 
Until these requirements for eliminating the STA position have been
 
established, the staff continues to require that, in addition to the staffing
 
requirements specified in its July 31, 1980 letter (as revised by item I.A.1.3
 
of this report), an STA be available for duty on each operating shift when a
 
plant is being operated in Modes 1-4 for a PWR and Modes 1-3 for a BWR. At
 
other times, an STA is not required to be on duty.
 
18.1-1 Rev. 0 WOLF CREEK Since the October 30, 1979 letter was issued, several efforts have been made to
 
establish, for the longer term, the minimum level of experience, education, and
 
training for STAs. These efforts include work on the revision to ANS-3.1, work
 
by the Institute of Nuclear Power Operations (INPO), and internal staff efforts.
 
INPO has issued a document entitled "Nuclear Power Plant Shift Technical
 
Advisor--Recommendations for Position Description, Qualifications, Education, and Training."  A copy of Revision 0 of this document, dated April 30, 1980, is
 
attached as Appendix C [to NUREG-0737]. Sections 5 and 6 of the INPO document
 
describe the education, training, and experience requirements for STAs. The
 
NRC staff finds that the descriptions set forth in Sections 5 and 6 of Revision
 
0 to the INPO document are an acceptable approach for the selection and
 
training of personnel to staff the STA positions.  [Note: This should not be interpreted to mean that this is an NRC requirement at this time. The intent is to refer to the INPO document as acceptable for interim guidance for a
 
utility in planning its STA program over the long term (i. e., beyond the
 
January 1, 1981 requirement to have STAs in place in accordance with the
 
qualification requirements specified in the staff's October 30, 1979 letter).]
 
No later than January 1, 1981, all licensees of operating reactors shall
 
provide this office with a description of their STA training program and their


The need for the STA position may be eliminated when the qualifications of the shift supervisors and senior operators have been upgraded and the man-machine interface in the control room has been acceptably upgraded. However, until these long term improvements are attained, the need for an STA program will continue. The staff has not yet established the detailed elements of the academic and training requirements of the STA beyond the guidance given in its October 30, 1979 letter. Nor has the staff made a decision on the level of upgrading required for licensed operating personnel and the man-machine interface in the control room that would be acceptable for eliminating the need of an STA.
plans for requalification training. This description shall indicate the level  
Until these requirements for eliminating the STA position have been established, the staff continues to require that, in addition to the staffing requirements specified in its July 31, 1980 letter (as revised by item I.A.1.3 of this report), an STA be available for duty on each operating shift when a plant is being operated in Modes 1-4 for a PWR and Modes 1-3 for a BWR. At other times, an STA is not required to be on duty.


18.1-1 Rev. 0 WOLF CREEK  Since the October 30, 1979 letter was issued, several efforts have been made to establish, for the longer term, the minimum level of experience, education, and training for STAs. These efforts include work on the revision to ANS-3.1, work by the Institute of Nuclear Power Operations (INPO), and internal staff efforts.
of training attained by STAs by January 1, 1981 and demonstrate conformance


INPO has issued a document entitled "Nuclear Power Plant Shift Technical Advisor--Recommendations for Position Description, Qualifications, Education, and Training."  A copy of Revision 0 of this document, dated April 30, 1980, is attached as Appendix C [to NUREG-0737]. Sections 5 and 6 of the INPO document describe the education, training, and experience requirements for STAs. The NRC staff finds that the descriptions set forth in Sections 5 and 6 of Revision 0 to the INPO document are an acceptable approach for the selection and training of personnel to staff the STA positions.  [Note: This should not be interpreted to mean that this is an NRC requirement at this time. The intent is to refer to the INPO document as acceptable for interim guidance for a utility in planning its STA program over the long term (i. e., beyond the January 1, 1981 requirement to have STAs in place in accordance with the qualification requirements specified in the staff's October 30, 1979 letter).]
with the qualification and training requirements in the October 30, 1979  


No later than January 1, 1981, all licensees of operating reactors shall provide this office with a description of their STA training program and their plans for requalification training. This description shall indicate the level of training attained by STAs by January 1, 1981 and demonstrate conformance with the qualification and training requirements in the October 30, 1979 letter. Applicants for operating licenses shall provide the same information in this application, or amendments thereto, on a schedule consistent with the NRC licensing review schedule.
letter. Applicants for operating licenses shall provide the same information  
No later than January 1, 1981, all licensees of operating reactors shall provide this office with a description of their long-term STA program, including qualification, selection criteria, training plans, and plans, if any, for the eventual phaseout of the STA program.  (Note:  The description shall include a comparison of the licensee/applicant program with the above-mentioned INPO document. This request solicits industry views to assist NRC in establishing long-term improvements in the STA program. Applicants for operating licenses shall provide the same information in their application, or amendments thereto, on a schedule consistent with the NRC licensing review schedule.)


18.1-2 Rev. 0 WOLF CREEK 18.1.1.2  The Operating Agent Response [Note:  The remainder of Section 18.1.1 is included for historical purposes, however, the operating agent's conformance with NUREG-0737, Item I.A.1.1, is as specified by the Commission Policy Statement on Engineering Expertise on Shift.]
in this application, or amendments thereto, on a schedule consistent with the
General The NRC issued a Policy Statement on Engineering Expertise on Shift in October 1985. The Commission Policy Statement on Engineering Expertise on shift is discussed in sections 13.2.1.1.3.1 and 13.2.1.1.3.2. The Policy Statement permits either of two options to be used to implement long term goals towards upgrading the qualifications and training of operating staffs. These are Option 1:  Combined SRO/STA Position and Option 2:  Continued Use of STA Position. Either of these options may be used to meet the requirements of NUREG-0737, Item I.A.1.1. Also, either Option 1 or 2 may be used on each shift. The complete requirements for the options are as follows:  
 
NRC licensing review schedule.
 
No later than January 1, 1981, all licensees of operating reactors shall provide this office with a description of their long-term STA program, including qualification, selection criteria, training plans, and plans, if any, for the eventual phaseout of the STA program.  (Note:  The description shall
 
include a comparison of the licensee/applicant program with the above-mentioned
 
INPO document. This request solicits industry views to assist NRC in
 
establishing long-term improvements in the STA program. Applicants for
 
operating licenses shall provide the same information in their application, or
 
amendments thereto, on a schedule consistent with the NRC licensing review
 
schedule.)
 
18.1-2 Rev. 0 WOLF CREEK 18.1.1.2  The Operating Agent Response
[Note:  The remainder of Section 18.1.1 is included for historical purposes, however, the operating agent's conformance with NUREG-0737, Item I.A.1.1, is as specified by the Commission Policy Statement on Engineering Expertise on Shift.]
General The NRC issued a Policy Statement on Engineering Expertise on Shift in October  
 
1985. The Commission Policy Statement on Engineering Expertise on shift is discussed in sections 13.2.1.1.3.1 and 13.2.1.1.3.2. The Policy Statement permits either of two options to be used to implement long term goals towards  
 
upgrading the qualifications and training of operating staffs. These are  
 
Option 1:  Combined SRO/STA Position and Option 2:  Continued Use of STA  
 
Position. Either of these options may be used to meet the requirements of  
 
NUREG-0737, Item I.A.1.1. Also, either Option 1 or 2 may be used on each shift. The complete requirements for the options are as follows:  


Option 1:  Combined SRO/STA Position  
Option 1:  Combined SRO/STA Position  


This option is satisfied by assigning an individual with the following qualifications to each operating shift crew as one of the SROs (preferably the Shift Manager) required by 10 CFR 50.54(m)(2)(i):  
This option is satisfied by assigning an individual with the following qualifications to each operating shift crew as one of the SROs (preferably the Shift Manager) required by 10 CFR 50.54(m)(2)(i):
: a. Licensed as a senior operator on the nuclear power  unit(s) to which assigned and;
: a. Licensed as a senior operator on the nuclear power  unit(s) to which assigned and;
: b. Meets the STA training criteria of NUREG-0737, Item I.A.1.1, and one of the following educational alternatives:  
: b. Meets the STA training criteria of NUREG-0737, Item I.A.1.1, and one of the following educational  
: 1. Bachelor's degree in engineering from an accredited institution;  
 
: 2. Professional Engineer's license obtained by the successful completion of the PE examination;  
alternatives:
: 3. Bachelor's degree in engineering technology from an accredited institution, including  course work in the physical, mathematical, or  engineering sciences; or  
: 1. Bachelor's degree in engineering from an accredited institution;
: 2. Professional Engineer's license obtained by the successful completion of the PE  
 
examination;
: 3. Bachelor's degree in engineering technology from an accredited institution, including  course work in the physical, mathematical, or  engineering sciences; or
: 4. Bachelor's degree in a physical science from an accredited institution, including course work in the physical, mathematical, or engineering sciences.  
: 4. Bachelor's degree in a physical science from an accredited institution, including course work in the physical, mathematical, or engineering sciences.  


18.1-3 Rev. 20 WOLF CREEK   Option 2:  Continued Use of STA Position  
18.1-3 Rev. 20 WOLF CREEK Option 2:  Continued Use of STA Position  


This option is satisfied by placing on each shift a dedicated Shift Technical Advisor (STA) who meets the STA criteria of  NUREG-0737, Item I.A.1.1. The STA should assume an active role in shift activities. For example, the STA should review plant logs, participate in shift turnover activities, and maintain an awareness of plant configuration and status.  
This option is satisfied by placing on each shift a dedicated Shift Technical Advisor (STA) who meets the STA criteria of  NUREG-0737, Item I.A.1.1. The STA should assume an active role in shift activities. For example, the STA should review plant logs, participate in shift turnover activities, and maintain an awareness of plant configuration and status.  


As stated in NUREG-0737 and the background to the NRC Policy Statement (discussed below), the requirement for an STA qualified person in the power plant in addition to an SRO licensed Shift Manager was intended to be a temporary requirement until the qualifications of the Shift Manager and senior operators are upgraded and control boards are reviewed and modified to make information and controls more useful to the operators. This is consistent with the industry consensus established by INPO standard GPG-01, "Nuclear Power Plant Shift Technical Advisor Position Description Qualifications, Education and Training" which refers to the fact of this position being "eliminated" when certain additional actions are completed. The December 17, 1981 approved copy of ANSI/ANS 3.1 also referred to this position as "interim."  
As stated in NUREG-0737 and the background to the NRC Policy Statement (discussed below), the requirement for an STA qualified person in the power  
 
plant in addition to an SRO licensed Shift Manager was intended to be a temporary requirement until the qualifications of the Shift Manager and senior operators are upgraded and control boards are reviewed and modified to make  
 
information and controls more useful to the operators. This is consistent with  
 
the industry consensus established by INPO standard GPG-01, "Nuclear Power  
 
Plant Shift Technical Advisor Position Description Qualifications, Education and Training" which refers to the fact of this position being "eliminated" when  
 
certain additional actions are completed. The December 17, 1981 approved copy  
 
of ANSI/ANS 3.1 also referred to this position as "interim."  
 
The NRC staff has completed the review of the WCGS operator qualification
 
program developed to address NUREG-0737, Item I.A.1.1. The program and NRC
 
staff review results are discussed below.
 
Man-Machine Interface Upgrade The man-machine interface in the control room has been upgraded by means of an
 
extensive control room design review which included human factors input. For a


The NRC staff has completed the review of the WCGS operator qualification program developed to address NUREG-0737, Item I.A.1.1. The program and NRC staff review results are discussed below.  
detailed description of this effort refer to Section 18.1.16 and 18.1.17.  


Man-Machine Interface Upgrade  The man-machine interface in the control room has been upgraded by means of an extensive control room design review which included human factors input. For a detailed description of this effort refer to Section 18.1.16 and 18.1.17.
Operator Qualification Upgrade Operator qualification upgrading in accordance with NUREG-0737, Item I.A.1.1 is  
Operator Qualification Upgrade Operator qualification upgrading in accordance with NUREG-0737, Item I.A.1.1 is discussed in Section 13.2.1.1.3.
The NRC staff, in SER Supplement 5, noted that if the Kansas State University adopted a Bachelor of Science Degree in Engineering Technology with a Nuclear Option program, completion of the requirements for this degree would achieve the necessary engineering expertise on shift. The program, which involves over


18.1-4 Rev. 13 WOLF CREEK 80 semester hours of college level credit, has been inaugurated as discussed in Section 13.2.1.1.3, Item 1.c. The schedule for completion of this training is provided in KMLNRC 85-210, dated September 3, 1985.
discussed in Section 13.2.1.1.3.
In the Fall of 1992, WCNOC suspended the implementation of its operator Baccalaureate program. In place of this program, WCNOC implemented a Shift Engineer Program. The Shift Engineers meet the academic and training requirements to perform the duties of STA.
 
Training requirements for the STA are described in sections 13.2.1.1.3.2 and 13.2.2.12. WCNOC has either a Senior Reactor Operator or a Shift Engineer who meets the STA training criteria of NUREG-0737, assigned to each of the Control Room Operating Crews when the reactor is in MODES 1-4.
The NRC staff, in SER Supplement 5, noted that if the Kansas State University
18.1.1.3 Conclusion The Operating Agent's actions to upgrade qualification of operating staff and the man-machine interface for control room personnel are consistent with the intent and specifics of the long-term resolution of Item I.A.1.1 of NUREG-0737.  
 
adopted a Bachelor of Science Degree in Engineering Technology with a Nuclear
 
Option program, completion of the requirements for this degree would achieve
 
the necessary engineering expertise on shift. The program, which involves over
 
18.1-4 Rev. 13 WOLF CREEK 80 semester hours of college level credit, has been inaugurated as discussed in  
 
Section 13.2.1.1.3, Item 1.c. The schedule for completion of this training is  
 
provided in KMLNRC 85-210, dated September 3, 1985.  
 
In the Fall of 1992, WCNOC suspended the implementation of its operator  
 
Baccalaureate program. In place of this program, WCNOC implemented a Shift  
 
Engineer Program. The Shift Engineers meet the academic and training  
 
requirements to perform the duties of STA.  
 
Training requirements for the STA are described in sections 13.2.1.1.3.2 and 13.2.2.12.
WCNOC has either a Senior Reactor Operator or a Shift Engineer who meets the STA training criteria of NUREG-0737, assigned to each of the Control Room  
 
Operating Crews when the reactor is in MODES 1-4.  
 
18.1.1.3 Conclusion The Operating Agent's actions to upgrade qualification of operating staff and  
 
the man-machine interface for control room personnel are consistent with the  
 
intent and specifics of the long-term resolution of Item I.A.1.1 of NUREG-0737.  


18.1.2  SHIFT SUPERVISOR'S ADMINISTRATIVE DUTIES (I.A.1.2)  
18.1.2  SHIFT SUPERVISOR'S ADMINISTRATIVE DUTIES (I.A.1.2)  


18.1.2.1  NRC Guidance Per NUREG-0578 Position  
18.1.2.1  NRC Guidance Per NUREG-0578 Position
: 1. The highest level of corporate management of each  licensee shall issue and periodically reissue a management directive that emphasizes the primary management responsibility of the shift supervisor for the safe operation of the plant under all conditions on his shift and that clearly establishes his command duties.  
: 1. The highest level of corporate management of each  licensee shall issue and periodically reissue a management directive that emphasizes the primary management responsibility of the shift supervisor for the safe operation of the plant under all conditions on his shift and that clearly establishes his command  
 
duties.
: 2. Plant procedures shall be reviewed to ensure that the duties, responsibilities, and authority of the shift supervisor and control room operators are properly  defined to effect the establishment of a definite line  of command and clear delineation of the command decision authority of the shift supervisor in the control room, relative to other plant management personnel.
: 2. Plant procedures shall be reviewed to ensure that the duties, responsibilities, and authority of the shift supervisor and control room operators are properly  defined to effect the establishment of a definite line  of command and clear delineation of the command decision authority of the shift supervisor in the control room, relative to other plant management personnel.
Particular emphasis shall be placed on the following:  
Particular emphasis shall be placed on the following:
: a. The responsibility and authority of the shift supervisor when on duty in the control room shall be to maintain the broadest perspective of operational conditions affecting the safety of the plant as a matter of highest priority at all times. The principle shall be reinforced that the shift supervisor should not become totally involved in any single operation in times of emergency when multiple operations are required in the control   room.   
: a. The responsibility and authority of the shift supervisor when on duty in the control room shall be to maintain the broadest perspective of operational conditions affecting the safety of the plant as a matter of highest priority at all times. The principle shall be reinforced that the shift supervisor should not become totally involved in any single operation in times of emergency when multiple operations are required in the control room.   


18.1-5 Rev. 20 WOLF CREEK  
18.1-5 Rev. 20 WOLF CREEK
: b. The shift supervisor, until properly relieved, shall remain in the control room at all times during accident situations to direct the activities  of control room operators. Persons authorized to relieve the shift supervisor shall be specified.  
: b. The shift supervisor, until properly relieved, shall remain in the control room at all times during accident situations to direct the activities  of control room operators. Persons authorized to relieve the shift supervisor shall be specified.
: c. If the shift supervisor is temporarily absent from the control room during routine operations, a lead control room operator shall be designated to assume the control room command function. These temporary duties, responsibilities, and authority shall be clearly specified.  
: c. If the shift supervisor is temporarily absent from the control room during routine operations, a lead control room operator shall be designated to assume the control room command function. These temporary duties, responsibilities, and authority shall be clearly specified.
: 3. Training programs for shift supervisors shall emphasize  and reinforce the responsibility for safe operation and the management function the shift supervisor is to provide for ensuring safety.  
: 3. Training programs for shift supervisors shall emphasize  and reinforce the responsibility for safe operation and the management function the shift supervisor is to provide for ensuring safety.
: 4. The administrative duties of the shift supervisor shall be reviewed by the senior officer of each utility responsible for plant operations. Administrative functions that detract from or are subordinate to the management responsibility for ensuring the safe operation of the plant shall be delegated to other operations personnel not on duty in the control room.  
: 4. The administrative duties of the shift supervisor shall be reviewed by the senior officer of each utility responsible for plant operations. Administrative functions that detract from or are subordinate to the management responsibility for ensuring the safe operation of the plant shall be delegated to other operations personnel not on duty in the control room.  


18.1.2.2  The Operating Agent Response The President and Chief Executive Officer issues and reviews on an annual basis a management directive which emphasizes the responsibilities of the Shift Manager. The directive clearly emphasizes the command responsibilities of the Shift Manager during all normal and emergency operating conditions. As discussed in Section 13.1.2.2.1, plant administrative procedures also define the duties, responsibilities, and authority of Shift Managers, Control Room Supervisors, and Reactor Operators (ROs). Licensed operators are trained in accordance with training programs which meet 10 CFR 55 criteria. Administrative procedures further define the line of command for the Shift Manager. The Shift Manager reports to the Superintendent Operations during normal operations and to the Duty/Call Superintendent
18.1.2.2  The Operating Agent Response The President and Chief Executive Officer issues and reviews on an annual basis  


18.1-6 Rev. 17 WOLF CREEK  during an emergency. The Shift Manager is the senior licensed management representative onsite on back shifts. The Control Room Supervisor, who reports  to the Shift Manager, is in direct charge of the control room during normal  operation, in order to allow the Shift Manager to direct his attention to  overall plant operation for which he is responsible. In the event of the  absence of the Shift Manager from the control room the control room command  function is established in accordance with Technical Specifications.
a management directive which emphasizes the responsibilities of the Shift  
In conjunction with the annual review of the management directive defining the Shift Manager's authority and responsibilities, the President and Chief  Executive Officer is provided an assessment of the administrative duties  undertaken by the Shift Manager. If these duties are found to detract from the  Shift Manager's responsibility for safe operation of the plant, they will be  delegated to other appropriate members of the station staff.


18.1.2.3  Conclusion The Operating Agent's commitment to the establishment and annual review of management directives defining the responsibilities and authority of the Shift Manager and to the implementation of training programs in accordance with 10 CFR Part 55 meet the specifics of Item I.A.1.2 in NUREG-0737.  
Manager. The directive clearly emphasizes the command responsibilities of the Shift Manager during all normal and emergency operating conditions.
As discussed in Section 13.1.2.2.1, plant administrative procedures also define
 
the duties, responsibilities, and authority of Shift Managers, Control Room
 
Supervisors, and Reactor Operators (ROs). Licensed operators are trained in
 
accordance with training programs which meet 10 CFR 55 criteria.
Administrative procedures further define the line of command for the Shift
 
Manager. The Shift Manager reports to the Superintendent Operations during
 
normal operations and to the Duty/Call Superintendent
 
18.1-6 Rev. 17 WOLF CREEK during an emergency. The Shift Manager is the senior licensed management representative onsite on back shifts. The Control Room Supervisor, who reports to the Shift Manager, is in direct charge of the control room during normal operation, in order to allow the Shift Manager to direct his attention to overall plant operation for which he is responsible. In the event of the absence of the Shift Manager from the control room the control room command function is established in accordance with Technical Specifications. 
 
In conjunction with the annual review of the management directive defining the
 
Shift Manager's authority and responsibilities, the President and Chief Executive Officer is provided an assessment of the administrative duties undertaken by the Shift Manager. If these duties are found to detract from the Shift Manager's responsibility for safe operation of the plant, they will be delegated to other appropriate members of the station staff.
 
18.1.2.3  Conclusion
 
The Operating Agent's commitment to the establishment and annual review of  
 
management directives defining the responsibilities and authority of the Shift  
 
Manager and to the implementation of training programs in accordance with 10 CFR Part 55 meet the specifics of Item I.A.1.2 in NUREG-0737.  


18.1.3  SHIFT MANNING (I.A.1.3)  
18.1.3  SHIFT MANNING (I.A.1.3)  


18.1.3.1  NRC Guidance Per NUREG-0737 Position  
18.1.3.1  NRC Guidance Per NUREG-0737
 
Position  
 
This position defines shift manning requirements for normal operation. The letter of July 31, 1980 from D. G. Eisenhut to all power reactor licensees and
 
applicants sets forth the interim criteria for shift staffing (to be effective
 
pending general criteria that will be the subject of future rule-making).


This position defines shift manning requirements for normal operation. The letter of July 31, 1980 from D. G. Eisenhut to all power reactor licensees and applicants sets forth the interim criteria for shift staffing (to be effective pending general criteria that will be the subject of future rule-making).
Overtime restrictions were also included in the July 31, 1980 letter.  
Overtime restrictions were also included in the July 31, 1980 letter.  


Clarification (as modified by NRC Generic Letter 82-12)  
Clarification (as modified by NRC Generic Letter 82-12)  


Licensees of operating plants and applicants for operating licenses shall include in their administrative procedures (required by license conditions) provisions governing required shift staffing and movement of key individuals about the plant. These provisions are required to assure that qualified plant personnel to man the operational shifts are readily available in the event of an abnormal or emergency situation.
Licensees of operating plants and applicants for operating licenses shall  


18.1-7 Rev. 13 WOLF CREEK  These administrative procedures shall also set forth a policy, the objective of which is to prevent situations where fatigue could reduce the ability of operating personnel to keep the reactor in a safe condition. The controls established should assure that, to the extent practicable, personnel are not assigned to shift duties while in a fatigued condition that could significantly reduce their mental alertness or their decision making ability. The controls shall apply to the plant staff who perform safety-related functions (e.g.,
include in their administrative procedures (required by license conditions)  
senior reactor operators, reactor operators, auxiliary operators, health physicists, and key maintenance personnel).


IE Circular No. 80-02, "Nuclear Power Plant Staff Work Hours", dated February 1, 1980 discusses the concern of overtime work for members of the plant staff who perform safety-related functions. The guidance contained in IE Circular No.
provisions governing required shift staffing and movement of key individuals about the plant. These provisions are required to assure that qualified plant personnel to man the operational shifts are readily available in the event of  
80-02 was amended by the July 31, 1980 letter. In turn, the overtime guidance of the July 31, 1980 letter was revised in Section I.A.1.3 of NUREG-0737. The NRC has issued a policy statement which further revises the overtime guidance as stated in NUREG-0737. This guidance is as follows:


Enough plant operating personnel should be employed to maintain adequate shift coverage without routine heavy use of overtime. The objective is to have operating personnel work a normal 8-hour day, 40-hour week while the plant is operating. However, in the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed:  
an abnormal or emergency situation.
: a. An individual should not be permitted to work more than 16 hours straight (excluding shift turnover time).  
 
: b. An individual should not be permitted to work more than  16 hours in any 24-hour period, nor more than 24 hours in any 48-hour period, nor more than 72 hours in any seven day period (all excluding shift turnover time).  
18.1-7 Rev. 13 WOLF CREEK These administrative procedures shall also set forth a policy, the objective of
: c. A break of at least eight hours should be allowed between work periods (including shift turnover time).  
 
which is to prevent situations where fatigue could reduce the ability of
 
operating personnel to keep the reactor in a safe condition. The controls
 
established should assure that, to the extent practicable, personnel are not assigned to shift duties while in a fatigued condition that could significantly
 
reduce their mental alertness or their decision making ability. The controls
 
shall apply to the plant staff who perform safety-related functions (e.g.,
senior reactor operators, reactor operators, auxiliary operators, health
 
physicists, and key maintenance personnel).
 
IE Circular No. 80-02, "Nuclear Power Plant Staff Work Hours", dated February
 
1, 1980 discusses the concern of overtime work for members of the plant staff
 
who perform safety-related functions. The guidance contained in IE Circular No.
 
80-02 was amended by the July 31, 1980 letter. In turn, the overtime guidance of the July 31, 1980 letter was revised in Section I.A.1.3 of NUREG-0737. The NRC has issued a policy statement which further revises the overtime guidance
 
as stated in NUREG-0737. This guidance is as follows:
 
Enough plant operating personnel should be employed to maintain adequate shift  
 
coverage without routine heavy use of overtime. The objective is to have  
 
operating personnel work a normal 8-hour day, 40-hour week while the plant is  
 
operating. However, in the event that unforeseen problems require substantial  
 
amounts of overtime to be used, or during extended periods of shutdown for  
 
refueling, major maintenance or major plant modifications, on a temporary  
 
basis, the following guidelines shall be followed:
: a. An individual should not be permitted to work more than 16 hours straight (excluding shift turnover time).
: b. An individual should not be permitted to work more than  16 hours in any 24-hour period, nor more than 24 hours in any 48-hour period, nor more than 72 hours in any seven day period (all excluding shift turnover time).
: c. A break of at least eight hours should be allowed between work periods (including shift turnover time).
: d. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on shift.  
: d. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on shift.  


18.1-8 Rev. 0 WOLF CREEK Recognizing that very unusual circumstances may arise requiring deviation from the above guidelines, such deviation shall be authorized by the plant manager or his deputy, or higher levels of management. The paramount consideration in such authorization shall be that significant reductions in the effectiveness of operating personnel would be highly unlikely. Authorized deviations to the working hour guidelines shall be documented and available for NRC review.  
18.1-8 Rev. 0 WOLF CREEK Recognizing that very unusual circumstances may arise requiring deviation from  
 
the above guidelines, such deviation shall be authorized by the plant manager  
 
or his deputy, or higher levels of management. The paramount consideration in  
 
such authorization shall be that significant reductions in the effectiveness of operating personnel would be highly unlikely. Authorized deviations to the  
 
working hour guidelines shall be documented and available for NRC review.  
 
In addition, procedures are encouraged that would allow licensed operators at
 
the controls to be periodically relieved and assigned to other duties away from
 
the control board during their tours of duty.
 
Operating license applicants shall complete these administrative procedures
 
before fuel loading. Development and implementation of the administrative
 
procedures at operating plants will be reviewed by the Office of Inspection and Enforcement beginning October 1, 1982.
 
See Section III.A.1.2 [of NUREG-0737] for minimum staffing and augment
 
capabilities for emergencies.
 
18.1.3.2  The Operating Agent Response Shift staffing is discussed in Section 13.1. The Operating Agent has an
 
administrative procedure governing shift manning and movement of key
 
individuals. Unexpected absences are also addressed in the procedure.
Additional information on staffing requirements is contained in the WCGS
 
Technical Specifications and in the Technical Requirements Manual. 
 
In addition, the Operating Agent administrative procedures discuss the overtime
 
restrictions addressed in NUREG-0737 as revised by Generic Letter 82-12. The
 
Operating Agent has committed to comply with these limitations, except in cases
 
where special circumstances require additional coverage. Any such exceptions


In addition, procedures are encouraged that would allow licensed operators at the controls to be periodically relieved and assigned to other duties away from the control board during their tours of duty.
are approved by the Plant Manager or his designated alternate, with appropriate 


Operating license applicants shall complete these administrative procedures before fuel loading. Development and implementation of the administrative procedures at operating plants will be reviewed by the Office of Inspection and Enforcement beginning October 1, 1982.
documentation.  
See Section III.A.1.2 [of NUREG-0737] for minimum staffing and augment capabilities for emergencies.  


18.1.3.2  The Operating Agent Response  Shift staffing is discussed in Section 13.1. The Operating Agent has an administrative procedure governing shift manning and movement of key individuals. Unexpected absences are also addressed in the procedure. Additional information on staffing requirements is contained in the WCGS Technical Specifications and in the Technical Requirements Manual.  
WCGS complies with 10 CFR 26, Subpart I, "Managing Fatigue."  Procedures and Programs affected by 10 CFR 26, Subpart I, has been updated to ensure compliance with the rule.
18.1.3.3 Conclusion


In addition, the Operating Agent administrative procedures discuss the overtime restrictions addressed in NUREG-0737 as revised by Generic Letter 82-12. The Operating Agent has committed to comply with these limitations, except in cases where special circumstances require additional coverage. Any such exceptions are approved by the Plant Manager or his designated alternate, with appropriate documentation.
The Operating Agent's commitments to a minimum shift complement and the  
WCGS complies with 10 CFR 26, Subpart I, "Managing Fatigue."  Procedures and Programs affected by 10 CFR 26, Subpart I, has been updated to ensure compliance with the rule. 18.1.3.3  Conclusion


The Operating Agent's commitments to a minimum shift complement and the additional commitment to observing the overtime restrictions listed in NUREG-0737, as revised by Generic Letter 82-12, meet the NRC's guidance.  
additional commitment to observing the overtime restrictions listed in NUREG-0737, as revised by Generic Letter 82-12, meet the NRC's guidance.  


18.1-9 Rev. 23 WOLF CREEK 18.1.4  IMMEDIATE UPGRADING OF REACTOR OPERATOR AND SENIOR REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1)
18.1-9 Rev. 23 WOLF CREEK 18.1.4  IMMEDIATE UPGRADING OF REACTOR OPERATOR AND SENIOR  


18.1.4.1  NRC Guidance Per NUREG-0737 Position  
REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1)
 
18.1.4.1  NRC Guidance Per NUREG-0737
 
Position  


Effective December 1, 1980, an applicant for a SRO license will be required to have been a licensed operator for 1 year.  
Effective December 1, 1980, an applicant for a SRO license will be required to have been a licensed operator for 1 year.  
Line 260: Line 684:
Clarification  
Clarification  


Applicants for SRO either come through the operations chain (C operator to B operator to A operator, etc.) or are degree-holding staff engineers who obtain licenses for backup purposes.  
Applicants for SRO either come through the operations chain (C operator to B  
 
operator to A operator, etc.) or are degree-holding staff engineers who obtain  
 
licenses for backup purposes.
 
In the past, many individuals who came through the operator ranks were
 
administered SRO examinations without first being an operator. This was clearly a poor practice and the letter of March 28, 1980 requires reactor operator experience for SRO applicants.
 
However, NRC does not wish to discourage staff engineers from becoming licensed
 
SROs. This effort is encouraged because it forces engineers to broaden their
 
knowledge about the plant and its operation.
 
In addition, in order to attract degree-holding engineers to consider the Shift
 
Supervisor's job as part of their career development, NRC should provide an
 
alternate path to holding an operator's license for 1 year.
 
The track followed by a high-school graduate (a nondegreed individual) to
 
become an SRO would be 4 years as a control room operator, at least one of
 
which would be as a licensed operator, and participation in an SRO training
 
program that includes 3 months onshift as an extra person.
The track followed by a degree-holding engineer would be, at a minimum, 2 years
 
of responsible nuclear power plant experience as a staff engineer, participation in an SRO training program equivalent to a cold applicant
 
training program, and 3 months onshift as an extra person in training for an
 
SRO position.
 
Holding these positions ensures that individuals who will direct the licensed
 
activities of licensed operators have had the necessary combination of
 
education, training, and actual operating experience prior to assuming a
 
supervisory role at that facility.
 
18.1-10 Rev. 0 WOLF CREEK The staff realizes that the necessary knowledge and experience can be gained in
 
a variety of ways. Consequently, credit for equivalent experience should be
 
given to applicants for SRO licenses.
 
Applicants for SRO licenses at a facility may obtain their 1-year operating
 
experience in a licensed capacity (operator or senior operator) at another
 
nuclear power plant. In addition, actual operating experience in a position
 
that is equivalent to a licensed operator or senior operator at military
 
propulsion reactors will be acceptable on a one-for-one basis. Individual
 
applicants must document this experience in their individual applications in
 
sufficient detail so that the staff can make a finding regarding equivalency.  


In the past, many individuals who came through the operator ranks were administered SRO examinations without first being an operator. This was clearly a poor practice and the letter of March 28, 1980 requires reactor operator experience for SRO applicants.
Applicants for SRO licenses who possess a degree in engineering or applicable


However, NRC does not wish to discourage staff engineers from becoming licensed SROs. This effort is encouraged because it forces engineers to broaden their knowledge about the plant and its operation.
sciences are deemed to meet the above requirement, provided they meet the requirements set forth in Sections A.1.a. and A.2. in enclosure l in the letter from H. R. Denton to all power reactor applicants and licensees, dated March


In addition, in order to attract degree-holding engineers to consider the Shift Supervisor's job as part of their career development, NRC should provide an alternate path to holding an operator's license for 1 year.
28, 1980, and have participated in a training program equivalent to that of a


The track followed by a high-school graduate (a nondegreed individual) to become an SRO would be 4 years as a control room operator, at least one of which would be as a licensed operator, and participation in an SRO training program that includes 3 months onshift as an extra person. The track followed by a degree-holding engineer would be, at a minimum, 2 years of responsible nuclear power plant experience as a staff engineer, participation in an SRO training program equivalent to a cold applicant training program, and 3 months onshift as an extra person in training for an SRO position.  
cold senior reactor operator applicant.  


Holding these positions ensures that individuals who will direct the licensed activities of licensed operators have had the necessary combination of education, training, and actual operating experience prior to assuming a supervisory role at that facility.
NRC has not imposed the 1-year experience requirement on cold applicants for


18.1-10 Rev. 0 WOLF CREEK  The staff realizes that the necessary knowledge and experience can be gained in a variety of ways. Consequently, credit for equivalent experience should be given to applicants for SRO licenses.
SRO licenses. Cold applicants are to work on a facility not yet in operation;
Applicants for SRO licenses at a facility may obtain their 1-year operating experience in a licensed capacity (operator or senior operator) at another nuclear power plant. In addition, actual operating experience in a position that is equivalent to a licensed operator or senior operator at military propulsion reactors will be acceptable on a one-for-one basis. Individual applicants must document this experience in their individual applications in sufficient detail so that the staff can make a finding regarding equivalency.


Applicants for SRO licenses who possess a degree in engineering or applicable sciences are deemed to meet the above requirement, provided they meet the requirements set forth in Sections A.1.a. and A.2. in enclosure l in the letter from H. R. Denton to all power reactor applicants and licensees, dated March 28, 1980, and have participated in a training program equivalent to that of a cold senior reactor operator applicant.
their training programs are designed to supply the equivalent of the experience


NRC has not imposed the 1-year experience requirement on cold applicants for SRO licenses. Cold applicants are to work on a facility not yet in operation; their training programs are designed to supply the equivalent of the experience not available to them.  
not available to them.  


18.1.4.2  The Operating Agent Response As discussed in Section 13.2, the Operating Agent has committed to conduct its licensed operator training and requalification programs in accordance with the requirements of 10 CFR Part 55. In addition, the Operating Agent complies with training and qualification guidance delineated in Regulatory Guide 1.8, Revision 2, Personnel Selection and Training, which references ANS-3.1-1981. Additional discussion of the Operating Agent's commitments relative to training and requalification programs is presented in Section 18.1.6.
18.1.4.2  The Operating Agent Response As discussed in Section 13.2, the Operating Agent has committed to conduct its  


18.1.4.3  Conclusion The Operating Agent has committed to comply with 10 CFR Part 55 requirements for operator licensing and requalification programs and to follow recommendations contained in supplementary industry guidance. 
licensed operator training and requalification programs in accordance with the


18.1-11 Rev. 14 WOLF CREEK  18.1.5  ADMINISTRATION OF TRAINING PROGRAMS (I.A.2.3)
requirements of 10 CFR Part 55. In addition, the Operating Agent complies with training and qualification guidance delineated in Regulatory Guide 1.8, Revision 2, Personnel Selection and Training, which references ANS-3.1-1981.
Additional discussion of the Operating Agent's commitments relative to training


18.1.5.1 NRC Guidance Per NUREG-0737 Position
and requalification programs is presented in Section 18.1.6.  


Pending accreditation of training institutions, licensees and applicants for operating licenses will assure that training center and facility instructors who teach systems, integrated responses, transient, and simulator courses demonstrate SRO qualifications and be enrolled in appropriate requalification programs.
18.1.4.3 Conclusion


Clarification The above position is a short-term position. In the future, accreditation of training institutions will include review of the procedure for certification of instructors. The certification of instructors may, or may not, include successful completion of an SRO examination.
The Operating Agent has committed to comply with 10 CFR Part 55 requirements


The purpose of the examination is to provide the NRC with reasonable assurance during the interim period that instructors are technically competent.
for operator licensing and requalification programs and to follow


The requirement is directed to permanent members of training staff who teach the subjects listed above, including members of other organizations who routinely conduct training at the facility. There is no intention to require guest lecturers who are experts in particular subjects (reactor theory, instrumentation, thermodynamics, health physics, chemistry, etc.) to successfully complete an SRO examination. Nor is it intended to require a system expert, such as the instrument and control supervisor teaching the control rod drive system, to complete an SRO examination.
recommendations contained in supplementary industry guidance.  
18.1.5.2  The Operating Agent Response  This material is discussed in Section 13.2.1.2.2, 13.2.2.10.3 and 13.2.3.4.  


All operator license program instructors are required to participate in selected requalification program topics, for licensed operators. In addition, licensed training instructors engaged in operator training participate in the following activities:  
18.1-11 Rev. 14 WOLF CREEK 18.1.5  ADMINISTRATION OF TRAINING PROGRAMS (I.A.2.3)
 
18.1.5.1 NRC Guidance Per NUREG-0737
 
Position
 
Pending accreditation of training institutions, licensees and applicants for
 
operating licenses will assure that training center and facility instructors
 
who teach systems, integrated  responses, transient, and simulator courses
 
demonstrate SRO qualifications and be enrolled in appropriate requalification
 
programs.
 
Clarification
 
The above position is a short-term position. In the future, accreditation of training institutions will include review of the procedure for certification of
 
instructors. The certification of instructors may, or may not, include
 
successful completion of an SRO examination.
 
The purpose of the examination is to provide the NRC with reasonable assurance
 
during the interim period that instructors are technically competent.
 
The requirement is directed to permanent members of training staff who teach
 
the subjects listed above, including members of other organizations who
 
routinely conduct training at the facility. There is no intention to require
 
guest lecturers who are experts in particular subjects (reactor theory, instrumentation, thermodynamics, health physics, chemistry, etc.) to
 
successfully complete an SRO examination. Nor is it intended to require a
 
system expert, such as the instrument and control supervisor teaching the control rod drive system, to complete an SRO examination.
 
18.1.5.2  The Operating Agent Response This material is discussed in Section 13.2.1.2.2, 13.2.2.10.3 and 13.2.3.4.
 
All operator license program instructors are required to participate in selected requalification program topics, for licensed operators. In addition, licensed training instructors engaged in operator training participate in the  
 
following activities:  


  - Periodic onshift assignments  
  - Periodic onshift assignments  
Line 302: Line 832:
  - Review of facility operating and emergency operating procedures as they are developed  
  - Review of facility operating and emergency operating procedures as they are developed  


18.1-12 Rev. 12 WOLF CREEK  - Participation in instructor certification programs, such as those proposed by INPO.  
18.1-12 Rev. 12 WOLF CREEK  
   - Participation in instructor certification programs, such as those proposed by INPO.  
 
18.1.5.3  Conclusion
 
The Operating Agent has committed to comply with NRC guidance relative to the
 
training and qualifications of nuclear training staff, and meets the legal


18.1.5.3  Conclusion The Operating Agent has committed to comply with NRC guidance relative to the training and qualifications of nuclear training staff, and meets the legal requirements of 10 CFR Part 55 where SRO licenses are required.
requirements of 10 CFR Part 55 where SRO licenses are required.  
18.1.6  REVISE SCOPE AND CRITERIA FOR LICENSING EXAMINATIONS (I.A.3.1)


18.1.6.1  NRC Guidance Per NUREG-0737 Position  
18.1.6  REVISE SCOPE AND CRITERIA FOR LICENSING EXAMINATIONS
 
(I.A.3.1)
 
18.1.6.1  NRC Guidance Per NUREG-0737 Position  
 
Simulator examinations will be included as part of the licensing examinations.


Simulator examinations will be included as part of the licensing examinations.
Clarification  
Clarification  


The clarification does not alter the staff's position regarding simulator examinations.
The clarification does not alter the staff's position regarding simulator  


The clarification does provide additional preparation time for utility companies and NRC to meet the examination requirements as stated. A study is under way to consider how similar a nonidentical simulator should be for a valid examination. In addition, present simulators are fully booked months in advance.
examinations.  
Application of this requirement was stated on June 1, 1980 to applicants where a simulator is located at the facility. Starting October 1, 1981, simulator examinations will be conducted for applicants of facilities that do not have simulators at the site.  


NRC simulator examinations normally require 2 to 3 hours. Normally, two applicants are examined during this time period by two examiners.
The clarification does provide additional preparation time for utility


Utility companies should make the necessary arrangements with an appropriate simulator training center to provide time for these examinations. Preferably, these examinations should be scheduled consecutively with the balance of the examination. However, they may be scheduled no sooner than 2 weeks prior to and no later than 2 weeks after the balance of the examination.  
companies and NRC to meet the examination requirements as stated. A study is


18.1-13 Rev. 0 WOLF CREEK 18.1.6.2  The Operating Agent Response The Operating Agent has a full scope simulator near the plant site. The simulator is used as part of the licensing examinations. For further direction as to the use of the simulator see Section 13.2.
under way to consider how similar a nonidentical simulator should be for a
18.1.6.3  Conclusion The Operating Agent has committed to NUREG-0737 guidance with regard to the NRC's revised scope and criteria for license examinations. In addition, the Operating Agent has incorporated simulator examinations into it's training program. These commitments comply fully with the NRC guidance as stated in NUREG-0737 relative to licensing examinations.  
 
valid examination. In addition, present simulators are fully booked months in advance.
Application of this requirement was stated on June 1, 1980 to applicants where
 
a simulator is located at the facility. Starting October 1, 1981, simulator
 
examinations will be conducted for applicants of facilities that do not have
 
simulators at the site.
 
NRC simulator examinations normally require 2 to 3 hours. Normally, two
 
applicants are examined during this time period by two examiners.
 
Utility companies should make the necessary arrangements with an appropriate
 
simulator training center to provide time for these examinations. Preferably, these examinations should be scheduled consecutively with the balance of the
 
examination. However, they may be scheduled no sooner than 2 weeks prior to
 
and no later than 2 weeks after the balance of the examination.
 
18.1-13 Rev. 0 WOLF CREEK 18.1.6.2  The Operating Agent Response
 
The Operating Agent has a full scope simulator near the plant site. The  
 
simulator is used as part of the licensing examinations. For further direction  
 
as to the use of the simulator see Section 13.2.  
 
18.1.6.3  Conclusion The Operating Agent has committed to NUREG-0737 guidance with regard to the  
 
NRC's revised scope and criteria for license examinations. In addition, the  
 
Operating Agent has incorporated simulator examinations into it's training program. These commitments comply fully with the NRC guidance as stated in  
 
NUREG-0737 relative to licensing examinations.  


18.1.7  EVALUATION OF ORGANIZATION AND MANAGEMENT (I.B.1.2)  
18.1.7  EVALUATION OF ORGANIZATION AND MANAGEMENT (I.B.1.2)  


18.1.7.1  NRC Guidance Per NUREG-0694 and NUREG-0737  Position
18.1.7.1  NRC Guidance Per NUREG-0694 and NUREG-0737 Position
 
The licensee organization shall comply with the findings and requirements generated in an interoffice NRC review of licensee organization and management. 
 
The review will be based, in part, on an NRC document entitled "Draft Criteria
 
for Utility Management and Technical Competence."  The first draft of this
 
document was dated February 25, 1980. The current draft was issued for interim
 
use and public comment in September 1980 as NUREG-0731, "Guidelines for Utility
 
Management Structure and Technical Resources." These draft guidelines address
 
the organization, resources, training, and qualifications of plant staff and
 
management (both onsite and offsite) for routine operations and the resources
 
and activities (both onsite and offsite) for accident conditions.
 
The licensee shall establish a group that is independent of the plant staff but is assigned onsite to perform independent reviews of plant operational
 
activities and a capability for evaluation of operating experiences of nuclear
 
power plants.


The licensee organization shall comply with the findings and requirements generated in an interoffice NRC review of licensee organization and management.
Organizational changes are to be implemented on a schedule to be determined
The review will be based, in part, on an NRC document entitled "Draft Criteria for Utility Management and Technical Competence."  The first draft of this document was dated February 25, 1980. The current draft was issued for interim use and public comment in September 1980 as NUREG-0731, "Guidelines for Utility Management Structure and Technical Resources."  These draft guidelines address the organization, resources, training, and qualifications of plant staff and management (both onsite and offsite) for routine operations and the resources and activities (both onsite and offsite) for accident conditions.
The licensee shall establish a group that is independent of the plant staff but is assigned onsite to perform independent reviews of plant operational activities and a capability for evaluation of operating experiences of nuclear power plants.


Organizational changes are to be implemented on a schedule to be determined prior to fuel loading.  
prior to fuel loading.  


Corporate management of the utility-owner of a nuclear power plant shall be sufficiently involved in the operational phase activities, including plant modifications, to ensure a continual understanding of plant conditions and safety considerations. Corporate management shall establish safety standards for the operation and  
Corporate management of the utility-owner of a nuclear power plant shall be  
 
sufficiently involved in the operational phase activities, including plant  
 
modifications, to ensure a continual understanding of plant conditions and  
 
safety considerations. Corporate management shall establish safety standards  
 
for the operation and  


18.1-14 Rev. 0   
18.1-14 Rev. 0   


WOLF CREEK   a. Assurance that critical plant parameters are within allowable limits (parameters and allowable limits shall be listed on the checklist).  
WOLF CREEK
: b. Assurance of the availability and proper alignment of all systems essential to the prevention and mitigation of operational transients and accidents by a check of the control console. What to check and criteria for acceptable status shall be included in the checklist.  
: a. Assurance that critical plant parameters are within allowable limits (parameters and allowable limits shall be listed on the checklist).
: c. Identification of systems and components that are in a degraded mode of operation permitted by the Technical Specifications. For such systems and  components, the length of time in the degraded mode  shall be compared with the Technical Specifications action statement.  (This shall be recorded as a separate entry on the checklist.)  
: b. Assurance of the availability and proper alignment of all systems essential to the prevention and mitigation of operational transients and accidents by a check of the control console. What to check and criteria for acceptable status shall be included in the checklist.
: 2. Checklists or logs shall be provided for completion by the offgoing and oncoming auxiliary operators and technicians. Such checklists or logs shall include any equipment under maintenance or test that by itself could degrade a system critical to the prevention and mitigation of operational transients and accidents or initiate an operational transient (what to check and criteria for acceptable status shall be included on the checklist); and  
: c. Identification of systems and components that are in a degraded mode of operation permitted by the Technical Specifications. For such systems and  components, the length of time in the degraded mode  shall be compared with the Technical Specifications action statement.  (This shall be recorded as a separate entry on the checklist.)
: 2. Checklists or logs shall be provided for completion by the offgoing and oncoming auxiliary operators and technicians. Such checklists or logs shall include any equipment under maintenance or test that by itself could degrade a system critical to the prevention and mitigation of operational transients and accidents or initiate an operational transient (what to check and criteria for acceptable status shall be included on the checklist); and
: 3. A system shall be established to evaluate the  effectiveness of the shift and relief turnover procedures (for example, periodic independent verification of system alignments).  
: 3. A system shall be established to evaluate the  effectiveness of the shift and relief turnover procedures (for example, periodic independent verification of system alignments).  


18.1.9.2  The Operating Agent Response Plant administrative procedures define specific shift relief and turnover procedures for WCGS. Turnover checklists have been developed which include the following information:
18.1.9.2  The Operating Agent Response Plant administrative procedures define specific shift relief and turnover  
 
procedures for WCGS. Turnover checklists have been developed which include the  
 
following information:
: a. Control Room relief and turnover:  
: a. Control Room relief and turnover:  


  - Provides means to review plant system alignment for anomalies via critical plant parameter and control panel checks;  
  - Provides means to review plant system alignment for anomalies via critical plant parameter and control panel checks;  


  - Provides means to determine that onshift activities impacting Technical Specifications have been appropriately documented;  
  - Provides means to determine that onshift activities impacting Technical Specifications have been appropriately documented;  


18.1-23 Rev. 0 WOLF CREEK  - Provides a clear record of transfer of control room command function from Shift Manager and Control    Room Supervisor to their successors on the next    shift.  
18.1-23 Rev. 0 WOLF CREEK  
   - Provides a clear record of transfer of control room command function from Shift Manager and Control    Room Supervisor to their successors on the next    shift.
: b. Nuclear Station Operator relief and turnover:  
: b. Nuclear Station Operator relief and turnover:  


  - Includes procedures which call for a review of    equipment on which maintenance or test activities are being performed.  
  - Includes procedures which call for a review of    equipment on which maintenance or test activities are being performed.  


18.1.9.3  Conclusion The Operating Agent has satisfied NRC guidance relative to shift relief/turnover procedures through it's commitments to implementation of the described procedures.
18.1.9.3  Conclusion The Operating Agent has satisfied NRC guidance relative to shift  
 
relief/turnover procedures through it's commitments to implementation of the  
 
described procedures.  
 
18.1.10  SHIFT SUPERVISOR'S RESPONSIBILITIES (I.C.3)  
18.1.10  SHIFT SUPERVISOR'S RESPONSIBILITIES (I.C.3)  


This item is discussed in Section 18.1.2, Shift Supervisor Administrative Duties.  
This item is discussed in Section 18.1.2, Shift Supervisor Administrative  
 
Duties.  


18.1.11  CONTROL ROOM ACCESS (I.C.4)  
18.1.11  CONTROL ROOM ACCESS (I.C.4)  


18.1.11.1  NRC Guidance Per NUREG-0578 Position  
18.1.11.1  NRC Guidance Per NUREG-0578 Position  
 
The licensee shall make provisions for limiting access to the control room to those individuals responsible for the direct operation of the nuclear power
 
plant (e.g., operations supervisor, shift supervisor, and control room
 
operators), to technical advisors who may be requested or required to support


The licensee shall make provisions for limiting access to the control room to those individuals responsible for the direct operation of the nuclear power plant (e.g., operations supervisor, shift supervisor, and control room operators), to technical advisors who may be requested or required to support the operation, and the predesignated NRC personnel. Provisions shall include the following:  
the operation, and the predesignated NRC personnel. Provisions shall include  
 
the following:
: 1. Develop and implement an administrative procedure that establishes the authority and responsibility of the person in charge of the control room to limit access.   
: 1. Develop and implement an administrative procedure that establishes the authority and responsibility of the person in charge of the control room to limit access.   


18.1-24 Rev. 13 WOLF CREEK   2. Develop and implement procedures that establish a clear line of authority and responsibility in the control room in the event of an emergency. The line of succession for the person in charge of the control room shall be  established and limited to persons possessing a current SRO's license. The plan shall clearly define the lines of communication and authority for plant management personnel not in direct command of operations, including those who report to stations outside the control room.  
18.1-24 Rev. 13 WOLF CREEK
: 2. Develop and implement procedures that establish a clear line of authority and responsibility in the control room in the event of an emergency. The line of succession for the person in charge of the control room shall be  established and limited to persons possessing a current SRO's license. The plan shall clearly define the lines of communication and authority for plant management personnel not in direct command of operations, including those who report to stations outside the control room.  
 
18.1.11.2  The Operating Agent Response The Operating Agent has administrative procedures which define the line of
 
authority in the control room:  the Shift Manager is in overall control room
 
command, and the Control Room Supervisor is in direct control room command.
The Operating Agent has implemented additional administrative procedures which
 
define lines of communication and authority for WCGS management "who report to
 
stations both within and outside the control room."  During normal plant
 
operations, access to the control room is controlled in accordance with the


18.1.11.2  The Operating Agent Response  The Operating Agent has administrative procedures which define the line of authority in the control room:  the Shift Manager is in overall control room command, and the Control Room Supervisor is in direct control room command. The Operating Agent has implemented additional administrative procedures which define lines of communication and authority for WCGS management "who report to stations both within and outside the control room."  During normal plant operations, access to the control room is controlled in accordance with the provisions of the WCGS Security Plan.  
provisions of the WCGS Security Plan.  


In addition, the Radiological Emergency Response Plan for the WCGS clearly indicates that control room access is controlled by the Shift Manager. Access  to the Control Room is controlled by the Shift Manager.
In addition, the Radiological Emergency Response Plan for the WCGS clearly  
18.1.11.3  Conclusion The Operating Agent has established a procedure which clearly defines the line of authority in the control room during normal and emergency situations. In addition, the Operating Agent has established a procedure that clearly defines restrictions on control room access during normal and emergency conditions.
This procedure further defines the authority of the Shift Manager to restrict control room access at all times. These procedures comply with the NRC guidance specified in NUREG-0578. 


18.1-25 Rev. 14 WOLF CREEK  18.1.12  PROCEDURES FOR FEEDBACK OF OPERATING EXPERIENCE TO PLANT STAFF (I.C.5)
indicates that control room access is controlled by the Shift Manager. Access to the Control Room is controlled by the Shift Manager.  


18.1.12.1 NRC Guidance Per NUREG-0737 Position
18.1.11.3 Conclusion


In accordance with Task Action Plan I.C.5, Procedures for Feedback of Operating Experience to Plant Staff (NUREG-0660), each applicant for an operating license shall prepare procedures to ensure that operating information pertinent to plant safety originating both within and outside the utility organization is continually supplied to operators and other personnel and is incorporated into training and retraining programs. These procedures shall:  
The Operating Agent has established a procedure which clearly defines the line
: 1. Clearly identify organizational responsibilities for review of operating experience, the feedback of pertinent information to operators and other personnel, and the incorporation of such information into training  and retraining programs;
 
: 2. Identify the administrative and technical review steps necessary in translating recommendations by the operating experience assessment group into plant actions (e.g., changes to procedures, operating orders);  
of authority in the control room during normal and emergency situations. In
: 3. Identify the recipients of various categories of information from operating experience (e.g., supervisory personnel, STAs, operators, maintenance personnel, and health physics technicians) or otherwise provide means through which such information can be readily related to the job functions of the recipients;  
 
: 4. Provide means to assure that affected personnel become  aware of and understand information of sufficient  importance that should not wait for emphasis through routine training and retraining programs;  
addition, the Operating Agent has established a procedure that clearly defines restrictions on control room access during normal and emergency conditions. 
: 5. Assure that plant personnel do not routinely receive extraneous and unimportant information on operating experience in such volume that it would obscure priority information or otherwise detract from overall job performance and proficiency;  
 
This procedure further defines the authority of the Shift Manager to restrict
 
control room access at all times. These procedures comply with the NRC
 
guidance specified in NUREG-0578. 
 
18.1-25 Rev. 14 WOLF CREEK 18.1.12  PROCEDURES FOR FEEDBACK OF OPERATING EXPERIENCE TO
 
PLANT STAFF (I.C.5)
 
18.1.12.1  NRC Guidance Per NUREG-0737
 
Position
 
In accordance with Task Action Plan I.C.5, Procedures for Feedback of Operating Experience to Plant Staff (NUREG-0660), each applicant for an operating license  
 
shall prepare procedures to ensure that operating information pertinent to  
 
plant safety originating both within and outside the utility organization is  
 
continually supplied to operators and other personnel and is incorporated into  
 
training and retraining programs. These procedures shall:
: 1. Clearly identify organizational responsibilities for review of operating experience, the feedback of pertinent information to operators and other personnel, and the incorporation of such information into training  and retraining programs;
: 2. Identify the administrative and technical review steps necessary in translating recommendations by the operating experience assessment group into plant actions (e.g., changes to procedures, operating orders);
: 3. Identify the recipients of various categories of information from operating experience (e.g., supervisory personnel, STAs, operators, maintenance personnel, and health physics technicians) or otherwise provide means through which such information can be readily related to the job functions of the recipients;
: 4. Provide means to assure that affected personnel become  aware of and understand information of sufficient  importance that should not wait for emphasis through routine training and retraining programs;
: 5. Assure that plant personnel do not routinely receive extraneous and unimportant information on operating experience in such volume that it would obscure priority information or otherwise detract from overall job performance and proficiency;
: 6. Provide suitable checks to assure that conflicting or contradictory information is not conveyed to operators and other personnel until resolution is reached; and   
: 6. Provide suitable checks to assure that conflicting or contradictory information is not conveyed to operators and other personnel until resolution is reached; and   


18.1-26 Rev. 0 WOLF CREEK   7. Provide periodic internal audit to assure that the feedback program functions effectively at all levels.  
18.1-26 Rev. 0 WOLF CREEK
: 7. Provide periodic internal audit to assure that the feedback program functions effectively at all levels.
 
Clarification
 
Each utility shall carry out an operating experience assessment function that
 
will involve utility personnel having collective competence in all areas
 
important to plant safety. In connection with this assessment function, it is
 
important that procedures exist to assure that important information on
 
operating experience originating both within and outside the organization is
 
continually provided to operators and other personnel and that it is
 
incorporated into plant operating procedures, training, and retraining
 
programs.
 
Those involved in the assessment of operating experience will review information from a variety of sources. These include operating information
 
from the licensee's own plant(s), publications such as IE Bulletins, Circulars, Notices, and pertinent NRC or industrial assessments of operating experience.  


Clarification Each utility shall carry out an operating experience assessment function that will involve utility personnel having collective competence in all areas important to plant safety. In connection with this assessment function, it is important that procedures exist to assure that important information on operating experience originating both within and outside the organization is continually provided to operators and other personnel and that it is incorporated into plant operating procedures, training, and retraining programs.
In some cases, information may be of sufficient importance that it must be  
Those involved in the assessment of operating experience will review information from a variety of sources. These include operating information from the licensee's own plant(s), publications such as IE Bulletins, Circulars, Notices, and pertinent NRC or industrial assessments of operating experience.
In some cases, information may be of sufficient importance that it must be dealt with promptly (through instructions, changes to operating and emergency procedures, issuance of special changes to operating and emergency procedures, issuance of special precautions, etc.) and must be handled in such a manner to assure that operations management personnel would be directly involved in the process. In many other cases, however, important information will become available which should be brought to the attention of operators and other personnel for their general information to assure continued safe plant operation. Since the total volume of information handled by the assessment group may be large, it is important that assurance be provided that high-priority matters are dealt with promptly and that discrimination is used in the feedback of other information so that personnel are not deluged with unimportant and extraneous information to the detriment of their overall proficiency. It is important, also, that technical reviews be conducted to preclude premature dissemination of conflicting or contradictory information.


18.1.12.2  The Operating Agent Response  Operating experience assessment for WCGS was originally conducted by various groups within the plant and Wichita office staffs who possessed appropriate experience within the area of concern. The program utilized the INPO SEE-IN Program, NRC Office of Inspection and Enforcement Issuances and Licensee Event Reports as input. 
dealt with promptly (through instructions, changes to operating and emergency


18.1-27 Rev. 1 WOLF CREEK  The operating experience assessment activities have been upgraded and enlarged to include the above inputs as well as INPO SOERs, SERs, NPRDS, Nuclear Network and information received from vendors and contractors. Input received from these sources is routed to the appropriate coordinator for logging, initial screening and assignment for evaluation. The coordinator also tracks the information through the evaluation and action phases, if necessary.
procedures, issuance of special changes to operating and emergency procedures, issuance of special precautions, etc.) and must be handled in such a manner to  


The administrative system for control of the handling and evaluation of appropriate operating experience data is controlled by division procedures.
assure that operations management personnel would be directly involved in the  


18.1.12.3  Conclusion  The Operating Agent's internal programs for the review, evaluation, and dissemination of operating experience gained at WCGS and at other operating facilities fulfill the NRC's NUREG-0737 guidance relative to feedback and evaluation of operating experience.
process. In many other cases, however, important information will become


18.1.13  VERIFY CORRECT PERFORMANCE OF OPERATING ACTIVITIES (I.C.6)
available which should be brought to the attention of operators and other


18.1.13.1  NRC Guidance Per NUREG-0737  Position
personnel for their general information to assure continued safe plant


It is required (from NUREG-0660) that licensees' procedures be reviewed and revised, as necessary, to assure that an effective system of verifying the correct performance of operating activities is provided as a means of reducing human errors and improving the quality of normal operations. This will reduce the frequency of occurrence of situations that could result in or contribute to accidents. Such a verification system may include automatic system status monitoring, human verification of operations and maintenance activities independent of the people performing the activity (see NUREG-0585, Recommendation 5), or both.
operation. Since the total volume of information handled by the assessment


Implementation of automatic status monitoring, if required, will reduce the extent of human verification of operations and maintenance activities but will not eliminate the need for such verification in all instances. The procedures adopted by the licensees may consist of two phases--one before and one after installation of automatic status monitoring equipment, if required, in accordance with Item I.D.3.
group may be large, it is important that assurance be provided that high-


18.1-28 Rev. 0 WOLF CREEK  Clarification
priority matters are dealt with promptly and that discrimination is used in the feedback of other information so that personnel are not deluged with unimportant and extraneous information to the detriment of their overall


Item I.C.6 of the U.S. Nuclear Regulatory Commission Task Action Plan (NUREG-0660) and Recommendation 5 of NUREG-0585 propose requiring that licensees' procedures be reviewed and revised, as necessary, to assure that an effective system of verifying the correct performance of operating activities is provided. An acceptable program for verification of operating activities is described below.
proficiency. It is important, also, that technical reviews be conducted to  


The American Nuclear Society has prepared a draft revision to ANSI Standard N18.7-1972 (ANS-3.2), "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants."  A second proposed revision to Regulatory Guide 1.33, "Quality Assurance Program Requirements (Operation),"
preclude premature dissemination of conflicting or contradictory information.
which is to be issued for public comment in the near future, will endorse the latest draft revision to ANS-3.2 subject to the following supplemental provisions:  
 
: 1. Applicability of the guidance of Section 5.2.6 should be extended to cover surveillance testing in addition to maintenance.  
18.1.12.2  The Operating Agent Response Operating experience assessment for WCGS was originally conducted by various
 
groups within the plant and Wichita office staffs who possessed appropriate
 
experience within the area of concern. The program utilized the INPO SEE-IN Program, NRC Office of Inspection and Enforcement Issuances and Licensee Event
 
Reports as input. 
 
18.1-27 Rev. 1 WOLF CREEK The operating experience assessment activities have been upgraded and enlarged
 
to include the above inputs as well as INPO SOERs, SERs, NPRDS, Nuclear Network
 
and information received from vendors and contractors. Input received from
 
these sources is routed to the appropriate coordinator for logging, initial screening and assignment for evaluation. The coordinator also tracks the
 
information through the evaluation and action phases, if necessary.
 
The administrative system for control of the handling and evaluation of
 
appropriate operating experience data is controlled by division procedures.
 
18.1.12.3  Conclusion The Operating Agent's internal programs for the review, evaluation, and
 
dissemination of operating experience gained at WCGS and at other operating
 
facilities fulfill the NRC's NUREG-0737 guidance relative to feedback and evaluation of operating experience.
 
18.1.13  VERIFY CORRECT PERFORMANCE OF OPERATING ACTIVITIES
 
(I.C.6)
 
18.1.13.1  NRC Guidance Per NUREG-0737 Position
 
It is required (from NUREG-0660) that licensees' procedures be reviewed and revised, as necessary, to assure that an effective system of verifying the
 
correct performance of operating activities is provided as a means of reducing
 
human errors and improving the quality of normal operations. This will reduce
 
the frequency of occurrence of situations that could result in or contribute to
 
accidents. Such a verification system may include automatic system status
 
monitoring, human verification of operations and maintenance activities
 
independent of the people performing the activity (see NUREG-0585, Recommendation 5), or both.
 
Implementation of automatic status monitoring, if required, will reduce the extent of human verification of operations and maintenance activities but will not eliminate the need for such verification in all instances. The procedures
 
adopted by the licensees may consist of two phases--one before and one after
 
installation of automatic status monitoring equipment, if required, in
 
accordance with Item I.D.3.
 
18.1-28 Rev. 0 WOLF CREEK Clarification
 
Item I.C.6 of the U.S. Nuclear Regulatory Commission Task Action Plan (NUREG-
 
0660) and Recommendation 5 of NUREG-0585 propose requiring that licensees' procedures be reviewed and revised, as necessary, to assure that an effective
 
system of verifying the correct performance of operating activities is
 
provided. An acceptable program for verification of operating activities is
 
described below.
 
The American Nuclear Society has prepared a draft revision to ANSI Standard  
 
N18.7-1972 (ANS-3.2), "Administrative Controls and Quality Assurance for the  
 
Operational Phase of Nuclear Power Plants."  A second proposed revision to  
 
Regulatory Guide 1.33, "Quality Assurance Program Requirements (Operation),"
which is to be issued for public comment in the near future, will endorse the latest draft revision to ANS-3.2 subject to the following supplemental provisions:
: 1. Applicability of the guidance of Section 5.2.6 should be extended to cover surveillance testing in addition to  
 
maintenance.
: 2. In lieu of any designated senior reactor operator (SRO),
: 2. In lieu of any designated senior reactor operator (SRO),
the authority to release systems and equipment for maintenance or surveillance testing or return-to-service may be delegated to an onshift SRO, provided provisions are made to ensure that the shift supervisor is kept fully informed of system status.  
the authority to release systems and equipment for maintenance or surveillance testing or return-to-service may be delegated to an onshift SRO, provided provisions are made to ensure that the shift supervisor is kept fully informed of system status.
: 3. Except in cases of significant radiation exposure, a  second qualified person should verify correct  implementation of equipment control measures, such as the tagging of equipment.  
: 3. Except in cases of significant radiation exposure, a  second qualified person should verify correct  implementation of equipment control measures, such as the tagging of equipment.
: 4. Equipment control procedures should include assurance that control room operators are informed of changes in equipment status and the effects of such changes.  
: 4. Equipment control procedures should include assurance that control room operators are informed of changes in equipment status and the effects of such changes.
: 5. For the return-to-service of equipment important to safety, a second qualified operator should verify proper system alignment unless functional testing can be performed without compromising plant safety, and can prove that all equipment, valves, and switches involved in the activity are correctly aligned.  
: 5. For the return-to-service of equipment important to safety, a second qualified operator should verify proper system alignment unless functional testing can be performed without compromising plant safety, and can prove that all equipment, valves, and switches involved in the activity are correctly aligned.  


18.1-29 Rev. 0 WOLF CREEK Note: A licensed operator possessing knowledge of the systems involved and the relationship of the systems to plant safety would be a "qualified" person. The staff is investigating the level of qualification necessary for  other operators to perform these functions.  
18.1-29 Rev. 0 WOLF CREEK Note: A licensed operator possessing knowledge of the systems involved and the relationship of the systems to plant safety would be a "qualified" person. The staff is investigating the level of qualification necessary for  other operators to perform these functions.  
 
For plants that have or will have automatic system status monitoring, as
 
discussed in Task Action Plan Item I.D.3, NUREG-0660, the extent of human
 
verification of operations and maintenance activities will be reduced. 


For plants that have or will have automatic system status monitoring, as discussed in Task Action Plan Item I.D.3, NUREG-0660, the extent of human verification of operations and maintenance activities will be reduced.
However, the need for such verification will not be eliminated in all  
However, the need for such verification will not be eliminated in all instances.


18.1.13.2  The Operating Agent Response The Operating Agent has developed specific administrative procedures and utilizes available status monitoring in the control room to control equipment status. The procedures describe the control measures and actions such as locking, tagging, notification, and identification of equipment. The procedures provide for control of equipment to maintain reactor and personnel safety and to avoid unauthorized or inadvertent operation of equipment. As suggested by NUREG-0737, administrative procedures provide instructions for verification of correct performance of operating and surveillance activities.
instances.
The status monitoring is in the form of position indication in the control room of safety-related valves and breakers or logging of valve/breaker position on the plant computer.  
 
18.1.13.2  The Operating Agent Response The Operating Agent has developed specific administrative procedures and  
 
utilizes available status monitoring in the control room to control equipment  
 
status. The procedures describe the control measures and actions such as locking, tagging, notification, and identification of equipment. The  
 
procedures provide for control of equipment to maintain reactor and personnel  
 
safety and to avoid unauthorized or inadvertent operation of equipment. As  
 
suggested by NUREG-0737, administrative procedures provide instructions for  
 
verification of correct performance of operating and surveillance activities.
 
The status monitoring is in the form of position indication in the control room  
 
of safety-related valves and breakers or logging of valve/breaker position on  
 
the plant computer.
 
18.1.13.3  Conclusion The Operating Agent's administrative controls for performance of operating
 
activities satisfy the guidance of NUREG-0737, Item I.C.6.  


18.1.13.3  Conclusion  The Operating Agent's administrative controls for performance of operating activities satisfy the guidance of NUREG-0737, Item I.C.6.
18.1.14  NSSS VENDOR REVIEW OF PROCEDURES (I.C.7)  
18.1.14  NSSS VENDOR REVIEW OF PROCEDURES (I.C.7)  


18.1.14.1  NRC Guidance Per NUREG-0660 Applicants for near-term operating licenses will be required to obtain NSSS vendor review of their low-power and power-ascension tests, and emergency procedures as a further verification of the adequacy of procedures.
18.1.14.1  NRC Guidance Per NUREG-0660 Applicants for near-term operating licenses will be required to obtain NSSS  
18.1.14.2  The Operating Agent Response The Operating Agent committed to a review by Westinghouse of specific low-power and power-ascension procedures as a means of further verification of their adequacy. Westinghouse assistance in the preoperational and startup test programs is discussed in   
 
vendor review of their low-power and power-ascension tests, and emergency  
 
procedures as a further verification of the adequacy of procedures.  
 
18.1.14.2  The Operating Agent Response The Operating Agent committed to a review by Westinghouse of specific low-power  
 
and power-ascension procedures as a means of further verification of their  
 
adequacy. Westinghouse assistance in the preoperational and startup test programs is discussed in   
 
18.1-30 Rev. 0 WOLF CREEK Section 14.2. However, the Operating Agent reserved the right to evaluate any
 
suggested changes resulting from vendor review and, in light of the Operating
 
Agent's ultimate responsibility for the safe operation of WCGS, to make the
 
final determination as to whether any suggested change is warranted.
 
As discussed in Section 18.1.8.2, the Operating Agent is participating in the
 
Westinghouse Owner's Group activities in which Westinghouse has developed
 
guidelines for preparation of emergency operating procedures. The Operating
 
Agent committed in that section to developing WCGS emergency operating
 
procedures from the generic guidelines. Westinghouse review of the WCGS
 
emergency operating procedures was not only limited to Westinghouse's review
 
and preparation of the generic guidelines. Copies of the emergency procedures
 
were provided to Westinghouse for review.
 
18.1.14.3  Conclusion The Operating Agent's actions relative to NSSS vendor review of selected
 
procedures comply with the guidance of NUREG-0737.
 
18.1.15  PILOT MONITORING OF SELECTED EMERGENCY PROCEDURES
 
FOR NEAR-TERM OPERATING LICENSE APPLICANTS (I.C.8)
 
18.1.15.1  NRC Guidance Per NUREG-0737 Position
 
The NRC will conduct an interdisciplinary and interoffice audit of selected plant emergency operating procedures (e.g., small-break LOCA, loss of
 
feedwater, restart of engineered safety features following a loss of ac power, steamline break, or steam-generator tube rupture).
 
The licensee should correct, before full-power operation, any deficiencies in
 
the emergency procedures, as necessary, based on the NRC audit.


18.1-30 Rev. 0 WOLF CREEK  Section 14.2. However, the Operating Agent reserved the right to evaluate any suggested changes resulting from vendor review and, in light of the Operating Agent's ultimate responsibility for the safe operation of WCGS, to make the final determination as to whether any suggested change is warranted.
18.1.15.2 The Operating Agent Response The Operating Agent did not object to a pilot review by the NRC of these
As discussed in Section 18.1.8.2, the Operating Agent is participating in the Westinghouse Owner's Group activities in which Westinghouse has developed guidelines for preparation of emergency operating procedures. The Operating Agent committed in that section to developing WCGS emergency operating procedures from the generic guidelines. Westinghouse review of the WCGS emergency operating procedures was not only limited to Westinghouse's review and preparation of the generic guidelines. Copies of the emergency procedures were provided to Westinghouse for review.
18.1.14.3  Conclusion  The Operating Agent's actions relative to NSSS vendor review of selected procedures comply with the guidance of NUREG-0737.
18.1.15  PILOT MONITORING OF SELECTED EMERGENCY PROCEDURES FOR NEAR-TERM OPERATING LICENSE APPLICANTS (I.C.8)


18.1.15.1  NRC Guidance Per NUREG-0737  Position
procedures. However, since the NRC has conducted an indepth review of the WOG


The NRC will conduct an interdisciplinary and interoffice audit of selected plant emergency operating procedures (e.g., small-break LOCA, loss of feedwater, restart of engineered safety features following a loss of ac power, steamline break, or steam-generator tube rupture).
guidelines (refer to Section 18.1.8.1), and since the Operating Agent has agreed to use the WOG guidelines, a specific review of the Operating Agent


The licensee should correct, before full-power operation, any deficiencies in the emergency procedures, as necessary, based on the NRC audit.  
procedures did not appear to be necessary. Based on this reasoning, the NRC, in Supplement 5 to the WCGS Safety Evaluation Report, concluded that Item I.C.8


18.1.15.The Operating Agent Response  The Operating Agent did not object to a pilot review by the NRC of these procedures. However, since the NRC has conducted an indepth review of the WOG guidelines (refer to Section 18.1.8.1), and since the Operating Agent has agreed to use the WOG guidelines, a specific review of the Operating Agent procedures did not appear to be necessary. Based on this reasoning, the NRC, in Supplement 5 to the WCGS Safety Evaluation Report, concluded that Item I.C.8 was resolved.  
was resolved.
 
18.1-31 Rev. 0 WOLF CREEK 18.1.15.3 Conclusion
 
The Operating Agent activities associated with Item I.C.1, Section 18.1.8, comply with the objectives of Item I.C.8 of NUREG-0737.  


18.1-31 Rev. 0 WOLF CREEK  18.1.15.3 Conclusion The Operating Agent activities associated with Item I.C.1, Section 18.1.8, comply with the objectives of Item I.C.8 of NUREG-0737.
18.1.16  CONTROL ROOM DESIGN REVIEW (I.D.1)  
18.1.16  CONTROL ROOM DESIGN REVIEW (I.D.1)  


18.1.16.1  NRC Guidance Per NUREG-0737 Position  
18.1.16.1  NRC Guidance Per NUREG-0737 Position  
 
In accordance with Task Action Plan I.D.1, Control Room Design Reviews (NUREG-0660), all licensees and applicants for operating licenses will be required to
 
conduct a detailed control room design review to identify and correct design
 
deficiencies. This detailed control room design review is expected to take
 
about a year. Therefore, the Office of Nuclear Reactor Regulation (NRR)
 
requires that those applicants for operating licenses who are unable to
 
complete this review prior to the issuance of a license make preliminary
 
assessments of their control rooms to identify significant human factors and
 
instrumentation problems and establish a schedule approved by the NRC for
 
correcting deficiencies. These applicants will be required to complete the
 
more detailed control room reviews on the same schedule as licensees with operating plants.


In accordance with Task Action Plan I.D.1, Control Room Design Reviews (NUREG-0660), all licensees and applicants for operating licenses will be required to conduct a detailed control room design review to identify and correct design deficiencies. This detailed control room design review is expected to take about a year. Therefore, the Office of Nuclear Reactor Regulation (NRR) requires that those applicants for operating licenses who are unable to complete this review prior to the issuance of a license make preliminary assessments of their control rooms to identify significant human factors and instrumentation problems and establish a schedule approved by the NRC for correcting deficiencies. These applicants will be required to complete the more detailed control room reviews on the same schedule as licensees with operating plants.
Clarification  
Clarification  


NRR is presently developing human engineering guidelines to assist each licensee and applicant in performing detailed control room review. A draft of the guidelines has been published for public comment as NUREG/CR-1580, "Human Engineering Guide to Control Room Evaluation."  The due date for comments on this draft document was September 29, 1980. NRR will issue the final version of the guidelines as NUREG-0700, by February 1981, after receiving, reviewing, and incorporating substantive public comments from operating reactor licensees, applicants for operating licenses, human factors engineering experts, and other interested parties. NRR will issue evaluation criteria, by July 1981, which will be used to judge the acceptability of the detailed reviews performed and the design modifications implemented. Applicants for operating licenses who will be unable to complete the detailed control room design review prior to the issuance of a license are required to perform a preliminary control room design assessment to identify significant human factors problems. Applicants will find it of value to refer to draft document NUREG/CR-1580, "Human Engineering Guide to Control Room Evaluation,"
NRR is presently developing human engineering guidelines to assist each  
 
licensee and applicant in performing detailed control room review. A draft of  
 
the guidelines has been published for public comment as NUREG/CR-1580, "Human  
 
Engineering Guide to Control Room Evaluation."  The due date for comments on  
 
this draft document was September 29, 1980. NRR will issue the final version  
 
of the guidelines as NUREG-0700, by February 1981, after receiving, reviewing, and incorporating substantive public comments from operating reactor licensees, applicants for operating licenses, human factors engineering experts, and other  
 
interested parties. NRR will issue evaluation criteria, by July 1981, which  
 
will be used to judge the acceptability of the detailed reviews performed and  
 
the design modifications implemented.
Applicants for operating licenses who will be unable to complete the detailed  
 
control room design review prior to the issuance of a license are required to  
 
perform a preliminary control room design assessment to identify significant  
 
human factors problems. Applicants will find it of value to refer to draft  
 
document NUREG/CR-1580, "Human Engineering Guide to Control Room Evaluation,"
in performing the preliminary assessment. NRR will evaluate the  
in performing the preliminary assessment. NRR will evaluate the  


18.1-32 Rev. 0 WOLF CREEK applicants' preliminary assessments, including the performance by NRR of onsite review/audit. The NRR onsite review/audit will be on a schedule consistent with licensing needs and will emphasize the following aspects of the control room:
18.1-32 Rev. 0 WOLF CREEK applicants' preliminary assessments, including the performance by NRR of onsite  
: 1. The adequacy of information presented to the operator to reflect plant status for normal operation, anticipated operational occurrences, and accident conditions.  
 
: 2. The groupings of displays and the layout of panels.  
review/audit. The NRR onsite review/audit will be on a schedule consistent  
: 3. Improvements in the safety monitoring and human factors enhancement of controls and control displays.  
 
: 4. The communications from the control room to points  outside the control room, such as the onsite technical support center, remote shutdown panel, and offsite telephone lines, and to other areas within the plant, for normal and emergency operation.  
with licensing needs and will emphasize the following aspects of the control  
: 5. The use of direct rather than derived signals for the presentation of process and safety information to the operator.  
 
: 6. The operability of the plant from the control room with multiple failures of nonsafety-grade and non-seismic systems.  
room:
: 7. The adequacy of operating procedures and operator  training with respect to the limitations of  instrumentation displays in the control room.  
: 1. The adequacy of information presented to the operator to reflect plant status for normal operation, anticipated operational occurrences, and accident conditions.
: 8. The categorization of alarms, with unique definition of safety alarms.  
: 2. The groupings of displays and the layout of panels.
: 3. Improvements in the safety monitoring and human factors enhancement of controls and control displays.
: 4. The communications from the control room to points  outside the control room, such as the onsite technical support center, remote shutdown panel, and offsite telephone lines, and to other areas within the plant, for normal and emergency operation.
: 5. The use of direct rather than derived signals for the presentation of process and safety information to the  
 
operator.
: 6. The operability of the plant from the control room with multiple failures of nonsafety-grade and non-seismic  
 
systems.
: 7. The adequacy of operating procedures and operator  training with respect to the limitations of  instrumentation displays in the control room.
: 8. The categorization of alarms, with unique definition of safety alarms.
: 9. The physical location of the Shift Supervisor's office, either adjacent to or within the control room complex.  
: 9. The physical location of the Shift Supervisor's office, either adjacent to or within the control room complex.  


Prior to the onsite review/audit, NRR will require a copy of the applicant's preliminary assessment and additional information, which will be used in formulating the details of the onsite review/audit.
Prior to the onsite review/audit, NRR will require a copy of the applicant's  


18.1.16.2  The Operating Agent Response  Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982) provided guidance and requirements for control room design reviews which superseded previous NRC guidance. 
preliminary assessment and additional information, which will be used in


18.1-33 Rev. 0 WOLF CREEK  A Preliminary Design Assessment (PDA) of the WCGS control room was performed and the results provided to the NRC (SNUPPS letter dated June 26, 1981). As a result of the PDA activities, four significant actions were undertaken to improve the operator-control board interface and the decision making process: 
formulating the details of the onsite review/audit.  
: 1. Extensive rearrangement of switches, recorders and indicators was performed to improve location relationship of equipment controls and associated indications.
: 2. The location of all annunciators was reviewed and an extensive hierarchical arrangement by priority was developed to assist the operator in recognizing independently significant and dependent annunciator  alarms. 
: 3. Panels of status and permissive lights have been rearranged into functional groups, and methods of designating different plant safeguards modes have been incorporated to improve the operator's ability to understand and respond to these indications.
: 4. The Operating Agent, in conjunction with several owners of Westinghouse plants, has developed an extensive Safety Parameter Display System with an ability to display critical parameters, both quantitatively and graphically. The Senior Reactor Operators in the control room have these Safety Parameter Display Systems available to them to monitor plant conditions during any  incident (refer to Section 18.1.17).
The original control board design had significant Prairie Island and Ginna plant operating experience input from Northern States Power and Rochester Gas and Electric during the initial design phases and had more extensive use of system mimic-layout than most nuclear plant control boards. The above modifications improved upon one of the better pre-TMI control board designs and results in the control board supplying relevant, easy to comprehend information to all control room personnel.  


An NRC control room design review audit (CRDR/A) was conducted from July 29 to July 31, 1981. Additional information to resolve PDA and CRDR/A issues was submitted to the NRC by SNUPPS letters dated August 12, 1981, January 19, 1982, March 16, 1982 and April 12, 1982. Additional information, addressing panels specific to WCGS, was submitted to the NRC by Operating Agent letters dated January 15, 1982, March 10, 1982 and June 29, 1982. 
18.1.16.2  The Operating Agent Response Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982)


18.1-34 Rev. 0 WOLF CREEK  In response to Supplement 1 to NUREG-0737, additional detailed control room design review (DCRDR) information was provided to the NRC by SNUPPS letters:
provided guidance and requirements for control room design reviews which


April 15, 1983 - Response to Generic Letter 82-33 June 30, 1983 - DCRDR Program Plan    November 28, 1983 - Revised DCRDR Program Plan
superseded previous NRC guidance. 


November 30, 1983 - Responses to PDA Issues February 2, 1984 -  DCRDR Summary Report  
18.1-33 Rev. 0 WOLF CREEK A Preliminary Design Assessment (PDA) of the WCGS control room was performed
 
and the results provided to the NRC (SNUPPS letter dated June 26, 1981). As a
 
result of the PDA activities, four significant actions were undertaken to
 
improve the operator-control board interface and the decision making process:
: 1. Extensive rearrangement of switches, recorders and indicators was performed to improve location relationship of equipment controls and associated
 
indications.
: 2. The location of all annunciators was reviewed and an extensive hierarchical arrangement by priority was developed to assist the operator in recognizing independently significant and dependent annunciator alarms.
: 3. Panels of status and permissive lights have been rearranged into functional groups, and methods of designating different plant safeguards modes have been incorporated to improve the operator's ability to understand and respond to these indications.
: 4. The Operating Agent, in conjunction with several owners of Westinghouse plants, has developed an extensive Safety Parameter Display System with an ability to display critical parameters, both quantitatively and graphically. The Senior Reactor Operators in the control room have these Safety Parameter Display Systems available to them to monitor plant conditions during any  incident (refer to Section 18.1.17).
 
The original control board design had significant Prairie Island and Ginna
 
plant operating experience input from Northern States Power and Rochester Gas
 
and Electric during the initial design phases and had more extensive use of
 
system mimic-layout than most nuclear plant control boards. The above
 
modifications improved upon one of the better pre-TMI control board designs and
 
results in the control board supplying relevant, easy to comprehend information
 
to all control room personnel.
 
An NRC control room design review audit (CRDR/A) was conducted from July 29 to
 
July 31, 1981. Additional information to resolve PDA and CRDR/A issues was
 
submitted to the NRC by SNUPPS letters dated August 12, 1981, January 19, 1982, March 16, 1982 and April 12, 1982. Additional information, addressing panels
 
specific to WCGS, was submitted to the NRC by Operating Agent letters dated
 
January 15, 1982, March 10, 1982 and June 29, 1982. 
 
18.1-34 Rev. 0 WOLF CREEK In response to Supplement 1 to NUREG-0737, additional detailed control room
 
design review (DCRDR) information was provided to the NRC by SNUPPS letters:
 
April 15, 1983 - Response to Generic Letter 82-33
 
June 30, 1983 - DCRDR Program Plan November 28, 1983 - Revised DCRDR Program Plan
 
November 30, 1983 - Responses to PDA Issues  
 
February 2, 1984 -  DCRDR Summary Report  


March 21, 1984 - Auxiliary Shutdown Panel Issues  
March 21, 1984 - Auxiliary Shutdown Panel Issues  
Line 497: Line 1,438:
October 10, 1984 - Task Analysis Procedure  
October 10, 1984 - Task Analysis Procedure  


December 21, 1984 - Human Factors Review The NRC conducted a second onsite audit in March 1984.
December 21, 1984 - Human Factors Review  
The Operating Agent also addressed the status of resolution of human engineering discrepancies (HEDs) in a letter to the NRC dated May 11, 1984.  
 
The NRC conducted a second onsite audit in March 1984.  
 
The Operating Agent also addressed the status of resolution of human  
 
engineering discrepancies (HEDs) in a letter to the NRC dated May 11, 1984.  


As a result of the DCRDR activities, including Control Room Inventory and Supplemental Survey and Auxiliary Shutdown Panel review, several significant activities were undertaken. Some of the major efforts are identified below and were performed together with the resolution of hundreds of specific human engineering findings.  
As a result of the DCRDR activities, including Control Room Inventory and  
: 1. A standard list of abbreviations was adopted to provide a uniform nomenclature for plant operators. The standard abbreviations were used to update control room equipment labels, annunciator windows, Auxiliary  Shutdown Panel labels and plant computer software.
 
: 2. Several system mimic displays were extensively revised, e.g., Chemical and Volume Control System, Component Cooling Water System and electrical systems.  
Supplemental Survey and Auxiliary Shutdown Panel review, several significant  
 
activities were undertaken. Some of the major efforts are identified below and  
 
were performed together with the resolution of hundreds of specific human  
 
engineering findings.
: 1. A standard list of abbreviations was adopted to provide a uniform nomenclature for plant operators. The standard abbreviations were used to update control room equipment labels, annunciator windows, Auxiliary  Shutdown Panel labels and plant computer software.
: 2. Several system mimic displays were extensively revised, e.g., Chemical and Volume Control System, Component Cooling Water System and electrical systems.
: 3. The J-handles of many control switches used on control boards were engraved with indicating arrows. The engraved arrows were filled with white paint for easy identification of handle position.  
: 3. The J-handles of many control switches used on control boards were engraved with indicating arrows. The engraved arrows were filled with white paint for easy identification of handle position.  


18.1-35 Rev. 4 WOLF CREEK   4. Approximately fifty instrumentation/control devices were relocated with attendant panel rewiring. An additional reactor coolant system wide range pressure channel was incorporated into the plant design.
18.1-35 Rev. 4 WOLF CREEK
: 5. Extensive use of demarcation lines was employed to visually isolate indication and control groups for systems and components.  
: 4. Approximately fifty instrumentation/control devices were relocated with attendant panel rewiring. An additional reactor coolant system wide range pressure channel was incorporated into the plant design.
: 5. Extensive use of demarcation lines was employed to visually isolate indication and control groups for systems and components.
: 6. Several hundred displays were modified to add tolerance bands to provide plant operators with information regarding range and setpoints.  
: 6. Several hundred displays were modified to add tolerance bands to provide plant operators with information regarding range and setpoints.  


In Supplement 5, to the WCGS Safety Evaluation Report, the NRC evaluated the DCRDR activities up to that time (March 1985) and concluded that the DCRDR substantially meets the requirements of Supplement 1 to NUREG-0737 except in the area of System Function Review and Task Analysis (SFR&TA).  
In Supplement 5, to the WCGS Safety Evaluation Report, the NRC evaluated the DCRDR activities up to that time (March 1985) and concluded that the DCRDR substantially meets the requirements of Supplement 1 to NUREG-0737 except in  
 
the area of System Function Review and Task Analysis (SFR&TA).
 
The Task Analysis procedure was revised by SNUPPS letter dated April 1, 1985. 
 
By SNUPPS letters dated April 26, 1985 and May 24, 1985, a final report
 
entitled "Task Analysis and Verification of the SNUPPS Control Room" was
 
submitted to the NRC. Additional NRC questions regarding the SFR&TA were
 
addressed by Operating Agent letters dated November 4, 1985 and November 5, 1986. The NRC staff evaluation, documenting resolution of the SFR and TA
 
issue, was issued by letter dated December 2, 1986.
 
18.1.16.3  Conclusions Based on the DCRDR activities and NRC staff review results summarized above, the Operating Agent acceptably complies with the regulatory requirements for
 
control room design review.
 
18.1.17  PLANT SAFETY PARAMETER DISPLAY SYSTEM (I.D.2)
 
18.1.17.1  NRC Guidance Per NUREG-0696 The purpose of the safety parameter display system (SPDS) is to assist control
 
room personnel in evaluating the safety status of the plant. The SPDS is to
 
provide a continuous indication of plant parameters or derived variables representative of the safety status of the plant. The primary function of the
 
SPDS is to aid the operator in the rapid detection of abnormal operating
 
conditions. The functional criteria for the SPDS presented in this section are
 
applicable for use only in the control room.
 
It is recognized that, upon the detection of an abnormal plant status, it may
 
be desirable to provide additional information to 
 
18.1-36 Rev. 1 WOLF CREEK analyze and diagnose the cause of the abnormality, execute corrective actions, and monitor plant response as secondary SPDS functions.
 
As an operator aid, the SPDS serves to concentrate a minimum set of plant parameters from which the plant safety status can be assessed. The grouping of
 
parameters is based on the function of enhancing the operator's capability to
 
assess plant status in a timely manner without surveying the entire control
 
room. However, the assessment based on SPDS is likely to be followed by
 
confirmatory surveys of many non-SPDS control room indicators.
 
Human factors engineering shall be incorporated in the various aspects of the
 
SPDS design to enhance the functional effectiveness of control room personnel. 
 
The design of the primary or principal display format shall be as simple as
 
possible, consistent with the required function, and shall include pattern and coding techniques to assist the operator's memory recall for the detection and recognition of unsafe operating conditions. The human-factored concentration
 
of these signals shall aid the operator in functionally comparing signals in
 
the assessment of safety status.
 
All data for display shall be validated where practicable on a realtime basis
 
as part of the display to control room personnel. For example, redundant sensor
 
data may be compared, the range of a parameter may be compared to predetermined
 
limits, or other quantitative methods may be used to compare values. When an
 
unsuccessful validation of data occurs, the SPDS shall contain means of
 
identifying the impacted parameter(s). Operating procedures and operator
 
training in the use of the SPDS shall contain information and provide guidance
 
for the resolution of unsuccessful data validation. The objective is to ensure
 
that the SPDS presents the most current and accurate status of the plant
 
possible and is not compromised by unidentified faulty processing or failed sensors.
The SPDS shall be in operation during normal and abnormal operating conditions. 
 
The SPDS shall be capable of displaying pertinent information during steady-
 
state and transient conditions. The SPDS shall be capable of presenting the
 
magnitudes and the trends of parameters or derived variables as necessary to
 
allow rapid assessment of the current plant status by control room personnel.
 
The parameter trending display shall contain recent and current magnitudes of
 
the parameter as a function of time. The derivation and presentation of
 
parameter trending during upset conditions is a task that may be automated, thus freeing the operator to interpret the trends rather than generate them. 
 
Display of time derivatives of the parameters in lieu of trends to both
 
optimize operator-process communication and conserve space may be acceptable.  


The Task Analysis procedure was revised by SNUPPS letter dated April 1, 1985.
18.1-37 Rev. 0 WOLF CREEK The SPDS may be a source of information to other systems, and the functional
By SNUPPS letters dated April 26, 1985 and May 24, 1985, a final report entitled "Task Analysis and Verification of the SNUPPS Control Room" was submitted to the NRC. Additional NRC questions regarding the SFR&TA were addressed by Operating Agent letters dated November 4, 1985 and November 5, 1986. The NRC staff evaluation, documenting resolution of the SFR and TA issue, was issued by letter dated December 2, 1986.


18.1.16.3  Conclusions  Based on the DCRDR activities and NRC staff review results summarized above,  the Operating Agent acceptably complies with the regulatory requirements for control room design review.  
criteria of these systems shall state the required interfaces with the SPDS.


18.1.17  PLANT SAFETY PARAMETER DISPLAY SYSTEM (I.D.2) 18.1.17.1  NRC Guidance Per NUREG-0696  The purpose of the safety parameter display system (SPDS) is to assist control room personnel in evaluating the safety status of the plant. The SPDS is to provide a continuous indication of plant parameters or derived variables representative of the safety status of the plant. The primary function of the SPDS is to aid the operator in the rapid detection of abnormal operating conditions. The functional criteria for the SPDS presented in this section are applicable for use only in the control room.
Any interface between the SPDS and a safety system shall be isolated in  


It is recognized that, upon the detection of an abnormal plant status, it may be desirable to provide additional information to 
accordance with the safety system criteria to preserve channel independence and ensure the integrity of the safety system in the case of SPDS malfunction.


18.1-36 Rev. 1 WOLF CREEK  analyze and diagnose the cause of the abnormality, execute corrective actions, and monitor plant response as secondary SPDS functions.
Design provisions shall be included in the interfaces between the SPDS and  


As an operator aid, the SPDS serves to concentrate a minimum set of plant parameters from which the plant safety status can be assessed. The grouping of parameters is based on the function of enhancing the operator's capability to assess plant status in a timely manner without surveying the entire control room. However, the assessment based on SPDS is likely to be followed by confirmatory surveys of many non-SPDS control room indicators.
nonsafety systems to ensure the integrity of the SPDS upon failure of nonsafety


Human factors engineering shall be incorporated in the various aspects of the SPDS design to enhance the functional effectiveness of control room personnel.
equipment.  
The design of the primary or principal display format shall be as simple as possible, consistent with the required function, and shall include pattern and coding techniques to assist the operator's memory recall for the detection and recognition of unsafe operating conditions. The human-factored concentration of these signals shall aid the operator in functionally comparing signals in the assessment of safety status.  


All data for display shall be validated where practicable on a realtime basis as part of the display to control room personnel. For example, redundant sensor data may be compared, the range of a parameter may be compared to predetermined limits, or other quantitative methods may be used to compare values. When an unsuccessful validation of data occurs, the SPDS shall contain means of identifying the impacted parameter(s). Operating procedures and operator training in the use of the SPDS shall contain information and provide guidance for the resolution of unsuccessful data validation. The objective is to ensure that the SPDS presents the most current and accurate status of the plant possible and is not compromised by unidentified faulty processing or failed sensors.
A qualification program shall be established to demonstrate SPDS conformance to  
The SPDS shall be in operation during normal and abnormal operating conditions.
The SPDS shall be capable of displaying pertinent information during steady-state and transient conditions. The SPDS shall be capable of presenting the magnitudes and the trends of parameters or derived variables as necessary to allow rapid assessment of the current plant status by control room personnel.


The parameter trending display shall contain recent and current magnitudes of the parameter as a function of time. The derivation and presentation of parameter trending during upset conditions is a task that may be automated, thus freeing the operator to interpret the trends rather than generate them.
the functional criteria of this [NUREG-0696] document.  
Display of time derivatives of the parameters in lieu of trends to both optimize operator-process communication and conserve space may be acceptable.  


18.1-37 Rev. 0 WOLF CREEK The SPDS may be a source of information to other systems, and the functional criteria of these systems shall state the required interfaces with the SPDS.
18.1.17.2 The Operating Agent Response Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982)
Any interface between the SPDS and a safety system shall be isolated in accordance with the safety system criteria to preserve channel independence and ensure the integrity of the safety system in the case of SPDS malfunction.
Design provisions shall be included in the interfaces between the SPDS and nonsafety systems to ensure the integrity of the SPDS upon failure of nonsafety equipment.


A qualification program shall be established to demonstrate SPDS conformance to the functional criteria of this [NUREG-0696] document.
provided guidance and requirements for the SPDS which superceded previous NRC


18.1.17.2  The Operating Agent Response  Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982) provided guidance and requirements for the SPDS which superceded previous NRC guidance.
guidance.  
In response to the NUREG-0696 design criteria guidance, a detailed description of the SPDS conceptual design was submitted to the NRC by SNUPPS letter dated June 1, 1981. In response to Generic Letter 82-33, further details were provided in a SNUPPS letter dated April 15, 1983. By SNUPPS letter dated January 13, 1984, an analysis of the bases for SPDS parameter selection was submitted to the NRC.  


Based on the NRC review of the submitted information and the results of an NRC audit of the WCGS SPDS conducted in August 1984, the NRC staff concluded that the SNUPPS utilities were required to address (refer to WCGS Safety Evaluation Report, Supplement 5):  
In response to the NUREG-0696 design criteria guidance, a detailed description
: 1. A commitment to add or justify not adding containment isolation status to the SPDS,  
 
: 2. The inclusion of additional events in the SPDS variable validation and verification effort,  
of the SPDS conceptual design was submitted to the NRC by SNUPPS letter dated
: 3. Involvement of human factors professionals in the design, and  
 
: 4. Human engineering discrepancies identified during the NRC audit.
June 1, 1981. In response to Generic Letter 82-33, further details were
By SNUPPS letters dated September 5, 1984 and February 27, 1986, the above issues were addressed and the entire verification and validation program for the SPDS at the SNUPPS plants was reported to be successfully completed.  
 
provided in a SNUPPS letter dated April 15, 1983. By SNUPPS letter dated
 
January 13, 1984, an analysis of the bases for SPDS parameter selection was
 
submitted to the NRC.
 
Based on the NRC review of the submitted information and the results of an NRC  
 
audit of the WCGS SPDS conducted in August 1984, the NRC staff concluded that the SNUPPS utilities were required to address (refer to WCGS Safety Evaluation Report, Supplement 5):
: 1. A commitment to add or justify not adding containment isolation status to the SPDS,
: 2. The inclusion of additional events in the SPDS variable validation and verification effort,
: 3. Involvement of human factors professionals in the design, and
: 4. Human engineering discrepancies identified during the NRC audit.  
 
By SNUPPS letters dated September 5, 1984 and February 27, 1986, the above issues were addressed and the entire verification and validation program for the SPDS at the SNUPPS plants was reported to be successfully completed.
 
18.1-38 Rev. 1 WOLF CREEK 18.1.17.3  Conclusions
 
Based on the above summary of SPDS activities, the WCGS SPDS design agrees
 
adequately with the requirements established in Supplement 1 to NUREG-0737.  


18.1-38 Rev. 1 WOLF CREEK  18.1.17.3  Conclusions Based on the above summary of SPDS activities, the WCGS SPDS design agrees adequately with the requirements established in Supplement 1 to NUREG-0737.
18.1.18  SPECIAL LOW POWER TESTING AND TRAINING (I.G.1)  
18.1.18  SPECIAL LOW POWER TESTING AND TRAINING (I.G.1)  


18.1.18.1  NRC Guidance Per NUREG-0694 NUREG-0694, "TMI-Related Requirements for New Operating Licenses," requires applicants for a new operating license to define and commit to a special low-power testing program approved by the NRC staff, to be conducted at power levels no greater than 5 percent, for the purposes of providing meaningful technical information beyond that obtained in the normal startup test program and to provide supplemental training. This requirement must be met before fuel loading.  
18.1.18.1  NRC Guidance Per NUREG-0694 NUREG-0694, "TMI-Related Requirements for New Operating Licenses," requires  
 
applicants for a new operating license to define and commit to a special low-
 
power testing program approved by the NRC staff, to be conducted at power levels no greater than 5 percent, for the purposes of providing meaningful  
 
technical information beyond that obtained in the normal startup test program  
 
and to provide supplemental training. This requirement must be met before fuel  
 
loading.  


Position  
Position  


The staff position was stated in a letter to the applicants dated November 14, 1980. This letter stated that the program should provide for the following:  
The staff position was stated in a letter to the applicants dated November 14, 1980. This letter stated that the program should provide for the following:  
   "Each licensed reactor operator (RO or SRO who performs RO or  SRO duties, respectively) should experience the initiation, maintenance, and recovery from natural circulation mode, using nuclear heat to simulate decay heat. Operators should be able to recognize when natural circulation has stabilized, and should be able to control saturation margin, RCS pressure, and heat removal rate without exceeding specified operating limits.  
   "Each licensed reactor operator (RO or SRO who performs RO or  SRO duties, respectively) should experience the initiation, maintenance, and recovery from natural circulation mode, using nuclear heat to simulate decay heat. Operators should be able to recognize when natural circulation has stabilized, and should be able to control saturation margin, RCS pressure, and heat removal rate without exceeding specified operating limits.  


These tests should demonstrate the following plant characteristics:  length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, and the ability to uniformly borate and cool down to hot shutdown conditions, using natural  circulation. The  latter  demonstration  may be performed  using decay heat following power ascension and vendor acceptance tests, and need only be performed at those plants for which the tests has not been demonstrated at a comparable prototype plant."  
These tests should demonstrate the following plant characteristics:  length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, and the ability to uniformly borate and cool down to hot shutdown conditions, using natural  circulation. The  latter  demonstration  may be performed  using decay heat following power ascension and vendor acceptance tests, and need only be performed at those plants for which the tests has not been demonstrated at a comparable prototype plant."  


18.1.18.2  The Operating Agent Response The WCGS natural circulation testing requirements are based on post-Three Mile Island (TMI) regulatory positions and NRC Branch   
18.1.18.2  The Operating Agent Response The WCGS natural circulation testing requirements are based on post-Three Mile  
 
Island (TMI) regulatory positions and NRC Branch   
 
18.1-39 Rev. 0 WOLF CREEK Technical Position RSB 5-1. In response to the post-TMI positions, Westinghouse developed a special low-power test program which was approved by
 
the NRC. In accordance with the test program, prototype natural circulation
 
testing for 4-loop plants was performed at the Diablo Canyon plant. The prototype testing was performed in 1985 and acceptably demonstrated plant
 
characteristics important to plant shutdown under natural circulation
 
conditions, such as, length of time to achieve natural circulation, the ability
 
to borate the reactor coolant system under natural circulation conditions and
 
the ability to cool the plant down and depressurize under natural circulation
 
conditions. The Diablo Canyon test results have been determined to be
 
applicable to the WCGS design.


18.1-39 Rev. 0 WOLF CREEK  Technical Position RSB 5-1. In response to the post-TMI positions, Westinghouse developed a special low-power test program which was approved by the NRC. In accordance with the test program, prototype natural circulation testing for 4-loop plants was performed at the Diablo Canyon plant. The prototype testing was performed in 1985 and acceptably demonstrated plant characteristics important to plant shutdown under natural circulation conditions, such as, length of time to achieve natural circulation, the ability to borate the reactor coolant system under natural circulation conditions and the ability to cool the plant down and depressurize under natural circulation conditions. The Diablo Canyon test results have been determined to be applicable to the WCGS design.
Plant-specific natural circulation testing was conducted at one SNUPPS plant (Callaway Plant -- operated by Union Electric Company). Sufficient data was collected during this testing to validate the simulation of natural circulation on the WCGS simulator. All licensed operators for WCGS received natural


Plant-specific natural circulation testing was conducted at one SNUPPS plant (Callaway Plant -- operated by Union Electric Company). Sufficient data was collected during this testing to validate the simulation of natural circulation on the WCGS simulator. All licensed operators for WCGS received natural circulation training by either participating in the natural circulation testing or by simulating natural circulation on a validated simulator.  
circulation training by either participating in the natural circulation testing  
: 1. Training - Each licensed RO (RO or SRO who performs RO or SRO duties respectively) participates in the initiation, maintenance and recovery from the natural circulation mode during the plant test or on the simulator. Operators are able to recognize when natural circulation has stabilized and will be able to control saturation margin, RCS pressure, and heat removal rates without exceeding specified operating limits.  
 
or by simulating natural circulation on a validated simulator.
: 1. Training - Each licensed RO (RO or SRO who performs RO or SRO duties respectively) participates in the initiation, maintenance and recovery from the natural circulation mode during the plant test or on the simulator. Operators are able to recognize when natural circulation has stabilized and will be able to control saturation margin, RCS pressure, and heat removal rates without exceeding specified operating limits.
: 2. Testing - The prototype and Callaway Plant tests  demonstrated the following plant characteristics:  Length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, the ability to uniformly borate and cooldown to hot shutdown conditions using natural circulation and the ability to control reactor coolant system subcooling margins.
: 2. Testing - The prototype and Callaway Plant tests  demonstrated the following plant characteristics:  Length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, the ability to uniformly borate and cooldown to hot shutdown conditions using natural circulation and the ability to control reactor coolant system subcooling margins.
Thermocouple/Core Cooling Monitor (T/CCM) system performance was not specifically addressed in the natural circulation testing; however, the parameters used by the T/CCM system (see Section 18.2.13.2) for subcooling calculations were monitored and used to control the natural circulation cooldown. Therefore, the capability of the T/CCM system to function during natural circulation conditions is assured.   
Thermocouple/Core Cooling Monitor (T/CCM) system performance was not specifically addressed in the natural circulation testing; however, the parameters used by the T/CCM system (see Section 18.2.13.2) for subcooling calculations were monitored and used to control the natural circulation cooldown. Therefore, the capability of the T/CCM system to function during natural circulation conditions is assured.   


18.1-40 Rev. 0 WOLF CREEK   3. Procedure Validation - These tests or the simulation make maximum practical use of WCGS written plant procedures to validate the completeness and accuracy of the procedures.
18.1-40 Rev. 0 WOLF CREEK
18.1.18.3  Conclusion The Operating Agent testing and training program meets Item I.G.1 of NUREG-0737.  
: 3. Procedure Validation - These tests or the simulation make maximum practical use of WCGS written plant procedures to validate the completeness and accuracy of the procedures.  
 
18.1.18.3  Conclusion The Operating Agent testing and training program meets Item I.G.1 of NUREG-
 
0737.  
 
18.1-41 Rev. 0 WOLF CREEK Table 18.1-1 (Sheet 1 of 2)
ISEG FUNCTION CROSS REFERENCE ISEG Function Implementing Procedures Examining plant operating characteristics, NRC issuances, industry advisories, reportable
 
events, and other sources of
 
plant design and operating
 
experience information, including plants of similar
 
design, which may indicate
 
areas of plant safety.
AP 20E-001, "Industry Operating Experience Program" 
 
AP 23-006, "System Engineering
 
Program" 
 
AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Through the corrective action
 
program, maintenance rule
 
program and the self assessment
 
program, detailed
 
recommendations are made to the
 
Vice President Engineering for
 
revised procedures, equipment
 
modifications, maintenance
 
activities, operations
 
activities, or other means of
 
improving plant safety.
AP 23-006, "System Engineering
 
Program" 
 
AP 23M-001, "WCGS Maintenance
 
Rule Program" 
 
AP 28A-100, "Condition Reports" AP 28D-001, "Self Assessment
 
Process" Maintaining surveillance of
 
plant activities to provide
 
independent verification that
 
these activities are performed
 
correctly and that human errors
 
are reduced as much as
 
practical.
AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" 
 
AP 23M-001, "WCGS Maintenance
 
Rule Program" 
 
AP 28D-001, "Self Assessment
 
Process" Independent review of plant
 
activities and operating
 
experience information.
AP 20E-001, "Industry Operating Experience Program" 
 
AP 23-006, "System Engineering
 
Program" 
 
AI 17C-006, "Results Engineering Program" Perform independent technical
 
evaluations of plant
 
maintenance, modifications, operational problems, operational analysis activities AP 23-006, "System Engineering
 
Program" 
 
AP 23M-001, "WCGS Maintenance
 
Rule Program" 
 
AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" 
 
AP 05-002, "Dispositions and
 
Change Packages" 
 
Rev. 27 WOLF CREEK Table 18.1-1 (Sheet 2 of 2)
ISEG FUNCTION CROSS REFERENCE ISEG Function Implementing Procedures Develop appropriate detailed recommendations for revisions
 
to procedures or modifications
 
to equipment as may be
 
necessary.
AP 23M-001, "WCGS Maintenance
 
Rule Program" 
 
AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Survey plant maintenance
 
operations and test activities
 
to provide verification
 
independent of the plant in
 
accordance with established
 
procedures.
AP 23-006, "System Engineering
 
Program" 
 
AP 23M-001, "WCGS Maintenance
 
Rule Program" 
 
AI 17C-006, "Results Engineering Program"
 
Rev. 27 WOLF CREEK 18.2  SITING AND DESIGN 18.2.1  POSTACCIDENT REACTOR COOLANT SYSTEM VENTING (II.B.1) 18.2.1.1  NRC Guidance Per NUREG0737 Position Each applicant and licensee shall install reactor coolant system (RCS) and reactor vessel head high point vents remotely operated from the control room.
 
Although the purpose of the system is to vent noncondensible gases from the RCS
 
which may inhibit core cooling during natural circulation, the vents must not lead to an unacceptable increase in the probability of a lossofcoolant
 
accident (LOCA) or a challenge to containment integrity. Since these vents
 
form a part of the reactor coolant pressure boundary, the design of the vents
 
shall conform to the requirements of Appendix A to 10 CFR Part 50, "General
 
Design Criteria."  The vent system shall be designed with sufficient redundancy
 
that ensures a low probability of inadvertent or irreversible actuation.
Each licensee shall provide the following information concerning the design and operation of the high point vent system:
: 1. Submit a description of the design, location, size, and power supply for the vent system along with results of analyses for lossofcoolant accidents initiated by a
 
break in the vent pipe. The results of the analyses
 
should demonstrate compliance with the acceptance
 
criteria of 10 CFR 50.46.
: 2. Submit procedures and supporting analysis for operator use of the vents that also include the information
 
available to the operator for initiating or terminating
 
vent usage.
Clarification
 
A. General
: 1. The important safety function enhanced by this venting capability is core cooling. For events
 
beyond the present design basis, this venting
 
capability will substantially increase the plant's
 
ability to deal with large quantities of
 
noncondensible gas which could interfere with core
 
cooling.                              18.21                        Rev. 0 WOLF CREEK
: 2. Procedures addressing the use of the reactor coolant system vents should define the conditions
 
under which the vents should be used as well as the
 
conditions under which the vents should not be
 
used. The procedures should be directed toward
 
achieving a substantial increase in the plant being
 
able to maintain core cooling without loss of
 
containment integrity for events beyond the design
 
basis. The use of vents for accidents within the
 
normal design basis must not result in a violation
 
of the requirements of 10CFR50.44 or 10CFR50.46.
: 3. The size of the reactor coolant vents is not a critical issue. The desired venting capability can
 
be achieved with vents in a fairly broad spectrum
 
of sizes. The criteria for sizing a vent can be
 
developed in several ways. One approach, which may
 
be considered, is to specify a volume of
 
noncondensible gas to be vented and in a specific
 
venting time. For containments particularly
 
vulnerable to failure from large hydrogen releases
 
over a short period of time, the necessity and
 
desirability for contained venting outside the
 
containment must be considered (e.g., into a decay
 
gas collection and storage system).
: 4. Where practical, the reactor coolant system vents should be kept smaller than the size corresponding
 
to the definition of LOCA (10 CFR 50, Appendix A).
 
This will minimize the challenges to the emergency
 
core cooling system (ECCS) since the inadvertent
 
opening of a vent smaller than the LOCA definition
 
would not require ECCS actuation, although it may
 
result in leakage beyond technical specification
 
limits. On PWRs, the use of new or existing lines
 
whose smallest orifice is larger than the LOCA
 
definition will require a valve in series with a
 
vent valve that can be closed from the control room
 
to terminate the LOCA that would result if an open
 
vent valve could not be reclosed.
: 5. A positive indication of valve position should be provided in the control room.
: 6. The reactor coolant vent system shall be operable from the control room.
: 7. Since the reactor coolant system vent will be part of the reactor coolant system pressure boundary,                              18.22                        Rev. 0 WOLF CREEK all requirements for the reactor pressure boundary must be met, and, in addition, sufficient redundancy should be incorporated into the design to minimize the probability of an inadvertent actuation of the system. Administrative procedures may be a viable option to meet the singlefailure criterion. For vents larger than the LOCA definition, an analysis is required to demonstrate compliance with 10CFR50.46.
: 8. The probability of a vent path failing to close,  once opened, should be minimized; this is a new requirement. Each vent must have its power supplied from an emergency bus. A single failure within the power and control aspects of the reactor coolant vent system should not prevent isolation of the entire vent system, when required. On BWRs,  block valves are not required in lines with safety valves that are used for venting.
: 9. Vent paths from the primary system to within containment should go to those areas that provide good mixing with containment air.
: 10. The reactor coolant vent system (i.e., vent valves,  block valves, position indication devices, cable terminations, and piping) shall be seismically and environmentally qualified in accordance with IEEE 3441975 as supplemented by Regulatory Guide 1.100,  1.92 and SEP 3.92, 3.43, and 3.10. Environmental qualifications are in accordance with the May 23,  1980 Commission Order and Memorandum (CLI8021).
: 11. Provisions to test for  operability of the reactor coolant vent system should be a part of the design. Testing should be performed in accordance with the ASME Code.
: 12. It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A humanfactor analysis should be performed taking into consideration:
: a. The use of this information by an operator during both normal and abnormal plant conditions. 18.23 Rev. 20 WOLF CREEK
: b. Integration into emergency procedures.
: c. Integration into operator training.
: d. Other alarms during emergency and need for prioritization of alarms. B. PWR Vent Design Considerations
: 1. Each PWR licensee should provide the capability to vent the reactor vessel head. The reactor vessel head vent should be capable of venting noncondensible gas from the reactor vessel hot legs (to the elevation of the top of the outlet nozzle) and cold legs (through head jets and other leakage paths).
: 2. Additional venting capability is required for those portions of each hot leg that cannot be vented through the reactor vessel head vent or pressurizer. It is impractical to vent each of the many thousands of tubes in a Utube steam generator; however, the staff believes that a procedure can be developed that ensures that sufficient liquid or steam can enter the Utube region so that decay heat can be effectively removed from the RCS. Such operating procedures should incorporate this consideration.
: 3. Venting of the pressurizer is required to ensure its availability for system pressure and volume control. These are important considerations,  especially during natural circulation.
18.2.1.2  The Operating Agent Response
 
The WCGS design provides the capability of venting the RCS to ensure that, if noncondensible gases become present in the RCS, regardless of the means
 
postulated for generation of such noncondensibles, gases can be vented from the
 
system, thereby ensuring that the flow paths associated with natural
 
circulation core cooling capability are maintained. The venting capability is provided by the existing redundant pressurizer poweroperated relief valves (PORVs) and their associated motoroperated isolation valves which can be used
 
for the venting of the pressurizer and by the reactor vessel head vent system
 
which provides redundant venting capability of the reactor vessel, RCS hot leg
 
piping, and RCS cold leg piping via bypass leakage paths to the vessel head.
 
The design features of these systems are discussed below. 18.24 Rev. 0 WOLF CREEK The capability for venting of the pressurizer and the reactor vessel head is provided via safety grade, Class IE, environmentally qualified, seismic
 
Category I, redundant systems, which meet the single failure criteria assuring
 
both vent opening and vent closing capabilities. Block valves are an integral
 
part of both the pressurizer and reactor vessel head vent system and meet the
 
same qualification requirements as the vent valves.
The size of the RCS vents is determined as follows:
: 1. The pressurizer vent was based on the existing PORV (3 inch valve) capabilities.      2. The reactor vessel head vent system incorporates a 3/8 inch orifice to limit the maximum reactor coolant flow
 
rate to a value less than that which defines a LOCA (see Figure 18.21). The design provides for a motoroperated isolation valve in series with each pressurizer PORV. These PORV isolation valves may be either remotely actuated
 
from the control room or automatically closed based on an RCS pressure
 
setpoint. The setpoint is selected based on providing isolation prior to actuation of the safety injection system. Control room indication is provided
 
for the pressurizer PORVs and PORV isolation valves and for the reactor vessel
 
head vent valves. Each vent is remotely operable from the control room. An
 
individual handswitch is provided for each valve.
The design of the RCS venting systems minimizes the probability of an inadvertent opening and consequence of such an opening.
: 1. The pressurizer vent system:
 
The pressurizer PORVs are normally closed, Class IE solenoid valves that energize to open. Thus, loss of
 
power will not actuate these valves. The PORV isolation valves are normally open, motoroperated valves. As
 
discussed above, assuming an inadvertent opening of the
 
PORV or its failure to close, a protection grade Class
 
IE signal is provided to automatically close the
 
associated block valve.
: 2. The reactor vessel head vent system:
 
Each of the redundant vent paths off of the reactor          vessel head contains two inseries, normally closed, same safety train, Class IE, environmentally qualified
 
solenoid valves. The two normally closed valves in
 
series limit any postulated events which could result in
 
an inadvertent opening of the vent.                              18.25                        Rev. 4 WOLF CREEK The pressurizer vents to the pressurizer relief tank. The reactor vessel head vent system valves are located on the CRDM seismic support platform above the
 
reactor vessel. The discharge from these valves is directed to the open area
 
of the containment above the refueling pool. This area precludes the potential
 
for forming stagnant pockets of vented gases. Mixing and cooling of the vented
 
gases is accomplished using permanent plant systems.
The Westinghouse Owners Group (WOG) has developed a generic reactor vessel head vent guideline. The Operating Agent has considered the generic guidance
 
developed by the WOG in the development of procedures for use of the head vent
 
system.18.2.1.3  Conclusion The WCGS design for the postaccident reactor coolant system vent system meets the applicable requirements of item II.B.1 of NUREG0737.
18.2.2  DESIGN REVIEW OF THE PLANT SHIELDING (II.B.2) 18.2.2.1  NRC Guidance Per NUREG0737 Position With the assumption of a postaccident release of radioactivity equivalent to that described in Regulatory Guides 1.3 and 1.4 (i.e., the equivalent of 50
 
percent of the core radioiodine, 100 percent of the core noble gas inventory, and 1 percent of the core solids are contained in the primary coolant), each licensee shall perform a radiation and shieldingdesign review of the spaces
 
around systems that may, as a result of an accident, contain highly radioactive
 
materials. The design review should identify the location of vital areas and
 
equipment, such as the control room, radwaste control stations, emergency power
 
supplies, motor control centers, and instrument areas, in which personnel
 
occupancy may be unduly limited or safety equipment may be unduly degraded by
 
the radiation fields during postaccident operations of these systems.
Each licensee shall provide for adequate access to vital areas and protection of safety equipment by design changes, increased permanent or temporary
 
shielding, or postaccident procedural controls. The design review shall
 
determine which types of corrective actions are needed for vital areas
 
throughout the facility.                              18.26                        Rev. 0 WOLF CREEK Clarification The purpose of this item is to ensure that licensees examine their plants to determine what actions can be taken over the shortterm to reduce radiation
 
levels and increase the capability of operators to control and mitigate the
 
consequences of an accident. These actions should be taken pending conclusions resulting in the longterm degraded core rulemaking, which may result in a need
 
to consider additional sources.
Any area which will or may require occupancy to permit an operator to aid in the mitigation of or recovery from an accident is designated as a vital area.
 
For the purposes of this evaluation, vital areas and equipment are not
 
necessarily the same vital areas or equipment defined in 10 CFR 73.2 for
 
security purposes. The security center is listed as an area to be considered
 
as potentially vital, since access to this area may be necessary to take action
 
to give access to other areas in the plant.
The control room, technical support center (TSC), sampling station, and sample analysis area must be included among those areas where access is considered
 
vital after an accident.  (See Item III.A.1.2 for discussion of the TSC and
 
emergency operations facility.)  The evaluation to determine the necessary
 
vital areas should also include, but not be limited to, consideration of the postLOCA hydrogen control system, containment isolation reset control area, manual ECCS alignment area (if any), motor control centers, instrument panels, emergency power supplies, security center, and radwaste control panels. Dose
 
rate determinations need not be for these areas if they are determined not to
 
be vital.
As a minimum, necessary modifications must be sufficient to provide for vital system operation and for occupancy of the control room, TSC, sampling station, and sample analysis area.
In order to ensure that personnel can perform the necessary postaccident operations in the vital areas, the following guidance is to be used by
 
licensees to evaluate the adequacy of radiation protection to the operators:
: 1. Source Term
 
The minimum radioactive source term should be equivalent to the source terms recommended in Regulatory Guides
 
1.3, 1.4, and 1.7 and Standard Review Plan 15.6.5 with
 
appropriate decay times based on plant design (i.e., you
 
may assume that the radioactive decay that occurs before
 
fission products can be transported to various systems).                              18.27                        Rev. 0 WOLF CREEK          a. LiquidContaining Systems:  100 percent of the core equilibrium noble gas inventory, 50 percent of the
 
core equilibrium halogen inventory, and 1 percent
 
of all others are assumed to be mixed in the
 
reactor coolant and liquids recirculated by residual heat removal (RHR), highpressure coolant injection (HPCI), and lowpressure coolant
 
injection (LPCI), or the equivalent of these
 
systems. In determining the source term for
 
recirculated, depressurized cooling water, you may
 
assume that the water contains no noble gases.          b. GasContaining Systems:  100 percent of the core equilibrium noble gas inventory and 25 percent of
 
the core equilibrium halogen activity are assumed
 
to be mixed in the containment atmosphere. For vaporcontaining lines connected to the primary
 
system (e.g., BWR steam lines), the concentration
 
of radioactivity shall be determined, assuming that
 
the activity is contained in the vapor space in the
 
primary coolant system.
: 2. Systems Containing the Source
 
Systems assumed in your analysis to contain high levels of radioactivity in a postaccident situation should
 
include, but not be limited to, containment, residual
 
heat removal system, safety injection systems, chemical
 
and volume control system (CVCS), containment spray
 
recirculation system, sample lines, gaseous radwaste
 
systems, and standby gas treatment systems (or
 
equivalent of these systems). If any of these systems
 
or others that could contain high levels of
 
radioactivity were excluded, you should explain why such
 
systems were excluded. Radiation from the leakage of
 
systems located outside of the containment need not be
 
considered for this analysis. Leakage measurement and
 
reduction is treated under Item III.D.1.1, "Integrity of
 
Systems Outside Containment Likely To Contain
 
Radioactive Material for PWRs and BWRs."  Liquid waste
 
systems need not be included in this analysis.
 
Modifications to liquid waste systems will be considered
 
after completion of Item III.D.1.4, "Radwaste System
 
Design Features To Aid in Accident Recovery and
 
Decontamination."                              18.28                        Rev. 0 WOLF CREEK
: 3. Dose Rate Criteria The design dose rate for personnel in a vital area should be such that the guidelines of GDC 19 will not be
 
exceeded during the course of the accident. GDC 19
 
requires that adequate radiation protection be provided


18.1-41 Rev. 0 WOLF CREEK  Table 18.1-1  (Sheet 1 of 2)  ISEG FUNCTION CROSS REFERENCE  ISEG Function  Implementing Procedures  Examining plant operating characteristics, NRC issuances, industry advisories, reportable events, and other sources of plant design and operating experience information, including plants of similar design, which may indicate areas of plant safety. AP 20E-001, "Industry Operating Experience Program" AP 23-006, "System Engineering Program" AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Through the corrective action program, maintenance rule program and the self assessment program, detailed recommendations are made to the Vice President Engineering for revised procedures, equipment modifications, maintenance activities, operations activities, or other means of improving plant safety. AP 23-006, "System Engineering Program" AP 23M-001, "WCGS Maintenance Rule Program" AP 28A-100, "Condition Reports" AP 28D-001, "Self Assessment Process"  Maintaining surveillance of plant activities to provide independent verification that these activities are performed correctly and that human errors are reduced as much as practical. AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" AP 23M-001, "WCGS Maintenance Rule Program" AP 28D-001, "Self Assessment Process" Independent review of plant activities and operating experience information. AP 20E-001, "Industry Operating Experience Program" AP 23-006, "System Engineering Program" AI 17C-006, "Results Engineering Program" Perform independent technical evaluations of plant maintenance, modifications, operational problems, operational analysis activities AP 23-006, "System Engineering Program" AP 23M-001, "WCGS Maintenance Rule Program" AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" AP 05-002, "Dispositions and Change Packages" Rev. 27 WOLF CREEK  Table 18.1-1  (Sheet 2 of 2)  ISEG FUNCTION CROSS REFERENCE    ISEG Function  Implementing Procedures Develop appropriate detailed recommendations for revisions to procedures or modifications to equipment as may be necessary. AP 23M-001, "WCGS Maintenance Rule Program" AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Survey plant maintenance operations and test activities to provide verification independent of the plant in accordance with established procedures. AP 23-006, "System Engineering Program" AP 23M-001, "WCGS Maintenance Rule Program" AI 17C-006, "Results Engineering Program" 
such that the dose to personnel should not be in excess


Rev. 27 WOLF CREEK 18.2  SITING AND DESIGN 18.2.1  POSTACCIDENT REACTOR COOLANT SYSTEM VENTING (II.B.1) 18.2.1.1  NRC Guidance Per NUREG0737Position Each applicant and licensee shall install reactor coolant system (RCS) and reactor vessel head high point vents remotely operated from the control room.
of 5 rem whole body, or its equivalent to any part of  
Although the purpose of the system is to vent noncondensible gases from the RCS which may inhibit core cooling during natural circulation, the vents must not lead to an unacceptable increase in the probability of a lossofcoolant accident (LOCA) or a challenge to containment integrity. Since these vents form a part of the reactor coolant pressure boundary, the design of the vents shall conform to the requirements of Appendix A to 10 CFR Part 50, "General Design Criteria."  The vent system shall be designed with sufficient redundancy that ensures a low probability of inadvertent or irreversible actuation. Each licensee shall provide the following information concerning the design and operation of the high point vent system:      1. Submit a description of the design, location, size, and          power supply for the vent system along with results of analyses for lossofcoolant accidents initiated by a break in the vent pipe. The results of the analyses should demonstrate compliance with the acceptance criteria of 10 CFR 50.46.      2. Submit procedures and supporting analysis for operator          use of the vents that also include the information available to the operator for initiating or terminating vent usage. Clarification A. General
: 1. The important safety function enhanced by this                venting capability is core cooling. For events beyond the present design basis, this venting capability will substantially increase the plant's ability to deal with large quantities of noncondensible gas which could interfere with core cooling.                              18.21                        Rev. 0 WOLF CREEK          2. Procedures addressing the use of the reactor                coolant system vents should define the conditions under which the vents should be used as well as the conditions under which the vents should not be used. The procedures should be directed toward achieving a substantial increase in the plant being able to maintain core cooling without loss of containment integrity for events beyond the design basis. The use of vents for accidents within the normal design basis must not result in a violation of the requirements of 10CFR50.44 or 10CFR50.46.          3. The size of the reactor coolant vents is not a                critical issue. The desired venting capability can be achieved with vents in a fairly broad spectrum of sizes. The criteria for sizing a vent can be developed in several ways. One approach, which may be considered, is to specify a volume of noncondensible gas to be vented and in a specific venting time. For containments particularly vulnerable to failure from large hydrogen releases over a short period of time, the necessity and desirability for contained venting outside the containment must be considered (e.g., into a decay gas collection and storage system).          4. Where practical, the reactor coolant system vents                should be kept smaller than the size corresponding to the definition of LOCA (10 CFR 50, Appendix A).
This will minimize the challenges to the emergency core cooling system (ECCS) since the inadvertent opening of a vent smaller than the LOCA definition would not require ECCS actuation, although it may result in leakage beyond technical specification limits. On PWRs, the use of new or existing lines whose smallest orifice is larger than the LOCA definition will require a valve in series with a vent valve that can be closed from the control room to terminate the LOCA that would result if an open vent valve could not be reclosed.          5. A positive indication of valve position should be                provided in the control room.          6. The reactor coolant vent system shall be operable                from the control room.          7. Since the reactor coolant system vent will be part                of the reactor coolant system pressure boundary,                              18.22                        Rev. 0 WOLF CREEK  all requirements for the reactor pressure boundary  must be met, and, in addition, sufficient  redundancy should be incorporated into the design  to minimize the probability of an inadvertent  actuation of the system. Administrative procedures  may be a viable option to meet the singlefailure  criterion. For vents larger than the LOCA  definition, an analysis is required to demonstrate  compliance with 10CFR50.46. 8. The probability of a vent path failing to close,  once opened, should be minimized; this is a new  requirement. Each vent must have its power  supplied from an emergency bus. A single failure  within the power and control aspects of the reactor  coolant vent system should not prevent isolation of  the entire vent system, when required. On BWRs,  block valves are not required in lines with safety  valves that are used for venting. 9. Vent paths from the primary system to within  containment should go to those areas that provide  good mixing with containment air. 10. The reactor coolant vent system (i.e., vent valves,  block valves, position indication devices, cable  terminations, and piping) shall be seismically and  environmentally qualified in accordance with IEEE  3441975 as supplemented by Regulatory Guide 1.100,  1.92 and SEP 3.92, 3.43, and 3.10. Environmental  qualifications are in accordance with the May 23,  1980 Commission Order and Memorandum (CLI8021). 11. Provisions to test for  operability of the reactor  coolant vent system should be a part of the  design. Testing should be performed in accordance  with the ASME Code. 12. It is important that the displays and controls  added to the control room as a result of this  requirement not increase the potential for operator  error. A humanfactor analysis should be performed  taking into consideration:  a. The use of this information by an operator  during both normal and abnormal plant  conditions. 18.23 Rev. 20 WOLF CREEK  b. Integration into emergency procedures. c. Integration into operator training. d. Other alarms during emergency and need for  prioritization of alarms. B. PWR Vent Design Considerations  1. Each PWR licensee should provide the capability to  vent the reactor vessel head. The reactor vessel  head vent should be capable of venting  noncondensible gas from the reactor vessel hot legs  (to the elevation of the top of the outlet nozzle)  and cold legs (through head jets and other leakage  paths).
: 2. Additional venting capability is required for those  portions of each hot leg that cannot be vented  through the reactor vessel head vent or  pressurizer. It is impractical to vent each of the  many thousands of tubes in a Utube steam  generator; however, the staff believes that a  procedure can be developed that ensures that  sufficient liquid or steam can enter the Utube  region so that decay heat can be effectively  removed from the RCS. Such operating procedures  should incorporate this consideration. 3. Venting of the pressurizer is required to ensure  its availability for system pressure and volume  control. These are important considerations,  especially during natural circulation. 18.2.1.2  The Operating Agent Response The WCGS design provides the capability of venting the RCS to ensure that, if noncondensible gases become present in the RCS, regardless of the means postulated for generation of such noncondensibles, gases can be vented from the system, thereby ensuring that the flow paths associated with natural circulation core cooling capability are maintained. The venting capability is provided by the existing redundant pressurizer poweroperated relief valves (PORVs) and their associated motoroperated isolation valves which can be used for the venting of the pressurizer and by the reactor vessel head vent system which provides redundant venting capability of the reactor vessel, RCS hot leg piping, and RCS cold leg piping via bypass leakage paths to the vessel head.
The design features of these systems are discussed below. 18.24 Rev. 0 WOLF CREEK The capability for venting of the pressurizer and the reactor vessel head is provided via safety grade, Class IE, environmentally qualified, seismic Category I, redundant systems, which meet the single failure criteria assuring both vent opening and vent closing capabilities. Block valves are an integral part of both the pressurizer and reactor vessel head vent system and meet the same qualification requirements as the vent valves. The size of the RCS vents is determined as follows:
: 1. The pressurizer vent was based on the existing PORV (3          inch valve) capabilities.      2. The reactor vessel head vent system incorporates a 3/8          inch orifice to limit the maximum reactor coolant flow rate to a value less than that which defines a LOCA (see Figure 18.21). The design provides for a motoroperated isolation valve in series with each pressurizer PORV. These PORV isolation valves may be either remotely actuated from the control room or automatically closed based on an RCS pressure setpoint. The setpoint is selected based on providing isolation prior toactuation of the safety injection system. Control room indication is provided for the pressurizer PORVs and PORV isolation valves and for the reactor vessel head vent valves. Each vent is remotely operable from the control room. An individual handswitch is provided for each valve. The design of the RCS venting systems minimizes the probability of an inadvertent opening and consequence of such an opening.      1. The pressurizer vent system:
The pressurizer PORVs are normally closed, Class IE          solenoid valves that energize to open. Thus, loss of power will not actuate these valves. The PORV isolation valves are normally open, motoroperated valves. As discussed above, assuming an inadvertent opening of the PORV or its failure to close, a protection grade Class IE signal is provided to automatically close the associated block valve.      2. The reactor vessel head vent system:
Each of the redundant vent paths off of the reactor          vessel head contains two inseries, normally closed, same safety train, Class IE, environmentally qualified solenoid valves. The two normally closed valves in series limit any postulated events which could result in an inadvertent opening of the vent.                              18.25                        Rev. 4 WOLF CREEK The pressurizer vents to the pressurizer relief tank. The reactor vessel head vent system valves are located on the CRDM seismic support platform above the reactor vessel. The discharge from these valves is directed to the open area of the containment above the refueling pool. This area precludes the potential for forming stagnant pockets of vented gases. Mixing and cooling of the vented gases is accomplished using permanent plant systems. The Westinghouse Owners Group (WOG) has developed a generic reactor vessel head vent guideline. The Operating Agent has considered the generic guidance developed by the WOG in the development of procedures for use of the head vent system.18.2.1.3  ConclusionThe WCGS design for the postaccident reactor coolant system vent system meets the applicable requirements of item II.B.1 of NUREG0737. 18.2.2  DESIGN REVIEW OF THE PLANT SHIELDING (II.B.2) 18.2.2.1  NRC Guidance Per NUREG0737Position With the assumption of a postaccident release of radioactivity equivalent to that described in Regulatory Guides 1.3 and 1.4 (i.e., the equivalent of 50 percent of the core radioiodine, 100 percent of the core noble gas inventory, and 1 percent of the core solids are contained in the primary coolant), each licensee shall perform a radiation and shieldingdesign review of the spaces around systems that may, as a result of an accident, contain highly radioactive materials. The design review should identify the location of vital areas and equipment, such as the control room, radwaste control stations, emergency power supplies, motor control centers, and instrument areas, in which personnel occupancy may be unduly limited or safety equipment may be unduly degraded by the radiation fields during postaccident operations of these systems. Each licensee shall provide for adequate access to vital areas and protection of safety equipment by design changes, increased permanent or temporary shielding, or postaccident procedural controls. The design review shall determine which types of corrective actions are needed for vital areas throughout the facility.                              18.26                        Rev. 0 WOLF CREEK ClarificationThe purpose of this item is to ensure that licensees examine their plants to determine what actions can be taken over the shortterm to reduce radiation levels and increase the capability of operators to control and mitigate the consequences of an accident. These actions should be taken pending conclusions resulting in the longterm degraded core rulemaking, which may result in a need to consider additional sources. Any area which will or may require occupancy to permit an operator to aid in the mitigation of or recovery from an accident is designated as a vital area.
For the purposes of this evaluation, vital areas and equipment are not necessarily the same vital areas or equipment defined in 10 CFR 73.2 for security purposes. The security center is listed as an area to be considered as potentially vital, since access to this area may be necessary to take action to give access to other areas in the plant. The control room, technical support center (TSC), sampling station, and sample analysis area must be included among those areas where access is considered vital after an accident.  (See Item III.A.1.2 for discussion of the TSC and emergency operations facility.)  The evaluation to determine the necessary vital areas should also include, but not be limited to, consideration of the postLOCA hydrogen control system, containment isolation reset control area, manual ECCS alignment area (if any), motor control centers, instrument panels, emergency power supplies, security center, and radwaste control panels. Dose rate determinations need not be for these areas if they are determined not to be vital. As a minimum, necessary modifications must be sufficient to provide for vital system operation and for occupancy of the control room, TSC, sampling station, and sample analysis area. In order to ensure that personnel can perform the necessary postaccident operations in the vital areas, the following guidance is to be used by licensees to evaluate the adequacy of radiation protection to the operators:      1. Source Term The minimum radioactive source term should be equivalent          to the source terms recommended in Regulatory Guides 1.3, 1.4, and 1.7 and Standard Review Plan 15.6.5 with appropriate decay times based on plant design (i.e., you may assume that the radioactive decay that occurs before fission products can be transported to various systems).                              18.27                        Rev. 0 WOLF CREEK          a. LiquidContaining Systems:  100 percent of the core                equilibrium noble gas inventory, 50 percent of the core equilibrium halogen inventory, and 1 percent of all others are assumed to be mixed in the reactor coolant and liquids recirculated by residual heat removal (RHR), highpressure coolant injection (HPCI), and lowpressure coolant injection (LPCI), or the equivalent of these systems. In determining the source term for recirculated, depressurized cooling water, you may assume that the water contains no noble gases.          b. GasContaining Systems:  100 percent of the core                equilibrium noble gas inventory and 25 percent of the core equilibrium halogen activity are assumed to be mixed in the containment atmosphere. For vaporcontaining lines connected to the primary system (e.g., BWR steam lines), the concentration of radioactivity shall be determined, assuming that the activity is contained in the vapor space in the primary coolant system.      2. Systems Containing the Source Systems assumed in your analysis to contain high levels          of radioactivity in a postaccident situation should include, but not be limited to, containment, residual heat removal system, safety injection systems, chemical and volume control system (CVCS), containment spray recirculation system, sample lines, gaseous radwaste systems, and standby gas treatment systems (or equivalent of these systems). If any of these systems or others that could contain high levels of radioactivity were excluded, you should explain why such systems were excluded. Radiation from the leakage of systems located outside of the containment need not be considered for this analysis. Leakage measurement and reduction is treated under Item III.D.1.1, "Integrity of Systems Outside Containment Likely To Contain Radioactive Material for PWRs and BWRs."  Liquid waste systems need not be included in this analysis.
Modifications to liquid waste systems will be considered after completion of Item III.D.1.4, "Radwaste System Design Features To Aid in Accident Recovery and Decontamination."                              18.28                        Rev. 0 WOLF CREEK      3. Dose Rate Criteria          The design dose rate for personnel in a vital area          should be such that the guidelines of GDC 19 will not be exceeded during the course of the accident. GDC 19 requires that adequate radiation protection be provided such that the dose to personnel should not be in excess of 5 rem whole body, or its equivalent to any part of the body for the duration of the accident. When determining the dose to an operator, care must be taken to determine the necessary occupancy times in a specific area. For example, areas requiring continuous occupancy will require much lower dose rates than areas where minimal occupancy is required. Therefore, allowable dose rates will be based upon expected occupancy, as well as the radioactive source terms and shielding.
However, in order to provide a general design objective, we are providing the following dose rate criteria with alternatives to be documented on a casebycase bases.
The recommended dose rates are average rates in the area. Local hot spots may exceed the dose rate guidelines. These doses are design objectives and are not to be used to limit access in the event of an accident.          a. Areas Requiring Continuous Occupancy: <15 mrem/hr                (averaged over 30 days). These areas will require fulltime occupancy during the course of the accident. The control room and onsite technical support center are areas where continuous occupancy will be required. The dose rate for these areas is based on the control room occupancy factors contained in SRP 6.4.          b. Areas Requiring Infrequent Access:  GDC 19. These                areas may require access on an irregular basis, not continuous occupancy. Shielding should be provided to allow access at a frequency and duration estimated by the licensee. The plant radiochemical/
chemical analysis laboratory, radwaste panel, motor control center, instrumentation locations, and reactor coolant and containment gas sample stations are examples of sites where occupancy may be needed often, but not continuously.      4. Radiation Qualification of SafetyRelated Equipment The review of safetyrelated equipment which may be          unduly degraded by radiation during postaccident operation of this equipment relates to equipment inside and                              18.29                        Rev. 0 WOLF CREEK          outside of the primary containment. Radiation source          terms calculated to determine environmental qualification of safetyrelated equipment consider the following:          a. LOCA events which completely depressurize the                primary system should consider releases of the source term (100 percent noble gases, 50 percent iodines, and 1 percent particulates) to the containment atmosphere.          b. LOCA events in which the primary system may not                depressurize should consider the source term (100 percent noble gases, 50 percent iodines, and 1 percent particulate) to remain in the primary coolant. This method is used to determine the qualification doses for equipment in close proximity to recirculating fluid systems inside and outside of the containment. NonLOCA events both inside and outside of the containment should use 10 percent noble gases, 10 percent iodines, and 0 percent particulate as a source term. The following table summarizes these considerations: ContainmentLOCA Source Term (Noble Gas/Iodine/ Particulate) NonLOCA HighEnergy Line Break Source Term( Noble Gas/Iodine/ Particulate)      %  % Outside  (100/50/1)  (10/10/0)  in RCS  in RCS      Inside  Larger of  (10/10/0)  (100/50/1)  in RCS  in containment or    (100/50/1) in RCS  18.2.2.2  The Operating Agent ResponseThe shielding design criteria used for WCGS is in accordance with NRC Standard Review Plan 12.2 and is described in Section 12.3.2 of the USAR. Two basic plant conditions are the bases of the      18.210    Rev. 0 WOLF CREEK shielding design, normal full power operation, and plant shutdown. The shielding design objectives for these conditions and anticipated operational occurrences, as stated in Section 12.3.2.1, are:      a. To ensure that radiation exposure to plant operating          personnel, contractors, administrators, visitors, and proximate site boundary occupants are ALARA and within the limits of 10 CFR 20.      b. To ensure sufficient personnel access and occupancy time          to allow normal anticipated maintenance, inspection, and safetyrelated operations required for each plant equipment and instrumentation area.      c. To reduce potential equipment neutron activation and          mitigate the possibility of radiation damage to materials.      d. The control room is sufficiently shielded, so that the          direct dose plus the inhalation dose (calculated in Chapter 15.0) will not exceed the limits of GDC19. Radiation zones have been established, based on required personnel access during these plant conditions. 18.2.2.2.1  Design Review of Plant Shielding 18.2.2.2.1.1  General The following discussion provides a description of the design review of plant shielding of spaces around systems that may contain highly radioactive materials as a result of an accident. Systems required to process reactor coolant outside the containment during postaccident conditions were selected for evaluation. The radiation and shielding design review was performed to identify the location of vital areas and equipment such as the control room, sample station, emergency power supplies, motor control centers, and instrument areas, in which personnel occupancy may be unduly limited or safety equipment may be unduly degraded by the radiation fields during postaccident operations of these systems. Additionally, the review results ensure that adequate access to vital areas and protection of safetyrelated equipment are provided. As shown in Figures 18.22 through 18.211, a number of radiation zone maps and associated dose rate decay curves have been produced as a result of the design review. Radiation levels for various areas  around  contaminated systems for various times can be found      18.211    Rev. 0 WOLF CREEK on these maps and curves. Operators may refer to the maps and curves to apprise themselves of the locations of potentially high radiation areas for any time following the postulated accident. These maps and curves are available in the critical postaccident control and support areas, e.g., control room, TSC, etc., for use following postulated DBA's. 18.2.2.2.1.2  Scope of Design Review 18.2.2.2.1.2.1  Systems Engineering Methodology A. Selection of Systems for Shielding Review Plant systems considered in the shielding review are          classified into the following categories:          Category A (Recirculation Systems)
The first category of systems are those systems designed          to mitigate a design basis loss of coolant accident and which might contain highly radioactive sources. Such systems include the emergency core cooling systems.          For the shielding review, the ECCS systems were          postulated to contain significant additional sources of radioactivity in excess of the original plant design basis. The following systems were selected to ensure the radiation safety concern is adequately addressed by the existing plant shielding design:      1. Those portions of the containment spray systems used to          recirculate water from the containment sump back into the containment.      2. Those portions of the residual heat removal systems used          to recirculate water from the containment sump back into the containment.      3. Those portions of the safety injection system used to          recirculate water from the containment sump back into the containment.      4. Those portions of the Chemical and Volume Control System          (CVCS) used to recirculate water from the containment sump back into the containment.      18.212    Rev. 0 WOLF CREEK  Category B (Extensions of Containment Atmosphere)


The second category of systems are the systems or portions of systems which would contain radioactivity by virtue of their connection to the containment atmosphere following an accident. These systems would not be expected to contain a significant level of radioactive sources that are considered in this shielding review, since proper operation of the emergency core cooling systems is expected to prevent extensive core damage. Nevertheless, such sources have been postulated for those portions of the post-accident containment hydrogen analyzer system external to the containment which would contain the atmosphere from the containment. An evaluation was also completed for a post-accident recovery sample should it be needed.  (Amendment 137) Category C (Liquid Samples)  
the body for the duration of the accident. When
 
determining the dose to an operator, care must be taken
 
to determine the necessary occupancy times in a specific
 
area. For example, areas requiring continuous occupancy
 
will require much lower dose rates than areas where
 
minimal occupancy is required. Therefore, allowable
 
dose rates will be based upon expected occupancy, as
 
well as the radioactive source terms and shielding.
 
However, in order to provide a general design objective, we are providing the following dose rate criteria with alternatives to be documented on a casebycase bases.
 
The recommended dose rates are average rates in the
 
area. Local hot spots may exceed the dose rate
 
guidelines. These doses are design objectives and are
 
not to be used to limit access in the event of an
 
accident.
: a. Areas Requiring Continuous Occupancy: <15 mrem/hr (averaged over 30 days). These areas will require fulltime occupancy during the course of the
 
accident. The control room and onsite technical
 
support center are areas where continuous occupancy
 
will be required. The dose rate for these areas is
 
based on the control room occupancy factors
 
contained in SRP 6.4.
: b. Areas Requiring Infrequent Access:  GDC 19. These areas may require access on an irregular basis, not
 
continuous occupancy. Shielding should be provided
 
to allow access at a frequency and duration
 
estimated by the licensee. The plant radiochemical/
 
chemical analysis laboratory, radwaste panel, motor
 
control center, instrumentation locations, and
 
reactor coolant and containment gas sample stations
 
are examples of sites where occupancy may be needed
 
often, but not continuously.      4. Radiation Qualification of SafetyRelated Equipment The review of safetyrelated equipment which may be unduly degraded by radiation during postaccident
 
operation of this equipment relates to equipment
 
inside and                              18.29                        Rev. 0 WOLF CREEK outside of the primary containment. Radiation source terms calculated to determine environmental qualification of safetyrelated equipment consider the
 
following:
: a. LOCA events which completely depressurize the primary system should consider releases of the
 
source term (100 percent noble gases, 50 percent
 
iodines, and 1 percent particulates) to the
 
containment atmosphere.
: b. LOCA events in which the primary system may not depressurize should consider the source term (100
 
percent noble gases, 50 percent iodines, and 1
 
percent particulate) to remain in the primary
 
coolant. This method is used to determine the
 
qualification doses for equipment in close
 
proximity to recirculating fluid systems inside and outside of the containment. NonLOCA events both
 
inside and outside of the containment should use 10
 
percent noble gases, 10 percent iodines, and 0
 
percent particulate as a source term.
The following table summarizes these considerations:
Containment LOCA Source Term (Noble Gas/Iodine/
Particulate) NonLOCA HighEnergy Line Break Source Term( Noble Gas/Iodine/
Particulate)      %  % Outside  (100/50/1)  (10/10/0) in RCS  in RCS      Inside  Larger of  (10/10/0)  (100/50/1)  in RCS  in containment or    (100/50/1) in RCS 18.2.2.2  The Operating Agent Response The shielding design criteria used for WCGS is in accordance with NRC Standard
 
Review Plan 12.2 and is described in Section 12.3.2 of the USAR. Two basic
 
plant conditions are the bases of the      18.210    Rev. 0 WOLF CREEK shielding design, normal full power operation, and plant shutdown. The shielding design objectives for these conditions and anticipated operational
 
occurrences, as stated in Section 12.3.2.1, are:
: a. To ensure that radiation exposure to plant operating personnel, contractors, administrators, visitors, and
 
proximate site boundary occupants are ALARA and within
 
the limits of 10 CFR 20.
: b. To ensure sufficient personnel access and occupancy time to allow normal anticipated maintenance, inspection, and safetyrelated operations required for each plant
 
equipment and instrumentation area.
: c. To reduce potential equipment neutron activation and mitigate the possibility of radiation damage to
 
materials.
: d. The control room is sufficiently shielded, so that the direct dose plus the inhalation dose (calculated in Chapter 15.0) will not exceed the limits of GDC19.
Radiation zones have been established, based on required personnel access during these plant conditions.
18.2.2.2.1  Design Review of Plant Shielding
 
18.2.2.2.1.1  General
 
The following discussion provides a description of the design review of plant shielding of spaces around systems that may contain highly radioactive
 
materials as a result of an accident. Systems required to process reactor coolant outside the containment during postaccident conditions were selected
 
for evaluation.
The radiation and shielding design review was performed to identify the location of vital areas and equipment such as the control room, sample station, emergency power supplies, motor control centers, and instrument areas, in which
 
personnel occupancy may be unduly limited or safety equipment may be unduly degraded by the radiation fields during postaccident operations of these
 
systems. Additionally, the review results ensure that adequate access to vital areas and protection of safetyrelated equipment are provided. As shown in Figures 18.22 through 18.211, a number of radiation zone maps and associated dose rate decay curves have been produced as a result of the design
 
review. Radiation levels for various areas  around  contaminated systems for
 
various times can be found      18.211    Rev. 0 WOLF CREEK on these maps and curves. Operators may refer to the maps and curves to apprise themselves of the locations of potentially high radiation areas for any
 
time following the postulated accident. These maps and curves are available in the critical postaccident control and support areas, e.g., control room, TSC, etc., for use following postulated DBA's.
18.2.2.2.1.2  Scope of Design Review
 
18.2.2.2.1.2.1  Systems Engineering Methodology
 
A. Selection of Systems for Shielding Review
 
Plant systems considered in the shielding review are classified into the following categories:
Category A (Recirculation Systems)
 
The first category of systems are those systems designed to mitigate a design basis loss of coolant accident and
 
which might contain highly radioactive sources. Such
 
systems include the emergency core cooling systems.
For the shielding review, the ECCS systems were postulated to contain significant additional sources of
 
radioactivity in excess of the original plant design
 
basis.
The following systems were selected to ensure the radiation safety concern is adequately addressed by the existing plant shielding design:
: 1. Those portions of the containment spray systems used to recirculate water from the containment sump back into
 
the containment.
: 2. Those portions of the residual heat removal systems used to recirculate water from the containment sump back into
 
the containment.
: 3. Those portions of the safety injection system used to recirculate water from the containment sump back into
 
the containment.
: 4. Those portions of the Chemical and Volume Control System (CVCS) used to recirculate water from the containment
 
sump back into the containment.      18.212    Rev. 0 WOLF CREEK Category B (Extensions of Containment Atmosphere)
 
The second category of systems are the systems or portions of systems which  
 
would contain radioactivity by virtue of their connection to the containment  
 
atmosphere following an accident. These systems would not be expected to  
 
contain a significant level of radioactive sources that are considered in this  
 
shielding review, since proper operation of the emergency core cooling systems  
 
is expected to prevent extensive core damage. Nevertheless, such sources have  
 
been postulated for those portions of the post-accident containment hydrogen analyzer system external to the containment which would contain the atmosphere from the containment. An evaluation was also completed for a post-accident recovery sample should it be needed.  (Amendment 137)
Category C (Liquid Samples)
 
The third category of systems is sampling systems. As discussed in Section
 
18.2.3, NUREG-0737, Task II.B.3 requires that certain post-accident liquid
 
samples be obtained from the reactor coolant system or containment systems.
Samples are no longer needed under this requirement. Those portions of the sampling system which must be used have been evaluated to assure that steps can be taken to obtain a post-accident recovery sample should it be needed. (Amendment 137)  


The third category of systems is sampling systems. As discussed in Section 18.2.3, NUREG-0737, Task II.B.3 requires that certain post-accident liquid samples be obtained from the reactor coolant system or containment systems. Samples are no longer needed under this requirement. Those portions of the sampling system which must be used have been evaluated to assure that steps can be taken to obtain a post-accident recovery sample should it be needed. (Amendment 137)
B. Radioactive Source Release Fractions  
B. Radioactive Source Release Fractions  


Per NUREG-0737, the following release fractions were used as a basis for determining the concentrations for the shielding review:  
Per NUREG-0737, the following release fractions were  
: 1. Source A:  Containment atmosphere - 100 percent noble gases, 25 percent halogens  
 
: 2. Source B:  Reactor coolant - 100 percent noble gases, 50 percent halogens, 1 percent solids  
used as a basis for determining the concentrations for  
: 3. Source C:  Containment sump liquid - 50 percent halogens, 1 percent solids  
 
the shielding review:
: 1. Source A:  Containment atmosphere - 100 percent  
 
noble gases, 25 percent halogens
: 2. Source B:  Reactor coolant - 100 percent noble  
 
gases, 50 percent halogens, 1 percent  
 
solids
: 3. Source C:  Containment sump liquid - 50 percent  
 
halogens, 1 percent solids  
 
These release fractions were applied to the total curies
 
available for the particular chemical species (i.e.,
noble gas, halogens, or solid) for an equilibrium
 
fission product inventory for the WCGS core.
 
18.2-13    Rev. 20 WOLF CREEK The release fraction for Cs was assumed to be 1 percent for the purposes of this shielding review. However, a relationship was developed which related the
 
dose rates calculated, assuming 1 percent Cs, to the dose rate that would be
 
expected if 50 percent of the Cs was released to the liquid source (as
 
recommended by Revision 1 to Regulatory Guide 1.89, "Qualification of Class IE
 
Equipment for Nuclear Power Plants"). This relationship is provided in Figure 18.211. No noble gases were included in the containment sump liquid (Source
 
C) because Regulatory Guide 1.7 has set this precedent in modeling liquids in
 
the containment sump.
C. Source Term Models
 
The preceding section (B) outlines the assumptions used for release fractions for the shielding design review.
 
However, these release fractions are only the first step
 
in modeling the source terms for the activity
 
concentrations in the systems under review. The
 
important modeling parameters, decay time and dilution
 
volume, obviously also affect any shielding analysis.
 
The following sections outline the rationale for the
 
selection of values for these key parameters.
: 1. Decay Time
 
For the first stage of the shielding design review process, no decay time credit was used with the
 
above releases. The primary reason for this was to
 
develop a set of normalized accident radiation zone
 
maps (i.e., no decay) that could be used as a tool
 
by the plant staff along with a set of decay curves


These release fractions were applied to the total curies available for the particular chemical species (i.e.,
to quantitatively assess the plant status quickly
noble gas, halogens, or solid) for an equilibrium fission product inventory for the WCGS core.


18.2-13    Rev. 20 WOLF CREEK The release fraction for Cs was assumed to be 1 percent for the purposes of this shielding review. However, a relationship was developed which related the dose rates calculated, assuming 1 percent Cs, to the dose rate that would be expected if 50 percent of the Cs was released to the liquid source (as recommended by Revision 1 to Regulatory Guide 1.89, "Qualification of Class IE Equipment for Nuclear Power Plants"). This relationship is provided in Figure 18.211. No noble gases were included in the containment sump liquid (Source C) because Regulatory Guide 1.7 has set this precedent in modeling liquids in the containment sump.      C. Source Term Models The preceding section (B) outlines the assumptions used          for release fractions for the shielding design review.
following any abnormal occurrence. Decay curves  
However, these release fractions are only the first step in modeling the source terms for the activity concentrations in the systems under review. The important modeling parameters, decay time and dilution volume, obviously also affect any shielding analysis.
 
The following sections outline the rationale for the selection of values for these key parameters.          1. Decay Time For the first stage of the shielding design review                process, no decay time credit was used with the above releases. The primary reason for this was to develop a set of normalized accident radiation zone maps (i.e., no decay) that could be used as a tool by the plant staff along with a set of decay curves to quantitatively assess the plant status quickly following any abnormal occurrence. Decay curves are provided for the containment atmosphere and containment sump liquid only. Except for areas adjacent to the containment, the sump liquid source will be the dominating contributor.           2. Dilution Volume The volume used for dilution is important, since it               affects the calculations of dose rate in a linear fashion. The following dilution volumes were used with the release fractions and decay times listed above to arrive at the actual source terms used in the shielding reviews:      18.214    Rev. 0 WOLF CREEK               a. Source A:  Containment free volume.               b. Source B:  Reactor coolant system volume.  
are provided for the containment atmosphere and  
: c. Source C:  The volume of water present at the                               time of recirculation (reactor coolant system + refueling water storage tank + accumulator tanks).           3. Associated Sources and Systems For the following systems, the source considered is               listed. Note that normally shut valves were assumed to remain shut.                a. Containment spray system  At the initiation                     of recirculation, Source C was used.                b. Safety injection system  At the initiation of                     recirculation, Source C was used.                c. Residual heat removal system  Source C was                     used for sump recirculation mode.                d. Sampling system  The sources used in the                     shielding design review for sampling systems were as follows:                    Containment air sample  Source A                    Reactor coolant sample  Source B Containment sump sample  Source C                e. CVCS system  The liquid source was Source C.
 
18.2.2.2.1.2.2  Shielding Design Review Methodology A. Analytical Shielding Techniques The previous sections outlined the rationale and           assumptions used for the selection of the systems in the shielding design review, as well as the formulation of the sources for those systems. The next step in the review process was to use those sources to estimate dose rates from those selected systems. The dose rates were determined using a pointkernel computer code developed by Bechtel. This code utilizes the semiempirical methods developed by Rockwell (Reference 8) for calculating the direct gamma dose rates. To determine the dose rate contribution from the containment, QADCG (Reference 9) was used. For corridors outside compartments, reviews were done to check the dose rate transmitted into the corridor through the walls  of adjacent      18.215    Rev. 0 WOLF CREEK           compartments. Checks were also made for any piping or           equipment that could directly contribute to corridor dose rates, i.e., piping that may be running directly in the corridor or equipment/piping in a compartment that could shine directly into corridors with no attenuation through compartment walls.     B. Accident Radiation Zone Maps Radiation levels are evaluated using the radiation zone          maps, Figures 18.22 through 18.29, and associated decay curves, Figures 18.210 and 18.211, and are considered in parallel with required operator actions.           The zone boundaries were formulated based on the           following rationale:  
containment sump liquid only. Except for areas  
 
adjacent to the containment, the sump liquid source  
 
will be the dominating contributor.
: 2. Dilution Volume  
 
The volume used for dilution is important, since it affects the calculations of dose rate in a linear  
 
fashion. The following dilution volumes were used  
 
with the release fractions and decay times listed  
 
above to arrive at the actual source terms used in  
 
the shielding reviews:      18.214    Rev. 0 WOLF CREEK
: a. Source A:  Containment free volume.
: b. Source B:  Reactor coolant system volume.
: c. Source C:  The volume of water present at the time of recirculation (reactor  
 
coolant system + refueling water  
 
storage tank + accumulator tanks).
: 3. Associated Sources and Systems  
 
For the following systems, the source considered is listed. Note that normally shut valves were  
 
assumed to remain shut.                a. Containment spray system  At the initiation of recirculation, Source C was used.                b. Safety injection system  At the initiation of recirculation, Source C was used.                c. Residual heat removal system  Source C was used for sump recirculation mode.                d. Sampling system  The sources used in the shielding design review for sampling systems  
 
were as follows:                    Containment air sample  Source A                    Reactor coolant sample  Source B Containment sump sample  Source C                e. CVCS system  The liquid source was Source C.  
 
18.2.2.2.1.2.2  Shielding Design Review Methodology  
 
A. Analytical Shielding Techniques  
 
The previous sections outlined the rationale and assumptions used for the selection of the systems in the  
 
shielding design review, as well as the formulation of  
 
the sources for those systems. The next step in the  
 
review process was to use those sources to estimate dose  
 
rates from those selected systems. The dose rates were determined using a pointkernel computer code developed by Bechtel. This code utilizes the semiempirical  
 
methods developed by Rockwell (Reference 8) for  
 
calculating the direct gamma dose rates. To determine the dose rate contribution from the containment, QADCG  
 
(Reference 9) was used. For corridors outside  
 
compartments, reviews were done to check the dose rate  
 
transmitted into the corridor through the walls  of  
 
adjacent      18.215    Rev. 0 WOLF CREEK compartments. Checks were also made for any piping or equipment that could directly contribute to corridor  
 
dose rates, i.e., piping that may be running directly in  
 
the corridor or equipment/piping in a compartment that  
 
could shine directly into corridors with no attenuation  
 
through compartment walls.
B. Accident Radiation Zone Maps  
 
Radiation levels are evaluated using the radiation zone          maps, Figures 18.22 through 18.29, and associated decay curves, Figures 18.210 and 18.211, and are  
 
considered in parallel with required operator actions.
The zone boundaries were formulated based on the following rationale:  
 
                                          .
 
Zone                        D, Zone Dose Rate Limits
 
Designation Rationale (Rem/hr)
                                                    .              AI      The first zone is          0  D  0.015                      consistent with the personnel radiation
 
exposure guidelines
 
of Task II.B.2 of NUREG0737 for vital
 
areas.
 
                                                        .            AII      The second zone is con  0.015  D  0.100                      sistent with the person nel radiation exposure
 
guidelines of Task II.B.2 of NUREG0737 for vital
 
areas requiring infrequent
 
access or corridors to
 
these areas. Such zones involve no time and mo
 
tion evaluations.
 
                                                        .            AIII    The third zone is con    0.100 < D  5                      sistent with the person nel radiation exposure
 
guidelines of Task II.B.2 of NUREG0737. Zones in
 
this range required that a
 
time and motion study be done to ensure that inte
 
grated exposure was not
 
greater than 5 Rem as given
 
in General Design Criteria 19.      18.216    Rev. 0 WOLF CREEK
                                           .
                                           .
Zone                        D, Zone Dose Rate Limits Designation      Rationale              (Rem/hr)                                                    .              AI      The first zone is          0  D  0.015                      consistent with the                      personnel radiation exposure guidelines of Task II.B.2 of NUREG0737 for vital areas.
Zone                        D, Zone Dose Rate Limits  
                                                        .            AII      The second zone is con  0.015  D  0.100                      sistent with the person                      nel radiation exposure guidelines of Task II.B.2 of NUREG0737 for vital areas requiring infrequent access or corridors to these areas. Such zones involve no time and mo tion evaluations.
 
                                                        .            AIII    The third zone is con    0.100 < D  5                      sistent with the person                      nel radiation exposure guidelines of Task II.B.2 of NUREG0737. Zones in this range required that a time and motion study be done to ensure that inte grated exposure was not greater than 5 Rem as given in General Design Criteria 19.      18.216    Rev. 0 WOLF CREEK                                          .              Zone                        D, Zone Dose Rate Limits Designation     Rationale               (Rem/hr)_______                                                    .            AIV                                5 < D  50                                                      .
Designation Rationale (Rem/hr)
_______                                                    .            AIV                                5 < D  50                                                      .
AV                                50 < D  500                                                      .
AV                                50 < D  500                                                      .
AVI                                500 < D  5000                                                        .
AVI                                500 < D  5000                                                        .
AVII                              5000 < D  50,000                                                          .            AVIII                              50,000 < D  500,000 18.2.2.2.1.2.3  Personnel Exposure Limits and Methodology     A. Access Operator actions that are required postLOCA were           reviewed to ensure that first priority safety actions can be achieved in the postulated radiation fields.
AVII                              5000 < D  50,000                                                          .            AVIII                              50,000 < D  500,000 18.2.2.2.1.2.3  Personnel Exposure Limits and Methodology A. Access Operator actions that are required postLOCA were reviewed to ensure that first priority safety actions  
This review ensures that access is available and required operator actions can be achieved as discussed in Section 18.2.2.2.1.3.     B. Personnel Radiation Exposure Guidelines The general basis for personnel radiation exposure           guidelines was 10 CFR 50, Appendix A, GDC 19. The following additional radiation limit guidelines were used to evaluate occupancy and accessibility of plant vital areas. General area dose rates were used rather than maximum surface dose rates. Contributions from all sources were considered.           1. Vital areas requiring continuous occupancy Vital areas such as control room, counting room,                laboratory, and the onsite technical support center were verified to ensure the direct dose rate was less than 15 mr/hr. The 30 day average direct radiation dose rate is less than 15 mr/hr for the SAS room and the control room toilet.      18.217    Rev. 0 WOLF CREEK           2. Vital areas requiring infrequent access or               corridors to these vital areas               For these areas, the dose rate was verified to be               less than 5 R/hr except as noted in Section 18.2.2.2.1.3. 18.2.2.2.1.3  Results of Review The shielding design criteria and objectives have been met in the design of WCGS. These criteria and objectives have been extended to the areas designated to be the onsite Technical Support Center and the Operations Support Center, as required by the expected occupancy of these areas. The following is a discussion of the impact of a postulated LOCA or TMI2 type event on the WCGS shielding design and is based on the WCGS specific system design capabilities:     A. LOCA Assuming a DBA LOCA with radiation source terms           consistent with Regulatory Guides 1.4 and 1.7, plus the Cs fraction discussed in Section 18.2.2.2.1.2.1, all safetyrelated equipment and instrumentation will be qualified for the maximum equipment doses associated with the time that the equipment must function. All safetyrelated systems operations are performed either automatically or remote manually from the control room.
 
Operations within the auxiliary building are not expected following a LOCA. During the longterm recovery phase, access to sample stations in the auxiliary building may be limited. Should a sample be requested, conditions will determine what stepswill be taken to assure dose is ALARA. Due to Amendment 137, PASS is no longer used. As discussed above, the dose limitations of GDC19 for control room operators are met.      B. TMI2          WCGS is designed to preclude events similar to the TMI2           event. For example, the WCGS design includes reactor coolant system high point vents (as discussed in Section 18.2.1) and the associated Class IE instrumentation required to detect inadequate core cooling and thus precludes the degradation of the fuel cladding and any massive release of activity to the coolant. However, assuming that a TMI2 event does occur, contamination      18.218    Rev. 20 WOLF CREEK           of the auxiliary building is precluded by design:  1)           Compliance with containment isolation criteria is described in Section 6.2.4 and Section 18.2.11 and precludes contamination of the auxiliary building by auxiliary systems, and 2) the WCGS design includes a dedicated, safetyrelated letdown system located totally within the containment which provides controlled letdown capability to the pressurizer relief tank, eliminating any operational need to contaminate the chemical and volume control system in the auxiliary building. Based on the above, dose rates were not evaluated in the auxiliary building for an undiluted reactor coolant system source term being present in the residual heat removal system. Dose rates inside containment due to the TMI2 type event have been considered for equipment qualification. Habitability of the TSC is addressed elsewhere in the USAR. 18.2.2.3  ConclusionThe shielding design criteria and objectives for WCGS meets the applicable recommendations of item II.B.2 of NUREG0737 and Amendment 137. Radiation qualification of WCGS safetyrelated equipment is addressed in Section 3.11(B). 18.2.3  POSTACCIDENT SAMPLING SYSTEM (II.B.3) 18.2.3.1  NRC Guidance Per NUREG0737Position A design and operational review of the reactor coolant and containment atmosphere sampling line systems shall be performed to determine the capability of personnel to promptly obtain (less than 1 hour) a sample under accident conditions without incurring a radiation exposure to any individual in excess of 3 and 183/4 Rem to the whole body or extremities, respectively. Accident conditions should assume a Regulatory Guide 1.3 or 1.4 release of fission products. If the review indicates that personnel could not promptly and safely obtain the samples, additional design features or shielding should be provided to meet the criteria. A design and operational review of the radiological spectrum analysis facilities shall be performed to determine the capability to promptly quantify (in less than 2 hours) certain radionuclides that are indicators of the degree of core damage. Such radionuclides are noble gases (which indicate cladding failure), iodines and cesiums (which indicate high fuel temperatures), and nonvolatile isotopes (which indicate fuel melting). The initial reactor      18.219    Rev. 20 WOLF CREEK coolant spectrum should correspond to a Regulatory Guide 1.3 or 1.4 release.The review should also consider the effects of direct radiation from piping and components in the auxiliary building and possible contamination and direct radiation from airborne effluents. If the review indicates that the analyses required cannot be performed in a prompt manner with existing equipment, design modifications or equipment procurement shall be undertaken to meet the criteria.In addition to the radiological analyses, certain chemical analyses are necessary for monitoring reactor conditions. Procedures shall be provided to perform boron and chloride chemical analyses, assuming a highly radioactive initial sample (Regulatory Guide 1.3 or 1.4 source term). Both analyses shall be capable of being completed promptly (i.e., the boron sample analysis within an hour and the chloride sample analysis within a shift). Clarification The following items are clarifications of requirements identified in NUREG0578, NUREG0660, or the September 13 and October 30, 1979 clarification letters. The system provides both online isotopic analysis and chemical analysis with systems designed to operate in the accident environment.
can be achieved in the postulated radiation fields.  
Provisions have also been included for taking undiluted and diluted grab samples. Accuracies of the online chemical analyzers will be comparable to those available from commercial grade analyzers.     1. The licensee shall have the capability to promptly           obtain reactor coolant samples and containment atmosphere samples. The combined time allotted for sampling and analysis should be 3 hours or less from the time a decision is made to take a sample.     2. The licensee shall establish an onsite radiological and          chemical analysis capability to provide, within the 3 hour time frame established above, quantification of the following:           a. Certain radionuclides in the reactor coolant and               containment atmosphere that may be indicators of the degree of core damage (e.g., noble gases, iodines and cesiums, and nonvolatile isotopes).           b. Hydrogen levels in the containment atmosphere.  
 
: c. Dissolved gases (e.g., H2), chloride (time allotted               for analysis subject to discussion below), and               boron concentration of liquids.      18.220    Rev. 0 WOLF CREEK           d. Alternatively, have inline monitoring capabilities               to perform all or part of the above analyses.     3. Reactor coolant and containment atmosphere sampling           during postaccident conditions shall not require an isolated auxiliary system [e.g., the letdown system, reactor water cleanup system (RWCUS)] to be placed in operation in order to use the sampling system.     4. Pressurized reactor coolant samples are not required if           the licensee can quantify the amount of dissolved gases with unpressurized reactor coolant samples. The measurement of either total dissolved gases or H2 gas in reactor coolant samples is considered adequate.
This review ensures that access is available and  
Measuring the O2 concentration is recommended, but is not mandatory.     5. The time for a chloride analysis to be performed is           dependent upon two factors:  (a) if the plant's coolant water is seawater or brackish water and (b) if there is only a single barrier between primary containment systems and the cooling water. Under both of the above conditions, the licensee shall provide for a chloride analysis within 24 hours of the sample being taken. For all other cases, the licensee shall provide for the analysis to be completed within 4 days. The chloride analysis does not have to be done onsite.     6. The design basis for plant equipment for reactor coolant           and containment atmosphere sampling and analysis must assume that it is possible to obtain and analyze a sample without radiation exposures to any individual exceeding the criteria of GDC 19 (Appendix A, 10 CFR Part 50) (i.e., 5 rem whole body, 75 rem extremities).  
 
          [Note that the design and operational review criterion was changed from the operational limits of 10 CFR Part 20 (NUREG0578) to the GDC 19 criterion (October 30, 1979 letter from H. R. Denton to all licensees).     7. The analysis of primary coolant samples for boron is           required for PWRs.  (Note that Revision 2 of Regulatory Guide 1.97, when issued, will likely specify the need for primary coolant boron analysis capability at BWR plants.)     8. If inline monitoring is used for any sampling and           analytical capability specified herein, the licensee shall provide backup sampling through grab samples, and shall demonstrate the capability of analyzing the samples.      18.221    Rev. 0 WOLF CREEK           Established planning for analysis at offsite           facilities is acceptable. Equipment provided for backup sampling shall be capable of providing at least one sample per day for 7 days following onset of the accident and at least one sample per week until the accident condition no longer exists.     9. The licensee's radiological and chemical sample analysis           capability shall include provisions to:           a. Identify and quantify the isotopes of the nuclide               categories discussed above to levels corresponding to the source terms given in Regulatory Guide 1.3 or 1.4 and 1.7. Where necessary and practicable, the ability to dilute samples to provide capability for measurement and reduction of personnel exposure should be provided. Sensitivity of onsite liquid sample analysis capability should be such as to permit measurement of nuclide concentration in the range from approximately 1 mCi/g to 10 Ci/g.           b. Restrict background levels of radiation in the               radiological and chemical analysis facility from sources, such that the sample analysis will provide results with an acceptably small error (approximately a factor of 2). This can be accomplished through the use of sufficient shielding around samples and outside sources, and by the use of ventilation system design which will control the presence of airborne radioactivity.     10. Accuracy, range, and sensitivity shall be adequate to           provide pertinent data to the operator in order to describe the radiological and chemical status of the reactor coolant systems.     11. In the design of the postaccident sampling and analysis           capability, consideration should be given to the following items:           a. Provisions for purging sample lines, for reducing               plateout in sample lines, for minimizing sample loss or distortion, for preventing blockage of sample lines by loose material in the RCS or containment, for appropriate disposal of the samples, and for flow restrictions to limit reactor coolant loss from a rupture of the sample line.
required operator actions can be achieved as discussed  
The postaccident reactor coolant and containment atmosphere samples should be representative of the reactor      18.222    Rev. 0 WOLF CREEK               coolant in the core area and the containment               atmosphere following a transient or accident. The sample lines should be as short as possible to minimize the volume of fluid to be taken from containment. The residues of sample collection should be returned to containment or to a closed system.           b. The ventilation exhaust from the sampling station               should be filtered with charcoal adsorbers and highefficiency particulate air (HEPA) filters.           c. Guidelines for analytical or instrumentation range                are given below in Table II.B.31. 18.2.3.2  The Operating Agent ResponseBy Amendment 137 the inline analyzers contained with PASS are no longer used.During a long term recovery, conditions will determine what steps will be taken to obtain a grab sample from the Nuclear Sample Panel SJ143. Analyses will be done on site by appropriate instruments or shipped offsite as needed. The sample for the containment atmosphere is done using the sample flask on the containment hydrogen monitor as described in Section 6.2.5.2.2.3 and shown on Figure 6.2.51. Guidelines of Table II.B.31 no longer apply.                          TABLE II.B.31 ANALYSES FOR THE POSTACCIDENT SAMPLING SYSTEM             Liquids                     RangesRadioisotopic identification              103 107Ci/ccBoron                                    0  6,000 ppm pH                                        1  13 Hydrogen                                  (Not required or performed. Reference USQD 59 980071, letter WO 980047 and letter 9801418.) Oxygen                                    0  20 ppm Chloride                                0  20 ppm Conductivity                              0.1  1,000  mhos      18.223    Rev. 20 WOLF CREEK         Gases                           RangesRadioisotopic identification              107 105 Ci/cc Oxygen                                    0  50 wt% Hydrogen                                0  10 Volume Percent Since the sample panel is located in the auxiliary building, any leakage from the system is filtered through the charcoal adsorber and HEPA filters of the auxiliary building emergency exhaust system (see Section 9.4.3). The nuclear sampling system P&ID (M12SJ01, M12SJ02, M12SJ03) are listed in Table 1.72. Accessibility of the auxiliary building to obtain a grab sample was addressed in Section 18.2.2. Core Damage Assessment Methodology (CDAM) was developed and approved by the NRC. WCAP14696, "Westinghouse Owners Group Core Damage Assessment Guidance," was developed and submitted to the NRC for review. This Core Damage Assessment Guidance (CDAG) utilizes installed instrumentation, rather than PASS samples to classify core damage accidents. NRC issued an SER on September 2, 1999 to approve the WCAP14696 methodology. Justification for elimination of PASS was submitted to the NRC in WCAP14986A, "Post Accident Sampling System Requirements:  A Technical Basis," October 26, 1998, as supplemented by letters dated April 28, 1999, April 10, 2000, and May 22, 2000. 18.2.3.3  ConclusionThe postaccident sampling system design for WCGS is not required to meet the recommendations of Item II.B.3 of NUREG0737. A Core Damage Assessment Guidance (WCAP14696) is implemented to provide evaluation and action during an accident. With implementation of WCAP14696, WCAP14986A and evaluations demonstrated that PASS was no longer required. Should contingency sampling be required during recovery, assessments will address taking samples from the Nuclear Sample System and the Containment Hydrogen Monitoring Equipment. No PASS samples are required to be taken.  (Reference USQD 59 980071, letter WO 980047 and letter 9801418.)      18.224    Rev. 20 WOLF CREEK 18.2.4  TRAINING FOR MITIGATING CORE DAMAGE (II.B.4) 18.2.4.1  NRC Guidance Per NUREG0737Position The staff requires that the applicants develop and implement a program to ensure that all operating personnel are trained in the use of installed plant systems to control or mitigate an accident in which the core is severely damaged.Clarification Shift Technical Advisors and operating personnel from the plant manager through the operations chain to the licensed operators shall receive the training listed below. The training program shall include the following topics:  
 
: a. Incore Instrumentation  
in Section 18.2.2.2.1.3.
: 1. Use of fixed or movable incore detectors to               determine the extent of core damage and geometry changes.           2. Use of thermocouples in determining peak               temperatures; methods for extended range readings; methods for direct readings at terminal junctions.           3. Methods for calling up (printing) incore data from               the plant computer.     b. Excore Nuclear Instrumentation (NIS)
B. Personnel Radiation Exposure Guidelines  
Use of NIS for determination of void formation; void           location basis for NIS response as a function of core temperatures and density changes.     c. Vital Instrumentation  
 
: 1. Instrumentation response in an accident               environment; failure sequence (time to failure, method of failure); indication reliability (actual versus indicated level).      18.225    Rev. 0 WOLF CREEK           2. Alternative methods for measuring flows, pressures,                levels, and temperatures.               (a)  Determination of pressurizer level if all                     level transmitters fail.               (b)  Determination of letdown flow with a clogged                     filter (low flow).               (c)  Determination of other reactor coolant system                     parameters if the primary method of measurement has failed.     d. Primary Chemistry  
The general basis for personnel radiation exposure guidelines was 10 CFR 50, Appendix A, GDC 19. The  
: 1. Expected chemistry results with severe core damage;               consequences of transferring small quantities of liquid outside containment; importance of using leaktight systems.           2. Expected isotopic breakdown for core damage; for               clad damage.           3. Corrosion  effects  of  extended  immersion  in               primary water; time to failure.     e. Radiation Monitoring  
 
: 1. Response of process and area monitors to severe               damage; behavior of detectors when saturated; method for detecting radiation readings by direct measurement at detector output (over ranged detector); expected accuracy of detectors at different locations; use of detectors to determine the extent of core damage.           2. Methods of determining dose rate inside the               containment from measurements taken outside the containment.     f. Gas Generation  
following additional radiation limit guidelines were  
: 1. Methods of H2 generation during an accident; other               sources of gas (Xe, Kr); techniques for venting or               disposal of noncondensibles.           2. H2 flammability and explosive limit, sources of  02               in containment or reactor coolant system.      18.226    Rev. 0 WOLF CREEK Managers and technicians in the Instrumentation and Control (I&C), health physics, and chemistry departments shall receive training commensurate with their responsibilities.  
 
used to evaluate occupancy and accessibility of plant  
 
vital areas. General area dose rates were used rather  
 
than maximum surface dose rates. Contributions from all  
 
sources were considered.
: 1. Vital areas requiring continuous occupancy  
 
Vital areas such as control room, counting room,                laboratory, and the onsite technical support center  
 
were verified to ensure the direct dose rate was  
 
less than 15 mr/hr. The 30 day average direct  
 
radiation dose rate is less than 15 mr/hr for the  
 
SAS room and the control room toilet.      18.217    Rev. 0 WOLF CREEK
: 2. Vital areas requiring infrequent access or corridors to these vital areas For these areas, the dose rate was verified to be less than 5 R/hr except as noted in Section  
 
18.2.2.2.1.3.
18.2.2.2.1.3  Results of Review  
 
The shielding design criteria and objectives have been met in the design of WCGS. These criteria and objectives have been extended to the areas designated  
 
to be the onsite Technical Support Center and the Operations Support Center, as  
 
required by the expected occupancy of these areas. The following is a discussion of the impact of a postulated LOCA or TMI2 type event on the WCGS  
 
shielding design and is based on the WCGS specific system design capabilities:
A. LOCA  
 
Assuming a DBA LOCA with radiation source terms consistent with Regulatory Guides 1.4 and 1.7, plus the  
 
Cs fraction discussed in Section 18.2.2.2.1.2.1, all safetyrelated equipment and instrumentation will be  
 
qualified for the maximum equipment doses associated  
 
with the time that the equipment must function. All safetyrelated systems operations are performed either  
 
automatically or remote manually from the control room.  
 
Operations within the auxiliary building are not expected following a LOCA. During the longterm  
 
recovery phase, access to sample stations in the  
 
auxiliary building may be limited. Should a sample be requested, conditions will determine what steps will be taken to assure dose is ALARA. Due to Amendment 137, PASS is no longer used. As discussed above, the dose limitations of GDC19 for control room operators are met.      B. TMI2          WCGS is designed to preclude events similar to the TMI2 event. For example, the WCGS design includes reactor  
 
coolant system high point vents (as discussed in Section  
 
18.2.1) and the associated Class IE instrumentation  
 
required to detect inadequate core cooling and thus  
 
precludes the degradation of the fuel cladding and any  
 
massive release of activity to the coolant. However, assuming that a TMI2 event does occur, contamination      18.218    Rev. 20 WOLF CREEK of the auxiliary building is precluded by design:  1)
Compliance with containment isolation criteria is  
 
described in Section 6.2.4 and Section 18.2.11 and  
 
precludes contamination of the auxiliary building by  
 
auxiliary systems, and 2) the WCGS design includes a dedicated, safetyrelated letdown system located totally  
 
within the containment which provides controlled letdown  
 
capability to the pressurizer relief tank, eliminating  
 
any operational need to contaminate the chemical and  
 
volume control system in the auxiliary building.
Based on the above, dose rates were not evaluated in the auxiliary building for an undiluted reactor coolant system source term being present in the residual heat removal system. Dose rates inside containment due to the TMI2 type event  
 
have been considered for equipment qualification. Habitability of the TSC is  
 
addressed elsewhere in the USAR.
18.2.2.3  Conclusion The shielding design criteria and objectives for WCGS meets the applicable recommendations of item II.B.2 of NUREG0737 and Amendment 137. Radiation qualification of WCGS safetyrelated equipment is addressed in Section 3.11(B).
18.2.3  POSTACCIDENT SAMPLING SYSTEM (II.B.3) 18.2.3.1  NRC Guidance Per NUREG0737 Position A design and operational review of the reactor coolant and containment atmosphere sampling line systems shall be performed to determine the capability  
 
of personnel to promptly obtain (less than 1 hour) a sample under accident  
 
conditions without incurring a radiation exposure to any individual in excess of 3 and 183/4 Rem to the whole body or extremities, respectively. Accident  
 
conditions should assume a Regulatory Guide 1.3 or 1.4 release of fission  
 
products. If the review indicates that personnel could not promptly and safely  
 
obtain the samples, additional design features or shielding should be provided  
 
to meet the criteria.
A design and operational review of the radiological spectrum analysis facilities shall be performed to determine the capability to promptly quantify (in less than 2 hours) certain radionuclides that are indicators of the degree  
 
of core damage. Such radionuclides are noble gases (which indicate cladding  
 
failure), iodines and cesiums (which indicate high fuel temperatures), and  
 
nonvolatile isotopes (which indicate fuel melting). The initial reactor      18.219    Rev. 20 WOLF CREEK coolant spectrum should correspond to a Regulatory Guide 1.3 or 1.4 release.
The review should also consider the effects of direct radiation from piping and  
 
components in the auxiliary building and possible contamination and direct  
 
radiation from airborne effluents. If the review indicates that the analyses  
 
required cannot be performed in a prompt manner with existing equipment, design  
 
modifications or equipment procurement shall be undertaken to meet the  
 
criteria.In addition to the radiological analyses, certain chemical analyses are necessary for monitoring reactor conditions. Procedures shall be provided to  
 
perform boron and chloride chemical analyses, assuming a highly radioactive  
 
initial sample (Regulatory Guide 1.3 or 1.4 source term). Both analyses shall  
 
be capable of being completed promptly (i.e., the boron sample analysis within  
 
an hour and the chloride sample analysis within a shift).
Clarification
 
The following items are clarifications of requirements identified in NUREG0578, NUREG0660, or the September 13 and October 30, 1979 clarification  
 
letters. The system provides both online isotopic analysis and chemical  
 
analysis with systems designed to operate in the accident environment.
 
Provisions have also been included for taking undiluted and diluted grab  
 
samples. Accuracies of the online chemical analyzers will be comparable to  
 
those available from commercial grade analyzers.
: 1. The licensee shall have the capability to promptly obtain reactor coolant samples and containment  
 
atmosphere samples. The combined time allotted for  
 
sampling and analysis should be 3 hours or less from the  
 
time a decision is made to take a sample.
: 2. The licensee shall establish an onsite radiological and          chemical analysis capability to provide, within the 3  
 
hour time frame established above, quantification of the  
 
following:
: a. Certain radionuclides in the reactor coolant and containment atmosphere that may be indicators of  
 
the degree of core damage (e.g., noble gases, iodines and cesiums, and nonvolatile isotopes).
: b. Hydrogen levels in the containment atmosphere.
: c. Dissolved gases (e.g., H 2), chloride (time allotted for analysis subject to discussion below), and boron concentration of liquids.      18.220    Rev. 0 WOLF CREEK
: d. Alternatively, have inline monitoring capabilities to perform all or part of the above analyses.
: 3. Reactor coolant and containment atmosphere sampling during postaccident conditions shall not require an  
 
isolated auxiliary system [e.g., the letdown system, reactor water cleanup system (RWCUS)] to be placed in  
 
operation in order to use the sampling system.
: 4. Pressurized reactor coolant samples are not required if the licensee can quantify the amount of dissolved gases  
 
with unpressurized reactor coolant samples. The  
 
measurement of either total dissolved gases or H2 gas in  
 
reactor coolant samples is considered adequate.  
 
Measuring the O2 concentration is recommended, but is  
 
not mandatory.
: 5. The time for a chloride analysis to be performed is dependent upon two factors:  (a) if the plant's coolant  
 
water is seawater or brackish water and (b) if there is  
 
only a single barrier between primary containment  
 
systems and the cooling water. Under both of the above  
 
conditions, the licensee shall provide for a chloride  
 
analysis within 24 hours of the sample being taken. For  
 
all other cases, the licensee shall provide for the  
 
analysis to be completed within 4 days. The chloride  
 
analysis does not have to be done onsite.
: 6. The design basis for plant equipment for reactor coolant and containment atmosphere sampling and analysis must  
 
assume that it is possible to obtain and analyze a  
 
sample without radiation exposures to any individual  
 
exceeding the criteria of GDC 19 (Appendix A, 10 CFR  
 
Part 50) (i.e., 5 rem whole body, 75 rem extremities).  
 
[Note that the design and operational review criterion  
 
was changed from the operational limits of 10 CFR Part 20 (NUREG0578) to the GDC 19 criterion (October 30, 1979 letter from H. R. Denton to all licensees).
: 7. The analysis of primary coolant samples for boron is required for PWRs.  (Note that Revision 2 of Regulatory  
 
Guide 1.97, when issued, will likely specify the need  
 
for primary coolant boron analysis capability at BWR  
 
plants.)
: 8. If inline monitoring is used for any sampling and analytical capability specified herein, the licensee  
 
shall provide backup sampling through grab samples, and  
 
shall demonstrate the capability of analyzing the  
 
samples.      18.221    Rev. 0 WOLF CREEK Established planning for analysis at offsite facilities is acceptable. Equipment provided for backup  
 
sampling shall be capable of providing at least one  
 
sample per day for 7 days following onset of the  
 
accident and at least one sample per week until the  
 
accident condition no longer exists.
: 9. The licensee's radiological and chemical sample analysis capability shall include provisions to:
: a. Identify and quantify the isotopes of the nuclide categories discussed above to levels corresponding  
 
to the source terms given in Regulatory Guide 1.3  
 
or 1.4 and 1.7. Where necessary and practicable, the ability to dilute samples to provide capability  
 
for measurement and reduction of personnel exposure  
 
should be provided. Sensitivity of onsite liquid  
 
sample analysis capability should be such as to  
 
permit measurement of nuclide concentration in the  
 
range from approximately 1 mCi/g to 10 Ci/g.
: b. Restrict background levels of radiation in the radiological and chemical analysis facility from  
 
sources, such that the sample analysis will provide  
 
results with an acceptably small error  
 
(approximately a factor of 2). This can be  
 
accomplished through the use of sufficient  
 
shielding around samples and outside sources, and  
 
by the use of ventilation system design which will  
 
control the presence of airborne radioactivity.
: 10. Accuracy, range, and sensitivity shall be adequate to provide pertinent data to the operator in order to  
 
describe the radiological and chemical status of the  
 
reactor coolant systems.
: 11. In the design of the postaccident sampling and analysis capability, consideration should be given to the  
 
following items:
: a. Provisions for purging sample lines, for reducing plateout in sample lines, for minimizing sample  
 
loss or distortion, for preventing blockage of  
 
sample lines by loose material in the RCS or  
 
containment, for appropriate disposal of the  
 
samples, and for flow restrictions to limit reactor  
 
coolant loss from a rupture of the sample line.
The postaccident reactor coolant and containment  
 
atmosphere samples should be representative of  
 
the reactor      18.222    Rev. 0 WOLF CREEK coolant in the core area and the containment atmosphere following a transient or accident. The  
 
sample lines should be as short as possible to  
 
minimize the volume of fluid to be taken from  
 
containment. The residues of sample collection  
 
should be returned to containment or to a closed  
 
system.
: b. The ventilation exhaust from the sampling station should be filtered with charcoal adsorbers and highefficiency particulate air (HEPA) filters.
: c. Guidelines for analytical or instrumentation range                are given below in Table II.B.31.
18.2.3.2  The Operating Agent ResponseBy Amendment 137 the inline analyzers contained with PASS are no longer used.
During a long term recovery, conditions will determine what steps will be taken to obtain a grab sample from the Nuclear Sample Panel SJ143. Analyses will be done on site by appropriate instruments or shipped offsite as needed. The sample for the containment atmosphere is done using the sample flask on the containment hydrogen monitor as described in Section 6.2.5.2.2.3 and shown on Figure 6.2.51. Guidelines of Table II.B.31 no longer apply.                          TABLE II.B.31  
 
ANALYSES FOR THE POSTACCIDENT SAMPLING SYSTEM Liquids Ranges Radioisotopic identification              10 3 10 7 Ci/ccBoron                                    0  6,000 ppm pH                                        1  13  
 
Hydrogen                                  (Not required or performed.
Reference USQD 59 980071, letter WO 980047 and letter 9801418.) Oxygen                                    0  20 ppm Chloride                                0  20 ppm Conductivity                              0.1  1,000  mhos      18.223    Rev. 20 WOLF CREEK Gases Ranges Radioisotopic identification              10 7 10 5 Ci/cc Oxygen                                    0  50 wt% Hydrogen                                0  10 Volume Percent Since the sample panel is located in the auxiliary building, any leakage from the system is filtered through the charcoal adsorber and HEPA filters of the auxiliary building emergency exhaust system (see Section 9.4.3). The nuclear sampling system P&ID (M12SJ01, M12SJ02, M12SJ03) are listed in Table 1.72.
Accessibility of the auxiliary building to obtain a grab sample was addressed in Section 18.2.2.
Core Damage Assessment Methodology (CDAM) was developed and approved by the NRC. WCAP14696, "Westinghouse Owners Group Core Damage Assessment Guidance,"
was developed and submitted to the NRC for review. This Core Damage Assessment Guidance (CDAG) utilizes installed instrumentation, rather than PASS samples to classify core damage accidents. NRC issued an SER on September 2, 1999 to approve the WCAP14696 methodology. Justification for elimination of PASS was submitted to the NRC in WCAP14986A, "Post Accident Sampling System Requirements:  A Technical Basis," October 26, 1998, as supplemented by letters dated April 28, 1999, April 10, 2000, and May 22, 2000.
18.2.3.3  Conclusion The postaccident sampling system design for WCGS is not required to meet the recommendations of Item II.B.3 of NUREG0737. A Core Damage Assessment Guidance (WCAP14696) is implemented to provide evaluation and action during an accident. With implementation of WCAP14696, WCAP14986A and evaluations demonstrated that PASS was no longer required. Should contingency sampling be required during recovery, assessments will address taking samples from the Nuclear Sample System and the Containment Hydrogen Monitoring Equipment. No PASS samples are required to be taken.  (Reference USQD 59 980071, letter WO 980047 and letter 9801418.)      18.224    Rev. 20 WOLF CREEK 18.2.4  TRAINING FOR MITIGATING CORE DAMAGE (II.B.4) 18.2.4.1  NRC Guidance Per NUREG0737 Position The staff requires that the applicants develop and implement a program to ensure that all operating personnel are trained in the use of installed plant  
 
systems to control or mitigate an accident in which the core is severely  
 
damaged.Clarification
 
Shift Technical Advisors and operating personnel from the plant manager through the operations chain to the licensed operators shall receive the training  
 
listed below.
The training program shall include the following topics:
: a. Incore Instrumentation
: 1. Use of fixed or movable incore detectors to determine the extent of core damage and geometry  
 
changes.
: 2. Use of thermocouples in determining peak temperatures; methods for extended range readings;  
 
methods for direct readings at terminal junctions.
: 3. Methods for calling up (printing) incore data from the plant computer.
: b. Excore Nuclear Instrumentation (NIS)  
 
Use of NIS for determination of void formation; void location basis for NIS response as a function of core  
 
temperatures and density changes.
: c. Vital Instrumentation
: 1. Instrumentation response in an accident environment; failure sequence (time to failure, method of failure); indication reliability (actual  
 
versus indicated level).      18.225    Rev. 0 WOLF CREEK
: 2. Alternative methods for measuring flows, pressures,                levels, and temperatures.
(a)  Determination of pressurizer level if all level transmitters fail.
(b)  Determination of letdown flow with a clogged filter (low flow).
(c)  Determination of other reactor coolant system parameters if the primary method of  
 
measurement has failed.
: d. Primary Chemistry
: 1. Expected chemistry results with severe core damage; consequences of transferring small quantities of  
 
liquid outside containment; importance of using  
 
leaktight systems.
: 2. Expected isotopic breakdown for core damage; for clad damage.
: 3. Corrosion  effects  of  extended  immersion  in primary water; time to failure.
: e. Radiation Monitoring
: 1. Response of process and area monitors to severe damage; behavior of detectors when saturated;  
 
method for detecting radiation readings by direct  
 
measurement at detector output (over ranged  
 
detector); expected accuracy of detectors at  
 
different locations; use of detectors to determine  
 
the extent of core damage.
: 2. Methods of determining dose rate inside the containment from measurements taken outside the  
 
containment.
: f. Gas Generation
: 1. Methods of H 2 generation during an accident; other sources of gas (Xe, Kr); techniques for venting or disposal of noncondensibles.
: 2. H 2 flammability and explosive limit, sources of  0 2               in containment or reactor coolant system.      18.226    Rev. 0 WOLF CREEK Managers and technicians in the Instrumentation and Control (I&C), health  
 
physics, and chemistry departments shall receive training commensurate with  
 
their responsibilities.  
 
18.2.4.2  The Operating Agent Response
 
The Operating Agent provided a course in Mitigating Core Damage for licensed
 
operator candidates. The outline of this course is provided in Table 18.2-1. 
 
The course, in conjunction with other lectures in the reactor operator training
 
program, covered a minimum of 80 hours of training in the control or mitigation
 
of accidents in which the core is severely damaged. A Mitigating Core Damage
 
course was given to all licensed operators and their supervisors up to and


18.2.4.2  The Operating Agent Response The Operating Agent provided a course in Mitigating Core Damage for licensed operator candidates. The outline of this course is provided in Table 18.2-1.
including the Plant Manager prior to fuel load.   
The course, in conjunction with other lectures in the reactor operator training program, covered a minimum of 80 hours of training in the control or mitigation of accidents in which the core is severely damaged. A Mitigating Core Damage course was given to all licensed operators and their supervisors up to and including the Plant Manager prior to fuel load.   


The current Mitigating Core Damage course is discussed in Section 13.2.  
The current Mitigating Core Damage course is discussed in Section 13.2.  


Supervisors and technicians in the Instrumentation and Controls, Health Physics and Chemistry groups were given training, prior to fuel load, commensurate with their responsibilities during accidents which involve severe core damage.
Supervisors and technicians in the Instrumentation and Controls, Health Physics  


18.2.4.3  Conclusion The Operating Agent's training program for mitigating core damage satisfies NUREG-0737.
and Chemistry groups were given training, prior to fuel load, commensurate with
NOTE:  Section 18.2.5 is historical and reflects conditions at the time of plant licensing. Section 18.2.5 will only be updated when potential hazards not previously analyzed are identified.
18.2.5  PERFORMANCE TESTING OF BOILING-WATER REACTOR AND PRESSURIZED-WATER REACTOR RELIEF AND SAFETY VALVES (II.D.1)


18.2.5.1  NRC Guidance Per NUREG-0737 Position
their responsibilities during accidents which involve severe core damage.  


Pressurized-water reactor and boiling-water reactor licensees and applicants shall conduct testing to qualify the reactor coolant system relief and safety valves under expected operating conditions for design-basis transients and accidents.  
18.2.4.3  Conclusion
 
The Operating Agent's training program for mitigating core damage satisfies
 
NUREG-0737.
 
NOTE:  Section 18.2.5 is historical and reflects conditions at the time of plant licensing. Section 18.2.5 will only be updated when potential hazards not previously analyzed are identified.
 
18.2.5  PERFORMANCE TESTING OF BOILING-WATER REACTOR AND
 
PRESSURIZED-WATER REACTOR RELIEF AND SAFETY
 
VALVES (II.D.1)
 
18.2.5.1  NRC Guidance Per NUREG-0737
 
Position
 
Pressurized-water reactor and boiling-water reactor licensees and applicants  
 
shall conduct testing to qualify the reactor coolant system relief and safety  
 
valves under expected operating conditions for design-basis transients and  
 
accidents.  


Clarification  
Clarification  


Licensees and applicants shall determine the expected valve operating conditions through the use of analyses of accidents and anticipated operational occurrences referenced in Regulatory Guide 1.70, Revision 2. The single failures applied to these analyses shall be chosen so that the dynamic forces   
Licensees and applicants shall determine the expected valve operating  
 
conditions through the use of analyses of accidents and anticipated operational  
 
occurrences referenced in Regulatory Guide 1.70, Revision 2. The single  
 
failures applied to these analyses shall be chosen so that the dynamic forces   
 
18.2-27    Rev. 30
 
WOLF CREEK on the safety and relief valves are maximized. Test pressures shall be the highest predicted by conventional safety analysis procedures. Reactor coolant system relief and safety valve qualification shall include qualification of
 
associated control circuitry, piping, and supports, as well as the valves
 
themselves. A. Performance Testing of Relief and Safety ValvesThe following information must be provided in report form by
 
October 1, 1981 for BWRs and July 1, 1982 for PWRs.
: 1. Evidence supported by test of safety and relief valve functionability for expected operating and accident (nonATWS) conditions must be provided to
 
NRC. The testing should demonstrate that the
 
valves will open and reclose under the expected
 
flow conditions.
: 2. Since it is not planned to test all valves on all plants, each licensee must submit to NRC a
 
correlation of other evidence to substantiate that
 
the valves tested in the EPRI (Electric Power
 
Research Institute) or other generic test program demonstrate the functionability of asinstalled
 
primary relief and safety valves. This correlation
 
must show that the test conditions used are
 
equivalent to expected operating and accident
 
conditions, as prescribed in the Final Safety Analysis Report (FSAR). The effect of asbuilt
 
relief and safety valve discharge piping on valve
 
operability must also be accounted for, if it is
 
different from the generic test loop piping.
: 3. Test data, including criteria for success and failure of valves tested, must be provided for NRC
 
staff review and evaluation. These test data should include data that would permit plant
 
specific evaluation of discharge piping and
 
supports that are not directly tested.      B. Qualification of PWR Block ValvesAlthough not          specifically listed as a shortterm lessons learned requirement in NUREG0578, qualification of PWR block valves is required by the NRC Task Action Plan NUREG
 
0660 under task item II.D.1. It is the understanding of
 
the NRC that testing of several commonly used block
 
valve designs is already included in the generic EPRI
 
PWR safety and relief valve testing program to be
 
completed by July 1, 1981. By means of this letter, NRC
 
is establishing July 1, 1982 as the date for
 
verification      18.228    Rev. 10 WOLF CREEK of block valve functionability. By July 1, 1982, each PWR  licensee,  for  plants  so equipped, should provide
 
evidence supported by test that the block or isolation valves between the pressurizer and each poweroperated
 
relief valve can be operated, closed, and opened for all
 
fluid conditions expected under operating and accident
 
conditions.      C. ATWS TestingAlthough ATWS testing need not be completed by July 1, 1981, the test facility should be
 
designed to accommodate ATWS conditions of approximately
 
3,200 to 3,500 (Service Level C pressure limit) psi and
 
700 F with sufficient capacity to enable testing of
 
relief and safety valves of the size and type used on operating pressurizedwater reactors.
18.2.5.2  The Operating Agent Response The PORVs in the WCGS design are relied on to function to alleviate  over pressurization that possibly could occur during startup of the reactor, or
 
during cold shutdown conditions, and they may be relied on to function during shut down of the reactor, assuming only safetygrade equipment is functioning.
(These functions are described in Section 5.2 and Appendix 5.4(A).)  The PORVs are not required to function to mitigate the consequences of any design basis
 
accident.The PORVs are also designed to limit high pressure during normal operation.
The description of this control function is presented in Sections 5.2 and 7.6.
 
As discussed below, operability of the PORVs will be demonstrated by
 
prototypical testing and appropriate analyses.
The safety valves for the WCGS design are relied on to limit primary system pressure following anticipated operational transients. The design basis for
 
the safety valves is presented in Section 5.2. The valves are required by ASME
 
Boiler and Pressure Vessel Code to mitigate excessive pressure increases, regardless of their source. As discussed below, operability of the safety
 
valves was demonstrated by prototypical testing and appropriate analyses.
The reactor coolant system is provided with two PORVs and three code safety valves. Each PORV also has an associated motoroperated block valve.      18.229    Rev. 12 WOLF CREEK The PORVs for WCGS were manufactured by Garrett; the safety valves were manufactured by Crosby. These valves are included in the safety and relief
 
valve testing program that has been developed by the Electric Power Research
 
Institute (EPRI). A description of this program entitled "Program Plan for the
 
Performance Verification of PWR Safety/Relief Valves and Systems," dated
 
December 13, 1979, was submitted to the NRC on December 17, 1979 (letters from
 
W. J. Cahill, Jr., Chairman of EPRI Safety and Analysis Task Force, to H.
 
Denton and D. Eisenhut, NRC). A revision to this program was submitted to the
 
NRC in July 1980. The NRC staff completed its review of this program and found
 
it acceptable.
An interim report on these valve tests was submitted by the PWR utilities to the NRC in July 1981. A final report on these tests was submitted in SNUPPS
 
letter dated October 20, 1982 and a final report on piping and supports was provided by SNUPPS letter dated January 7, 1983 (distributed as 82002).
Preoperational testing of the PORVs included monitoring the dynamic response of the relief valve discharge piping during actuation of the PORVs. These in plant dynamic tests were initiated with a watersolid inlet (loop seal) at the
 
PORVs and a steam bubble maintained in the pressurizer.
Regarding verification of the block valve functionability, WCGS information on qualification of the block valves was provided by SNUPPS letter dated July 1, 1982.Based on the NRC review of the submittals addressing safety valves, PORVs, PORV block valves and associated piping, the Operating Agent was requested to
 
provide additional information. SNUPPS letters dated June 30, 1986 and
 
September 26, 1986 provided responses to the NRC questions.
18.2.5.3  Conclusion The plan to demonstrate the operability of the PORVs and safety valves at WCGS satisfies the guidance of item II.D.1 in NUREG0737. The NRC review of this
 
issue is continuing.
18.2.6  DIRECT INDICATION OF RELIEF AND SAFETY VALVE POSITION (II.D.3) 18.2.6.1  NRC Requirement Per NUREG0737 Position Reactor coolant system relief and safety valves shall be provided with a positive indication in the control room derived from a      18.230    Rev. 0 WOLF CREEK reliable valveposition detection device or a reliable indication of flow in the discharge pipe.
Clarification
: 1. The basic requirement is to provide the operator with unambiguous indication of valve position (open or
 
closed) so that appropriate operator actions can be
 
taken.
: 2. The valve position should be indicated in the control room. An alarm should be provided in conjunction with
 
this indication.
: 3. The valve position indication may be safety grade. If the position indication is not safety grade, a reliable singlechannel direct indication powered from a vital
 
instrument bus may be provided if backup methods of
 
determining valve position are available and are
 
discussed in the emergency procedures as an aid to
 
operator diagnosis of an action.
: 4. The valve position indication should be seismically qualified, consistent with the component or system to
 
which it is attached.
: 5. The position indication should be qualified for its appropriate environment (any transient or accident which
 
would cause the relief or safety valve to lift) and in accordance with Commission Order, May 23, 1980 (CLI20
 
81).
: 6. It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed taking into con
 
sideration:
: a. The use of this information by an operator during both normal and abnormal plant conditions.
: b. Integration into emergency procedures.
: c. Integration into operator training.
: d. Other alarms during emergency and need for prioritization of alarms.      18.231    Rev. 0 WOLF CREEK 18.2.6.2  The Operating Agent ResponseSafetygrade position indication is provided for each safety valve and power operated relief valve (PORV) that indicates when the valve is not in its fully
 
closed position. The position indication is seismically and environmentally
 
qualified. The position indication for each valve is displayed in the control
 
room, and an alarm is provided if any of the PORVs or safety valves is not
 
fully closed. Other, nonsafetyrelated instrumentation is provided on the valve discharge piping and the pressurizer relief tank to provide an alternate means of assessing the status of the safety valves and PORVs (see Figure 5.11, Sheet
 
2).18.2.6.3  ConclusionThe WCGS design satisfies the guidance of Item II.D.3 of NUREG0737.
 
18.2.7  AUXILIARY FEEDWATER SYSTEM EVALUATION (II.E.1.1) 18.2.7.1  NRC Guidance Per NUREG0737 Position The office of Nuclear Reactor Regulation is requiring reevaluation of the auxiliary feedwater (AFW) systems for all PWR operating plant licensees and
 
operating license applications. This action includes:
: 1. Perform a simplified AFW system reliability analysis          that uses eventtree and faulttree logic techniques to
 
determine the potential for AFW system failure under various lossofmainfeedwatertransient conditions.
 
Particular emphasis is given to determining potential
 
failures that could result from human errors, common causes, singlepoint vulnerabilities, and test and
 
maintenance outages.
: 2. Perform a deterministic review of the AFW system using the acceptance criteria of Standard Review Plan Section 10.4.9 and associated Branch Technical Position ASB 101
 
as principal guidance.
: 3. Reevaluate the AFW system flowrate design bases and criteria.      18.232    Rev. 0 WOLF CREEK ClarificationOperating License Applicants  Operating license applicants have been requested to respond to staff letters of March 10, 1980 (W and CE) and April 24, 1980 (B&W). These responses will be reviewed during the normal review process for
 
these applications.
18.2.7.2  The Operating Agent Response A reliability analysis of the WCGS auxiliary feedwater system (AFS) was submitted to the NRC by SNUPPS letter dated June 8, 1981. A comparison of the design with Standard Review Plan 10.4.9 and Branch Technical Position ASB 101
 
is provided in Section 10.4.9. An evaluation of the auxiliary feedwater system
 
flowrate design bases and criteria was submitted by SNUPPS letter dated June 3, 1981.The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.
 
Based on this review, a confirmatory licensing issue was identified, regarding
 
physically securing the condensate storage tank manual isolation valve. This
 
issue was resolved prior to initial fuel load.
18.2.7.3  Conclusion The WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.1 of NUREG0737.
18.2.8  AUXILIARY  FEEDWATER  SYSTEM AUTOMATIC INITIATION AND FLOW INDICATION (II.E.1.2) 18.2.8.1  NRC Guidance Per NUREG0737Position  Part 1:  AFS Automatic Initiation
 
Consistent with satisfying the requirements of General Design Criterion 20 of Appendix A to 10 CFR Part 50 with respect to the timely initiation of the
 
auxiliary feedwater system (AFS), the following requirements shall be
 
implemented in the short term:
: 1. The design shall provide for the automatic initiation of the AFS.
: 2. The automatic initiation signals and circuits shall be designed so that a single failure will not result in the
 
loss of AFS function.      18.233    Rev. 0 WOLF CREEK
: 3. Testability of the initiation signals and circuits shall be a feature of the design.
: 4. The initiating signals and circuits shall be powered from the emergency buses.
: 5. Manual capability to initiate the AFS from the control room shall be retained and shall be implemented so that
 
a single failure in the manual circuits will not result
 
in the loss of system function.      6. The ac motordriven pumps and valves in the AFS shall be included in the automatic actuation (simultaneous and/or


18.2-27    Rev. 30 WOLF CREEK on the safety and relief valves are maximized. Test pressures shall be thehighest predicted by conventional safety analysis procedures. Reactor coolant system relief and safety valve qualification shall include qualification of associated control circuitry, piping, and supports, as well as the valves themselves. A. Performance Testing of Relief and Safety ValvesThe          following information must be provided in report form by October 1, 1981 for BWRs and July 1, 1982 for PWRs.          1. Evidence supported by test of safety and relief                valve functionability for expected operating and accident (nonATWS) conditions must be provided to NRC. The testing should demonstrate that the valves will open and reclose under the expected flow conditions.          2. Since it is not planned to test all valves on all                plants, each licensee must submit to NRC a correlation of other evidence to substantiate that the valves tested in the EPRI (Electric Power Research Institute) or other generic test program demonstrate the functionability of asinstalled primary relief and safety valves. This correlation must show that the test conditions used are equivalent to expected operating and accident conditions, as prescribed in the Final Safety Analysis Report (FSAR). The effect of asbuilt relief and safety valve discharge piping on valve operability must also be accounted for, if it is different from the generic test loop piping.          3. Test data, including criteria for success and                failure of valves tested, must be provided for NRC staff review and evaluation. These test data should include data that would permit plant specific evaluation of discharge piping and supports that are not directly tested.      B. Qualification of PWR Block ValvesAlthough not          specifically listed as a shortterm lessons learned requirement in NUREG0578, qualification of PWR block valves is required by the NRC Task Action Plan NUREG 0660 under task item II.D.1. It is the understanding of the NRC that testing of several commonly used block valve designs is already included in the generic EPRI PWR safety and relief valve testing program to be completed by July 1, 1981. By means of this letter, NRC is establishing July 1, 1982 as the date for verification      18.228    Rev. 10 WOLF CREEK          of block valve functionability. By July 1, 1982, each          PWR  licensee,  for  plants  so equipped, should provide evidence supported by test that the block or isolation valves between the pressurizer and each poweroperated relief valve can be operated, closed, and opened for all fluid conditions expected under operating and accident conditions.      C. ATWS TestingAlthough ATWS testing need not be          completed by July 1, 1981, the test facility should be designed to accommodate ATWS conditions of approximately 3,200 to 3,500 (Service Level C pressure limit) psi and 700 F with sufficient capacity to enable testing of relief and safety valves of the size and type used on operating pressurizedwater reactors. 18.2.5.2  The Operating Agent ResponseThe PORVs in the WCGS design are relied on to function to alleviate  overpressurization that possibly could occur during startup of the reactor, or during cold shutdown conditions, and they may be relied on to function during shut down of the reactor, assuming only safetygrade equipment is functioning.
sequential) of the loads onto the emergency buses.
(These functions are described in Section 5.2 and Appendix 5.4(A).)  The PORVsare not required to function to mitigate the consequences of any design basis accident.The PORVs are also designed to limit high pressure during normal operation.The description of this control function is presented in Sections 5.2 and 7.6.
: 7. The automatic initiating signals and circuits shall be designed so that their failure will not result in the  
As discussed below, operability of the PORVs will be demonstrated by prototypical testing and appropriate analyses. The safety valves for the WCGS design are relied on to limit primary system pressure following anticipated operational transients. The design basis for the safety valves is presented in Section 5.2. The valves are required by ASME Boiler and Pressure Vessel Code to mitigate excessive pressure increases, regardless of their source. As discussed below, operability of the safety valves was demonstrated by prototypical testing and appropriate analyses. The reactor coolant system is provided with two PORVs and three code safety valves. Each PORV also has an associated motoroperated block valve.      18.229    Rev. 12 WOLF CREEK The PORVs for WCGS were manufactured by Garrett; the safety valves were manufactured by Crosby. These valves are included in the safety and relief valve testing program that has been developed by the Electric Power Research Institute (EPRI). A description of this program entitled "Program Plan for the Performance Verification of PWR Safety/Relief Valves and Systems," dated December 13, 1979, was submitted to the NRC on December 17, 1979 (letters from W. J. Cahill, Jr., Chairman of EPRI Safety and Analysis Task Force, to H.
Denton and D. Eisenhut, NRC). A revision to this program was submitted to the NRC in July 1980. The NRC staff completed its review of this program and found it acceptable. An interim report on these valve tests was submitted by the PWR utilities to the NRC in July 1981. A final report on these tests was submitted in SNUPPS letter dated October 20, 1982 and a final report on piping and supports was provided by SNUPPS letter dated January 7, 1983 (distributed as 82002). Preoperational testing of the PORVs included monitoring the dynamic response of the relief valve discharge piping during actuation of the PORVs. These in plant dynamic tests were initiated with a watersolid inlet (loop seal) at the PORVs and a steam bubble maintained in the pressurizer. Regarding verification of the block valve functionability, WCGS information on qualification of the block valves was provided by SNUPPS letter dated July 1, 1982.Based on the NRC review of the submittals addressing safety valves, PORVs, PORV block valves and associated piping, the Operating Agent was requested to provide additional information. SNUPPS letters dated June 30, 1986 and September 26, 1986 provided responses to the NRC questions. 18.2.5.3  ConclusionThe plan to demonstrate the operability of the PORVs and safety valves at WCGS satisfies the guidance of item II.D.1 in NUREG0737. The NRC review of this issue is continuing. 18.2.6  DIRECT INDICATION OF RELIEF AND SAFETY VALVE POSITION        (II.D.3) 18.2.6.1  NRC Requirement Per NUREG0737Position Reactor coolant system relief and safety valves shall be provided with a positive indication in the control room derived from a      18.230    Rev. 0 WOLF CREEK reliable valveposition detection device or a reliable indication of flow in the discharge pipe. Clarification
: 1. The basic requirement is to provide the operator with          unambiguous indication of valve position (open or closed) so that appropriate operator actions can be taken.      2. The valve position should be indicated in the control          room. An alarm should be provided in conjunction with this indication.      3. The valve position indication may be safety grade. If          the position indication is not safety grade, a reliable singlechannel direct indication powered from a vital instrument bus may be provided if backup methods of determining valve position are available and are discussed in the emergency procedures as an aid to operator diagnosis of an action.      4. The valve position indication should be seismically          qualified, consistent with the component or system to which it is attached.      5. The position indication should be qualified for its          appropriate environment (any transient or accident which would cause the relief or safety valve to lift) and in accordance with Commission Order, May 23, 1980 (CLI20 81).      6. It is important that the displays and controls added to          the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed taking into con sideration:          a. The use of this information by an operator during                both normal and abnormal plant conditions.          b. Integration into emergency procedures.
: c. Integration into operator training.
: d. Other alarms during emergency and need for                prioritization of alarms.      18.231    Rev. 0 WOLF CREEK 18.2.6.2  The Operating Agent ResponseSafetygrade position indication is provided for each safety valve and poweroperated relief valve (PORV) that indicates when the valve is not in its fully closed position. The position indication is seismically and environmentally qualified. The position indication for each valve is displayed in the control room, and an alarm is provided if any of the PORVs or safety valves is not fully closed. Other, nonsafetyrelated instrumentation is provided on the valve discharge piping and the pressurizer relief tank to provide an alternate means of assessing the status of the safety valves and PORVs (see Figure 5.11, Sheet 2).18.2.6.3  ConclusionThe WCGS design satisfies the guidance of Item II.D.3 of NUREG0737.
18.2.7  AUXILIARY FEEDWATER SYSTEM EVALUATION (II.E.1.1) 18.2.7.1  NRC Guidance Per NUREG0737Position The office of Nuclear Reactor Regulation is requiring reevaluation of the auxiliary feedwater (AFW) systems for all PWR operating plant licensees and operating license applications. This action includes:      1. Perform a simplified AFW system reliability analysis          that uses eventtree and faulttree logic techniques to determine the potential for AFW system failure under various lossofmainfeedwatertransient conditions.
Particular emphasis is given to determining potential failures that could result from human errors, common causes, singlepoint vulnerabilities, and test and maintenance outages.      2. Perform a deterministic review of the AFW system using          the acceptance criteria of Standard Review Plan Section 10.4.9 and associated Branch Technical Position ASB 101 as principal guidance.      3. Reevaluate the AFW system flowrate design bases and          criteria.      18.232    Rev. 0 WOLF CREEK ClarificationOperating License Applicants  Operating license applicants have been requested to respond to staff letters of March 10, 1980 (W and CE) and April 24, 1980 (B&W). These responses will be reviewed during the normal review process for these applications. 18.2.7.2  The Operating Agent ResponseA reliability analysis of the WCGS auxiliary feedwater system (AFS) was submitted to the NRC by SNUPPS letter dated June 8, 1981. A comparison of the design with Standard Review Plan 10.4.9 and Branch Technical Position ASB 101 is provided in Section 10.4.9. An evaluation of the auxiliary feedwater system flowrate design bases and criteria was submitted by SNUPPS letter dated June 3, 1981.The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.
Based on this review, a confirmatory licensing issue was identified, regarding physically securing the condensate storage tank manual isolation valve. This issue was resolved prior to initial fuel load. 18.2.7.3  ConclusionThe WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.1 of NUREG0737. 18.2.8  AUXILIARY  FEEDWATER  SYSTEM AUTOMATIC INITIATION AND FLOW        INDICATION (II.E.1.2) 18.2.8.1  NRC Guidance Per NUREG0737Position  Part 1:  AFS Automatic Initiation Consistent with satisfying the requirements of General Design Criterion 20 of Appendix A to 10 CFR Part 50 with respect to the timely initiation of the auxiliary feedwater system (AFS), the following requirements shall be implemented in the short term:      1. The design shall provide for the automatic initiation of          the AFS.      2. The automatic initiation signals and circuits shall be          designed so that a single failure will not result in the loss of AFS function.      18.233    Rev. 0 WOLF CREEK      3. Testability of the initiation signals and circuits shall          be a feature of the design.      4. The initiating signals and circuits shall be powered          from the emergency buses.      5. Manual capability to initiate the AFS from the control          room shall be retained and shall be implemented so that a single failure in the manual circuits will not result in the loss of system function.      6. The ac motordriven pumps and valves in the AFS shall be          included in the automatic actuation (simultaneous and/or sequential) of the loads onto the emergency buses.     7. The automatic initiating signals and circuits shall be           designed so that their failure will not result in the loss of manual capability to initiate the AFS from the control room. In the long term, the automatic initiation signals and circuits shall be upgraded in accordance with safetygrade requirements. Clarification The intent of this recommendation is to ensure a reliable automatic initiation system. This objective can be met by providing a system which meets all the requirements of IEEE Standard 2791971. Position  Part 2:  AFS Flowrate Indication Consistent with satisfying the requirements set forth in General Design Criterion 13 to provide the capability in the control room to ascertain the actual performance of the AFS when it is called to perform its intended function, the following requirements shall be implemented:      1. Safetygrade indication of auxiliary feedwater flow to          each steam generator shall be provided in the control room.      2. The auxiliary feedwater flow instrument channels shall          be powered from the emergency buses consistent with satisfying the emergency power diversity requirements of the auxiliary feedwater system set forth in Auxiliary Systems Branch Technical Position 101 of the Standard Review Plan, Section 10.4.9.      18.234    Rev. 0 WOLF CREEK ClarificationThe intent of this recommendation is to ensure a reliable indication of AFS performance. This objective can be met by providing an overall indication system that meets the following appropriate design principles: For Westinghouse and Combustion Engineering Plants
: 1. To satisfy these requirements, W and CE plants must          provide as a minimum one auxiliary feedwater flow rate indicator and one widerange steamgenerator level indicator for each steam generator or two flowrate indicators.      2. The flow indication system should be:
: a. Environmentally qualified
: b. Powered from highly reliable, batterybacked non                Class 1E power source          c. Periodically testable
: d. Part of plant quality assurance program
: e. Capable of display on command It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A humanfactor analysis should be performed, taking into consideration:      1. The use of this information by an operator during both          normal and abnormal plant conditions.      2. Integration into emergency procedures.
: 3. Integration into operator training.
: 4. Other alarms during emergency and need for          prioritization of alarms. 18.2.8.2  The Operating Agent ResponseAutomatic initiation of the AFS meets the NRC recommendations, as described in Sections 10.4.9 and 7.3.6. The AFS flowrate indication meets the NRC recommendations, as described in Sections 10.4.9 and 7.5.      18.235    Rev. 0 WOLF CREEK The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.
Based on this review a confirmatory licensing issue was identified, regarding physically securing the condensate storage tank manual isolation valve. This issue was resolved prior to initial fuel load. 18.2.8.3  ConclusionThe WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.2 of NUREG0737. 18.2.9  EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS (II.E.3.1) 18.2.9.1  NRC Guidance Per NUREG0737Position Consistent with satisfying the requirements of General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of loss of offsite power, the following positions shall be implemented:      1. The pressurizer heater power supply design shall provide          the capability to supply, from either the offsite power source or the emergency power source (when offsite power is not available), a predetermined number of pressurizer heaters  and associated  controls necessary to establish and maintain natural circulation at hot standby conditions. The required heaters and their controls shall be connected to the emergency buses in a manner that will provide redundant power supply capability.      2. Procedures and training shall be established to make the          operator aware of when and how the required pressurizer heaters shall be connected to the emergency buses. If required, the procedures shall identify under what conditions selected emergency loads can be shed from the emergency power source to provide sufficient capacity for the connection of the pressurizer heaters.      3. The time required to accomplish the connection of the          preselected pressurizer heater to the emergency buses shall be consistent with the timely initiation and maintenance of natural circulation conditions.      18.236    Rev. 0 WOLF CREEK      4. Pressurizer heater motive and control power interfaces          with the emergency buses shall be accomplished through devices that have been qualified in accordance with safetygrade requirements. Clarification
: 1. Redundant heater capacity must be provided, and each          redundant heater or group of heaters should have access to only Class 1E division power supply.      2. The number of heaters required to have access to each          emergency power source is that number required to maintain natural circulation in the hot standby condition.      3. The power sources need not necessarily have the capacity          to provide power to the heaters concurrently with the loads required for lossofcoolant accident.      4. Any changover of the heaters from normal offsite power          to emergency onsite power is to be accomplished manually in the control room.      5. In establishing procedure to manually load the          pressurizer heaters onto the emergency power sources, careful consideration must be given to:          a. Which ESF loads may be appropriately shed for a                given situation.          b. Reset of the safety injection actuation signal to                permit the operation of the heaters.          c. Instrumentation and criteria for operator use to                prevent overloading a diesel generator.      6. The Class 1E interfaces for main power and control power          are to be protected by safetygrade circuit breakers (see also Regulatory Guide 1.75).      7. Being nonClass 1E loads, the pressurizer heaters must          be automatically shed from the emergency power sources upon the occurrence of a safety injection actuation signal (see item 5.b. above). 18.2.9.2  The Operating Agent ResponseThe total rated capacity of the pressurizer heaters at 480 volts ac is 1800 Kw(Table 5.11). The pressurizer heaters are divided      18.237    Rev. 14 WOLF CREEK into three groups (see Figure 8.31). The rated capacity of each group is as follows:    Group A  692 Kw      Group B  692 Kw Group C  416 KwThe group C heaters are used for proportional control during power operation. Groups A and B are the backup heater groups; each of these two groups is powered from a Class lE power source. This power is interrupted by the load shedder/sequencer following a safety injection or emergency bus undervoltage signal.The controls for each backup pressurizer heater group are provided from a non Class 1E 125 Vdc power system. The normal power source is from a nonClass 1E480 Vac through a battery charger. There is a 125 Vdc battery backup to the480 Vac supply (see Figure 8.36). Each battery charger of the 125Vdc systemis supplied from a single separation group of the 4.16kV onsite emergency distribution system. When the 480Vac system is unavailable following a loss ofoffsite power, the dcbacked power supplies will supply the backup pressurizer heater controls. Similar to the breakers feeding the heater load centers, the circuit breakers supplying the 125Vdc battery chargers are automatically tripped upon an SIS or emergency bus undervoltage signal. They may be reclosed from the control room when desired after reset of the breaker tripping signals. For additional reliability, a crosstie is provided between Separation Groups 5 and 6 of the nonClass 1E 125Vdc system. This will permit operation of selected loads of both separation groups in the event of a failure of either battery charger. All the breakers which function upon SIS and bus undervoltage are seismically qualified isolation devices. Analysis shows that subcooling would be maintained in the reactor coolant system for up to 4 hours without heat input from the pressurizer heaters.
Pressure control for the reactor coolant system, as discussed in Section 5.4(A), can be accomplished without pressurizer heaters. If pressurizer heaters were used for pressure control, analysis indicates that 150 kW is sufficient to maintain subcooling. Plant procedures have been provided for manually connecting (from the control room) pressurizer heaters to emergency power sources following a loss of offsite power.      18.238    Rev. 14 WOLF CREEK 18.2.9.3  ConclusionThe WCGS  design satisfies the guidance of item I.E.3.1 of NUREG0737. 18.2.10  DEDICATED HYDROGEN PENETRATIONS (II.E.4.1) 18.2.10.1  NRC Guidance Per NUREG0737Position Plants using external recombiners or purge systems for postaccident combustible gas control of the containment atmosphere should provide containment penetration systems for external recombiner or purge systems that are dedicated to that service only, that meet the redundancy and singlefailure requirements of General Design Criteria 54 and 56 of Appendix A to 10 CFR 50, and that are sized to satisfy the flow requirements of the recombiner or purge system.The procedures for the use of combustible gas control systems following an accident that results in a degraded core and release of radioactivity to the containment must be reviewed and revised, if necessary. Clarification
: 1. An acceptable alternative to the dedicated penetration          is a combined design that is singlefailure proof for containment isolation purposes and singlefailure proof for operation of the recombiner or purge system.      2. The dedicated penetration or the combined singlefailure          proof alternative shall be sized such that the flow requirements for the use of the recombiner or purge system are satisfied. The design shall be based on 10 CFR 50.44 requirements.      3. Components furnished to satisfy this requirement shall          be safety grade.      4. Licensees that rely on purge systems as the primary          means of controlling combustible gases following a loss ofcoolant accident should be aware of the positions taken in SECY80399, "Proposed Interim Amendments to 10 CFR Part 50 Related to Hydrogen Control and Certain Degraded Core Considerations."  This proposed rule, published in the Federal Register on October 2, 1980, would require plants that do  not  have  recombiners  to      18.239    Rev. 0 WOLF CREEK          have the capacity to install external recombiners by          January 1, 1982.  (Installed internal recombiners are an acceptable alternative to the above.)      5. Containment atmosphere dilution (CAD) systems are          considered to be purge systems for the purpose of implementing the requirements of this TMI Task Action item. 18.2.10.2  The Operating Agent ResponseThe postaccident H2 control is accomplished by redundant hydrogen recombiners which are permanently installed inside the containment. Therefore, dedicated hydrogen control penetrations are not required, and this item is not applicable to WCGS. As a backup to the safetyrelated hydrogen control system, a means of purging hydrogen from the containment is provided. Only the containment penetrations and the associated isolation valves are safetyrelated in the hydrogen purge system. These penetrations are not the subject of this item, since they do not serve external hydrogen recombiners. Since the hydrogen recombiners are actuated from the control room, the shielding and personnel exposure limitations associated with recombiner use and development of procedures for reduction of doses are not applicable to WCGS. 18.2.10.3  ConclusionItem II.E.4.1 is not applicable to WCGS.
18.2.11  CONTAINMENT ISOLATION DEPENDABILITY (II.E.4.2) 18.2.11.1  NRC Guidance Per NUREG0737Position
: 1. Containment isolation system designs shall comply with          the recommendations of Standard Review Plan Section 6.2.4 (i.e., that there be diversity in the parameters sensed for the initiation of containment isolation).      2. All plant personnel shall give careful consideration to          the definition of essential and nonessential systems, identify each system determined to be essential, identify each system determined to be nonessential, describe the basis for selection of each essential system, modify their containment isolation designs accordingly, and report the results of the reevaluation to the NRC.      3. All nonessential systems shall be automatically isolated          by the containment isolation signal.      18.240    Rev. 0 WOLF CREEK      4. The design of control systems for automatic containment          isolation valves shall be such that resetting the isolation signal will not result in the automatic reopening of containment isolation valves. Reopening of containment isolation valves shall require deliberate operator action.      5. The containment setpoint pressure that initiates          containment isolation for nonessential penetrations must be reduced to the minimum compatible with normal operating conditions.      6. Containment purge valves that do not satisfy the          operability criteria set forth in Branch Technical Position CSB 64 or the Staff Interim Position of October 23, 1979 must be sealed closed as defined in SRP 6.2.4, Item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves must be verified to be closed at least every 31 days.  (A copy of the Staff Interim Position [was to be] enclosed as Attachment 1
          [to NUREG0737].)      7. Containment purge and vent isolation valves must close          on a high radiation signal. Clarification
: 1. The reference to SRP 6.2.4 in position 1 is only to the          diversity requirements set forth in that document.      2. For postaccident situations, each nonessential          penetration (except instrument lines) is required to have two isolation barriers in series that meet the requirements of General Design Criteria 54, 55, 56, and 57, as clarified by Standard Review Plan, Section 6.2.4.
Isolation must be performed automatically (i.e., no credit can be given for operator action). Manual valves must be sealed closed, as defined by Standard Review Plan, Section 6.2.4, to qualify as an isolation barrier. Each automatic isolation valve in a nonessential penetration must receive the diverse isolation signals.      3. Revision 2 to Regulatory Guide 1.141 will contain          guidance on the classification of essential versus nonessential systems and is due to be issued by June 1981. Requirements for operating plants to review their list of essential and nonessential systems will be issued in conjunction with this guide, including an appropriate time schedule for completion.      18.241    Rev. 0 WOLF CREEK      4. Administrative provisions to close all isolation valves          manually before resetting the isolation signals is not an acceptable method of meeting position 4.      5. Ganged reopening of containment isolation valves is not          acceptable. Reopening of isolation valves must be performed on a valvebyvalve basis, or on a lineby line basis, provided that electrical independence and other singlefailure criteria continue to be satisfied.      6. The containment pressure history during normal operation          should be used as a basis for arriving at an appropriate minimum pressure setpoint for initiating containment isolation. The pressure setpoint selected should be far enough above the maximum observed (or expected) pressure inside containment during normal operation so that inadvertent containment isolation does not occur during normal operation from instrument drift or fluctuations due to the accuracy of the pressure sensor. A margin of 1 psi above the maximum expected containment pressure should be adequate to account for instrument error. Any proposed values greater than 1 psi will require detailed justification. Applicants for an operating  license and  operating  plant licensees that  have operated less than one year should use pressure history data from similar plants that have operated more than one year, if possible, to arrive at a minimum containment setpoint pressure.      7.)  Sealedclosed purge isolation valves shall be under          administrative control to ensure that they cannot be inadvertently opened. Administrative control includes mechanical devices to seal or lock the valve closed, or to prevent power from being supplied to the valve operator. Checking the valve position light in the control room is an adequate method for verifying every 24 hours that the purge valves are closed. 18.2.11.2  The Operating Agent ResponseThe containment isolation system and the containment isolation actuation are described in Sections 6.2.4, 7.3.2, and 7.3.8. All lines penetrating the containment are identified in Figure 6.2.41. This figure also identifies the actuation signal(s) for isolation of those lines requiring isolation. The logic design for containment isolation is such that resetting of the containment isolation signal will not result in the loss of containment      18.242    Rev. 0 WOLF CREEK isolation. Once the initiating signal is reset, individual valves can be opened from the control room, if required. Reopening of isolation valves is performed on a valvebyvalve or linebyline basis. The containment isolation setpoint pressure (Hi1) that initiates containment isolation (CISA) for nonessential penetrations has been reduced to the minimum compatible with normal operating conditions. Refer to SNUPPS letter dated March 15, 1984. The Technical Specifications establish a limit for containment pressure during normal operations. The Technical Specifications also contain the setpoint for Hi1 which is based on the normal operation limit and instrument drift and accuracy. Table 18.22 identifies systems as either essential or nonessential. Essential systems are those systems required to have isolation valves open for eitherpostaccident safe shutdown or mitigation of the consequences of an accident.The greatest number of lines are automatically isolated upon initiation of a containment isolation signal, Phase A (CISA). A safety injection signal (SIS)initiates a feedwater isolation signal (FWIS) and a steam generator blowdown isolation signal (SGBSIS). A CISA is initiated when a safety injection signal (SIS) is initiated. The diverse parameters sensed to initiate a SIS are lowsteam line pressure or low pressurizer pressure or high containment pressure(Hi1). The CISA logic is shown on Figure 7.21, Sheet 8. The main steam and related lines are automatically isolated upon initiation of a steam line isolation signal (SLIS). The diverse parameters sensed to initiate an SLIS are either low steam line pressure or high negative steam pressure rate and high containment pressure (Hi2). The SLIS logic is shown on Figure 7.21, Sheet 8. The lines supplying component cooling water to equipment inside the containment are isolated by CISB. A CISB is initiated by high containment pressure (Hi 3). It is not diverse, and is initiated with initiation of a containment spray actuation, which does utilize diversity. The CISB is shown on Figure 7.21, Sheet 8. The containment purge system is isolated upon initiation of a containment purge isolation signal (CPIS). The diverse parameters sensed to initiate a CPIS are high containment radiation level and high containment purge exhaust radiation level, or a CISA signal. The CPIS logic is shown in Figure 7.31, Sheet 2.      18.243    Rev. 14 WOLF CREEK  The guidelines used for operability of containment purge isolation valves intended for use during plant operation comply with NRC criteria.
Documentation of operability was provided by SNUPPS letter dated January 16, 1984.  (Reference 11). The shutdown purge system isolation valves meet SRP 6.2.4, item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves are verified to be closed in accordance with NUREG-0737, Item II.E.4.2.


All containment isolation valves are provided with control switches on the main control board. Manual actuation switches are provided for initiation of CIS-A, SLIS, and CPIS. In addition to diversity, these systems are redundant and meet safety-grade (Class 1E) criteria.  
loss of manual capability to initiate the AFS from the
 
control room.
In the long term, the automatic initiation signals and circuits shall be upgraded in accordance with safetygrade requirements.
Clarification
 
The intent of this recommendation is to ensure a reliable automatic initiation system. This objective can be met by providing a system which meets all the requirements of IEEE Standard 2791971. Position  Part 2:  AFS Flowrate Indication
 
Consistent with satisfying the requirements set forth in General Design Criterion 13 to provide the capability in the control room to ascertain the
 
actual performance of the AFS when it is called to perform its intended
 
function, the following requirements shall be implemented:      1. Safetygrade indication of auxiliary feedwater flow to each steam generator shall be provided in the control
 
room.
: 2. The auxiliary feedwater flow instrument channels shall be powered from the emergency buses consistent with
 
satisfying the emergency power diversity requirements of
 
the auxiliary feedwater system set forth in Auxiliary Systems Branch Technical Position 101 of the Standard
 
Review Plan, Section 10.4.9.      18.234    Rev. 0 WOLF CREEK Clarification The intent of this recommendation is to ensure a reliable indication of AFS performance. This objective can be met by providing an overall indication
 
system that meets the following appropriate design principles:
For Westinghouse and Combustion Engineering Plants
: 1. To satisfy these requirements, W and CE plants must provide as a minimum one auxiliary feedwater flow rate indicator and one widerange steamgenerator level
 
indicator for each steam generator or two flowrate
 
indicators.
: 2. The flow indication system should be:
: a. Environmentally qualified
: b. Powered from highly reliable, batterybacked non Class 1E power source
: c. Periodically testable
: d. Part of plant quality assurance program
: e. Capable of display on command
 
It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A humanfactor analysis should be performed, taking into consideration:
: 1. The use of this information by an operator during both normal and abnormal plant conditions.
: 2. Integration into emergency procedures.
: 3. Integration into operator training.
: 4. Other alarms during emergency and need for prioritization of alarms.
18.2.8.2  The Operating Agent Response Automatic initiation of the AFS meets the NRC recommendations, as described in Sections 10.4.9 and 7.3.6. The AFS flowrate indication meets the NRC
 
recommendations, as described in Sections 10.4.9 and 7.5.      18.235    Rev. 0 WOLF CREEK The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.
 
Based on this review a confirmatory licensing issue was identified, regarding
 
physically securing the condensate storage tank manual isolation valve. This
 
issue was resolved prior to initial fuel load.
18.2.8.3  Conclusion The WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.2 of NUREG0737.
18.2.9  EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS (II.E.3.1) 18.2.9.1  NRC Guidance Per NUREG0737 Position Consistent with satisfying the requirements of General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of loss of offsite
 
power, the following positions shall be implemented:
: 1. The pressurizer heater power supply design shall provide the capability to supply, from either the offsite power
 
source or the emergency power source (when offsite power
 
is not available), a predetermined number of pressurizer
 
heaters  and associated  controls necessary to establish
 
and maintain natural circulation at hot standby
 
conditions. The required heaters and their controls
 
shall be connected to the emergency buses in a manner
 
that will provide redundant power supply capability.
: 2. Procedures and training shall be established to make the operator aware of when and how the required pressurizer
 
heaters shall be connected to the emergency buses. If
 
required, the procedures shall identify under what
 
conditions selected emergency loads can be shed from the
 
emergency power source to provide sufficient capacity
 
for the connection of the pressurizer heaters.
: 3. The time required to accomplish the connection of the preselected pressurizer heater to the emergency buses
 
shall be consistent with the timely initiation and
 
maintenance of natural circulation conditions.      18.236    Rev. 0 WOLF CREEK
: 4. Pressurizer heater motive and control power interfaces with the emergency buses shall be accomplished through
 
devices that have been qualified in accordance with safetygrade requirements.
Clarification
: 1. Redundant heater capacity must be provided, and each redundant heater or group of heaters should have access
 
to only Class 1E division power supply.
: 2. The number of heaters required to have access to each emergency power source is that number required to
 
maintain natural circulation in the hot standby
 
condition.
: 3. The power sources need not necessarily have the capacity to provide power to the heaters concurrently with the loads required for lossofcoolant accident.
: 4. Any changover of the heaters from normal offsite power to emergency onsite power is to be accomplished manually
 
in the control room.
: 5. In establishing procedure to manually load the pressurizer heaters onto the emergency power sources, careful consideration must be given to:
: a. Which ESF loads may be appropriately shed for a given situation.
: b. Reset of the safety injection actuation signal to permit the operation of the heaters.
: c. Instrumentation and criteria for operator use to prevent overloading a diesel generator.
: 6. The Class 1E interfaces for main power and control power          are to be protected by safetygrade circuit breakers
 
(see also Regulatory Guide 1.75).      7. Being nonClass 1E loads, the pressurizer heaters must be automatically shed from the emergency power sources
 
upon the occurrence of a safety injection actuation
 
signal (see item 5.b. above).
18.2.9.2  The Operating Agent Response The total rated capacity of the pressurizer heaters at 480 volts ac is 1800 Kw(Table 5.11). The pressurizer heaters are divided      18.237    Rev. 14 WOLF CREEK into three groups (see Figure 8.31). The rated capacity of each group is as follows:    Group A  692 Kw      Group B  692 Kw Group C  416 Kw The group C heaters are used for proportional control during power operation.
Groups A and B are the backup heater groups; each of these two groups is powered from a Class lE power source. This power is interrupted by the load
 
shedder/sequencer following a safety injection or emergency bus undervoltage
 
signal.The controls for each backup pressurizer heater group are provided from a non Class 1E 125 Vdc power system. The normal power source is from a nonClass 1E 480 Vac through a battery charger. There is a 125 Vdc battery backup to the480 Vac supply (see Figure 8.36). Each battery charger of the 125Vdc systemis supplied from a single separation group of the 4.16kV onsite emergency distribution system. When the 480Vac system is unavailable following a loss ofoffsite power, the dcbacked power supplies will supply the backup
 
pressurizer heater controls. Similar to the breakers feeding the heater load centers, the circuit breakers supplying the 125Vdc battery chargers are
 
automatically tripped upon an SIS or emergency bus undervoltage signal. They
 
may be reclosed from the control room when desired after reset of the breaker
 
tripping signals. For additional reliability, a crosstie is provided between Separation Groups 5 and 6 of the nonClass 1E 125Vdc system. This will permit operation of
 
selected loads of both separation groups in the event of a failure of either
 
battery charger.
All the breakers which function upon SIS and bus undervoltage are seismically qualified isolation devices.
Analysis shows that subcooling would be maintained in the reactor coolant system for up to 4 hours without heat input from the pressurizer heaters.
 
Pressure control for the reactor coolant system, as discussed in Section
 
5.4(A), can be accomplished without pressurizer heaters. If pressurizer
 
heaters were used for pressure control, analysis indicates that 150 kW is
 
sufficient to maintain subcooling. Plant procedures have been provided for
 
manually connecting (from the control room) pressurizer heaters to emergency
 
power sources following a loss of offsite power.      18.238    Rev. 14 WOLF CREEK 18.2.9.3  ConclusionThe WCGS  design satisfies the guidance of item I.E.3.1 of NUREG0737.
18.2.10  DEDICATED HYDROGEN PENETRATIONS (II.E.4.1) 18.2.10.1  NRC Guidance Per NUREG0737 Position Plants using external recombiners or purge systems for postaccident combustible gas control of the containment atmosphere should provide
 
containment penetration systems for external recombiner or purge systems that are dedicated to that service only, that meet the redundancy and singlefailure
 
requirements of General Design Criteria 54 and 56 of Appendix A to 10 CFR 50, and that are sized to satisfy the flow requirements of the recombiner or purge
 
system.The procedures for the use of combustible gas control systems following an accident that results in a degraded core and release of radioactivity to the
 
containment must be reviewed and revised, if necessary.
Clarification
: 1. An acceptable alternative to the dedicated penetration          is a combined design that is singlefailure proof for containment isolation purposes and singlefailure proof
 
for operation of the recombiner or purge system.      2. The dedicated penetration or the combined singlefailure proof alternative shall be sized such that the flow
 
requirements for the use of the recombiner or purge
 
system are satisfied. The design shall be based on 10
 
CFR 50.44 requirements.
: 3. Components furnished to satisfy this requirement shall be safety grade.
: 4. Licensees that rely on purge systems as the primary          means of controlling combustible gases following a loss ofcoolant accident should be aware of the positions taken in SECY80399, "Proposed Interim Amendments to 10
 
CFR Part 50 Related to Hydrogen Control and Certain
 
Degraded Core Considerations."  This proposed rule, published in the Federal Register on October 2, 1980, would require plants that do  not  have  recombiners  to      18.239    Rev. 0 WOLF CREEK have the capacity to install external recombiners by January 1, 1982.  (Installed internal recombiners are
 
an acceptable alternative to the above.)
: 5. Containment atmosphere dilution (CAD) systems are considered to be purge systems for the purpose of
 
implementing the requirements of this TMI Task Action
 
item.
18.2.10.2  The Operating Agent Response The postaccident H 2 control is accomplished by redundant hydrogen recombiners which are permanently installed inside the containment. Therefore, dedicated hydrogen control penetrations are not required, and this item is not applicable
 
to WCGS. As a backup to the safetyrelated hydrogen control system, a means of purging hydrogen from the containment is provided. Only the containment penetrations and the associated isolation valves are safetyrelated in the hydrogen purge
 
system. These penetrations are not the subject of this item, since they do not
 
serve external hydrogen recombiners. Since the hydrogen recombiners are
 
actuated from the control room, the shielding and personnel exposure
 
limitations associated with recombiner use and development of procedures for
 
reduction of doses are not applicable to WCGS.
18.2.10.3  Conclusion Item II.E.4.1 is not applicable to WCGS.
 
18.2.11  CONTAINMENT ISOLATION DEPENDABILITY (II.E.4.2) 18.2.11.1  NRC Guidance Per NUREG0737 Position
: 1. Containment isolation system designs shall comply with the recommendations of Standard Review Plan Section
 
6.2.4 (i.e., that there be diversity in the parameters
 
sensed for the initiation of containment isolation).
: 2. All plant personnel shall give careful consideration to the definition of essential and nonessential systems, identify each system determined to be essential, identify each system determined to be nonessential, describe the basis for selection of each essential
 
system, modify their containment isolation designs accordingly, and report the results of the reevaluation
 
to the NRC.
: 3. All nonessential systems shall be automatically isolated by the containment isolation signal.      18.240    Rev. 0 WOLF CREEK
: 4. The design of control systems for automatic containment isolation valves shall be such that resetting the
 
isolation signal will not result in the automatic
 
reopening of containment isolation valves. Reopening of
 
containment isolation valves shall require deliberate
 
operator action.
: 5. The containment setpoint pressure that initiates containment isolation for nonessential penetrations must
 
be reduced to the minimum compatible with normal
 
operating conditions.
: 6. Containment purge valves that do not satisfy the operability criteria set forth in Branch Technical Position CSB 64 or the Staff Interim Position of
 
October 23, 1979 must be sealed closed as defined in SRP
 
6.2.4, Item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves must be verified to
 
be closed at least every 31 days.  (A copy of the Staff
 
Interim Position [was to be] enclosed as Attachment 1
[to NUREG0737].)
: 7. Containment purge and vent isolation valves must close on a high radiation signal.
Clarification
: 1. The reference to SRP 6.2.4 in position 1 is only to the diversity requirements set forth in that document.
: 2. For postaccident situations, each nonessential penetration (except instrument lines) is required to
 
have two isolation barriers in series that meet the
 
requirements of General Design Criteria 54, 55, 56, and
 
57, as clarified by Standard Review Plan, Section 6.2.4.
 
Isolation must be performed automatically (i.e., no
 
credit can be given for operator action). Manual valves
 
must be sealed closed, as defined by Standard Review
 
Plan, Section 6.2.4, to qualify as an isolation
 
barrier. Each automatic isolation valve in a
 
nonessential penetration must receive the diverse
 
isolation signals.
: 3. Revision 2 to Regulatory Guide 1.141 will contain guidance on the classification of essential versus
 
nonessential systems and is due to be issued by June
 
1981. Requirements for operating plants to review their
 
list of essential and nonessential systems will be
 
issued in conjunction with this guide, including an
 
appropriate time schedule for completion.      18.241    Rev. 0 WOLF CREEK
: 4. Administrative provisions to close all isolation valves manually before resetting the isolation signals is not
 
an acceptable method of meeting position 4.
: 5. Ganged reopening of containment isolation valves is not acceptable. Reopening of isolation valves must be performed on a valvebyvalve basis, or on a lineby
 
line basis, provided that electrical independence and other singlefailure criteria continue to be satisfied.
: 6. The containment pressure history during normal operation should be used as a basis for arriving at an appropriate
 
minimum pressure setpoint for initiating containment
 
isolation. The pressure setpoint selected should be far
 
enough above the maximum observed (or expected) pressure
 
inside containment during normal operation so that
 
inadvertent containment isolation does not occur during
 
normal operation from instrument drift or fluctuations
 
due to the accuracy of the pressure sensor. A margin of
 
1 psi above the maximum expected containment pressure
 
should be adequate to account for instrument error. Any
 
proposed values greater than 1 psi will require detailed
 
justification. Applicants for an operating  license
 
and  operating  plant licensees that  have operated less
 
than one year should use pressure history data from
 
similar plants that have operated more than one year, if
 
possible, to arrive at a minimum containment setpoint
 
pressure.      7.)  Sealedclosed purge isolation valves shall be under administrative control to ensure that they cannot be
 
inadvertently opened. Administrative control includes
 
mechanical devices to seal or lock the valve closed, or
 
to prevent power from being supplied to the valve
 
operator. Checking the valve position light in the
 
control room is an adequate method for verifying every
 
24 hours that the purge valves are closed.
18.2.11.2  The Operating Agent Response The containment isolation system and the containment isolation actuation are described in Sections 6.2.4, 7.3.2, and 7.3.8. All lines penetrating the containment are identified in Figure 6.2.41. This figure also identifies the actuation signal(s) for isolation of those lines
 
requiring isolation. The logic design for containment isolation is such that
 
resetting of the containment isolation signal will not result in the loss of
 
containment      18.242    Rev. 0 WOLF CREEK isolation. Once the initiating signal is reset, individual valves can be opened from the control room, if required. Reopening of isolation valves is performed on a valvebyvalve or linebyline basis. The containment isolation setpoint pressure (Hi1) that initiates containment isolation (CISA) for nonessential penetrations has been reduced to the
 
minimum compatible with normal operating conditions. Refer to SNUPPS letter
 
dated March 15, 1984. The Technical Specifications establish a limit for
 
containment pressure during normal operations. The Technical Specifications also contain the setpoint for Hi1 which is based on the normal operation limit
 
and instrument drift and accuracy. Table 18.22 identifies systems as either essential or nonessential. Essential systems are those systems required to have isolation valves open for eitherpostaccident safe shutdown or mitigation of the consequences of an accident.
The greatest number of lines are automatically isolated upon initiation of a containment isolation signal, Phase A (CISA). A safety injection signal (SIS) initiates a feedwater isolation signal (FWIS) and a steam generator blowdown isolation signal (SGBSIS). A CISA is initiated when a safety injection signal (SIS) is initiated. The diverse parameters sensed to initiate a SIS are low steam line pressure or low pressurizer pressure or high containment pressure(Hi1). The CISA logic is shown on Figure 7.21, Sheet 8.
The main steam and related lines are automatically isolated upon initiation of a steam line isolation signal (SLIS). The diverse parameters sensed to
 
initiate an SLIS are either low steam line pressure or high negative steam pressure rate and high containment pressure (Hi2). The SLIS logic is shown on Figure 7.21, Sheet 8.
The lines supplying component cooling water to equipment inside the containment are isolated by CISB. A CISB is initiated by high containment pressure (Hi 3). It is not diverse, and is initiated with initiation of a containment spray actuation, which does utilize diversity. The CISB is shown on Figure 7.21, Sheet 8. The containment purge system is isolated upon initiation of a containment purge isolation signal (CPIS). The diverse parameters sensed to initiate a CPIS are
 
high containment radiation level and high containment purge exhaust radiation level, or a CISA signal. The CPIS logic is shown in Figure 7.31, Sheet 2.      18.243    Rev. 14 WOLF CREEK The guidelines used for operability of containment purge isolation valves
 
intended for use during plant operation comply with NRC criteria. 
 
Documentation of operability was provided by SNUPPS letter dated January 16, 1984.  (Reference 11). The shutdown purge system isolation valves meet SRP
 
6.2.4, item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves are verified to be closed in accordance with NUREG-0737, Item
 
II.E.4.2.
 
All containment isolation valves are provided with control switches on the main  
 
control board. Manual actuation switches are provided for initiation of CIS-A, SLIS, and CPIS. In addition to diversity, these systems are redundant and meet  
 
safety-grade (Class 1E) criteria.
 
18.2.11.3  Conclusion
 
The design for the containment isolation system satisfies the requirements of
 
Item II.E.4.2 of NUREG-0737.
 
NOTE:  Section 18.2.12 is historical and reflects conditions at the time of plant licensing. Section 18.2.12 will only be updated when potential hazards not previously analyzed are identified.  


18.2.11.3  Conclusion The design for the containment isolation system satisfies the requirements of Item II.E.4.2 of NUREG-0737.
NOTE:  Section 18.2.12 is historical and reflects conditions at the time of plant licensing. Section 18.2.12 will only be updated when potential hazards not previously analyzed are identified.
18.2.12  ACCIDENT MONITORING INSTRUMENTATION (II.F.1)  
18.2.12  ACCIDENT MONITORING INSTRUMENTATION (II.F.1)  


18.2.12.1  NRC Guidance Per NUREG-0737 Introduction  
18.2.12.1  NRC Guidance Per NUREG-0737  
 
Introduction  
 
Item II.F.1 of NUREG-0660 contains the following subparts:
: 1. Noble gas effluent radiological monitor.
: 2. Provisions for continuous sampling of plant effluents


Item II.F.1 of NUREG-0660 contains the following subparts:
for post-accident releases of radioactive iodines and  
: 1. Noble gas effluent radiological monitor.
 
: 2. Provisions for continuous sampling of plant effluents for post-accident releases of radioactive iodines and particulates and onsite laboratory capabilities (this requirement was inadvertently omitted from NUREG-0660; see Attachment 2 that follows, for position).  
particulates and onsite laboratory capabilities (this  
: 3. Containment high-range radiation monitor.  
 
: 4. Containment pressure monitor.  
requirement was inadvertently omitted from NUREG-0660;  
: 5. Containment water level monitor.  
 
see Attachment 2 that follows, for position).
: 3. Containment high-range radiation monitor.
: 4. Containment pressure monitor.
: 5. Containment water level monitor.
: 6. Containment hydrogen concentration monitor.  
: 6. Containment hydrogen concentration monitor.  


18.2-44    Rev. 30 WOLF CREEK NUREG0578 provided the basic requirements associated with items 1 through 3 above. NRC staff letters issued to All Operating Nuclear Power Plants dated September 13, 1979 and October 30, 1979 provided clarification of staff requirements associated with items 1 through 6 above. Attachments 1 through 6 present the staff position on these matters. It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed (see NUREG0737, Section II.D.2),
18.2-44    Rev. 30 WOLF CREEK NUREG0578 provided the basic requirements associated with items 1 through 3 above. NRC staff letters issued to All Operating Nuclear Power Plants dated  
taking into consideration:     a. the use of this information by an operator during both           normal and abnormal plant conditions,      b. integration into emergency procedures,  
 
: c. integration into operator training,  
September 13, 1979 and October 30, 1979 provided clarification of staff  
: d. other alarms during emergency and need for           prioritization of alarms.      (NOTE:  Because of an editorial error, references to NUREG             0737, Appendix A in the following sections should actually be references to Appendix B.) Attachment 1 Noble Gas Effluent MonitorPosition Noble gas effluent monitors shall be installed with an extended range designed to function during accident conditions as well as during normal operating conditions. Multiple monitors are considered necessary to cover the ranges of interest. 1. Noble gas effluent monitors with an upper range capacity           of 105 Ci/cc (Xe133) are considered to be practical           and should be installed in all operating plants.     2. Noble gas effluent monitoring shall be provided for the           total range of concentration extending from normal conditions (as low as reasonably achievable (ALARA))           concentrations to a maximum of 105Ci/cc (Xe133).           Multiple monitors are considered to be necessary to           cover the ranges of interest. The range capacity of individual monitors should overlap by a factor of 10. 18.245 Rev. 0 WOLF CREEK Clarification    1. Licensees shall provide continuous monitoring of high          level, postaccident releases of radioactive noble gases from the plant. Gaseous effluent monitors shall meet the requirements specified in Table II.F.11 [of NUREG 0737, presented below]. Typical plant effluent pathways to be monitored are also given in the table.     2. The monitors shall be capable of functioning both during           and following an accident. System designs shall accommodate a designbasis release and then be capable of following decreasing concentrations of noble gases.     3. Offline monitors are not required for the PWR secondary           side main steam safety valve and atmospheric relief valve         discharge lines. For this application, externally mounted         monitors viewing the main steam line upstream of the valves are acceptable with procedures to correct for the low energy gammas the external monitors would not detect. Isotopic identification is not required.     4. Instrumentation ranges shall overlap to cover the entire           range of effluents from normal (ALARA) through accident conditions.           The design description shall include the following           information.           a. System description, including:  
 
              (i)    Instrumentation to be used, including range                       or sensitivity, energy dependence or response, calibration frequency and technique, and vendor's model number, if applicable.               (ii)    Monitoring locations (or points of                       sampling), including description of methods used to ensure representative measurements and background correction.               (iii)  Location of instrument readout(s) and                       method of recording including description of the method or procedure for transmitting or disseminating the information or data. 18.246 Rev. 13 WOLF CREEK               (iv)    Assurance of the capability to obtain                       readings at least every 15 minutes during and following an accident.               (v)    The source of power to be used.  
requirements associated with items 1 through 6 above. Attachments 1 through 6  
: b. Description of procedures or calculational methods               to be used for converting instrument readings to release rate per unit time, based on exhaust air flow and considering radionuclide spectrum distribution as a function of time after shutdown.                          TABLE II.F.11              HIGHRANGE NOBLE GAS EFFLUENT MONITORSREQUIREMENT       Capability to detect and measure concentrations                   of noble gas fission products in plant gaseous effluents during and following an accident.
 
All potential accident release paths shall be monitored. PURPOSE            To provide the plant operator and emergency                   planning agencies with information on plant releases of noble gases during and following an accident. Design Basis Maximum RangeDesign range values may be expressed in Xe133 equivalent values for monitors employing gamma radiation detectors or in microcuries per cubic centimeter of air at standard temperature and pressure (STP) for monitors employing beta radiation detectors (Note:  1 R/hr at 1 ft = 6.7 Ci Xe133 equivalent for point source). Calibrations with a higher energy source are acceptable. The decay of radionuclide noble gases after an accident (i.e., the distribution of noble gases changes) should be taken into account. 105Ci/cc        Undiluted containment exhaust gases (e.g., PWR                   reactor building purge, BWR drywell purge                   through the standby gas treatment system).                   Undiluted PWR condenser air removal system                   exhaust. 18.247 Rev. 0 WOLF CREEK 104Ci/cc        Diluted containment exhaust gases (e.g., >10:1                   dilution, as with auxiliary building exhaust                   air).                   BWR reactor building (secondary containment)                   exhaust air.                   PWR secondary containment exhaust air. 103Ci/cc        Buildings with systems containing primary                   coolant or primary coolant offgases (e.g. PWR                   auxiliary building, BWR turbine buildings).                   PWR steam safety valve discharge, atmospheric                 relief valve discharge.102Ci/cc        Other release points (e.g., radwaste building,                  fuel handling/storage buildings).
present the staff position on these matters.
REDUNDANCY        Not required; monitoring the final release point                   of several discharge inputs is acceptable. SPECIFICATIONS    (None) Sampling design criteria per ANSI N13.1.
It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed (see NUREG0737, Section II.D.2),
POWER SUPPLY      Vital instrument bus or dependable backup power                   supply to normal ac. CALIBRATION      Calibrate monitors using gamma detectors to Xe                  133 equivalent (1 R/hr @ 1 ft = 6.7 Ci Xe133 equivalent for point source).                  Calibrate monitors using beta detectors to Sr90                  or similar longlived beta isotope of at least 0.2 MeV. DISPLAY          Continuous and recording as equivalent Xe133                   concentrations or Ci/cc or actual noble gases. QUALIFICATION    The instruments shall provide sufficiently                   accurate responses to perform the intended function in the environment to which they will be exposed during accidents. DESIGN            Offline monitoring is acceptable for allCONSIDERATIONS   ranges of noble gas concentrations.                   Inline (induct) sensors are acceptable for 102Ci/cc to 105Ci/cc noble gases. For less than                   102Ci/cc, offline monitoring is recommended. 18.248 Rev. 13 WOLF CREEK                   Upstream filtration (prefiltering to remove                   radioactive iodines and particulates) is not required; however, design should consider all alternatives with respect to capability to monitor effluents following an accident.                   For external mounted monitors (e.g., PWR main                   steam line), the thickness of the pipe should be taken into account in accounting for lowenergy gamma radiation. Attachment 2 Sampling of Plant EffluentsSampling of Plant Effluents Position Because iodine gaseous effluent monitors for the accident condition are not considered to be practical at this time, capability for effluent monitoring of radioiodines for the accident condition shall be provided with sampling conducted by adsorption on charcoal or other media, followed by onsite laboratory analysis. Clarification
taking into consideration:
: 1. Licensees shall provide continuous sampling of plant           gaseous effluent for postaccident releases of radioactive iodines and particulates to meet the requirements of the enclosed Table II.F.12 (from NUREG 0737, presented below). Licensees shall also provide onsite laboratory capabilities to analyze or measure these samples. This requirement should not be construed to prohibit design and development of radioiodine and particulate monitors to provide online sampling and analysis for the accident condition. If gross gamma radiation measurement techniques are used, then provisions shall be made to minimize noble gas interference.      2. The shielding design basis is given in Table II.F.12          [of NUREG0737]. The sampling system design shall be such that plant personnel could remove samples, replace sampling media, and transport the samples to the onsite analysis facility with radiation exposures that are not in excess of the criteria of GDC19 of 5rem wholebody exposure and 75 rem to the extremities during the duration of the accident.      18.249    Rev. 0 WOLF CREEK     3. The design of the systems for the sampling of           particulates and iodines should provide for sample nozzle entry velocities which are approximately isokinetic (same velocity) with expected induct or instack air velocities. For accident conditions, sampling may be complicated by a reduction in stack or vent effluent velocities to below design levels, making it necessary to substantially reduce sampler intake flow rates to achieve the isokinetic condition. Reductions in air flow may well be beyond the capability of available sampler flow controllers to maintain isokinetic conditions; therefore, the staff will accept flow control devices which have the capability of maintaining isokinetic conditions with variations in stack or duct design flow velocity of +20 percent.
: a. the use of this information by an operator during both normal and abnormal plant conditions,      b. integration into emergency procedures,
Further departure from the isokinetic condition need not be considered in design. Corrections for nonisokinetic sampling conditions, as provided in Appendix C of ANSI 13.11969, may be considered on an ad hoc basis.     4. Effluent streams which may contain air with entrained           water, e.g., air ejector discharge, shall have provisions to ensure that the adsorber is not degraded while providing a representative sample, e.g., heaters.                          TABLE II.F.12SAMPLING AND ANALYSIS OR MEASUREMENT OF HIGHRANGE RADIOIODINE     AND PARTICULATE EFFLUENTS IN GASEOUS EFFLUENT STREAMSEQUIPMENT         Capability to collect and analyze or measure                   representative samples of radioactive iodines and particulates in plant gaseous effluents during and following an accident. The capability to sample and analyze for radioiodine and particulate effluents is not required for PWR secondary main steam safety valve and dump valve discharge lines. PURPOSE          To determine quantitative release of                   radioiodines and particulates for dose calculation and assessment. DESIGN BASIS      102Ci/cc of gaseous radioiodine and particuSHIELDING         lates, deposited on sampling media; 30 minutesENVELOPE         sampling time, average gamma energy (E) of 0.5 MeV.      18.250    Rev. 0 WOLF CREEK SAMPLING MEDIA     Iodine > 90 percent effective adsorption for all forms of     gaseous iodine. Particulates > 90 percent effective retention for 0.3 micron     () diameter particles. SAMPLING CONSIDERATIONS    Representative sampling per ANSI N13.11969. Entrained moisture in effluent stream should not degrade     adsorber. Continuous collection required whenever exhaust flow occurs. Provisions for limiting occupational dose to personnel     incorporated in sampling systems, in sample handling and     transport, and in analysis of samples. ANALYSIS    Design of analytical facilities and preparation of analytical     procedures shall consider the design basis sample. Highly radioactive samples may not be compatible with     generally accepted analytical procedures; in such cases,      measurement of emissive gamma radiations and the use of shielding and distance factors should be considered in design. Attachment 3 Containment HighRange Radiation MonitorPosition In containment radiationlevel monitors with a maximum range of 108 rad/hr shall be installed. A minimum of two such monitors that are physically separated shall be provided. Monitors shall be developed and qualified to function in an accident environment. Clarification
: c. integration into operator training,
: 1. Provide two radiation monitor systems in containment           which are documented to meet the requirements of Table II.F.13 (of NUREG0737, presented below).      18.251    Rev. 0 WOLF CREEK     2. The specification of 108 rad/hr in the above position           was based on a calculation of postaccident containment           radiation levels that included both particulate (beta) and photon (gamma) radiation. A radiation detector that responds to both beta and gamma radiation cannot be qualified to postLOCA (lossofcoolant accident) containment environments, but gammasensitive instruments can be so qualified. In order to follow the course of an accident, a containment monitor that measures only gamma radiation is adequate. The requirement was revised in the October 30, 1979 letter to  provide  for  a photononly measurement with an upper range of 107 R/hr.      3. The monitors shall be located in containment(s) in a manner which will provide a reasonable assessment of area radiation conditions inside the containment. The monitors shall be widely separated so as to provide independent measurements and shall "view" a large fraction of the containment volume. Monitors should not be placed in areas which are protected by massive shielding and should be reasonably accessible for replacement, maintenance, or calibration. Placement high in a reactor building dome is not recommended because of potential maintenance difficulties.     4. For BWR Mark III containments, two such monitoring           systems should be inside both the primary containment (drywell) and the secondary containment.     5. The monitors are required to respond to gamma photons           with energies as low as 60 keV and to provide an essentially flat response for gamma energies between 100 keV and 3 MeV, as specified in Table 11.F.13 of NUREG 0737. Monitors that use thick shielding to increase the upper range will underestimate postaccident radiation levels in containment by several orders of magnitude because of their insensitivity to low energy gammas and are not acceptable.                          TABLE II.F.13            CONTAINMENT HIGHRANGE RADIATION MONITORREQUIREMENT         The capability to detect and measure the                     radiation level within the reactor containment during and following an accident.      18.252    Rev. 0 WOLF CREEK RANGE              l rad/hr to 108 rads/hr (beta and gamma) or                     alternatively 1 R/hr to 107 R/hr (gamma only). RESPONSE            60 keV to 3 MeV photons, with linear energy                     response +20%) for photons of 0.1 MeV to 3 MeV. Instruments must be accurate enough to provide usable information. REDUNDANT          A minimum of two physically separated monitors                     (i.e., monitoring widely separated spaces within containment). DESIGN AND          Category  1  instruments  as  described  in QUALIFICATION      Appendix  A  (of NUREG0737), except as listed below. SPECIAL            In situ calibration by electronic  signal subCALIBRATION         stitution is acceptable for all range decades above 10 R/hr. In situ calibration for at least one decade below 10 R/hr shall be by means of calibrated radiation source. The original laboratory calibration is not an acceptable position due to the possible differences after in situ installation. For highrange calibration, no adequate sources exist, so an alternate was provided. SPECIAL            Calibrate  and typetest representative speci ENVIRONMENTAL      mens of detectors at sufficient points to QUALIFICATIONS      demonstrate linearity through all scales up to 106 R/hr. Prior to initial use, certify                     calibration of each detector for at least one point per decade of range between 1 R/hr and 103 R/hr. Attachment 4 Containment Pressure MonitorPositionA continuous indication of containment pressure shall be provided in the control room of each operating reactor. Measurement and indication capability shall include three times the design pressure of the containment for concrete, four times the design pressure for steel and 5 psig for all containments.      18.253    Rev. 0 WOLF CREEK Clarification     1. Design and qualification criteria are outlined in          Appendix A (of NUREG0737).     2. Measurement and indication capability shall extend to 5           psia for subatmospheric containments.     3. Two or more instruments may be used to meet           requirements. However, instruments that need to be switched from one scale to another scale to meet the range requirements are not acceptable.     4. Continuous display and recording of the containment           pressure over the specified range in the control room is required.     5. The accuracy and response time specifications of the           pressure monitor shall be provided and justified to be adequate for their intended function. Attachment 5 Containment Water Level MonitorPosition A continuous indication of containment water level shall be provided in the control room for all plants. A narrow range instrument shall be provided for PWRs and cover the range from the bottom to the top of the containment sump. A wide range instrument shall also be provided for PWRs and shall cover the range from the bottom of  the containment to the elevation equivalent to a 600,000 gallon capacity. For BWRs, a wide range instrument shall be provided and cover the range from the bottom to 5 feet above the normal water level of the suppression pool. Clarification    1. The containment widerange water level indication           channels shall meet the design and qualification criteria as outlined in Appendix A (of NUREG0737). The narrowrange channel shall meet the requirements of Regulatory Guide 1.89.     2. The measurement capability of 600,000 gallons is based           on recent plant designs. For older plants with smaller water capacities, licensees may propose deviations from this requirement, based on the available water supply capability at their plant.      18.254    Rev. 0 WOLF CREEK      3. Narrowrange water level monitors are required for all           sizes of sumps but are not required in those plants that do not contain sumps inside the containment.      4. For BWR pressuresuppression containments, the emergency           core cooling system (ECCS) suction line inlets may be used as a starting reference point for the narrowrange and widerange water level monitors, instead of the bottom of the suppression pool.     5. The accuracy requirements of the water level monitors           shall be provided and justified to be adequate for their intended function. Attachment 6 Containment Hydrogen MonitorPosition A continuous indication of hydrogen concentration in the containment atmosphere shall be provided in the control room. Measurement capability shall be provided over the range of 0 to 10 percent hydrogen concentration under both positive and negative ambient pressure. Clarification     1. Design and qualification criteria are outlined in          Appendix A (of NUREG0737).     2. The continuous indication of hydrogen concentration is           not required during normal operation.           If an indication is not available at all times,          continuous indication and recording shall be functioning within 30 minutes of the initiation of safety injection.     3. The accuracy and placement of the hydrogen monitors           shall be provided and justified to be adequate for their intended function. 18.255 Rev. 0 WOLF CREEK 18.2.12.2  The Operating Agent ResponseRadiological Noble Gas Effluent Monitors The WCGS design provides a wide range noble gas radiation monitor for each of the release paths listed below. Each monitor includes detectors covering the range shown below:           MONITOR                       RANGE     Plant unit vent                107 to 10+5Ci/cc    (GTRE21B)     Radwaste building effluent      107 to 10+5Ci/Cc    (GHRE10B) The locations of these monitors are shown on Radiation Zone Drawing Figure 12.3.2, sheet 4. Separate monitoring capability for the condenser air removal system is not provided because this system exhausts through the plant vent.
: d. other alarms during emergency and need for prioritization of alarms.      (NOTE:  Because of an editorial error, references to NUREG 0737, Appendix A in the following sections should  
The WCGS design includes gamma detectors to monitor the plume from the mainsteam atmospheric relief valves and to monitor the steam discharge from the turbinedriven auxiliary feedwater pump except for a small quantity of steam vented from the turbine glands. Additional information on this monitoring system is included in Reference 10. Continuous indication is provided in the control room for each monitor. Each monitor is recorded in the control room. The system/methods for monitoring and analysis is described in Reference 10.The readouts from the wide range monitors are input to the plant computers.
 
This information is accessible from the Technical Support Center and the Emergency Operations Facility. The procedures used to calibrate the instruments and calculate release rates have been incorporated into the WCGS procedures. The following additional information was provided by Reference 10.  
actually be references to Appendix B.)   Noble Gas Effluent Monitor Position Noble gas effluent monitors shall be installed with an extended range designed to function during accident conditions as well as during normal operating  
: a. System description information, including energy           dependence or response, range and sensitivity with respect to Xe133, vendor model number, and methods used to assure representative measurements and background correction.     b. The calculational methods or procedures used for           converting instrument readings to release rate per unit time based on exhaust air flow, and considering radionuclide spectrum distribution as a function of time after shutdown. 18.256 Rev. 13 WOLF CREEK Provisions for Continuous Sampling of Plant Effluents for Post Accident Releases of Radioiodines and Particulates The WCGS design provides for continuous sampling of effluent radioiodines and particulates. The wide range gas monitors described above include the capability to obtain grab samples. The sampling accomplished by adsorption of iodine on charcoal filters or other media has been determined to be within the criteria of GDC19 (see Reference 10). The sampling system criteria for all airborne monitoring systems are provided in Section 11.5.2.3.1.2. After collection, laboratory analyzers can be used to quantify iodine or particulates releases. A backup power source is provided for sample collection and analysis equipment to ensure operation for a minimum of 7 consecutive days. The WCGS procedures discuss the methods and counting equipment used to determine releases. The expected doses from obtaining and counting a sample have been calculated to range between 750 and 1750 mrem for a sample at the unit vent.
 
conditions. Multiple monitors are considered necessary to cover the ranges of  
 
interest. 1. Noble gas effluent monitors with an upper range capacity of 10 5 Ci/cc (Xe133) are considered to be practical and should be installed in all operating plants.
: 2. Noble gas effluent monitoring shall be provided for the total range of concentration extending from normal  
 
conditions (as low as reasonably achievable (ALARA))
concentrations to a maximum of 10 5Ci/cc (Xe133).
Multiple monitors are considered to be necessary to cover the ranges of interest. The range capacity of  
 
individual monitors should overlap by a factor of 10. 18.245 Rev. 0 WOLF CREEK Clarification    1. Licensees shall provide continuous monitoring of high          level, postaccident releases of radioactive noble gases  
 
from the plant. Gaseous effluent monitors shall meet the requirements specified in Table II.F.11 [of NUREG  
 
0737, presented below]. Typical plant effluent pathways  
 
to be monitored are also given in the table.
: 2. The monitors shall be capable of functioning both during and following an accident. System designs shall accommodate a designbasis release and then be capable  
 
of following decreasing concentrations of noble gases.
: 3. Offline monitors are not required for the PWR secondary side main steam safety valve and atmospheric relief valve discharge lines. For this application, externally mounted monitors viewing the main steam line upstream of the  
 
valves are acceptable with procedures to correct for the  
 
low energy gammas the external monitors would not  
 
detect. Isotopic identification is not required.
: 4. Instrumentation ranges shall overlap to cover the entire range of effluents from normal (ALARA) through accident  
 
conditions.
The design description shall include the following information.
: a. System description, including:  
 
(i)    Instrumentation to be used, including range or sensitivity, energy dependence or  
 
response, calibration frequency and  
 
technique, and vendor's model number, if  
 
applicable.
(ii)    Monitoring locations (or points of sampling), including description of methods  
 
used to ensure representative measurements  
 
and background correction.
(iii)  Location of instrument readout(s) and method of recording including description  
 
of the method or procedure for transmitting  
 
or disseminating the information or data. 18.246 Rev. 13 WOLF CREEK (iv)    Assurance of the capability to obtain readings at least every 15 minutes during  
 
and following an accident.
(v)    The source of power to be used.
: b. Description of procedures or calculational methods to be used for converting instrument readings to  
 
release rate per unit time, based on exhaust air  
 
flow and considering radionuclide spectrum  
 
distribution as a function of time after shutdown.                          TABLE II.F.11              HIGHRANGE NOBLE GAS EFFLUENT MONITORS REQUIREMENT       Capability to detect and measure concentrations of noble gas fission products in plant gaseous  
 
effluents during and following an accident.  
 
All potential accident release paths shall be  
 
monitored.
PURPOSE            To provide the plant operator and emergency planning agencies with information on plant  
 
releases of noble gases during and following an  
 
accident.
Design Basis Maximum RangeDesign range values may be expressed in Xe133 equivalent values for monitors employing gamma radiation detectors or in microcuries per cubic centimeter of  
 
air at standard temperature and pressure (STP) for monitors employing beta radiation detectors (Note:  1 R/hr at 1 ft = 6.7 Ci Xe133 equivalent for point  
 
source). Calibrations with a higher energy source are acceptable. The decay of  
 
radionuclide noble gases after an accident (i.e., the distribution of noble  
 
gases changes) should be taken into account.
10 5 Ci/cc        Undiluted containment exhaust gases (e.g., PWR reactor building purge, BWR drywell purge through the standby gas treatment system).
Undiluted PWR condenser air removal system exhaust. 18.247 Rev. 0 WOLF CREEK 10 4 Ci/cc        Diluted containment exhaust gases (e.g., >10:1 dilution, as with auxiliary building exhaust air).
BWR reactor building (secondary containment) exhaust air.
PWR secondary containment exhaust air.
10 3 Ci/cc        Buildings with systems containing primary coolant or primary coolant offgases (e.g. PWR auxiliary building, BWR turbine buildings).
PWR steam safety valve discharge, atmospheric relief valve discharge.
10 2 Ci/cc        Other release points (e.g., radwaste building,                  fuel handling/storage buildings).  
 
REDUNDANCY        Not required; monitoring the final release point of several discharge inputs is acceptable.
SPECIFICATIONS    (None) Sampling design criteria per ANSI N13.1.  
 
POWER SUPPLY      Vital instrument bus or dependable backup power supply to normal ac. CALIBRATION      Calibrate monitors using gamma detectors to Xe                  133 equivalent (1 R/hr @ 1 ft = 6.7 Ci Xe133  
 
equivalent for point source).                  Calibrate monitors using beta detectors to Sr90                  or similar longlived beta isotope of at least  
 
0.2 MeV. DISPLAY          Continuous and recording as equivalent Xe133 concentrations or Ci/cc or actual noble gases.
QUALIFICATION    The instruments shall provide sufficiently accurate responses to perform the intended  
 
function in the environment to which they will  
 
be exposed during accidents.
DESIGN            Offline monitoring is acceptable for all CONSIDERATIONS   ranges of noble gas concentrations.
Inline (induct) sensors are acceptable for 10 2 Ci/cc to 10 5 Ci/cc noble gases. For less than 10 2 Ci/cc, offline monitoring is recommended.
18.248 Rev. 13 WOLF CREEK Upstream filtration (prefiltering to remove radioactive iodines and particulates) is not  
 
required; however, design should consider all  
 
alternatives with respect to capability to  
 
monitor effluents following an accident.
For external mounted monitors (e.g., PWR main steam line), the thickness of the pipe should be taken into account in accounting for lowenergy  
 
gamma radiation. Sampling of Plant Effluents Sampling of Plant Effluents  
 
Position Because iodine gaseous effluent monitors for the accident condition are not considered to be practical at this time, capability for effluent monitoring of  
 
radioiodines for the accident condition shall be provided with sampling  
 
conducted by adsorption on charcoal or other media, followed by onsite  
 
laboratory analysis.
Clarification
: 1. Licensees shall provide continuous sampling of plant gaseous effluent for postaccident releases of  
 
radioactive iodines and particulates to meet the requirements of the enclosed Table II.F.12 (from NUREG  
 
0737, presented below). Licensees shall also provide  
 
onsite laboratory capabilities to analyze or measure  
 
these samples. This requirement should not be construed  
 
to prohibit design and development of radioiodine and  
 
particulate monitors to provide online sampling and  
 
analysis for the accident condition. If gross gamma  
 
radiation measurement techniques are used, then  
 
provisions shall be made to minimize noble gas  
 
interference.      2. The shielding design basis is given in Table II.F.12          [of NUREG0737]. The sampling system design shall be  
 
such that plant personnel could remove samples, replace  
 
sampling media, and transport the samples to the onsite  
 
analysis facility with radiation exposures that are not in excess of the criteria of GDC19 of 5rem wholebody  
 
exposure and 75 rem to the extremities during the  
 
duration of the accident.      18.249    Rev. 0 WOLF CREEK
: 3. The design of the systems for the sampling of particulates and iodines should provide for sample  
 
nozzle entry velocities which are approximately  
 
isokinetic (same velocity) with expected induct or  
 
instack air velocities. For accident conditions, sampling may be complicated by a reduction in stack or  
 
vent effluent velocities to below design levels, making  
 
it necessary to substantially reduce sampler intake flow  
 
rates to achieve the isokinetic condition. Reductions  
 
in air flow may well be beyond the capability of  
 
available sampler flow controllers to maintain  
 
isokinetic conditions; therefore, the staff will accept  
 
flow control devices which have the capability of  
 
maintaining isokinetic conditions with variations in  
 
stack or duct design flow velocity of +20 percent.  
 
Further departure from the isokinetic condition need not  
 
be considered in design. Corrections for nonisokinetic  
 
sampling conditions, as provided in Appendix C of ANSI 13.11969, may be considered on an ad hoc basis.
: 4. Effluent streams which may contain air with entrained water, e.g., air ejector discharge, shall have  
 
provisions to ensure that the adsorber is not degraded  
 
while providing a representative sample, e.g., heaters.                          TABLE II.F.12SAMPLING AND ANALYSIS OR MEASUREMENT OF HIGHRANGE RADIOIODINE AND PARTICULATE EFFLUENTS IN GASEOUS EFFLUENT STREAMS EQUIPMENT         Capability to collect and analyze or measure representative samples of radioactive iodines  
 
and particulates in plant gaseous effluents  
 
during and following an accident. The  
 
capability to sample and analyze for radioiodine  
 
and particulate effluents is not required for  
 
PWR secondary main steam safety valve and dump  
 
valve discharge lines.
PURPOSE          To determine quantitative release of radioiodines and particulates for dose  
 
calculation and assessment.
DESIGN BASIS      10 2 Ci/cc of gaseous radioiodine and particu SHIELDING         lates, deposited on sampling media; 30 minutes ENVELOPE         sampling time, average gamma energy (E) of 0.5  
 
MeV.      18.250    Rev. 0 WOLF CREEK SAMPLING MEDIA Iodine > 90 percent effective adsorption for all forms of gaseous iodine.
Particulates > 90 percent effective retention for 0.3 micron
() diameter particles.
SAMPLING CONSIDERATIONS    Representative sampling per ANSI N13.11969.
Entrained moisture in effluent stream should not degrade adsorber.
Continuous collection required whenever exhaust flow occurs.
Provisions for limiting occupational dose to personnel incorporated in sampling systems, in sample handling and transport, and in analysis of samples.
ANALYSIS    Design of analytical facilities and preparation of analytical procedures shall consider the design basis sample.
Highly radioactive samples may not be compatible with generally accepted analytical procedures; in such cases,      measurement of emissive gamma radiations and the use of  
 
shielding and distance factors should be considered in  
 
design. Attachment 3 Containment HighRange Radiation Monitor Position In containment radiationlevel monitors with a maximum range of 10 8 rad/hr shall be installed. A minimum of two such monitors that are physically separated shall be provided. Monitors shall be developed and qualified to  
 
function in an accident environment.
Clarification
: 1. Provide two radiation monitor systems in containment which are documented to meet the requirements of Table II.F.13 (of NUREG0737, presented below).      18.251    Rev. 0 WOLF CREEK
: 2. The specification of 10 8 rad/hr in the above position was based on a calculation of postaccident containment radiation levels that included both particulate (beta)  
 
and photon (gamma) radiation. A radiation detector that  
 
responds to both beta and gamma radiation cannot be qualified to postLOCA (lossofcoolant accident) containment environments, but gammasensitive  
 
instruments can be so qualified. In order to follow the  
 
course of an accident, a containment monitor that  
 
measures only gamma radiation is adequate. The  
 
requirement was revised in the October 30, 1979 letter to  provide  for  a photononly measurement with an  
 
upper range of 10 7 R/hr.      3. The monitors shall be located in containment(s) in a  
 
manner which will provide a reasonable assessment of  
 
area radiation conditions inside the containment. The  
 
monitors shall be widely separated so as to provide  
 
independent measurements and shall "view" a large  
 
fraction of the containment volume. Monitors should not  
 
be placed in areas which are protected by massive  
 
shielding and should be reasonably accessible for  
 
replacement, maintenance, or calibration. Placement  
 
high in a reactor building dome is not recommended  
 
because of potential maintenance difficulties.
: 4. For BWR Mark III containments, two such monitoring systems should be inside both the primary containment  
 
(drywell) and the secondary containment.
: 5. The monitors are required to respond to gamma photons with energies as low as 60 keV and to provide an  
 
essentially flat response for gamma energies between 100 keV and 3 MeV, as specified in Table 11.F.13 of NUREG  
 
0737. Monitors that use thick shielding to increase the  
 
upper range will underestimate postaccident radiation  
 
levels in containment by several orders of magnitude  
 
because of their insensitivity to low energy gammas and  
 
are not acceptable.                          TABLE II.F.13            CONTAINMENT HIGHRANGE RADIATION MONITOR REQUIREMENT         The capability to detect and measure the radiation level within the reactor containment  
 
during and following an accident.      18.252    Rev. 0 WOLF CREEK RANGE              l rad/hr to 10 8 rads/hr (beta and gamma) or alternatively 1 R/hr to 10 7 R/hr (gamma only).
RESPONSE            60 keV to 3 MeV photons, with linear energy response +20%) for photons of 0.1 MeV to 3  
 
MeV. Instruments must be accurate enough to  
 
provide usable information.
REDUNDANT          A minimum of two physically separated monitors (i.e., monitoring widely separated spaces  
 
within containment).
DESIGN AND          Category  1  instruments  as  described  in QUALIFICATION      Appendix  A  (of NUREG0737), except as listed  
 
below.
SPECIAL            In situ calibration by electronic  signal sub CALIBRATION         stitution is acceptable for all range decades  
 
above 10 R/hr. In situ calibration for at  
 
least one decade below 10 R/hr shall be by  
 
means of calibrated radiation source. The  
 
original laboratory calibration is not an  
 
acceptable position due to the possible  
 
differences after in situ installation. For highrange calibration, no adequate sources  
 
exist, so an alternate was provided. SPECIAL            Calibrate  and typetest representative speci ENVIRONMENTAL      mens of detectors at sufficient points to
 
QUALIFICATIONS      demonstrate linearity through all scales up to  
 
10 6 R/hr. Prior to initial use, certify calibration of each detector for at least one  
 
point per decade of range between 1 R/hr and  
 
10 3 R/hr. Attachment 4 Containment Pressure Monitor Position A continuous indication of containment pressure shall be provided in the control room of each operating reactor. Measurement and indication capability  
 
shall include three times the design pressure of the containment for concrete, four times the design pressure for steel and 5 psig for all containments.      18.253    Rev. 0 WOLF CREEK Clarification
: 1. Design and qualification criteria are outlined in          Appendix A (of NUREG0737).
: 2. Measurement and indication capability shall extend to 5 psia for subatmospheric containments.
: 3. Two or more instruments may be used to meet requirements. However, instruments that need to be  
 
switched from one scale to another scale to meet the  
 
range requirements are not acceptable.
: 4. Continuous display and recording of the containment pressure over the specified range in the control room is  
 
required.
: 5. The accuracy and response time specifications of the pressure monitor shall be provided and justified to be  
 
adequate for their intended function. Containment Water Level Monitor Position A continuous indication of containment water level shall be provided in the control room for all plants. A narrow range instrument shall be provided for  
 
PWRs and cover the range from the bottom to the top of the containment sump. A  
 
wide range instrument shall also be provided for PWRs and shall cover the range  
 
from the bottom of  the containment to the elevation equivalent to a 600,000  
 
gallon capacity. For BWRs, a wide range instrument shall be provided and cover  
 
the range from the bottom to 5 feet above the normal water level of the  
 
suppression pool.
Clarification    1. The containment widerange water level indication channels shall meet the design and qualification criteria as outlined in Appendix A (of NUREG0737). The narrowrange channel shall meet the requirements of  
 
Regulatory Guide 1.89.
: 2. The measurement capability of 600,000 gallons is based on recent plant designs. For older plants with smaller  
 
water capacities, licensees may propose deviations from  
 
this requirement, based on the available water supply  
 
capability at their plant.      18.254    Rev. 0 WOLF CREEK      3. Narrowrange water level monitors are required for all sizes of sumps but are not required in those plants that  
 
do not contain sumps inside the containment.      4. For BWR pressuresuppression containments, the emergency core cooling system (ECCS) suction line inlets may be used as a starting reference point for the narrowrange and widerange water level monitors, instead of the  
 
bottom of the suppression pool.
: 5. The accuracy requirements of the water level monitors shall be provided and justified to be adequate for their  
 
intended function. Containment Hydrogen Monitor Position A continuous indication of hydrogen concentration in the containment atmosphere shall be provided in the control room. Measurement capability shall be provided  
 
over the range of 0 to 10 percent hydrogen concentration under both positive  
 
and negative ambient pressure.
Clarification
: 1. Design and qualification criteria are outlined in          Appendix A (of NUREG0737).
: 2. The continuous indication of hydrogen concentration is not required during normal operation.
If an indication is not available at all times,          continuous indication and recording shall be functioning  
 
within 30 minutes of the initiation of safety injection.
: 3. The accuracy and placement of the hydrogen monitors shall be provided and justified to be adequate for their  
 
intended function. 18.255 Rev. 0 WOLF CREEK 18.2.12.2  The Operating Agent Response Radiological Noble Gas Effluent Monitors The WCGS design provides a wide range noble gas radiation monitor for each of the release paths listed below. Each monitor includes detectors covering the  
 
range shown below:
MONITOR RANGE Plant unit vent                10 7 to 10+5 Ci/cc    (GTRE21B)
Radwaste building effluent      10 7 to 10+5 Ci/Cc    (GHRE10B)
The locations of these monitors are shown on Radiation Zone Drawing Figure 12.3.2, sheet 4. Separate monitoring capability for the condenser air removal  
 
system is not provided because this system exhausts through the plant vent.
 
The WCGS design includes gamma detectors to monitor the plume from the main steam atmospheric relief valves and to monitor the steam discharge from the turbinedriven auxiliary feedwater pump except for a small quantity of steam  
 
vented from the turbine glands. Additional information on this monitoring  
 
system is included in Reference 10.
Continuous indication is provided in the control room for each monitor. Each monitor is recorded in the control room.
The system/methods for monitoring and analysis is described in Reference 10.
The readouts from the wide range monitors are input to the plant computers.
 
This information is accessible from the Technical Support Center and the  
 
Emergency Operations Facility.
The procedures used to calibrate the instruments and calculate release rates have been incorporated into the WCGS procedures.
The following additional information was provided by Reference 10.
: a. System description information, including energy dependence or response, range and sensitivity with respect to Xe133, vendor model number, and methods used  
 
to assure representative measurements and background  
 
correction.
: b. The calculational methods or procedures used for converting instrument readings to release rate per unit  
 
time based on exhaust air flow, and considering  
 
radionuclide spectrum distribution as a function of time  
 
after shutdown. 18.256 Rev. 13 WOLF CREEK Provisions for Continuous Sampling of Plant Effluents for Post Accident Releases of Radioiodines and Particulates The WCGS design provides for continuous sampling of effluent radioiodines and particulates. The wide range gas monitors described above include the  
 
capability to obtain grab samples. The sampling accomplished by adsorption of  
 
iodine on charcoal filters or other media has been determined to be within the criteria of GDC19 (see Reference 10). The sampling system criteria for all  
 
airborne monitoring systems are provided in Section 11.5.2.3.1.2. After  
 
collection, laboratory analyzers can be used to quantify iodine or particulates  
 
releases. A backup power source is provided for sample collection and analysis  
 
equipment to ensure operation for a minimum of 7 consecutive days. The WCGS  
 
procedures discuss the methods and counting equipment used to determine  
 
releases. The expected doses from obtaining and counting a sample have been  
 
calculated to range between 750 and 1750 mrem for a sample at the unit vent.
These doses meet the requirements of NUREG0737 and Regulatory Guide 1.97.
These doses meet the requirements of NUREG0737 and Regulatory Guide 1.97.
Additional information regarding how WCGS meets the recommendations of Table II.F.12 and the provisions for approximate isokinetic sampling was provided by Reference 10. Containment Radiation Monitors The WCGS design meets the recommendations of Table II.F.13. The design includes two physically separated Class lE containment radiation monitors. The monitors are designated as 0GTRE59 and 0GTRE60. The detectors are located inside containment. Indication is provided in the control room for each monitor, which is powered from a vital class lE power source. One channel is provided with a recorder, which is powered from vital class 1E power sources. Each monitor has a range up to 108 R/hr for gamma radiation. The monitors are sensitive down to 60 keVphotons. The energy response of the monitors is linear (+20%) for energies between .1 Mev and 3 Mev. The equipment is seismically qualified for the location in which it is installed. The components are environmentally qualified for the environmental conditions to which they may be subjected. Calibration of the monitors is addressed in procedures.
 
Additional information regarding the details of the design is described in Section 11.5.2.3.2.4.      18.257    Rev. 14 WOLF CREEK Containment Pressure Indication The WCGS design provides a dual range, redundant, continuous indication of containment pressure with both ranges (0 to 60 psig and 5 to 180 psig) indicated and recorded in the control room at the same time. The extended range indication loops are Class lE. As a minimum, their range is from minus 5 psig to three times the containment design pressure of 60 psig. The response time of the containment pressure control room indication is 10 seconds for both the narrow and widerange instrument channels. The accuracy of both the narrow and wide range channels is +4 percent of scale. The pressure monitor instrumentation meets the design and qualification criteria of NUREG0737, Appendix B. Containment Water Level Indication The WCGS design includes in the control room continuous indication of the containment water level. This instrumentation is redundant and designed and qualified in accordance with Class lE requirements to meet the requirements of NUREG0737, Appendix B. A single range is used to monitor both the containment normal sump level and the containment water level. The range is 13 feet, which covers 6 inches from the bottom of the containment normal sump to an elevation equivalent to 836,000 gallons. The upper limit of the range is greater than the maximum calculated water level. The accuracy of the indication is 4percent. The switchover of the low pressure safety injection pumps to recirculation is accomplished without the use of the containment water level indication.A single range for the two RHR sump level indicators is used to measure the RHR sump level. Both RHR sump level indicator ranges are 11' 7" (139") measured from 1994' 6" (30" above sump bottom) to 2006' 11" (equivalent to 626,000 gallons). This indication issued to determine if adequate NPSH is available to the pumps taking suction from the containment. Containment Hydrogen Concentration Monitor The present design includes redundant safetygrade (Class lE) containment postLOCA hydrogen analyzers with redundant Class lE indication provided in the control room. These monitors meet the design and qualification requirements of NUREG0737, Appendix B. The hydrogen analyzers have a range of 010 percent hydrogen volume and are designed to operate under minimum and maximum containment design pressure. The hydrogen analyzers are manually initiated following a LOCA. Once initiated, they provide a continuous measurement of hydrogen concentration within 30 minutes.      18.258    Rev. 21 WOLF CREEK The sample points for the containment hydrogen monitors are in the vicinity of the intake of the containment air coolers and the postaccident water level. 18.2.12.3  ConclusionThe WCGS design provides six additional postaccident monitors specified in NUREG0737 for accident diagnosis and mitigation. The Operating Agent has developed emergency operating procedures which detail use of each instrument specified during an accident. The WCGS design is consistent with the recommendations of NUREG0737, item II.F.1, for noble gas monitors. The WCGS design includes features to sample plant effluents under accident conditions. The design of sampling system satisfies the criteria in NUREG 0737, item II.F.1. The containment radiation monitor design meets the recommendations of item II.F.13.The extended range containment pressure monitor design meets the recommendations of item II.F.13. The WCGS design for containment water level indication meets the requirements of NUREG0737, item II.F.15. The WCGS design for the containment hydrogen monitors meet the requirements of NUREG0737, item II.F.16. 18.2.13  INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE         COOLING (II.F.2) 18.2.13.1  NRC Guidance Per NUREG0737Position Licensees shall provide a description of any additional instrumentation or controls (primary or backup) proposed for the plant to supplement existing instrumentation (including primary coolant saturation monitors) in order to provide an unambiguous, easytointerpret indication of inadequate core cooling (ICC). A description of the functional design requirements for the system shall also be included. A description of the procedures to be used with the proposed equipment, the analysis used in developing these procedures, and a schedule for installing the equipment shall be provided.      18.259    Rev. 0 WOLF CREEK Clarification     1. Design of new instrumentation should provide an           unambiguous indication of ICC. This may require new measurements or a synthesis of existing measurements which meet design criteria (item 7).      2. The evaluation is to include reactorwaterlevel           indication.     3. Licensees and applicants are required to provide the           necessary design analysis to support the proposed final instrumentation system for inadequate core cooling and to evaluate the merits of various instruments to monitor water level and to monitor other parameters indicative of corecooling conditions.     4. The indication of ICC must be unambiguous in that it           should have the following properties:           a. It must indicate the existence of inadequate core                cooling caused by various phenomena (i.e., high void fractionpumped flow as well as stagnant boil off); and,          b. It must not erroneously indicate ICC because of the               presence of an unrelated phenomenon.     5. The indication must give advanced warning of the           approach of ICC.     6. The indication must cover the full range from normal           operation to complete core uncovery. For example, waterlevel instrumentation may be chosen to provide advanced warning of twophase level drop to the top of the core and could be supplemented by other indicators such as incore and coreexit thermocouples provided that the indicated temperatures can be correlated to provide indication of the existence of ICC and to infer the extent of core uncovery. Alternatively, fullrange level instrumentation to the bottom of the core may be employed in conjunction with other diverse indicators such as coreexit thermocouples to preclude misinterpretation due to any inherent deficiencies or inaccuracies in the measurement system selected.      18.260    Rev. 0 WOLF CREEK     7. All instrumentation in the final ICC system must be          evaluated for conformance to Appendix A (to NUREG0737),  
Additional information regarding how WCGS meets the recommendations of Table II.F.12 and the provisions for approximate isokinetic sampling was provided by  
           "Design and Qualification Criteria for Accident Monitoring Instrumentation," as clarified or modified by the provisions of items 8 and 9 that follow. This is a new requirement.      8. If a computer is provided to process liquidlevel           signals for display, seismic qualification is not required for the computer and associated hardware beyond the isolator or input buffer at a location accessible for maintenance following an accident. The single failure criteria of item 2, Appendix A, need not apply to the channel beyond the isolation device if it is designed to provide 99 percent availability with respect to functional capability for liquidlevel display. The display and associated hardware beyond the isolation device need not be Class IE, but should be energized from a highreliability power source which is battery backed. The quality assurance provisions cited in Appendix A, item 5, need not apply to this portion of the instrumentation system. This is a new requirement.     9. Incore thermocouples located at the core exit or at           discrete axial levels of the ICC monitoring system and which are part of the monitoring system should be evaluated for conformity with Attachment 1, "Design and Qualification Criteria for PWR Incore Thermocouples,"
 
which is a new requirement.     10. The types and locations of displays and alarms should be           determined by performing a human factors analysis taking into consideration:           a. The use of this information by an operator during               both normal and abnormal plant conditions.           b. Integration into emergency procedures.  
Reference 10.
: c. Integration into operator training.  
Containment Radiation Monitors The WCGS design meets the recommendations of Table II.F.13. The design includes two physically separated Class lE containment radiation monitors. The monitors are designated as 0GTRE59 and 0GTRE60. The detectors are  
: d. Other alarms during emergency and need for               prioritization of alarms.      18.261    Rev. 0 WOLF CREEK ATTACHMENT 1, DESIGN AND QUALIFICATION CRITERIA FOR PRESSURIZEDWATER REACTOR INCORE THERMOCOUPLES     1. Thermocouples located at the core exit for each core           quadrant, in conjunction with core inlet temperature data, shall be of sufficient number to provide indication of radial distribution of the coolant enthalpy (temperature) rise across representative regions of the core. Power distribution symmetry should be considered when determining the specific number and location of thermocouples to be provided for diagnosis of local core problems.     2. There should be a primary operator display (or displays)           having the capabilities which follow:           a. A spatially oriented core map available on demand               indicating the temperature or temperature difference across the core at each core exit thermocouple location.           b. A selective reading of core exit temperature,                continuous on demand, which is consistent with parameters pertinent to operator actions in connecting with plantspecific inadequate core cooling procedures. For example, the action requirement and the displayed temperature might be either the highest of all operable thermocouples or the average of five highest thermocouples.          c. Direct readout and hardcopy capability should be               available for all thermocouple temperatures. The range should extend from 200  F (or less) to 1800 F (or more).          d. Trend capability showing the temperaturetime               history of representative core exit temperature values should be available on demand.           e. Appropriate alarm capability should be provided               consistent with operator procedure requirements.          f. The operatordisplay device interface shall be                humanfactor designed to provide rapid access to requested displays.      18.262    Rev. 0 WOLF CREEK     3. A backup display (or displays) should be provided with           the capability for selective reading of a minimum of 16 operable thermocouples, 4 from each core quadrant, all within a time interval no greater than 6 minutes. The           range should extend from 200  F (or less) to 2300F (or          more).     4. The types and locations of displays and alarms should be          determined by performing a humanfactors analysis taking into consideration:           a. the use of this information by an operator during               both normal and abnormal plant conditions,          b. integration into emergency procedures,  
 
: c. integration into operator training, and  
located inside containment.
: d. other alarms during emergency and need for               prioritization of alarms.     5. The instrumentation must be evaluated for conformance to          Appendix B (to NUREG0737), "Design and Qualification Criteria for Accident Monitoring Instrumentation," as modified by the provisions of items 6 through 9 which follow.     6. The primary and backup display channels should be           electrically independent, energized from independent station Class lE power sources, and physically separated in accordance with Regulatory Guide 1.75 up to and including any isolation device. The primary display and associated hardware beyond the isolation device need not be Class lE, but should be energized from a high reliability power source, battery backed, where momentary interruption is not tolerable. The backup display and associated hardware should be Class lE.     7. The instrumentation should be environmentally qualified           as described in Appendix B, Item 1, except that seismic qualification is not required for the primary display and associated hardware beyond the isolater/input buffer at a location accessible for maintenance following an accident.      18.263    Rev. 0 WOLF CREEK     8. The primary and backup display channels should be           designed to provide 99 percent availability for each channel with respect to functional capability to display a minimum of four thermocouples per core quadrant. The availability shall be addressed in Technical Specifications.     9. The quality assurance provisions cited in Appendix B,          item 5, should be applied except for the primary display and associated hardware beyond the isolation device. 18.2.13.2  The Operating Agent ResponseItem II.F.2 of NUREG0737 specifies the following as required documentation concerning instrumentation for detection of inadequate core cooling (ICC):     1. A description of the proposed final system including:  
Indication is provided in the control room for each monitor, which is powered from a vital class lE power source. One channel is provided with a recorder, which is powered from vital class 1E power sources. Each monitor has a range  
: a. A final design description of additional               instrumentation and displays.           b. A detailed description of existing instrumentation                system (e.g., subcooling meters and incore thermo couples), including parameter ranges and displays, which provide operating information pertinent to ICC consideration.           c. A description of any planned modifications to the               instrumentation systems described in item 1.b above.     2. The necessary design analysis, including evaluation of           various instruments to monitor water level, and available test data to support the design described in item 1 above.     3. A description of additional test programs to be           conducted for evaluation, qualification, and calibration of additional instrumentation.     4. An evaluation, including proposed actions, of the           conformance of the ICC instrument system to this document, including Attachment 1 and Appendix B. Any deviations should be justified.      18.264    Rev. 0 WOLF CREEK     5. A description of the computer functions associated with           ICC monitoring and functional specifications for relevant software in the process computer and other pertinent calculators. The reliability of nonredundant computers used in the system should be addressed.     6. A current schedule, including contingencies, for           installation, testing and calibration, and implementation of any proposed new instrumentation or informative displays.     7. Guidelines for use of the additional instrumentation,          and analyses used to develop these procedures.     8. A summary of key operator action instructions in the           current emergency procedures for ICC and a description of how these procedures will be modified when the final monitoring system is implemented.     9. A description and schedule commitment for any additional           submittals which are needed to support the acceptability of the proposed final instrumentation system and emergency procedures for ICC. The following is a discussion of each of the above items as they relate to the WCGS instrumentation for detection of ICC:     1. The system used at the WCGS unit to detect ICC consists           of a reactor vessel level instrumentation system (RVLIS) and a thermocouple/core cooling monitor system (T/CCMS).           ICC Defined          ICC was defined in WCAP9754, "Inadequate Core Cooling           Studies of Scenario With Feedwater Available Using the NOTRUMP Computer Code," as a high temperature condition in the core such that the operator is required to take action to cool the core before significant damage occurs. During the design basis small lossofcoolant accident, the operator is not required to take any action to recover the plant other than to verify the operable status of the safeguards equipment, trip the reactor coolant pumps (RCPs) when appropriate plant conditions are met, and initiate cold and hot leg recirculation procedures as required. In the design basis small Loss of Coolant Accident (LOCA), a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment. The heatup period is dependent upon the break size and ECCS performance.      18.265    Rev. 0 WOLF CREEK           For a LOCA equivalent in size to approximately 6 inches           diameter or less, an ICC condition can only occur if two or more failures occur in the ECCS. As indicated in WCAP9754, an ICC condition can be calculated by hypothesizing the failure of all high head safety injection (HPSI) for LOCAs of approximately 1 inch in size. For a 4inch equivalentsize LOCA, one can hypothesize an ICC condition by assuming the failure of all HPSI as well as the failure of the passive accumulator system (a truly incredible sequence of events).           For LOCAs of sizes of 6 inches or less, the approach to           ICC is unambiguous to the reactor operators. The first indication of a possible ICC situation is the indication that some of the ECCS pumps have failed to start or are not delivering flow. The second indication of a possible ICC situation is the occurrence of a saturation condition in the primary coolant system as indicated on the subcooling monitor. Shortly after the second indication, the RVLIS would start to indicate the presence of steam voids in the vessel. At some point in time the RVLIS will indicate a collapsed liquid level below the top of the core. The core exit thermocouples (T/Cs) will begin to indicate superheated steam conditions. The RVLIS and core exit T/C behavior provide unambiguous indications to the operator to follow the ICC mitigation procedure.          WCAP9754 indicates that the selected core exit T/Cs           will read 1200F at approximately 11,000 seconds after          the initiation of a 1inch LOCA with the loss of all           High Pressure Safety Injection. The Generic Westinghouse Emergency Operating Procedure (EOP)
 
Guideline instructs the operator to pursue ICC mitigation procedures when these conditions are          reached. The 4inch LOCA indicates 1200F at about 1350           seconds. By following the Westinghouse recommended           EOPs, the operators have earlier indication of a possible ICC situation.           Realistically, an indication of an ICC condition would           not occur until the primary coolant system has drained sufficiently for the reactor vessel mixture level to fall below the top of the core. Westinghouse has performed analyses which indicate that the upper head will drain below the top of the guide tubes before ICC conditions exist. The guide tubes are the only flow path from the upper head to the upper plenum. In WCAP 9754, it was found that ICC situations would not result for LOCAs equivalent in size to approximately 6 inches or      18.266    Rev. 0 WOLF CREEK           less without two or more failures in the ECCS. In both          specific scenarios examined in WCAP9754, a 1inch and 4inch small LOCA, the upper head and upper plenum had completely drained before the onset of an ICC condition.           Large break LOCAs consist of LOCAs in which the fluid           behavior is inertially dominated. Small break LOCAs, on the other hand, have the fluid behavior dominated by gravitational effects. For LOCAs which are significantly larger than an equivalent 6inch break, the ECCS has the maximum potential for flow delivery, since the primary coolant system is at low pressure.
up to 10 8 R/hr for gamma radiation. The monitors are sensitive down to 60 keV photons. The energy response of the monitors is linear (+20%) for energies  
Analyses for LOCAs in this range indicate ambiguous behavior of the core exit T/Cs and RVLIS early in the accident due to dynamic blowdown effects. This behavior is temporary, and the core exit T/Cs and the RVLIS will indicate the progress being made by the ECCS in recovering the core. When the core exit T/Cs and RVLIS may be temporarily providing ambiguous indications, no manual action is needed or useful. Later in the accident when manual action may be useful, the core exit T/Cs and RVLIS provide an unambiguous indication of ICC if it exists. This unambiguous indication may be present as early as 30 seconds after the initiation of the LOCA for a double ended guillotine rupture of a main coolant pipe.           It follows from the above discussion that, for ICC           considerations, a reasonable definition of large breaks are breaks that are significantly larger than an equivalent 6inch break. Note:  The large and small break LOCA         has been redefined as noted in section 6.3 and 15.6.5.         Reactor Vessel Level Instrumentation System          The WCGS design provides redundant safetygrade (Class 1E) reactor vessel water level instrumentation. The four reactor vessel water level indicators (LI1311, LI 1312, LI1321, and LI1322) are located on the main control board reactor auxiliaries console, RL021. The reactor vessel level instrumentation system (Figures 18.213 and 5.11) utilizes two sets of two d/p cells.
 
These cells measure the pressure differential between the bottom of the reactor vessel and the top of the vessel. This d/p measuring system utilizes cells of differing ranges to cover different flow behavior with and without pump operation as discussed below:      18.267    Rev. 14 WOLF CREEK          a. Reactor Vessel  Narrow Range (Pb)              This measurement provides an indication of reactor               vessel level from the bottom of the reactor vessel to the top of the reactor during natural circulation conditions.          b. Reactor Vessel  Wide Range (Pc)              This instrument provides an indication of reactor               core and internals pressure drop for any combination of operating RCPs. Comparison of the measured pressure drop with the normal, single phase pressure drop provides an approximate indication of the relative void content or density of the circulating fluid. The indication of coolant density is significant only when the subcooling is near zero. This instrument monitors coolant conditions on a continuing basis during forced flow conditions. Calculations were performed to obtain an estimate of the differential pressure that the wide range instrument measures with all pumps operating, from ambient temperature to operating temperature. The calculations employ the same methods used to estimate reactor coolant flow for plant design and safety analysis. These calculations were used primarily to define the instrument span and to provide an estimate for the function that compensates the differential pressure signal over the full temperature range, i.e., that results in the wide range display indicating 100 percent over the full temperature range with all pumps operating, pumping subcooled coolant. During the initial plant startup following installation of the instrumentation, wide range differential pressure data is obtained and used to confirm or revise the compensation function so that a 100 percent output is obtained at all temperatures.
between .1 Mev and 3 Mev. The equipment is seismically qualified for the  
Since the calculated compensation function was verified by plant operating data, any uncertainties in the flow and differential pressure estimates are eliminated.                The relationships used in the analogbased RVLIS               system to calculate density corrections are from the ASME Steam Tables, dated 1967. These relationships are implemented within the system by means of memory circuits that generate an output signal      18.268    Rev. 0 WOLF CREEK               which is a predetermined function of the input               signal. The predetermined functions produce specific scopes which are added together to obtain the required inputoutput relationships.           To provide the required accuracy for level measurement,          temperature measurements of the impulse lines are provided. These measurements, together with existing reactor coolant temperature measurements and widerange RCS pressure, are employed to compensate the d/p transmitter outputs for differences in system density and reference leg density, particularly during the change in the environment inside the containment structure following an accident.           Resistance Temperature Detector (RTD) sensors are           installed on every independently run vertical section of impulse line, to provide a measurement for density compensation of the reference leg. If the vertical section of impulse line runs through two compartments separated by a solid floor, an RTD sensor is installed in each compartment. The RTD is installed at the midpoint of each vertical section based on the assumption that the temperature in the compartment is uniform or that the temperature distribution is linear in the vicinity of the impulse line. An allowance for a 5 F difference between the true average impulse line temperature and the RTD measurement is included in the measurement uncertainty analysis. This allowance permits a significant deviation from a linear gradient; e.g., 20 percent of the impulse line could differ by as much as 25 F from a linear gradient without exceeding the allowance. During normal operation, forced circulation from cooling fans is expected to maintain reasonably uniform compartment temperatures. During the LOCA, turbulence within a compartment due to release of steam would also produce a reasonably uniform temperature. Note that the impulse lines are protected from direct jet impingement by metal instrument tubing channels.           The WCGS design does not include hot leg impulse lines.           The layout of the impulse line from the upper head is arranged to prevent or minimize the impact of drainage during an accident. In general, however, the water in the impulse line is cooler than the water in the reactor, and there is sufficient subcooling overpressure in the line so that very little, if any, of the water would flash to steam during a depressurization or      18.269    Rev. 0 WOLF CREEK          containment heatup. Heat conduction along the small           diameter piping and tubing would be insufficient to result in flashing in a significant length of piping.           The connection to the upper head from a spare control           rod drive mechanism port drops or slopes down from the highest point of the vessel connection to the sensor bellows mounted on the refueling canal wall, so water would be retained in this piping. Draining of the vertical section immediately above the reactor vessel has no effect on the level measurement, since this section is included in the operating range of the instrument. Draining of the horizontal portion of vessel vent piping above the vessel also has no effect on the measurement, since no elevation head is involved.           The majority of the impulse line length is in capillary           tubing sealed at both ends with a bellows (sensor bellows at the reactor end, hydraulic isolator at the containment penetration end), so water would be retained in the impulse line at all times. The water is demineralized, deaerated and pressurized by reactor pressure. In the event of a LOCA, the water in the capillary lines would not flash since it is in a sealed system. The lines contain no noncondensible gases and are not in a radiation environment sufficient for the dissociation of water.           Since there is no mechanism for concentration of gases           at the top of the reactor vessel during normal operation, the connection to the top of the vessel would contain, at most, the normal quantity of dissolved gases in the coolant, and the subcooling pressure during an accident would maintain this quantity of gas in solution.           Redundancy of the two instrument trains of the RVLIS is           not compromised by having a shared upper reactor vessel tap since it is not conceivable that the tap will fail either from plugging or breaking. Freedom from plugging is enhanced by 1) use of stainless steel connections which preclude corrosion products, and 2) absence of mechanisms, such as flow for concentrating boric acid.
 
It is also inconceivable that the tap will break because it is in  a protected area. Even if the share tap does      18.270    Rev. 0 WOLF CREEK           fail, it should be recognized that RVLIS is not a           protection system initiating automatic action, but a monitoring system with adequate backup monitoring such as by core exit thermocouples for operator correlation.           Additional information (i.e., analyses, evaluations)           concerning the Westinghouse generic reactor vessel level instrumentation system has been submitted to the NRC via Reference 7. The specific hardware for WCGS is not exactly as documented in Reference 7, since the WCGS design does not include a measurement of reactor vessel level above the hot legs. However, the analyses, evaluations, and conclusions contained in Reference 7 are applicable to WCGS, since they are not sensitive to the above mentioned design difference.           The RVLIS measurement from top to bottom of the vessel           measures the level in the following regions:  top of vessel to top of guide tube; inside guide tube from top to upper support plate; upper plenum; reactor core; and lower plenum. During a LOCA, the RVLIS would measure the water level in the upper head only until the level drops to the top of the guide tubes; RVLIS would then measure level reduction in the guide tubes and upper plenum. The water remaining in the upper head below the top of the guide tubes is not measured by RVLIS. This water would eventually drain through small holes into the guide tubes and downcomer, and this drainage would be accomplished within a few minutes, depending on the accident. In any case, the water temporarily retained in the upper head would have no effect on the RVLIS indication.  (It should be noted that the WFLASH Code, which was used to analyze RVLIS performance, includes calculation of water mass and pressure in the upper head, but this water mass is not included in the calculation of mixture level; hence, the mixture level is indicated only below the elevation of the upper support plate.)           Environmental qualification of the reactor vessel level           instrumentation system high volume sensor was completed in accordance with 10 CFR 50.49.           Thermocouple/Core Cooling Monitor System         The T/CCMS is a core exit thermocouple/core cooling           detection system which provides presentation and display of the status of the core heat removal capability to both the plant operators and the technical support      18.271    Rev. 0 WOLF CREEK           center. In the control room, the two subcooling temperature indicators are located immediately above the four level indicators on the vertical portion of the control board, RL-022. The core exit thermocouple display is mounted on the subcooling monitor cabinet, RP-081. The system consists of redundant channels and output trains of thermocouple measurements, wide-range hot and cold-leg RTD temperatures, and reactor pressure signals. These parameters are used by the system to display thermocouple temperatures and to calculate saturation temperatures and margin of saturation (Tsat margin), which is often referred to as subcooling. The calculations are performed by the system which is based on Advanced Logic System (ALS) Platform and data handling devices.
location in which it is installed. The components are environmentally  
Thermocouple Monitor The core exit thermocouple portion of the ICC system is arranged as follows:  
 
qualified for the environmental conditions to which they may be subjected.
Calibration of the monitors is addressed in procedures.  
 
Additional information regarding the details of the design is described in Section 11.5.2.3.2.4.      18.257    Rev. 14 WOLF CREEK Containment Pressure Indication The WCGS design provides a dual range, redundant, continuous indication of containment pressure with both ranges (0 to 60 psig and 5 to 180 psig)  
 
indicated and recorded in the control room at the same time. The extended  
 
range indication loops are Class lE. As a minimum, their range is from minus 5  
 
psig to three times the containment design pressure of 60 psig.
The response time of the containment pressure control room indication is 10 seconds for both the narrow and widerange instrument channels. The accuracy  
 
of both the narrow and wide range channels is +4 percent of scale. The  
 
pressure monitor instrumentation meets the design and qualification criteria of NUREG0737, Appendix B.
Containment Water Level Indication  
 
The WCGS design includes in the control room continuous indication of the containment water level. This instrumentation is redundant and designed and  
 
qualified in accordance with Class lE requirements to meet the requirements of NUREG0737, Appendix B. A single range is used to monitor both the containment  
 
normal sump level and the containment water level. The range is 13 feet, which  
 
covers 6 inches from the bottom of the containment normal sump to an elevation  
 
equivalent to 836,000 gallons. The upper limit of the range is greater than the maximum calculated water level. The accuracy of the indication is 4 percent. The switchover of the low pressure safety injection pumps to recirculation is accomplished without the use of the containment water level indication.
A single range for the two RHR sump level indicators is used to measure the RHR sump level. Both RHR sump level indicator ranges are 11' 7" (139") measured from 1994' 6" (30" above sump bottom) to 2006' 11" (equivalent to 626,000 gallons). This indication issued to determine if adequate NPSH is available to the pumps taking suction from the containment.
Containment Hydrogen Concentration Monitor The present design includes redundant safetygrade (Class lE) containment post LOCA hydrogen analyzers with redundant Class lE indication provided in the  
 
control room. These monitors meet the design and qualification requirements of NUREG0737, Appendix B. The hydrogen analyzers have a range of 010 percent  
 
hydrogen volume and are designed to operate under minimum and maximum  
 
containment design pressure.
The hydrogen analyzers are manually initiated following a LOCA. Once initiated, they provide a continuous measurement of hydrogen concentration within 30  
 
minutes.      18.258    Rev. 21 WOLF CREEK The sample points for the containment hydrogen monitors are in the vicinity of the intake of the containment air coolers and the postaccident water level.
18.2.12.3  ConclusionThe WCGS design provides six additional postaccident monitors specified in NUREG0737 for accident diagnosis and mitigation. The Operating Agent has  
 
developed emergency operating procedures which detail use of each instrument  
 
specified during an accident. The WCGS design is consistent with the recommendations of NUREG0737, item II.F.1, for noble gas monitors.
The WCGS design includes features to sample plant effluents under accident conditions. The design of sampling system satisfies the criteria in NUREG
 
0737, item II.F.1.
The containment radiation monitor design meets the recommendations of item II.F.13.The extended range containment pressure monitor design meets the recommendations of item II.F.13.
The WCGS design for containment water level indication meets the requirements of NUREG0737, item II.F.15.
The WCGS design for the containment hydrogen monitors meet the requirements of NUREG0737, item II.F.16.
18.2.13  INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE COOLING (II.F.2) 18.2.13.1  NRC Guidance Per NUREG0737 Position Licensees shall provide a description of any additional instrumentation or controls (primary or backup) proposed for the plant to supplement existing  
 
instrumentation (including primary coolant saturation monitors) in order to provide an unambiguous, easytointerpret indication of inadequate core cooling (ICC). A description of the functional design requirements for the system  
 
shall also be included. A description of the procedures to be used with the  
 
proposed equipment, the analysis used in developing these procedures, and a  
 
schedule for installing the equipment shall be provided.      18.259    Rev. 0 WOLF CREEK Clarification
: 1. Design of new instrumentation should provide an unambiguous indication of ICC. This may require new  
 
measurements or a synthesis of existing measurements  
 
which meet design criteria (item 7).      2. The evaluation is to include reactorwaterlevel indication.
: 3. Licensees and applicants are required to provide the necessary design analysis to support the proposed final  
 
instrumentation system for inadequate core cooling and  
 
to evaluate the merits of various instruments to monitor  
 
water level and to monitor other parameters indicative of corecooling conditions.
: 4. The indication of ICC must be unambiguous in that it should have the following properties:
: a. It must indicate the existence of inadequate core                cooling caused by various phenomena (i.e., high void fractionpumped flow as well as stagnant boil  
 
off); and,          b. It must not erroneously indicate ICC because of the presence of an unrelated phenomenon.
: 5. The indication must give advanced warning of the approach of ICC.
: 6. The indication must cover the full range from normal operation to complete core uncovery. For example, waterlevel instrumentation may be chosen to provide advanced warning of twophase level drop to the top of  
 
the core and could be supplemented by other indicators such as incore and coreexit thermocouples provided that  
 
the indicated temperatures can be correlated to provide  
 
indication of the existence of ICC and to infer the extent of core uncovery. Alternatively, fullrange  
 
level instrumentation to the bottom of the core may be  
 
employed in conjunction with other diverse indicators such as coreexit thermocouples to preclude  
 
misinterpretation due to any inherent deficiencies or  
 
inaccuracies in the measurement system selected.      18.260    Rev. 0 WOLF CREEK
: 7. All instrumentation in the final ICC system must be          evaluated for conformance to Appendix A (to NUREG0737),  
           "Design and Qualification Criteria for Accident  
 
Monitoring Instrumentation," as clarified or modified by  
 
the provisions of items 8 and 9 that follow. This is a  
 
new requirement.      8. If a computer is provided to process liquidlevel signals for display, seismic qualification is not  
 
required for the computer and associated hardware beyond  
 
the isolator or input buffer at a location accessible for maintenance following an accident. The single  
 
failure criteria of item 2, Appendix A, need not apply  
 
to the channel beyond the isolation device if it is  
 
designed to provide 99 percent availability with respect to functional capability for liquidlevel display. The  
 
display and associated hardware beyond the isolation  
 
device need not be Class IE, but should be energized from a highreliability power source which is battery  
 
backed. The quality assurance provisions cited in  
 
Appendix A, item 5, need not apply to this portion of  
 
the instrumentation system. This is a new requirement.
: 9. Incore thermocouples located at the core exit or at discrete axial levels of the ICC monitoring system and  
 
which are part of the monitoring system should be  
 
evaluated for conformity with Attachment 1, "Design and Qualification Criteria for PWR Incore Thermocouples,"
which is a new requirement.
: 10. The types and locations of displays and alarms should be determined by performing a human factors analysis taking  
 
into consideration:
: a. The use of this information by an operator during both normal and abnormal plant conditions.
: b. Integration into emergency procedures.
: c. Integration into operator training.
: d. Other alarms during emergency and need for prioritization of alarms.      18.261    Rev. 0 WOLF CREEK ATTACHMENT 1, DESIGN AND QUALIFICATION CRITERIA FOR PRESSURIZEDWATER REACTOR INCORE THERMOCOUPLES
: 1. Thermocouples located at the core exit for each core quadrant, in conjunction with core inlet temperature  
 
data, shall be of sufficient number to provide  
 
indication of radial distribution of the coolant  
 
enthalpy (temperature) rise across representative  
 
regions of the core. Power distribution symmetry should  
 
be considered when determining the specific number and  
 
location of thermocouples to be provided for diagnosis  
 
of local core problems.
: 2. There should be a primary operator display (or displays) having the capabilities which follow:
: a. A spatially oriented core map available on demand indicating the temperature or temperature  
 
difference across the core at each core exit  
 
thermocouple location.
: b. A selective reading of core exit temperature,                continuous on demand, which is consistent with  
 
parameters pertinent to operator actions in connecting with plantspecific inadequate core  
 
cooling procedures. For example, the action  
 
requirement and the displayed temperature might be  
 
either the highest of all operable thermocouples or  
 
the average of five highest thermocouples.          c. Direct readout and hardcopy capability should be available for all thermocouple temperatures. The  
 
range should extend from 200  F (or less) to 1800  
 
F (or more).          d. Trend capability showing the temperaturetime history of representative core exit temperature  
 
values should be available on demand.
: e. Appropriate alarm capability should be provided consistent with operator procedure requirements.          f. The operatordisplay device interface shall be                humanfactor designed to provide rapid access to  
 
requested displays.      18.262    Rev. 0 WOLF CREEK
: 3. A backup display (or displays) should be provided with the capability for selective reading of a minimum of 16  
 
operable thermocouples, 4 from each core quadrant, all  
 
within a time interval no greater than 6 minutes. The range should extend from 200  F (or less) to 2300 F (or          more).
: 4. The types and locations of displays and alarms should be          determined by performing a humanfactors analysis taking  
 
into consideration:
: a. the use of this information by an operator during both normal and abnormal plant conditions,          b. integration into emergency procedures,
: c. integration into operator training, and
: d. other alarms during emergency and need for prioritization of alarms.
: 5. The instrumentation must be evaluated for conformance to          Appendix B (to NUREG0737), "Design and Qualification  
 
Criteria for Accident Monitoring Instrumentation," as  
 
modified by the provisions of items 6 through 9 which  
 
follow.
: 6. The primary and backup display channels should be electrically independent, energized from independent  
 
station Class lE power sources, and physically separated  
 
in accordance with Regulatory Guide 1.75 up to and  
 
including any isolation device. The primary display and  
 
associated hardware beyond the isolation device need not be Class lE, but should be energized from a high  
 
reliability power source, battery backed, where  
 
momentary interruption is not tolerable. The backup  
 
display and associated hardware should be Class lE.
: 7. The instrumentation should be environmentally qualified as described in Appendix B, Item 1, except that seismic  
 
qualification is not required for the primary display  
 
and associated hardware beyond the isolater/input buffer  
 
at a location accessible for maintenance following an  
 
accident.      18.263    Rev. 0 WOLF CREEK
: 8. The primary and backup display channels should be designed to provide 99 percent availability for each  
 
channel with respect to functional capability to display  
 
a minimum of four thermocouples per core quadrant. The  
 
availability shall be addressed in Technical  
 
Specifications.
: 9. The quality assurance provisions cited in Appendix B,          item 5, should be applied except for the primary display  
 
and associated hardware beyond the isolation device.
18.2.13.2  The Operating Agent ResponseItem II.F.2 of NUREG0737 specifies the following as required documentation concerning instrumentation for detection of inadequate core cooling (ICC):
: 1. A description of the proposed final system including:
: a. A final design description of additional instrumentation and displays.
: b. A detailed description of existing instrumentation                system (e.g., subcooling meters and incore thermo  
 
couples), including parameter ranges and displays, which provide operating information pertinent to  
 
ICC consideration.
: c. A description of any planned modifications to the instrumentation systems described in item 1.b  
 
above.
: 2. The necessary design analysis, including evaluation of various instruments to monitor water level, and  
 
available test data to support the design described in  
 
item 1 above.
: 3. A description of additional test programs to be conducted for evaluation, qualification, and calibration  
 
of additional instrumentation.
: 4. An evaluation, including proposed actions, of the conformance of the ICC instrument system to this  
 
document, including Attachment 1 and Appendix B. Any  
 
deviations should be justified.      18.264    Rev. 0 WOLF CREEK
: 5. A description of the computer functions associated with ICC monitoring and functional specifications for  
 
relevant software in the process computer and other  
 
pertinent calculators. The reliability of nonredundant  
 
computers used in the system should be addressed.
: 6. A current schedule, including contingencies, for installation, testing and calibration, and  
 
implementation of any proposed new instrumentation or  
 
informative displays.
: 7. Guidelines for use of the additional instrumentation,          and analyses used to develop these procedures.
: 8. A summary of key operator action instructions in the current emergency procedures for ICC and a description  
 
of how these procedures will be modified when the final  
 
monitoring system is implemented.
: 9. A description and schedule commitment for any additional submittals which are needed to support the acceptability  
 
of the proposed final instrumentation system and  
 
emergency procedures for ICC.
The following is a discussion of each of the above items as they relate to the WCGS instrumentation for detection of ICC:
: 1. The system used at the WCGS unit to detect ICC consists of a reactor vessel level instrumentation system (RVLIS)  
 
and a thermocouple/core cooling monitor system (T/CCMS).
ICC Defined          ICC was defined in WCAP9754, "Inadequate Core Cooling Studies of Scenario With Feedwater Available Using the  
 
NOTRUMP Computer Code," as a high temperature condition  
 
in the core such that the operator is required to take  
 
action to cool the core before significant damage occurs. During the design basis small lossofcoolant  
 
accident, the operator is not required to take any  
 
action to recover the plant other than to verify the  
 
operable status of the safeguards equipment, trip the  
 
reactor coolant pumps (RCPs) when appropriate plant  
 
conditions are met, and initiate cold and hot leg  
 
recirculation procedures as required. In the design  
 
basis small Loss of Coolant Accident (LOCA), a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment. The heatup  
 
period is dependent upon the break size and ECCS  
 
performance.      18.265    Rev. 0 WOLF CREEK For a LOCA equivalent in size to approximately 6 inches diameter or less, an ICC condition can only occur if two  
 
or more failures occur in the ECCS. As indicated in WCAP9754, an ICC condition can be calculated by  
 
hypothesizing the failure of all high head safety  
 
injection (HPSI) for LOCAs of approximately 1 inch in size. For a 4inch equivalentsize LOCA, one can  
 
hypothesize an ICC condition by assuming the failure of  
 
all HPSI as well as the failure of the passive  
 
accumulator system (a truly incredible sequence of  
 
events).
For LOCAs of sizes of 6 inches or less, the approach to ICC is unambiguous to the reactor operators. The first  
 
indication of a possible ICC situation is the indication  
 
that some of the ECCS pumps have failed to start or are  
 
not delivering flow. The second indication of a  
 
possible ICC situation is the occurrence of a saturation  
 
condition in the primary coolant system as indicated on  
 
the subcooling monitor. Shortly after the second  
 
indication, the RVLIS would start to indicate the  
 
presence of steam voids in the vessel. At some point in  
 
time the RVLIS will indicate a collapsed liquid level  
 
below the top of the core. The core exit thermocouples  
 
(T/Cs) will begin to indicate superheated steam  
 
conditions. The RVLIS and core exit T/C behavior  
 
provide unambiguous indications to the operator to  
 
follow the ICC mitigation procedure.          WCAP9754 indicates that the selected core exit T/Cs will read 1200 F at approximately 11,000 seconds after          the initiation of a 1inch LOCA with the loss of all High Pressure Safety Injection. The Generic  
 
Westinghouse Emergency Operating Procedure (EOP)  
 
Guideline instructs the operator to pursue ICC  
 
mitigation procedures when these conditions are          reached. The 4inch LOCA indicates 1200 F at about 1350 seconds. By following the Westinghouse recommended EOPs, the operators have earlier indication of a  
 
possible ICC situation.
Realistically, an indication of an ICC condition would not occur until the primary coolant system has drained  
 
sufficiently for the reactor vessel mixture level to  
 
fall below the top of the core. Westinghouse has  
 
performed analyses which indicate that the upper head  
 
will drain below the top of the guide tubes before ICC  
 
conditions exist. The guide tubes are the only flow path from the upper head to the upper plenum. In WCAP  
 
9754, it was found that ICC situations would not result  
 
for LOCAs equivalent in size to approximately 6  
 
inches or      18.266    Rev. 0 WOLF CREEK less without two or more failures in the ECCS. In both          specific scenarios examined in WCAP9754, a 1inch and 4inch small LOCA, the upper head and upper plenum had  
 
completely drained before the onset of an ICC condition.
Large break LOCAs consist of LOCAs in which the fluid behavior is inertially dominated. Small break LOCAs, on  
 
the other hand, have the fluid behavior dominated by  
 
gravitational effects. For LOCAs which are significantly larger than an equivalent 6inch break, the ECCS has the maximum potential for flow delivery, since the primary coolant system is at low pressure.  
 
Analyses for LOCAs in this range indicate ambiguous  
 
behavior of the core exit T/Cs and RVLIS early in the  
 
accident due to dynamic blowdown effects. This behavior  
 
is temporary, and the core exit T/Cs and the RVLIS will  
 
indicate the progress being made by the ECCS in  
 
recovering the core. When the core exit T/Cs and RVLIS  
 
may be temporarily providing ambiguous indications, no  
 
manual action is needed or useful. Later in the  
 
accident when manual action may be useful, the core exit  
 
T/Cs and RVLIS provide an unambiguous indication of ICC  
 
if it exists. This unambiguous indication may be  
 
present as early as 30 seconds after the initiation of  
 
the LOCA for a double ended guillotine rupture of a main  
 
coolant pipe.
It follows from the above discussion that, for ICC considerations, a reasonable definition of large breaks  
 
are breaks that are significantly larger than an equivalent 6inch break. Note:  The large and small break LOCA has been redefined as noted in section 6.3 and 15.6.5.
Reactor Vessel Level Instrumentation System          The WCGS design provides redundant safetygrade (Class  
 
1E) reactor vessel water level instrumentation. The four reactor vessel water level indicators (LI1311, LI 1312, LI1321, and LI1322) are located on the main control board reactor auxiliaries console, RL021. The  
 
reactor vessel level instrumentation system (Figures 18.213 and 5.11) utilizes two sets of two d/p cells.  
 
These cells measure the pressure differential between  
 
the bottom of the reactor vessel and the top of the  
 
vessel. This d/p measuring system utilizes cells of  
 
differing ranges to cover different flow behavior with  
 
and without pump operation as discussed below:      18.267    Rev. 14 WOLF CREEK          a. Reactor Vessel  Narrow Range (Pb)              This measurement provides an indication of reactor vessel level from the bottom of the reactor vessel  
 
to the top of the reactor during natural  
 
circulation conditions.          b. Reactor Vessel  Wide Range (Pc)              This instrument provides an indication of reactor core and internals pressure drop for any  
 
combination of operating RCPs. Comparison of the measured pressure drop with the normal, single  
 
phase pressure drop provides an approximate  
 
indication of the relative void content or density  
 
of the circulating fluid. The indication of  
 
coolant density is significant only when the  
 
subcooling is near zero. This instrument monitors  
 
coolant conditions on a continuing basis during  
 
forced flow conditions. Calculations were  
 
performed to obtain an estimate of the differential  
 
pressure that the wide range instrument measures  
 
with all pumps operating, from ambient temperature  
 
to operating temperature. The calculations employ  
 
the same methods used to estimate reactor coolant  
 
flow for plant design and safety analysis. These  
 
calculations were used primarily to define the  
 
instrument span and to provide an estimate for the  
 
function that compensates the differential pressure  
 
signal over the full temperature range, i.e., that  
 
results in the wide range display indicating 100  
 
percent over the full temperature range with all  
 
pumps operating, pumping subcooled coolant. During  
 
the initial plant startup following installation of  
 
the instrumentation, wide range differential  
 
pressure data is obtained and used to confirm or revise the compensation function so that a 100  
 
percent output is obtained at all temperatures.  
 
Since the calculated compensation function was  
 
verified by plant operating data, any uncertainties  
 
in the flow and differential pressure estimates are  
 
eliminated.                The relationships used in the analogbased RVLIS system to calculate density corrections are from  
 
the ASME Steam Tables, dated 1967. These  
 
relationships are implemented within the system by  
 
means of memory circuits that generate an  
 
output signal      18.268    Rev. 0 WOLF CREEK which is a predetermined function of the input signal. The predetermined functions produce  
 
specific scopes which are added together to obtain the required inputoutput relationships.
To provide the required accuracy for level measurement,          temperature measurements of the impulse lines are  
 
provided. These measurements, together with existing reactor coolant temperature measurements and widerange  
 
RCS pressure, are employed to compensate the d/p  
 
transmitter outputs for differences in system density  
 
and reference leg density, particularly during the  
 
change in the environment inside the containment  
 
structure following an accident.
Resistance Temperature Detector (RTD) sensors are installed on every independently run vertical section of  
 
impulse line, to provide a measurement for density  
 
compensation of the reference leg. If the vertical  
 
section of impulse line runs through two compartments  
 
separated by a solid floor, an RTD sensor is installed  
 
in each compartment. The RTD is installed at the  
 
midpoint of each vertical section based on the  
 
assumption that the temperature in the compartment is  
 
uniform or that the temperature distribution is linear  
 
in the vicinity of the impulse line. An allowance for a  
 
5 F difference between the true average impulse line  
 
temperature and the RTD measurement is included in the  
 
measurement uncertainty analysis. This allowance  
 
permits a significant deviation from a linear gradient;  
 
e.g., 20 percent of the impulse line could differ by as  
 
much as 25 F from a linear gradient without exceeding  
 
the allowance. During normal operation, forced  
 
circulation from cooling fans is expected to maintain  
 
reasonably uniform compartment temperatures. During the  
 
LOCA, turbulence within a compartment due to release of  
 
steam would also produce a reasonably uniform  
 
temperature. Note that the impulse lines are protected  
 
from direct jet impingement by metal instrument tubing  
 
channels.
The WCGS design does not include hot leg impulse lines.
The layout of the impulse line from the upper head is  
 
arranged to prevent or minimize the impact of drainage  
 
during an accident. In general, however, the water in  
 
the impulse line is cooler than the water in the  
 
reactor, and there is sufficient subcooling overpressure  
 
in the line so that very little, if any, of the water  
 
would flash to steam during a depressurization or      18.269    Rev. 0 WOLF CREEK          containment heatup. Heat conduction along the small diameter piping and tubing would be insufficient to  
 
result in flashing in a significant length of piping.
The connection to the upper head from a spare control rod drive mechanism port drops or slopes down from the  
 
highest point of the vessel connection to the sensor  
 
bellows mounted on the refueling canal wall, so water  
 
would be retained in this piping. Draining of the  
 
vertical section immediately above the reactor vessel  
 
has no effect on the level measurement, since this  
 
section is included in the operating range of the  
 
instrument. Draining of the horizontal portion of  
 
vessel vent piping above the vessel also has no effect  
 
on the measurement, since no elevation head is  
 
involved.
The majority of the impulse line length is in capillary tubing sealed at both ends with a bellows (sensor  
 
bellows at the reactor end, hydraulic isolator at the  
 
containment penetration end), so water would be retained  
 
in the impulse line at all times. The water is  
 
demineralized, deaerated and pressurized by reactor  
 
pressure. In the event of a LOCA, the water in the  
 
capillary lines would not flash since it is in a sealed  
 
system. The lines contain no noncondensible gases and  
 
are not in a radiation environment sufficient for the  
 
dissociation of water.
Since there is no mechanism for concentration of gases at the top of the reactor vessel during normal  
 
operation, the connection to the top of the vessel would  
 
contain, at most, the normal quantity of dissolved gases  
 
in the coolant, and the subcooling pressure during an  
 
accident would maintain this quantity of gas in  
 
solution.
Redundancy of the two instrument trains of the RVLIS is not compromised by having a shared upper reactor vessel  
 
tap since it is not conceivable that the tap will fail  
 
either from plugging or breaking. Freedom from plugging  
 
is enhanced by 1) use of stainless steel connections  
 
which preclude corrosion products, and 2) absence of  
 
mechanisms, such as flow for concentrating boric acid.  
 
It is also inconceivable that the tap will break because  
 
it is in  a protected area. Even if the share tap does      18.270    Rev. 0 WOLF CREEK fail, it should be recognized that RVLIS is not a protection system initiating automatic action, but a  
 
monitoring system with adequate backup monitoring such  
 
as by core exit thermocouples for operator correlation.
Additional information (i.e., analyses, evaluations) concerning the Westinghouse generic reactor vessel level  
 
instrumentation system has been submitted to the NRC via  
 
Reference 7. The specific hardware for WCGS is not  
 
exactly as documented in Reference 7, since the WCGS  
 
design does not include a measurement of reactor vessel  
 
level above the hot legs. However, the analyses, evaluations, and conclusions contained in Reference 7  
 
are applicable to WCGS, since they are not sensitive to  
 
the above mentioned design difference.
The RVLIS measurement from top to bottom of the vessel measures the level in the following regions:  top of  
 
vessel to top of guide tube; inside guide tube from top  
 
to upper support plate; upper plenum; reactor core; and  
 
lower plenum. During a LOCA, the RVLIS would measure  
 
the water level in the upper head only until the level  
 
drops to the top of the guide tubes; RVLIS would then  
 
measure level reduction in the guide tubes and upper  
 
plenum. The water remaining in the upper head below the  
 
top of the guide tubes is not measured by RVLIS. This  
 
water would eventually drain through small holes into  
 
the guide tubes and downcomer, and this drainage would  
 
be accomplished within a few minutes, depending on the  
 
accident. In any case, the water temporarily retained  
 
in the upper head would have no effect on the RVLIS  
 
indication.  (It should be noted that the WFLASH Code, which was used to analyze RVLIS performance, includes  
 
calculation of water mass and pressure in the upper  
 
head, but this water mass is not included in the  
 
calculation of mixture level; hence, the mixture level  
 
is indicated only below the elevation of the upper  
 
support plate.)
Environmental qualification of the reactor vessel level instrumentation system high volume sensor was completed  
 
in accordance with 10 CFR 50.49.
Thermocouple/Core Cooling Monitor System The T/CCMS is a core exit thermocouple/core cooling detection system which provides presentation and display  
 
of the status of the core heat removal capability to  
 
both the plant operators and the technical support      18.271    Rev. 0 WOLF CREEK center. In the control room, the two subcooling  
 
temperature indicators are located immediately above the  
 
four level indicators on the vertical portion of the  
 
control board, RL-022. The core exit thermocouple  
 
display is mounted on the subcooling monitor cabinet, RP-081. The system consists of redundant channels and  
 
output trains of thermocouple measurements, wide-range  
 
hot and cold-leg RTD temperatures, and reactor pressure  
 
signals. These parameters are used by the system to  
 
display thermocouple temperatures and to calculate  
 
saturation temperatures and margin of saturation (Tsat  
 
margin), which is often referred to as subcooling. The  
 
calculations are performed by the system which is based  
 
on Advanced Logic System (ALS) Platform and data handling devices.  
 
Thermocouple Monitor  
 
The core exit thermocouple portion of the ICC system is  
 
arranged as follows:
: a. Primary system  
: a. Primary system  


The primary system measures all the thermocouples via isolators located in the qualified backup system cabinet.  
The primary system measures all the thermocouples  
 
via isolators located in the qualified backup  
 
system cabinet.
: b. Backup system  
: b. Backup system  


The backup system consists of two channels, each monitoring approximately half of the 47 core outlet thermocouples. The system has separation and redundancy as well as qualification to comply with Appendix B of NUREG-0737 (see the discussion of item 4 below).
The backup system consists of two channels, each  
 
monitoring approximately half of the 47 core outlet  
 
thermocouples. The system has separation and  


Core Cooling Monitor The core cooling monitor portion of ICC system compares core outlet thermocouple temperatures and hot and cold leg RTD temperatures with the saturation temperature based on the lowest of three pressure signals. This system has separation and redundancy as well as qualification to comply with Appendix B of NUREG-0737 (see the discussion of item 4 below).
redundancy as well as qualification to comply with  


One of the indicators of an approach to an ICC situation is the response of the core exit thermocouples (T/Cs) to the presence of superheated steam. The core exit thermocouples do not provide an indication of the amount 
Appendix B of NUREG-0737 (see the discussion of  


18.2-72    Rev. 28 WOLF CREEK            of core voiding. Response of the core exit T/Cs provides a direct indication of the existence of ICC, the effectiveness of ICC recovery actions, and restoration of adequate core cooling. The core is adequately cooled whenever the vessel mixture level is above the top of the core, and the core may have a significant void fraction and still be adequately cooled.  
item 4 below).  


The thermocouple/core cooling monitor combines the functions of monitoring for excessive core exit thermocouple temperatures and monitoring both core exit thermocouple temperatures and hot and cold leg RTD temperatures for saturation margin (Tsat meter).
Core Cooling Monitor


The system consists of two redundant channels, each monitoring half of the core outlet thermocouples, and four hot and cold leg RTDs. Three reactor pressure input signals are used with the auctioneered low pressure used by the ALS Platform to perform the Tsat          margin function. The thermocouple temperatures are corrected for reference junction temperature with three reference junction temperature signals input to each channel.  (All of the thermocouples connected to one channel are from one reference junction unit).
The core cooling monitor portion of ICC system compares


The system's two redundant trains utilize the following safety-grade equipment:  
core outlet thermocouple temperatures and hot and cold
: a. Thermocouples  
 
: b. Reference junction boxes  
leg RTD temperatures with the saturation temperature
: c. RTDs  
 
: d. Termination Panel
based on the lowest of three pressure signals. This
: e. ALS Platform f. Flat Panel display           g. Analog meters  
 
: h. Digital Recorder (Black Box)
system has separation and redundancy as well as
: i. Power supplies  
 
qualification to comply with Appendix B of NUREG-0737
 
(see the discussion of item 4 below).
 
One of the indicators of an approach to an ICC situation
 
is the response of the core exit thermocouples (T/Cs) to
 
the presence of superheated steam. The core exit
 
thermocouples do not provide an indication of the amount 
 
18.2-72    Rev. 28 WOLF CREEK of core voiding. Response of the core exit T/Cs
 
provides a direct indication of the existence of ICC, the effectiveness of ICC recovery actions, and
 
restoration of adequate core cooling. The core is
 
adequately cooled whenever the vessel mixture level is
 
above the top of the core, and the core may have a
 
significant void fraction and still be adequately
 
cooled.
 
The thermocouple/core cooling monitor combines the
 
functions of monitoring for excessive core exit
 
thermocouple temperatures and monitoring both core exit
 
thermocouple temperatures and hot and cold leg RTD
 
temperatures for saturation margin (Tsat meter).
 
The system consists of two redundant channels, each
 
monitoring half of the core outlet thermocouples, and
 
four hot and cold leg RTDs. Three reactor pressure
 
input signals are used with the auctioneered low
 
pressure used by the ALS Platform to perform the Tsat margin function. The thermocouple temperatures are
 
corrected for reference junction temperature with three
 
reference junction temperature signals input to each
 
channel.  (All of the thermocouples connected to one
 
channel are from one reference junction unit).
 
The system's two redundant trains utilize the following  
 
safety-grade equipment:
: a. Thermocouples
: b. Reference junction boxes
: c. RTDs
: d. Termination Panel
: e. ALS Platform
: f. Flat Panel display
: g. Analog meters
: h. Digital Recorder (Black Box)
: i. Power supplies
: j. Connections and cabling  
: j. Connections and cabling  


18.2-73    Rev. 28 WOLF CREEK           The equipment listed above and shown in Figure 18.2-12 has been designed to satisfy the requirements of IEEE Standard 279. This safety-grade system is isolated from the non-Class 1E plant computer, technical support center, and data links by qualified isolation devices. Details of isolation device qualification for TCCM upgrade can be found in Westinghouse letter LTR-EQ-13-228 "Results of ALS-601 fault and Isolation Barrier Testing for TCCM."
18.2-73    Rev. 28 WOLF CREEK The equipment listed above and shown in Figure 18.2-12  
The system can display individual thermocouple temperatures and provides two levels of alarm when preset temperatures are exceeded. The display is a           flat panel display located at the processing cabinets,          behind the main control board.  
 
has been designed to satisfy the requirements of IEEE  
 
Standard 279. This safety-grade system is isolated from  
 
the non-Class 1E plant computer, technical support  
 
center, and data links by qualified isolation devices.
Details of isolation device qualification for TCCM upgrade can be found in Westinghouse letter LTR-EQ-13-228 "Results of ALS-601 fault and Isolation Barrier Testing for TCCM."  
 
The system can display individual thermocouple  
 
temperatures and provides two levels of alarm when  
 
preset temperatures are exceeded. The display is a flat panel display located at the processing cabinets,          behind the main control board.  
 
The thermocouple monitor can calculate and display core
 
outlet temperature quadrant tilts based on thermocouple
 
temperatures. The tilts calculated by each unit are
 
based on half the total number of core thermocouples.
 
This information is also available to the operator at
 
the main control board via the plant computer.
 
The core cooling monitor compares core outlet
 
thermocouple temperatures and hot and cold leg RTD
 
temperatures with the saturation temperature based on
 
the lowest of three pressure signals. Two levels of
 
alarm are provided for the core cooling (Tsat) monitor
 
function. The margin to saturation is displayed on two
 
redundant analog meters on the vertical section of the
 
main control board and are visible to an operator at the
 
control console.
 
The thermocouple/core cooling monitor provides
 
information to the operator that assists in the
 
performance of the required manual safety functions
 
following a Condition II, III, or IV event. This
 
includes information relative to maintaining the plant 
 
in a Hot Standby condition or to proceeding to a cold 
 
shutdown condition consistent with the Technical
 
Specification limits.
 
At WCGS, the core exit T/Cs protrude slightly from the
 
bottom of the upper core plate support columns. In this
 
location, they measure the temperature of the fluid
 
leaving the core region through the flow passages in the
 
upper core plate. Flow from the upper head must enter
 
the upper plenum via the control rod drive guide tubes 
 
18.2-74    Rev. 28 WOLF CREEK before being able to enter the upper core plate flow passages. In addition, the LOCA blowdown
 
depressurization behavior must be such that there is a
 
flow reversal for the core exit T/Cs to detect the upper
 
head fluid temperature. The upper head fluid is
 
expected to mix with the upper plenum fluid as it drains
 
from the upper head.
The potential for core exit T/C cooling from colder upper head fluid, while the core has an appreciable void
 
fraction, is not viewed as a potential problem for the
 
detection of an inadequate core cooling situation.
 
Although some Semiscale tests indicated core voiding
 
while the upper head was liquid solid, these tests do
 
not imply that the core exit T/Cs would give an
 
ambiguous indication of ICC calculations for a
 
Westinghouse PWR, and consideration of the core exit T/C
 
design would not result in ambiguous ICC indications.
Additional information concerning the thermocouple/core          cooling monitor system is provided in Table 18.23.
: 2. Reference 7 provides a design analysis and evaluation of the instrumentation for detection of ICC. Additional
 
information is provided below.
The reactor coolant pressure and temperature signals          originate from the existing widerange pressure and hot
 
leg RTDs already installed in the plant, and the
 
uncertainties for these instruments are understood. The pressure uncertainty is  60 psi, and the temperature uncertainty is +/- 6 F, resulting in a maximum RVLIS uncertainty contribution of +/- 2.3 percent when the
 
vessel is full. This uncertainty is smaller when the
 
level is at the elevation of the reactor core. This
 
contribution to the total uncertainty would increase
 
roughly in proportion to an increase in the pressure or
 
temperature measurement uncertainty.
A system accuracy of +/- 6 percent water level was a target value established during the conceptual design
 
and was related to the dimensions of the reactor vessel
 
(12 percent from nozzles to top of core) and core (30
 
percent), and the usefulness of the measurement during
 
an accident. The individual uncertainties, resulting
 
from random effects, were combined statistically to
 
obtain the overall instrument system accuracy. Some of      18.275    Rev. 0 WOLF CREEK the individual uncertainties vary with conditions such          as system pressure. Table 18.24 identifies the
 
individual uncertainties for the narrow range
 
measurement while at a system pressure of 1200 psia.
The statistical combination (square root of the sum of the squares) of the individual uncertainties described
 
above resulted in an overall system instrumentation
 
uncertainty of +/- 3.9 percent of the level span for the
 
narrow range indication of approximately 40 feet, or
 
          +/- 1.5 feet, at a system pressure of 1200 psia. Examples
 
of the uncertainty at other system pressures are:
Uncertainty = +/- 3.6 percent at 400 psia Uncertainty = +/- 4.2 percent at 2000 psia By letter dated February 20, 1986, (Reference 15)
Westinghouse reported to the NRC the results of an
 
evaluation relative to the consequences of larger than expected postaccident errors on the T/CCMS. These
 
errors, which are identified in WCAP 8587 (Reference
 
16), affected subcooling margin calculations, the use of
 
T/Cs for ICC indication and the use of T/Cs as
 
temperature compensation for RVLIS. Based on the
 
revised error values, restrictions were placed on use of
 
T/Cs for RVLIS and subcooling margin calculations and
 
the EOP Guidelines were revised to incorporate new ICC
 
indication setpoints and revised accuracy requirements
 
were developed for RVLIS. Modifications to plant
 
hardware and procedures, required by the larger than
 
expected T/CCMS errors, have been implemented at WCGS.
An analysis of the RVLIS hydraulics, an independent analysis of the hydraulics by Oak Ridge National
 
Laboratory (ORNL), and the results of testing at the
 
Semiscale Test Facility in Idaho generally support a
 
response time (50 percent response to a step change in
 
level) of 3 seconds or less for the hydraulics. There
 
are, however, two types of transients which affect the
 
RVLIS response:  a change in level and a change in
 
system pressure. The major factors that influence the
 
RVLIS hydraulics response to these two types of
 
transients are the fluid volume within the RVLIS system
 
and the length of capillary tubing connected to the d/p
 
transmitter. For a level transient, the volume required
 
to displace the transmitter bellows and the total length
 
of capillary tubing are the significant parameters.
 
Although the capillary tubing length (typically 600
 
feet) and diameter (0.089 inch) represent a significant      18.276    Rev. 0 WOLF CREEK resistance to flow, the volume required for a full span deflection of the transmitter bellows is small (0.1
 
cubic inch). The sensor and hydraulic isolator bellows
 
displacement spring constants introduce a small error in
 
the measured level but do not impact the response time
 
of the system.
For a system pressure transient, the total fluid volume of the RVLIS system and the difference in length between
 
the two capillary lines connected to the d/p transmitter
 
are the significant parameters. In theory, the
 
transmitter would not respond to a change in pressure if
 
the two capillary lines were equal in length. In
 
practice, plant layout requirements result in lengths
 
differing by as much as 100 feet. During a system
 
pressure change, the water volume in the RVLIS system
 
will expand or contract a small amount, but measurable
 
pressure drops will develop in the capillary lines as
 
the small volumes move to equalize pressure. The d/p
 
transmitter will indicate a differential pressure or
 
offset caused by one line being longer than the other.
 
For a reasonably rapid transient of 100 psi per second
 
imposed on an RVLIS system having a difference in line
 
lengths of 100 feet, the offset or apparent level change
 
would approach about 2 feet of water, and the offset
 
would remain until the pressure transient is
 
terminated. After the initial blowdown from a small
 
break, the pressure transients would be much slower, and
 
the level offset would be negligible. Much larger
 
offsets approaching full scale deflection could occur
 
(and have been observed during a large break test at
 
Semiscale) during the initial large break transient, but
 
an RVLIS output during this short period of less than 2
 
minutes would not otherwise be useful or required for
 
actions associated with ICC. In addition to the
 
hydraulics response characteristics, the RVLIS
 
electronics incorporate an adjustable lag to filter
 
hydraulic noise when reactor coolant pumps are
 
operating. The lag time constant is adjustable up to 10
 
seconds. The response time associated with the rest of
 
the electronics has essentially no impact on the total
 
response time, which is within 10 seconds.
Blockage in the core will increase the frictional pressure drop and increase the total differential
 
pressure across the vessel. This would be reflected as
 
a higher RVLIS indication. The increase in the RVLIS is
 
most significant under forced flow conditions when the
 
reactor coolant pumps are operating.      18.277    Rev. 0 WOLF CREEK In order for blockage to be present, the core would have to have been uncovered for a prolonged period of time.
 
A low RVLIS indication along with a high core exit
 
thermocouple indication would have been indicated during
 
this time. If the RCPs had been operating throughout
 
the transient, there would have been sufficient cooling
 
to prevent significant core damage. Therefore, for
 
significant blockage to exist during pump operation, the
 
operator would have restarted the pumps after an ICC
 
condition had existed for a period of time. Based on
 
the history of the transient, the operator would know
 
that the RVLIS would read higher than expected.
 
Although the RVLIS would read high, it would still
 
follow the trend in vessel inventory. The operator
 
would be able to monitor the recovery with the RVLIS.
Under natural circulation conditions, the impact of core blockage is not expected to be large. Although the
 
RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and
 
provide useful information for monitoring the recovery
 
from ICC. ICC will have been indicated at an earlier


The thermocouple monitor can calculate and display core outlet temperature quadrant tilts based on thermocouple temperatures. The tilts calculated by each unit are based on half the total number of core thermocouples.
time, before a significant amount of core blockage has
This information is also available to the operator at the main control board via the plant computer.


The core cooling monitor compares core outlet thermocouple temperatures and hot and cold leg RTD temperatures with the saturation temperature based on the lowest of three pressure signals. Two levels of alarm are provided for the core cooling (Tsat) monitor function. The margin to saturation is displayed on two redundant analog meters on the vertical section of the main control board and are visible to an operator at the control console.
occurred. The operator would know that the RVLIS could


The thermocouple/core cooling monitor provides information to the operator that assists in the performance of the required manual safety functions following a Condition II, III, or IV event. This includes information relative to maintaining the plant in a Hot Standby condition or to proceeding to a cold shutdown condition consistent with the Technical Specification limits.
read slightly high, based on the history of the  


At WCGS, the core exit T/Cs protrude slightly from the bottom of the upper core plate support columns. In this location, they measure the temperature of the fluid leaving the core region through the flow passages in the upper core plate. Flow from the upper head must enter the upper plenum via the control rod drive guide tubes 
transient.
Reverse flow in the vessel tends to decrease the d/p across the vessel which would cause the RVLIS to


18.2-74    Rev. 28 WOLF CREEK          before being able to enter the upper core plate flow          passages. In addition, the LOCA blowdown depressurization behavior must be such that there is a flow reversal for the core exit T/Cs to detect the upper head fluid temperature. The upper head fluid is expected to mix with the upper plenum fluid as it drains from the upper head.          The potential for core exit T/C cooling from colder          upper head fluid, while the core has an appreciable void fraction, is not viewed as a potential problem for the detection of an inadequate core cooling situation.
indicate a lower collapsed level than actually exists.  
Although some Semiscale tests indicated core voiding while the upper head was liquid solid, these tests do not imply that the core exit T/Cs would give an ambiguous indication of ICC calculations for a Westinghouse PWR, and consideration of the core exit T/C design would not result in ambiguous ICC indications.          Additional information concerning the thermocouple/core          cooling monitor system is provided in Table 18.23.      2. Reference 7 provides a design analysis and evaluation of          the instrumentation for detection of ICC. Additional information is provided below.          The reactor coolant pressure and temperature signals          originate from the existing widerange pressure and hot leg RTDs already installed in the plant, and the uncertainties for these instruments are understood. The          pressure uncertainty is  60 psi, and the temperature          uncertainty is +/- 6 F, resulting in a maximum RVLIS          uncertainty contribution of +/- 2.3 percent when the vessel is full. This uncertainty is smaller when the level is at the elevation of the reactor core. This contribution to the total uncertainty would increase roughly in proportion to an increase in the pressure or temperature measurement uncertainty.          A system accuracy of +/- 6 percent water level was a          target value established during the conceptual design and was related to the dimensions of the reactor vessel (12 percent from nozzles to top of core) and core (30 percent), and the usefulness of the measurement during an accident. The individual uncertainties, resulting from random effects, were combined statistically to obtain the overall instrument system accuracy. Some of      18.275    Rev. 0 WOLF CREEK          the individual uncertainties vary with conditions such          as system pressure. Table 18.24 identifies the individual uncertainties for the narrow range measurement while at a system pressure of 1200 psia.          The statistical combination (square root of the sum of          the squares) of the individual uncertainties described above resulted in an overall system instrumentation uncertainty of +/- 3.9 percent of the level span for the narrow range indication of approximately 40 feet, or
          +/- 1.5 feet, at a system pressure of 1200 psia. Examples of the uncertainty at other system pressures are:                Uncertainty = +/- 3.6 percent at 400 psia                Uncertainty = +/- 4.2 percent at 2000 psia          By letter dated February 20, 1986, (Reference 15)          Westinghouse reported to the NRC the results of an evaluation relative to the consequences of larger than expected postaccident errors on the T/CCMS. These errors, which are identified in WCAP 8587 (Reference 16), affected subcooling margin calculations, the use of T/Cs for ICC indication and the use of T/Cs as temperature compensation for RVLIS. Based on the revised error values, restrictions were placed on use of T/Cs for RVLIS and subcooling margin calculations and the EOP Guidelines were revised to incorporate new ICC indication setpoints and revised accuracy requirements were developed for RVLIS. Modifications to plant hardware and procedures, required by the larger than expected T/CCMS errors, have been implemented at WCGS.          An analysis of the RVLIS hydraulics, an independent          analysis of the hydraulics by Oak Ridge National Laboratory (ORNL), and the results of testing at the Semiscale Test Facility in Idaho generally support a response time (50 percent response to a step change in level) of 3 seconds or less for the hydraulics. There are, however, two types of transients which affect the RVLIS response:  a change in level and a change in system pressure. The major factors that influence the RVLIS hydraulics response to these two types of transients are the fluid volume within the RVLIS system and the length of capillary tubing connected to the d/p transmitter. For a level transient, the volume required to displace the transmitter bellows and the total length of capillary tubing are the significant parameters.
Although the capillary tubing length (typically 600 feet) and diameter (0.089 inch) represent a significant      18.276    Rev. 0 WOLF CREEK          resistance to flow, the volume required for a full span          deflection of the transmitter bellows is small (0.1 cubic inch). The sensor and hydraulic isolator bellows displacement spring constants introduce a small error in the measured level but do not impact the response time of the system.          For a system pressure transient, the total fluid volume          of the RVLIS system and the difference in length between the two capillary lines connected to the d/p transmitter are the significant parameters. In theory, the transmitter would not respond to a change in pressure if the two capillary lines were equal in length. In practice, plant layout requirements result in lengths differing by as much as 100 feet. During a system pressure change, the water volume in the RVLIS system will expand or contract a small amount, but measurable pressure drops will develop in the capillary lines as the small volumes move to equalize pressure. The d/p transmitter will indicate a differential pressure or offset caused by one line being longer than the other.
For a reasonably rapid transient of 100 psi per second imposed on an RVLIS system having a difference in line lengths of 100 feet, the offset or apparent level change would approach about 2 feet of water, and the offset would remain until the pressure transient is terminated. After the initial blowdown from a small break, the pressure transients would be much slower, and the level offset would be negligible. Much larger offsets approaching full scale deflection could occur (and have been observed during a large break test at Semiscale) during the initial large break transient, but an RVLIS output during this short period of less than 2 minutes would not otherwise be useful or required for actions associated with ICC. In addition to the hydraulics response characteristics, the RVLIS electronics incorporate an adjustable lag to filter hydraulic noise when reactor coolant pumps are operating. The lag time constant is adjustable up to 10 seconds. The response time associated with the rest of the electronics has essentially no impact on the total response time, which is within 10 seconds.          Blockage in the core will increase the frictional          pressure drop and increase the total differential pressure across the vessel. This would be reflected as a higher RVLIS indication. The increase in the RVLIS is most significant under forced flow conditions when the reactor coolant pumps are operating.      18.277    Rev. 0 WOLF CREEK          In order for blockage to be present, the core would have          to have been uncovered for a prolonged period of time.
A low RVLIS indication along with a high core exit thermocouple indication would have been indicated during this time. If the RCPs had been operating throughout the transient, there would have been sufficient cooling to prevent significant core damage. Therefore, for significant blockage to exist during pump operation, the operator would have restarted the pumps after an ICC condition had existed for a period of time. Based on the history of the transient, the operator would know that the RVLIS would read higher than expected.
Although the RVLIS would read high, it would still follow the trend in vessel inventory. The operator would be able to monitor the recovery with the RVLIS.          Under natural circulation conditions, the impact of core          blockage is not expected to be large. Although the RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and provide useful information for monitoring the recovery from ICC. ICC will have been indicated at an earlier time, before a significant amount of core blockage has occurred. The operator would know that the RVLIS could read slightly high, based on the history of the transient.          Reverse flow in the vessel tends to decrease the d/p          across the vessel which would cause the RVLIS to indicate a lower collapsed level than actually exists.
The low indication would not cause the operator to take unnecessary actions, since an ICC recovery action would be based on a coincidence of a low level indication and          a high core exit thermocouple indication (>700F). In a          reverse flow situation, the core exit thermocouples          would be responding to the saturated temperature of the water flowing from the upper plenum to the core, so a          high thermocouple indication of >700F would not occur.          It is important to note that large reverse flows are not          expected to occur for breaks smaller than 6 inches in diameter during the time that the core is uncovered.
Large reverse flow rates may occur early in the blowdown transient for large diameter breaks, but, as is discussed below, it is not necessary to use the RVLIS as a basis for operator action for breaks in this range.      18.278    Rev. 0 WOLF CREEK          During the course of a LOCA transient, the upper plenum          will experience voiding before the upper head. The voids in the upper plenum will be indicated by a lower RVLIS reading. The RVLIS will not indicate where the voiding is occurring, but at this point in the transient, it is not necessary to know the location of the region of voiding. In the early part of the transient, when the mixture level is above the top of the guide tube in the upper head, it is sufficient for the operator to know that the vessel inventory is decreasing, irrespective of the region where voiding is occurring. The fluid in the upper head does not affect the RVLIS indication after the upper head has drained to below the top of the guide tubes. The upper head will drain before the onset of ICC, and  there is not an ambiguous indication during the period of time RVLIS is used.          Experience in overranging of differential pressure          instruments has been obtained in previous applications of differential pressure capsules similar to those used in RVLIS. In dual range flow (differential pressure) applications, the "low flow" transmitter (and/or gauges) are overranged to 300 percent or greater by normal flow rates, yet provide reliable metering when required for startup.          Also, test data exist on the basic transmitter design          showing about 0.5 percent effect on calibration with 24 hours exposure to 3000 psig overrange. All units are similarly exposed to this overrange for 5 minutes in both directions as a part of factory testing.          There have been instances involving accidental overrange          of these instruments (including RVLIS) as the result of leakage or operator errors where full line pressure overranges have occurred for up to several weeks with minimal effect on instrument accuracy.          Based upon this experience and test data, it is expected          that reliable measurements can be made by the selected overranged instrument designs used for RVLIS. Online calibration capability is provided if needed to support gathering of statistical data.      18.279    Rev. 0 WOLF CREEK          The following are conditions which could cause the DP          level system to give ambiguous indications:          a. When the downcomer is highly voided and the                accumulators inject, the cold accumulator water condenses some of the steam in the downcomer which causes a local depressurization. The local depressurization will lower the pressure at the bottom of the vessel which will lower the differential pressure across the vessel, causing an apparent decrease in level indication. The lower pressure in the downcomer also causes the mixture in the core to flow to the lower plenum, causing an actual decrease in level. The period of time when the RVLIS indication is lower than the actual collapsed liquid level is brief.                An example of a situation in which this phenomenon                may occur is when the reactor coolant pumps have been running for a long period of time in a small break transient. After the RCS loops have drained and the pumps are circulating mostly steam, the level in the downcomer will be depressed. A large volume of steam will be present in the downcomer, above the low mixture level, which allows a large amount of condensation to occur. For most small break transients, the reactor coolant pumps are tripped early in the transient, and the downcomer mixture level will remain high, even in cases where ICC occurs. When the downcomer level is high, the effect of accumulator injection on the RVLIS indication is minor.          b. When the upper head begins to drain, the pressure                in the upper head decreases at a slower rate than the pressure in the rest of the RCS. This is due to the upper head region behaving much like the pressurizer. The higher resistance across the upper support plate relative to the rest of the RCS prevents the upper head from draining quickly.
This situation only exists until the mixture level in the upper head falls below the top of the guide tubes. At this time, steam is allowed to flow from the upper plenum to the upper head, and the pressure equilibrates. While the upper head is behaving like a pressurizer, the vessel differential pressure is reduced, and the RVLIS indicates a lower than actual collapsed liquid level.      18.280    Rev. 0 WOLF CREEK                This phenomenon is discussed in the summary report                on the Westinghouse RVLIS for Monitoring ICC, December 1980 relative to the 3inch cold leg break. Since that time, the upper head modeling has been investigated in more detail. It was found that the modeling used at that time assumed a flow resistance that was too high for the guide tubes.
Subsequent analyses have shown that the pressurizer effect has less impact on the vessel differential pressure than was originally shown. There is very little impact on the results after the level drains below the top of the guide tubes. The pressurizer effect is still believed to exist, and it becomes more significant as break size increases. The interval of time when the upper head behaves like a pressurizer is brief, and the RVLIS will resume trending with the vessel level after the top of the guide tubes uncovers. The reduced RVLIS indication will not cause the operator to take any              nonconservative action, even if a level below the              top of the core is indicated, since the core exit thermocouples are used as a corroborative indication of the approach to ICC.          c. The normal condition for continuous upper plenum                injection (UPI) occurs only with the operation of the low head safety injection pumps, which does not occur until a pressure of under 200 psi is realized. The RVLIS may not accurately trend with vessel level during the initial start of UPI.
During this short period of time, the cold water being injected mixes with the steam in the upper plenum causing condensation. This condensation will occur faster than the system response. The system will equilibrate after a short period of time. Upon equilibrating, the system will continue to accurately trend with the vessel level.                In the range of break sizes where RVLIS is most                useful in detecting the approach to ICC, the system pressure will equilibrate at a level above the pressure where UPI will normally occur. It is important to note that the flow from the low head pumps is sufficient to recover the core, and no operator action based on the RVLIS indication will be necessary.      18.281    Rev. 14 WOLF CREEK                For the vast majority of small breaks, the condition of upper plenum injection does not cause a significant impact. For the remainder, the impact is very small and within tolerable limits.
NOTE:  Section 18.2.13.2.2.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.2.d will only be updated when potential hazards not previously analyzed are identified. 
: d. During the time when the distribution of voids in the vessel is changing rapidly, there can be a large change in the two-phase mixture level with very little change in collapsed mixture level. The use of the RVLIS, in conjunction with the core exit thermocouples, is still valid for this situation, however. The only event that has been identified which could cause a large void redistribution is when the reactor coolant pumps are tripped when the vessel mixture is highly voided. After the pump performance has degraded enough that the flow pressure drop contribution to the vessel differential pressure is small, the change in RVLIS indication is very small when the pumps are tripped. As discussed in the summary report, the approach to ICC would be indicated when the wide range indication read 33 percent. If the pumps were tripped at this time, the core would still be covered. The operator knows that the core may uncover if the pumps were tripped with a wide range indication lower than 33 percent. Prior to pump trip, the core will remain adequately cooled due to forced circulation of the mixture. When the pumps trip, the two-phase level may equilibrate at a level below the top of the core. The narrow range indication provides an indication of core coolability at this time.  


A Westinghouse RVLIS was installed at the Semiscale Test Facility in Idaho. Small break loss-of-coolant experiments were conducted at this facility by EG&G for the NRC. The results of these tests have been used to compare the RVLIS measurements with Semiscale differential pressure measurements, gamma densitometer data, and core cladding surface thermocouple indications. To date, after correcting for difference between PWR reactor vessel internals and Semiscale modeling, good correlation between Semiscale level indications and RVLIS measurements has been observed. In cooperation with the NRC, EG&G, and ORNL, Westinghouse has prepared a report summarizing the RVLIS performance during selected Semiscale tests.
The low indication would not cause the operator to take
The reports are "Westinghouse Evaluation of RVLIS Performance at


18.2-82    Rev. 30 WOLF CREEK                the Semiscale Test Facility for Test 5-2B-1,"
unnecessary actions, since an ICC recovery action would
transmitted to the NRC in letter SED-SA-00081 dated June 28, 1982 from E.P. Rahe, Westinghouse, to L.E. Phillips, NRC, and "Westinghouse Evaluation of RVLIS Performance at the Semiscale Test Facility,"
transmitted to the NRC in letter NS-EPR-2526 dated December 9, 1981 from E.P. Rahe, Westinghouse, to L.E. Phillips, NRC.
NOTE:  Section 18.2.13.2.3 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.3 will only be updated when potential hazards not previously analyzed are identified. 
: 3. Additional testing of the equipment described above has been completed in order to establish and upgrade qualification of the equipment to comply with NUREG-0737.


The test programs were:
be based on a coincidence of a low level indication and a high core exit thermocouple indication (>700 F). In a reverse flow situation, the core exit thermocouples would be responding to the saturated temperature of the
: a. Qualification tests of core exit thermocouples
: b. Qualification tests of reference (temperature compensation) junction boxes
: c. Qualification tests of electronics to add to the system computer and technical support center isolators and signal processing equipment.
: d. Qualification of isolation devices, cables and connectors, reference leg RTDs and hydraulic isolators.


The in-service life of the RVLIS and T/CCM electronics is dependent upon proper maintenance, including the replacement of individual component parts when necessary. The provisions for this maintenance are included in the technical manual. Based on the assumption of normal conditions and proper maintenance of the components, the only limitation to the in-service life is the availability of replacement parts. It is estimated that in 20 years, some of the components will be technically obsolete and no longer produced.
water flowing from the upper plenum to the core, so a high thermocouple indication of >700 F would not occur.
Consequently, the cards may have to be modified in the future to accommodate the current technology. Thus, any individual component failures are regarded as maintenance considerations, and their replacement is necessary to prolong in-service life.
It is important to note that large reverse flows are not expected to occur for breaks smaller than 6 inches in  


In-service life, which is different than design life and qualified life, is dependent upon implementing a scheduled preventative maintenance program including periodic overhaul of the equipment. In this manner, the 
diameter during the time that the core is uncovered.  


18.2-83    Rev. 30 WOLF CREEK            equipment is restored to a level that ensures continual operability. In developing the maintenance program, repair costs may necessitate replacement of the equipment. If the maintenance program is followed, there is no apparent reason that operation of the equipment cannot be extended. Some of the equipment is similar to equipment installed in present Westinghouse plants that have been operating for 10 to 15 years.
Large reverse flow rates may occur early in the blowdown


The RVLIS valves supplied by Westinghouse were designed for a service life of 40 years.
transient for large diameter breaks, but, as is  
: 4. An evaluation of the conformance of the reactor vessel level instrumentation system to NUREG-0737 is provided in Reference 7.


An evaluation of the conformance of the thermocouple/core cooling monitor system to NUREG-0737 (Attachment l and Appendix B) is as follows:  
discussed below, it is not necessary to use the RVLIS as
 
a basis for operator action for breaks in this range.      18.278    Rev. 0 WOLF CREEK During the course of a LOCA transient, the upper plenum will experience voiding before the upper head. The
 
voids in the upper plenum will be indicated by a lower
 
RVLIS reading. The RVLIS will not indicate where the
 
voiding is occurring, but at this point in the
 
transient, it is not necessary to know the location of
 
the region of voiding. In the early part of the
 
transient, when the mixture level is above the top of
 
the guide tube in the upper head, it is sufficient for
 
the operator to know that the vessel inventory is
 
decreasing, irrespective of the region where voiding is
 
occurring. The fluid in the upper head does not affect
 
the RVLIS indication after the upper head has drained to
 
below the top of the guide tubes. The upper head will
 
drain before the onset of ICC, and  there is not an
 
ambiguous indication during the period of time RVLIS is
 
used.
Experience in overranging of differential pressure instruments has been obtained in previous applications
 
of differential pressure capsules similar to those used
 
in RVLIS. In dual range flow (differential pressure)
 
applications, the "low flow" transmitter (and/or gauges)
 
are overranged to 300 percent or greater by normal flow
 
rates, yet provide reliable metering when required for startup.
Also, test data exist on the basic transmitter design showing about 0.5 percent effect on calibration with 24
 
hours exposure to 3000 psig overrange. All units are
 
similarly exposed to this overrange for 5 minutes in
 
both directions as a part of factory testing.
There have been instances involving accidental overrange of these instruments (including RVLIS) as the result of
 
leakage or operator errors where full line pressure
 
overranges have occurred for up to several weeks with
 
minimal effect on instrument accuracy.
Based upon this experience and test data, it is expected that reliable measurements can be made by the selected overranged instrument designs used for RVLIS. Online
 
calibration capability is provided if needed to support
 
gathering of statistical data.      18.279    Rev. 0 WOLF CREEK The following are conditions which could cause the DP level system to give ambiguous indications:
: a. When the downcomer is highly voided and the accumulators inject, the cold accumulator water
 
condenses some of the steam in the downcomer which
 
causes a local depressurization. The local
 
depressurization will lower the pressure at the
 
bottom of the vessel which will lower the
 
differential pressure across the vessel, causing an
 
apparent decrease in level indication. The lower
 
pressure in the downcomer also causes the mixture
 
in the core to flow to the lower plenum, causing an
 
actual decrease in level. The period of time when
 
the RVLIS indication is lower than the actual
 
collapsed liquid level is brief.
An example of a situation in which this phenomenon may occur is when the reactor coolant pumps have
 
been running for a long period of time in a small
 
break transient. After the RCS loops have drained
 
and the pumps are circulating mostly steam, the
 
level in the downcomer will be depressed. A large
 
volume of steam will be present in the downcomer, above the low mixture level, which allows a large
 
amount of condensation to occur. For most small
 
break transients, the reactor coolant pumps are
 
tripped early in the transient, and the downcomer
 
mixture level will remain high, even in cases where
 
ICC occurs. When the downcomer level is high, the
 
effect of accumulator injection on the RVLIS
 
indication is minor.
: b. When the upper head begins to drain, the pressure in the upper head decreases at a slower rate than
 
the pressure in the rest of the RCS. This is due
 
to the upper head region behaving much like the
 
pressurizer. The higher resistance across the
 
upper support plate relative to the rest of the RCS
 
prevents the upper head from draining quickly.
 
This situation only exists until the mixture level
 
in the upper head falls below the top of the guide
 
tubes. At this time, steam is allowed to flow from
 
the upper plenum to the upper head, and the
 
pressure equilibrates. While the upper head is
 
behaving like a pressurizer, the vessel
 
differential pressure is reduced, and the RVLIS
 
indicates a lower than actual collapsed liquid
 
level.      18.280    Rev. 0 WOLF CREEK This phenomenon is discussed in the summary report on the Westinghouse RVLIS for Monitoring ICC, December 1980 relative to the 3inch cold leg
 
break. Since that time, the upper head modeling
 
has been investigated in more detail. It was found
 
that the modeling used at that time assumed a flow
 
resistance that was too high for the guide tubes.
 
Subsequent analyses have shown that the pressurizer
 
effect has less impact on the vessel differential
 
pressure than was originally shown. There is very
 
little impact on the results after the level drains
 
below the top of the guide tubes. The pressurizer
 
effect is still believed to exist, and it becomes
 
more significant as break size increases. The
 
interval of time when the upper head behaves like a
 
pressurizer is brief, and the RVLIS will resume
 
trending with the vessel level after the top of the
 
guide tubes uncovers. The reduced RVLIS indication
 
will not cause the operator to take any              nonconservative action, even if a level below the top of the core is indicated, since the core exit
 
thermocouples are used as a corroborative indication
 
of the approach to ICC.
: c. The normal condition for continuous upper plenum injection (UPI) occurs only with the operation of
 
the low head safety injection pumps, which does not
 
occur until a pressure of under 200 psi is
 
realized. The RVLIS may not accurately trend with
 
vessel level during the initial start of UPI.
 
During this short period of time, the cold water
 
being injected mixes with the steam in the upper
 
plenum causing condensation. This condensation
 
will occur faster than the system response. The
 
system will equilibrate after a short period of
 
time. Upon equilibrating, the system will continue
 
to accurately trend with the vessel level.
In the range of break sizes where RVLIS is most useful in detecting the approach to ICC, the system
 
pressure will equilibrate at a level above the
 
pressure where UPI will normally occur. It is
 
important to note that the flow from the low head
 
pumps is sufficient to recover the core, and no
 
operator action based on the RVLIS indication will
 
be necessary.      18.281    Rev. 14 WOLF CREEK For the vast majority of small breaks, the
 
condition of upper plenum injection does not cause
 
a significant impact. For the remainder, the
 
impact is very small and within tolerable limits.
 
NOTE:  Section 18.2.13.2.2.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.2.d will only be updated when potential hazards not previously analyzed are identified.
: d. During the time when the distribution of voids in
 
the vessel is changing rapidly, there can be a
 
large change in the two-phase mixture level with
 
very little change in collapsed mixture level. The
 
use of the RVLIS, in conjunction with the core exit
 
thermocouples, is still valid for this situation, however. The only event that has been identified
 
which could cause a large void redistribution is
 
when the reactor coolant pumps are tripped when the
 
vessel mixture is highly voided. After the pump
 
performance has degraded enough that the flow
 
pressure drop contribution to the vessel
 
differential pressure is small, the change in RVLIS
 
indication is very small when the pumps are
 
tripped. As discussed in the summary report, the
 
approach to ICC would be indicated when the wide
 
range indication read 33 percent. If the pumps
 
were tripped at this time, the core would still be
 
covered. The operator knows that the core may
 
uncover if the pumps were tripped with a wide range
 
indication lower than 33 percent. Prior to pump
 
trip, the core will remain adequately cooled due to
 
forced circulation of the mixture. When the pumps
 
trip, the two-phase level may equilibrate at a
 
level below the top of the core. The narrow range
 
indication provides an indication of core
 
coolability at this time.
 
A Westinghouse RVLIS was installed at the Semiscale
 
Test Facility in Idaho. Small break loss-of-
 
coolant experiments were conducted at this facility
 
by EG&G for the NRC. The results of these tests
 
have been used to compare the RVLIS measurements
 
with Semiscale differential pressure measurements, gamma densitometer data, and core cladding surface
 
thermocouple indications. To date, after
 
correcting for difference between PWR reactor
 
vessel internals and Semiscale modeling, good
 
correlation between Semiscale level indications and
 
RVLIS measurements has been observed. In
 
cooperation with the NRC, EG&G, and ORNL, Westinghouse has prepared a report summarizing the
 
RVLIS performance during selected Semiscale tests.
 
The reports are "Westinghouse Evaluation of
 
RVLIS Performance at
 
18.2-82    Rev. 30 WOLF CREEK the Semiscale Test Facility for Test 5-2B-1,"
transmitted to the NRC in letter SED-SA-00081 dated
 
June 28, 1982 from E.P. Rahe, Westinghouse, to
 
L.E. Phillips, NRC, and "Westinghouse Evaluation of
 
RVLIS Performance at the Semiscale Test Facility,"
transmitted to the NRC in letter NS-EPR-2526 dated
 
December 9, 1981 from E.P. Rahe, Westinghouse, to
 
L.E. Phillips, NRC.
 
NOTE:  Section 18.2.13.2.3 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.3 will only be updated when potential hazards not previously analyzed are identified.
: 3. Additional testing of the equipment described above has
 
been completed in order to establish and upgrade
 
qualification of the equipment to comply with NUREG-
 
0737.
 
The test programs were:
: a. Qualification tests of core exit thermocouples
: b. Qualification tests of reference (temperature
 
compensation) junction boxes
: c. Qualification tests of electronics to add to the
 
system computer and technical support center
 
isolators and signal processing equipment.
: d. Qualification of isolation devices, cables and
 
connectors, reference leg RTDs and hydraulic
 
isolators.
 
The in-service life of the RVLIS and T/CCM electronics
 
is dependent upon proper maintenance, including the
 
replacement of individual component parts when
 
necessary. The provisions for this maintenance are
 
included in the technical manual. Based on the
 
assumption of normal conditions and proper maintenance
 
of the components, the only limitation to the in-service
 
life is the availability of replacement parts. It is
 
estimated that in 20 years, some of the components will
 
be technically obsolete and no longer produced.
 
Consequently, the cards may have to be modified in the
 
future to accommodate the current technology. Thus, any
 
individual component failures are regarded as
 
maintenance considerations, and their replacement is
 
necessary to prolong in-service life.
 
In-service life, which is different than design life and
 
qualified life, is dependent upon implementing a
 
scheduled preventative maintenance program including
 
periodic overhaul of the equipment. In this manner, the 
 
18.2-83    Rev. 30 WOLF CREEK equipment is restored to a level that ensures continual
 
operability. In developing the maintenance program, repair costs may necessitate replacement of the
 
equipment. If the maintenance program is followed, there is no apparent reason that operation of the
 
equipment cannot be extended. Some of the equipment is
 
similar to equipment installed in present Westinghouse
 
plants that have been operating for 10 to 15 years.
 
The RVLIS valves supplied by Westinghouse were designed
 
for a service life of 40 years.
: 4. An evaluation of the conformance of the reactor vessel
 
level instrumentation system to NUREG-0737 is provided
 
in Reference 7.
 
An evaluation of the conformance of the  
 
thermocouple/core cooling monitor system to NUREG-0737  
 
(Attachment l and Appendix B) is as follows:
: a. Attachment l, Item (1)  
: a. Attachment l, Item (1)  


The core exit thermocouples have been qualified so as to comply with the recommendations of Regulatory Guides 1.89 and 1.100. The thermocouples are located at the core exit and in an arrangement such that each of the redundant systems has core               exit temperatures distributed over the entire               core, in sufficient number to determine the               radial power distribution and so located as to verify power distribution symmetry among core quadrants.  
The core exit thermocouples have been qualified so  
 
as to comply with the recommendations of Regulatory  
 
Guides 1.89 and 1.100. The thermocouples are  
 
located at the core exit and in an arrangement such  
 
that each of the redundant systems has core exit temperatures distributed over the entire core, in sufficient number to determine the radial power distribution and so located as to  
 
verify power distribution symmetry among core  
 
quadrants.
: b. Attachment 1, Item (2)  
: b. Attachment 1, Item (2)  


The primary operator display is a computer-based display and calculation system. It provides information as required by subitems (a) through (f) of Attachment 1, Item (2) in Section 18.2.13.1.  
The primary operator display is a computer-based  
 
display and calculation system. It provides  
 
information as required by subitems (a) through (f)  
 
of Attachment 1, Item (2) in Section 18.2.13.1.
: c. Attachment 1, Item (3)  
: c. Attachment 1, Item (3)  


The backup system to display thermocouple readings is located in a cabinet which also houses the core cooling monitor. Backup system display is accomplished by the Class 1E ICC instrumentation including the ALS platform, flat panel   
The backup system to display thermocouple readings  
 
is located in a cabinet which also houses the core  
 
cooling monitor. Backup system display is  
 
accomplished by the Class 1E ICC instrumentation  
 
including the ALS platform, flat panel  
 
18.2-84    Rev. 28 WOLF CREEK displays, analog meters, and digital recorders. 
 
This backup system can display all of the 47 individual thermocouple temperatures within 6 minutes. The range extends from less than 200 F  to 2300 F. NOTE: Section 18.2.13.2.4.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.d will only be updated when potential hazards not previously analyzed are identified.
: d. Attachment 1, Item (4)
 
Human factors consideration of the types and
 
locations of displays and alarms is discussed in
 
Sections 18.1.16 and 18.3.2. The ICC
 
instrumentation has been considered in the overall


18.2-84    Rev. 28 WOLF CREEK                displays, analog meters, and digital recorders.
human factors evaluation.  
This backup system can display all of the 47  individual thermocouple temperatures within 6  minutes. The range extends from less than 200F  to 2300F. NOTE:  Section 18.2.13.2.4.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.d will only be updated when potential hazards not previously analyzed are identified.            d. Attachment 1, Item (4)


Human factors consideration of the types and locations of displays and alarms is discussed in Sections 18.1.16 and 18.3.2. The ICC instrumentation has been considered in the overall human factors evaluation.
NOTE:  Section 18.2.13.2.4.e.1 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.1 will only be updated when potential hazards not previously analyzed are identified.
NOTE:  Section 18.2.13.2.4.e.1 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.1 will only be updated when potential hazards not previously analyzed are identified.
: e. Attachment 1, Item (5)  
: e. Attachment 1, Item (5)  


Conformance to the specific items of Appendix B to NUREG-0737 is as follows:  
Conformance to the specific items of Appendix B to  
 
NUREG-0737 is as follows:
: 1)  Appendix B, Item (1)  
: 1)  Appendix B, Item (1)  


The thermocouple/core cooling monitor instrumentation has been tested to establish environmental qualification in accordance with Regulatory Guide 1.89 (NUREG-0588). This qualification requirement applies to the complete instrumentation channel from thermocouple to display where display indicates the remote display, analog meter, and digital recorder. Qualified channel isolation devices isolate this qualified instrumentation from the data links, technical support center display, and plant computer display.
The thermocouple/core cooling monitor  
 
instrumentation has been tested to establish  


The seismic portion of the environmental qualification testing has been performed to comply with Regulatory Guide 1.100. This seismic qualification provides assurance that the instrumentation will continue to read within the required accuracy following, but not necessarily during, a safe shutdown earthquake.
environmental qualification in accordance with  


18.2-85    Rev. 30 WOLF CREEK                      Instrumentation  whose ranges are required to extend beyond those ranges calculated in the most severe design basis accident event for a given variable has been qualified using the following criteria.  
Regulatory Guide 1.89 (NUREG-0588). This


The qualification environment is based on the design basis accident events, except the assumed maximum of the value of the monitored variable is the value equal to the maximum range for the variable. The monitored variable is assumed to approach this peak by extrapolating the most severe initial ramp associated with the design basis accident events. The decay for this variable is considered proportional to the decay for this variable associated with the design basis accident events. No additional qualification margin needs to be added to the extended range variable. All environmental envelopes except that pertaining to the variable measured by the information display channel are those associated with the design basis accident events.
qualification requirement applies to the  


The above environmental qualification requirement does not account for steady-state elevated levels that may occur in other environmental parameters associated with the extended range variables. For example, a sensor measuring containment pressure must be qualified for the measured process variable range, but the corresponding ambient temperature is not mechanistically linked to that pressure. Rather, the ambient temperature value is the bounding value for design basis accident events analyzed in Chapter 15.0. The extended range requirement ensures that the equipment will continue to provide information should conditions degrade beyond those postulated in the safety analysis. Since variable ranges are nonmechanistically determined, extension of associated parameter levels is not justifiable and has, therefore, not been required.
complete instrumentation channel from


18.2-86    Rev. 0 WOLF CREEK NOTE:  Section 18.2.13.2.4.e.2 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.2 will only be updated when potential hazards not previously analyzed are identified.                2)  Appendix B, Item (2)
thermocouple to display where display


The  purpose  for qualifying the thermocouple/
indicates the remote display, analog meter, and digital recorder. Qualified channel isolation
core cooling monitoring system is to generate evidence that the equipment will maintain and perform  its  functions  during a design basis event. It is of special concern during the qualification effort to uncover common mode failures.  


The single-failure criteria for the computer and information beyond the isolator does not apply to this data-based information device as referred to in NUREG-0737 (clarification item  
devices isolate this qualified instrumentation
                    [8]). In relation to diversification, the use of reactor vessel level instrumentation adds diversification to the ICC instrumentation.
 
Inclusion of the core cooling (Tsat margin) monitoring functions enhances even further the capability of the ICC instrumentation.  
from the data links, technical support center
 
display, and plant computer display.
 
The seismic portion of the environmental
 
qualification testing has been performed to
 
comply with Regulatory Guide 1.100. This
 
seismic qualification provides assurance that
 
the instrumentation will continue to read
 
within the required accuracy following, but
 
not necessarily during, a safe shutdown
 
earthquake.
 
18.2-85    Rev. 30 WOLF CREEK Instrumentation  whose ranges are required to
 
extend beyond those ranges calculated in the
 
most severe design basis accident event for a
 
given variable has been qualified using the
 
following criteria.
 
The qualification environment is based on the
 
design basis accident events, except the
 
assumed maximum of the value of the monitored
 
variable is the value equal to the maximum
 
range for the variable. The monitored
 
variable is assumed to approach this peak by
 
extrapolating the most severe initial ramp
 
associated with the design basis accident
 
events. The decay for this variable is
 
considered proportional to the decay for this
 
variable associated with the design basis
 
accident events. No additional qualification
 
margin needs to be added to the extended range
 
variable. All environmental envelopes except
 
that pertaining to the variable measured by
 
the information display channel are those
 
associated with the design basis accident
 
events.
 
The above environmental qualification
 
requirement does not account for steady-state
 
elevated levels that may occur in other
 
environmental parameters associated with the
 
extended range variables. For example, a
 
sensor measuring containment pressure must be
 
qualified for the measured process variable
 
range, but the corresponding ambient
 
temperature is not mechanistically linked to
 
that pressure. Rather, the ambient
 
temperature value is the bounding value for
 
design basis accident events analyzed in
 
Chapter 15.0. The extended range requirement
 
ensures that the equipment will continue to
 
provide information should conditions degrade
 
beyond those postulated in the safety
 
analysis. Since variable ranges are
 
nonmechanistically determined, extension of
 
associated parameter levels is not justifiable
 
and has, therefore, not been required.
 
18.2-86    Rev. 0 WOLF CREEK NOTE:  Section 18.2.13.2.4.e.2 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.2 will only be updated when potential hazards not previously analyzed are identified.
: 2)  Appendix B, Item (2)
 
The  purpose  for qualifying the thermocouple/
 
core cooling monitoring system is to generate
 
evidence that the equipment will maintain and
 
perform  its  functions  during a design basis
 
event. It is of special concern during the
 
qualification effort to uncover common mode
 
failures.
 
The single-failure criteria for the computer  
 
and information beyond the isolator does not  
 
apply to this data-based information device as  
 
referred to in NUREG-0737 (clarification item  
 
[8]). In relation to diversification, the use  
 
of reactor vessel level instrumentation adds  
 
diversification to the ICC instrumentation.  
 
Inclusion of the core cooling (Tsat margin)  
 
monitoring functions enhances even further the  
 
capability of the ICC instrumentation.
: 3)  Appendix B, Item (3)  
: 3)  Appendix B, Item (3)  


The instrumentation is energized from Class 1E power sources.  
The instrumentation is energized from Class 1E  
 
power sources.
: 4)  Appendix B, Item (4)  
: 4)  Appendix B, Item (4)  


Although not specifically recommended by NUREG-0737, the ICC instrumentation complies with the applicable portions of IEEE Standard 279. The systems utilize two trains; therefore, the "Exemption" as defined in Paragraph 4.11 of IEEE Standard 279 is applicable here.  
Although not specifically recommended by  
 
NUREG-0737, the ICC instrumentation complies  
 
with the applicable portions of IEEE Standard  
 
279. The systems utilize two trains;  
 
therefore, the "Exemption" as defined in  
 
Paragraph 4.11 of IEEE Standard 279 is  
 
applicable here.
: 5)  Appendix B, Item (5)  
: 5)  Appendix B, Item (5)  


The ICC equipment falls under the quality assurance requirements applicable to Class 1E equipment. Refer to Appendix 3A for a discussion of the quality assurance regulatory guides.
The ICC equipment falls under the quality  
: 6)  Appendix B, Item (6)
 
A flat panel display is provided for thermocouple readings in the backup system. 
assurance requirements applicable to Class 1E  
 
equipment. Refer to Appendix 3A for a  


18.2-87    Rev. 30 WOLF CREEK                     The computer-based (primary) thermocouple indication system has continuous                     (recording) displays.  
discussion of the quality assurance regulatory
 
guides.
: 6)  Appendix B, Item (6)
 
A flat panel display is provided for thermocouple
 
readings in the backup system.
 
18.2-87    Rev. 30 WOLF CREEK The computer-based (primary) thermocouple indication system has continuous (recording) displays.
: 7)  Appendix B, Item (7)  
: 7)  Appendix B, Item (7)  


The backup Class 1E system (which is on demand) includes redundant digital recorders. The                     computer-based (primary) indication system has continuous (recording) displays.  
The backup Class 1E system (which is on  
 
demand) includes redundant digital recorders. The computer-based (primary) indication system has  
 
continuous (recording) displays.
: 8)  Appendix B, Item (8)  
: 8)  Appendix B, Item (8)  


The instruments are specifically identified on the control panels so that the operator can easily discern that they are intended for use under accident conditions.  
The instruments are specifically identified on  
 
the control panels so that the operator can  
 
easily discern that they are intended for use  
 
under accident conditions.
: 9)  Appendix B, Item (9)  
: 9)  Appendix B, Item (9)  


The WCGS ICC instrumentation complies with isolation requirements.  
The WCGS ICC instrumentation complies with  
 
isolation requirements.
: 10)  Appendix B, Item (10)  
: 10)  Appendix B, Item (10)  


The WCGS ICC instrumentation is testable as required.  
The WCGS ICC instrumentation is testable as  
 
required.
: 11)  Appendix B, Item (11)  
: 11)  Appendix B, Item (11)  


Servicing, testing, and calibrating programs are specified to maintain the capability of the monitoring instrumentation.  
Servicing, testing, and calibrating programs  
 
are specified to maintain the capability of  
 
the monitoring instrumentation.
: 12)  Appendix B, Item (12)  
: 12)  Appendix B, Item (12)  


The access to the thermocouple/core cooling monitor permits removing channels for service (location is in the main control room). The testing and/or maintenance is facilitated by this system location.  
The access to the thermocouple/core cooling  
 
monitor permits removing channels for service  
 
(location is in the main control room). The  
 
testing and/or maintenance is facilitated by  
 
this system location.
: 13)  Appendix B, Item (13)  
: 13)  Appendix B, Item (13)  


The design facilitates administrative control of the access to all setpoint adjustments, module calibration adjustments, and test points.  
The design facilitates administrative control  
 
of the access to all setpoint adjustments, module calibration adjustments, and test  
 
points.  
 
18.2-88    Rev. 28 WOLF CREEK
: 14)  Appendix B, Item (14)


18.2-88    Rev. 28 WOLF CREEK                14)  Appendix B, Item (14)
The monitoring instrumentation design


The monitoring instrumentation design minimizes the development of conditions that would cause meters, annunciators, recorders, alarms, etc., to give anomalous indications potentially confusing to the operator.  
minimizes the development of conditions that  
 
would cause meters, annunciators, recorders, alarms, etc., to give anomalous indications  
 
potentially confusing to the operator.
: 15)  Appendix B, Item (15)  
: 15)  Appendix B, Item (15)  


The instrumentation is designed to facilitate the recognition, location, replacement, repair, or adjustment of malfunctioning components or modules.  
The instrumentation is designed to facilitate  
 
the recognition, location, replacement, repair, or adjustment of malfunctioning  
 
components or modules.
: 16)  Appendix B, Item (16)  
: 16)  Appendix B, Item (16)  


The instrumentation used in both the reactor vessel level instrumentation system and thermocouple monitoring receives input signals directly from the sensors that measure the parameters. The core cooling monitor also derives most of the signals directly from the sensors except in the case where Tsat pressures and others are obtained from the protection set.  
The instrumentation used in both the reactor  
 
vessel level instrumentation system and  
 
thermocouple monitoring receives input signals  
 
directly from the sensors that measure the  
 
parameters. The core cooling monitor also  
 
derives most of the signals directly from the  
 
sensors except in the case where Tsat  
 
pressures and others are obtained from the  
 
protection set.
: 17)  Appendix B, Item (17)  
: 17)  Appendix B, Item (17)  


The instruments used for ICC instrumentation are also used, with the exception of the reactor vessel level indication, for monitoring normal operation of the plant to the extent that it is practical. No loss of sensitivity is expected due to this use.  
The instruments used for ICC instrumentation  
 
are also used, with the exception of the  
 
reactor vessel level indication, for  
 
monitoring normal operation of the plant to  
 
the extent that it is practical. No loss of  
 
sensitivity is expected due to this use.
: 18)  Appendix B, Item (18)  
: 18)  Appendix B, Item (18)  


Periodic testing is in accordance with the applicable portions of Regulatory Guide 1.118.  
Periodic testing is in accordance with the  
 
applicable portions of Regulatory Guide 1.118.  
 
(f)  Attachment 1, Item (6)
 
The instrumentation system power supplies are in
 
conformance with this requirement. However, the
 
required circuits to the thermocouples are
 
separated only to the maximum extent possible.
 
18.2-89    Rev. 0 WOLF CREEK (g)  Attachment 1, Item (7)
 
The instrumentation qualification is discussed in
 
item 4.e.1 above.
 
(h)  Attachment 1, Item (8)
 
The instrumentation system is in conformance with
 
this requirement.
 
(i)  Attachment l, Item (9)
 
Quality assurance is discussed in item 4.e.5 above.
: 5. The nonredundant plant computer performs the
 
thermocouple and Tsat functions for the primary
 
display. However, these functions are also performed
 
independent of the plant computer by the Class 1E ICC
 
instrumentation. The Class 1E ALS platform performs the calculations and provides the signals to the Class
 
1E backup display.
: 6. In general, the system electronics are verified, maintained, and calibrated on-line by placing one of the
 
redundant trains into a test and calibrate mode while
 
leaving the other train in operation to monitor
 
inadequate core cooling.
 
A general verification was performed before shipment, but plant specific data was not used. The capability
 
exists for the operator to verify the operation of the
 
system. This involves disconnecting the sensors at the
 
RVLIS electronics, providing an artificial input, and
 
observing the response of the system on the front panel
 
and remote display.
 
The "7300" RVLIS incorporates circuit cards that provide
 
an output proportional to the change in resistance of
 
the RTD. The card contains a resistance bridge driven
 
by a power supply to produce a signal proportional to
 
the changes in resistance of the RTD, and a signal
 
characterizer which accommodates linear calibration of
 
non-linear RTDs.
 
On-line calibration of the system is made possible by
 
the "card edge" adjustments. The circuit cards were
 
calibrated at the factory; however, if the function is
 
changed or a component on the card is replaced, the
 
calibration procedure is given within the equipment
 
reference manual.
 
18.2-90    Rev. 28 WOLF CREEK The RVLIS system requires the normal maintenance given
 
to other control and protection systems within the
 
plant. On-line maintenance is accomplished by placing
 
only one of the two redundant trains into maintenance at
 
a time; this allows continued monitoring of inadequate
 
core cooling.
 
The remote display unit of RVLIS indicates the status of
 
the input sensors. If any sensors are out of range, regardless of the reason, a symbol allows the affected
 
level reading on the summary display page. The
 
particular sensor that is out of range is identified at
 
the bottom of the summary display page. Due to the
 
redundant sensors and trains it is possible for the
 
operator to disable some of the sensors without
 
affecting the system reliability. The display indicates
 
which level readings are affected. The disabled sensors
 
are also displayed at the bottom of the summary page. A
 
separate sensor status page can be displayed, showing
 
all sensors that are disabled or out of range and their
 
affected level readings.
 
In addition, software programs are provided so that the
 
front panel controls and display can be used to perform
 
a functional test, serial data link tests, calibration
 
tests, and deadman timer tests. These tests are
 
considered part of the operator maintenance procedures
 
and are performed monthly. The cabinet-mounted
 
equipment is designed to facilitate periodic tests to
 
identify malfunctioning components and to ensure that
 
the equipment functional operability is maintained
 
comparable to the original design standards. Component
 
power supply failure is annunciated in the main control
 
room. The ICC instrumentation was installed by fuel
 
load.
 
NOTE:  Sections 18.2.13.2.7, 8, and 9 are historical and reflect conditions at the time of plant licensing. Sections 18.2.13.2.7, 8, and 9 will only be updated when potential hazards not previously analyzed are identified.
: 7. and 8. The Westinghouse Owners Group has developed ICC
 
operating guidelines. These guidelines were
 
developed using the generic ICC analyses discussed
 
in Section 18.1.8. These generic guidelines were
 
considered, as appropriate, by The Operating Agent
 
in developing plant specific operating procedures.
: 9. No additional submittals are required, with the
 
exception of emergency operating procedures. 
 
18.2-91    Rev. 30 WOLF CREEK 18.2.13.3  Conclusion The WCGS instrumentation used for detection of ICC adequately meets the guidance of NUREG0737, Item II.F.2.
18.2.14  EMERGENCY POWER FOR PRESSURIZER EQUIPMENT (II.G.1) 18.2.14.1  NRC Guidance Per NUREG0737 Position Consistent with satisfying the requirements for General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of lossofoffsite
 
power, the following positions shall be implemented:
Power Supply for Pressurizer Relief and Block Valves and Pressurizer Level Indicators    1. Motive and control components of the poweroperated relief valves (PORVs) shall be capable of being supplied
 
from either the offsite power source or the emergency
 
power source when the offsite power is not available.
: 2. Motive and control components associated with the PORV block valves shall be capable of being supplied from
 
either the offsite power source or the emergency power
 
source when the offsite power is not available.
: 3. Motive and control power connections to the emergency buses for the PORVs and their associated block valves
 
shall be through devices that have been qualified in accordance with safetygrade requirements.
: 4. The pressurizer level indication instrument channels shall be powered from the vital instrument buses. The
 
buses shall have the capability of being supplied from
 
either the offsite power source or the emergency power
 
source when offsite power is not available.
Clarification
: 1. Although the primary concern resulting from lessons learned from the accident at TMI is that the PORV block
 
valves must be closable, the design should retain, to
 
the extent practical, the capability to also open these
 
valves.      18.292    Rev. 0 WOLF CREEK      2. The motive and control power for the blockvalve should be supplied from an emergency power bus different from
 
the source supplying the PORV.      3. Any changeover of the PORV and blockvalve motive and control power from the normal offsite power to the
 
emergency onsite power is to be accomplished manually in
 
the control room.
: 4. For those designs in which instrument air is needed for operation, the electrical power supply should be
 
required to have the capability to be manually connected
 
to the emergency power sources.
18.2.14.2  The Operating Agent Response The pressurizer level indication channels are powered from vital, Class lE buses and displayed in the control room. These buses are described in Section
 
8.3; they are capable of being supplied from onsite emergency power (diesel
 
generators) or offsite power.
The pressurizer PORVs and block valves are powered from vital, Class lE power sources. The separation group assignment is indicated on system drawings in
 
Section 5.1.
The pressurizer PORVs are relied on to perform two safety functions:
: a. Pressure control during a shutdown concurrent with loss of offsite power      b. Overpressure protection at low reactor coolant system pressures These functions are described in Sections 5.2 and 5.4 (A).
 
The PORV block valve is provided to isolate the PORV should the PORV develop unacceptable leakage during operation.
The pressurizer level indication is used during normal operation to control pressurizer level (see Figure 7.21, sheet 11).
The pressurizer level indication is used for the reactor trip logic and is a displayed parameter for postaccident and postfire safe shutdown control. The safety design basis of the pressurizer level indication is provided in Section
 
7.2 and Section 7.5.      18.293    Rev. 14 WOLF CREEK 18.2.14.3  Conclusion The WCGS design for the emergency power for pressurizer equipment satisfies Item II.G.1 of NUREG0737. The WCGS design proposes an alternative to the
 
power supply assignment proposed for the pressurizer PORVs and PORV block
 
valves. The alternative is justified based on the diversity in power supply assignments for these valves, i.e., motoroperated (AC) block valves and solenoidoperated (DC) PORVs and based on the requirements for PORV use for
 
overpressure protection.
18.2.15  REQUESTS BY NRC INSPECTION AND ENFORCEMENT BULLETINS (II.K.1) 18.2.15.1  NRC Guidance Per NUREG0694 Position
"(C.1.5) Review all valve positions, positioning requirements, positive controls and related test and maintenance procedures to assure proper ESF functioning. See Bulletins 7906A Item 8, 7906B Item 7, and 7908 Item 6 in Reference 11 [NUREG0560]. (C.1.10) Review and modify, as required, procedures for removing safetyrelated systems from service (and restoring to service) to assure operability status is known. See Bulletins 7905A Item 10, 7906A Item 10, 7906B Item 9, and 7908 Item 8 in Reference 11 [NUREG0560]. (C.1.17) For Westinghousedesigned reactors, trip the pressurizer lowlevel coincident signal bistables, so that safety injection would be initiated when the pressurizer lowpressure setpoint is reached regardless of the pressurizer level. See Bulletin 7906A and Revision 1, Item 3 in Reference 11 [NUREG
 
0560]." 18.2.15.2  The Operating Agent Response The development and review of procedures for testing, maintenance and system operation for the SNUPPS facilities were carried out as a joint effort between
 
Union Electric, the Operating Agent, and other consultants. This development
 
and review effort has considered the concerns of Items C.1.5 and C.1.10 of NUREG0694 and The Operating Agent has performed the actions required by the
 
applicable I&E Bulletin sections.
The item related to the safety injection logic is not applicable to the WCGS design (see Figure 7.21, Sheet 8).      18.294    Rev. 0 WOLF CREEK 18.2.15.3  Conclusion The Operating Agent has developed and reviewed plant procedures in accordance with the NRC guidance in II.K.1 of NUREG0694.
18.2.16  ORDERS ON FACILITIES WITH BABCOCK & WILCOX NUCLEAR STEAM SUPPLIER SYSTEMS (II.K.2) 18.2.16.1  Control of Auxiliary Feedwater Independent of the Integrated Control System (II.K.2.2)
Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.2  Auxiliary Feedwater System Upgrading (II.K.2.8)
Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.3  Failure Mode Effects Analysis on the Integrated Control System II.K.2.9)
Not applicable to Westinghouse pressurized water reactors.
18.2.16.4  SafetyGrade Anticipatory Reactor Trip (II.K.2.10)
Not applicable to Westinghouse pressurized water reactors.
18.2.16.5  Thermal Mechanical ReportEffect of HighPres sure Injection on Vessel Integrity for Small          Break LossofCoolant Accident with no Auxiliary Feedwater (II.K.2.13)18.2.16.5.1  NRC Guidance Per NUREG0737
 
Position A detailed analysis shall be performed of the thermalmechanical conditions in the reactor vessel during recovery from small breaks with an extended loss of
 
all feedwater.
Clarification
 
The position deals with the potential for thermal shock of reactor vessels resulting from cold safety injection flow. One aspect that bears heavily on
 
the effects of safety injection flow is the mixing of safety injection water
 
with reactor coolant in the reactor vessel. B&W provided a report on July 30, 1980 that discussed the mixing question and the basis for a conservative      18.295    Rev. 0 WOLF CREEK analysis of the potential for thermal shock to the reactor vessel. Other PWR vendors are also required to address this issue with regard to recovery from
 
small breaks with an extended loss of all feedwater. In particular, demonstration shall be provided that sufficient mixing would occur of the cold highpressure injection (HPI) water with reactor coolant so that significant
 
thermal shock effects to the vessel are precluded.
18.2.16.5.2  The Operating Agent Response
 
Westinghouse (in support of the Westinghouse Owners Group) has developed a method and performed analyses for a spectrum of small break lossofcoolant
 
accidents. The method employs the NOTRUMP computer program to generate the
 
thermal/hydraulic transients. The thermal transients on the reactor vessel beltline and the inlet nozzle are analyzed based on the thermal/hydraulic data from the NOTRUMP code. The Westinghousedeveloped pressurized thermal shock
 
evaluation (PTS) methodology has been submitted to the NRC (Reference 13). In
 
accordance with the Operating Agent's letter to the NRC dated January 23, 1986, the WCGS calculated RTPTS values are well below the screening criterion of 10
 
CFR 50.61.
18.2.16.6  Effects of Slug Flow on Steam Generator Tubes (II.K.2.15)
Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.7  Reactor Coolant Pump Seal Damage (II.K.2.16)
Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.8  Potential for Voiding in the Reactor Coolant System During Transients (II.K.2.17)18.2.16.8.1  NRC Guidance Per NUREG0737
 
Position Analyze the potential for voiding in the reactor coolant system (RCS) during anticipated transients.
Clarification
 
The background for this concern and a request for this analysis was originally sent to the Babcock and Wilcox (B&W) licensees in a letter from R. W. Reid, NRC, to all B&W operating plants, dated January 9, 1980.      18.296    Rev. 0 WOLF CREEK 18.2.16.8.2  The Operating Agent Response Westinghouse (in support of the Westinghouse Owners Group) has performed a study which addresses the potential for void formation in Westinghousedesigned
 
nuclear steam supply systems during natural circulation
 
cooldown/depressurization transients. This study has been submitted to the NRC
 
by the Westinghouse Owners Group (Ref. 1) and is applicable to Wolf Creek.
In addition, the Westinghouse Owners Group has developed appropriate modifications to the Westinghouse Owners Group Emergency Response Guidelines (ERGs) to take the results of the study into account so as to preclude void
 
formation in the upper head region during natural circulation
 
cooldown/depressurization transients, and to specify those conditions under
 
which upper head voiding may occur. The Operating Agent has considered the
 
generic guidance developed by the Westinghouse Owners Group in the development
 
of plant specific operating procedures.
18.2.16.9  Sequential Auxiliary Feedwater Flow Analysis (II.K.2.19)
Not applicable to Westinghouse pressurized water reactors.
18.2.16.10  SmallBreak LossofCoolant Accident Which Repressurizes the Reactor Coolant System to the            PowerOperated Relief Valve Set Point (II.K.2.20)
Not applicable to Westinghouse pressurized water reactors.
 
18.2.17  RECOMMENDATIONS FROM THE BULLETINS AND ORDERS TASK FORCE (II.K.3) 18.2.17.1  Installation and Testing of Automatic Power Operated Relief Valve Isolation System (II.K.3.1)18.2.17.1.1  NRC Guidance Per NUREG0737
 
Position All PWR licensees should provide a system that uses the PORV block valve to protect against a smallbreak lossofcoolant accident. This system will
 
automatically cause the block valve to close when the reactor coolant system
 
pressure decays after the PORV has opened. Justification should be provided to
 
ensure that failure of this system would not decrease overall safety by
 
aggravating plant transients and accidents.      18.297    Rev. 0 WOLF CREEK Each licensee shall perform a confirmatory test of the automatic block valve closure system following installation.
Clarification
 
Implementation of this action item was modified in the May 1980 version of NUREG0660. The change delays implementation of this action item until after
 
the studies specified in TMI Action Plan item II.K.3.2 have been completed, if
 
such studies confirm that the subject system is necessary.
18.2.17.1.2  The Operating Agent Response
 
Westinghouse, as a part of the response prepared for the Westinghouse Owners Group to address item II.K.3.2 (refer to Section 18.2.17.2), has evaluated the necessity of incorporating an automatic pressurizer poweroperated relief valve
 
isolation system. This evaluation is documented in Reference 2 and concluded
 
that such a system should not be required. However, an automatic PORV
 
isolation capability is part of the WCGS design as discussed in Sections 7.6.6
 
and 7.6.10.
18.2.17.1.3  Conclusion Based on the above discussion, WCGS meets the guidelines of NUREG0737, Item II.K.3.1.18.2.17.2  Report on Overall Safety Effect of PowerOperated Relief Valve Isolation System (II.K.3.2)18.2.17.2.1  NRC Guidance Per NUREG0737
 
Position
: 1. The licensee should submit a report for staff review documenting the various actions taken to decrease the probability of a smallbreak lossofcoolant accident (LOCA) caused by a stuckopen, poweroperated relief
 
valve (PORV) and show how those actions constitute
 
sufficient improvements in reactor safety.      2. Safetyvalve failure rates based on past history of the operating plants designed by the specific nuclear steam
 
supply system (NSSS) vendor should be included in the
 
report submitted in response to (1) above.      18.298    Rev. 0 WOLF CREEK Clarification Based on its review of feedwater transients and small LOCAs for operating plants, the Bulletins and Orders Task Force in the Office of Nuclear Reactor
 
Regulation recommended that a report be prepared and submitted for staff review
 
which documents the various actions that have been taken to reduce the probability of a smallbreak LOCA caused by a stuckopen PORV and show how
 
these actions constitute sufficient improvements in reactor safety. Action Item II.K.3.2 of NUREG0660, published in May 1980, changed the implementation of
 
this recommendation as follows:  In addition to modifications already
 
implemented on PORVs, the report specified above should include safety
 
examination of an automatic PORV isolation system identified in Task Action
 
Plan item II.K.3.1. Modifications to reduce the likelihood of a stuckopen PORV will be considered sufficient improvements in reactor safety if they reduce the probability of a smallbreak LOCA caused by a stuckopen PORV such that it is not a significant contributor to the probability of a smallbreak LOCA due to all causes.
(According to WASH1400, the median probability of a smallbreak LOCA S2 with a
 
break diameter between 0.5 inches and 2.0 inches is 10 3 per reactoryear with a variation ranging from 10 2 to 10 4 per reactoryear.) The abovespecified report should also include an analysis of safetyvalve failures based on the operating experience of the pressurizedwaterreactor (PWR) vendor designs. The licensee has the option of preparing and submitting either a plantspecific or a generic report. If a generic report is submitted, each licensee should document the applicability of the generic report to his
 
own plant.
Based on the above guidance and clarification, each licensee should perform an analysis of the probability of a smallbreak LOCA caused by a stuckopen PORV
 
or safety valve. This analysis should consider modifications which have been made since the TMI2 accident to improve the probability. This analysis shall
 
evaluate the effect of an automatic PORV isolation system specified in Task
 
Action Plan, Item II.K.3.1.
In evaluating the automatic PORV isolation system, the potential of causing a subsequent stuckopen safety valve and the overall effect on safety (e.g.,
effect on other accidents) should be examined.      18.299    Rev. 0 WOLF CREEK Actual operational data may be used in this analysis, where appropriate. The bases for any assumptions used should be clearly stated and justified.
The results of the probability analysis should then be used to determine whether the modifications already implemented have reduced the probability of a smallbreak LOCA due to a stuckopen PORV or safety valve a sufficient amount
 
to satisfy the criterion stated above, or whether the automatic PORV isolation


          (f)  Attachment 1, Item (6)
system specified in Task Action item II.K.3.1 is necessary.
In addition to the analysis described above, the licensee should compile operational data regarding pressurizer safety valves for PWR vendor designs.
These data should then be used to determine safetyvalve failure rates.
The analyses should be documented in a report. If this requirement is implemented on a generic basis, each licensee should review the appropriate


The instrumentation system power supplies are in conformance with this requirement. However, the required circuits to the thermocouples are separated only to the maximum extent possible.  
generic report and document its applicability to his own plant(s). The report


18.2-89    Rev. 0 WOLF CREEK            (g)  Attachment 1, Item (7)  
and the documentation of applicability (where appropriate) should be submitted


The instrumentation qualification is discussed in item 4.e.1 above.  
for NRC staff review by the specified date.
18.2.17.2.2  The Operating Agent Response


          (h) Attachment 1, Item (8)  
As mentioned in item II.K.3.1 above (Section 18.2.17.1), the Westinghouse Owners Group has submitted a Westinghouseprepared report (Ref. 2) which


The instrumentation system is in conformance with this requirement.
provides a probabilistic analysis to determine the probability of a PORV LOCA, estimates the effect of the postTMI modifications, evaluates an automatic PORV


          (i)  Attachment l, Item (9)
isolation concept, and provides PORV and safety valve operational data for


Quality assurance is discussed in item 4.e.5 above.
Westinghouse plants. Because of the sensitivity analyses included in the  
: 5. The nonredundant plant computer performs the thermocouple and Tsat functions for the primary display. However, these functions are also performed independent of the plant computer by the Class 1E ICC instrumentation. The Class 1E ALS platform performs          the calculations and provides the signals to the Class 1E backup display.
: 6. In general, the system electronics are verified, maintained, and calibrated on-line by placing one of the redundant trains into a test and calibrate mode while leaving the other train in operation to monitor inadequate core cooling.


A general verification was performed before shipment, but plant specific data was not used. The capability exists for the operator to verify the operation of the system. This involves disconnecting the sensors at the RVLIS electronics, providing an artificial input, and observing the response of the system on the front panel and remote display.  
report, the report is generic and is applicable to the WCGS. The report


The "7300" RVLIS incorporates circuit cards that provide an output proportional to the change in resistance of the RTD. The card contains a resistance bridge driven by a power supply to produce a signal proportional to the changes in resistance of the RTD, and a signal characterizer which accommodates linear calibration of non-linear RTDs.
identifies a significant reduction in the PORV LOCA probability as a result of postTMI modifications, and the calculations compare favorably with the


On-line calibration of the system is made possible by the "card edge" adjustments. The circuit cards were calibrated at the factory; however, if the function is changed or a component on the card is replaced, the calibration procedure is given within the equipment reference manual.
operational data for Westinghouse plants (included as an appendix to the  


18.2-90    Rev. 28 WOLF CREEK            The RVLIS system requires the normal maintenance given to other control and protection systems within the plant. On-line maintenance is accomplished by placing only one of the two redundant trains into maintenance at a time; this allows continued monitoring of inadequate core cooling.  
report).18.2.17.2.3  Conclusion


The remote display unit of RVLIS indicates the status of the input sensors. If any sensors are out of range, regardless of the reason, a symbol allows the affected level reading on the summary display page. The particular sensor that is out of range is identified at the bottom of the summary display page. Due to the redundant sensors and trains it is possible for the operator to disable some of the sensors without affecting the system reliability. The display indicates which level readings are affected. The disabled sensors are also displayed at the bottom of the summary page. A separate sensor status page can be displayed, showing all sensors that are disabled or out of range and their affected level readings.
The requirements of this item were resolved by submittal of the Reference 2 analysis report.      18.2100    Rev. 0 WOLF CREEK 18.2.17.3  Reporting Safety and Relief Valve Failures and Challenges (II.K.3.3)18.2.17.3.1  NRC Guidance Per NUREG0694 Assure that any failure of a PORV or safety valve to close will be reported to the NRC promptly. All challenges to the PORVs or safety valves should be  


In addition, software programs are provided so that the front panel controls and display can be used to perform a functional test, serial data link tests, calibration tests, and deadman timer tests. These tests are considered part of the operator maintenance procedures and are performed monthly. The cabinet-mounted equipment is designed to facilitate periodic tests to identify malfunctioning components and to ensure that the equipment functional operability is maintained comparable to the original design standards. Component power supply failure is annunciated in the main control room. The ICC instrumentation was installed by fuel load.
documented in the annual report.
NOTE:  Sections 18.2.13.2.7, 8, and 9 are historical and reflect conditions at the time of plant licensing. Sections 18.2.13.2.7, 8, and 9 will only be updated when potential hazards not previously analyzed are identified. 
18.2.17.3.2 The Operating Agent Response
: 7. and 8. The Westinghouse Owners Group has developed ICC operating guidelines. These guidelines were developed using the generic ICC analyses discussed in Section 18.1.8. These generic guidelines were considered, as appropriate, by The Operating Agent in developing plant specific operating procedures.
: 9. No additional submittals are required, with the exception of emergency operating procedures. 


18.2-91    Rev. 30 WOLF CREEK 18.2.13.3  ConclusionThe WCGS instrumentation used for detection of ICC adequately meets the guidance of NUREG0737, Item II.F.2. 18.2.14  EMERGENCY POWER FOR PRESSURIZER EQUIPMENT (II.G.1) 18.2.14.1  NRC Guidance Per NUREG0737Position Consistent with satisfying the requirements for General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of lossofoffsite power, the following positions shall be implemented: Power Supply for Pressurizer Relief and Block Valves and Pressurizer Level Indicators    1. Motive and control components of the poweroperated          relief valves (PORVs) shall be capable of being supplied from either the offsite power source or the emergency power source when the offsite power is not available.      2. Motive and control components associated with the PORV          block valves shall be capable of being supplied from either the offsite power source or the emergency power source when the offsite power is not available.      3. Motive and control power connections to the emergency          buses for the PORVs and their associated block valves shall be through devices that have been qualified in accordance with safetygrade requirements.      4. The pressurizer level indication instrument channels          shall be powered from the vital instrument buses. The buses shall have the capability of being supplied from either the offsite power source or the emergency power source when offsite power is not available. Clarification
The failure of a PORV to close on demand and a failure of a primary system safety valve to close will no longer be reported per the guidance of GenericLetter 9702.
: 1. Although the primary concern resulting from lessons          learned from the accident at TMI is that the PORV block valves must be closable, the design should retain, to the extent practical, the capability to also open these valves.      18.292    Rev. 0 WOLF CREEK      2. The motive and control power for the blockvalve should          be supplied from an emergency power bus different from the source supplying the PORV.      3. Any changeover of the PORV and blockvalve motive and          control power from the normal offsite power to the emergency onsite power is to be accomplished manually in the control room.      4. For those designs in which instrument air is needed for          operation, the electrical power supply should be required to have the capability to be manually connected to the emergency power sources. 18.2.14.2  The Operating Agent ResponseThe pressurizer level indication channels are powered from vital, Class lE buses and displayed in the control room. These buses are described in Section 8.3; they are capable of being supplied from onsite emergency power (diesel generators) or offsite power. The pressurizer PORVs and block valves are powered from vital, Class lE power sources. The separation group assignment is indicated on system drawings in Section 5.1. The pressurizer PORVs are relied on to perform two safety functions:
18.2.17.3.3  Conclusion  
: a. Pressure control during a shutdown concurrent with loss          of offsite power      b. Overpressure protection at low reactor coolant          system pressures These functions are described in Sections 5.2 and 5.4 (A).
 
The PORV block valve is provided to isolate the PORV should the PORV develop unacceptable leakage during operation. The pressurizer level indication is used during normal operation to control pressurizer level (see Figure 7.21, sheet 11). The pressurizer level indication is used for the reactor trip logic and is a displayed parameter for postaccident and postfire safe shutdown control. Thesafety design basis of the pressurizer level indication is provided in Section 7.2 and Section 7.5.      18.293    Rev. 14 WOLF CREEK 18.2.14.3  ConclusionThe WCGS design for the emergency power for pressurizer equipment satisfies Item II.G.1 of NUREG0737. The WCGS design proposes an alternative to the power supply assignment proposed for the pressurizer PORVs and PORV block valves. The alternative is justified based on the diversity in power supply assignments for these valves, i.e., motoroperated (AC) block valves and solenoidoperated (DC) PORVs and based on the requirements for PORV use for overpressure protection. 18.2.15  REQUESTS BY NRC INSPECTION AND ENFORCEMENT BULLETINS          (II.K.1) 18.2.15.1  NRC Guidance Per NUREG0694Position
The Operating Agent's commitment documented above meets the requirements of NUREG0737, II.K.3.3.
"(C.1.5) Review all valve positions, positioning requirements, positive controls and related test and maintenance procedures to assure proper ESF functioning. See Bulletins 7906A Item 8, 7906B Item 7, and 7908 Item 6 in Reference 11 [NUREG0560]. (C.1.10) Review and modify, as required, procedures for removing safetyrelated systems from service (and restoring to service) to assure operability status is known. See Bulletins 7905A Item 10, 7906A Item 10, 7906B Item 9, and 7908 Item 8 in Reference 11 [NUREG0560]. (C.1.17) For Westinghousedesigned reactors, trip the pressurizer lowlevel coincident signal bistables, so that safety injection would be initiated when the pressurizer lowpressure setpoint is reached regardless of the pressurizer level. See Bulletin 7906A and Revision 1, Item 3 in Reference 11 [NUREG 0560]."18.2.15.2  The Operating Agent ResponseThe development and review of procedures for testing, maintenance and system operation for the SNUPPS facilities were carried out as a joint effort between Union Electric, the Operating Agent, and other consultants. This development and review effort has considered the concerns of Items C.1.5 and C.1.10 of NUREG0694 and The Operating Agent has performed the actions required by the applicable I&E Bulletin sections. The item related to the safety injection logic is not applicable to the WCGS design (see Figure 7.21, Sheet 8).      18.294    Rev. 0 WOLF CREEK 18.2.15.3  ConclusionThe Operating Agent has developed and reviewed plant procedures in accordance with the NRC guidance in II.K.1 of NUREG0694. 18.2.16  ORDERS ON FACILITIES WITH BABCOCK & WILCOX NUCLEAR          STEAM SUPPLIER SYSTEMS (II.K.2) 18.2.16.1  Control of Auxiliary Feedwater Independent of          the Integrated Control System (II.K.2.2)Not applicable to Westinghouse pressurized water reactors.
18.2.17.4  Automatic Trip of Reactor Coolant Pumps During          LossofCoolant Accident (II.K.3.5)18.2.17.4.1  NRC Guidance Per NUREG0737  
18.2.16.2  Auxiliary Feedwater System Upgrading (II.K.2.8)Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.3  Failure Mode Effects Analysis on the Integrated          Control System II.K.2.9)Not applicable to Westinghouse pressurized water reactors.
Position Tripping of the reactor coolant pumps in case of a lossofcoolant accident (LOCA) is not an ideal solution. Licensees should consider other solutions to the smallbreak LOCA problem (for example, an increase in the safety injection  
18.2.16.4  SafetyGrade Anticipatory Reactor Trip (II.K.2.10)Not applicable to Westinghouse pressurized water reactors.
 
18.2.16.5  Thermal Mechanical ReportEffect of HighPres          sure Injection on Vessel Integrity for Small          Break LossofCoolant Accident with no Auxiliary          Feedwater (II.K.2.13)18.2.16.5.1  NRC Guidance Per NUREG0737 Position A detailed analysis shall be performed of the thermalmechanical conditions in the reactor vessel during recovery from small breaks with an extended loss of all feedwater. Clarification The position deals with the potential for thermal shock of reactor vessels resulting from cold safety injection flow. One aspect that bears heavily on the effects of safety injection flow is the mixing of safety injection water with reactor coolant in the reactor vessel. B&W provided a report on July 30, 1980 that discussed the mixing question and the basis for a conservative      18.295    Rev. 0 WOLF CREEK analysis of the potential for thermal shock to the reactor vessel. Other PWR vendors are also required to address this issue with regard to recovery from small breaks with an extended loss of all feedwater. In particular, demonstration shall be provided that sufficient mixing would occur of the cold highpressure injection (HPI) water with reactor coolant so that significant thermal shock effects to the vessel are precluded. 18.2.16.5.2  The Operating Agent Response Westinghouse (in support of the Westinghouse Owners Group) has developed a method and performed analyses for a spectrum of small break lossofcoolant accidents. The method employs the NOTRUMP computer program to generate the thermal/hydraulic transients. The thermal transients on the reactor vessel beltline and the inlet nozzle are analyzed based on the thermal/hydraulic data from the NOTRUMP code. The Westinghousedeveloped pressurized thermal shock evaluation (PTS) methodology has been submitted to the NRC (Reference 13). In accordance with the Operating Agent's letter to the NRC dated January 23, 1986, the WCGS calculated RTPTS values are well below the screening criterion of 10 CFR 50.61. 18.2.16.6  Effects of Slug Flow on Steam Generator Tubes          (II.K.2.15)Not applicable to Westinghouse pressurized water reactors.
flow rate). In the meantime, until a better solution is found, the reactor coolant pumps should be tripped automatically in case of a smallbreak LOCA.
18.2.16.7  Reactor Coolant Pump Seal Damage (II.K.2.16)Not applicable to Westinghouse pressurized water reactors.
18.2.16.8  Potential for Voiding in the Reactor Coolant          System During Transients (II.K.2.17)18.2.16.8.1  NRC Guidance Per NUREG0737 Position Analyze the potential for voiding in the reactor coolant system (RCS) during anticipated transients. Clarification The background for this concern and a request for this analysis was originally sent to the Babcock and Wilcox (B&W) licensees in a letter from R. W. Reid, NRC, to all B&W operating plants, dated January 9, 1980.      18.296    Rev. 0 WOLF CREEK 18.2.16.8.2  The Operating Agent Response Westinghouse (in support of the Westinghouse Owners Group) has performed a study which addresses the potential for void formation in Westinghousedesigned nuclear steam supply systems during natural circulation cooldown/depressurization transients. This study has been submitted to the NRC by the Westinghouse Owners Group (Ref. 1) and is applicable to Wolf Creek. In addition, the Westinghouse Owners Group has developed appropriate modifications to the Westinghouse Owners Group Emergency Response Guidelines (ERGs) to take the results of the study into account so as to preclude void formation in the upper head region during natural circulation cooldown/depressurization transients, and to specify those conditions under which upper head voiding may occur. The Operating Agent has considered the generic guidance developed by the Westinghouse Owners Group in the development of plant specific operating procedures. 18.2.16.9  Sequential Auxiliary Feedwater Flow Analysis          (II.K.2.19)Not applicable to Westinghouse pressurized water reactors.
18.2.16.10  SmallBreak LossofCoolant Accident Which            Repressurizes the Reactor Coolant System to the            PowerOperated Relief Valve Set Point (II.K.2.20)Not applicable to Westinghouse pressurized water reactors.
18.2.17  RECOMMENDATIONS FROM THE BULLETINS AND ORDERS TASK          FORCE (II.K.3) 18.2.17.1  Installation and Testing of Automatic Power          Operated Relief Valve Isolation System (II.K.3.1)18.2.17.1.1  NRC Guidance Per NUREG0737 Position All PWR licensees should provide a system that uses the PORV block valve to protect against a smallbreak lossofcoolant accident. This system will automatically cause the block valve to close when the reactor coolant system pressure decays after the PORV has opened. Justification should be provided to ensure that failure of this system would not decrease overall safety by aggravating plant transients and accidents.      18.297    Rev. 0 WOLF CREEK Each licensee shall perform a confirmatory test of the automatic block valve closure system following installation. Clarification Implementation of this action item was modified in the May 1980 version of NUREG0660. The change delays implementation of this action item until after the studies specified in TMI Action Plan item II.K.3.2 have been completed, if such studies confirm that the subject system is necessary. 18.2.17.1.2  The Operating Agent Response Westinghouse, as a part of the response prepared for the Westinghouse Owners Group to address item II.K.3.2 (refer to Section 18.2.17.2), has evaluated the necessity of incorporating an automatic pressurizer poweroperated relief valve isolation system. This evaluation is documented in Reference 2 and concluded that such a system should not be required. However, an automatic PORV isolation capability is part of the WCGS design as discussed in Sections 7.6.6 and 7.6.10. 18.2.17.1.3  Conclusion Based on the above discussion, WCGS meets the guidelines of NUREG0737, Item II.K.3.1.18.2.17.2  Report on Overall Safety Effect of PowerOperated          Relief Valve Isolation System (II.K.3.2)18.2.17.2.1  NRC Guidance Per NUREG0737 Position
: 1. The licensee should submit a report for staff review          documenting the various actions taken to decrease the probability of a smallbreak lossofcoolant accident (LOCA) caused by a stuckopen, poweroperated relief valve (PORV) and show how those actions constitute sufficient improvements in reactor safety.      2. Safetyvalve failure rates based on past history of the          operating plants designed by the specific nuclear steam supply system (NSSS) vendor should be included in the report submitted in response to (1) above.      18.298    Rev. 0 WOLF CREEK ClarificationBased on its review of feedwater transients and small LOCAs for operating plants, the Bulletins and Orders Task Force in the Office of Nuclear Reactor Regulation recommended that a report be prepared and submitted for staff review which documents the various actions that have been taken to reduce the probability of a smallbreak LOCA caused by a stuckopen PORV and show how these actions constitute sufficient improvements in reactor safety. Action Item II.K.3.2 of NUREG0660, published in May 1980, changed the implementation of this recommendation as follows:  In addition to modifications already implemented on PORVs, the report specified above should include safety examination of an automatic PORV isolation system identified in Task Action Plan item II.K.3.1. Modifications to reduce the likelihood of a stuckopen PORV will be considered sufficient improvements in reactor safety if they reduce the probability of a smallbreak LOCA caused by a stuckopen PORV such that it is not a significant contributor to the probability of a smallbreak LOCA due to all causes.
(According to WASH1400, the median probability of a smallbreak LOCA S2 with a break diameter between 0.5 inches and 2.0 inches is 103 per reactoryear with a variation ranging from 102 to 104 per reactoryear.) The abovespecified report should also include an analysis of safetyvalve failures based on the operating experience of the pressurizedwaterreactor (PWR) vendor designs. The licensee has the option of preparing and submitting either a plantspecific or a generic report. If a generic report is submitted, each licensee should document the applicability of the generic report to his own plant. Based on the above guidance and clarification, each licensee should perform an analysis of the probability of a smallbreak LOCA caused by a stuckopen PORV or safety valve. This analysis should consider modifications which have been made since the TMI2 accident to improve the probability. This analysis shall evaluate the effect of an automatic PORV isolation system specified in Task Action Plan, Item II.K.3.1. In evaluating the automatic PORV isolation system, the potential of causing a subsequent stuckopen safety valve and the overall effect on safety (e.g.,
effect on other accidents) should be examined.      18.299    Rev. 0 WOLF CREEK Actual operational data may be used in this analysis, where appropriate. The bases for any assumptions used should be clearly stated and justified. The results of the probability analysis should then be used to determine whether the modifications already implemented have reduced the probability of a smallbreak LOCA due to a stuckopen PORV or safety valve a sufficient amount to satisfy the criterion stated above, or whether the automatic PORV isolation system specified in Task Action item II.K.3.1 is necessary. In addition to the analysis described above, the licensee should compile operational data regarding pressurizer safety valves for PWR vendor designs.
These data should then be used to determine safetyvalve failure rates. The analyses should be documented in a report. If this requirement is implemented on a generic basis, each licensee should review the appropriate generic report and document its applicability to his own plant(s). The report and the documentation of applicability (where appropriate) should be submitted for NRC staff review by the specified date. 18.2.17.2.2  The Operating Agent Response As mentioned in item II.K.3.1 above (Section 18.2.17.1), the Westinghouse Owners Group has submitted a Westinghouseprepared report (Ref. 2) which provides a probabilistic analysis to determine the probability of a PORV LOCA, estimates the effect of the postTMI modifications, evaluates an automatic PORV isolation concept, and provides PORV and safety valve operational data for Westinghouse plants. Because of the sensitivity analyses included in the report, the report is generic and is applicable to the WCGS. The report identifies a significant reduction in the PORV LOCA probability as a result of postTMI modifications, and the calculations compare favorably with the operational data for Westinghouse plants (included as an appendix to the report).18.2.17.2.3  Conclusion The requirements of this item were resolved by submittal of the Reference 2 analysis report.      18.2100    Rev. 0 WOLF CREEK 18.2.17.3  Reporting Safety and Relief Valve Failures and          Challenges (II.K.3.3)18.2.17.3.1  NRC Guidance Per NUREG0694 Assure that any failure of a PORV or safety valve to close will be reported to the NRC promptly. All challenges to the PORVs or safety valves should be documented in the annual report. 18.2.17.3.2 The Operating Agent Response The failure of a PORV to close on demand and a failure of a primary systemsafety valve to close will no longer be reported per the guidance of GenericLetter 9702.18.2.17.3.3  Conclusion The Operating Agent's commitment documented above meets the requirements of NUREG0737, II.K.3.3. 18.2.17.4  Automatic Trip of Reactor Coolant Pumps During          LossofCoolant Accident (II.K.3.5)18.2.17.4.1  NRC Guidance Per NUREG0737 Position Tripping of the reactor coolant pumps in case of a lossofcoolant accident (LOCA) is not an ideal solution. Licensees should consider other solutions to the smallbreak LOCA problem (for example, an increase in the safety injection flow rate). In the meantime, until a better solution is found, the reactor coolant pumps should be tripped automatically in case of a smallbreak LOCA.
The signals designated to initiate the pump trip are discussed in NUREG0623.      18.2101    Rev. 13 WOLF CREEK ClarificationThis action item has been revised in the May 1980 version of NUREG0660 to provide for continued study of criteria for early reactor coolant pump trip.
The signals designated to initiate the pump trip are discussed in NUREG0623.      18.2101    Rev. 13 WOLF CREEK ClarificationThis action item has been revised in the May 1980 version of NUREG0660 to provide for continued study of criteria for early reactor coolant pump trip.
Implementation, if any is required, will be delayed accordingly. As part of the continued study, all holders of approved emergency core cooling (ECC) models have been required to analyze the forthcoming LOFT test (L36). The capability of the industry models to correctly predict the experimental behavior of this test will have a strong input on the staff's determination of when and how the reactor coolant pumps should be tripped. 18.2.17.4.2  The Operating Agent Response In response to IE Bulletin No. 7906C, Westinghouse, in support of the Westinghouse Owners Group (WOG) performed an analysis of delayed reactor coolant pump (RCP) trip during smallbreak LOCAs. This analysis is documented in Reference 3 and is the basis for the Westinghouse and WCGS position on RCP trip (i.e., automatic RCP trip is not necessary since sufficient time is available for manual tripping of the RCPs). Westinghouse (again in support of the Westinghouse Owners Group) has performed test predictions of the LOFT Experiment L36. The results of these predictions are documented in References 4 and 5. The results constitute both a best estimate model prediction with the NOTRUMP computer program and an evaluation model prediction with the WFLASH computer program, using the supplied set of initial boundary assumptions. By letter dated February 8, 1983, the NRC issued Generic Letter 8310c. The NRC concluded that each nuclear plant applicant should determine the need to trip the reactor coolant pumps following an accident or transient. By SNUPPS letters dated April 22, 1983 and April 13, 1984, responses to Generic Letter 8310c were provided. The responses referenced previous Westinghouse Owner's Group reports dated December 1, 1983 and March 9, 1984. The NRC has issued Generic Letter 8512 which confirmed the acceptability of the information provided by the Westinghouse Owner's Group, in response to Generic Letter 8310, and requested that plantspecific information be submitted to the NRC. By letter dated November 27, 1985, the Operating Agent responded to Generic Letter 8512. By letter dated March 21, 1989 (8900605), the NRC staff found that Wolf Creek appropriately referenced the WOG reports and the issue was closed.      18.2102    Rev. 21 WOLF CREEK 18.2.17.5  Evaluation of PORV Opening Probability During           Overpressure Transient (II.K.3.7)Not applicable to Westinghouse pressurized water reactors. 18.2.17.6  Proportional Integral Derivative Controller           Modification (II.K.3.9)18.2.17.6.1  NRC Guidance Per NUREG0737 Position The Westinghouserecommended modification to the proportional integral derivative (PID) controller should be implemented by affected licensees. Clarification The Westinghouserecommended modification is to raise the interlock bistable trip setting to preclude derivative action from opening the poweroperated relief valve (PORV). Some plants have proposed changing the derivative action setting to zero, thereby eliminating it from consideration. Either modification is acceptable to the staff. This represents a newly available option.18.2.17.6.2  The Operating Agent Response The WCGS design includes a pressure integral derivative (PID) controller in the poweroperated relief valve control circuit (see Figures 7.74 and 7.21, Sheet 11). The time derivative constant in the PID controller for the pressurizer PORV will be turned to "OFF" (set to zero) at WCGS. The appropriate plantprocedure for calibrating the set points in this nonsafety grade system will reflect this decision. Setting the derivative time constant to "OFF," in effect, removes the derivative action from the controller. Removal of the derivative action will decrease the likelihood of opening the pressurizer PORV since the actuation signal for the valve is then no longer sensitive to the rate of change of pressurizer pressure. 18.2.17.6.3  Conclusion The NUREG0737 provisions for the PID controller are met at WCGS.      18.2103    Rev. 14 WOLF CREEK 18.2.17.7  Proposed Anticipatory Trip Modification           (II.K.3.10)18.2.17.7.1  NRC Guidance Per NUREG0737 Position The anticipatory trip modification proposed by some licensees to confine the range of use to highpower levels should not be made until it has been shown on a plantbyplant basis that the probability of a smallbreak lossofcoolant accident (LOCA) resulting from a stuckopen poweroperated relief valve (PORV) is substantially unaffected by the modification. Clarification This evaluation is required for only those licensees/applicants who propose the modification.18.2.17.7.2  The Operating Agent Response This anticipatory trip modification is included in the WCGS design.
 
The NRC has raised the question of whether the pressurizer poweroperated relief valves would be actuated for a turbine trip without reactor trip below a power level of 50 percent (P9 set point). An analysis has been performed using realistic yet conservative values for the core physics parameters (primarily reactivity feedback coefficients and control rod worths), and a conservatively high initial power, average reactor temperature (TAVG), and pressurizer pressure level to account for instrument inaccuracies. The transient was initiated from the set point for the P9 interlock, namely 50 percent of the reactor full power level plus 2 percent for power measurement uncertainty. This is a conservative starting point, and would bracket all transients initiated from a lower power level. The core physics parameters used were the ones that would result in the most positive reactivity feedbacks (i.e., highest power levels). The steam dump valves were assumed to be actuated by the load rejection controller. Based upon the results from the analysis, the peak pressure reached in the pressurizer would be 2,302 psia. The set point for the actuation of the pressurizer poweroperated relief valves is 2,350 psia. Even including the +20 psi pressure measurement      18.2104    Rev. 0 WOLF CREEK uncertainty, there is still a margin of 28 psi between the peak pressure reached and the minimum activation pressure for the pressurizer poweroperated relief valves. An additional analysis has been performed to determine the consequences (specifically the likelihood of the pressurizer poweroperated relief valves opening) of having a turbine trip due to a loss of condenser vacuum. The major difference between this analysis and the one presented above is that now the normal steam dump system is unavailable, and the steam relief must be carried out through the atmospheric relief valves. Since there is a longer delay time before the atmospheric reliefs reach their set point (in comparison to the normal steam dump system) and their capacity is about onehalf of the steam dump system, there is an increased likelihood that the pressurizer PORVs will open. Figure 18.214 shows the plant operating ranges for which the pressurizer PORVs will open for a turbine trip due to a loss of condenser signal. Above 50 percent power, a turbine trip will cause a reactor trip (due to P9 set point),
Implementation, if any is required, will be delayed accordingly. As part of  
and the pressurizer PORV set point will not be reached. Below a power level of 35 to 40 percent (depending on fuel burnup), the pressurizer spray rate is adequate to maintain the pressurizer pressure below the set point. Therefore, only in the narrow band between about 35 and 50 percent power will the pressurizer PORVs open for a loss of condenser. Based upon the operating history of current plants, the chances of getting a condenser unavailable signal (and hence a turbine trip) is about 156 out of 107operating hours. Assuming 98 percent plant availability and a 40year plant lifetime, this works out to about four condenser unavailable turbine trips occurring during the normal life of a plant. Assuming an equal chance of having the plant operate anywhere between 0 and 100 percent power (an unrealistic value, since they usually operate either at a full or no load level), the chances of having a condenser unavailable signal generate a transient which would result in the opening of the pressurizer PORVs is less than one per plant lifetime. 18.2.17.7.3  Conclusion The analysis described above demonstrates an acceptably low probability of a small LOCA caused by a stuck open PORV.      18.2105    Rev. 0 WOLF CREEK 18.2.17.8  Justification for Use of Certain PORVs (II.K.3.11)18.2.17.8.1  NRC Guidance Per NUREG0694 Position Demonstrate that the PORV installed in the plant has a failure rate equivalent to or less than the valves for which there is an operating history. 18.2.17.8.2  The Operating Agent Response The PORVs to be used in the WCGS design are pilotoperated relief valves.These valves are a new design and were supplied by Garrett. The valve design was tested in the Electric Power Research Institute (EPRI) valve test program (refer to NUREG0737, Item II.D.1). The performance of the Garrett PORVs was comparable to other designs tested. In addition, the analysis of PORVs in accordance with NUREG0737, Item III.K.3.2 (Section 18.2.17.2) addresses valve failure rates. 18.2.17.8.3  Conclusion Based on the EPRI testing and PORV analysis identified above, failure rates for the WCGS PORV design are adequately addressed. 18.2.17.9  Confirm Existence of Anticipatory Reactor Trip           Upon Turbine Trip (II.K.3.12)18.2.17.9.1  NRC Guidance Per NUREG0737 Position Licensees with Westinghousedesigned operating plants should confirm that their plants have an anticipatory reactor trip upon turbine trip. The licensee of any plant where this trip is not present should provide a conceptual design and evaluation for the installation of this trip. 18.2.17.9.2  The Operating Agent Response The WCGS design includes an anticipatory reactor trip upon turbine trip (refer to Figure 7.21).      18.2106    Rev. 0 WOLF CREEK 18.2.17.10  Separation of HighPressure Coolant Injection           and Reactor Core Isolation Cooling System            Initiation LevelsAnalysis and Implementation           (II.K.3.13)Not applicable to pressurized water reactors. 18.2.17.11  Isolation of Isolation Condensers on High           Radiation (II.K.3.14)Not applicable to pressurized water reactors.
 
18.2.17.12  Modify BreakDetection Logic to Prevent Spurious            Isolation of HighPressure Coolant Injection and           Reactor Core Isolation Cooling (II.K.3.15)Not applicable to pressurized water reactors.
the continued study, all holders of approved emergency core cooling (ECC) models have been required to analyze the forthcoming LOFT test (L36). The  
18.2.17.13  Reduction of Challenges and Failures of Relief            ValvesFeasibility Study and System Modification           (II.K.3.16)Not applicable to pressurized water reactors.
 
18.2.17.14  Report on Outages of Emergency CoreCooling           Systems Licensee Report and Proposed Technical           Specification Changes (II.K.3.17)18.2.17.14.1  NRC Guidance Per NUREG0737 Position Several components of the emergency corecooling (ECC) systems are permitted by technical specifications to have substantial outage times (e.g., 72 hours for one dieselgenerator; 14 days for the HPCI system). In addition, there are no cumulative outage time limitations for ECC systems. Licensees should submit a report detailing outage dates and lengths of outages for all ECC systems for the last 5 years of operation. The report should also include the causes of the outages (i.e., controller failure, spurious isolation). Clarification The present technical specifications contain limits on allowable outage times for ECC systems and components. However, there are no cumulative outage time limitations on these same systems. It      18.2107    Rev. 0 WOLF CREEK is possible that ECC equipment could meet present technical specification requirements but have a high unavailability because of frequent outages within the allowable technical specifications. The licensees should submit a report detailing outage dates and length of outages for all ECC systems for the last 5 years of operation, including causes of the outages. This report will provide the staff with a quantification of historical unreliability due to test and maintenance outages, which will be used to determine if a need exists for cumulative outage requirements in the technical specifications. Based on the above guidance and clarification, a detailed report should be submitted. The report should contain (1) outage dates and duration of outages; (2) cause of the outage; (3) ECC systems or components involved in the outage; and (4) corrective action taken. Test and maintenance outages should be included in the above listings which are to cover the last 5 years of operation. The licensee should propose changes to improve the availability of ECC equipment, if needed. Applicant for an operating license shall establish a plan to meet these requirements.18.2.17.14.2  The Operating Agent Response The Operating Agent provides safety system outage information as required by regulations and WCGS Technical Specifications. In addition, records are retained of the maintenance, inspections, and surveillance tests of the principal items related to nuclear safety. These records can be reviewed by the NRC for additional specific data on component availability. The documentation will include:  1) outage dates and duration, 2) cause of the outage, 3) systems or components involved in the outage, and 4) corrective action taken. 18.2.17.14.3  Conclusion The WCGS reports safety system outages as required by 10 CFR 50.72, 10 CFR 50.73, The Technical Specifications and other applicable regulations. This reporting ensures that the data requested by Item II.K.3.17 of NUREG0737 is available.18.2.17.15  Modification of Automatic Depressurization            System LogicFeasibility for Increased           Diversity for Some Event Sequences (II.K.3.18)Not applicable to pressurized water reactors.      18.2108    Rev. 0 WOLF CREEK 18.2.17.16  Interlock on Recirculation Pump Loops (II.K.3.19)Not applicable to pressurized water reactors. 18.2.17.17  Restart of Core Spray and LowPressure Coolant           Injection Systems (II.K.3.21)Not applicable to pressurized water reactors.
capability of the industry models to correctly predict the experimental  
18.2.17.18  Automatic Switchover of Reactor Core Isolation            Cooling System SuctionVerify Procedures and           Modify Design (II.K.3.22)Not applicable to pressurized water reactors.
 
18.2.17.19  Confirm Adequacy of Space Cooling for High           Pressure Coolant Injection and Reactor Core           Isolation Cooling Systems (II.K.3.24)Not applicable to pressurized water reactors.
behavior of this test will have a strong input on the staff's determination of  
18.2.17.20  Effect of Loss of AlternatingCurrent Power           on Pump Seals (II.K.3.25)18.2.17.20.1  NRC Guidance Per NUREG0737 Position The licensees should determine, on a plantspecific basis, by analysis or experiment, the consequences of a loss of cooling water to the reactor recirculation pump seal coolers. The pump seals should be designed to withstand a complete loss of alternatingcurrent (ac) power for at least 2 hours. Adequacy of the seal design should be demonstrated. Clarification The intent of this position is to prevent excessive loss of reactor coolant system (RCS) inventory following an anticipated operational  occurrence. Loss of  ac power for  this case is construed to be loss of offsite power. If seal failure is the consequence of loss of cooling water to the reactor coolant pump (RCP) seal coolers for 2 hours, due to loss of offsite power, one acceptable solution would be to supply emergency power to the component cooling water pump. This topic is addressed for Babcock and Wilcox (B&W) reactors in Section II.K.2.16.      18.2109    Rev. 0 WOLF CREEK 18.2.17.20.2  The Operating Agent Response During normal operation, seal injection flow from the chemical and volume control system is provided to cool the RCP seals, and the component cooling water system provides flow to the thermal barrier heat exchanger to limit the heat transfer from the reactor coolant to the RCP internals. In the event of a loss of offsite power, the RCP motor is deenergized and both of these cooling supplies are terminated; however, the diesel generators are automatically started and both seal injection flow and component cooling water to the thermal barrier heat exchanger are automatically restored within seconds. Either of these cooling supplies is adequate to provide seal cooling and prevent seal failure due to a loss of seal cooling during a loss of offsite power for at least 2 hours. 18.2.17.20.3  Conclusion The WCGS design meets the RCP seal cooling requirements of this item.
 
18.2.17.21  Provide Common Reference Level for Vessel Level           Instrumentation (II.K.3.27)Not applicable to pressurized water reactors.
when and how the reactor coolant pumps should be tripped.
18.2.17.22  Verify Qualification of Accumulators on Automatic           Depressurization System Valves (II.K.3.28)Not applicable to pressurized water reactors.
18.2.17.4.2  The Operating Agent Response In response to IE Bulletin No. 7906C, Westinghouse, in support of the Westinghouse Owners Group (WOG) performed an analysis of delayed reactor coolant pump (RCP) trip during smallbreak LOCAs. This analysis is documented in Reference 3 and is the basis for the Westinghouse and WCGS position on RCP  
18.2.17.23  Study to Demonstrate Performance of Isolation           Condensers with Noncondensibles (II.K.3.29)Not applicable to pressurized water reactors.
 
18.2.17.24  Revised SmallBreak LossofCoolant Accident           Methods to Show Compliance with 10 CFR Part 50,            Appendix K (II.K.3.30)18.2.17.24.1  NRC Guidance Per NUREG0737 Position The analysis methods used by nuclear steam supply system (NSSS) vendors and/or fuel suppliers for smallbreak lossofcoolant accident (LOCA) analysis for compliance with Appendix K to 10 CFR      18.2110    Rev. 0 WOLF CREEK Part 50 should be revised, documented, and submitted for NRC approval. The revisions should account for comparisons with experimental data, including data from the LOFT Test and Semiscale Test facilities. Clarification As a result of the accident at TMI2, the Bulletins and Orders Task Force was formed within the Office of Nuclear Reactor Regulation. This task force was charged, in part, to review the analytical predictions of feedwater transients and smallbreak LOCAs for the purpose of assuring the continued safe operation of all operating reactors, including a determination of acceptability of emergency guidelines for operators. As a result of the task force reviews, a number of concerns were identified regarding the adequacy of certain features of smallbreak LOCA models, particularly the need to confirm specific model features (e.g., condensation heat transfer rates) against applicable experimental data. These concerns, as they applied to each lightwater reactor (LWR) vendor's models, were documented in the task force reports for each LWR vendor. In addition to the modeling concerns identified, the task force also concluded that, in light of the TMI2 accident, additional systems verification of the smallbreak LOCA model as required by II.4 of Appendix K to 10 CFR 50 was needed. This included providing predictions of Semiscale Test S0710B and LOFT Test (L31) and providing experimental verification of the various modes of singlephase and twophase natural circulation predicted to occur in each vendor's reactor during smallbreak LOCAs. Based on the cumulative staff requirements for additional smallbreak LOCA model verification, including both integral system and separate effects verification, the staff considered model revision as the appropriate method for reflecting any potential upgrading of the analysis methods. The purpose of the verification was to provide the necessary assurance that the smallbreak LOCA models were acceptable to calculate the behavior and consequences of small primary system breaks. The staff believes that this assurance can alternatively be provided, as appropriate, by additional justification of the acceptability of present smallbreak LOCA models with regard to specific staff concerns and recent test data. Such justification could supplement or supersede the need for model revision. The specific staff concerns regarding smallbreak LOCA models are provided in the analysis sections of the B&O Task Force reports for each LWR vendor, (NUREG0635, 0565, 0626, 0611, and      18.2111    Rev. 0 WOLF CREEK 0623). These concerns should be reviewed in total by each holder of an approved emergency core cooling system (ECCS) model and addressed in the evaluation as appropriate. The recent tests include the entire Semiscale smallbreak test series and LOFT Tests (L31) and (L32). The staff believes that the present smallbreak LOCA models can be both qualitatively and quantitatively assessed against these tests. Other separate effects tests (e.g., ORNL core uncovery tests) and future tests, as appropriate, should also be factored into this assessment. Based on the preceding information, a detailed outline of the proposed program to address this issue should be submitted. In particular, this submittal should identify (1) which areas of the models, if any, the licensee intends to upgrade, (2) which areas the licensee intends to address by further justification of acceptability, (3) test data to be used as part of the overall verification/upgrade effort, and (4) the estimated schedule for performing the necessary work and submitting this information for staff review and approval. 18.2.17.24.2  The Operating Agent Response The present Westinghouse Small Break Evaluation Model used to analyze WCGS (refer to Section 15.6.5) is in conformance with 10 CFR Part 50, Appendix K.
trip (i.e., automatic RCP trip is not necessary since sufficient time is  
Nevertheless, Westinghouse (as documented in Ref. 6) has addressed the specific NRC items contained in NUREG0611 in a model (NOTRUMP) documented in WCAP 10054 (dated 12/28/82) and WCAP 10079 (dated 11/12/82). The NRC approved NOTRUMP as satisfying II.K.3.30 in a safety evaluation dated May 21, 1985. NOTRUMP was also found to be in full compliance with Appendix K to 10 CFR 50 and was designated as the new Westinghouse licensing tool for smallbreak LOCA evaluations to satisfy the provisions of II.K.3.31. 18.2.17.24.3  Conclusion The NOTRUMP Code satisfies the provisions of NUREG0737, Item II.K.3.30.
 
18.2.17.25  PlantSpecific Calculations to Show Compliance           With 10 CFR Part 50.46 (II.K.3.31)18.2.17.25.1  NRC Guidance Per NUREG0737 Position Plantspecific calculations using NRCapproved models for smallbreak lossofcoolant accidents (LOCAs), as described in item      18.2112    Rev. 0 WOLF CREEK II.K.3.30 to show compliance with 10 CFR 50.46, should be submitted for NRC approval by all licensees. 18.2.17.25.2  The Operating Agent Response The present Westinghouse Small Break Evaluation Model and small break LOCA analyses for WCGS (refer to Section 15.6.5) are in conformance with 10 CFR Part 50, Appendix K and 10 CFR Part 50.46. As stated in the response to Item II.K.3.30 (refer to Section 18.2.17.24.2), the NRC has approved the Westinghouse NOTRUMP Code for smallbreak LOCA analysis. In response to generic letter 8335, the Westinghouse Owners Group has developed a program to demonstrate on a generic basis that the new NOTRUMP model predicts lower calculated peak clad temperatures than WFLASH. By letter dated October 6, 1986 (Reference 17), the NRC concluded that the generic study results could be used to resolve NUREG0737, Item II.K.3.31. The Operating Agent has submitted a letter dated June 26, 1986 to the NRC to verify the applicability of the generic study results to WCGS. 18.2.17.25.3  Conclusion Upon submittal of the letter confirming the applicability of the generic results to WCGS, the requirements of NUREG0737, Item II.K.3.31 are met. 18.2.17.26  Evaluation of Anticipated Transients with Single           Failure to Verify No Fuel Failure (II.K.3.44)Not applicable to pressurized water reactors.
available for manual tripping of the RCPs).
18.2.17.27  Evaluation of Depressurization with Other than           Automatic Depressurization System (II.K.3.45)Not applicable to pressurized water reactors.
Westinghouse (again in support of the Westinghouse Owners Group) has performed test predictions of the LOFT Experiment L36. The results of these predictions  
18.2.17.28  Identify Water Sources Prior to Actuation of           Automatic Depressurization System (II.K.3.57)Not applicable to pressurized water reactors.
 
18.2.18  REFERENCES  
are documented in References 4 and 5. The results constitute both a best  
: 1. Letter OG57, dated April 20, 1981, Jurgensen, R. W.     (Chairman, Westinghouse Owners Group) to Check, P. S. (NRC).      18.2113    Rev. 0 WOLF CREEK 2. Wood, D. C. and Gottshall, C. L., "Probabilistic Analysis and      Operational Data in Response to NUREG0737 Item II.K.3.2 for Westinghouse NSSS Plants," WCAP9804, February 1981. 3.  "Analysis of Delayed Reactor Coolant Pump Trip During Small     Loss of Coolant Accidents for Westinghouse Nuclear Steam Supply Systems," WCAP9584 (Proprietary) and WCAP9585 (Non Proprietary), August 1979. 4. Letter OG49, dated March 3, 1981, Jurgensen, R. W.     (Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.  
 
    (NRC). 5. Letter OG50, dated March 23, 1981, Jurgensen, R. W.     (Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.  
estimate model prediction with the NOTRUMP computer program and an evaluation  
    (NRC). 6. Letter NSTMA2318, dated September 26, 1980, Anderson, T. M.     (Westinghouse) to Eisenhut, D. G. (NRC). 7. Letter NSTMA2357, dated December 23, 1980, T. M. Anderson     (Westinghouse) to D. G. Eisenhut (NRC). 8. Rockwell, T., Reactor Shielding Design Manual, D. Van      Nostrand Co., New York, New York, 1956.  
 
: 9. QADCG:  A Combinatorial Geometry Version of QADP5A, Bechtel     Power Corporation internal computer code.  
model prediction with the WFLASH computer program, using the supplied set of  
: 10. Letter SLNRC 830048, dated September 1, 1983, N. A. Petrick     (SNUPPS) to H. R. Denton (NRC). 11. Letter SLNRC 84004, dated January 16, 1984, N. A. Petrick     (SNUPPS) to H. R. Denton (NRC). 12. Letter SLNRC 83002 (distributed as 82002), dated January 7,      1983, N. A. Petrick (SNUPPS) to H. R. Denton (NRC). 13.  "A Generic Assessment of Significant Flaw Extension,      Including, Stagnant Loop Conditions, From Pressurized Thermal Shock of Reactor Vessels on Westinghouse Power Plants," WCAP 10319, December 1983. 14. Union Electric Calculation Sheet HPCI8404, dated April 27,      1984, "An Assessment of Personnel Dose to Obtain Gaseous Effluent and Reactor Coolant System Grab Samples Following a DBA Loss of Coolant Accident."      18.2114    Rev. 0 WOLF CREEK 15. Letter NSNRC863099, dated February 20, 1986, Rahe, E. P.     (Westinghouse) to Taylor, J. M. (NRC). 16.  "Methodology for Qualifying Westinghouse WRDSupplied NSSS      SafetyRelated Electrical Equipment," WCAP8587, Rev. 6A, dated November 1983. 17. Safety Evaluation Report, WCAP11145, Westinghouse Small     Break LOCA ECCS Evaluation Model Generic Study with NOTRUMP Code, transmitted by NRC letter (C. Rossi) to Westinghouse Owners Group (L. Butterfield), dated October 6, 1986.      18.2115    Rev. 0 WOLF CREEK                   TABLE 18.2-1 (Page 1 of 2)
 
MITIGATING CORE DAMAGE COURSECOURSE DESCRIPTIONWestinghouse has performed detailed analysis of numeroussituations which could arise in two loop, three loop, and four loop PWR plants. The Westinghouse program has then been structured to use the most limiting case for each situation as the basis for instruction to students.COURSE INTRODUCTION     -  Major Plant Assumptions
initial boundary assumptions. By letter dated February 8, 1983, the NRC issued Generic Letter 8310c. The NRC concluded that each nuclear plant applicant should determine the need to  
       -  Core Thermal and Linear Power Density LimitsINCORE INSTRUMENTATION     -  System Functions, Characteristics, and Operations Including Moveable Incore Detection System and Incore Thermocouples
 
       -  Determination of Core Damage Extent and Core Geometry Changes
trip the reactor coolant pumps following an accident or transient. By SNUPPS  
 
letters dated April 22, 1983 and April 13, 1984, responses to Generic Letter 8310c were provided. The responses referenced previous Westinghouse Owner's  
 
Group reports dated December 1, 1983 and March 9, 1984. The NRC has issued Generic Letter 8512 which confirmed the acceptability of the information provided by the Westinghouse Owner's Group, in response to Generic Letter 8310, and requested that plantspecific information be  
 
submitted to the NRC. By letter dated November 27, 1985, the Operating Agent responded to Generic Letter 8512. By letter dated March 21, 1989 (8900605), the NRC staff found that Wolf Creek appropriately referenced the WOG reports and the issue was closed.      18.2102    Rev. 21 WOLF CREEK 18.2.17.5  Evaluation of PORV Opening Probability During Overpressure Transient (II.K.3.7)
Not applicable to Westinghouse pressurized water reactors.
18.2.17.6  Proportional Integral Derivative Controller Modification (II.K.3.9)18.2.17.6.1  NRC Guidance Per NUREG0737  
 
Position The Westinghouserecommended modification to the proportional integral derivative (PID) controller should be implemented by affected licensees.
Clarification The Westinghouserecommended modification is to raise the interlock bistable trip setting to preclude derivative action from opening the poweroperated  
 
relief valve (PORV). Some plants have proposed changing the derivative action  
 
setting to zero, thereby eliminating it from consideration. Either  
 
modification is acceptable to the staff. This represents a newly available  
 
option.18.2.17.6.2  The Operating Agent Response  
 
The WCGS design includes a pressure integral derivative (PID) controller in the poweroperated relief valve control circuit (see Figures 7.74 and 7.21, Sheet  
 
11). The time derivative constant in the PID controller for the pressurizer  
 
PORV will be turned to "OFF" (set to zero) at WCGS. The appropriate plant procedure for calibrating the set points in this nonsafety grade system will  
 
reflect this decision.
Setting the derivative time constant to "OFF," in effect, removes the derivative action from the controller. Removal of the derivative action will  
 
decrease the likelihood of opening the pressurizer PORV since the actuation  
 
signal for the valve is then no longer sensitive to the rate of change of  
 
pressurizer pressure.
18.2.17.6.3  Conclusion The NUREG0737 provisions for the PID controller are met at WCGS.      18.2103    Rev. 14 WOLF CREEK 18.2.17.7  Proposed Anticipatory Trip Modification (II.K.3.10)18.2.17.7.1  NRC Guidance Per NUREG0737 Position The anticipatory trip modification proposed by some licensees to confine the range of use to highpower levels should not be made until it has been shown on a plantbyplant basis that the probability of a smallbreak lossofcoolant accident (LOCA) resulting from a stuckopen poweroperated relief valve (PORV)  
 
is substantially unaffected by the modification.
Clarification
 
This evaluation is required for only those licensees/applicants who propose the modification.
18.2.17.7.2  The Operating Agent Response  
 
This anticipatory trip modification is included in the WCGS design.
The NRC has raised the question of whether the pressurizer poweroperated relief valves would be actuated for a turbine trip without reactor trip below a power level of 50 percent (P9 set point). An analysis has been performed  
 
using realistic yet conservative values for the core physics parameters (primarily reactivity feedback coefficients and control rod worths), and a  
 
conservatively high initial power, average reactor temperature (TAVG), and  
 
pressurizer pressure level to account for instrument inaccuracies. The transient was initiated from the set point for the P9 interlock, namely 50 percent of the reactor full power level plus 2 percent for power measurement  
 
uncertainty. This is a conservative starting point, and would bracket all  
 
transients initiated from a lower power level. The core physics parameters  
 
used were the ones that would result in the most positive reactivity feedbacks (i.e., highest power levels). The steam dump valves were assumed to be  
 
actuated by the load rejection controller.
Based upon the results from the analysis, the peak pressure reached in the pressurizer would be 2,302 psia. The set point for the actuation of the pressurizer poweroperated relief valves is 2,350 psia. Even including the +20  
 
psi pressure measurement      18.2104    Rev. 0 WOLF CREEK uncertainty, there is still a margin of 28 psi between the peak pressure reached and the minimum activation pressure for the pressurizer poweroperated  
 
relief valves.
An additional analysis has been performed to determine the consequences (specifically the likelihood of the pressurizer poweroperated relief valves  
 
opening) of having a turbine trip due to a loss of condenser vacuum.
The major difference between this analysis and the one presented above is that now the normal steam dump system is unavailable, and the steam relief must be  
 
carried out through the atmospheric relief valves. Since there is a longer  
 
delay time before the atmospheric reliefs reach their set point (in comparison to the normal steam dump system) and their capacity is about onehalf of the  
 
steam dump system, there is an increased likelihood that the pressurizer PORVs  
 
will open. Figure 18.214 shows the plant operating ranges for which the pressurizer PORVs will open for a turbine trip due to a loss of condenser signal. Above 50 percent power, a turbine trip will cause a reactor trip (due to P9 set point),
and the pressurizer PORV set point will not be reached. Below a power level of  
 
35 to 40 percent (depending on fuel burnup), the pressurizer spray rate is  
 
adequate to maintain the pressurizer pressure below the set point. Therefore, only in the narrow band between about 35 and 50 percent power will the  
 
pressurizer PORVs open for a loss of condenser.
Based upon the operating history of current plants, the chances of getting a condenser unavailable signal (and hence a turbine trip) is about 156 out of 10 7operating hours. Assuming 98 percent plant availability and a 40year plant  
 
lifetime, this works out to about four condenser unavailable turbine trips  
 
occurring during the normal life of a plant. Assuming an equal chance of  
 
having the plant operate anywhere between 0 and 100 percent power (an  
 
unrealistic value, since they usually operate either at a full or no load  
 
level), the chances of having a condenser unavailable signal generate a  
 
transient which would result in the opening of the pressurizer PORVs is less  
 
than one per plant lifetime.
18.2.17.7.3  Conclusion  
 
The analysis described above demonstrates an acceptably low probability of a small LOCA caused by a stuck open PORV.      18.2105    Rev. 0 WOLF CREEK 18.2.17.8  Justification for Use of Certain PORVs (II.K.3.11)18.2.17.8.1  NRC Guidance Per NUREG0694 Position Demonstrate that the PORV installed in the plant has a failure rate equivalent to or less than the valves for which there is an operating history.
18.2.17.8.2  The Operating Agent Response The PORVs to be used in the WCGS design are pilotoperated relief valves.
These valves are a new design and were supplied by Garrett. The valve design  
 
was tested in the Electric Power Research Institute (EPRI) valve test program (refer to NUREG0737, Item II.D.1). The performance of the Garrett PORVs was  
 
comparable to other designs tested. In addition, the analysis of PORVs in accordance with NUREG0737, Item III.K.3.2 (Section 18.2.17.2) addresses valve  
 
failure rates.
18.2.17.8.3  Conclusion  
 
Based on the EPRI testing and PORV analysis identified above, failure rates for the WCGS PORV design are adequately addressed.
18.2.17.9  Confirm Existence of Anticipatory Reactor Trip Upon Turbine Trip (II.K.3.12)18.2.17.9.1  NRC Guidance Per NUREG0737  
 
Position Licensees with Westinghousedesigned operating plants should confirm that their plants have an anticipatory reactor trip upon turbine trip. The licensee of  
 
any plant where this trip is not present should provide a conceptual design and  
 
evaluation for the installation of this trip.
18.2.17.9.2  The Operating Agent Response  
 
The WCGS design includes an anticipatory reactor trip upon turbine trip (refer to Figure 7.21).      18.2106    Rev. 0 WOLF CREEK 18.2.17.10  Separation of HighPressure Coolant Injection and Reactor Core Isolation Cooling System            Initiation LevelsAnalysis and Implementation (II.K.3.13)
Not applicable to pressurized water reactors.
18.2.17.11  Isolation of Isolation Condensers on High Radiation (II.K.3.14)
Not applicable to pressurized water reactors.
18.2.17.12  Modify BreakDetection Logic to Prevent Spurious            Isolation of HighPressure Coolant Injection and Reactor Core Isolation Cooling (II.K.3.15)
Not applicable to pressurized water reactors.  
 
18.2.17.13  Reduction of Challenges and Failures of Relief            ValvesFeasibility Study and System Modification (II.K.3.16)
Not applicable to pressurized water reactors.
18.2.17.14  Report on Outages of Emergency CoreCooling Systems Licensee Report and Proposed Technical Specification Changes (II.K.3.17)18.2.17.14.1  NRC Guidance Per NUREG0737  
 
Position Several components of the emergency corecooling (ECC) systems are permitted by technical specifications to have substantial outage times (e.g., 72 hours for one dieselgenerator; 14 days for the HPCI system). In addition, there are no  
 
cumulative outage time limitations for ECC systems. Licensees should submit a  
 
report detailing outage dates and lengths of outages for all ECC systems for  
 
the last 5 years of operation. The report should also include the causes of  
 
the outages (i.e., controller failure, spurious isolation).
Clarification
 
The present technical specifications contain limits on allowable outage times for ECC systems and components. However, there are no cumulative outage time  
 
limitations on these same systems. It      18.2107    Rev. 0 WOLF CREEK is possible that ECC equipment could meet present technical specification requirements but have a high unavailability because of frequent outages within  
 
the allowable technical specifications.
The licensees should submit a report detailing outage dates and length of outages for all ECC systems for the last 5 years of operation, including causes  
 
of the outages. This report will provide the staff with a quantification of  
 
historical unreliability due to test and maintenance outages, which will be  
 
used to determine if a need exists for cumulative outage requirements in the  
 
technical specifications.
Based on the above guidance and clarification, a detailed report should be submitted. The report should contain (1) outage dates and duration of outages;  
 
(2) cause of the outage; (3) ECC systems or components involved in the outage;  
 
and (4) corrective action taken. Test and maintenance outages should be  
 
included in the above listings which are to cover the last 5 years of  
 
operation. The licensee should propose changes to improve the availability of  
 
ECC equipment, if needed.
Applicant for an operating license shall establish a plan to meet these requirements.
18.2.17.14.2  The Operating Agent Response  
 
The Operating Agent provides safety system outage information as required by regulations and WCGS Technical Specifications. In addition, records are  
 
retained of the maintenance, inspections, and surveillance tests of the  
 
principal items related to nuclear safety. These records can be reviewed by  
 
the NRC for additional specific data on component availability. The  
 
documentation will include:  1) outage dates and duration, 2) cause of the  
 
outage, 3) systems or components involved in the outage, and 4) corrective  
 
action taken.
18.2.17.14.3  Conclusion  
 
The WCGS reports safety system outages as required by 10 CFR 50.72, 10 CFR 50.73, The Technical Specifications and other applicable regulations. This reporting ensures that the data requested by Item II.K.3.17 of NUREG0737 is  
 
available.
18.2.17.15  Modification of Automatic Depressurization            System LogicFeasibility for Increased Diversity for Some Event Sequences (II.K.3.18)
Not applicable to pressurized water reactors.      18.2108    Rev. 0 WOLF CREEK 18.2.17.16  Interlock on Recirculation Pump Loops (II.K.3.19)
Not applicable to pressurized water reactors. 18.2.17.17  Restart of Core Spray and LowPressure Coolant Injection Systems (II.K.3.21)
Not applicable to pressurized water reactors.  
 
18.2.17.18  Automatic Switchover of Reactor Core Isolation            Cooling System SuctionVerify Procedures and Modify Design (II.K.3.22)
Not applicable to pressurized water reactors.  
 
18.2.17.19  Confirm Adequacy of Space Cooling for High Pressure Coolant Injection and Reactor Core Isolation Cooling Systems (II.K.3.24)
Not applicable to pressurized water reactors.
18.2.17.20  Effect of Loss of AlternatingCurrent Power on Pump Seals (II.K.3.25)18.2.17.20.1  NRC Guidance Per NUREG0737  
 
Position The licensees should determine, on a plantspecific basis, by analysis or experiment, the consequences of a loss of cooling water to the reactor  
 
recirculation pump seal coolers. The pump seals should be designed to withstand a complete loss of alternatingcurrent (ac) power for at least 2  
 
hours. Adequacy of the seal design should be demonstrated.
Clarification
 
The intent of this position is to prevent excessive loss of reactor coolant system (RCS) inventory following an anticipated operational  occurrence. Loss  
 
of  ac power for  this case is construed to be loss of offsite power. If seal  
 
failure is the consequence of loss of cooling water to the reactor coolant pump (RCP) seal coolers for 2 hours, due to loss of offsite power, one acceptable  
 
solution would be to supply emergency power to the component cooling water  
 
pump. This topic is addressed for Babcock and Wilcox (B&W) reactors in Section  
 
II.K.2.16.      18.2109    Rev. 0 WOLF CREEK 18.2.17.20.2  The Operating Agent Response During normal operation, seal injection flow from the chemical and volume control system is provided to cool the RCP seals, and the component cooling  
 
water system provides flow to the thermal barrier heat exchanger to limit the  
 
heat transfer from the reactor coolant to the RCP internals. In the event of a  
 
loss of offsite power, the RCP motor is deenergized and both of these cooling  
 
supplies are terminated; however, the diesel generators are automatically  
 
started and both seal injection flow and component cooling water to the thermal  
 
barrier heat exchanger are automatically restored within seconds. Either of  
 
these cooling supplies is adequate to provide seal cooling and prevent seal  
 
failure due to a loss of seal cooling during a loss of offsite power for at  
 
least 2 hours.
18.2.17.20.3  Conclusion  
 
The WCGS design meets the RCP seal cooling requirements of this item.  
 
18.2.17.21  Provide Common Reference Level for Vessel Level Instrumentation (II.K.3.27)
Not applicable to pressurized water reactors.  
 
18.2.17.22  Verify Qualification of Accumulators on Automatic Depressurization System Valves (II.K.3.28)
Not applicable to pressurized water reactors.  
 
18.2.17.23  Study to Demonstrate Performance of Isolation Condensers with Noncondensibles (II.K.3.29)
Not applicable to pressurized water reactors.
18.2.17.24  Revised SmallBreak LossofCoolant Accident Methods to Show Compliance with 10 CFR Part 50,            Appendix K (II.K.3.30)18.2.17.24.1  NRC Guidance Per NUREG0737  
 
Position The analysis methods used by nuclear steam supply system (NSSS) vendors and/or fuel suppliers for smallbreak lossofcoolant accident (LOCA) analysis for  
 
compliance with Appendix K to 10 CFR      18.2110    Rev. 0 WOLF CREEK Part 50 should be revised, documented, and submitted for NRC approval. The revisions should account for comparisons with experimental data, including data  
 
from the LOFT Test and Semiscale Test facilities.
Clarification As a result of the accident at TMI2, the Bulletins and Orders Task Force was formed within the Office of Nuclear Reactor Regulation. This task force was  
 
charged, in part, to review the analytical predictions of feedwater transients and smallbreak LOCAs for the purpose of assuring the continued safe operation  
 
of all operating reactors, including a determination of acceptability of  
 
emergency guidelines for operators.
As a result of the task force reviews, a number of concerns were identified regarding the adequacy of certain features of smallbreak LOCA models, particularly the need to confirm specific model features (e.g., condensation  
 
heat transfer rates) against applicable experimental data. These concerns, as  
 
they applied to each lightwater reactor (LWR) vendor's models, were documented  
 
in the task force reports for each LWR vendor. In addition to the modeling concerns identified, the task force also concluded that, in light of the TMI2 accident, additional systems verification of the smallbreak LOCA model as  
 
required by II.4 of Appendix K to 10 CFR 50 was needed. This included providing predictions of Semiscale Test S0710B and LOFT Test (L31) and providing experimental verification of the various modes of singlephase and twophase natural circulation predicted to occur in each vendor's reactor during smallbreak LOCAs. Based on the cumulative staff requirements for additional smallbreak LOCA model verification, including both integral system and separate effects  
 
verification, the staff considered model revision as the appropriate method for  
 
reflecting any potential upgrading of the analysis methods.
The purpose of the verification was to provide the necessary assurance that the smallbreak LOCA models were acceptable to calculate the behavior and  
 
consequences of small primary system breaks. The staff believes that this  
 
assurance can alternatively be provided, as appropriate, by additional justification of the acceptability of present smallbreak LOCA models with  
 
regard to specific staff concerns and recent test data. Such justification  
 
could supplement or supersede the need for model revision. The specific staff concerns regarding smallbreak LOCA models are provided in the analysis sections of the B&O Task Force reports for each LWR vendor, (NUREG0635, 0565, 0626, 0611, and      18.2111    Rev. 0 WOLF CREEK 0623). These concerns should be reviewed in total by each holder of an approved emergency core cooling system (ECCS) model and addressed in the evaluation as appropriate. The recent tests include the entire Semiscale smallbreak test series and LOFT Tests (L31) and (L32). The staff believes that the present smallbreak LOCA  
 
models can be both qualitatively and quantitatively assessed against these  
 
tests. Other separate effects tests (e.g., ORNL core uncovery tests) and  
 
future tests, as appropriate, should also be factored into this assessment.
Based on the preceding information, a detailed outline of the proposed program to address this issue should be submitted. In particular, this submittal  
 
should identify (1) which areas of the models, if any, the licensee intends to  
 
upgrade, (2) which areas the licensee intends to address by further  
 
justification of acceptability, (3) test data to be used as part of the overall  
 
verification/upgrade effort, and (4) the estimated schedule for performing the  
 
necessary work and submitting this information for staff review and approval.
18.2.17.24.2  The Operating Agent Response  
 
The present Westinghouse Small Break Evaluation Model used to analyze WCGS (refer to Section 15.6.5) is in conformance with 10 CFR Part 50, Appendix K.
 
Nevertheless, Westinghouse (as documented in Ref. 6) has addressed the specific NRC items contained in NUREG0611 in a model (NOTRUMP) documented in WCAP 10054 (dated 12/28/82) and WCAP 10079 (dated 11/12/82). The NRC approved NOTRUMP as  
 
satisfying II.K.3.30 in a safety evaluation dated May 21, 1985. NOTRUMP was  
 
also found to be in full compliance with Appendix K to 10 CFR 50 and was designated as the new Westinghouse licensing tool for smallbreak LOCA  
 
evaluations to satisfy the provisions of II.K.3.31.
18.2.17.24.3  Conclusion The NOTRUMP Code satisfies the provisions of NUREG0737, Item II.K.3.30.
18.2.17.25  PlantSpecific Calculations to Show Compliance With 10 CFR Part 50.46 (II.K.3.31)18.2.17.25.1  NRC Guidance Per NUREG0737  
 
Position Plantspecific calculations using NRCapproved models for smallbreak lossof coolant accidents (LOCAs), as described in item      18.2112    Rev. 0 WOLF CREEK II.K.3.30 to show compliance with 10 CFR 50.46, should be submitted for NRC approval by all licensees.
18.2.17.25.2  The Operating Agent Response  
 
The present Westinghouse Small Break Evaluation Model and small break LOCA analyses for WCGS (refer to Section 15.6.5) are in conformance with 10 CFR Part  
 
50, Appendix K and 10 CFR Part 50.46. As stated in the response to Item  
 
II.K.3.30 (refer to Section 18.2.17.24.2), the NRC has approved the Westinghouse NOTRUMP Code for smallbreak LOCA analysis. In response to generic letter 8335, the Westinghouse Owners Group has developed a program to demonstrate on a generic basis that the new NOTRUMP  
 
model predicts lower calculated peak clad temperatures than WFLASH. By letter  
 
dated October 6, 1986 (Reference 17), the NRC concluded that the generic study results could be used to resolve NUREG0737, Item II.K.3.31. The Operating  
 
Agent has submitted a letter dated June 26, 1986 to the NRC to verify the  
 
applicability of the generic study results to WCGS.
18.2.17.25.3  Conclusion  
 
Upon submittal of the letter confirming the applicability of the generic results to WCGS, the requirements of NUREG0737, Item II.K.3.31 are met.
18.2.17.26  Evaluation of Anticipated Transients with Single Failure to Verify No Fuel Failure (II.K.3.44)
Not applicable to pressurized water reactors.  
 
18.2.17.27  Evaluation of Depressurization with Other than Automatic Depressurization System (II.K.3.45)
Not applicable to pressurized water reactors.  
 
18.2.17.28  Identify Water Sources Prior to Actuation of Automatic Depressurization System (II.K.3.57)
Not applicable to pressurized water reactors.  
 
18.2.18  REFERENCES
: 1. Letter OG57, dated April 20, 1981, Jurgensen, R. W.
(Chairman, Westinghouse Owners Group) to Check, P. S. (NRC).      18.2113    Rev. 0 WOLF CREEK
: 2. Wood, D. C. and Gottshall, C. L., "Probabilistic Analysis and      Operational Data in Response to NUREG0737 Item II.K.3.2 for Westinghouse NSSS Plants," WCAP9804, February 1981.
: 3.  "Analysis of Delayed Reactor Coolant Pump Trip During Small Loss of Coolant Accidents for Westinghouse Nuclear Steam Supply Systems," WCAP9584 (Proprietary) and WCAP9585 (Non  
 
Proprietary), August 1979. 4. Letter OG49, dated March 3, 1981, Jurgensen, R. W.
(Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.  
 
(NRC). 5. Letter OG50, dated March 23, 1981, Jurgensen, R. W.
(Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.  
 
(NRC). 6. Letter NSTMA2318, dated September 26, 1980, Anderson, T. M.
(Westinghouse) to Eisenhut, D. G. (NRC). 7. Letter NSTMA2357, dated December 23, 1980, T. M. Anderson (Westinghouse) to D. G. Eisenhut (NRC).
: 8. Rockwell, T., Reactor Shielding Design Manual , D. Van      Nostrand Co., New York, New York, 1956.
: 9. QADCG:  A Combinatorial Geometry Version of QADP5A , Bechtel Power Corporation internal computer code.
: 10. Letter SLNRC 830048, dated September 1, 1983, N. A. Petrick (SNUPPS) to H. R. Denton (NRC). 11. Letter SLNRC 84004, dated January 16, 1984, N. A. Petrick (SNUPPS) to H. R. Denton (NRC). 12. Letter SLNRC 83002 (distributed as 82002), dated January 7,      1983, N. A. Petrick (SNUPPS) to H. R. Denton (NRC).
: 13.  "A Generic Assessment of Significant Flaw Extension,      Including, Stagnant Loop Conditions, From Pressurized Thermal  
 
Shock of Reactor Vessels on Westinghouse Power Plants," WCAP  
 
10319, December 1983. 14. Union Electric Calculation Sheet HPCI8404, dated April 27,      1984, "An Assessment of Personnel Dose to Obtain Gaseous  
 
Effluent and Reactor Coolant System Grab Samples Following a  
 
DBA Loss of Coolant Accident."      18.2114    Rev. 0 WOLF CREEK 15. Letter NSNRC863099, dated February 20, 1986, Rahe, E. P.
(Westinghouse) to Taylor, J. M. (NRC). 16.  "Methodology for Qualifying Westinghouse WRDSupplied NSSS      SafetyRelated Electrical Equipment," WCAP8587, Rev. 6A, dated November 1983. 17. Safety Evaluation Report, WCAP11145, Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with NOTRUMP  
 
Code, transmitted by NRC letter (C. Rossi) to Westinghouse  
 
Owners Group (L. Butterfield), dated October 6, 1986.      18.2115    Rev. 0 WOLF CREEK TABLE 18.2-1 (Page 1 of 2)
 
MITIGATING CORE DAMAGE COURSE COURSE DESCRIPTION Westinghouse has performed detailed analysis of numerous situations which could arise in two loop, three loop, and four
 
loop PWR plants. The Westinghouse program has then been
 
structured to use the most limiting case for each situation as the
 
basis for instruction to students.
COURSE INTRODUCTION
      -  Major Plant Assumptions
 
       -  Core Thermal and Linear Power Density Limits INCORE INSTRUMENTATION
      -  System Functions, Characteristics, and Operations
 
Including Moveable Incore Detection System and Incore
 
Thermocouples
 
       -  Determination of Core Damage Extent and Core Geometry
 
Changes
 
       -  Determination of Peak Core Temperatures
       -  Determination of Peak Core Temperatures
       -  Methods of Obtaining Extended Range Readings
       -  Methods of Obtaining Extended Range Readings
       -  Direct Readings at Terminal Junctions
       -  Direct Readings at Terminal Junctions
       -  System Outputs and Recorders
       -  System Outputs and Recorders
       -  Potential Causes of Instrument Failures and Probable Time to Failure Under Various Degraded ConditionsEXCORE INSTRUMENTATION     -  Factors Affecting Excore Instrumentation Response During Various Operational Conditions
 
       -  Expected Indications for Various Loss of Coolant Accidents
       -  Potential Causes of Instrument Failures and Probable Time
 
to Failure Under Various Degraded Conditions EXCORE INSTRUMENTATION
      -  Factors Affecting Excore Instrumentation Response During
 
Various Operational Conditions
 
       -  Expected Indications for Various Loss of Coolant
 
Accidents
 
       -  Determination of Void Formation in the Core Region
       -  Determination of Void Formation in the Core Region
       -  Detector Reliability Under Adverse Environmental ConditionsPOST ACCIDENT CHEMISTRY     -  Expected Changes in Primary Plant Chemistry
 
       -  Consequences of Transferring Primary Water Outside of Containment
       -  Detector Reliability Under Adverse Environmental
       -  Long Term System Problems Associated with Extended Immersion in Contaminated Primary Water and Potential Failure Mechanisms
 
       -  Expected Isotopic Breakdowns for Various Conditions of Fuel and CladdingRev. 0 TABLE 18.2-1 (Page 2 of 2)RADIATION MONITORING     -  Types of Detectors Utilized in the Radiation Monitoring System
Conditions POST ACCIDENT CHEMISTRY
       -  Response of Process and Area Monitors to Radioactivity Release
      -  Expected Changes in Primary Plant Chemistry
       -  Verification of Installed Instrumentation Through Supplemental Measurements
 
       -  Determination of Dose Rates with Nonfunctional or Nonavailable InstrumentationVITAL PROCESS INSTRUMENTATION     -  Specific Applications of Major Types of Transmitters
       -  Consequences of Transferring Primary Water Outside of
 
Containment
 
       -  Long Term System Problems Associated with Extended
 
Immersion in Contaminated Primary Water and Potential
 
Failure Mechanisms
 
       -  Expected Isotopic Breakdowns for Various Conditions of
 
Fuel and Cladding Rev. 0 TABLE 18.2-1 (Page 2 of 2)
RADIATION MONITORING
      -  Types of Detectors Utilized in the Radiation Monitoring
 
System
 
       -  Response of Process and Area Monitors to Radioactivity
 
Release
 
       -  Verification of Installed Instrumentation Through
 
Supplemental Measurements
 
       -  Determination of Dose Rates with Nonfunctional or
 
Nonavailable Instrumentation VITAL PROCESS INSTRUMENTATION
      -  Specific Applications of Major Types of Transmitters
 
       -  Various Failure Methods and Their Reliability
       -  Various Failure Methods and Their Reliability
       -  Pressurizer Pressure Instrumentation
       -  Pressurizer Pressure Instrumentation
       -  Steam Generator Level Instrumentation
       -  Steam Generator Level Instrumentation
       -  Various Temperature Detectors
       -  Various Temperature Detectors
       -  Major Flow Indicators
       -  Major Flow Indicators
       -  Alternate Methods to Determine Critical Process Variables
       -  Alternate Methods to Determine Critical Process Variables
       -  Use of Plant Computer Stored InformationGAS GENERATION     -  Physical and Chemical Characteristics and Potential Sources of Major Gases
 
       -  Use of Plant Computer Stored Information GAS GENERATION
      -  Physical and Chemical Characteristics and Potential
 
Sources of Major Gases
 
       -  Hydrogen Flammability and Explosion Limits
       -  Hydrogen Flammability and Explosion Limits
       -  Venting, Disposal, and Sampling Methods of Containment GasesPOTENTIALLY DAMAGING SITUATIONS AND COOLING METHODS     -  Loss of Feedwater Induced Loss of Coolant Accident
 
       -  Venting, Disposal, and Sampling Methods of Containment
 
Gases POTENTIALLY DAMAGING SITUATIONS AND COOLING METHODS
      -  Loss of Feedwater Induced Loss of Coolant Accident
 
       -  Heat Removal Paths and Sinks
       -  Heat Removal Paths and Sinks
       -  Steam and Water Cooling
       -  Steam and Water Cooling
       -  Injection Flowpaths - Hot Leg Versus Cold Leg Injection
       -  Injection Flowpaths - Hot Leg Versus Cold Leg Injection
       -  Quenching Effects on Clad Material
       -  Quenching Effects on Clad Material
       -  Gas or Steam Binding Effects
       -  Gas or Steam Binding Effects
      -  Natural Circulation Indications and Controls - One Phase and Two Phase FluidsRev. 0 WOLF CREEK                          TABLE 18.2-2                ESSENTIAL/NONESSENTIAL CONTAINMENT PENETRATIONSFig. 6.2.4-1,                                        Essential/  Sheet      Penetration    Service              Nonessential      1          P-1      Main steam/PORV          Nonessential/
essential 2          P-2      Main steam/PORV          Nonessential/
essential 3          P-3      Main steam/PORV & AFW    Nonessential/
steam                    essential 4          P-4      Main steam/PORV & AFW    Nonessential/
steam                    essential 5          P-5      Main/aux. feedwater      Nonessential/
essential 6          P-6      Main/aux. feedwater      Nonessential/
essential 7          P-7      Main/aux. feedwater      Nonessential/
essential 8          P-8      Main/aux. feedwater      Nonessential/
essential 9          P-9      SG blowdown              Nonessential 10          P-10      SG blowdown              Nonessential 11          P-11      SG blowdown              Nonessential 12          P-12      SG blowdown              Nonessential 13          P-13      Containment recirc-      Essential ulation sump suction to containment spray pump 14          P-14      Containment recirc-      Essential ulation sump suction to RHR pump 15          P-15      Containment recirc-      Essential ulation sump suc-tion to RHR pump 16          P-16      Containment recirc-      Essential ulation sump suction to containment spray pump 17          P-21      RHR hot leg injection    Essential 18          P-22      RCP-B seal water        Essential supply 19          P-23      CVCS letdown            Nonessential 20          P-24      RCP seal water return    NonessentialRev. 0 WOLF CREEK                      TABLE 18.2-2 (Sheet 2)
Fig. 6.2.4-1,                                        Essential/  Sheet      Penetration    Service              Nonessential    21          P-25      Reactor makeup water    Nonessential supply 22          P-26      Reactor coolant drain    Nonessential tank discharge 23          P-27      RHR cold leg injection  Essential loops 3 and 4 24          P-28      ESW supply to contain-  Essential ment air coolers 25          P-29      ESW return from con-    Essential tainment air coolers 26          P-30      Instrument air supply    Nonessential 27          P-32      Containment sump pump    Nonessential discharge 28          P-34      Containment ILRT test    Nonessential line 29          P-39      RCP-C seal water supply  Essential 30          P-40      RCP-D seal water supply  Essential 31          P-41      RCP-A seal water supply  Essential 32          P-43      Auxiliary steam supply - Nonessential decontamination 33          P-44      Reactor coolant drain    Nonessential tank vent 34          P-45      Accumulator nitrogen    Nonessential supply 35          P-48      SI pump-B, discharge to  Essential hot legs 1 and 4 36          P-49      SI pumps to cold legs    Essential 1, 2, 3, and 4 37          P-51      ILRT pressure sensing    Nonessential lines 38          P-52      RHR shutdown suction    Essential 39          P-53      Fuel pool cooling and    Nonessential cleanup, refueling pool supply 40          P-54      Fuel pool cooling and    Nonessential cleanup, refueling pool suction 41          P-55      Fuel pool cooling and    Nonessential cleanup, refueling pool skimmer suctionRev. 0 WOLF CREEK                      TABLE 18.2-2 (Sheet 3) Fig. 6.2.4-1,                                        Essential/    Sheet  Penetration    Service              Nonessential    42          P-56      Post-LOCA hydrogen      Essential analyzer return 42a          P-56      Containment Atmosphere  Nonessential                            Monitor      42b          P-57      Sample Return - Post    Nonessential                            Accident Sampling System      43          P-58      Accumulator fill line    Nonessential from SI pump 43a          P-59,91  RVLIS Sample Line        Nonessential                            Reactor Coolant System      44          P-62      Pressurizer relief tank  Nonessential nitrogen supply 45          P-63      Service air supply      Nonessential 45a          P-64      RC loop and Pressurizer  Nonessential                            liquid sample      46          P-65      Hydrogen purge          Nonessential 47          P-66      Containment spray supply Essential pump B 48          P-67      Fire protection supply  Nonessential 49          P-69      Pressurizer vapor sample Nonessential 50          P-71      ESW supply to contain-  Essential ment air coolers 51          P-73      ESW return from contain- Essential ment air coolers 52          P-74      CCW supply              Essential 53          P-75      CCW return              Essential 54          P-76      CCW return RCP thermal  Essential barrier 55          P-78      S.G. drain              Nonessential 56          P-79      RHR shutdown suction    Essential 57          P-80      CVCS charging            Nonessential 58          P-82      RHR discharge to hot    Essential legs loops 1 and 2 59          P-83      S.G. D sample            Nonessential 60          P-84      S.G. A sample            Nonessential 61          P-85      S.G. B sample            Nonessential 62          P-86      S.G. C sample            Nonessential 63          P-87      SI pump A discharge to  Essential hot legs loops 2 and 3 64          P-88      Boron injection supply  Essential to cold legs loops 1, 2, 3, and 4 65          P-89      Containment spray supply Essential pump A 66          P-92      ECCS test line return    Nonessential 67          P-93      R.C. loop                Nonessential                            liquid samples      68          P-95      Accumulator tank sample  Nonessential            Rev. 15 WOLF CREEK                      TABLE 18.2-2 (Sheet 4)
Fig. 6.2.4-1,                                        Essential/    Sheet  Penetration    Service              Nonessential    69          P-97      Post-LOCA hydrogen      Essential analyzer return 69a          P-97      Sample Return -          Nonessential                            Containment Atmosphere                            Monitor      69b          P-98      Breathing Air Supply    Nonessential      70          P-99      Post-LOCA hydrogen      Essential analyzer supply 70a          P-99      Sample Line -            Nonessential                            Containment Atmosphere                            Monitor      71          P-101    Post-LOCA hydrogen      Essential analyzer supply 71a          P-101    Sample Line -            Nonessential                            Containment Atmosphere                            Monitor      72          E-256    Containment pressure    Essential P-103/104 sensing monitors 73          V-160    Containment purge        Nonessential exhaust 74          V-161    Containment purge        Nonessential supply            Rev. 15 WOLF CREEK                          TABLE 18.2-3 DETAILS FOR THE THERMOCOUPLE/CORE COOLING MONITOR SYSTEM DisplayInformation Displayed (T-Tsat, Tsat,    P-Psat subcooled-  Press, etc.)                          T-Tsat - superheatedDisplay Type (analog, digital, CRT)      Analog (control board)                                        and digital (electronics package)Continuous or on Demand                  Continuous (control                                        board) and on demand (electronics package)Single or Redundant Display              Redundant Location of Display                      Control board and control                                        roomAlarms (include set points)              Caution:  5&deg;F subcooled                                        Alarm:    0&deg;F subcooled Overall uncertainty                      Digital:  3&deg;F for RTD Analog:  5&deg;F for RTD Range of Display                        Calibrated:  200&deg;F                                                      subcooled to 2000&deg;F superheat Overall:    Never off scaleQualifications (seismic, environ-        Seismic and environmental  mental)Rev. 10 WOLF CREEK                      TABLE 18.2-3 (Sheet 2)
CalculatorType (process computer, dedicated        Dedicated digital  digital or analog calc.)If process computer is used specify      NA  availability (percent of time)Single or redundant calculators          Redundant Selection Logic (highest T.,            Auctioneered high hot  lowest press)                        leg RTD. Auctioneered low reactor coolant pressureQualifications (seismic, environ-        Seismic and environmental  mental)Calculational Technical (steam          Functional fit - ambienttables, functional fit, ranges)          to critical pointInput Temperature (RTDs or T/Cs)              RTDs, T/Cs, and Tref Temperature (number of sensors          RTDs - 2 hot leg and 2  and locations)                        cold leg/channel T/Cs - 25 per channelRange of temperature sensorsRTDs 700&deg;F                                        T/Cs 2300&deg;F Calibration unit range 2300&deg;FUncertainty* of temperature sensors      See WCAP 8587 Qualifications (seismic, environ-        Seismic and environ-  mental)                              mental as classified in Section 18.2.13.2Rev. 0 WOLF CREEK                      TABLE 18.2-3 (Sheet 3)
Pressure (specify instrument used)      Qualified Pressure                                        TransmitterPressure (number of sensors and          1 wide range - RCS loop  locations)                            2 narrow range - pres-surizerRange of pressure sensors                Wide range 0-3000 psi                                        narrow range 1700-2500 psiUncertainty* of pressure sensors        See WCAP 8587 Qualifications (seismic, environ-        Seismic and environmental  mental)*Uncertainties must address conditions of forced flow and natural circulation.Rev. 0 WOLF CREEK                          TABLE 18.2-4            NARROW RANGE MEASUREMENT UNCERTAINTY FOR REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM                                                    Uncertainty    Component and Uncertainty Definition          Level, percenta. Differential pressure transmitter                +2.1    calibration and drift allowance
    (+1.5 percent of span) multiplied by the ratio of ambient to operating water density.b. Differential pressure transmitter                +0.7    allowance for change in calibration    due to ambient temperature change
    (+0.5 percent of span for +50&deg;F)    multiplied by the density ratio.c. Differential pressure transmitter                +0.34    allowance for change in calibration    due to change in system pressure
    (+0.2 percent of span per 1000 psi    change) multiplied by the density ratio.d. Differential pressure transmitter                +0.7    allowance for change in calibration    due to exposure to long-term overrange (+0.5 percent of span)    multiplied by the density ratio.e. Reference leg temperature instrument              +0.64    (RTD) uncertainty of +5&deg;F and/or    allowance of +5&deg;F for the    difference between the measurement    and the true average temperature of the reference leg, applied to each vertical section of the reference leg where a measurement is made.
Stated uncertainty is based on a maximum containment temperature of 420&deg;F, and a typical reference leg installation.Rev. 0 WOLF CREEK                      TABLE 18.2-4 (Sheet 2)
Uncertainty    Component and Uncertainty Definition          Level, percentf. Reactor coolant density based on                  +2.3    auctioneering for highest water density obtained from hot leg temperature (+6 F) or system    pressure (+6 psi). Magnitude of uncertainty varies with system pressure and water level, with largest uncertainty occurring when the reactor vessel is full. g. Sensor and hydraulic isolator bellows            +1.46    displacements due to system pressure changes or reference leg temperature changes will introduce minor errors in the level measurement due to the small volumes and small bellows spring constants. The changes, such as pressure or temperature, tend to cancel; i.e., the bellows associated with each measurement move in the same direction. Maximum expected error due to differences in capillary line volume and local temperatures is equivalent to a level change of about 5 inches, multiplied by the density ratio. h. Density function generator output                +0.50    mismatch with ASME Steam Tables limited to this maximum. i. Overall uncertainty of electronics                +1.0    system calibration is limited to less than this amount. j. Control board indicator resolution.              +0.5          Rev 0 


WOLF CREEK 18.3 EMERGENCY PREPARATIONS AND RADIATION PROTECTION 18.3.1 UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1)  
      -  Natural Circulation Indications and Controls - One Phase
 
and Two Phase Fluids Rev. 0 WOLF CREEK TABLE 18.2-2 ESSENTIAL/NONESSENTIAL CONTAINMENT
 
PENETRATIONS Fig. 6.2.4-1,                                        Essential/
Sheet      Penetration Service Nonessential 1          P-1      Main steam/PORV          Nonessential/
 
essential
 
2          P-2      Main steam/PORV          Nonessential/
 
essential
 
3           P-3      Main steam/PORV & AFW    Nonessential/
 
steam                    essential
 
4          P-4      Main steam/PORV & AFW    Nonessential/
 
steam                    essential
 
5          P-5      Main/aux. feedwater      Nonessential/
 
essential
 
6          P-6      Main/aux. feedwater      Nonessential/
 
essential
 
7          P-7      Main/aux. feedwater      Nonessential/
 
essential
 
8          P-8      Main/aux. feedwater      Nonessential/
 
essential
 
9          P-9      SG blowdown              Nonessential
 
10          P-10      SG blowdown              Nonessential
 
11          P-11      SG blowdown              Nonessential
 
12          P-12      SG blowdown              Nonessential
 
13          P-13      Containment recirc-      Essential
 
ulation sump suction
 
to containment spray
 
pump
 
14          P-14      Containment recirc-      Essential
 
ulation sump suction
 
to RHR pump
 
15          P-15      Containment recirc-      Essential
 
ulation sump suc-
 
tion to RHR pump
 
16          P-16      Containment recirc-      Essential
 
ulation sump suction
 
to containment spray
 
pump
 
17          P-21      RHR hot leg injection    Essential
 
18          P-22      RCP-B seal water        Essential
 
supply
 
19          P-23      CVCS letdown            Nonessential
 
20          P-24      RCP seal water return    Nonessential Rev. 0 WOLF CREEK TABLE 18.2-2 (Sheet 2)
 
Fig. 6.2.4-1,                                        Essential/
Sheet      Penetration Service Nonessential 21          P-25      Reactor makeup water    Nonessential
 
supply
 
22          P-26      Reactor coolant drain    Nonessential
 
tank discharge
 
23          P-27      RHR cold leg injection  Essential
 
loops 3 and 4
 
24          P-28      ESW supply to contain-  Essential
 
ment air coolers
 
25          P-29      ESW return from con-    Essential
 
tainment air coolers
 
26          P-30      Instrument air supply    Nonessential
 
27          P-32      Containment sump pump    Nonessential
 
discharge
 
28          P-34      Containment ILRT test    Nonessential
 
line
 
29          P-39      RCP-C seal water supply  Essential
 
30          P-40      RCP-D seal water supply  Essential
 
31          P-41      RCP-A seal water supply  Essential
 
32          P-43      Auxiliary steam supply - Nonessential
 
decontamination
 
33          P-44      Reactor coolant drain    Nonessential
 
tank vent
 
34          P-45      Accumulator nitrogen    Nonessential
 
supply
 
35          P-48      SI pump-B, discharge to  Essential
 
hot legs 1 and 4
 
36          P-49      SI pumps to cold legs    Essential
 
1, 2, 3, and 4
 
37          P-51      ILRT pressure sensing    Nonessential
 
lines
 
38          P-52      RHR shutdown suction    Essential
 
39          P-53      Fuel pool cooling and    Nonessential
 
cleanup, refueling pool
 
supply
 
40          P-54      Fuel pool cooling and    Nonessential
 
cleanup, refueling pool
 
suction
 
41          P-55      Fuel pool cooling and    Nonessential
 
cleanup, refueling pool
 
skimmer suction Rev. 0 WOLF CREEK TABLE 18.2-2 (Sheet 3)
Fig. 6.2.4-1,                                        Essential/
Sheet  Penetration Service Nonessential 42          P-56      Post-LOCA hydrogen      Essential
 
analyzer return
 
42a          P-56      Containment Atmosphere  Nonessential Monitor 42b          P-57      Sample Return - Post    Nonessential Accident Sampling System 43          P-58      Accumulator fill line    Nonessential
 
from SI pump
 
43a          P-59,91  RVLIS Sample Line        Nonessential Reactor Coolant System 44          P-62      Pressurizer relief tank  Nonessential
 
nitrogen supply
 
45          P-63      Service air supply      Nonessential
 
45a          P-64      RC loop and Pressurizer  Nonessential liquid sample 46          P-65      Hydrogen purge          Nonessential
 
47          P-66      Containment spray supply Essential
 
pump B
 
48          P-67      Fire protection supply  Nonessential
 
49          P-69      Pressurizer vapor sample Nonessential
 
50          P-71      ESW supply to contain-  Essential
 
ment air coolers
 
51          P-73      ESW return from contain- Essential
 
ment air coolers
 
52          P-74      CCW supply              Essential
 
53          P-75      CCW return              Essential
 
54          P-76      CCW return RCP thermal  Essential
 
barrier
 
55          P-78      S.G. drain              Nonessential
 
56          P-79      RHR shutdown suction    Essential
 
57          P-80      CVCS charging            Nonessential
 
58          P-82      RHR discharge to hot    Essential
 
legs loops 1 and 2
 
59          P-83      S.G. D sample            Nonessential
 
60          P-84      S.G. A sample            Nonessential
 
61          P-85      S.G. B sample            Nonessential
 
62          P-86      S.G. C sample            Nonessential
 
63          P-87      SI pump A discharge to  Essential
 
hot legs loops 2 and 3
 
64          P-88      Boron injection supply  Essential
 
to cold legs loops 1, 2, 3, and 4
 
65          P-89      Containment spray supply Essential
 
pump A
 
66          P-92      ECCS test line return    Nonessential
 
67          P-93      R.C. loop                Nonessential liquid samples 68          P-95      Accumulator tank sample  Nonessential            Rev. 15 WOLF CREEK TABLE 18.2-2 (Sheet 4)
 
Fig. 6.2.4-1,                                        Essential/
Sheet  Penetration Service Nonessential 69          P-97      Post-LOCA hydrogen      Essential
 
analyzer return
 
69a          P-97      Sample Return -          Nonessential Containment Atmosphere Monitor 69b          P-98      Breathing Air Supply    Nonessential 70          P-99      Post-LOCA hydrogen      Essential
 
analyzer supply
 
70a          P-99      Sample Line -            Nonessential Containment Atmosphere Monitor 71          P-101    Post-LOCA hydrogen      Essential
 
analyzer supply
 
71a          P-101    Sample Line -            Nonessential Containment Atmosphere Monitor 72          E-256    Containment pressure    Essential
 
P-103/104 sensing monitors
 
73          V-160    Containment purge        Nonessential
 
exhaust
 
74          V-161    Containment purge        Nonessential
 
supply            Rev. 15 WOLF CREEK TABLE 18.2-3
 
DETAILS FOR THE THERMOCOUPLE/CORE COOLING MONITOR SYSTEM
 
Display Information Displayed (T-Tsat, Tsat,    P-Psat subcooled-Press, etc.)                          T-Tsat - superheated Display Type (analog, digital, CRT)      Analog (control board) and digital (electronics
 
package)
Continuous or on Demand                  Continuous (control board) and on
 
demand (electronics
 
package)
Single or Redundant Display              Redundant
 
Location of Display                      Control board and control room Alarms (include set points)              Caution:  5&deg;F subcooled Alarm:    0&deg;F subcooled
 
Overall uncertainty                      Digital:  3&deg;F for RTD
 
Analog:  5&deg;F for RTD
 
Range of Display                        Calibrated:  200&deg;F subcooled to


18.3.1.1 NRC Guidance per NUREG-0694 Position
2000&deg;F


Provide an emergency response plan in substantial compliance with NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," except that only a description of and completion schedule for the means for providing prompt notification to the population (App. 3), the staffing for emergencies in addition to that already required (Table B.1), and an upgraded meteorological program (App. 2) need be provided. NRC will give substantial weight to Federal Emergency Management Agency (FEMA) findings on offsite plans in judging the adequacy against NUREG-0654. Perform an emergency response exercise to test the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations. This requirement shall be met before issuance of a full-power license.
superheat


18.3.1.2 The Operating Agent Response The Operating Agent has prepared and filed with the NRC on April 7, 1981 the "Radiological Emergency Response Plan for the Wolf Creek Generating Station."
Overall:    Never off
This plan and subsequent revisions were prepared to meet the requirements of 10 CFR Part 50, Section 50.47 and Appendix E. The plan has been prepared with consideration given to additional NRC emergency planning guidance presented in NUREG-0654. Compliance with NRC requirements has been addressed in Supplement 6 to the WCGS Safety Evaluation Report, NUREG-0881.


18.3.1.3 Conclusion The Operating Agent has provided the NRC documentation relative to the emergency planning activities at WCGS which satisfies the requirements of 10 CFR Part 50, Section 50.47 and Appendix E, and the supplementary NRC guidance in NUREG-0694.  
scale Qualifications (seismic, environ-        Seismic and environmental mental)
Rev. 10 WOLF CREEK TABLE 18.2-3 (Sheet 2)
 
Calculator Type (process computer, dedicated        Dedicated digital digital or analog calc.)
If process computer is used specify      NA availability (percent of time)
Single or redundant calculators          Redundant
 
Selection Logic (highest T.,            Auctioneered high hot lowest press)                        leg RTD. Auctioneered
 
low reactor coolant
 
pressure Qualifications (seismic, environ-        Seismic and environmental mental)
Calculational Technical (steam          Functional fit - ambient tables, functional fit, ranges)          to critical point Input Temperature (RTDs or T/Cs)              RTDs, T/Cs, and Tref
 
Temperature (number of sensors          RTDs - 2 hot leg and 2 and locations)                        cold leg/channel
 
T/Cs - 25 per channelRange of temperature sensorsRTDs 700&deg;F T/Cs 2300&deg;F
 
Calibration unit
 
range 2300&deg;F Uncertainty* of temperature sensors      See WCAP 8587
 
Qualifications (seismic, environ-        Seismic and environ-mental)                              mental as classified in
 
Section 18.2.13.2 Rev. 0 WOLF CREEK TABLE 18.2-3 (Sheet 3)
 
Pressure (specify instrument used)      Qualified Pressure Transmitter Pressure (number of sensors and          1 wide range - RCS loop locations)                            2 narrow range - pres-
 
surizer Range of pressure sensors                Wide range 0-3000 psi narrow range 1700-2500
 
psi Uncertainty* of pressure sensors        See WCAP 8587
 
Qualifications (seismic, environ-        Seismic and environmental mental)
*Uncertainties must address conditions of forced flow and natural circulation.
Rev. 0 WOLF CREEK TABLE 18.2-4 NARROW RANGE MEASUREMENT UNCERTAINTY FOR
 
REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM Uncertainty Component and Uncertainty Definition          Level, percent
: a. Differential pressure transmitter                +2.1 calibration and drift allowance
 
(+1.5 percent of span) multiplied
 
by the ratio of ambient to
 
operating water density.
: b. Differential pressure transmitter                +0.7 allowance for change in calibration due to ambient temperature change
 
(+0.5 percent of span for +50&deg;F) multiplied by the density ratio.
: c. Differential pressure transmitter                +0.34 allowance for change in calibration due to change in system pressure
 
(+0.2 percent of span per 1000 psi change) multiplied by the density
 
ratio.
: d. Differential pressure transmitter                +0.7 allowance for change in calibration due to exposure to long-term
 
overrange (+0.5 percent of span) multiplied by the density ratio.
: e. Reference leg temperature instrument              +0.64 (RTD) uncertainty of +5&deg;F and/or allowance of +5&deg;F for the difference between the measurement and the true average temperature of
 
the reference leg, applied to each
 
vertical section of the reference
 
leg where a measurement is made.
 
Stated uncertainty is based on a
 
maximum containment temperature of
 
420&deg;F, and a typical reference leg
 
installation.
Rev. 0 WOLF CREEK TABLE 18.2-4 (Sheet 2)
 
Uncertainty Component and Uncertainty Definition Level, percent
: f. Reactor coolant density based on                  +
2.3    auctioneering for highest water
 
density obtained from hot leg
 
temperature (+
6 F) or system pressure (+6 psi). Magnitude of
 
uncertainty varies with system
 
pressure and water level, with
 
largest uncertainty occurring when
 
the reactor vessel is full.
: g. Sensor and hydraulic isolator bellows            +
1.46    displacements due to system pressure
 
changes or reference leg temperature
 
changes will introduce minor errors
 
in the level measurement due to the
 
small volumes and small bellows
 
spring constants. The changes, such
 
as pressure or temperature, tend to
 
cancel; i.e., the bellows associated
 
with each measurement move in the
 
same direction. Maximum expected
 
error due to differences in
 
capillary line volume and local
 
temperatures is equivalent to a
 
level change of about 5 inches, multiplied by the density ratio.
: h. Density function generator output                +
0.50    mismatch with ASME Steam Tables
 
limited to this maximum.
: i. Overall uncertainty of electronics                +
1.0    system calibration is limited to
 
less than this amount.
: j. Control board indicator resolution.              +
0.5          Rev 0 
 
WOLF CREEK 18.3 EMERGENCY PREPARATIONS AND RADIATION PROTECTION
 
18.3.1 UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1)
 
18.3.1.1 NRC Guidance per NUREG-0694
 
Position
 
Provide an emergency response plan in substantial compliance with NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response
 
Plans and Preparedness in Support of Nuclear Power Plants," except that only a
 
description of and completion schedule for the means for providing prompt
 
notification to the population (App. 3), the staffing for emergencies in
 
addition to that already required (Table B.1), and an upgraded meteorological
 
program (App. 2) need be provided. NRC will give substantial weight to Federal
 
Emergency Management Agency (FEMA) findings on offsite plans in judging the
 
adequacy against NUREG-0654. Perform an emergency response exercise to test
 
the integrated capability and a major portion of the basic elements existing
 
within emergency preparedness plans and organizations. This requirement shall
 
be met before issuance of a full-power license.
 
18.3.1.2 The Operating Agent Response
 
The Operating Agent has prepared and filed with the NRC on April 7, 1981 the "Radiological Emergency Response Plan for the Wolf Creek Generating Station." 
 
This plan and subsequent revisions were prepared to meet the requirements of 10
 
CFR Part 50, Section 50.47 and Appendix E. The plan has been prepared with
 
consideration given to additional NRC emergency planning guidance presented in
 
NUREG-0654. Compliance with NRC requirements has been addressed in Supplement
 
6 to the WCGS Safety Evaluation Report, NUREG-0881.
 
18.3.1.3 Conclusion  
 
The Operating Agent has provided the NRC documentation relative to the  
 
emergency planning activities at WCGS which satisfies the requirements of 10  
 
CFR Part 50, Section 50.47 and Appendix E, and the supplementary NRC guidance  
 
in NUREG-0694.  


18.3.2 UPGRADE EMERGENCY SUPPORT FACILITIES (III.A.1.2)  
18.3.2 UPGRADE EMERGENCY SUPPORT FACILITIES (III.A.1.2)  


18.3.2.1 NRC Guidance Per NUREG-0578 and NUREG-0694 (A) ONSITE TECHNICAL SUPPORT CENTER (NUREG-0578, ITEM 2.2.2.b)  
18.3.2.1 NRC Guidance Per NUREG-0578 and NUREG-0694  
 
(A) ONSITE TECHNICAL SUPPORT CENTER (NUREG-0578, ITEM 2.2.2.b)  
 
(See Section 18.4 for Updated Information)
 
18.3-1 Rev. 28 WOLF CREEK Position Each operating nuclear power plant shall maintain an onsite Technical Support Center (TSC) separate from and in close proximity to the control room that has
 
the capability to display and transmit plant status to those individuals who
 
are knowledgeable of and responsible for engineering and management support of
 
reactor operations in the event of an accident. The center shall be habitable
 
to the same degree as the control room for postulated accident conditions. The
 
licensee shall revise his emergency plans as necessary to incorporate the role
 
and location of the technical support center. Records that pertain to the as
 
built conditions and layout of structures, systems, and components shall be
 
readily available to personnel in the TSC.
Clarification (NRC Letter dated November 9, 1979)
: 1. By January 1, 1980, each licensee should meet items ag that follow. Each licensee is encouraged to provide additional upgrading of the TSC (items bg) as soon as practical, but no
 
later than January 1, 1981.
: a. Establish a TSC and provide a complete description.
: b. Provide plans and procedures for engineering/ management support and staffing of the TSC.
: c. Install dedicated communications between the TSC and the      control room, nearsite emergency operations center, and the
 
NRC.
: d. Provide monitoring (either portable or permanent) for both direct radiation and airborne radioactive contaminants. The
 
monitors should provide warning if the radiation levels in
 
the support center are reaching potentially dangerous
 
levels. The licensee should designate action levels to
 
define when protective measures should be taken (such as
 
using breathing apparatus and potassium iodide tablets or
 
evacuation to the control room).
: e. Assimilate or ensure access to technical data, including the licensee's best effort to have direct display of plant
 
parameters necessary for assessment in the TSC.
: f. Develop procedures for performing this accident assessment function from the control room should the TSC become
 
uninhabitable.                              18.32                        Rev. 0 WOLF CREEK
: g. Submit to the NRC a longer range plan for upgrading the TSC to meet all requirements.
: 2. Location It is recommended that the TSC be located in close proximity to the control room to ease communications and access to technical
 
information during an emergency. The center should be located
 
onsite, i.e., within the plant security boundary. The greater
 
the distance from the control room, the more sophisticated and
 
complete should be the communications and availability of
 
technical information. Consideration should be given to
 
providing key TSC personnel with a means for gaining access to
 
the control room.
: 3. Physical Size and Staffing The TSC should be large enough to house 25 persons, necessary engineering data, and information displays (TV monitors, recorders, etc.). Each licensee should specify staffing levels


(See Section 18.4 for Updated Information) 
and disciplines reporting to the TSC for emergencies of varying


18.3-1 Rev. 28 WOLF CREEK PositionEach operating nuclear power plant shall maintain an onsite Technical Support Center (TSC) separate from and in close proximity to the control room that has the capability to display and transmit plant status to those individuals who are knowledgeable of and responsible for engineering and management support of reactor operations in the event of an accident. The center shall be habitable to the same degree as the control room for postulated accident conditions. The licensee shall revise his emergency plans as necessary to incorporate the role and location of the technical support center. Records that pertain to the as built conditions and layout of structures, systems, and components shall be readily available to personnel in the TSC. Clarification (NRC Letter dated November 9, 1979)
severity.
: 1. By January 1, 1980, each licensee should meet items ag that      follow. Each licensee is encouraged to provide additional upgrading of the TSC (items bg) as soon as practical, but no later than January 1, 1981. a. Establish a TSC and provide a complete description.
: 4. Activation The center should be activated in accordance with the "Alert"    level as defined in the NRC document "Draft Emergency Action Level Guidelines, NUREG0610" dated September 1979, and  
: b. Provide plans and procedures for engineering/ management      support and staffing of the TSC. c. Install dedicated communications between the TSC and the      control room, nearsite emergency operations center, and the NRC. d. Provide monitoring (either portable or permanent) for both      direct radiation and airborne radioactive contaminants. The monitors should provide warning if the radiation levels in the support center are reaching potentially dangerous levels. The licensee should designate action levels to define when protective measures should be taken (such as using breathing apparatus and potassium iodide tablets or evacuation to the control room). e. Assimilate or ensure access to technical data, including the      licensee's best effort to have direct display of plant parameters necessary for assessment in the TSC. f. Develop procedures for performing this accident assessment      function from the control room should the TSC become uninhabitable.                              18.32                        Rev. 0 WOLF CREEK  g. Submit to the NRC a longer range plan for upgrading the TSC      to meet all requirements. 2. Location  It is recommended that the TSC be located in close proximity to    the control room to ease communications and access to technical information during an emergency. The center should be located onsite, i.e., within the plant security boundary. The greater the distance from the control room, the more sophisticated and complete should be the communications and availability of technical information. Consideration should be given to providing key TSC personnel with a means for gaining access to the control room. 3. Physical Size and Staffing  The TSC should be large enough to house 25 persons, necessary    engineering data, and information displays (TV monitors, recorders, etc.). Each licensee should specify staffing levels and disciplines reporting to the TSC for emergencies of varying severity. 4. Activation   The center should be activated in accordance with the "Alert"    level as defined in the NRC document "Draft Emergency Action Level Guidelines, NUREG0610" dated September 1979, and currently out for public comment. Instrumentation in the TSC should be capable of providing displays of vital plant parameters from the time the accident began (t = 0 defined as either reactor or turbine trip). The STA should be consulted on the "Notification of Unusual Event."  However, the activation of the TSC is discretionary for that class of event. 5. Instrumentation   The instrumentation to be located in the TSC need not meet    safetygrade requirements but should be qualitatively comparable (as regards accuracy and reliability) to that in the control room. The TSC should have the capability to access and display plant parameters independent from actions in the control room. Careful consideration should be given to the design of the interface of the TSC instrumentation to ensure that addition of the TSC will not result in any degradation of the control room or other plant functions.                              18.33                        Rev. 0 WOLF CREEK 6. Instrumentation Power Supply   The power supply to the TSC instrumentation need not meet    safetygrade requirements, but should be reliable and of a quality compatible with the TSC instrumentation requirements.
 
To ensure continuity of information at the TSC, the power supply provided should be continuous once the TSC is activated. Consideration should be given to avoid loss of stored data (e.g., plant computer) due to momentary loss of power or switching transients. If the power supply is provided from a plant safetyrelated power source, careful attention should be given to ensure that the capability and reliability of the safetyrelated power source is not degraded as a result of this modification. 7. Technical Data   Each licensee should establish the technical data requirements   for the TSC, keeping in mind the accident assessment function that has been established for those persons reporting to the TSC during an emergency. As a minimum, data (historical in addition to current status) should be available to permit the assessment of:   a. Plant Safety System Parameters for:  
currently out for public comment. Instrumentation in the TSC  
  (1)  Reactor Coolant System (2)  Secondary System (PWRs)  
 
  (3)  Emergency Core Cooling Systems (4)  Feedwater and Makeup Systems (5)  Containment  
should be capable of providing displays of vital plant  
 
parameters from the time the accident began (t = 0 defined as  
 
either reactor or turbine trip). The STA should be consulted  
 
on the "Notification of Unusual Event."  However, the  
 
activation of the TSC is discretionary for that class of event.
: 5. Instrumentation The instrumentation to be located in the TSC need not meet    safetygrade requirements but should be qualitatively  
 
comparable (as regards accuracy and reliability) to that in the  
 
control room. The TSC should have the capability to access and  
 
display plant parameters independent from actions in the  
 
control room. Careful consideration should be given to the  
 
design of the interface of the TSC instrumentation to ensure  
 
that addition of the TSC will not result in any degradation of  
 
the control room or other plant functions.                              18.33                        Rev. 0 WOLF CREEK
: 6. Instrumentation Power Supply The power supply to the TSC instrumentation need not meet    safetygrade requirements, but should be reliable and of a  
 
quality compatible with the TSC instrumentation requirements.  
 
To ensure continuity of information at the TSC, the power  
 
supply provided should be continuous once the TSC is  
 
activated. Consideration should be given to avoid loss of  
 
stored data (e.g., plant computer) due to momentary loss of  
 
power or switching transients. If the power supply is provided from a plant safetyrelated power source, careful attention  
 
should be given to ensure that the capability and reliability of the safetyrelated power source is not degraded as a result  
 
of this modification.
: 7. Technical Data Each licensee should establish the technical data requirements for the TSC, keeping in mind the accident assessment function  
 
that has been established for those persons reporting to the  
 
TSC during an emergency. As a minimum, data (historical in  
 
addition to current status) should be available to permit the  
 
assessment of:
: a. Plant Safety System Parameters for:  
 
(1)  Reactor Coolant System  
 
(2)  Secondary System (PWRs)  
 
(3)  Emergency Core Cooling Systems  
 
(4)  Feedwater and Makeup Systems  
 
(5)  Containment
: b. Inplant Radiological Parameters for:  
: b. Inplant Radiological Parameters for:  
  (1)  Reactor Coolant System (2)  Containment (3)  Effluent Treatment (4)  Release Paths                              18.34                        Rev. 0 WOLF CREEK   c. Offsite Radiological for:   (1)  Meteorology (2)  Offsite Radiation Levels  
 
: 8. Data Transmission   In addition to providing a data transmission link between the   TSC and the control room, each licensee should review current technology as regards transmission of those parameters identified for TSC display. Although there is not a requirement at the present time, each licensee should investigate the capability to transmit plant data offsite to the Emergency Operations Center (EOC), the NRC, the reactor vendor, etc. 9. Structural Integrity a. The TSC need not be designed to seismic Category I       requirements. The center should be well built in accordance with sound engineering practice with due consideration to the effects of natural phenomena that may occur at the site. b. Since the center need not be designed to the same stringent       requirements as the control room, each licensee should prepare a backup plan for responding to an emergency from the control room. 10. Habitability   The licensee should provide protection for the TSC personnel   from radiological hazards, including direct radiation and airborne contaminants, as per General Design Criterion (GDC) 19 and SRP 6.4. a. Licensee should ensure that personnel inside the TSC will      not receive doses in excess of those specified in GDC19 and SRP 6.4 (i.e., 5 rem wholebody and 30 rem to the thyroid for the duration of the accident). Major sources of radiation should be considered. b. Permanent monitoring systems should be provided to       continuously indicate radiation dose rates and airborne radioactivity concentrations inside the TSC. The monitoring systems should include local alarms  to  warn  personnel of adverse  conditions.                              18.35                        Rev. 0 WOLF CREEK Procedures must be provided which will specify appropriate protective actions to be taken in the event that high dose rates or airborne radioactive concentrations exist.  
(1)  Reactor Coolant System  
: c. Permanent ventilation systems which include particulate and charcoal filters should be provided. The ventilation systems need not be qualified as ESF systems. The design and testing guidance of Regulatory Guide 1.52 should be followed, except that the systems do not have to be redundant, seismic, instrumented in the control room, or automatically activated. In addition, the HEPA filters need not be tested as specified in Regulatory Guide 1.52, and the HEPAs do not have to meet the QA requirements of Appendix B to 10 CFR 50. However, spare parts should be readily available and procedures in place for replacing failed components during an accident. The systems should be designed to operate from the emergency power supply.  
 
(2)  Containment  
 
(3)  Effluent Treatment  
 
(4)  Release Paths                              18.34                        Rev. 0 WOLF CREEK
: c. Offsite Radiological for:
(1)  Meteorology  
 
(2)  Offsite Radiation Levels
: 8. Data Transmission In addition to providing a data transmission link between the TSC and the control room, each licensee should review current  
 
technology as regards transmission of those parameters  
 
identified for TSC display. Although there is not a  
 
requirement at the present time, each licensee should  
 
investigate the capability to transmit plant data offsite to  
 
the Emergency Operations Center (EOC), the NRC, the reactor  
 
vendor, etc.
: 9. Structural Integrity
: a. The TSC need not be designed to seismic Category I requirements. The center should be well built in accordance  
 
with sound engineering practice with due consideration to  
 
the effects of natural phenomena that may occur at the site.
: b. Since the center need not be designed to the same stringent requirements as the control room, each licensee should  
 
prepare a backup plan for responding to an emergency from  
 
the control room.
: 10. Habitability The licensee should provide protection for the TSC personnel from radiological hazards, including direct radiation and  
 
airborne contaminants, as per General Design Criterion (GDC) 19  
 
and SRP 6.4.
: a. Licensee should ensure that personnel inside the TSC will      not receive doses in excess of those specified in GDC19 and SRP 6.4 (i.e., 5 rem wholebody and 30 rem to the thyroid  
 
for the duration of the accident). Major sources of  
 
radiation should be considered.
: b. Permanent monitoring systems should be provided to continuously indicate radiation dose rates and airborne  
 
radioactivity concentrations inside the TSC. The monitoring  
 
systems should include local alarms  to  warn  personnel of  
 
adverse  conditions.                              18.35                        Rev. 0 WOLF CREEK Procedures must be provided which will specify appropriate protective actions  
 
to be taken in the event that high dose rates or airborne radioactive  
 
concentrations exist.
: c. Permanent ventilation systems which include particulate and charcoal filters should be provided. The ventilation systems need not be qualified as ESF systems. The design and testing guidance of Regulatory Guide 1.52 should be followed, except that the systems do not have to be redundant, seismic, instrumented in the control room, or automatically activated. In addition, the HEPA filters need not be tested as specified in Regulatory Guide 1.52, and the HEPAs do not have to meet the QA requirements of Appendix B to 10 CFR 50. However, spare parts should be readily available and procedures in place for replacing failed components during an accident. The systems should be designed to operate from the emergency power supply.
: d. Dose reduction measures such as breathing apparatus and potassium iodide tablets cannot be used as a design basis for the TSC in lieu of ventilation systems with charcoal filters. However, potassium iodide and breathing apparatus should be available.  
: d. Dose reduction measures such as breathing apparatus and potassium iodide tablets cannot be used as a design basis for the TSC in lieu of ventilation systems with charcoal filters. However, potassium iodide and breathing apparatus should be available.  


Line 1,052: Line 7,572:
Position  
Position  


An area to be designated as the onsite Operational Support Center (OSC) shall be established. It shall be separate from the control room and shall be the place to which the operations support personnel will report in an emergency situation. Communications with the control room shall be provided. The emergency plan shall be revised to reflect the existence of the center and to establish the methods and lines of communication and management.  
An area to be designated as the onsite Operational Support Center (OSC) shall  
 
be established. It shall be separate from the control room and shall be the  
 
place to which the operations support personnel will report in an emergency  
 
situation. Communications with the control room shall be provided. The  
 
emergency plan shall be revised to reflect the existence of the center and to  
 
establish the methods and lines of communication and management.  
 
(C) NEAR-SITE EMERGENCY OPERATION FACILITY (NUREG-0694)
(See Section 18.4 for Updated Information)
Position
 
Designate a near-site emergency operations facility with communications with
 
the plant to provide evaluation of radiation releases and coordination of all
 
onsite and offsite activities during an accident.
 
18.3-6 Rev. 28 WOLF CREEK Provide shielding against direct radiation, ventilation isolation capability, dedicated communications with the onsite Technical Support Center, and direct
 
display of radiological and meteorological parameters.
18.3.2.2  The Operating Agent Response The Operating Agent prepared a detailed description of each emergency response facility:  the onsite TSC, the onsite OSC, and the nearsite EOF. This report
 
submitted by SNUPPS letter dated June 4, 1981, contains a complete functional
 
system description for each facility which describes the data acquisition display and transmittal systems selected for each facility. The report, in
 
addition, discusses the size, location, and habitability specifications to
 
which the facilities have been designed. The design of the emergency
 
facilities for WCGS has been prepared in consideration of the 10 CFR Part 50, Appendix E legal requirement and the guidance presented in NUREG0696 and NUREG0654.NRC Generic Letter 8233, dated December 17, 1982, provided guidance for meeting regulatory requirements for, among other issues, NUREG0737, Item III.A.1.2. Based on the NRC review of the response to Generic Letter 8233 (SNUPPS letter dated April 15, 1983), a license condition was issued which
 
required that the TSC and EOF be operational prior to startup following the
 
first refueling outage at WCGS. As discussed in Supplement 4 to the WCGS Safety Evaluation Report, the NRC will conduct a postimplementation appraisal
 
of WCGS Emergency Response Facilities.
18.3.2.3  Conclusion The functional description of each emergency response facility at WCGS filed with the NRC on June 1, 1981 detailed the means by which the Operating Agent
 
meets the appropriate NRC guidance. 18.3.3  IMPROVING LICENSEE EMERGENCY PREPAREDNESS          LONGTERM (III.A.2) 18.3.3.1  NRC Guidance Per NUREG0737 Each nuclear facility shall upgrade its emergency plans to provide reasonable assurance that adequate protective measures can and will be taken in the event
 
of a radiological emergency. Specific criteria to meet this requirement is delineated in NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation
 
of Radiological Emergency Response Plans and Preparation in Support of Nuclear
 
Power Plants."                              18.37                        Rev. 2 WOLF CREEK Clarification In accordance with Task Action Plan Item III.A.1.1, "Upgrade Emergency Preparedness," each nuclear power facility was required to immediately upgrade
 
its emergency plans with criteria provided October 10, 1979, as revised by NUREG0654 (FEMAREP1, issued for interim use and comment, January 1980). New
 
plans were submitted by January 1, 1980, using the October 10, 1979 criteria.
Reviews were started on the upgraded plans using NUREG0654. Concomitant to
 
these actions, amendments were developed to 10 CFR Part 50 and Appendix E to 10 CFR Part 50, to provide the longterm implementation requirements. These new
 
rules were issued in the Federal Register on August 19, 1980, with an effective
 
date of November 3, 1980. The revised rules delineate requirements for
 
emergency preparedness at nuclear reactor facilities. NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear
 
Power Plants," provides detailed items to be included in the upgraded emergency
 
plans and, along with the revised rules, provides for meteorological criteria, means for providing for a prompt notification to the population, and the need for emergency response facilities (see Item III.A.1.2 [of NUREG0737]).
Implementation of the new rules levied the requirement for the licensee to provide procedures implementing the upgraded emergency plans to the NRC for review. Publication of Revision 1 to NUREG0654 (FEMAREP1) which incorporates
 
the many public comments received is expected in October 1980. This is the
 
document that will be used by the NRC and FEMA in their evaluation of emergency
 
plans submitted in accordance with the new NRC rules. NUREG0654, Revision 1; NUREG0696, "Functional Criteria for Emergency Response Facilities;" and the amendments to 10 CFR Part 50 and Appendix E to 10 CFR Part
 
50 regarding emergency preparedness, provide more detailed criteria for
 
emergency plans, design, and functional criteria for emergency response
 
facilities and establishes firm dates for submission of upgraded emergency
 
plans for installation of prompt notification systems. These revised criteria
 
and rules supersede previous Commission guidance for the upgrading of emergency
 
preparedness at nuclear power facilities. Revision 1 to NUREG0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear
 
Power Plants," provides meteorological criteria to fulfill, in part, the
 
standard that "Adequate methods, systems, and equipment for assessing and
 
monitoring actual or potential offsite consequences of a radiological emergency
 
condition are in                              18.38                        Rev. 0 WOLF CREEK use" (see 10 CFR 50.47). The position in Appendix 2 to NUREG0654 outlines four essential elements that can be categorized into three functions:
 
measurements, assessment, and communications.
Proposed Revision 1 to Regulatory Guide 1.23, "Meteorological Measurements Programs in Support of Nuclear Power Plants," has been adopted to provide
 
guidance criteria for the primary meteorological measurements program
 
consisting of a primary system and secondary system(s) where necessary, and a
 
backup system. Data collected from these systems are intended for use in the
 
assessment of the offsite consequences of a radiological emergency condition. Appendix 2 to NUREG0654 delineates two classes of assessment capabilities to provide input for the evaluation of offsite consequences of a radiological
 
emergency condition. Both classes of capabilities provide input to decisions
 
regarding emergency actions. The Class A capability should provide information
 
to determine the necessity for notification, sheltering, evacuation, and, during the initial phase of a radiological emergency, making confirmatory


(C) NEAR-SITE EMERGENCY OPERATION FACILITY (NUREG-0694)
radiological measurements. The Class B capability should provide information
(See Section 18.4 for Updated Information)  Position


Designate a near-site emergency operations facility with communications with the plant to provide evaluation of radiation releases and coordination of all onsite and offsite activities during an accident.  
regarding the placement of supplemental meteorological monitoring equipment, and the need to make additional confirmatory radiological measurements. The
 
Class B capability shall identify the areas of contaminated property and
 
foodstuff requiring protective measures and may also provide information to
 
determine the necessity for sheltering and evacuation.
Proposed Revision 1 to Regulatory Guide 1.23 outlines the set of meteorological measurements that should be accessible from a system that can be interrogated;
 
the meteorological data should be presented in the prescribed format. The
 
results of the assessments should be accessible from this system; this information should incorporate humanfactors engineering in its display to
 
convey the essential information to the initial decision makers and subsequent
 
management team. An integrated system should allow the eventual incorporation
 
of effluent monitoring and radiological monitoring information with the  
 
environmental transport to provide direct dose consequence assessments. Requirements of the new emergencypreparedness rules under Paragraphs 50.47 and 50.54 and the revised Appendix E to Part 50 taken together with NUREG0654 Revision 1 and NUREG0696, when approved for issuance, go beyond the previous
 
requirements for meteorological programs. To provide a realistic time frame
 
for implementation, a staged schedule has been established with compensating
 
actions provided for interim measures.                              18.39                        Rev. 0 WOLF CREEK 18.3.3.2  The Operating Agent Response See Section 18.3.1.2.
18.3.3.3  Conclusion See Section 18.3.1.3.
 
18.3.4  INTEGRITY OF SYSTEMS OUTSIDE OF CONTAINMENT (III.D.1.1) 18.3.4.1  NRC Guidance Per NUREG0737 Position Applicants shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to aslowaspractical levels. This program
 
shall include the following:
: 1. Immediate leak reduction
: a. Implement all practical leak reduction measures for all systems that could carry radioactive fluid outside of  
 
containment.
: b. Measure actual leakage rates with system in operation and report them to the NRC. 2. Continuing Leak Reduction  Establish and implement a      program of preventive maintenance to reduce leakage to as lowaspractical levels. This program shall include periodic
 
integrated leak tests at intervals not to exceed each
 
refueling cycle.
Clarification Applicants shall provide a summary description, together with initial leaktest results, of their program to reduce leakage from systems outside the
 
containment that would or could contain primary coolant or other highly
 
radioactive fluids or gases during or following a serious transient or
 
accident. 1. Systems that should be leak tested are as follows (any other plant system which has similar functions or postaccident
 
characteristics, even though not specified herein, should be
 
included):      18.310    Rev. 0 WOLF CREEK Residual heat removal (RHR)


18.3-6 Rev. 28 WOLF CREEK Provide shielding against direct radiation, ventilation isolation capability, dedicated communications with the onsite Technical Support Center, and direct display of radiological and meteorological parameters. 18.3.2.2  The Operating Agent ResponseThe Operating Agent prepared a detailed description of each emergency response facility:  the onsite TSC, the onsite OSC, and the nearsite EOF. This report submitted by SNUPPS letter dated June 4, 1981, contains a complete functional system description for each facility which describes the data acquisitiondisplay and transmittal systems selected for each facility. The report, in addition, discusses the size, location, and habitability specifications to which the facilities have been designed. The design of the emergency facilities for WCGS has been prepared in consideration of the 10 CFR Part 50, Appendix E legal requirement and the guidance presented in NUREG0696 and NUREG0654.NRC Generic Letter 8233, dated December 17, 1982, provided guidance for meeting regulatory requirements for, among other issues, NUREG0737, Item III.A.1.2. Based on the NRC review of the response to Generic Letter 8233 (SNUPPS letter dated April 15, 1983), a license condition was issued which required that the TSC and EOF be operational prior to startup following the first refueling outage at WCGS. As discussed in Supplement 4 to the WCGS Safety Evaluation Report, the NRC will conduct a postimplementation appraisal of WCGS Emergency Response Facilities. 18.3.2.3  ConclusionThe functional description of each emergency response facility at WCGS filed with the NRC on June 1, 1981 detailed the means by which the Operating Agent meets the appropriate NRC guidance. 18.3.3  IMPROVING LICENSEE EMERGENCY PREPAREDNESS          LONGTERM (III.A.2) 18.3.3.1  NRC Guidance Per NUREG0737Each nuclear facility shall upgrade its emergency plans to provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. Specific criteria to meet this requirement is delineated in NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparation in Support of Nuclear Power Plants."                              18.37                        Rev. 2 WOLF CREEK ClarificationIn accordance with Task Action Plan Item III.A.1.1, "Upgrade Emergency Preparedness," each nuclear power facility was required to immediately upgrade its emergency plans with criteria provided October 10, 1979, as revised by NUREG0654 (FEMAREP1, issued for interim use and comment, January 1980). New plans were submitted by January 1, 1980, using the October 10, 1979 criteria.
Reviews were started on the upgraded plans using NUREG0654. Concomitant to these actions, amendments were developed to 10 CFR Part 50 and Appendix E to 10 CFR Part 50, to provide the longterm implementation requirements. These new rules were issued in the Federal Register on August 19, 1980, with an effective date of November 3, 1980. The revised rules delineate requirements for emergency preparedness at nuclear reactor facilities. NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," provides detailed items to be included in the upgraded emergency plans and, along with the revised rules, provides for meteorological criteria, means for providing for a prompt notification to the population, and the need for emergency response facilities (see Item III.A.1.2 [of NUREG0737]). Implementation of the new rules levied the requirement for the licensee to provide procedures implementing the upgraded emergency plans to the NRC for review. Publication of Revision 1 to NUREG0654 (FEMAREP1) which incorporates the many public comments received is expected in October 1980. This is the document that will be used by the NRC and FEMA in their evaluation of emergency plans submitted in accordance with the new NRC rules. NUREG0654, Revision 1; NUREG0696, "Functional Criteria for Emergency Response Facilities;" and the amendments to 10 CFR Part 50 and Appendix E to 10 CFR Part 50 regarding emergency preparedness, provide more detailed criteria for emergency plans, design, and functional criteria for emergency response facilities and establishes firm dates for submission of upgraded emergency plans for installation of prompt notification systems. These revised criteria and rules supersede previous Commission guidance for the upgrading of emergency preparedness at nuclear power facilities. Revision 1 to NUREG0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," provides meteorological criteria to fulfill, in part, the standard that "Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in                              18.38                        Rev. 0 WOLF CREEK use" (see 10 CFR 50.47). The position in Appendix 2 to NUREG0654 outlines four essential elements that can be categorized into three functions:
measurements, assessment, and communications. Proposed Revision 1 to Regulatory Guide 1.23, "Meteorological Measurements Programs in Support of Nuclear Power Plants," has been adopted to provide guidance criteria for the primary meteorological measurements program consisting of a primary system and secondary system(s) where necessary, and a backup system. Data collected from these systems are intended for use in the assessment of the offsite consequences of a radiological emergency condition. Appendix 2 to NUREG0654 delineates two classes of assessment capabilities to provide input for the evaluation of offsite consequences of a radiological emergency condition. Both classes of capabilities provide input to decisions regarding emergency actions. The Class A capability should provide information to determine the necessity for notification, sheltering, evacuation, and, during the initial phase of a radiological emergency, making confirmatory radiological measurements. The Class B capability should provide information regarding the placement of supplemental meteorological monitoring equipment, and the need to make additional confirmatory radiological measurements. The Class B capability shall identify the areas of contaminated property and foodstuff requiring protective measures and may also provide information to determine the necessity for sheltering and evacuation. Proposed Revision 1 to Regulatory Guide 1.23 outlines the set of meteorological measurements that should be accessible from a system that can be interrogated; the meteorological data should be presented in the prescribed format. The results of the assessments should be accessible from this system; this information should incorporate humanfactors engineering in its display to convey the essential information to the initial decision makers and subsequent management team. An integrated system should allow the eventual incorporation of effluent monitoring and radiological monitoring information with the environmental transport to provide direct dose consequence assessments. Requirements of the new emergencypreparedness rules under Paragraphs 50.47 and 50.54 and the revised Appendix E to Part 50 taken together with NUREG0654 Revision 1 and NUREG0696, when approved for issuance, go beyond the previous requirements for meteorological programs. To provide a realistic time frame for implementation, a staged schedule has been established with compensating actions provided for interim measures.                              18.39                        Rev. 0 WOLF CREEK 18.3.3.2  The Operating Agent ResponseSee Section 18.3.1.2. 18.3.3.3  ConclusionSee Section 18.3.1.3.
18.3.4  INTEGRITY OF SYSTEMS OUTSIDE OF CONTAINMENT (III.D.1.1) 18.3.4.1  NRC Guidance Per NUREG0737Position Applicants shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to aslowaspractical levels. This program shall include the following:  1. Immediate leak reduction
: a. Implement all practical leak reduction measures for all      systems that could carry radioactive fluid outside of containment. b. Measure actual leakage rates with system in operation and      report them to the NRC. 2. Continuing Leak Reduction  Establish and implement a      program of preventive maintenance to reduce leakage to as lowaspractical levels. This program shall include periodic integrated leak tests at intervals not to exceed each refueling cycle. Clarification Applicants shall provide a summary description, together with initial leaktest results, of their program to reduce leakage from systems outside the containment that would or could contain primary coolant or other highly radioactive fluids or gases during or following a serious transient or accident. 1. Systems that should be leak tested are as follows (any other      plant system which has similar functions or postaccident characteristics, even though not specified herein, should be included):      18.310    Rev. 0 WOLF CREEK    Residual heat removal (RHR)
Containment spray recirculation  
Containment spray recirculation  


Line 1,074: Line 7,749:
Makeup and letdown (PWRs only)  
Makeup and letdown (PWRs only)  


Waste gas (includes headers and cover gas system outside of the containment in addition to decay or storage system)  
Waste gas (includes headers and cover gas system outside of the  
 
containment in addition to decay or storage system)  
 
Include a list of systems containing radioactive materials
 
which are excluded from program and provide justification for
 
exclusion.
: 2. Testing of gaseous systems should include helium leak
 
detection or equivalent testing methods.
: 3. Should consider program to reduce leakage potential release


Include a list of systems containing radioactive materials which are excluded from program and provide justification for exclusion.
paths due to design and operator deficiencies as discussed in  
: 2. Testing of gaseous systems should include helium leak detection or equivalent testing methods.
: 3. Should consider program to reduce leakage potential release paths due to design and operator deficiencies as discussed in our letter to all operating nuclear power plants regarding North Anna and related incidents  dated October 17, 1979.


18.3.4.2  The Operating Agent Response This defines the operating agent's program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.
our letter to all operating nuclear power plants regarding
The systems considered include the recirculation portion of the containment spray system, safety injection system, chemical and volume control system,and residual heat removal system. The program is as follows:
 
North Anna and related incidents  dated October 17, 1979.
 
18.3.4.2  The Operating Agent Response  
 
This defines the operating agent's program to reduce leakage from those  
 
portions of systems outside containment that could contain highly radioactive  
 
fluids during a serious transient or accident to as low as practical levels.
 
The systems considered include the recirculation portion of the containment  
 
spray system, safety injection system, chemical and volume control system,and residual heat removal system. The program is as follows:
: 1. General Practical Leak Reduction Measures  
: 1. General Practical Leak Reduction Measures  


Operations, via their normal duties and responsibilities, perform routine rounds in the auxiliary and radwaste buildings. These help assure the integrity of systems which routinely contain radioactive fluids or gases. Identification of leakage and initiation of appropriate corrective is one of the objectives of routine operator rounds, consistent with keeping occupational and routine releases as low as reasonable achievable.
Operations, via their normal duties and responsibilities, perform routine rounds in the auxiliary and radwaste buildings. These help  
Maintenance, as directed by the corrective action program, performs repair/rework on all components as needed to correct leaks. 


18.3-11    Rev. 29 WOLF CREEK  2. Periodic Visual Inspection In accordance with administrative procedures, Operations performs a periodic visual inspection, on a refueling cycle basis, of the recirculation portion of the containment spray system, safety injection system, chemical and volume control system and residual heat removal system. These procedures require measurement of leakage rates and initiation of corrective action for any and all detectable leaks.
assure the integrity of systems which routinely contain radioactive
 
fluids or gases. Identification of leakage and initiation of
 
appropriate corrective is one of the objectives of routine operator
 
rounds, consistent with keeping occupational and routine releases
 
as low as reasonable achievable.
 
Maintenance, as directed by the corrective action program, performs repair/rework on all components as needed to correct leaks.
 
18.3-11    Rev. 29 WOLF CREEK  2. Periodic Visual Inspection  
 
In accordance with administrative procedures, Operations performs a periodic visual inspection, on a refueling cycle basis, of the  
 
recirculation portion of the containment spray system, safety  
 
injection system, chemical and volume control system and residual  
 
heat removal system. These procedures require measurement of leakage rates and initiation of corrective action for any and all  
 
detectable leaks.
: 3. Additional Programs Resulting in Detection and Reduction of Leakage  
: 3. Additional Programs Resulting in Detection and Reduction of Leakage  


WCNOC has a Managed Maintenance Program, which includes preventive maintenance activities based on experience, engineering judgment, inspection, testing and replacement of items which have a specific lifetime such as wear rings, bearings, seals, and packing.
WCNOC has a Managed Maintenance Program, which includes preventive maintenance activities based on experience, engineering judgment, inspection, testing and replacement of items which have a specific  
WCNOC is also committed to ASME Section XI Inservice Inspection Program using the ASME Code.
 
A description of the WCGS program is documented in KMLNRC 84-46, dated March 30, 1984. Amendment No. 137 eliminated the requirements for PASS. The PASS system has been abandoned in place.   
lifetime such as wear rings, bearings, seals, and packing.  
 
WCNOC is also committed to ASME Section XI Inservice Inspection Program using the ASME Code.  
 
A description of the WCGS program is documented in KMLNRC 84-46, dated March  
 
30, 1984. Amendment No. 137 eliminated the requirements for PASS. The PASS  
 
system has been abandoned in place.  
 
18.3.4.3 Conclusion
 
The WCGS design includes provisions to insure the integrity of fluids systems
 
which are postulated to contain highly contaminated fluids following a design
 
basis accident. The provision is based on the preservice and inservice tests
 
required by the ASME Code and programmatic controls implemented by the
 
Operating Agent. These provisions provide assurance that these systems perform
 
their intended functions, including leaktightness, following a design basis
 
accident. This commitment satisfies Item III.D.1.1 of NUREG-0737 and Amendment
 
No. 137.
 
18.3.5  IMPROVED INPLANT IODINE INSTRUMENTATION UNDER ACCIDENT


18.3.4.3  Conclusion The WCGS design includes provisions to insure the integrity of fluids systems which are postulated to contain highly contaminated fluids following a design basis accident. The provision is based on the preservice and inservice tests required by the ASME Code and programmatic controls implemented by the Operating Agent. These provisions provide assurance that these systems perform their intended functions, including leaktightness, following a design basis accident. This commitment satisfies Item III.D.1.1 of NUREG-0737 and Amendment No. 137.  
CONDITIONS (III.D.3.3)


18.3.5   IMPROVED INPLANT IODINE INSTRUMENTATION UNDER ACCIDENT CONDITIONS (III.D.3.3)
18.3.5.1  NRC Guidance Per NUREG-0737


18.3.5.1  NRC Guidance Per NUREG-0737 Position  
Position
: a. Each licensee shall provide equipment and associated training and procedures for accurately determining the airborne iodine concentration in areas within the facility where plant personnel may be present during an accident.
: a. Each licensee shall provide equipment and associated training  


18.3-12    Rev. 29 WOLF CREEK  b. Each applicant for a fuelloading license to be issued prior      to January 1, 1981 shall provide the equipment, training, and procedures necessary to accurately determine the presence of airborne radioiodine in areas within the plant where plant personnel may be present during an accident. Clarification Effective monitoring of increasing iodine levels in the buildings under accident conditions must include the use of portable instruments using sample media that will collect iodine selectively over xenon (e.g., silver zeolite) for the following reasons:  a. The physical size of the auxiliary and/or fuel handling      building precludes locating stationary monitoring instrumentation at all areas where airborne  iodine concentration data might be required. b. Unanticipated isolated "hot spots" may occur in locations      where no stationary monitoring instrumentation is located. c. Unexpectedly high background radiation levels near stationary      monitoring instrumentation after an accident may interfere with filter radiation readings. d. The time required to retrieve samples after an accident may      result in high personnel exposures if these filters are located in highdoserate areas. After January 1, 1981, each applicant and licensee shall have the capability to remove the sampling cartridge to a lowbackground, lowcontamination area for further analysis. Normally, counting rooms in auxiliary buildings will not have sufficiently low backgrounds for such analyses following an accident. In the low background area, the sample should first be purged of any entrapped noble gases using nitrogen gas or clean air free of noble gases. The licensee shall have the capability to measure accurately the iodine concentrations present on these samples under accident conditions. There should be sufficient samplers to sample all vital areas. For applicants with fuelloading dates prior to January 1, 1981, provide by fuel loading (until January 1, 1981) the capability to accurately detect the presence of iodine in the region of interest following an accident. This can be accomplished by using a portable or cartmounted iodine sampler with attached singlechannel analyzer (SCA). The SCA window should be calibrated to the 365 KeV of iodine131, using the SCA. This will give an initial conservative estimate of presence of iodine and can be used to determine if respiratory protection is required. Care must be taken to assure that the counting system is not saturated as a result of too much activity collected on the sampling cartridge.      18.313    Rev. 12 WOLF CREEK 18.3.5.2  The Operating Agent ResponseThe Operating Agent provides iodine monitoring capability as specified in the following paragraphs. During accident conditions, sampling cartridges removed from air samplers will be purged with air or nitrogen to remove noble gases. Purging will be done under an appropriate ventilation hood. Cartridges will then be taken to the counting room for isotopic analysis using a high purity Germanium detector and a multichannel analyzer to accurately determine the radioiodine concentrations.
and procedures for accurately determining the airborne iodine
If, due to the accident conditions, the normal counting room is unavailable or unaccessible, an alternate low background counting room in the shop building will be used. Depending upon the conditions at the time of sampling, the sample media may be charcoal or silver zeolite cartridges. The appropriate sample media will be determined on the basis of sampling environment and the efficiency of the media for collection of radiohalogens, particulates and noble gases. Procedures are based on specific equipment purchased by the Operating Agent. A training program has been developed and includes the review of procedures and demonstration of methods by personnel responsible for air sample collection, preparation and counting/analysis to assure proficiency in determining radioiodine concentrations during accident and postaccident conditions. 18.3.5.3  ConclusionSee Section 18.3.1.3.
18.3.6  CONTROL ROOM HABITABILITY (III.D.3.4) 18.3.6.1  NRC Guidance Per NUREG0737In accordance with Task Action Plan Item III.D.3.4 and control room habitability, licensees shall ensure that control room operators will be adequately protected against the effects of accidental release of toxic and radioactive gases and that the nuclear power plant can be safely operated or shut down under design basis accident conditions (Criterion 19, "Control Room,"
of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50). Clarification
: 1. All licensees must make a submittal to the NRC regardless of      whether or not they met the criteria of the referenced Standard Review Plans (SRP) sections. The new clarification specifies that licensees that meet the criteria of the SRPs should provide the basis for their conclusion that SRP 6.4 requirements are met. Licensees may establish this basis by referencing past submittals to the NRC and/or providing new or additional information to supplement past submittals. 2. All licensees with control rooms that meet the criteria of      the following sections of the Standard Review Plan:  2.2.12.2.2  Identification of Potential Hazards in Site                Vicinity, 2.2.3        Evaluation of Potential Accidents, and 6.4          Habitability System      18.314    Rev. 12 WOLF CREEK    shall report their findings regarding the specific SRP sections    as explained below. The following documents should be used for guidance:  a. Regulatory Guide 1.78, "Assumptions for Evaluating the      habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release;"  b. Regulatory Guide 1.95, "Protection of Nuclear Power Plant      Control Room Operators Against an Accidental Chlorine Release;" and,  c. K. G. Murphy and K. M. Campe, "Nuclear Power Plant Control      Room Ventilation System Design for Meeting General Design Criterion 19," 13th AEC Air Cleaning Conference, August 1974. Licensees shall submit the results of their findings as well as    the basis for those findings by January 1, 1981. In providing the basis for the habitability finding, licensees may reference their past submittals. Licensees should, however, ensure that these submittals    reflect the current facility design and that the information    requested in Attachment 1, to NUREG0737, item III.D.3.4 is provided. 3. All licensees with control rooms that do not meet the      criteria of the abovelisted references, Standard Review Plans, Regulatory Guides, and other references. These licensees shall perform the necessary evaluations and identify appropriate modifications. Each licensee submittal shall include the results of the analyses of control room concentrations from postulated accidental release of toxic gases and control room operator radiation exposures from airborne radioactive material and direct radiation resulting from designbasis accidents. The toxic gas accident analysis should be performed for all potential hazardous chemical releases occurring either on the site or within 5 miles of the plantsite boundary. Regulatory Guide 1.78 lists the chemicals most commonly encountered in the evaluation of control room habitability but is not all inclusive. The designbasisaccident (DBA) radiation source term should be for the lossofcoolant accident (LOCA) containment leakage and engineered safety feature (ESF) leakage contribution outside the containment, as described in Appendix A and B of Standard Review Plan Chapter 15.6.5. In addition, boilingwater reactor (BWR) facility evaluations should add any leakage from the main steam isolation valves (MSIV) (i.e., valvestem leakage, valve seat leakage, main steam isolation valve leakage control system release) to the containment leakage and ESF leakage following a LOCA. This should not be construed as altering the staff recommendations in Section D of Regulatory Guide 1.96 (Rev.
: 2) regarding MSIV leakagecontrol systems. Other DBAs should be reviewed to determine whether they might constitute a moresevere control room hazard than the LOCA.      18.315    Rev. 12 WOLF CREEK In addition to the accident-analysis results, which should either identify the possible need for control room modifications or provide assurance that the habitability systems will operate under all postulated conditions to permit the control room operators to remain in the control room to take appropriate actions required by General Design Criterion 19, the licensee should submit sufficient information needed for an independent evaluation of the adequacy of the habitability systems. Attachment 1 lists the information that should be provided along with the licensee's evaluation.
18.3.6.2  The Operating Agent Response  The safety design bases for the habitability system for the control room are defined in Section 6.4. This section also discusses the applicable recommendations of Regulatory Guides 1.78, and 1.95. The results of dose calculations for a design basis loss-of-coolant accident release are presented in Section 15.6.5 and 15A.3.
The design of the habitability system for the control room envelope meets the appropriate recommendations of Regulatory Guide 1.78 and 1.95 and requirements of GDC-19.
18.3.6.3  Conclusion  The design of the control room habitability system meets the recommendations of item III.D.3.4 of NUREG-0737.


18.3-16    Rev. 28 WOLF CREEK  18.4  ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS  18.4.1  EMERGENCY FACILITIES AND EQUIPMENT  18.4.1.1  10CFR50, Appendix E, Section IV, E  Position  The NRC updated 10CFR50, Appendix E, Section IV, E, in 2011 providing revised requirements for emergency facilities and associated equipment. 18.4.1.2  The Operating Agent Compliance for EOF and Alternate TSC  The Operating Agent has constructed an off-site Emergency Operations Facility and Alternate Technical Support Center (TSC) whuch replaces previously existing facilities in compliance with 10CFR50, Appendix E, Section IV, E. The building facility is located approximately 11 miles northwest of the plant and approximately 1/4 mile southwest of te intersection fo US Highway 75 and Interstate 35 (locally referred as BETO Junction). This building facility and its operation are intended to fully meet the requirements of the applicable regulations. Details of te facility are provided in the comprehensive emergency plan and applicable site procedures. The facility was declared operational prior to December 23, 2014, as required. 18.4.1.3  Conclusion  The Operating Agent has established an operational off-site EOF and Alternate TSC which meets requirements of the applicable regulations. 
concentration in areas within the facility where plant  


18.4-1 Rev. 28 Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-1 Rev. 29 License Renewal Application  A0 APPENDIX A INTRODUCTION AND LICENSE RENEWAL COMMITMENTS Introduction This appendix provides the information submitted in an Updated Safety Analysis Report Supplement as required by 10 CFR 54.21(d) for the WCGS License Renewal application. Section A1 of this appendix contains summary descriptions of the programs used to manage the effects of aging during the period of extended operation. Section A2 contains summary descriptions of programs used for management of time-limited aging analyses during the period of extended operation. Section A3 contains evaluation summaries of Time Limited Aging Analyses (TLAAs) for the period of extended operation. During the review of the WCGS Unit 1 license renewal application (LRA) by the staff of the NRC, WCNOC made commitments related to aging management programs to manage aging effects for structures and components. The following pages list these commitments.  
personnel may be present during an accident.  


Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-2 Rev. 30 License Renewal Application A1 SUMMARY DESCRIPTIONS OF AGING MANAGEMENT PROGRAMS The integrated plant assessment and evaluation of time-limited aging analyses (TLAA) identified existing and new aging management programs necessary to provide reasonable assurance that components within the scope of License Renewal will continue to perform their intended functions consistent with the current licensing basis (CLB) for the period of extended operation. Sections A1 and A2 describe the programs and their implementation activities. Three elements common to all aging management programs discussed in Sections A1 and A2 are corrective actions, confirmation process, and administrative controls. These elements are included in the WCNOC Quality Assurance (QA) Program, which implements the requirements of 10 CFR 50, Appendix B and are applicable to the safety-related and nonsafety-related systems, structures and components that are subject to aging management review activities.
18.3-12    Rev. 29 WOLF CREEK b. Each applicant for a fuelloading license to be issued prior to January 1, 1981 shall provide the equipment, training, and  
A1.1 ASME SECTION XI INSERVICE INSPECTION, SUBSECTIONS IWB, IWC, AND IWD ASME Section XI Inservice Inspection, Subsections IWB, IWC, & IWD inspections are performed to manage aging in Class 1, 2, and 3 piping and components within the scope of license renewal. The program includes periodic visual, surface, volumetric examinations and leakage tests of Class 1, 2 and 3 pressure-retaining components, including welds, pump casings, valve bodies, integral attachments, and pressure-retaining bolting. WCGS inspections meet ASME Section XI requirements and can manage aging such as cracking, surface and subsurface discontinuities, loss of material, loss of fracture toughness, and physical damage. The WCGS ISI Program is in accordance with 10 CFR 50.55a. In accordance with 10CFR 50.55a (g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest Edition and Addenda of the Code specified twelve months before the start of the inspection interval. A1.2 WATER CHEMISTRY The Water Chemistry program includes maintenance of the chemical environment in the reactor coolant system and related auxiliary systems containing treated borated water and includes maintenance of the chemical environment in the steam generator secondary side and the secondary cycle systems to limit loss of material and cracking.
 
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-3 Rev. 30 License Renewal Application  The Water Chemistry Program is based upon the EPRI primary and secondary water chemistry guidelines. A1.3 REACTOR HEAD CLOSURE STUDS The Reactor Head Closure Studs program includes periodic visual, surface, and volumetric examinations of reactor vessel flange stud hole threads, reactor head closure studs, nuts, and washers and performs visual inspection of the reactor vessel flange closure during primary system leakage tests. The program implements ASME Section XI code, Subsection IWB, same Edition and Addenda as the WCGS ISI Program per 10 CFR 50.55a(g)(4)(ii), and detects reactor vessel stud, nut and washer cracking, loss of material due to wear and corrosion, and reactor coolant leakage from the reactor vessel flange. A1.4 BORIC ACID CORROSION The Boric Acid Corrosion program manages loss of material due to boric acid corrosion. The program includes provisions to identify, inspect, examine and evaluate leakage, and initiate corrective actions. The program relies in part on implementation of recommendations of NRC Generic Letter 88-05, "Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR plants."  Additionally, the program includes examinations conducted during ISI pressure tests performed in accordance with ASME Section XI requirements. The program addresses operating experience noted in NRC Regulatory Issue Summary 2003, "NRC Review of Responses to Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity." Prior to the period of extended operation, procedures will be enhanced to state that susceptible components adjacent to potential leakage sources will include electrical components and connectors. A1.5 NICKEL-ALLOY PENETRATION NOZZLES WELDED TO THE UPPER REACTOR VESSEL CLOSURE HEADS OF PRESSURIZED WATER REACTORS Wolf Creek's Nickel Alloy Aging Management Program (A1.34) includes the Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors.
procedures necessary to accurately determine the presence of
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-4 Rev. 30 License Renewal Application  A1.6 Flow-Accelerated Corrosion  The Flow-Accelerated Corrosion (FAC) program manages aging effects of wall thinning due to FAC on the internal surfaces of carbon or low alloy steel piping, elbows, reducers, expanders, and valve bodies which contain high energy fluids (both single phase and two phases). The objectives of the FAC program are achieved by (a) identifying system components susceptible to FAC, (b) an analysis using a predictive code such as CHECWORKS to determine critical locations for inspection and evaluation, (c) providing guidance of follow-up inspections, (d) repairing or replacing components, as determined by the guidance provided by the program, and (e) continual evaluation and incorporation of the latest technologies, industry and plant in-house operating experience.
 
Wolf Creek  Appendix A USAR Supplement    Wolf Creek Generating Station Page 18A-5 Rev. 29 License Renewal Application  Procedures and methods used by the FAC program are consistent with WCGS commitments to NRC Bulletin 87-01, "Thinning of Pipe Wall in Nuclear Power Plants," and NRC Generic Letter 89-08, "Erosion/Corrosion-Induced Pipe Wall Thinning." A1.7 BOLTING INTEGRITY The Bolting Integrity program manages the aging effects of cracking, loss of material, and loss of preload for pressure retaining bolting and ASME component support bolting. The program includes preload control, selection of bolting material, use of lubricants/sealants consistent with EPRI good bolting practices, and performance of periodic inspections for indication of aging techniques. The program also includes the inservice inspection requirements established in accordance with ASME Section XI, Subsections IWB, IWC, IWD, and IWF for ASME Class bolting. WCGS good bolting practices are established in accordance with plant procedures. These procedures include requirements for proper disassembling, inspecting, and assembling of connections with threaded fasteners. The general practices that are established in this program are consistent with EPRI NP-5067, "Good Bolting Practices, Volume 1 and Volume 2," and EPRI TR-104213, "Bolted Joint Maintenance and Applications Guide." A1.8 STEAM GENERATOR TUBE INTEGRITY The Steam Generator Tube Integrity program includes the preventive measures, condition monitoring inspections, degradation assessment, repair and leakage monitoring activities necessary to manage cracking and loss of material. The aging management measures employed include non-destructive examination, visual inspection, sludge removal, tube plugging, in-situ pressure testing, maintaining the chemistry environment by removal of impurities and addition of chemicals to control pH and oxygen. NDE inspection scope and frequency, and primary to secondary leak rate monitoring are conducted consistent with the requirements of WCGS Unit 1 Technical Specifications. Structural integrity limits consistent with Regulatory Guide 1.121, Revision 0, "Bases for Plugging Degraded PWR Steam Generator Tubes," are applied. Steam generator management practices are consistent with NEI 97-06 "Steam Generator Program Guidelines". Program deviations from NEI 97-06 Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-6 Rev. 29 License Renewal Application are prepared and approved in accordance with NEI 97-06 and EPRI steam generator management program guidance. A1.9 OPEN-CYCLE COOLING WATER SYSTEM The Open-Cycle Cooling Water (OCCW) System program manages loss of material and reduction of heat transfer for components exposed to raw water. The program includes chemical treatment and control of biofouling; heat exchanger performance testing; and periodic inspections to ensure that the effects of aging will be managed on the OCCW systems or structures and components serviced by the OCCW systems for the period of extended operation. The program is consistent with commitments as established in WCGS responses to NRC Generic Letter 89-13 "Service Water System Problems Affecting Safety-Related Components." The Open-Cycle Cooling Water System program provides the general requirements for implementation and maintenance of programs and activities which mitigate aging of OCCW systems and components. The various aspects of the WCGS program (control, monitoring, maintenance and inspections) are implemented in station procedures. A1.10 CLOSED-CYCLE COOLING WATER SYSTEM The Closed-Cycle Cooling Water System Program manages loss of material, cracking, and reduction in heat transfer for components in closed cycle cooling water systems. The program includes maintenance of system corrosion inhibitor concentrations and chemistry parameters following the guidance of EPRI TR-107396 to minimize aging, and periodic testing and inspections to evaluate system and component performance. Inspection methods include visual, ultrasonic testing (UT) and eddy current testing (ECT). Prior to the period of extended operation, a new periodic preventive maintenance activity will be developed to specify performing inspections of the internal surfaces of valve bodies and accessible piping while the valves are disassembled for operational readiness inspections to detect loss of material and fouling. The acceptance criteria will be specified in this preventive maintenance activity. In addition, visual inspection procedures used for identification of stress corrosion cracking will be enhanced to define cracking, provide additional guidance for detection of cracking and identify specific acceptance criteria relating to "as-found" cracking.
airborne radioiodine in areas within the plant where plant
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-7 Rev. 29 License Renewal Application A1.11 INSPECTION OF OVERHEAD HEAVY LOAD AND LIGHT LOAD (RELATED TO REFUELING) HANDLING SYSTEMS The Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems program manages the loss of material due to corrosion and the effects of rail wear for all cranes, trolley structural components and applicable rails within the scope of license renewal. The program is implemented through periodic visual inspections of components. Crane inspection activities verify structural integrity of the crane components required to maintain the crane intended function. Visual inspections assess conditions such as loss of material due to corrosion of structural members, misalignment, flaking, side wear of rails, loose tie down bolts and excessive wear or deformation of monorails. The inspection requirements are consistent with the guidance provided by NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" for load handling systems that handle heavy loads which can directly or indirectly cause a release of radioactive material, applicable industry standards (such as CMAA Spec 70 and ANSI B30.11) for other cranes within the scope of license renewal, and applicable OSHA regulations (such as 29 CFR Volume XVII, Part 1910 and Section 1910.179). Prior to the period of extended operation, procedures will be enhanced to identify industry standards or WCGS specifications that are applicable to the component and to specifically inspect for loss of material due to corrosion or rail wear. A1.12 FIRE PROTECTION The Fire Protection program manages loss of material for fire rated doors, fire dampers, diesel-driven fire pump, and the halon fire suppression system, cracking, spalling, and loss of material for fire barrier walls, ceilings, and floors, hardness and shrinkage due to weathering of fire barrier penetration seals, and hardness - loss of strength for halon fire suppression system flexible hoses.
 
Periodic visual inspections of fire barrier penetration seals, fire dampers, fire barrier walls, ceilings and floors, and periodic visual inspections and functional tests of fire-rated doors are performed. The internal surface of the diesel-driven fire pump fuel oil supply line is managed by the Fuel Oil Chemistry program (A1.14), which utilizes the One-Time Inspection program (A1.16) to verify the effectiveness of the Fuel Oil Chemistry program using a Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-8 Rev. 29 License Renewal Application representative sample of components in systems that contain fuel oil, ensuring that there is no loss of function due to aging of the fuel oil supply line. Drop tests on approximately 10 percent of accessible horizontal and vertical fire dampers are performed on an 18 month basis. Fire dampers that are inaccessible for drop testing are visually inspected to assess integrity/availability. Visual inspections are performed on fire-rated doors at least once per year to verify the integrity of door surfaces and for clearances to detect aging of the fire doors. A visual inspection and function test of the halon fire suppression system is performed every 18 months. Approximately 10 percent of each type (electrical and mechanical as practical) of penetration seal is visually inspected at least once every 18 months. Fire barrier walls, ceilings, and floors including coatings and wraps (structural steel fireproofing, raceway fire wrap and hatch covers) are visually inspected at least once every 18 months. Prior to the period of extended operation, fire damper inspection and drop test procedures will be enhanced to inspect damper housing for signs of corrosion and to specify fire barriers and doors described in USAR Appendix 9.5A, "WCGS Fire Protection Comparison to APCSB 9.5-1 Appendix A," and WCGS Fire Hazards Analysis. Training for technicians performing the fire door and fire damper visual inspections will be enhanced to include fire protection inspection requirements and training documentation. Prior to the period of extended of operation, halon fire suppression system inspection procedures will be enhanced to include visual inspection of halon tank flexible hoses for hardening - loss of strength. Visual inspections would not be required for flexible hoses that have scheduled periodic replacement intervals. A1.13 FIRE WATER SYSTEM The Fire Water System program manages loss of material for water-based fire protection systems. Periodic hydrant inspections, fire main flushing, sprinkler inspections, and flow tests are performed considering applicable National Fire Protection Association (NFPA) codes and standards. Nuclear Electric Insurance Limited (NEIL) performance based guidance is utilized for fire protection system inspection, testing, and maintenance intervals. The fire water system discharge pressure is continuously monitored such that loss of system pressure is immediately detected and corrective actions Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-9 Rev. 29 License Renewal Application are initiated. The Fire Water System program conducts an air or water flow test through each open head spray/sprinkler head to verify that each open head spray/sprinkler nozzle is unobstructed. The Fire Water System program tests a representative sample of fire protection sprinkler heads or replaces those that have been in service for 50 years, using the guidance of NFPA 25, 2002 Edition, and tests at 10 year intervals thereafter during the period of extended operation to ensure that signs of aging are detected in a timely manner. Visual inspections of the fire protection system exposed to water, evaluating wall thickness to identify evidence of loss of material due to corrosion, are covered by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (A1.22). A1.14 FUEL OIL CHEMISTRY The Fuel Oil Chemistry program manages loss of material on the internal surface of components in the emergency diesel fuel oil storage and transfer system and diesel fire pump fuel oil system.
personnel may be present during an accident.
The program includes (a) surveillance and monitoring procedures for maintaining fuel oil quality by controlling contaminants in accordance with applicable ASTM Standards, (b) periodic draining of water from fuel oil tanks, (c) visual inspection of internal surfaces during periodic draining and cleaning of fuel oil tanks in the emergency diesel fuel oil storage and transfer system, (d) ultrasonic wall thickness measurements from external surfaces of fuel oil tanks, (e) one-time ultrasonic (UT) or pulsed eddy current (PEC) thickness examination on the external surface of the diesel fire pump fuel oil tank, (f) inspection of new fuel oil before it is introduced into the storage tanks, and (g) one-time inspections of a representative sample of components in systems that contain fuel oil by the One-Time Inspection program. Prior to the period of extended operation, the emergency fuel oil day tanks will be added to the ten year drain, clean, and internal inspection program. Procedures will be enhanced to provide for supplemental ultrasonic thickness measurements if there are indications of reduced cross sectional thickness found during the visual inspection of the emergency fuel oil storage tanks.
Clarification
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-10 Rev. 29 License Renewal Application A1.15 Reactor Vessel Surveillance The Reactor Vessel Surveillance program is consistent with ASTM E 185. Actual reactor vessel coupons are used, but an exemption in the original license permits use of other than beltline weld material for the weld coupons. The surveillance coupons are tested by a qualified offsite vendor, to its procedures. The testing program and reporting conform to requirements of 10 CFR 50 Appendix H. The schedule has been revised by removal of the last two coupon sets to the spent fuel pool, at exposures greater than those expected at the beltline wall at 60 years. This withdrawal therefore meets the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life. Vessel fluence is now determined by ex-vessel dosimetry. This schedule change has been approved by the NRC, as required by 10 CFR 50 Appendix H, "Reactor Vessel Material Surveillance Program Requirements." A1.16 ONE-TIME INSPECTION The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of the Water Chemistry program (A1.2), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer. The One-Time Inspection program determines non-destructive examination (NDE) sample size for each material-environment group using established statistical methodologies and selects piping/component inspection locations within the sample that are based on service period, operating conditions, and design margins. The One-Time Inspection program specifies corrective actions and increased sampling of components if aging effects are found. This new program will be implemented and completed within the ten year period prior to the period of extended operation.
 
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-11 Rev. 29 License Renewal Application A1.17  Selective Leaching of Materials The Selective Leaching of Materials program manages the loss of material due to selective leaching for brass (>15% zinc) and gray cast iron components exposed to raw water or closed-cycle cooling water within the scope of license renewal. The Selective Leaching of Materials program is in addition to the Open Cycle Cooling Water program and the Closed Cycle Cooling Water program in these cases. The program includes a one-time inspection (visual and mechanical methods) of a selected sample of component internal surfaces to determine whether loss of material due to selective leaching is occurring. If indications of selective leaching are confirmed, follow up examinations or evaluations are performed. The Selective Leaching of Materials program is a new program that will be implemented prior to the period of extended operation. A1.18 BURIED PIPING AND TANKS INSPECTION The Buried Piping and Tanks Inspection program manages loss of material of buried components in the essential service water system, emergency diesel engine fuel oil storage and transfer system, auxiliary feedwater system, high pressure coolant injection system (borated refueling water storage system), and the fire protection system. Visual inspections monitor the condition of protective coatings and wrappings found on carbon steel, gray cast iron or ductile iron components and assess the condition of stainless steel components with no protective coatings or wraps. The program includes opportunistic inspection of buried piping and tanks as they are excavated or on a planned basis if opportunistic inspections have not occurred. The Buried Piping and Tanks Inspection program is a new program that will be implemented prior to the period of extended of operation.
Effective monitoring of increasing iodine levels in the buildings under accident conditions must include the use of portable instruments using sample
 
media that will collect iodine selectively over xenon (e.g., silver zeolite)
 
for the following reasons:
: a. The physical size of the auxiliary and/or fuel handling building precludes locating stationary monitoring
 
instrumentation at all areas where airborne  iodine
 
concentration data might be required.
: b. Unanticipated isolated "hot spots" may occur in locations where no stationary monitoring instrumentation is located.
: c. Unexpectedly high background radiation levels near stationary monitoring instrumentation after an accident may interfere
 
with filter radiation readings.
: d. The time required to retrieve samples after an accident may result in high personnel exposures if these filters are located in highdoserate areas.
After January 1, 1981, each applicant and licensee shall have the capability to remove the sampling cartridge to a lowbackground, lowcontamination area for
 
further analysis. Normally, counting rooms in auxiliary buildings will not
 
have sufficiently low backgrounds for such analyses following an accident. In
 
the low background area, the sample should first be purged of any entrapped
 
noble gases using nitrogen gas or clean air free of noble gases. The licensee
 
shall have the capability to measure accurately the iodine concentrations
 
present on these samples under accident conditions. There should be sufficient
 
samplers to sample all vital areas. For applicants with fuelloading dates prior to January 1, 1981, provide by fuel loading (until January 1, 1981) the capability to accurately detect the
 
presence of iodine in the region of interest following an accident. This can be accomplished by using a portable or cartmounted iodine sampler with attached singlechannel analyzer (SCA). The SCA window should be calibrated to the 365 KeV of iodine131, using the SCA. This will give an initial
 
conservative estimate of presence of iodine and can be used to determine if
 
respiratory protection is required. Care must be taken to assure that the
 
counting system is not saturated as a result of too much activity collected on
 
the sampling cartridge.      18.313    Rev. 12 WOLF CREEK 18.3.5.2  The Operating Agent Response The Operating Agent provides iodine monitoring capability as specified in the following paragraphs.
During accident conditions, sampling cartridges removed from air samplers will be purged with air or nitrogen to remove noble gases. Purging will be done
 
under an appropriate ventilation hood. Cartridges will then be taken to the  
 
counting room for isotopic analysis using a high purity Germanium detector and  
 
a multichannel analyzer to accurately determine the radioiodine concentrations.
 
If, due to the accident conditions, the normal counting room is unavailable or
 
unaccessible, an alternate low background counting room in the shop building
 
will be used.
Depending upon the conditions at the time of sampling, the sample media may be charcoal or silver zeolite cartridges. The appropriate sample media will be
 
determined on the basis of sampling environment and the efficiency of the media
 
for collection of radiohalogens, particulates and noble gases.
Procedures are based on specific equipment purchased by the Operating Agent. A training program has been developed and includes the review of procedures and  
 
demonstration of methods by personnel responsible for air sample collection, preparation and counting/analysis to assure proficiency in determining radioiodine concentrations during accident and postaccident conditions.
18.3.5.3  Conclusion See Section 18.3.1.3.
 
18.3.6  CONTROL ROOM HABITABILITY (III.D.3.4) 18.3.6.1  NRC Guidance Per NUREG0737 In accordance with Task Action Plan Item III.D.3.4 and control room habitability, licensees shall ensure that control room operators will be
 
adequately protected against the effects of accidental release of toxic and  
 
radioactive gases and that the nuclear power plant can be safely operated or
 
shut down under design basis accident conditions (Criterion 19, "Control Room,"
of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR
 
Part 50).
Clarification
: 1. All licensees must make a submittal to the NRC regardless of whether or not they met the criteria of the referenced
 
Standard Review Plans (SRP) sections. The new clarification
 
specifies that licensees that meet the criteria of the SRPs
 
should provide the basis for their conclusion that SRP 6.4  
 
requirements are met. Licensees may establish this basis by
 
referencing past submittals to the NRC and/or providing new
 
or additional information to supplement past submittals.
: 2. All licensees with control rooms that meet the criteria of the following sections of the Standard Review Plan:  2.2.12.2.2  Identification of Potential Hazards in Site Vicinity, 2.2.3        Evaluation of Potential Accidents, and
 
6.4          Habitability System      18.314    Rev. 12 WOLF CREEK shall report their findings regarding the specific SRP sections as explained below. The following documents should be used for
 
guidance:
: a. Regulatory Guide 1.78, "Assumptions for Evaluating the habitability of a Nuclear Power Plant Control Room During a
 
Postulated Hazardous Chemical Release;"   b. Regulatory Guide 1.95, "Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine
 
Release;" and,   c. K. G. Murphy and K. M. Campe, "Nuclear Power Plant Control Room Ventilation System Design for Meeting General Design
 
Criterion 19," 13th AEC Air Cleaning Conference, August
 
1974.
Licensees shall submit the results of their findings as well as the basis for those findings by January 1, 1981. In providing
 
the basis for the habitability finding, licensees may reference
 
their past submittals. Licensees should, however, ensure
 
that these submittals reflect the current facility design and that the information    requested in Attachment 1, to NUREG0737, item III.D.3.4 is
 
provided.
: 3. All licensees with control rooms that do not meet the      criteria of the abovelisted references, Standard Review
 
Plans, Regulatory Guides, and other references.
These licensees shall perform the necessary evaluations and identify appropriate modifications.
Each licensee submittal shall include the results of the analyses of control room concentrations from postulated accidental release of toxic gases and
 
control room operator radiation exposures from airborne radioactive material and direct radiation resulting from designbasis accidents. The toxic gas
 
accident analysis should be performed for all potential hazardous chemical releases occurring either on the site or within 5 miles of the plantsite
 
boundary. Regulatory Guide 1.78 lists the chemicals most commonly encountered
 
in the evaluation of control room habitability but is not all inclusive. The designbasisaccident (DBA) radiation source term should be for the lossofcoolant accident (LOCA) containment leakage and engineered safety feature (ESF) leakage contribution outside the containment, as described in Appendix A and B of Standard Review Plan Chapter 15.6.5. In addition, boilingwater
 
reactor (BWR) facility evaluations should add any leakage from the main steam isolation valves (MSIV) (i.e., valvestem leakage, valve seat leakage, main
 
steam isolation valve leakage control system release) to the containment
 
leakage and ESF leakage following a LOCA. This should not be construed as
 
altering the staff recommendations in Section D of Regulatory Guide 1.96 (Rev.
: 2) regarding MSIV leakagecontrol systems. Other DBAs should be reviewed to determine whether they might constitute a moresevere control room hazard than
 
the LOCA.      18.315    Rev. 12 WOLF CREEK In addition to the accident-analysis results, which should either identify the possible need for control room modifications or provide assurance that the  
 
habitability systems will operate under all postulated conditions to permit the
 
control room operators to remain in the control room to take appropriate
 
actions required by General Design Criterion 19, the licensee should submit
 
sufficient information needed for an independent evaluation of the adequacy of
 
the habitability systems. Attachment 1 lists the information that should be
 
provided along with the licensee's evaluation.
 
18.3.6.2  The Operating Agent Response The safety design bases for the habitability system for the control room are defined in Section 6.4. This section also discusses the applicable
 
recommendations of Regulatory Guides 1.78, and 1.95. The results of dose
 
calculations for a design basis loss-of-coolant accident release are presented
 
in Section 15.6.5 and 15A.3.  
 
The design of the habitability system for the control room envelope meets the appropriate recommendations of Regulatory Guide 1.78 and 1.95 and requirements
 
of GDC-19.
 
18.3.6.3 Conclusion The design of the control room habitability system meets the recommendations of item III.D.3.4 of NUREG-0737.  
 
18.3-16    Rev. 28 WOLF CREEK 18.4  ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS 18.4.1  EMERGENCY FACILITIES AND EQUIPMENT 18.4.1.1  10CFR50, Appendix E, Section IV, E Position  The NRC updated 10CFR50, Appendix E, Section IV, E, in 2011 providing revised requirements for emergency facilities and associated equipment.
18.4.1.2  The Operating Agent Compliance for EOF and Alternate TSC The Operating Agent has constructed an off-site Emergency Operations Facility and Alternate Technical Support Center (TSC) whuch replaces previously existing facilities in compliance with 10CFR50, Appendix E, Section IV, E.
The building facility is located approximately 11 miles northwest of the plant and approximately 1/4 mile southwest of te intersection fo US Highway 75 and Interstate 35 (locally referred as BETO Junction). This building facility and its operation are intended to fully meet the requirements of the applicable regulations. Details of te facility are provided in the comprehensive emergency plan and applicable site procedures. The facility was declared operational prior to December 23, 2014, as required.
18.4.1.3  Conclusion The Operating Agent has established an operational off-site EOF and Alternate TSC which meets requirements of the applicable regulations.
 
18.4-1 Rev. 28 Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-1 Rev. 29 License Renewal Application A0 APPENDIX A INTRODUCTION AND LICENSE RENEWAL COMMITMENTS Introduction This appendix provides the information submitted in an Updated Safety Analysis Report Supplement as required by 10 CFR 54.21(d) for the WCGS License Renewal application. Section A1 of this appendix contains summary descriptions of the programs used to manage the effects of aging during the period of extended operation. Section A2 contains summary descriptions of programs used for management of time-limited aging analyses during the period of extended operation.
Section A3 contains evaluation summaries of Time Limited Aging Analyses (TLAAs) for the period of extended operation.
During the review of the WCGS Unit 1 license renewal application (LRA) by the staff of the NRC, WCNOC made commitments related to aging management programs to manage aging effects for structures and components. The following pages list these commitments.  
 
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-2 Rev. 30 License Renewal Application A1  
 
==SUMMARY==
DESCRIPTIONS OF AGING MANAGEMENT PROGRAMS The integrated plant assessment and evaluation of time-limited aging analyses (TLAA) identified existing and new aging management programs necessary to provide reasonable assurance that components within the scope of License Renewal will continue to perform their intended functions consistent with the current licensing basis (CLB) for the period of extended operation. Sections A1 and A2 describe the programs and their implementation activities. Three elements common to all aging management programs discussed in Sections A1 and A2 are corrective actions, confirmation process, and administrative controls. These elements are included in the WCNOC Quality Assurance (QA) Program, which implements the requirements of 10 CFR 50, Appendix B and are applicable to the safety-related and nonsafety-related systems, structures and components that are subject to aging management review activities.
 
A1.1 ASME SECTION XI INSERVICE INSPECTION, SUBSECTIONS IWB, IWC, AND IWD ASME Section XI Inservice Inspection, Subsections IWB, IWC, & IWD inspections are performed to manage aging in Class 1, 2, and 3 piping and components within the scope of license renewal. The program includes periodic visual, surface, volumetric examinations and leakage tests of Class 1, 2 and 3 pressure-retaining components, including welds, pump casings, valve bodies, integral attachments, and pressure-retaining bolting. WCGS inspections meet ASME Section XI requirements and can manage aging such as cracking, surface and subsurface discontinuities, loss of material, loss of fracture toughness, and physical damage. The WCGS ISI Program is in accordance with 10 CFR 50.55a. In accordance with 10CFR 50.55a (g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest Edition and Addenda of the Code specified twelve months before the start of the inspection interval.
A1.2 WATER CHEMISTRY The Water Chemistry program includes maintenance of the chemical environment in the reactor coolant system and related auxiliary systems containing treated borated water and includes maintenance of the chemical environment in the steam generator secondary side and the secondary cycle systems to limit loss of material and cracking.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-3 Rev. 30 License Renewal Application The Water Chemistry Program is based upon the EPRI primary and secondary water chemistry guidelines.
A1.3 REACTOR HEAD CLOSURE STUDS The Reactor Head Closure Studs p rogram includes periodic visual, surface, and volumetric examinations of reactor vessel flange stud hole threads, reactor head closure studs, nuts, and washers and performs visual inspection of the reactor vessel flange closure during primary system leakage tests. The program implements ASME
 
Section XI code, Subsection IWB, same Edition and Addenda as the WCGS ISI Program per 10 CFR 50.55a(g)(4)(ii), and detects reactor vessel stud, nut and washer cracking, loss of material due to wear and corrosion, and reactor coolant leakage from the reactor vessel
 
flange.
A1.4 BORIC ACID CORROSION The Boric Acid Corrosion program manages loss of material due to boric acid corrosion. The program includes provisions to identify, inspect, examine and evaluate leakage, and initiate corrective actions. The program relies in part on implementation of
 
recommendations of NRC Generic Letter 88-05, "Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR plants."  Additionally, the program includes examinations conducted during ISI pressure tests performed in accordance with ASME Section XI requirements. The program addresses operating experience noted in NRC Regulatory Issue Summary 2003, "NRC Review of Responses to Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity."  Prior to the period of extended operation, procedures will be enhanced to state that susceptible components adjacent to potential leakage sources will include electrical components and connectors.
A1.5 NICKEL-ALLOY PENETRATION NOZZLES WELDED TO THE UPPER REACTOR VESSEL CLOSURE HEADS OF PRESSURIZED WATER
 
REACTORS Wolf Creek's Nickel Alloy Aging Management Program (A1.34) includes the Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors. 
 
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-4 Rev. 30 License Renewal Application A1.6 Flow-Accelerated Corrosion The Flow-Accelerated Corrosion (FAC) program manages aging effects of wall thinning due to FAC on the internal surfaces of carbon or
 
low alloy steel piping, elbows, reducers, expanders, and valve bodies which contain high energy fluids (both single phase and two phases).
The objectives of the FAC program are achieved by (a) identifying system components susceptible to FAC, (b) an analysis using a predictive code such as CHECWORKS to determine critical locations for inspection and evaluation, (c) providing guidance of follow-up inspections, (d) repairing or replacing components, as determined by the guidance provided by the program, and (e) continual evaluation and incorporation of the latest technologies, industry and plant in-house operating experience.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-5 Rev. 29 License Renewal Application Procedures and methods used by the FAC program are consistent with WCGS commitments to NRC Bulletin 87-01, "Thinning of Pipe Wall in Nuclear Power Plants," and NRC Generic Letter 89-08, "Erosion/Corrosion-Induced Pipe Wall Thinning." A1.7 BOLTING INTEGRITY The Bolting Integrity program manages the aging effects of cracking, loss of material, and loss of preload for pressure retaining bolting and ASME component support bolting. The program includes preload control, selection of bolting material, use of lubricants/sealants consistent with EPRI good bolting practices, and performance of periodic inspections for indication of aging techniques. The program also includes the inservice inspection requirements established in
 
accordance with ASME Section XI, Subsections IWB, IWC, IWD, and IWF for ASME Class bolting. WCGS good bolting practices are established in accordance with plant procedures. These procedures include requirements for proper disassembling, inspecting, and assembling of connections with threaded fasteners. The general practices that are established in this program are consistent with EPRI NP-5067, "Good Bolting Practices, Volume 1 and Volume 2," and EPRI TR-104213, "Bolted Joint Maintenance and Applications Guide." A1.8 STEAM GENERATOR TUBE INTEGRITY The Steam Generator Tube Integrity program includes the preventive measures, condition monitoring inspections, degradation assessment, repair and leakage monitoring activities necessary to manage cracking and loss of material. The aging management measures employed include non-destructive examination, visual inspection, sludge removal, tube plugging, in-situ pressure testing, maintaining the chemistry environment by removal of impurities and addition of chemicals to control pH and oxygen. NDE inspection scope and frequency, and primary to secondary leak rate monitoring are conducted consistent with the requirements of WCGS Unit 1 Technical Specifications. Structural integrity limits
 
consistent with Regulatory Guide 1.121, Revision 0, "Bases for Plugging Degraded PWR Steam Generator Tubes," are applied. Steam generator management practices are consistent with NEI 97-06 "Steam Generator Program Guidelines". Program deviations from NEI 97-06 Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-6 Rev. 29 License Renewal Application are prepared and approved in accordance with NEI 97-06 and EPRI steam generator management program guidance. A1.9 OPEN-CYCLE COOLING WATER SYSTEM The Open-Cycle Cooling Water (OCCW) System program manages loss of material and reduction of heat transfer for components exposed to
 
raw water. The program includes chemical treatment and control of biofouling; heat exchanger performance testing; and periodic inspections to ensure that the effects of aging will be managed on the OCCW systems or structures and components serviced by the OCCW systems for the period of extended operation. The program is consistent with commitments as established in WCGS responses to NRC Generic Letter 89-13 "Service Water System Problems Affecting Safety-Related Components." The Open-Cycle Cooling Water System program provides the general requirements for implementation and maintenance of programs and activities which mitigate aging of OCCW systems and components. The various aspects of the WCGS program (control, monitoring, maintenance and inspections) are implemented in station procedures. A1.10 CLOSED-CYCLE COOLING WATER SYSTEM The Closed-Cycle Cooling Water System Program manages loss of material, cracking, and reduction in heat transfer for components in closed cycle cooling water systems. The program includes maintenance of system corrosion inhibitor concentrations and chemistry parameters following the guidance of EPRI TR-107396 to minimize aging, and periodic testing and inspections to evaluate system and component performance. Inspection methods include visual, ultrasonic testing (UT) and eddy current testing (ECT).
Prior to the period of extended operation, a new periodic preventive maintenance activity will be developed to specify performing inspections of the internal surfaces of valve bodies and accessible piping while the valves are disassembled for operational readiness
 
inspections to detect loss of material and fouling. The acceptance criteria will be specified in this preventive maintenance activity. In addition, visual inspection procedures used for identification of stress corrosion cracking will be enhanced to define cracking, provide additional guidance for detection of cracking and identify specific acceptance criteria relating to "as-found" cracking.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-7 Rev. 29 License Renewal Application A1.11 INSPECTION OF OVERHEAD HEAVY LOAD AND LIGHT LOAD (RELATED TO REFUELING) HANDLING SYSTEMS The Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems program manages the loss of material due to corrosion and the effects of rail wear for all cranes, trolley
 
structural components and applicable rails within the scope of license renewal. The program is implemented through periodic visual inspections of components. Crane inspection activities verify structural integrity of the crane components required to maintain the crane intended function. Visual inspections assess conditions such as loss of material due to corrosion of structural members, misalignment, flaking, side wear of rails, loose tie down bolts and excessive wear or deformation of monorails. The inspection requirements are consistent with the guidance provided by NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" for load handling systems that handle heavy loads which can directly or indirectly cause a release of radioactive material, applicable industry standards (such as CMAA Spec 70 and ANSI B30.11) for other cranes within the scope of license renewal, and applicable OSHA regulations (such as 29 CFR Volume XVII, Part 1910 and Section 1910.179). Prior to the period of extended operation, procedures will be enhanced to identify industry standards or WCGS specifications that are applicable to the component and to specifically inspect for loss of material due to corrosion or rail wear. A1.12 FIRE PROTECTION The Fire Protection program manages loss of material for fire rated doors, fire dampers, diesel-driven fire pump, and the halon fire suppression system, cracking, spalling, and loss of material for fire barrier walls, ceilings, and floors, hardness and shrinkage due to weathering of fire barrier penetration seals, and hardness - loss of strength for halon fire suppression system flexible hoses.
Periodic visual inspections of fire barrier penetration seals, fire
 
dampers, fire barrier walls, ceilings and floors, and periodic visual inspections and functional tests of fire-rated doors are performed. The internal surface of the diesel-driven fire pump fuel
 
oil supply line is managed by the Fuel Oil Chemistry program (A1.14), which utilizes the One-Time Inspection program (A1.16) to verify the effectiveness of the Fuel Oil Chemistry program using a Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-8 Rev. 29 License Renewal Application representative sample of components in systems that contain fuel oil, ensuring that there is no loss of function due to aging of the fuel oil supply line. Drop tests on approximately 10 percent of accessible horizontal and vertical fire dampers are performed on an 18 month basis. Fire dampers that are inaccessible for drop testing are visually inspected to assess integrity/availability. Visual inspections are performed on fire-rated doors at least once per year to verify the integrity of door surfaces and for clearances to detect aging of the fire doors. A visual inspection and function test of the halon fire suppression system is performed every 18 months. Approximately 10 percent of each type (electrical and mechanical as practical) of penetration seal is visually inspected at least once every 18 months. Fire barrier walls, ceilings, and floors including coatings and wraps (structural steel fireproofing, raceway fire wrap and  
 
hatch covers) are visually inspected at least once every 18 months. Prior to the period of extended operation, fire damper inspection and drop test procedures will be enhanced to inspect damper housing for signs of corrosion and to specify fire barriers and doors described in USAR Appendix 9.5A, "WCGS Fire Protection Comparison to APCSB 9.5-1 Appendix A," and WCGS Fire Hazards Analysis. Training for technicians performing the fire door and fire damper visual  
 
inspections will be enhanced to include fire protection inspection requirements and training documentation.
Prior to the period of extended of operation, halon fire suppression system inspection procedures will be enhanced to include visual inspection of halon tank flexible hoses for hardening - loss of strength. Visual inspections would not be required for flexible hoses that have scheduled periodic replacement intervals. A1.13 FIRE WATER SYSTEM The Fire Water System program manages loss of material for water-based fire protection systems. Periodic hydrant inspections, fire main flushing, sprinkler inspections, and flow tests are performed  
 
considering applicable National Fire Protection Association (NFPA) codes and standards. Nuclear Electric Insurance Limited (NEIL) performance based guidance is utilized for fire protection system inspection, testing, and maintenance intervals. The fire water system discharge pressure is continuously monitored such that loss of system pressure is immediately detected and corrective actions Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-9 Rev. 29 License Renewal Application are initiated. The Fire Water System program conducts an air or water flow test through each open head spray/sprinkler head to verify that each open head spray/sprinkler nozzle is unobstructed.
The Fire Water System program tests a representative sample of fire protection sprinkler heads or replaces those that have been in service for 50 years, using the guidance of NFPA 25, 2002 Edition, and tests at 10 year intervals thereafter during the period of extended operation to ensure that signs of aging are detected in a timely manner. Visual inspections of the fire protection system exposed to water, evaluating wall thickness to identify evidence of loss of material due to corrosion, are covered by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (A1.22). A1.14 FUEL OIL CHEMISTRY The Fuel Oil Chemistry program manages loss of material on the internal surface of components in the emergency diesel fuel oil storage and transfer system and diesel fire pump fuel oil system.
The program includes (a) surveillance and monitoring procedures for maintaining fuel oil quality by controlling contaminants in accordance with applicable ASTM Standards, (b) periodic draining of  
 
water from fuel oil tanks, (c) visual inspection of internal surfaces during periodic draining and cleaning of fuel oil tanks in the emergency diesel fuel oil storage and transfer system, (d) ultrasonic wall thickness measurements from external surfaces of fuel oil tanks, (e) one-time ultrasonic (UT) or pulsed eddy current (PEC) thickness examination on the external surface of the diesel fire pump fuel oil tank, (f) inspection of new fuel oil before it is introduced into the storage tanks, and (g) one-time inspections of a representative sample of components in systems that contain fuel oil  
 
by the One-Time Inspection program.
Prior to the period of extended operation, the emergency fuel oil day tanks will be added to the ten year drain, clean, and internal inspection program. Procedures will be enhanced to provide for supplemental ultrasonic thickness measurements if there are indications of reduced cross sectional thickness found during the visual inspection of the emergency fuel oil storage tanks.  
 
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-10 Rev. 29 License Renewal Application A1.15 Reactor Vessel Surveillance The Reactor Vessel Surveillance program is consistent with ASTM E 185. Actual reactor vessel coupons are used, but an exemption in the original license permits use of other than beltline weld material for the weld coupons. The surveillance coupons are tested by a qualified offsite vendor, to its procedures. The testing program and reporting conform to requirements of 10 CFR 50 Appendix H. The schedule has been revised by removal of the last two coupon sets to the spent fuel pool, at exposures greater than those expected at the beltline wall at 60 years. This withdrawal therefore meets the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life. Vessel fluence is now determined by ex-vessel dosimetry. This schedule change has been approved by the NRC, as required by 10 CFR 50 Appendix H, "Reactor Vessel Material Surveillance Program  
 
Requirements." A1.16 ONE-TIME INSPECTION The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of  
 
the Water Chemistry program (A1.2), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging  
 
effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer. The One-Time Inspection program determines non-destructive examination (NDE)  
 
sample size for each material-environment group using established statistical methodologies and selects piping/component inspection locations within the sample that are based on service period, operating conditions, and design margins. The One-Time Inspection program specifies corrective actions and increased sampling of components if aging effects are found.
This new program will be implemented and completed within the ten year period prior to the period of extended operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-11 Rev. 29 License Renewal Application A1.17  Selective Leaching of Materials The Selective Leaching of Materials program manages the loss of material due to selective leaching for brass (>15% zinc) and gray cast iron components exposed to raw water or closed-cycle cooling water within the scope of license renewal. The Selective Leaching of Materials program is in addition to the Open Cycle Cooling Water  
 
program and the Closed Cycle Cooling Water program in these cases. The program includes a one-time inspection (visual and mechanical methods) of a selected sample of component internal surfaces to determine whether loss of material due to selective leaching is occurring. If indications of selective leaching are confirmed, follow up examinations or evaluations are performed.
The Selective Leaching of Materials program is a new program that will be implemented prior to the period of extended operation. A1.18 BURIED PIPING AND TANKS INSPECTION The Buried Piping and Tanks Inspection program manages loss of material of buried components in the essential service water system, emergency diesel engine fuel oil storage and transfer system, auxiliary feedwater system, high pressure coolant injection system (borated refueling water storage system), and the fire protection system. Visual inspections monitor the condition of protective  
 
coatings and wrappings found on carbon steel, gray cast iron or ductile iron components and assess the condition of stainless steel components with no protective coatings or wraps. The program includes opportunistic inspection of buried piping and tanks as they are excavated or on a planned basis if opportunistic inspections have not occurred. The Buried Piping and Tanks Inspection program is a new program that will be implemented prior to the period of extended of operation.
Within the ten year period prior to entering the period of extended operation, an opportunistic or planned inspection will be performed.
Within the ten year period prior to entering the period of extended operation, an opportunistic or planned inspection will be performed.
Upon entering the period of extended operation a planned inspection within ten years will be required unless an opportunistic inspection has occurred within this ten year period.
Upon entering the period of extended operation a planned inspection within ten years will be required unless an opportunistic inspection has occurred within this ten year period.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-12 Rev. 30 License Renewal Application A1.19 ONE-TIME INSPECTION OF ASME CODE CLASS 1 SMALL-BORE PIPING The One-Time Inspection of ASME Code Class 1 Small-Bore Piping program manages cracking of stainless steel ASME Code Class 1 piping less than or equal to 4 inches and greater than or equal to 1 inch. This program is a part of the WCGS Risk-Informed Inservice Inspection (RI-ISI) program. For ASME Code Class 1 small-bore piping, the RI-ISI program requires volumetric examinations (by ultrasonic testing) on selected weld locations to detect cracking. Weld locations are selected based on the guidelines provided in EPRI TR-112657. Ultrasonic examinations are conducted in accordance with ASME Section XI with acceptance criteria from Paragraph IWB-3131 and IWB-2430. The fourth interval of the ISI program at WCGS will provide the results for the one time inspection of ASME Code Class 1 small-bore piping. A1.20 EXTERNAL SURFACES MONITORING PROGRAM The External Surfaces Monitoring Program manages loss of material for external surfaces of steel components and hardening and loss of strength for elastomers in ventilation and mechanical systems. The External Surfaces Monitoring Program consists of periodic visual inspections for aging management of loss of material, leakage, elastomer hardening and loss of strength. Loss of material for external surfaces is managed by the Boric Acid Corrosion program (A1.4) for components in a system with treated borated water or reactor coolant environment on which boric acid corrosion may occur, Buried Piping and Tanks Inspection program (A1.18) for buried components, and Structures Monitoring Program (A1.32) for supports, structural items, and electrical components. A1.21 FLUX THIMBLE TUBE INSPECTION The Flux Thimble Tube Inspection program performs wall thickness eddy current testing of all flux thimble tubes that form part of the reactor coolant system pressure boundary. The pressure boundary includes the length of the tube inside the reactor out to the seal fittings outside the reactor vessel. Eddy current testing is performed on the portion of the tubes inside the reactor vessel.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-12 Rev. 30 License Renewal Application A1.19 ONE-TIME INSPECTION OF ASME CODE CLASS 1 SMALL-BORE PIPING The One-Time Inspection of ASME Code Class 1 Small-Bore Piping program manages cracking of stainless steel ASME Code Class 1 piping less than or equal to 4 inches and greater than or equal to 1 inch. This program is a part of the WCGS Risk-Informed Inservice  
Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-13 Rev. 30 License Renewal Application  The program implements the recommendations of NRC Bulletin 88-09, "Thimble Tube Thinning in Westinghouse Reactors." During each refueling outage, flux thimble tube wear is evaluated and inspections are performed based on evaluation results. Wall thickness measurements are trended and wear rates are calculated. If the predicted wear (as a measure of percent through wall) for a given flux thimble tube is projected to exceed the established acceptance criteria prior to the next outage, corrective actions are taken to reposition, cap or replace the tube. A1.22 INSPECTION OF INTERNAL SURFACES IN MISCELLANEOUS PIPING AND DUCTING COMPONENTS The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program manages cracking, loss of material and hardening - loss of strength. Visual inspections of the internal surfaces of piping, piping components, ducting and other components that are not covered by other aging management programs is included in this program. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program uses the work control process to conduct and document inspections. The program performs visual inspections during periodic maintenance, predictive maintenance, surveillance testing and corrective maintenance to detect aging effects that could result in a loss of component intended function. For those systems or components where inspections of opportunity are insufficient, an inspection will be conducted prior to the period of extended operation to provide reasonable assurance that the intended functions are maintained. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program is a new program that will be implemented prior to the period of extended operation. A1.23 LUBRICATING OIL ANALYSIS The Lubricating Oil Analysis program manages loss of material and reduction of heat transfer for components within the scope of license renewal. The program maintains lubricating oil contaminants Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-14 Rev. 29 License Renewal Application  Additionally, ferrography is performed on oil samples for trending of wear particle concentrations for the reactor coolant pumps upper and lower bearing oil and other components. Monitoring and trending of lubricating oil analysis results identifies component aging prior to loss of component intended function. A1.24 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the aging effects of embrittlement, melting, cracking, swelling, surface contamination, or discoloration to ensure that electrical cables and connections not subject to the environmental qualification (EQ) requirements of 10 CFR 50.49 and within the scope of license renewal are capable of performing their intended functions. Non-EQ cables and connections within the scope of license renewal in accessible areas with an adverse localized environment are inspected. The inspections of Non-EQ cables and connectors in accessible areas are representative, with reasonable assurance, of cables and connections in inaccessible areas with an adverse localized environment. At least once every ten years, the Non-EQ cables and connections within the scope of license renewal in accessible areas are visually inspected for embrittlement, melting, cracking, swelling, surface contamination, or discoloration. The acceptance criterion for visual inspection of accessible Non-EQ cable jacket and connection insulating material is the absence of anomalous indications that are signs of degradation. Corrective actions for conditions that are adverse to quality are performed in accordance with the corrective action program as part of the QA program. The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program is a new program that will be implemented prior to the period of extended operation.
 
Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-15 Rev. 30 License Renewal Application  A1.25 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS USED IN INSTRUMENTATION CIRCUITS The scope of this program includes the cables and connections used in sensitive instrumentation circuits with sensitive, high voltage low-level signals within the Ex-core Neutron Monitoring System including the source range, intermediate range, and power range monitors. This program provides reasonable assurance that the intended function of cables and connections used in instrumentation circuits with sensitive, low-level signals that are not subject to the environmental qualification requirements of 10 CFR 50.49 and are exposed to adverse localized environments caused by heat, radiation, or moisture are maintained consistent with the current licensing basis through the period of extended operation. In most areas, the actual ambient environments (e.g., temperature, radiation, or moisture) are less severe than the plant design environment for those areas. Cable testing is used to manage the aging of the cable insulation and connections so that instrumentation circuits perform their intended functions. A cable system test for deleting deterioration of the cable insulation and connections will be performed. The test frequency shall be at least once every 10 years with the first test being completed before the period of extended operation. A1.26 INACCESSIBLE MEDIUM VOLTAGE CABLES NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program manages the aging effects of inaccessible medium voltage cables within the scope of license renewal exposed to adverse localized environments caused by significant moisture simultaneously with significant voltage. All cable manholes that contain in-scope Non-EQ inaccessible medium voltage cables will be inspected for water collection. Collected water will be removed as required. This inspection and water removal will be performed based on actual plant experience with the Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-16 Rev. 29 License Renewal Application  frequency being at least once every five years for electrical manholes with sump pumps. The program provides for testing of in-scope Non-EQ inaccessible medium voltage cables to provide an indication of the conductor insulation condition. At least once every ten years, a polarization index test as described in EPRI TR-103834-P1-2 or other testing that is state-of-the-art at the time of the testing is performed. The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program is a new program that will be implemented prior to the period of extended operation. A1.27 ASME SECTION XI, SUBSECTION IWE The ASME Section XI, Subsection IWE containment inservice inspection program provides aging management of the steel liner of the concrete containment building, including the containment liner plate, piping and electrical penetrations, access hatches, and the fuel transfer tube. Inspections are performed to identify and manage any containment liner aging effects that could result in loss of intended function. Acceptance criteria for components subject to Subsection IWE exam requirements are specified in Article IWE-3000.
Inspection (RI-ISI) program.
In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS CISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of the Code specified twelve months before the start of the inspection interval. A1.28 ASME SECTION XI, SUBSECTION IWL The ASME Section XI, Subsection IWL containment inservice inspection program manages aging of the concrete containment structure (including the tendon gallery ceiling), the concrete dome, and the post-tensioning system. Inspections are performed to identify and manage any containment concrete aging effects that could result in loss of intended function. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of the Code specified twelve months before the start of the inspection interval.
For ASME Code Class 1 small-bore piping, the RI-ISI program requires volumetric examinations (by ultrasonic testing) on selected weld  
Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-17 Rev. 29 License Renewal Application  Prior to the period of extended operation, procedures will be enhanced to include two new provisions regarding inspection of repair/replacement activities. A1.29 ASME SECTION XI, SUBSECTION IWF The ASME Section XI, Subsection IWF program manages aging effects that could result in loss of intended function for Class 1, 2 and 3 component supports. There are no Class MC supports at WCGS. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of the Code specified twelve months before the start of the inspection interval. A1.30 10 CFR 50, APPENDIX J The 10 CFR Part 50, Appendix J program monitors leakage rates through the containment pressure boundary, including the penetrations and access openings, in order to detect degradation of containment pressure boundary. Seals, gaskets, and bolted connections are also monitored under the program. Containment leak rate tests are performed in accordance with 10 CFR 50 Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors" Option B; Regulatory Guide 1.163, Revision 0, "Performance-Based Containment Leak-Testing Program," NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50 Appendix J; and ANSI/ANS 56.8, "Containment System Leakage Testing Requirements."  Containment leak rate tests are performed to assure that leakage through the primary containment, and systems and components penetrating primary containment does not exceed allowable leakage limits specified in the Technical Specifications. Corrective actions are taken if leakage rates exceed established administrative limits for individual penetrations or the overall containment pressure boundary. A1.31 MASONRY WALL PROGRAM The Masonry Wall Program, which is part of the Structures Monitoring Program, manages aging of masonry walls, and structural steel Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-18 Rev. 29 License Renewal Application  restraint systems of the masonry walls, within scope of license renewal based on guidance provided in IE Bulletin 80-11, "Masonry Wall Design" and NRC Information Notice 87-67, "Lessons Learned from Regional Inspections of Licensee Actions in Response to NRC IE Bulletin 80-11."  The Masonry Wall Program contains inspection Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-19 Rev. 29 License Renewal Application  guidelines and lists attributes that cause aging of masonry walls, which are to be monitored during structural monitoring inspections, as well as establishes examination criteria, evaluation requirements, and acceptance criteria. Prior to the period of extended operation, procedures will be enhanced to identify unreinforced masonry in the radwaste building within the scope of license renewal that requires aging management. A1.32 STRUCTURES MONITORING PROGRAM The Structures Monitoring Program manages the cracking, loss of material, and change in material properties by monitoring the condition of structures and structural supports that are within the scope of license renewal. The Structures Monitoring Program implements the requirements of 10 CFR 50.65 and is consistent with the guidance of NUMARC 93-01, Revision 2 and Regulatory Guide 1.160, Revision 2. The Structures Monitoring Program provides inspection guidelines and walkdown checklists for concrete elements, structural steel, masonry walls, treated wood, structural features (e.g., caulking, sealants, roofs, etc.), structural supports, and miscellaneous components such as doors. The Structures Monitoring Program includes all masonry walls within the scope of license renewal. The Structures Monitoring Program also inspects supports for equipment, piping, conduit, cable tray, HVAC, and instrument components. The Structures Monitoring Program monitors groundwater for pH, sulfates, and chlorides. Prior to the period of extended operation, procedures will be enhanced to add inspection parameters for treated wood, to add the disconnect enclosure and foundation in the switchyard, and to monitor groundwater for pH, sulfates, and chlorides. Two samples of groundwater will be tested every five years. A1.33 RG 1.127, INSPECTION OF WATER-CONTROL STRUCTURES ASSOCIATED WITH NUCLEAR POWER PLANTS The Regulatory Guide 1.127, Inspection of Water Control Structures Associated with Nuclear Power Plants program manages aging due to extreme environmental conditions and the effects of natural Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-20 Rev. 30  License Renewal Application  phenomena that may affect water-control structures. WCGS meets the recommendations of Regulatory Guide 1.127, Revision 1. This program includes inspection and surveillance activities for dams, slopes, canals, and other water-control structures associated with emergency cooling water systems or flood protection.
 
The program includes periodic visual inspections of in-scope concrete structures, periodic monitoring of the hydraulic and structural condition of the Ultimate Heat Sink (UHS), as well as associated structures, main dam service spillway, and auxiliary spillway, periodic dredging of the UHS reservoir and channel connecting the reservoir to the essential service water pumphouse, and survey of the UHS dam for vertical movement.
locations to detect cracking. Weld locations are selected based on the guidelines provided in EPRI TR-112657. Ultrasonic examinations are conducted in accordance with ASME Section XI with acceptance  
Prior to the period of extended operation, procedures will be enhanced so that the main dam service spillway and the auxiliary spillway will be inspected in accordance with the same specification, to clarify the scope of inspections for the spillways, to add the 5 year inspection frequency for the main dam service spillway, and to add cavitation to the list of concrete aging effects for surfaces other than spillways.
 
A1.34 NICKEL ALLOY AGING MANAGEMENT PROGRAM  The Nickel Alloy Aging Management Program manages cracking due to primary water stress corrosion cracking in all plant locations that contain Alloy 600, with the exception of steam generator tubing (aging management of steam generator tubing is performed by the Steam Generator Tubing Integrity program (B2.1.8)). Aging management requirements for nickel alloy penetration nozzles welded to the upper reactor vessel closure head noted in the Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors program (B2.1.5) are included here. This includes reactor coolant system (RCS) pressure boundary, RCS non-pressure boundary, and ESF locations.
criteria from Paragraph IWB-3131 and IWB-2430.
The Nickel Alloy Aging Management Program uses inspections, mitigation techniques, repair/replace activities and monitoring of operating experience to manage the aging of Alloy 600 at WCGS. Detection of indications is accomplished through a variety of examinations consistent with ASME Section XI Subsections IWB and IWC, and ASME Code Cases N-729-1, N-770-1 & N-722-1 with conditions  as published in 10 CFR 50.55(a).
The fourth interval of the ISI program at WCGS will provide the results for the one time  
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-21 Rev. 30 License Renewal Application  Mitigation techniques are implemented when appropriate to preemptively remove conditions that contribute to primary water stress corrosion cracking. Repair/replacement activities are performed to proactively remove or overlay Alloy 600 material, or as a corrective measure in response to an unacceptable flaw in the material. The Wolf Creek Nickel Alloy Aging Management Program will be supplemented with implementation of applicable (1) ASME Code Cases  N-729-1, N-770-1 & N-722-1 with conditions as published in 10 CFR 50.55 (a) and (2) staff-accepted industry guidelines, and (3) participation in industry initiatives, such as owners group programs and the EPRI Materials Reliability Program, for managing aging effects associated with nickel alloys. If flaws attributed to PWSCC have been identified, whether acceptable or not for continuous service under paragraph 3130 or 3140 of ASME Code case N-729-1, the re-inspection interval must be each refueling outage instead of re-inspection interval required by Table 1 Note 8 of ASME Code Case N-729-1 commencing from the same outage in which flaw is detected. A1.35 REACTOR COOLANT SYSTEM SUPPLEMENT  Section 3.1 of NUREG-1800, "Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and 10 CFR 50.55a supplements the aging management programs for the reactor coolant system components with the following additional requirements. WCNOC will: A. Reactor Coolant System Nickel Alloy Pressure Boundary Components A final rule updating 10 CFR 50.55a requires following ASME Code Cases N-722-1, N-729-1, and N-770-1 as conditioned by 10 CFR 50.55a, and  B. Reactor Vessel Internals Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-22 Rev. 29 License Renewal Application  (1) Participate in the industry programs for investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of the industry programs as applicable to the reactor internals; and (3) upon completion of these programs, but not less than 24 months before entering the period of extended operation, WCNOC will submit an inspection plan for reactor internals to the NRC for review and approval. A1.36 ELECTRICAL CABLE CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the effects of loosening of bolted connections due to thermal cycling, ohmic heating, electrical transients, vibration, chemical contamination, corrosion, and oxidation. A representative sample of electrical cable connections not subject to 10 CFR 50.49 environmental qualification requirements within the scope of license renewal is infrared thermography tested as part of the WCGS predictive maintenance. The sample is based upon application, circuit loading and environment. Infrared thermography testing is being performed at least once every 10 years. Prior to the period of extended operation, the infrared thermography testing procedure will be enhanced to require an engineering evaluation when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, and the likelihood of recurrence. A one-time inspection of a representative sample of low voltage low current or low load connections will be performed prior to the period of extended operation. The technical basis for the selected sample will be documented and based upon application (low voltage), circuit loading (low current or low load), and environment (plant indoor air and outdoor air). An engineering evaluation will be performed when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, the likelihood of recurrence and the need to expand the sample size and/or frequency of the inspection.
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-23 Rev. 29 License Renewal Application  A2 SUMMARY DESCRIPTIONS OF TIME-LIMITED AGING ANALYSIS AGING MANAGEMENT PROGRAMS A2.1 METAL FATIGUE OF REACTOR COOLANT PRESSURE BOUNDARY The WCGS Metal Fatigue of the Reactor Coolant Pressure Boundary program ensures that actual plant experience remains bounded by the assumptions used in the deesign calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring results indicate that none of the design transients should occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and that fatigue usage factors should remain below the code allowable limit of 1.0, including effects of the reactor coolant environment as described by NUREG/CR-6260. Prior to the period of extended operation, the Metal Fatigue of Reactor Coolant Pressure Boundary program will be enhanced to include:  A cycle count action limit and corrective actions. An action limit will be established that requires corrective action when the cycle count for any of the critical thermal and pressure transients is projected to reach a stated percentage of the design-specified number of cycles before the end of the next fuel cycle. If this action limit is reached, acceptable corrective actions include: 1. Review of fatigue usage calculations  To determine whether the transient in question contributes significantly to CUF. To identify the components and analyses that are affected by the transient in question. To ensure that the analytical bases of the leak-before-break (LBB) fatigue crack propagation analysis and of the high-energy line break (HELB) locations are maintained. 2. Evaluation of remaining margins on CUF based on cycle-based or stress-based CUF calculations using the WCGS fatigue management program software.
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-24 Rev. 29 License Renewal Application  3. Redefinition of the specified number of cycles (e.g., by reducing specified numbers of cycles for other transients and using the margin to increase the allowed number of cycles for the transient that is approaching its specified number of cycles). A cumulative fatigue usage action limit and corrective actions. An action limit will be established that requires corrective action when calculated CUF (from cycle-based or stress-based monitoring) for any monitored location is projected to reach 1.0 within the next 2 or 3 fuel cycles. If this action limit is reached acceptable corrective actions include: 1. Determine whether the scope of the monitoring program must be enlarged to include additional affected reactor coolant pressure boundary locations. This determination will ensure that other locations do not approach design limits without an appropriate action. 2. Enhance fatigue monitoring to confirm continued conformance to the code limit. 3. Repair the component. 4. Replace the component.
: 5. Perform a more rigorous analysis of the component to demonstrate that the design code limit will not be exceeded. 6. Modify plant operating practices to reduce the fatigue usage accumulation rate. 7. Perform a flaw tolerance evaluation and impose component-specific inspections, under ASME Section XI Appendices A or C (or their successors), and obtain required approvals by the NRC. These corrective actions are equally applicable to the WCGS NUREG/CR-6260 locations described in Section A3.2.3, "Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components," including consideration of the effects of the reactor coolant environment.
Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-25 Rev. 29 License Renewal Application  10 CFR 50 Appendix B procedural and record requirements. Validation of the presence of absence of charging nozzle thermal sleeves. If sleeves are not present, the fatigue monitoring program analysis for the charging nozzle will be re-performed. A fatigue monitoring program updated baseline for the pressurizer hot leg surge nozzle based on the additional insurge/outsurge cycles accumulated in a pre-MOP environment. Additionally, the fatigue monitoring program baseline for the charging nozzles will be updated with consideration for the differential contribution of fatigue for each category of charging event. A2.2 ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS The Environmental Qualification (EQ) of Electrical Components program manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f) qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the aging limits established in the evaluation. The Environmental Qualification (EQ) of Electrical Components program is consistent with the requirements of 10 CFR 50.49, and the guidance of NUREG-0588, "Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment" and Regulatory Guide 1.89, "Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants", Revision 1 for maintaining qualification of equipment. A2.3 CONCRETE CONTAINMENT TENDON PRESTRESS The Concrete Containment Tendon Prestress program, within the WCGS Creek ASME Section XI Subsection IWL Program, manages the loss of tendon prestress in the post-tensioning system. The WCGS post-tensioning system consists of inverted U-shaped tendons, extending up through the basemat, through the full height of the cylindrical walls and over the dome; and horizontal circumferential (hoop) tendons, at intervals from the basemat to about the 45-degree elevation of the dome. The basemat is Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-26 Rev. 29 License Renewal Application  conventionally reinforced. The tendons are ungrouted, in grease- filled glands. Prior to the period of extended operation, procedures will be revised to extend the list of surveillance tendons to include random samples for the 40, 45, 50, and 55 year surveillances, to explicitly require a regression analysis for each tendon group after every surveillance; and to invoke and describe regression analysis methods used to construct the lift-off trend lines. Surveillance program predicted force lines for the vertical and hoop tendon groups will be extended to 60 years. Procedure descriptions of acceptance criteria action levels will be revised to conform to the ASME Code, Subsection IWL 3221 descriptions.   


Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-27 Rev. 29 License Renewal Application  A3 EVALUATION SUMMARIES OF TIME-LIMITED AGING ANALYSES 10 CFR 54.21(c) requires that an applicant for a renewed license identify time-limited aging analyses (TLAAs) and evaluate them for the period of extended operation. The following TLAAs have been identified and evaluated for WCGS. A3.1 REACTOR VESSEL NEUTRON EMBRITTLEMENT Ferritic materials of the reactor vessel are subject to embrittlement (loss of fracture toughness) due to high-energy neutron exposure. The following predictions of neutron fluence and of its embrittlement effects are TLAAs:  Neutron Fluence, Upper Shelf Energy, Adjusted Reference Temperature (Fluence, USE, and ART)  Pressurized Thermal Shock (PTS) Reactor Vessel Thermal Limit Analysis and Pressure-Temperature (P-T) Limits  Low Temperature Overpressure Protection (LTOP) The Reactor Vessel Surveillance program is described in Section A1.15. A3.1.1 Neutron Fluence, Upper Shelf Energy and Adjusted Reference Temperature (Fluence, USE, and ART) Fluence Neutron embrittlement depends on lifetime fluence of neutrons with energies greater than 1 MeV. The original design basis estimate for expected end-of-life fluence has been increased to account for increased unit rating and for increased plant capacity factors, but also reduced for low-leakage core loadings. WCGS has evaluated projected fluences and their uncertainties based on the guidance of Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence,"
inspection of ASME Code Class 1 small-bore piping. A1.20 EXTERNAL SURFACES MONITORING PROGRAM The External Surfaces Monitoring Program manages loss of material for external surfaces of steel components and hardening and loss of strength for elastomers in ventilation and mechanical systems. The External Surfaces Monitoring Program consists of periodic visual inspections for aging management of loss of material, leakage, elastomer hardening and loss of strength. Loss of material for external surfaces is managed by the Boric Acid Corrosion program (A1.4) for components in a system with treated borated water or reactor coolant environment on which boric acid corrosion may occur, Buried Piping and Tanks Inspection program (A1.18) for buried components, and Structures Monitoring Program (A1.32) for supports, structural items, and electrical components. A1.21 FLUX THIMBLE TUBE INSPECTION The Flux Thimble Tube Inspection program performs wall thickness eddy current testing of all flux thimble tubes that form part of the reactor coolant system pressure boundary.
Revision 0. The 1/4-t and 3/4-t fluences in the vessel wall were also projected consistent with Regulatory Guide 1.99, "Radiation Damage Wolf Creek  Appendix A USAR Supplement  Wolf Creek Generating Station Page 18A-28 Rev. 29 License Renewal Application  to Reactor Vessel Materials," Revision 2, Section 1.1, Equation 3, attenuation. The evaluation also projected the alternative displacements-per-iron atom (dpa) measure of embrittlement to 54 EFPY using methods consistent with ASTM E853 and E693, in support of dpa assessments consistent with Regulatory Guide 1.99, Revision 2. Since the W and Z coupon exposure has now exceeded that expected at the end of the extended period of operation, these capsules have been removed to the spent fuel pool, and vessel neutron fluence is now confirmed by ex-vessel dosimetry. USE and ART For reactor vessel materials, 10 CFR 50 Appendix G requires the predicted end-of-life Charpy impact test upper-shelf absorbed energy (USE) to be at least 50 ft-lb, unless an approved analysis supports a lower value. The 60 year end-of-life USE and adjusted reference temperature (ART) of the limiting material was confirmed from test of the X-capsule coupons, with exposures nearly equal to the projected 54 EFPY, 60-year vessel wall fluence. The examination methods were consistent with 10 CFR 50 Appendices G and H, ASTM E185-82, and Westinghouse procedures. The X-coupon analysis demonstrates more-than-adequate EOL USE, and indicates that ART for the limiting material will remain modest and will permit adequate operating margins to P-T limits until the end of a 60-year period of extended operation. See Section A3.1.3 for P-T limits. A3.1.2 Pressurized Thermal Shock (PTS) If the reference temperature for pressurized thermal shock (RTPTS) for each heat of material of the reactor pressure vessel does not exceed 270 &#xba;F for plates, forgings, and axial welds; or 300 &#xba;F for circumferential welds (the PTS screening criteria), only the reactor pressure vessel is "relied on to demonstrate compliance" with the 10 CFR 50.61 PTS rule. RTPTS for the limiting material has been projected to remain well below its screening criterion until the end of a 60-year period of extended operation. The reactor pressure vessel therefore meets the PTS screening criteria and will continue to do so for the period of extended operation. Therefore no safety analysis by Regulatory Guide 1.154, "Format and Content of Plant-Specific Pressurized Thermal Shock Safety Analysis Reports for Pressurized Water Reactors," Revision 0, alternative methods is required, and the vessel is therefore the only component relied upon Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-29 Rev. 29 License Renewal Application  to demonstrate compliance with 10 CFR 50.61 throughout the period of extended operation. A3.1.3 Pressure-Temperature (P-T) Limits 10 CFR 50 Appendix G requires a reactor vessel thermal limit analysis to determine operating pressure-temperature limits for heatup, cooldown, criticality, and inservice leakage and hydrostatic testing. The resulting P-T limit curves are operating limits, conditions of the operating license, and are included in the Pressure and Temperature Limits Report (PTLR), as required by Technical Specifications. Because of the relationship between the operating pressure-temperature limits and the fracture toughness transition of the reactor vessel, the thermal limits analysis is valid only up to a stated vessel fluence limit. The currently-applicable PTLR is valid  up to 54 EFPY. A3.1.4 Low Temperature Overpressure Protection (LTOP) LTOP is required by Technical Specifications and is provided (in part) by the cold overpressurization mitigation system (COMS), which opens the power-operated relief valves at a setpoint determined by the currently-applicable pressure-temperature limits analysis. The COMS setpoint is established in the Pressure and Temperature Limits Report (PTLR), Section A3.1.3. A3.2 METAL FATIGUE This section describes:  ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components  ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure  Vessel Internals Wolf Creek  Appendix A  USAR Supplement    Wolf Creek Generating Station Page 18A-30 Rev. 29 License Renewal Application   Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190  Assumed Thermal Cycle Count for Allowable Secondary Stress Range Reduction Factor in B31.1 and ASME Section III Class 2 and 3 Piping  Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic Events  Fatigue Design and Analysis of Class IE Electrical Raceway Support Angle Fittings for Seismic Events At WCGS, no vessels, heat exchangers, or pumps were designed to ASME Section III Class 2 or 3, or ASME VIII Division 2 rules that required design for a stated number of load cycles. Basis of Fatigue Analyses ASME Section III Class 1 design specifications define a design basis set of static and transient load conditions. The design number of each transient was selected to be somewhat larger than expected to occur during the 40-year licensed life of the plant, based on operating experience, and on projections of future operation based on innovations in the system designs. Although original design specifications commonly state that the transients are for a 40-year design life, the fatigue analyses themselves are based on the specified number of occurrences of each transient rather than on this lifetime. Fatigue Management Program The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that actual plant experience remains bounded by the assumptions used in the design calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring cycle counts indicate that none of the design transients will occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and consequently, that the fatigue analysis TLAAs based on those transients will remain valid for the period of extended operation.
The pressure boundary includes the length of the tube inside the reactor out to the seal fittings outside the reactor vessel. Eddy current testing is performed on the portion of the tubes inside the reactor vessel.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-31 Rev. 29 License Renewal Application   A3.2.1 ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components Fatigue analyses exist for ASME  Section III Division 1 Class 1 piping, vessels, steam generators, pumps, and valves. The reactor vessel internals are not designed to ASME Section III Class 1 but are analyzed to ASME Section III Subsection NG. See Section A3.2.2. A3.2.1.1 Reactor Pressure Vessel, Nozzles, Head, and Studs The WCGS reactor vessel is designed to ASME Section III, Subsection NB (Class 1), 1971 Edition with addenda through Winter 1972. The analysis has been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate and Thot reduction, minor modifications, and possible operating contingencies. See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and reactor vessel. The reactor vessel primary coolant inlet and outlet nozzles and lower-head-to-shell juncture are evaluated for effects of the reactor coolant environment on fatigue behavior of these materials, consistent with the guidance of NUREG/CR-06260. See Section A3.2.3 of this document. Fatigue usage factors in the reactor vessel pressure boundary do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients and on boltup. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.2 Control Rod Drive Mechanism (CRDM) Pressure Housings, Adapter Plugs, and Canopy Seals The CRDM housings are designed to ASME Section III, Subsection NB (Class 1), 1974 Edition with addenda through Winter 1974. The analysis of pressure-retaining components was reexamined for the power rerate and Thot reduction modification, and for addition of Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-32 Rev. 29 License Renewal Application   canopy seal clamp assemblies. The fatigue usage factors for the CRDM pressure housings, adapter plugs, and canopy seals have been evaluated and projected to remain below the ASME Code allowable of 1.0 for 60 years. A3.2.1.3 Reactor Coolant Pump Pressure Boundary Components The pump pressure boundary was designed to ASME Section III, 1971 edition with addenda through Summer 1973. Subarticle NB-3400, "Design of Class 1 Pumps," of this edition and addenda, does not require a fatigue analysis, but the nuclear steam supply vendor specified a fatigue analysis. Low stresses permitted a fatigue waiver analysis for many pump components. These fatigue and fatigue waiver analyses have been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor modifications. Fatigue usage factors in the reactor coolant pumps do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.4 Pressurizer and Pressurizer Nozzles The WCGS pressurizer is designed to ASME Section III, Subsection NB (Class 1), 1974 Edition. The analysis has been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate and Thot reduction, and minor modifications; including the effects of thermal stratification in the lower head, surge nozzle, and surge line discussed in NRC Bulletin 88-11. The pressurizer surge nozzle and lower head may be subject to significant operating thermal stress cycles due to thermal stratification and insurge-outsurge cycles, and are therefore expected to be the limiting pressurizer components for fatigue. The fatigue usage factors of these locations are specifically monitored. The expected usage factors in these locations should be acceptable for 60 years of operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-13 Rev. 30 License Renewal Application The program implements the recommendations of NRC Bulletin 88-09, "Thimble Tube Thinning in Westinghouse Reactors." During each refueling outage, flux thimble tube wear is evaluated and inspections are performed based on evaluation results. Wall thickness measurements are trended and wear rates are calculated.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-33 Rev. 29 License Renewal Application   With the exception of thermal stratification effects in the surge nozzle, fatigue usage factors in the pressurizer pressure boundary and support components do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.5 Steam Generator ASME Section III Class 1, Class 2 Secondary Side, and Feedwater Nozzle Fatigue Analyses The steam generators are designed to ASME Section III, Subsection NB (Class 1) and Subsection NC (Class 2), 1971 Edition with addenda through Summer 1973. Although the secondary side is Class 2, all pressure retaining parts of the steam generator satisfy the Class 1 criteria, including the Class 2 secondary side boundaries. Although the steam generator tubes have a Class 1 fatigue analysis, the safety determination for integrity of steam generator tubes now depends on managing aging effects by a periodic inspection program rather than on the fatigue analysis, described in Section A1.8. The code fatigue analysis of the tubes is theefore not a TLAA. Except for the tubes, fatigue usage factors in the steam generator components do not depend on flow-induced vibration or other effects that are time-dependent at steady-state conditions, but depend only on effects of operational and upset transient events. At the current rate of accumulation of these events the design basis number of events should be sufficient for 60 years of operation. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for steam generator components with fatigue analyses for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.6 ASME Section III Class 1 Valves WCGS Class 1 valves are designed to ASME Section III, Subsection NB, 1974 Edition and later addenda. At WCGS, Class 1 fatigue analyses Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-34 Rev. 29 License Renewal Application   are TLAAs only for Class 1 valves with inlets greater than four inches nominal. For all valves the allowed NB-3545.3 NA normal duty operations far exceed those expected to occur. The calculated worst-case usage factors It for Class 1 pressurizer safety valves and for six inch swing check valves indicate that the designs have large margins, and therefore that the pressure boundaries would withstand fatigue effects for at least two of the original design lifetimes. The design of these valves for fatigue effects is therefore valid for the period of extended operation. The calculated worst-case usage factors for the 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves exceed 0.4. However, fatigue usage factors in these valves do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. As discussed in Section A3.2.1.7, the current rate of accumulation of these event cycles for Class 1 piping systems containing valves indicates that the 40-year design basis number of events should be sufficient for 60 years of operation, and that the calculated usage factors should not be exceeded. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the assumed numbers of transient cycles for 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves are not exceeded, and consequently, that the fatigue analysis TLAAs based on those transients remain valid for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.7 ASME Section III Class 1 Piping and Piping Nozzles Class 1 reactor coolant main-loop piping supplied by Westinghouse is designed to ASME Section III, Subsection NB, 1974 edition with addenda through Winter 1975. The main loop piping fatigue analysis was performed to the 1974 edition with addenda through Winter 1975.
If the predicted wear (as a measure of percent through wall) for a given flux thimble tube is projected to exceed the established acceptance criteria prior to the next outage, corrective actions are taken to reposition, cap or replace the tube. A1.22 INSPECTION OF INTERNAL SURFACES IN MISCELLANEOUS PIPING AND DUCTING COMPONENTS The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program manages cracking, loss of material and hardening - loss of strength. Visual inspections of the internal surfaces of piping, piping components, ducting and other components that are not covered by other aging management programs is included
The fatigue analyses of piping outside the main loop used code addenda through summer 1979 [USAR Table 5.2-1]. These analyses have been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor modifications. See Section A3.2.1.8 for fatigue in the pressurizer surge lines.
 
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-35 Rev. 29 License Renewal Application   See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and reactor vessel. The evaluation of these noise events found no effect on the primary coolant piping fatigue analysis. The hot leg surge nozzle is subject to possible thermal stratification effects. Fatigue at this location is specifically monitored, including the stratification effects. Fatigue due to high-cycle vibration has been evaluated in thermowells added at former RTD nozzles. The calculated usage factor has been validated for the period of extended operation and remains negligible. With the exception of the hot leg surge nozzle and thermowells, fatigue usage factors in Class 1 piping and nozzles do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.8 Bulletin 88-11 Revised Fatigue Analysis of the Pressurizer Surge Line for Thermal Cycling and Stratification NRC Bulletin 88-11 requested that licensees establish and implement a program to confirm pressurizer surge line integrity in view of the occurrence of thermal stratification and required them to inform the staff of the actions taken to resolve this issue. The original surge line fatigue analysis used code addenda through summer 1979.
in this program. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program uses the work control process to conduct and document inspections. The program performs visual inspections
 
during periodic maintenance, predictive maintenance, surveillance testing and corrective maintenance to detect aging effects that could result in a loss of component intended function. For those
 
systems or components where inspections of opportunity are insufficient, an inspection will be conducted prior to the period of extended operation to provide reasonable assurance that the intended
 
functions are maintained. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program is a new program that will be implemented prior to the period of extended operation. A1.23 LUBRICATING OIL ANALYSIS The Lubricating Oil Analysis program manages loss of material and reduction of heat transfer for components within the scope of license renewal. The program maintains lubricating oil contaminants Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-14 Rev. 29 License Renewal Application Additionally, ferrography is performed on oil samples for trending of wear particle concentrations for the reactor coolant pumps upper and lower bearing oil and other components. Monitoring and trending of lubricating oil analysis results identifies component aging prior
 
to loss of component intended function. A1.24 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the aging effects of embrittlement, melting, cracking, swelling, surface contamination, or discoloration to ensure that electrical cables and connections not subject to the environmental qualification (EQ) requirements of 10 CFR 50.49 and within the scope of license renewal are capable of performing their intended functions.
Non-EQ cables and connections within the scope of license renewal in accessible areas with an adverse localized environment are inspected. The inspections of Non-EQ cables and connectors in accessible areas are representative, with reasonable assurance, of  
 
cables and connections in inaccessible areas with an adverse localized environment. At least once every ten years, the Non-EQ cables and connections within the scope of license renewal in accessible areas are visually inspected for embrittlement, melting, cracking, swelling, surface contamination, or discoloration. The acceptance criterion for visual inspection of accessible Non-EQ cable jacket and connection insulating material is the absence of anomalous indications that are signs of degradation. Corrective actions for conditions that are adverse to quality are performed in accordance with the corrective action program as part of the QA
 
program. The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program is a new program that will be implemented prior to the period of extended operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-15 Rev. 30 License Renewal Application A1.25 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS USED IN INSTRUMENTATION CIRCUITS The scope of this program includes the cables and connections used in sensitive instrumentation circuits with sensitive, high voltage low-level signals within the Ex-core Neutron Monitoring System including the source range, intermediate range, and power range
 
monitors. This program provides reasonable assurance that the intended function of cables and connections used in instrumentation circuits with sensitive, low-level signals that are not subject to the environmental qualification requirements of 10 CFR 50.49 and are
 
exposed to adverse localized environments caused by heat, radiation, or moisture are maintained consistent with the current licensing basis through the period of extended operation. In most areas, the actual ambient environments (e.g., temperature, radiation, or moisture) are less severe than the plant design environment for those areas. Cable testing is used to manage the aging of the cable insulation and connections so that instrumentation circuits perform their intended functions. A cable system test for deleting deterioration of the cable insulation and connections will be performed. The test frequency shall be at least once every 10 years with the first test being completed before the period of extended operation. A1.26 INACCESSIBLE MEDIUM VOLTAGE CABLES NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program manages the aging effects of inaccessible medium voltage cables within the scope of license renewal exposed to adverse localized environments caused by significant moisture simultaneously with significant voltage. All cable manholes that contain in-scope Non-EQ inaccessible medium voltage cables will be inspected for water collection. Collected water will be removed as required. This inspection and water removal will be performed based on actual plant experience with the Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-16 Rev. 29 License Renewal Application frequency being at least once every five years for electrical manholes with sump pumps.
The program provides for testing of in-scope Non-EQ inaccessible medium voltage cables to provide an indication of the conductor insulation condition. At least once every ten years, a polarization
 
index test as described in EPRI TR-103834-P1-2 or other testing that is state-of-the-art at the time of the testing is performed.
The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program is a new program that will be implemented prior to the period of extended operation. A1.27 ASME SECTION XI, SUBSECTION IWE The ASME Section XI, Subsection IWE containment inservice inspection program provides aging management of the steel liner of the concrete containment building, including the containment liner plate, piping and electrical penetrations, access hatches, and the fuel transfer tube. Inspections are performed to identify and manage any
 
containment liner aging effects that could result in loss of intended function. Acceptance criteria for components subject to Subsection IWE exam requirements are specified in Article IWE-3000.
In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS CISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of  
 
the Code specified twelve months before the start of the inspection interval. A1.28 ASME SECTION XI, SUBSECTION IWL The ASME Section XI, Subsection IWL containment inservice inspection program manages aging of the concrete containment structure (including the tendon gallery ceiling), the concrete dome, and the
 
post-tensioning system. Inspections are performed to identify and manage any containment concrete aging effects that could result in loss of intended function. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of the Code specified twelve months before the start of the inspection interval.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-17 Rev. 29 License Renewal Application Prior to the period of extended operation, procedures will be enhanced to include two new provisions regarding inspection of
 
repair/replacement activities. A1.29 ASME SECTION XI, SUBSECTION IWF The ASME Section XI, Subsection IWF program manages aging effects that could result in loss of intended function for Class 1, 2 and 3 component supports. There are no Class MC supports at WCGS. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of
 
the Code specified twelve months before the start of the inspection
 
interval. A1.30 10 CFR 50, APPENDIX J The 10 CFR Part 50, Appendix J program monitors leakage rates through the containment pressure boundary, including the penetrations and access openings, in order to detect degradation of containment pressure boundary. Seals, gaskets, and bolted
 
connections are also monitored under the program.
Containment leak rate tests are performed in accordance with 10 CFR 50 Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors" Option B; Regulatory Guide 1.163, Revision 0, "Performance-Based Containment Leak-Testing Program," NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50 Appendix J; and ANSI/ANS 56.8, "Containment
 
System Leakage Testing Requirements."  Containment leak rate tests are performed to assure that leakage through the primary containment, and systems and components penetrating primary containment does not exceed allowable leakage limits specified in the Technical Specifications. Corrective actions are taken if leakage rates exceed established administrative limits for individual penetrations or the overall containment
 
pressure boundary. A1.31 MASONRY WALL PROGRAM The Masonry Wall Program, which is part of the Structures Monitoring Program, manages aging of masonry walls, and structural steel Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-18 Rev. 29 License Renewal Application restraint systems of the masonry walls, within scope of license renewal based on guidance provided in IE Bulletin 80-11, "Masonry Wall Design" and NRC Information Notice 87-67, "Lessons Learned from Regional Inspections of Licensee Actions in Response to NRC IE
 
Bulletin 80-11.The Masonry Wall Program contains inspection Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-19 Rev. 29 License Renewal Application guidelines and lists attributes that cause aging of masonry walls, which are to be monitored during structural monitoring inspections, as well as establishes examination criteria, evaluation requirements, and acceptance criteria. Prior to the period of extended operation, procedures will be enhanced to identify unreinforced masonry in the radwaste building within the scope of license renewal that requires aging management. A1.32 STRUCTURES MONITORING PROGRAM The Structures Monitoring Program manages the cracking, loss of material, and change in material properties by monitoring the condition of structures and structural supports that are within the scope of license renewal. The Structures Monitoring Program implements the requirements of 10 CFR 50.65 and is consistent with
 
the guidance of NUMARC 93-01, Revision 2 and Regulatory Guide 1.160, Revision 2. The Structures Monitoring Program provides inspection guidelines and walkdown checklists for concrete elements, structural steel, masonry walls, treated wood, structural features (e.g., caulking, sealants, roofs, etc.), structural supports, and miscellaneous components such
 
as doors. The Structures Monitoring Program includes all masonry walls within the scope of license renewal. The Structures Monitoring Program also inspects supports for equipment, piping, conduit, cable tray, HVAC, and instrument components. The Structures Monitoring Program monitors groundwater for pH, sulfates, and chlorides. Prior to the period of extended operation, procedures will be enhanced to add inspection parameters for treated wood, to add the disconnect enclosure and foundation in the switchyard, and to monitor groundwater for pH, sulfates, and chlorides. Two samples of groundwater will be tested every five years. A1.33 RG 1.127, INSPECTION OF WATER-CONTROL STRUCTURES ASSOCIATED WITH NUCLEAR POWER PLANTS The Regulatory Guide 1.127, Inspection of Water Control Structures Associated with Nuclear Power Plants program manages aging due to extreme environmental conditions and the effects of natural Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-20 Rev. 30  License Renewal Application phenomena that may affect water-control structures. WCGS meets the recommendations of Regulatory Guide 1.127, Revision 1.
This program includes inspection and surveillance activities for dams, slopes, canals, and other water-control structures associated with emergency cooling water systems or flood protection.  
 
The program includes periodic visual inspections of in-scope concrete structures, periodic monitoring of the hydraulic and structural condition of the Ultimate Heat Sink (UHS), as well as associated structures, main dam service spillway, and auxiliary spillway, periodic dredging of the UHS reservoir and channel connecting the reservoir to the essential service water pumphouse, and survey of the UHS dam for vertical movement.
 
Prior to the period of extended operation, procedures will be enhanced so that the main dam service spillway and the auxiliary
 
spillway will be inspected in accordance with the same specification, to clarify the scope of inspections for the spillways, to add the 5 year inspection frequency for the main dam
 
service spillway, and to add cavitation to the list of concrete aging effects for surfaces other than spillways. 
 
A1.34 NICKEL ALLOY AGING MANAGEMENT PROGRAM The Nickel Alloy Aging Management Program manages cracking due to primary water stress corrosion cracking in all plant locations that contain Alloy 600, with the exception of steam generator tubing (aging management of steam generator tubing is performed by the
 
Steam Generator Tubing Integrity program (B2.1.8)). Aging management requirements for nickel alloy penetration nozzles welded to the upper reactor vessel closure head noted in the Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors program (B2.1.5) are included here. This includes reactor coolant system (RCS) pressure boundary, RCS
 
non-pressure boundary, and ESF locations.
 
The Nickel Alloy Aging Management Program uses inspections, mitigation techniques, repair/replace activities and monitoring of operating experience to manage the aging of Alloy 600 at WCGS. Detection of indications is accomplished through a variety of examinations consistent with ASME Section XI Subsections IWB and IWC, and ASME Code Cases N-729-1, N-770-1 & N-722-1 with conditions as published in 10 CFR 50.55(a).
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-21 Rev. 30 License Renewal Application Mitigation techniques are implemented when appropriate to preemptively remove conditions that contribute to primary water stress corrosion cracking. Repair/replacement activities are
 
performed to proactively remove or overlay Alloy 600 material, or as a corrective measure in response to an unacceptable flaw in the
 
material.
The Wolf Creek Nickel Alloy Aging Management Program will be supplemented with implementation of applicable (1) ASME Code Cases  N-729-1, N-770-1 & N-722-1 with conditions as published in 10 CFR 50.55 (a) and (2) staff-accepted industry guidelines, and (3) participation in industry initiatives, such as owners group programs and the EPRI Materials Reliability Program, for managing aging effects associated with nickel alloys. If flaws attributed to PWSCC have been identified, whether acceptable or not for continuous service under paragraph 3130 or 3140 of ASME Code case N-729-1, the re-inspection interval must be each refueling outage instead of re-inspection interval required by Table 1 Note 8 of ASME Code Case N-729-1 commencing from the same outage in which flaw is detected. A1.35 REACTOR COOLANT SYSTEM SUPPLEMENT Section 3.1 of NUREG-1800, "Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and 10 CFR 50.55a supplements the aging management programs for the reactor coolant system components with the following additional
 
requirements.
WCNOC will: A. Reactor Coolant System Nickel Alloy Pressure Boundary Components A final rule updating 10 CFR 50.55a requires following ASME Code Cases N-722-1, N-729-1, and N-770-1 as conditioned by 10 CFR 50.55a, and  B. Reactor Vessel Internals Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-22 Rev. 29 License Renewal Application (1) Participate in the industry programs for investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of the industry programs as applicable to the reactor internals; and (3) upon completion of these programs, but not less than 24 months before entering the period of extended operation, WCNOC will submit an inspection plan for reactor internals to the NRC for review and approval. A1.36 ELECTRICAL CABLE CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the effects of loosening of bolted connections due to thermal cycling, ohmic
 
heating, electrical transients, vibration, chemical contamination, corrosion, and oxidation. A representative sample of electrical cable connections not subject to 10 CFR 50.49 environmental qualification requirements within the scope of license renewal is infrared thermography tested as part of the WCGS predictive maintenance. The sample is based upon application, circuit loading
 
and environment. Infrared thermography testing is being performed at least once every 10 years. Prior to the period of extended operation, the infrared thermography testing procedure will be enhanced to require an engineering evaluation when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, and the likelihood of recurrence.
A one-time inspection of a representative sample of low voltage low current or low load connections will be performed prior to the period of extended operation. The technical basis for the selected sample will be documented and based upon application (low voltage), circuit loading (low current or low load), and environment (plant indoor air and outdoor air). An engineering evaluation will be
 
performed when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, the likelihood of recurrence and the need to expand the sample size and/or
 
frequency of the inspection.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-23 Rev. 29 License Renewal Application A2
 
==SUMMARY==
DESCRIPTIONS OF TIME-LIMITED AGING ANALYSIS AGING MANAGEMENT PROGRAMS A2.1 METAL FATIGUE OF REACTOR COOLANT PRESSURE BOUNDARY The WCGS Metal Fatigue of the Reactor Coolant Pressure Boundary program ensures that actual plant ex perience remains bounded by the assumptions used in the deesign calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring results
 
indicate that none of the design transients should occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and that fatigue usage factors should
 
remain below the code allowable limit of 1.0, including effects of
 
the reactor coolant environment as described by NUREG/CR-6260.
Prior to the period of extended operation, the Metal Fatigue of Reactor Coolant Pressure Boundary program will be enhanced to include:  A cycle count action limit and corrective actions. An action limit will be established that requires corrective action when the cycle count for any of the critical thermal and pressure transients is projected to reach a stated percentage of the design-specified number of cycles before the end of the next fuel cycle.
If this action limit is reached, acceptable corrective actions include:
: 1. Review of fatigue usage calculations  To determine whether the transient in question
 
contributes significantly to CUF. To identify the components and analyses that are
 
affected by the transient in question. To ensure that the analytical bases of the leak-
 
before-break (LBB) fatigue crack propagation analysis and of the high-energy line break (HELB) locations are maintained. 2. Evaluation of remaining margins on CUF based on cycle-based or stress-based CUF calculations using the WCGS fatigue management program software.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-24 Rev. 29 License Renewal Application
: 3. Redefinition of the specified number of cycles (e.g., by reducing specified numbers of cycles for other transients and using the margin to increase the allowed number of cycles for the transient that is approaching its
 
specified number of cycles). A cumulative fatigue usage action limit and corrective actions. An action limit will be established that requires corrective action when calculated CUF (from cycle-based or stress-based monitoring) for any monitored location is projected to reach 1.0 within the next 2 or 3 fuel cycles. If this action limit is reached acceptable corrective actions
 
include: 1. Determine whether the scope of the monitoring program must be enlarged to include additional affected reactor coolant pressure boundary locations. This determination will ensure that other locations do not approach design limits without an appropriate action. 2. Enhance fatigue monitoring to confirm continued conformance to the code limit. 3. Repair the component. 4. Replace the component.
: 5. Perform a more rigorous analysis of the component to demonstrate that the design code limit will not be exceeded. 6. Modify plant operating practices to reduce the fatigue usage accumulation rate. 7. Perform a flaw tolerance evaluation and impose component-specific inspections, under ASME Section XI Appendices A or C (or their successors), and obtain required approvals by the NRC. These corrective actions are equally applicable to the WCGS NUREG/CR-6260 locations described in Section A3.2.3, "Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components," including consideration of the effects
 
of the reactor coolant environment.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-25 Rev. 29 License Renewal Application 10 CFR 50 Appendix B procedural and record requirements. Validation of the presence of absence of charging nozzle thermal sleeves. If sleeves are not present, the fatigue monitoring program analysis for the charging nozzle will be re-performed. A fatigue monitoring program updated baseline for the pressurizer hot leg surge nozzle based on the additional insurge/outsurge cycles accumulated in a pre-MOP environment. Additionally, the fatigue monitoring program baseline for the charging nozzles will be updated with consideration for the
 
differential contribution of fatigue for each category of charging event. A2.2 ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS The Environmental Qualification (EQ) of Electrical Components program manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f)
 
qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the
 
aging limits established in the evaluation. The Environmental Qualification (EQ) of Electrical Components program is consistent with the requirements of 10 CFR 50.49, and the guidance of NUREG-0588, "Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment" and Regulatory Guide 1.89, "Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants", Revision 1 for maintaining qualification of equipment. A2.3 CONCRETE CONTAINMENT TENDON PRESTRESS The Concrete Containment Tendon Prestress program, within the WCGS Creek ASME Section XI Subsection IWL Program, manages the loss of
 
tendon prestress in the post-tensioning system. The WCGS post-tensioning system consists of inverted U-shaped tendons, extending up through the basemat, through the full height of the cylindrical walls and over the dome; and horizontal circumferential (hoop) tendons, at intervals from the basemat to about the 45-degree elevation of the dome. The basemat is Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-26 Rev. 29 License Renewal Application conventionally reinforced. The tendons are ungrouted, in grease-filled glands. Prior to the period of extended operation, procedures will be revised to extend the list of surveillance tendons to include random samples for the 40, 45, 50, and 55 year surveillances, to explicitly require a regression analysis for each tendon group after every surveillance; and to invoke and describe regression analysis methods used to construct the lift-off trend lines. Surveillance program
 
predicted force lines for the vertical and hoop tendon groups will be extended to 60 years. Procedure descriptions of acceptance criteria action levels will be revised to conform to the ASME Code, Subsection IWL 3221 descriptions. 
 
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-27 Rev. 29 License Renewal Application A3 EVALUATION SUMMARIES OF TIME-LIMITED AGING ANALYSES 10 CFR 54.21(c) requires that an applicant for a renewed license identify time-limited aging analyses (TLAAs) and evaluate them for
 
the period of extended operation. The following TLAAs have been identified and evaluated for WCGS. A3.1 REACTOR VESSEL NEUTRON EMBRITTLEMENT Ferritic materials of the reactor vessel are subject to embrittlement (loss of fracture toughness) due to high-energy neutron exposure. The following predictions of neutron fluence and of its embrittlement effects are TLAAs:  Neutron Fluence, Upper Shelf Energy, Adjusted Reference
 
Temperature (Fluence, USE, and ART)  Pressurized Thermal Shock (PTS)  Reactor Vessel Thermal Limit Analysis and Pressure-Temperature (P-T) Limits  Low Temperature Overpressure Protection (LTOP) The Reactor Vessel Surveillance program is described in
 
Section A1.15. A3.1.1 Neutron Fluence, Upper Shelf Energy and Adjusted Reference Temperature (Fluence, USE, and ART)
Fluence Neutron embrittlement depends on lifetime fluence of neutrons with energies greater than 1 MeV. The original design basis estimate for expected end-of-life fluence has been increased to account for increased unit rating and for increased plant capacity factors, but also reduced for low-leakage core loadings. WCGS has evaluated projected fluences and their uncertainties based on the guidance of Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence,"
Revision 0. The 1/4-t and 3/4-t fluences in the vessel wall were also projected consistent with Regulatory Guide 1.99, "Radiation Damage Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-28 Rev. 29 License Renewal Application to Reactor Vessel Materials," Revision 2, Section 1.1, Equation 3, attenuation. The evaluation also projected the alternative displacements-per-iron atom (dpa) measure of embrittlement to 54 EFPY using methods consistent with ASTM E853 and E693, in support of dpa assessments consistent with Regulatory Guide 1.99, Revision 2. Since the W and Z coupon exposure has now exceeded that expected at the end of the extended period of operation, these capsules have been removed to the spent fuel pool, and vessel neutron fluence is now confirmed by ex-vessel dosimetry.
USE and ART For reactor vessel materials, 10 CFR 50 Appendix G requires the predicted end-of-life Charpy impact test upper-shelf absorbed energy (USE) to be at least 50 ft-lb, unless an approved analysis supports a lower value. The 60 year end-of-life USE and adjusted reference temperature (ART) of the limiting material was confirmed from test of the X-capsule coupons, with exposures nearly equal to the projected 54 EFPY, 60-year vessel wall fluence. The examination methods were consistent with 10 CFR 50 Appendices G and H, ASTM E185-82, and Westinghouse procedures. The X-coupon analysis demonstrates more-than-adequate EOL USE, and indicates that ART for the limiting material will remain modest and will permit adequate operating margins to P-T limits until the end of a 60-year period of
 
extended operation. See Section A3.1.3 for P-T limits. A3.1.2 Pressurized Thermal Shock (PTS)
If the reference temperature for pressurized thermal shock (RT PTS) for each heat of material of the reactor pressure vessel does not exceed 270 &#xba;F for plates, forgings, and axial welds; or 300 &#xba;F for circumferential welds (the PTS screening criteria), only the reactor pressure vessel is "relied on to demonstrate compliance" with the 10 CFR 50.61 PTS rule. RT PTS for the limiting material has been projected to remain well below its screening criterion until the end of a 60-year period of extended operation. The reactor pressure vessel therefore meets the PTS screening criteria and will continue to do so for the period of extended operation. Therefore no safety analysis by Regulatory Guide 1.154, "Format and Content of Plant-Specific Pressurized Thermal Shock Safety Analysis Reports for Pressurized Water Reactors," Revision 0, alternative methods is required, and the vessel is therefore the only component relied upon Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-29 Rev. 29 License Renewal Application to demonstrate compliance with 10 CFR 50.61 throughout the period of extended operation. A3.1.3 Pressure-Temperature (P-T) Limits 10 CFR 50 Appendix G requires a reactor vessel thermal limit analysis to determine operating pressure-temperature limits for heatup, cooldown, criticality, and inservice leakage and hydrostatic testing. The resulting P-T limit curves are operating limits, conditions of the operating license, and are included in the Pressure and Temperature Limits Report (PTLR), as required by Technical Specifications. Because of the relationship between the operating pressure-temperature limits and the fracture toughness transition of the reactor vessel, the thermal limits analysis is valid only up to a
 
stated vessel fluence limit. The currently-applicable PTLR is valid up to 54 EFPY. A3.1.4 Low Temperature Overpressure Protection (LTOP) LTOP is required by Technical Specifications and is provided (in part) by the cold overpressurization mitigation system (COMS), which opens the power-operated relief valves at a setpoint determined by
 
the currently-applicable pressure-temperature limits analysis.
The COMS setpoint is established in the Pressure and Temperature Limits Report (PTLR), Section A3.1.3. A3.2 METAL FATIGUE
 
This section describes:  ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components  ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure Vessel Internals Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-30 Rev. 29 License Renewal Application Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190  Assumed Thermal Cycle Count for Allowable Secondary Stress
 
Range Reduction Factor in B31.1 and ASME Section III Class 2
 
and 3 Piping  Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic
 
Events  Fatigue Design and Analysis of Class IE Electrical Raceway
 
Support Angle Fittings for Seismic Events At WCGS, no vessels, heat exchangers, or pumps were designed to ASME Section III Class 2 or 3, or ASME VIII Division 2 rules that required design for a stated number of load cycles.
Basis of Fatigue Analyses ASME Section III Class 1 design specifications define a design basis set of static and transient load conditions. The design number of
 
each transient was selected to be somewhat larger than expected to occur during the 40-year licensed life of the plant, based on
 
operating experience, and on projections of future operation based on innovations in the system designs. Although original design specifications commonly state that the transients are for a 40-year design life, the fatigue analyses themselves are based on the specified number of occurrences of each transient rather than on this lifetime.
Fatigue Management Program The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that actual plant experience remains bounded by the assumptions used in the design calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring cycle counts indicate that none of the design transients will occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and consequently, that the fatigue analysis TLAAs based on those transients will remain valid for the period of extended operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-31 Rev. 29 License Renewal Application A3.2.1 ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components Fatigue analyses exist for ASME  Section III Division 1 Class 1 piping, vessels, steam generators, pumps, and valves. The reactor vessel internals are not designed to ASME Section III Class 1 but
 
are analyzed to ASME Section III Subsection NG. See Section A3.2.2. A3.2.1.1 Reactor Pressure Vessel, Nozzles, Head, and Studs The WCGS reactor vessel is designed to ASME Section III, Subsection NB (Class 1), 1971 Edition with addenda through Winter
 
1972. The analysis has been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate and
 
T hot reduction, minor modifications, and possible operating contingencies. See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and reactor vessel. The reactor vessel primary coolant inlet and outlet nozzles and lower-head-to-shell juncture are evaluated for effects of the reactor coolant environment on fatigue behavior of these materials, consistent with the guidance of NUREG/CR-06260. See Section A3.2.3
 
of this document.
Fatigue usage factors in the reactor vessel pressure boundary do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients and on boltup. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing
 
basis by other acceptable means. A3.2.1.2 Control Rod Drive Mechanism (CRDM) Pressure Housings, Adapter Plugs, and Canopy Seals The CRDM housings are designed to ASME Section III, Subsection NB (Class 1), 1974 Edition with addenda through Winter 1974. The analysis of pressure-retaining components was reexamined for the power rerate and T hot reduction modification, and for addition of Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-32 Rev. 29 License Renewal Application canopy seal clamp assemblies. The fatigue usage factors for the CRDM pressure housings, adapter plugs, and canopy seals have been evaluated and projected to remain below the ASME Code allowable of 1.0 for 60 years. A3.2.1.3 Reactor Coolant Pump Pressure Boundary Components The pump pressure boundary was designed to ASME Section III, 1971 edition with addenda through Summer 1973. Subarticle NB-3400, "Design of Class 1 Pumps," of this edition and addenda, does not require a fatigue analysis, but the nuclear steam supply vendor specified a fatigue analysis. Low stresses permitted a fatigue
 
waiver analysis for many pump components. These fatigue and fatigue waiver analyses have been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor modifications. Fatigue usage factors in the reactor coolant pumps do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients. The WCGS
 
Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.4 Pressurizer and Pressurizer Nozzles The WCGS pressurizer is designed to ASME Section III, Subsection NB (Class 1), 1974 Edition. The analysis has been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate and Thot reduction, and minor modifications; including the effects of thermal stratification in the lower head, surge nozzle, and surge line discussed in NRC Bulletin 88-11.
The pressurizer surge nozzle and lower head may be subject to significant operating thermal stress cycles due to thermal stratification and insurge-outsurge cycles, and are therefore  
 
expected to be the limiting pressurizer components for fatigue. The fatigue usage factors of these locations are specifically monitored. The expected usage factors in these locations should be acceptable  
 
for 60 years of operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-33 Rev. 29 License Renewal Application With the exception of thermal stratification effects in the surge nozzle, fatigue usage factors in the pressurizer pressure boundary  
 
and support components do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable  
 
means. A3.2.1.5 Steam Generator ASME Section III Class 1, Class 2 Secondary Side, and Feedwater Nozzle Fatigue Analyses The steam generators are designed to ASME Section III, Subsection NB (Class 1) and Subsection NC (Class 2), 1971 Edition with addenda through Summer 1973. Although the secondary side is Class 2, all pressure retaining parts of the steam generator satisfy the Class 1  
 
criteria, including the Class 2 secondary side boundaries. Although the steam generator tubes have a Class 1 fatigue analysis, the safety determination for integrity of steam generator tubes now depends on managing aging effects by a periodic inspection program rather than on the fatigue analysis, described in Section A1.8. The code fatigue analysis of the tubes is theefore not a TLAA.
Except for the tubes, fatigue usage factors in the steam generator components do not depend on flow-induced vibration or other effects that are time-dependent at steady-state conditions, but depend only on effects of operational and upset transient events. At the current rate of accumulation of these events the design basis number of events should be sufficient for 60 years of operation. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for steam generator components with fatigue analyses for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.6 ASME Section III Class 1 Valves WCGS Class 1 valves are designed to ASME Section III, Subsection NB, 1974 Edition and later addenda. At WCGS, Class 1 fatigue analyses Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-34 Rev. 29 License Renewal Application are TLAAs only for Class 1 valves with inlets greater than four inches nominal.
For all valves the allowed NB-3545.3 N A normal duty operations far exceed those expected to occur.
The calculated worst-case usage factors I t for Class 1 pressurizer safety valves and for six inch swing check valves indicate that the designs have large margins, and therefore that the pressure boundaries would withstand fatigue effects for at least two of the original design lifetimes. The design of these valves for fatigue  
 
effects is therefore valid for the period of extended operation.
The calculated worst-case usage factors for the 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves exceed 0.4.
However, fatigue usage factors in these valves do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. As discussed in Section A3.2.1.7, the current rate of accumulation of these event cycles for Class 1 piping systems containing valves indicates that the 40-year design basis number of events should be sufficient for 60 years of operation, and that the calculated usage factors should not be exceeded. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the assumed numbers of transient cycles for 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves are not exceeded, and consequently, that the fatigue analysis TLAAs based on those transients remain valid for the period of extended operation, or that appropriate corrective measures  
 
maintain the design and licensing basis by other acceptable means. A3.2.1.7 ASME Section III Class 1 Piping and Piping Nozzles Class 1 reactor coolant main-loop piping supplied by Westinghouse is designed to ASME Section III, Subsection NB, 1974 edition with  
 
addenda through Winter 1975. The main loop piping fatigue analysis was performed to the 1974 edition with addenda through Winter 1975.
 
The fatigue analyses of piping outside the main loop used code addenda through summer 1979 [USAR Table 5.2-1]. These analyses have been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor  
 
modifications.
See Section A3.2.1.8 for fatigue in the pressurizer surge lines.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-35 Rev. 29 License Renewal Application See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and  
 
reactor vessel. The evaluation of these noise events found no effect on the primary coolant piping fatigue analysis. The hot leg surge nozzle is subject to possible thermal stratification effects. Fatigue at this location is specifically  
 
monitored, including the stratification effects. Fatigue due to high-cycle vibration has been evaluated in thermowells added at former RTD nozzles. The calculated usage factor has been validated for the period of extended operation and  
 
remains negligible.
With the exception of the hot leg surge nozzle and thermowells, fatigue usage factors in Class 1 piping and nozzles do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable  
 
means. A3.2.1.8 Bulletin 88-11 Revised Fatigue Analysis of the Pressurizer Surge Line for Thermal Cycling and Stratification NRC Bulletin 88-11 requested that licensees establish and implement a program to confirm pressurizer surge line integrity in view of the occurrence of thermal stratification and required them to inform the staff of the actions taken to resolve this issue. The original surge line fatigue analysis used code addenda through summer 1979.
The surge line design was re-evaluated to the 1986 code in response to the NRC Bulletin 88-11 thermal stratification concerns. This analysis was later reevaluated for effects of snubber removals.
The surge line design was re-evaluated to the 1986 code in response to the NRC Bulletin 88-11 thermal stratification concerns. This analysis was later reevaluated for effects of snubber removals.
These results have been incorporated into the piping and main-loop nozzle code design reports. The current analysis includes effects of power rerate and Thot reduction. See Section A3.2.1.4 for effects on the pressurizer surge nozzle.
These results have been incorporated into the piping and main-loop nozzle code design reports. The current analysis includes effects of power rerate and T hot reduction. See Section A3.2.1.4 for effects on the pressurizer surge nozzle.
 
See Section A3.2.1.7 for effects on the hot leg surge nozzle.
See Section A3.2.1.7 for effects on the hot leg surge nozzle.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-36 Rev. 29 License Renewal Application   The maximum calculated CUF at any location in the surge lines, under the current analysis of record, including thermal stratification effects, is less than 0.1. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 monitors fatigue in the surge line and ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The re-evaluation of the surge line for NRC Bulletin 88-11 under the 1986 code did not retroactively impose Subarticle NF-3330 stress limits for high-cycle fatigue of Class 1 supports. A3.2.1.9 Primary Coolant System Heatup Expansion Noise Events Since 1990, abrupt audible events have been heard inside containment at WCGS toward the end of primary system heatups. They have been attributed to an abrupt release of differential expansion energy, originally believed to be at the crossover piping support saddle shims, later found to have probably also occurred between the reactor vessel support pads and shoes, under the vessel main loop nozzles. The evaluation of effects of these events found no effect, or only nominal effects, on stress and fatigue analyses of the reactor vessel inlet and outlet nozzles, reactor coolant piping primary loop and component supports, steam generator nozzles, and primary loop leak-before-break analysis. The heatup noise events have been evaluated and projected to remain within the 330 cycles assumed in the fatigue evaluation. A3.2.1.10 High Energy Line Break Postulation Based on Fatigue Cumulative Usage Factor A leak-before-break analysis (LBB) eliminated large breaks in the main reactor coolant loops. See Section A3.2.1.11. Outside the main loop breaks are selected in accordance with Regulatory Guide 1.46, Revision 0, "Protection Against Pipe Whip Inside Containment," and Branch Technical Positions ASB 3-1 and MEB 3-1. See USAR Section 3.6.1. The citation of MEB 3-1 means that "intermediate breaks," "between terminal ends," in piping with ASME Section III Class 1 fatigue Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-37 Rev. 29 License Renewal Application   analyses are identified at any location where cumulative usage factor is equal to or greater than 0.1, with the stated exception of the reactor coolant system primary loops. A revised stress analysis of the surge line reduced all intermediate locations below 0.1, and thereby eliminated intermediate breaks in it. Break locations that depend on usage factor, and their absence in the surge line, remain valid as long as the calculated usage factors are not exceeded. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the originally calculated maximum usage factors are not exceeded, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.11 Fatigue Crack Growth Assessment in Support of a Fracture Mechanics Analysis for the Leak-Before-Break (LBB) Elimination of Dynamic Effects of Primary Loop Piping Failures USAR Section 3.6.1 describes a leak-before-break analysis that eliminated the large breaks in the main reactor coolant loops, which permitted omission of evaluations of their jet and pipe whip effects. This permitted omission of large jet barriers and whip restraints. The containment pressurization and equipment qualification analyses retained the large-break assumptions. The fracture mechanics analysis depends on a saturated rather than a time-dependent crack initiation energy integral, is therefore not time-dependent, and is therefore not a TLAA. However, the final leak-before-break submittal is also supported by a fatigue crack growth assessment for a 40-year design life, which is a TLAA. The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is written to confirm that the maximum usage factor in the primary loop piping remains below the number assumed for the existing analysis, and therefore that the basis for the LBB analysis remains valid for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-36 Rev. 29 License Renewal Application The maximum calculated CUF at any location in the surge lines, under the current analysis of record, including thermal stratification effects, is less than 0.1. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 monitors fatigue in the surge line and ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The re-evaluation of the surge line for NRC Bulletin 88-11 under the 1986 code did not retroactively impose Subarticle NF-3330 stress limits for high-cycle fatigue of Class 1 supports. A3.2.1.9 Primary Coolant System Heatup Expansion Noise Events Since 1990, abrupt audible events have been heard inside containment at WCGS toward the end of primary system heatups. They have been attributed to an abrupt release of differential expansion energy, originally believed to be at the crossover piping support saddle shims, later found to have probably also occurred between the  
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-38 Rev. 29 License Renewal Application   A3.2.2 ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure Vessel Internals The WCGS reactor vessel internals were designed after the incorporation of Subsection NG into the 1974 Edition of Section III of the ASME Boiler and Pressure Vessel Code. The design meets the intent of paragraph NG-3311(c); that is, design and construction of core support structures meet Subsection NG in full, and other internals are designed and constructed to ensure that their effects on the core support structures remain within the core support structure code limits. The current reactor vessel internals design report incorporates effects of power rerate and of hot leg temperature reduction (Thot). It identifies usage factors for the specified set of design basis transient events and for 40 years of high-cycle effects. The greater part of each calculated fatigue usage factor is due to effects of significant transients. The review and projection of transient events and usage factor accumulation to date indicates that the specified number of each transient should not be exceeded during the 60-year period of extended operation, and the WCGS fatigue management program tracks these events. Therefore, the contribution of these transient events to fatigue usage in the internals will not exceed that originally calculated without the condition being identified, and without an appropriate evaluation being performed and any necessary mitigating actions being taken. However, some part of fatigue usage in internals is due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transients. High-cycle fatigue must therefore be evaluated separately in order to extend the conclusion of the supplementary design report to the end of the 60-year licensed operating period.
 
For locations with reported usage factors greater than 0.66, the detailed fatigue calculations were reviewed to determine the contribution of high cycle fatigue to the total usage. In these locations, the review determined that high cycle fatigue was not calculated for the component because either the vibratory stresses are very small compared to thermal transient stresses or the usage from high cycle effects was insignificant. Therefore, the reported usage is from the specified design transients and is proportional to the numbers of transients experienced but not explicitly to time of operation.
reactor vessel support pads and shoes, under the vessel main loop nozzles. The evaluation of effects of these events found no effect, or only nominal effects, on stress and fatigue analyses of the reactor vessel inlet and outlet nozzles, reactor coolant piping primary loop and component supports, steam generator nozzles, and primary loop leak-before-break analysis.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-39 Rev. 29 License Renewal Application   For locations with reported usage factors of less than 0.66, some part of the fatigue usage in internals may be due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transient events. Because these locations have reported usage of less than 0.66, multiplying the reported fatigue usage values by 1.5 to account for 60 years of operation gives fatigue usage results less than the limit of 1.0 and is therefore acceptable. Therefore, the analysis has been projected to the end of the period of extended operation. Fatigue Analyses of Barrel-to-Former and Baffle-to-Former Bolts Cracked baffle-to-former bolts were found in a few offshore reactors with designs and materials similar to Westinghouse units. The failures have been attributed to a combination of time-dependent effects. Fatigue in these bolts is the subject of an ASME code analysis, which is a TLAA. The high predicted usage factor, the additional aging effects requiring mitigation, and the fact that some of these are synergistic (e.g., fatigue and the other cracking mechanisms) dictate that management of the fatigue usage factor in these bolts will be insufficient by itself, and that an aging management program must be constructed for the bolts which either adequately address all of these effects, or which will ensure their safety function despite these effects. The Wolf Creek aging management program for reactor vessel internals for the license renewal period has not been determined. See Section A1.35 for the commitment to develop this program. A3.2.3 Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190) Concerns with possible effects of elevated temperature, reactor coolant chemistry environments, and different strain rates prompted NRC-sponsored research to assess these effects, culminating in the guidance of NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components."  Although GSI 190 has been closed for plants with 40-year initial licenses, the NUREG-1800 states that "The applicant's consideration of the effects of coolant environment on component fatigue life for license renewal is an area of review," noting the staff recommendation "-that the samples in NUREG/CR-6260 should be evaluated considering environmental effects for license renewal."
The heatup noise events have been evaluated and projected to remain within the 330 cycles assumed in the fatigue evaluation. A3.2.1.10 High Energy Line Break Postulation Based on Fatigue Cumulative Usage Factor A leak-before-break analysis (LBB) eliminated large breaks in the main reactor coolant loops. See Section A3.2.1.11. Outside the main loop breaks are selected in accordance with Regulatory Guide 1.46, Revision 0, "Protection Against Pipe Whip Inside Containment," and Branch Technical Positions ASB 3-1 and MEB 3-1.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-40 Rev. 29 License Renewal Application   NUREG/CR-6260 Table 5-82 identifies seven sample locations for newer Westinghouse plants such as WCGS:  Reactor Vessel Lower Head to Shell Juncture  Reactor Vessel Primary Coolant Inlet Nozzle  Reactor Vessel Primary Coolant Outlet Nozzle  Surge Line Hot Leg Nozzle  Charging Nozzles (Loop 1 and 4 nozzles are separately monitored at WCGS)  Safety Injection Nozzles - Boron Injection tank (BIT) or High-Head Safety Injection (HHSI) Nozzles  Residual Heat Removal Line Inlet Transition Degree Accumulator Safety Injection (ACCSI) and RHR Cold Leg Injection Nozzles. WCGS performed plant-specific calculations for these seven sample locations using the appropriate Fen factors from NUREG/CR-6583 for carbon and low-alloy steels and from NUREG/CR-5704 for stainless steels, as appropriate for the material at each location. The material-specific worst-case FEN multiplier was calculated for each location, and applied to the fatigue usage factor expected at 60 Years at that location. Strain rate information was not used to determine FEN. All of these locations except the first, the vessel lower head to shell juncture, are included in the Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1. The first location is not monitored because the low projected usage factor, when multiplied by the applicable FEN, remains negligible. At the first location, the expected 60-year fatigue usage factor was determined by multiplying the calculated design basis 40-year usage factor times 1.5. All others were projected from the historical and current rates of accumulation of transient cycles and usage factors. When these projected 60-year usage factors are multiplied by the respective FEN, the results are all less than the code limit of 1.0. The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is structured to continue to confirm that this is so, or to initiate appropriate evaluations and corrective measures.
See USAR Section 3.6.1. The citation of MEB 3-1 means that "intermediate breaks," "between terminal ends," in piping with ASME Section III Class 1 fatigue Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-37 Rev. 29 License Renewal Application analyses are identified at any location where cumulative usage factor is equal to or greater than 0.1, with the stated exception of the reactor coolant system primary loops.
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-41 Rev. 29 License Renewal Application   A3.2.4 Assumed Thermal Cycle Count for Allowable Secondary Stress Range Reduction Factor in B31.1 and ASME Section III Class 2 and 3 Piping None of ANSI B31.1 or ASME Section III Subsections NC and ND invokes fatigue analyses. However, if the number of full-range thermal cycles is expected to exceed 7,000, these codes require the application of a stress range reduction factor to the allowable stress range for expansion stresses (secondary stresses). The allowable secondary stress range is 1.0 SA for 7000 equivalent full-temperature thermal cycles or less and is reduced in steps to 0.5 SA for greater than 100,000 cycles. Partial cycles are counted proportional to their temperature range. A review of ASME Section III Class 2 and 3 and B31.1 piping specifications found no indication of a number of expected lifetime full-range or equivalent full-range thermal cycles greater than 7,000 during the original 40-year plant life. The survey of all plant piping systems found that some of the reactor coolant sample lines may be subject to more than 7,000 but less than 11,000 full temperature cycles in 60 years requiring a stress range reduction factor (SRRF) of 0.9 times the allowable stress. The WCGS design analyses of secondary stress ranges are within the limits imposed by the 0.9 SRRF in all line segments. A3.2.5 Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic Events The WCGS spent fuel pool racks were replaced in order to accommodate a larger inventory. The design of the replacement racks included a fatigue analysis of the racks and of high-stress locations in the pool liner. These analyses are described in USAR Section 9.1A.4.3.5.4. The analyses remain valid for any period for which the number of operating basis earthquake events (OBE) has not been and is not expected to be exceeded, assuming an additional safe shutdown earthquake (SSE) might occur. Since the remaining plant life from the present to the end of the period of extended operation (2006 to 2045) is less than that of the original license to which the numbers of OBE and SSE events apply, and since no SSE or significant OBE has occurred, these analyses remain valid for the period of extended operation.
A revised stress analysis of the surge line reduced all intermediate locations below 0.1, and thereby eliminated intermediate breaks in it. Break locations that depend on usage factor, and their absence in the surge line, remain valid as long as the calculated usage factors are not exceeded. The WCGS Metal Fatigue of Reactor Coolant  
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-42 Rev. 29 License Renewal Application   A3.2.6 Fatigue Design and Analysis of Class IE Electrical Raceway Support Angle Fittings for Seismic Events The design of Class IE electrical raceway included a fatigue evaluation of the effects of operating basis and safe shutdown earthquake loads (OBE and SSE loads) on angle fittings used at the connections of strut hangers to overhead supports, or at interhanger locations. This analysis was extremely conservative, assuming 1000 allowable cycles for a deflection considerably less than the endurance limit. No seismic events have induced significant cyclic loads on these components in the 20-year operating history of the plant to date, so that the design basis number of events remains sufficient for the remainder of the original licensed operating period, plus the period of extended operation. A3.3  ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS Aging evaluations that qualify electrical and I&C components required to meet the requirements of 10 CFR 50.49 are evaluated to demonstrate qualification for the 40 year plant life are TLAAs. The existing WCGS Environmental Qualification program adequately manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f) qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the aging limits established in the evaluation. Continuing the existing 10 CFR 50.49 EQ program ensures that the aging effects are managed and that the EQ components continue to perform their intended functions for the period of extended operation. The Environmental Qualification of Electrical Components program is described in Section A2.2. A3.4  CONCRETE CONTAINMENT TENDON PRESTRESS The WCGS containment is a prestressed concrete, hemispherical-dome-on-a-cylinder structure, with a steel membrane liner. Post-tensioned tendons compress the concrete and permit the structure to withstand design basis accident internal pressures. The reinforced concrete basemat is conventionally reinforced.
 
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-43 Rev. 29 License Renewal Application   To ensure the integrity of the containment pressure boundary under design basis accident loads, design predictions of loss of prestress demonstrate that prestress should remain adequate for the design life. An inspection program confirms that the tendon prestress remains within design limits throughout the life of the plant [USAR Section 3.8.1, Technical Specification Surveillance Requirement SR 3.6.1.2]. Continuing the existing ASME Subsection IWL tendon surveillance program ensures that loss of prestress aging effects will be managed and that the containment tendons will continue to perform their intended functions for the period of extended operation. The program is described in Section A2.3. A3.5 CONTAINMENT LINER PLATE, POLAR CRANE BRACKET, AND PENETRATION LOAD CYCLES Design of the polar crane for a finite number of loads is a TLAA at WCGS (Section A3.6.1). At some plants, though not at WCGS, the supporting crane rail brackets or other supporting structural elements may also have been designed for these cyclic loads.
Pressure Boundary program described in Section A2.1 ensures that the originally calculated maximum usage factors are not exceeded, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.11 Fatigue Crack Growth Assessment in Support of a Fracture Mechanics Analysis for the Leak-Before-Break (LBB)
NUREG-1800 Section 4.6.1 notes that in some designs "Fatigue of the liner plates or metal containments may be considered in the design based on an assumed number of loading cycles for the current operating term." At WCGS however, the only metallic components of the containment pressure boundary that are designed for a specific number of load cycles in a design lifetime are the main steam penetrations. The containment liner and the remaining penetrations were designed to stress limit criteria, independent of the number of load cycles, and with no fatigue analyses. A3.5.1 Design Cycles for the Main Steam Line Penetrations The BC-TOP-1, "Containment Building Liner Plate Design Report," Part II Section 1.1, describes the main steam penetration design for cyclic loads. The design basis includes  100 lifetime steady state operating thermal gradient plus normal operating cyclic loads ("Loading Condition V"), and  10 steady state operating thermal gradient plus steam pipe rupture cyclic loads ("Loading Condition IV").
Elimination of Dynamic Effects of Primary Loop Piping Failures USAR Section 3.6.1 describes a leak-before-break analysis that  
Wolf Creek  Appendix A USAR Supplement   Wolf Creek Generating Station Page 18A-44 Rev. 29 License Renewal Application   The operating history to date indicates that the original design basis 100 operating cycles assumed for main steam penetrations will be adequate for the 60-year extended operating period. For license renewal, an evaluation of an equivalent ASME Section III Class 1 fatigue usage factor found that the penetrations could withstand as many as 2500 lifetime full-range thermal cycles ("Condition V" events), plus the fatigue effects of an end-of-life main steam rupture inside containment (a "Condition IV" event), with a cumulative usage factor of less than 1.0. There is therefore more than sufficient margin in the design for any possible increase in operating cycles above the original estimate. The design of the main steam penetrations is therefore valid for the period of extended operation. A3.6 PLANT-SPECIFIC TIME-LIMITED AGING ANALYSES A3.6.1 Containment Polar Crane, Fuel Building Cask Handling Crane, Spent Fuel Pool Bridge Crane, and Fuel Handling Machine CMAA-70 Load Cycle Limits The USAR Section 9.1.4 describes design of these lifting machines to Crane Manufacturers Association of America Specification No. 70 (CMAA-70 (1975)). The CMAA-70 crane service classification ("class" or "design class") for each machine depends, in part, on the assumption that the number of stress cycles at or near the maximum allowable stress will not exceed the number assumed for that design class. In operation, this means the number of significant lifts, i.e. those which approach or equal the design load, should not exceed the number of stress cycles assumed for that design class. In all cases the design standard number of full-capacity lifts far exceeds the number expected of the machine for a 60-year period of extended operation. The lifting machine designs therefore remain valid for the period of extended operation. A3.7 TLAAS SUPPORTING 10 CFR 50.12 EXEMPTIONS One 10 CFR 50.12 exemption, for use of a leak-before-break analysis for the primary coolant loops, is based in part on a time-limited aging analysis of fatigue effects. See Section A3.2.1.11.}}
 
eliminated the large breaks in the main reactor coolant loops, which permitted omission of evaluations of their jet and pipe whip effects. This permitted omission of large jet barriers and whip restraints. The containment pressurization and equipment  
 
qualification analyses retained the large-break assumptions.
The fracture mechanics analysis depends on a saturated rather than a time-dependent crack initiation energy integral, is therefore not time-dependent, and is therefore not a TLAA. However, the final leak-before-break submittal is also supported by a fatigue crack growth assessment for a 40-year design life, which is a TLAA.
The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is written to confirm that the maximum usage factor in the primary loop piping remains below the number assumed for the existing analysis, and therefore that the basis for the LBB analysis remains valid for the period of extended operation, or that appropriate corrective measures maintain the design and  
 
licensing basis by other acceptable means.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-38 Rev. 29 License Renewal Application A3.2.2 ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure Vessel Internals The WCGS reactor vessel internals were designed after the incorporation of Subsection NG into the 1974 Edition of Section III of the ASME Boiler and Pressure Vessel Code. The design meets the intent of paragraph NG-3311(c); that is, design and construction of core support structures meet Subsection NG in full, and other internals are designed and constructed to ensure that their effects on the core support structures remain within the core support structure code limits.
The current reactor vessel internals design report incorporates effects of power rerate and of hot leg temperature reduction (T hot). It identifies usage factors for the specified set of design basis transient events and for 40 years of high-cycle effects. The greater part of each calculated fatigue usage factor is due to effects of significant transients.
The review and projection of transient events and usage factor accumulation to date indicates that the specified number of each transient should not be exceeded during the 60-year period of extended operation, and the WCGS fatigue management program tracks these events. Therefore, the contribution of these transient events to fatigue usage in the internals will not exceed that originally calculated without the condition being identified, and without an appropriate evaluation  
 
being performed and any necessary mitigating actions being taken. However, some part of fatigue usage in internals is due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transients. High-cycle fatigue must therefore be evaluated separately in order to extend the conclusion of the supplementary design report to the end of the 60-year licensed operating period.  
 
For locations with reported usage factors greater than 0.66, the detailed fatigue calculations were reviewed to determine the contribution of high cycle fatigue to the total usage. In these locations, the review determined that high cycle fatigue was not calculated for the component because either the vibratory stresses are very small compared to thermal transient stresses or the usage from high cycle effects was insignificant. Therefore, the reported usage is from the specified design transients and is proportional to the numbers of transients experienced but not explicitly to time of  
 
operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-39 Rev. 29 License Renewal Application For locations with reported usage factors of less than 0.66, some part of the fatigue usage in internals may be due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transient events. Because these locations have reported usage of less than 0.66, multiplying the reported fatigue usage values by 1.5 to account for 60 years of operation gives fatigue usage results less than the limit of 1.0 and is therefore acceptable. Therefore, the analysis has been projected to the end of the period of extended operation.
Fatigue Analyses of Barrel-to-Former and Baffle-to-Former Bolts Cracked baffle-to-former bolts were found in a few offshore reactors with designs and materials similar to Westinghouse units. The failures have been attributed to a combination of time-dependent effects. Fatigue in these bolts is the subject of an ASME code analysis, which is a TLAA. The high predicted usage factor, the additional aging effects requiring mitigation, and the fact that some of these are synergistic (e.g., fatigue and the other cracking mechanisms) dictate that management of the fatigue usage factor in these bolts will be insufficient by itself, and that an aging management program must be constructed for the bolts which either adequately address all of these effects, or which will ensure their safety function despite these effects. The Wolf Creek aging management program for  
 
reactor vessel internals for the license renewal period has not been determined. See Section A1.35 for the commitment to develop this program. A3.2.3 Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190) Concerns with possible effects of elevated temperature, reactor coolant chemistry environments, and different strain rates prompted NRC-sponsored research to assess these effects, culminating in the guidance of NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components."  Although GSI 190 has been closed for plants with 40-year initial licenses, the NUREG-1800 states that "The applicant's consideration of the effects of coolant environment on component fatigue life for license renewal is an area of review," noting the staff recommendation "-that the samples in NUREG/CR-6260 should be  
 
evaluated considering environmental effects for license renewal."
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-40 Rev. 29 License Renewal Application NUREG/CR-6260 Table 5-82 identifies seven sample locations for newer Westinghouse plants such as WCGS:  Reactor Vessel Lower Head to Shell Juncture  Reactor Vessel Primary Coolant Inlet Nozzle  Reactor Vessel Primary Coolant Outlet Nozzle  Surge Line Hot Leg Nozzle  Charging Nozzles (Loop 1 and 4 nozzles are separately monitored at WCGS)  Safety Injection Nozzles - Boron Injection tank (BIT) or High-
 
Head Safety Injection (HHSI) Nozzles  Residual Heat Removal Line Inlet Transition Degree Accumulator Safety Injection (ACCSI) and RHR Cold Leg Injection Nozzles.
WCGS performed plant-specific calculations for these seven sample  
 
locations using the appropriate F en factors from NUREG/CR-6583 for carbon and low-alloy steels and from NUREG/CR-5704 for stainless  
 
steels, as appropriate for the material at each location. The material-specific worst-case F EN multiplier was calculated for each location, and applied to the fatigue usage factor expected at 60 Years at that location. Strain rate information was not used to determine F EN. All of these locations except the first, the vessel lower head to shell juncture, are included in the Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1. The first location is not monitored because the low projected usage factor, when multiplied by the applicable F EN , remains negligible. At the first location, the expected 60-year fatigue usage factor was determined by multiplying the calculated design basis 40-year usage factor times 1.5. All others were projected from the historical and current rates of accumulation of transient cycles and usage factors. When these projected 60-year usage factors are multiplied by the respective F EN, the results are all less than the code limit of 1.0.
The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is structured to continue to confirm that this is so, or to initiate appropriate evaluations and corrective  
 
measures.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-41 Rev. 29 License Renewal Application A3.2.4 Assumed Thermal Cycle Count for Allowable Secondary Stress Range Reduction Factor in B31.1 and ASME Section III Class 2 and 3 Piping None of ANSI B31.1 or ASME Section III Subsections NC and ND invokes fatigue analyses. However, if the number of full-range thermal cycles is expected to exceed 7,000, these codes require the application of a stress range reduction factor to the allowable stress range for expansion stresses (secondary stresses). The allowable secondary stress range is 1.0 S A for 7000 equivalent full-temperature thermal cycles or less and is reduced in steps to 0.5 S A for greater than 100,000 cycles. Partial cycles are counted  
 
proportional to their temperature range. A review of ASME Section III Class 2 and 3 and B31.1 piping specifications found no indication of a number of expected lifetime full-range or equivalent full-range thermal cycles greater than 7,000 during the original 40-year plant life. The survey of all plant piping systems found that some of the reactor coolant sample lines may be subject to more than 7,000 but  
 
less than 11,000 full temperature cycles in 60 years requiring a stress range reduction factor (SRRF) of 0.9 times the allowable  
 
stress. The WCGS design analyses of secondary stress ranges are within the limits imposed by the 0.9 SRRF in all line segments. A3.2.5 Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic Events The WCGS spent fuel pool racks were replaced in order to accommodate a larger inventory. The design of the replacement racks included a fatigue analysis of the racks and of high-stress locations in the pool liner. These analyses are described in USAR Section 9.1A.4.3.5.4. The analyses remain valid for any period for which the number of operating basis earthquake events (OBE) has not been and is not expected to be exceeded, assuming an additional safe shutdown earthquake (SSE) might occur. Since the remaining plant life from the present to the end of the period of extended operation (2006 to 2045) is less than that of the original license to which the numbers of OBE and SSE events apply, and since no SSE or significant OBE has occurred, these analyses remain valid for the period of extended  
 
operation.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-42 Rev. 29 License Renewal Application A3.2.6 Fatigue Design and Analysis of Class IE Electrical Raceway Support Angle Fittings for Seismic Events The design of Class IE electrical raceway included a fatigue evaluation of the effects of operating basis and safe shutdown earthquake loads (OBE and SSE loads) on angle fittings used at the connections of strut hangers to overhead supports, or at interhanger locations.
This analysis was extremely conservative, assuming 1000 allowable cycles for a deflection considerably less than the endurance limit. No seismic events have induced significant cyclic loads on these components in the 20-year operating history of the plant to date, so that the design basis number of events remains sufficient for the remainder of the original licensed operating period, plus the period  
 
of extended operation. A3.3  ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS Aging evaluations that qualify electrical and I&C components required to meet the requirements of 10 CFR 50.49 are evaluated to  
 
demonstrate qualification for the 40 year plant life are TLAAs. The existing WCGS Environmental Qualification program adequately manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f) qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the  
 
current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the aging limits established in the evaluation.
Continuing the existing 10 CFR 50.49 EQ program ensures that the aging effects are managed and that the EQ components continue to perform their intended functions for the period of extended operation. The Environmental Qualification of Electrical Components  
 
program is described in Section A2.2. A3.4  CONCRETE CONTAINMENT TENDON PRESTRESS The WCGS containment is a prestressed concrete, hemispherical-dome-on-a-cylinder structure, with a steel membrane liner. Post-tensioned tendons compress the concrete and permit the structure to withstand design basis accident internal pressures. The reinforced concrete basemat is conventionally reinforced.
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-43 Rev. 29 License Renewal Application To ensure the integrity of the containment pressure boundary under design basis accident loads, design predictions of loss of prestress demonstrate that prestress should remain adequate for the design life. An inspection program confirms that the tendon prestress  
 
remains within design limits throughout the life of the plant [USAR Section 3.8.1, Technical Specification Surveillance Requirement SR 3.6.1.2]. Continuing the existing ASME Subsection IWL tendon surveillance program ensures that loss of prestress aging effects will be managed and that the containment tendons will continue to perform their intended functions for the period of extended operation. The program  
 
is described in Section A2.3. A3.5 CONTAINMENT LINER PLATE, POLAR CRANE BRACKET, AND PENETRATION LOAD CYCLES Design of the polar crane for a finite number of loads is a TLAA at WCGS (Section A3.6.1). At some plants, though not at WCGS, the supporting crane rail brackets or other supporting structural elements may also have been designed for these cyclic loads.
NUREG-1800 Section 4.6.1 notes that in some designs "Fatigue of the liner plates or metal containments may be considered in the design based on an assumed number of loading cycles for the current  
 
operating term." At WCGS however, the only metallic components of the containment pressure boundary that are designed for a specific number of load cycles in a design lifetime are the main steam penetrations. The containment liner and the remaining penetrations were designed to stress limit criteria, independent of the number of load cycles, and with no fatigue analyses. A3.5.1 Design Cycles for the Main Steam Line Penetrations The BC-TOP-1, "Containment Building Liner Plate Design Report," Part II Section 1.1, describes the main steam penetration design for cyclic loads. The design basis includes  100 lifetime steady state operating thermal gradient plus  
 
normal operating cyclic loads ("Loading Condition V"), and  10 steady state operating thermal gradient plus steam pipe rupture cyclic loads ("Loading Condition IV").
Wolf Creek  Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-44 Rev. 29 License Renewal Application The operating history to date indicates that the original design basis 100 operating cycles assumed for main steam penetrations will be adequate for the 60-year extended operating period. For license renewal, an evaluation of an equivalent ASME Section III Class 1 fatigue usage factor found that the penetrations could withstand as many as 2500 lifetime full-range thermal cycles ("Condition V" events), plus the fatigue effects of an end-of-life main steam rupture inside containment (a "Condition IV" event), with a cumulative usage factor of less than 1.0. There is therefore more than sufficient margin in the design for any possible increase in operating cycles above the original estimate. The design of the main steam penetrations is therefore valid for the  
 
period of extended operation. A3.6 PLANT-SPECIFIC TIME-LIMITED AGING ANALYSES A3.6.1 Containment Polar Crane, Fuel Building Cask Handling Crane, Spent Fuel Pool Bridge Crane, and Fuel Handling Machine CMAA-70 Load Cycle Limits The USAR Section 9.1.4 describes design of these lifting machines to Crane Manufacturers Association of America Specification No. 70 (CMAA-70 (1975)). The CMAA-70 crane service classification ("class"  
 
or "design class") for each machine depends, in part, on the assumption that the number of stress cycles at or near the maximum allowable stress will not exceed the number assumed for that design class. In operation, this means the number of significant lifts, i.e. those which approach or equal the design load, should not exceed the number of stress cycles assumed for that design class.
In all cases the design standard number of full-capacity lifts far exceeds the number expected of the machine for a 60-year period of extended operation. The lifting machine designs therefore remain valid for the period of extended operation. A3.7 TLAAS SUPPORTING 10 CFR 50.12 EXEMPTIONS One 10 CFR 50.12 exemption, for use of a leak-before-break analysis for the primary coolant loops, is based in part on a time-limited aging analysis of fatigue effects. See Section A3.2.1.11.}}

Latest revision as of 14:07, 6 May 2019

Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements.
ML17151B018
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/09/2017
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17151A982 List: ... further results
References
WO 17-0045
Download: ML17151B018 (250)


Text

WOLF CREEK TABLE OF CONTENTS

CHAPTER 18.0

RESPONSE TO NUREG-0737 CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS

Section Page

18.0 RESPONSE TO NUREG-0737, "CLARIFICATION OF 18.0-1 TMI ACTION PLAN REQUIREMENTS" 18.0.1 COMPLIANCE WITH REVISED REGULATIONS 10.0-1 10CFR50 AND 10CFR52 (NRC 2008-0122) RIN 3150-A I10, "ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS" [EFFECTIVE 12/23/2011] AFFECTING RESPONSE TO NUREG-0737

18.1 OPERATIONAL SAFETY 18.1-1

18.1.1 SHIFT TECHNICAL ADVISOR (I.A.1.1) 18.1-1

18.1.2 SHIFT SUPERVISOR'S ADMINISTRATIVE 18.1-5

DUTIES (I.A.1.2)

18.1.3 SHIFT MANNING (I.A.1.3) 18.1-7

18.1.4 IMMEDIATE UPGRADING OF REACTOR OPERATOR 18.1-10

AND SENIOR REACTOR OPERATOR TRAINING

AND QUALIFICATIONS (I.A.2.1)

18.1.5 ADMINISTRATION OF TRAINING PROGRAMS 18.1-12

(I.A.2.3)

18.1.6 REVISE SCOPE AND CRITERIA FOR 18.1-13

LICENSING EXAMINATIONS (I.A.3.1)

18.1.7 EVALUATION OF ORGANIZATION AND 18.1-14

MANAGEMENT (I.B.1.2)

18.1.8 GUIDANCE FOR EVALUATION AND 18.1-17

DEVELOPMENT OF PROCEDURES FOR

TRANSIENTS AND ACCIDENTS (I.C.1)

18.1.9 SHIFT RELIEF AND TURNOVER PROCEDURE 18.1-22

(I.C.2)

18.1.10 SHIFT SUPERVISOR'S RESPONSIBILITIES 18.1-24

(I.C.3)

18.1.11 CONTROL ROOM ACCESS (I.C.4) 18.1-24

18.1.12 PROCEDURES FOR FEEDBACK OF OPERATING 18.1-26

EXPERIENCE TO PLANT STAFF (I.C.5)

18.1.13 VERIFY CORRECT PERFORMANCE OF 18.1-28

OPERATING ACTIVITIES (I.C.6)

18.0-i Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)

Section Page

18.1.14 NSSS VENDOR REVIEW OF PROCEDURES 18.1-30

(I.C.7)

18.1.15 PILOT MONITORING OF SELECTED EMERGENCY 18.1-31

PROCEDURES FOR NEAR-TERM OPERATING

LICENSE APPLICANTS (I.C.8)

18.1.16 CONTROL ROOM DESIGN REVIEW (I.D.1) 18.1-32

18.1.17 PLANT SAFETY PARAMETER DISPLAY SYSTEM 18.1-36

(I.D.2)

18.1.18 SPECIAL LOW POWER TESTING AND 18.1-39

TRAINING (I.G.1)

18.2 SITING AND DESIGN 18.2-1

18.2.1 POSTACCIDENT REACTOR COOLANT SYSTEM 18.2-1

VENTING (II.B.1)

18.2.2 DESIGN REVIEW OF THE PLANT SHIELDING 18.2-6

(II.B.2)

18.2.3 POSTACCIDENT SAMPLING SYSTEM (II.B.3) 18.2-19

18.2.4 TRAINING FOR MITIGATING CORE DAMAGE 18.2-25

(II.B.4)

18.2.5 PERFORMANCE TESTING OF BOILING-WATER 18.2-27

REACTOR AND PRESSURIZED-WATER REACTOR

RELIEF AND SAFETY VALVES (II.D.1)

18.2.6 DIRECT INDICATION OF RELIEF AND SAFETY 18.2-30

VALVE POSITION (II.D.3)

18.2.7 AUXILIARY FEEDWATER SYSTEM 18.2-32

EVALUATION (II.E.1.1)

18.2.8 AUXILIARY FEEDWATER AUTOMATIC 18.2-33

INITIATION AND FLOW INDICATION

(II.E.1.2)

18.2.9 EMERGENCY POWER SUPPLY FOR PRESSURIZER 18.2-36

HEATERS (II.E.3.1)

18.0-ii Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)

Section Page

18.2.10 DEDICATED HYDROGEN PENETRATIONS 18.2-39

(II.E.4.1)

18.2.11 CONTAINMENT ISOLATION DEPENDABILITY 18.2-40

(II.E.4.2)

18.2.12 ACCIDENT MONITORING INSTRUMENTATION 18.2-44

(II.F.1)

18.2.13 INSTRUMENTATION FOR DETECTION OF 18.2-59

INADEQUATE CORE COOLING (II.F.2)

18.2.14 EMERGENCY POWER FOR PRESSURIZER 18.2-92

EQUIPMENT (II.G.1)

18.2.15 REQUEST BY NRC INSPECTION AND 18.2-94

ENFORCEMENT BULLETINS (II.K.1)

18.2.16 ORDERS ON FACILITIES WITH BABCOCK 18.2-95

AND WILCOX NUCLEAR STEAM SUPPLIER

SYSTEMS (II.K.2-SERIES)

18.2.17 RECOMMENDATIONS FROM THE BULLETINS 18.2-97

AND ORDERS TASK FORCE (II.K.3-SERIES)

18.2.18 REFERENCES 18.2-113

18.3 EMERGENCY PREPARATION AND RADIATION 18.3-1 PROTECTION

18.3.1 UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1) 18.3-1

18.3.2 UPGRADE EMERGENCY SUPPORT FACILITIES 18.3-1

(III.A.1.2)

18.3.3 IMPROVING LICENSEE EMERGENCY 18.3-7

PREPAREDNESS-LONG TERM (III.A.2)

18.3.4 INTEGRITY OF SYSTEMS OUTSIDE OF 18.3-10

CONTAINMENT (III.D.1.1)

18.3.5 IMPROVED INPLANT IODINE INSTRUMENTATION 18.3-12

UNDER ACCIDENT CONDITIONS (III.D.3.3)

18.3.6 CONTROL ROOM HABITABILITY (III.D.3.4) 18.3-14

18.4 ENHANCEMENTS TO EMERGENCY 18.4-1 PREPAREDNESS REGULATIONS

18.4.1 EMERGENCY FACILITIES AND EQUIPMENT 18.4-1

Appendix A AGING MANAGEMENT PROGRAMS & TIME LIMITED 18 A-1 AGING ANALYSES

18.0-iii Rev. 29 WOLF CREEK TABLE OF CONTENTS (Continued)

LIST OF TABLES

Table No. Title

18.1-1 ISEG FUNCTION CROSS REFERENCE

18.2-1 Mitigating Core Damage Course

18.2-2 Essential/Nonessential Containment Penetrations

18.2-3 Details for the Thermocouple/Core Cooling Monitor

System

18.2-4 Narrow Range Measurement Uncertainty for Reactor

Vessel Level Instrumentation System

18.0-iv Rev. 29

WOLF CREEK CHAPTER 18 - LIST OF FIGURES

  • Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.

Figure # Sheet Title Drawing #* 18.2-1 0 Reactor Head Vent System 18.2-2 0 Post-Accident Radiation Zones Elevation 1974' 18.2-3 0 Post-Accident Radiation Zones Elevation 1988' 18.2-4 0 Post-Accident Radiation Zones Elevation 2000' 18.2-5 0 Post-Accident Radiation Zones Elevation 2026' 18.2-6 0 Post-Accident Radiation Zones Elevation 2047'-6" 18.2-7 0 Post-Accident Radiation Zones Control Building and Communications Corridor Elevations 1974' and 1984' 18.2-8 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor

Elevations 2000' and 2016' 18.2-9 0 Post-Accident Radiation Zones Control and Diesel Generator Buildings and Communications Corridor

Elevations 2032' and 2047'-6" 18.2-10 0 Normalized Dose Rate Decay Curves for Airborne Source (Source A) 18.2-11 0 Normalized Dose Rate Decay Curves for Sump Source (Source C) with 1 Percent Cs and 50 Percent

Cs 18.2-12 0 Functional Diagram (Reactor Core Subcooling Monitor) 18.2-13 0 Reactor Vessel Level Instrumentation System 18.2-14 0 PORV Opening Band - Turbine Trip with Condenser Unavailable 18.2-15 0 Nuclear Sampling System M-12SJ04

18.0-v Rev. 29 WOLF CREEK CHAPTER 18.0

18.0 RESPONSE TO NUREG-0737, "CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS" The following discussion of the SNUPPS response to NUREG-0737 is subdivided

into three sections: 18.1, Operational Safety; 18.2, Siting and Design; and

18.3, Emergency Preparations and Radiation Protection. Unless otherwise noted, the subsections presenting the NRC guidance are verbatim quotes from NRC

documents.

Information in the sections listed below is historical and reflects conditions

at the time of plant licensing. This material will not be updated as a whole

as it establishes the conditions relevant to initial plant siting and design.

Changes to facilities or conditions will be reviewed and updated only when

potential hazards not previously analyzed are identified.

18.2.5 18.2.12 18.2.13.2 paragraph 2 2.d.

18.2.13.2 paragraph 2 3.

18.2.13.2 paragraph 2 4.d.

18.2.13.2 paragraph 2 4.e. 1)

18.2.13.2 paragraph 2 4.e. 2)

18.2.13.2 paragraph 2 7.

18.2.13.2 paragraph 2 8.

18.2.13.2 paragraph 2 9.

18.0.1 COMPLIANCE WITH REVSED REGULATIONS 10CFR50 AND 10CFR52 (NRC-2008-0122)

RIN 3150-AI10, "ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS" [EFFECTIVE 12/23/2011] AFFECTING RESPONSE TO NUREG-0737

Section 18.4 provides a discussion for compliance with revised regulations 10CFR50 and 10CFR52 pertaining to "Enhancements to Emergency Preparedness Regulations" applicable to the Emergency Operations Facility (EOF) and Alternate Technical Support Center (TSC). The compliance with the revised regulations may enhance or supersede previous information provided in section 18.3 applicable to the EOF and Alternate TSC for the response to NUREG-0737.

The comprehensive emergency plan provides the implementation of the revised objectives and requirements of 10CFR50, Appendix E, applicable to the EOF and Alternate TSC.

18.0-1 Rev. 28 WOLF CREEK 18.1 OPERATIONAL SAFETY

18.1.1 SHIFT TECHNICAL ADVISOR (I.A.1.1)

18.1.1.1 NRC Guidance Per NUREG-0737

Position

Each licensee shall provide an on-shift technical advisor to the shift supervisor. The shift technical advisor (STA) may serve more than one unit at

a multiunit site if qualified to perform the advisor function for the various

units.

The STA shall have a bachelor's degree or equivalent in a scientific or

engineering discipline and have received specific training in the response and

analysis of the plant for transients and accidents. The STA shall also receive

training in plant design and layout, including the capabilities of

instrumentation and controls in the control room. The licensee shall assign

normal duties to the STAs that pertain to the engineering aspects of ensuring safe operations of the plant, including the review and evaluation of operating experience.

Clarification

The staff letter of October 30, 1979 from H. R. Denton to All Operating Nuclear

Power Plants clarified the short-term STA requirements. The letter indicated

that the STAs must have completed all training by January 1, 1981. This paper

confirms these requirements and requests additional information.

The need for the STA position may be eliminated when the qualifications of the

shift supervisors and senior operators have been upgraded and the man-machine

interface in the control room has been acceptably upgraded. However, until

these long term improvements are attained, the need for an STA program will

continue.

The staff has not yet established the detailed elements of the academic and

training requirements of the STA beyond the guidance given in its October 30, 1979 letter. Nor has the staff made a decision on the level of upgrading

required for licensed operating personnel and the man-machine interface in the

control room that would be acceptable for eliminating the need of an STA.

Until these requirements for eliminating the STA position have been

established, the staff continues to require that, in addition to the staffing

requirements specified in its July 31, 1980 letter (as revised by item I.A.1.3

of this report), an STA be available for duty on each operating shift when a

plant is being operated in Modes 1-4 for a PWR and Modes 1-3 for a BWR. At

other times, an STA is not required to be on duty.

18.1-1 Rev. 0 WOLF CREEK Since the October 30, 1979 letter was issued, several efforts have been made to

establish, for the longer term, the minimum level of experience, education, and

training for STAs. These efforts include work on the revision to ANS-3.1, work

by the Institute of Nuclear Power Operations (INPO), and internal staff efforts.

INPO has issued a document entitled "Nuclear Power Plant Shift Technical

Advisor--Recommendations for Position Description, Qualifications, Education, and Training." A copy of Revision 0 of this document, dated April 30, 1980, is

attached as Appendix C [to NUREG-0737]. Sections 5 and 6 of the INPO document

describe the education, training, and experience requirements for STAs. The

NRC staff finds that the descriptions set forth in Sections 5 and 6 of Revision

0 to the INPO document are an acceptable approach for the selection and

training of personnel to staff the STA positions. [Note: This should not be interpreted to mean that this is an NRC requirement at this time. The intent is to refer to the INPO document as acceptable for interim guidance for a

utility in planning its STA program over the long term (i. e., beyond the

January 1, 1981 requirement to have STAs in place in accordance with the

qualification requirements specified in the staff's October 30, 1979 letter).]

No later than January 1, 1981, all licensees of operating reactors shall

provide this office with a description of their STA training program and their

plans for requalification training. This description shall indicate the level

of training attained by STAs by January 1, 1981 and demonstrate conformance

with the qualification and training requirements in the October 30, 1979

letter. Applicants for operating licenses shall provide the same information

in this application, or amendments thereto, on a schedule consistent with the

NRC licensing review schedule.

No later than January 1, 1981, all licensees of operating reactors shall provide this office with a description of their long-term STA program, including qualification, selection criteria, training plans, and plans, if any, for the eventual phaseout of the STA program. (Note: The description shall

include a comparison of the licensee/applicant program with the above-mentioned

INPO document. This request solicits industry views to assist NRC in

establishing long-term improvements in the STA program. Applicants for

operating licenses shall provide the same information in their application, or

amendments thereto, on a schedule consistent with the NRC licensing review

schedule.)

18.1-2 Rev. 0 WOLF CREEK 18.1.1.2 The Operating Agent Response

[Note: The remainder of Section 18.1.1 is included for historical purposes, however, the operating agent's conformance with NUREG-0737, Item I.A.1.1, is as specified by the Commission Policy Statement on Engineering Expertise on Shift.]

General The NRC issued a Policy Statement on Engineering Expertise on Shift in October

1985. The Commission Policy Statement on Engineering Expertise on shift is discussed in sections 13.2.1.1.3.1 and 13.2.1.1.3.2. The Policy Statement permits either of two options to be used to implement long term goals towards

upgrading the qualifications and training of operating staffs. These are

Option 1: Combined SRO/STA Position and Option 2: Continued Use of STA

Position. Either of these options may be used to meet the requirements of

NUREG-0737, Item I.A.1.1. Also, either Option 1 or 2 may be used on each shift. The complete requirements for the options are as follows:

Option 1: Combined SRO/STA Position

This option is satisfied by assigning an individual with the following qualifications to each operating shift crew as one of the SROs (preferably the Shift Manager) required by 10 CFR 50.54(m)(2)(i):

a. Licensed as a senior operator on the nuclear power unit(s) to which assigned and;
b. Meets the STA training criteria of NUREG-0737, Item I.A.1.1, and one of the following educational

alternatives:

1. Bachelor's degree in engineering from an accredited institution;
2. Professional Engineer's license obtained by the successful completion of the PE

examination;

3. Bachelor's degree in engineering technology from an accredited institution, including course work in the physical, mathematical, or engineering sciences; or
4. Bachelor's degree in a physical science from an accredited institution, including course work in the physical, mathematical, or engineering sciences.

18.1-3 Rev. 20 WOLF CREEK Option 2: Continued Use of STA Position

This option is satisfied by placing on each shift a dedicated Shift Technical Advisor (STA) who meets the STA criteria of NUREG-0737, Item I.A.1.1. The STA should assume an active role in shift activities. For example, the STA should review plant logs, participate in shift turnover activities, and maintain an awareness of plant configuration and status.

As stated in NUREG-0737 and the background to the NRC Policy Statement (discussed below), the requirement for an STA qualified person in the power

plant in addition to an SRO licensed Shift Manager was intended to be a temporary requirement until the qualifications of the Shift Manager and senior operators are upgraded and control boards are reviewed and modified to make

information and controls more useful to the operators. This is consistent with

the industry consensus established by INPO standard GPG-01, "Nuclear Power

Plant Shift Technical Advisor Position Description Qualifications, Education and Training" which refers to the fact of this position being "eliminated" when

certain additional actions are completed. The December 17, 1981 approved copy

of ANSI/ANS 3.1 also referred to this position as "interim."

The NRC staff has completed the review of the WCGS operator qualification

program developed to address NUREG-0737, Item I.A.1.1. The program and NRC

staff review results are discussed below.

Man-Machine Interface Upgrade The man-machine interface in the control room has been upgraded by means of an

extensive control room design review which included human factors input. For a

detailed description of this effort refer to Section 18.1.16 and 18.1.17.

Operator Qualification Upgrade Operator qualification upgrading in accordance with NUREG-0737, Item I.A.1.1 is

discussed in Section 13.2.1.1.3.

The NRC staff, in SER Supplement 5, noted that if the Kansas State University

adopted a Bachelor of Science Degree in Engineering Technology with a Nuclear

Option program, completion of the requirements for this degree would achieve

the necessary engineering expertise on shift. The program, which involves over

18.1-4 Rev. 13 WOLF CREEK 80 semester hours of college level credit, has been inaugurated as discussed in

Section 13.2.1.1.3, Item 1.c. The schedule for completion of this training is

provided in KMLNRC 85-210, dated September 3, 1985.

In the Fall of 1992, WCNOC suspended the implementation of its operator

Baccalaureate program. In place of this program, WCNOC implemented a Shift

Engineer Program. The Shift Engineers meet the academic and training

requirements to perform the duties of STA.

Training requirements for the STA are described in sections 13.2.1.1.3.2 and 13.2.2.12.

WCNOC has either a Senior Reactor Operator or a Shift Engineer who meets the STA training criteria of NUREG-0737, assigned to each of the Control Room

Operating Crews when the reactor is in MODES 1-4.

18.1.1.3 Conclusion The Operating Agent's actions to upgrade qualification of operating staff and

the man-machine interface for control room personnel are consistent with the

intent and specifics of the long-term resolution of Item I.A.1.1 of NUREG-0737.

18.1.2 SHIFT SUPERVISOR'S ADMINISTRATIVE DUTIES (I.A.1.2)

18.1.2.1 NRC Guidance Per NUREG-0578 Position

1. The highest level of corporate management of each licensee shall issue and periodically reissue a management directive that emphasizes the primary management responsibility of the shift supervisor for the safe operation of the plant under all conditions on his shift and that clearly establishes his command

duties.

2. Plant procedures shall be reviewed to ensure that the duties, responsibilities, and authority of the shift supervisor and control room operators are properly defined to effect the establishment of a definite line of command and clear delineation of the command decision authority of the shift supervisor in the control room, relative to other plant management personnel.

Particular emphasis shall be placed on the following:

a. The responsibility and authority of the shift supervisor when on duty in the control room shall be to maintain the broadest perspective of operational conditions affecting the safety of the plant as a matter of highest priority at all times. The principle shall be reinforced that the shift supervisor should not become totally involved in any single operation in times of emergency when multiple operations are required in the control room.

18.1-5 Rev. 20 WOLF CREEK

b. The shift supervisor, until properly relieved, shall remain in the control room at all times during accident situations to direct the activities of control room operators. Persons authorized to relieve the shift supervisor shall be specified.
c. If the shift supervisor is temporarily absent from the control room during routine operations, a lead control room operator shall be designated to assume the control room command function. These temporary duties, responsibilities, and authority shall be clearly specified.
3. Training programs for shift supervisors shall emphasize and reinforce the responsibility for safe operation and the management function the shift supervisor is to provide for ensuring safety.
4. The administrative duties of the shift supervisor shall be reviewed by the senior officer of each utility responsible for plant operations. Administrative functions that detract from or are subordinate to the management responsibility for ensuring the safe operation of the plant shall be delegated to other operations personnel not on duty in the control room.

18.1.2.2 The Operating Agent Response The President and Chief Executive Officer issues and reviews on an annual basis

a management directive which emphasizes the responsibilities of the Shift

Manager. The directive clearly emphasizes the command responsibilities of the Shift Manager during all normal and emergency operating conditions.

As discussed in Section 13.1.2.2.1, plant administrative procedures also define

the duties, responsibilities, and authority of Shift Managers, Control Room

Supervisors, and Reactor Operators (ROs). Licensed operators are trained in

accordance with training programs which meet 10 CFR 55 criteria.

Administrative procedures further define the line of command for the Shift

Manager. The Shift Manager reports to the Superintendent Operations during

normal operations and to the Duty/Call Superintendent

18.1-6 Rev. 17 WOLF CREEK during an emergency. The Shift Manager is the senior licensed management representative onsite on back shifts. The Control Room Supervisor, who reports to the Shift Manager, is in direct charge of the control room during normal operation, in order to allow the Shift Manager to direct his attention to overall plant operation for which he is responsible. In the event of the absence of the Shift Manager from the control room the control room command function is established in accordance with Technical Specifications.

In conjunction with the annual review of the management directive defining the

Shift Manager's authority and responsibilities, the President and Chief Executive Officer is provided an assessment of the administrative duties undertaken by the Shift Manager. If these duties are found to detract from the Shift Manager's responsibility for safe operation of the plant, they will be delegated to other appropriate members of the station staff.

18.1.2.3 Conclusion

The Operating Agent's commitment to the establishment and annual review of

management directives defining the responsibilities and authority of the Shift

Manager and to the implementation of training programs in accordance with 10 CFR Part 55 meet the specifics of Item I.A.1.2 in NUREG-0737.

18.1.3 SHIFT MANNING (I.A.1.3)

18.1.3.1 NRC Guidance Per NUREG-0737

Position

This position defines shift manning requirements for normal operation. The letter of July 31, 1980 from D. G. Eisenhut to all power reactor licensees and

applicants sets forth the interim criteria for shift staffing (to be effective

pending general criteria that will be the subject of future rule-making).

Overtime restrictions were also included in the July 31, 1980 letter.

Clarification (as modified by NRC Generic Letter 82-12)

Licensees of operating plants and applicants for operating licenses shall

include in their administrative procedures (required by license conditions)

provisions governing required shift staffing and movement of key individuals about the plant. These provisions are required to assure that qualified plant personnel to man the operational shifts are readily available in the event of

an abnormal or emergency situation.

18.1-7 Rev. 13 WOLF CREEK These administrative procedures shall also set forth a policy, the objective of

which is to prevent situations where fatigue could reduce the ability of

operating personnel to keep the reactor in a safe condition. The controls

established should assure that, to the extent practicable, personnel are not assigned to shift duties while in a fatigued condition that could significantly

reduce their mental alertness or their decision making ability. The controls

shall apply to the plant staff who perform safety-related functions (e.g.,

senior reactor operators, reactor operators, auxiliary operators, health

physicists, and key maintenance personnel).

IE Circular No. 80-02, "Nuclear Power Plant Staff Work Hours", dated February

1, 1980 discusses the concern of overtime work for members of the plant staff

who perform safety-related functions. The guidance contained in IE Circular No.

80-02 was amended by the July 31, 1980 letter. In turn, the overtime guidance of the July 31, 1980 letter was revised in Section I.A.1.3 of NUREG-0737. The NRC has issued a policy statement which further revises the overtime guidance

as stated in NUREG-0737. This guidance is as follows:

Enough plant operating personnel should be employed to maintain adequate shift

coverage without routine heavy use of overtime. The objective is to have

operating personnel work a normal 8-hour day, 40-hour week while the plant is

operating. However, in the event that unforeseen problems require substantial

amounts of overtime to be used, or during extended periods of shutdown for

refueling, major maintenance or major plant modifications, on a temporary

basis, the following guidelines shall be followed:

a. An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (excluding shift turnover time).
b. An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any seven day period (all excluding shift turnover time).
c. A break of at least eight hours should be allowed between work periods (including shift turnover time).
d. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on shift.

18.1-8 Rev. 0 WOLF CREEK Recognizing that very unusual circumstances may arise requiring deviation from

the above guidelines, such deviation shall be authorized by the plant manager

or his deputy, or higher levels of management. The paramount consideration in

such authorization shall be that significant reductions in the effectiveness of operating personnel would be highly unlikely. Authorized deviations to the

working hour guidelines shall be documented and available for NRC review.

In addition, procedures are encouraged that would allow licensed operators at

the controls to be periodically relieved and assigned to other duties away from

the control board during their tours of duty.

Operating license applicants shall complete these administrative procedures

before fuel loading. Development and implementation of the administrative

procedures at operating plants will be reviewed by the Office of Inspection and Enforcement beginning October 1, 1982.

See Section III.A.1.2 [of NUREG-0737] for minimum staffing and augment

capabilities for emergencies.

18.1.3.2 The Operating Agent Response Shift staffing is discussed in Section 13.1. The Operating Agent has an

administrative procedure governing shift manning and movement of key

individuals. Unexpected absences are also addressed in the procedure.

Additional information on staffing requirements is contained in the WCGS

Technical Specifications and in the Technical Requirements Manual.

In addition, the Operating Agent administrative procedures discuss the overtime

restrictions addressed in NUREG-0737 as revised by Generic Letter 82-12. The

Operating Agent has committed to comply with these limitations, except in cases

where special circumstances require additional coverage. Any such exceptions

are approved by the Plant Manager or his designated alternate, with appropriate

documentation.

WCGS complies with 10 CFR 26, Subpart I, "Managing Fatigue." Procedures and Programs affected by 10 CFR 26, Subpart I, has been updated to ensure compliance with the rule.

18.1.3.3 Conclusion

The Operating Agent's commitments to a minimum shift complement and the

additional commitment to observing the overtime restrictions listed in NUREG-0737, as revised by Generic Letter 82-12, meet the NRC's guidance.

18.1-9 Rev. 23 WOLF CREEK 18.1.4 IMMEDIATE UPGRADING OF REACTOR OPERATOR AND SENIOR

REACTOR OPERATOR TRAINING AND QUALIFICATIONS (I.A.2.1)

18.1.4.1 NRC Guidance Per NUREG-0737

Position

Effective December 1, 1980, an applicant for a SRO license will be required to have been a licensed operator for 1 year.

Clarification

Applicants for SRO either come through the operations chain (C operator to B

operator to A operator, etc.) or are degree-holding staff engineers who obtain

licenses for backup purposes.

In the past, many individuals who came through the operator ranks were

administered SRO examinations without first being an operator. This was clearly a poor practice and the letter of March 28, 1980 requires reactor operator experience for SRO applicants.

However, NRC does not wish to discourage staff engineers from becoming licensed

SROs. This effort is encouraged because it forces engineers to broaden their

knowledge about the plant and its operation.

In addition, in order to attract degree-holding engineers to consider the Shift

Supervisor's job as part of their career development, NRC should provide an

alternate path to holding an operator's license for 1 year.

The track followed by a high-school graduate (a nondegreed individual) to

become an SRO would be 4 years as a control room operator, at least one of

which would be as a licensed operator, and participation in an SRO training

program that includes 3 months onshift as an extra person.

The track followed by a degree-holding engineer would be, at a minimum, 2 years

of responsible nuclear power plant experience as a staff engineer, participation in an SRO training program equivalent to a cold applicant

training program, and 3 months onshift as an extra person in training for an

SRO position.

Holding these positions ensures that individuals who will direct the licensed

activities of licensed operators have had the necessary combination of

education, training, and actual operating experience prior to assuming a

supervisory role at that facility.

18.1-10 Rev. 0 WOLF CREEK The staff realizes that the necessary knowledge and experience can be gained in

a variety of ways. Consequently, credit for equivalent experience should be

given to applicants for SRO licenses.

Applicants for SRO licenses at a facility may obtain their 1-year operating

experience in a licensed capacity (operator or senior operator) at another

nuclear power plant. In addition, actual operating experience in a position

that is equivalent to a licensed operator or senior operator at military

propulsion reactors will be acceptable on a one-for-one basis. Individual

applicants must document this experience in their individual applications in

sufficient detail so that the staff can make a finding regarding equivalency.

Applicants for SRO licenses who possess a degree in engineering or applicable

sciences are deemed to meet the above requirement, provided they meet the requirements set forth in Sections A.1.a. and A.2. in enclosure l in the letter from H. R. Denton to all power reactor applicants and licensees, dated March

28, 1980, and have participated in a training program equivalent to that of a

cold senior reactor operator applicant.

NRC has not imposed the 1-year experience requirement on cold applicants for

SRO licenses. Cold applicants are to work on a facility not yet in operation;

their training programs are designed to supply the equivalent of the experience

not available to them.

18.1.4.2 The Operating Agent Response As discussed in Section 13.2, the Operating Agent has committed to conduct its

licensed operator training and requalification programs in accordance with the

requirements of 10 CFR Part 55. In addition, the Operating Agent complies with training and qualification guidance delineated in Regulatory Guide 1.8, Revision 2, Personnel Selection and Training, which references ANS-3.1-1981.

Additional discussion of the Operating Agent's commitments relative to training

and requalification programs is presented in Section 18.1.6.

18.1.4.3 Conclusion

The Operating Agent has committed to comply with 10 CFR Part 55 requirements

for operator licensing and requalification programs and to follow

recommendations contained in supplementary industry guidance.

18.1-11 Rev. 14 WOLF CREEK 18.1.5 ADMINISTRATION OF TRAINING PROGRAMS (I.A.2.3)

18.1.5.1 NRC Guidance Per NUREG-0737

Position

Pending accreditation of training institutions, licensees and applicants for

operating licenses will assure that training center and facility instructors

who teach systems, integrated responses, transient, and simulator courses

demonstrate SRO qualifications and be enrolled in appropriate requalification

programs.

Clarification

The above position is a short-term position. In the future, accreditation of training institutions will include review of the procedure for certification of

instructors. The certification of instructors may, or may not, include

successful completion of an SRO examination.

The purpose of the examination is to provide the NRC with reasonable assurance

during the interim period that instructors are technically competent.

The requirement is directed to permanent members of training staff who teach

the subjects listed above, including members of other organizations who

routinely conduct training at the facility. There is no intention to require

guest lecturers who are experts in particular subjects (reactor theory, instrumentation, thermodynamics, health physics, chemistry, etc.) to

successfully complete an SRO examination. Nor is it intended to require a

system expert, such as the instrument and control supervisor teaching the control rod drive system, to complete an SRO examination.

18.1.5.2 The Operating Agent Response This material is discussed in Section 13.2.1.2.2, 13.2.2.10.3 and 13.2.3.4.

All operator license program instructors are required to participate in selected requalification program topics, for licensed operators. In addition, licensed training instructors engaged in operator training participate in the

following activities:

- Periodic onshift assignments

- Review of facility operating and emergency operating procedures as they are developed

18.1-12 Rev. 12 WOLF CREEK

- Participation in instructor certification programs, such as those proposed by INPO.

18.1.5.3 Conclusion

The Operating Agent has committed to comply with NRC guidance relative to the

training and qualifications of nuclear training staff, and meets the legal

requirements of 10 CFR Part 55 where SRO licenses are required.

18.1.6 REVISE SCOPE AND CRITERIA FOR LICENSING EXAMINATIONS

(I.A.3.1)

18.1.6.1 NRC Guidance Per NUREG-0737 Position

Simulator examinations will be included as part of the licensing examinations.

Clarification

The clarification does not alter the staff's position regarding simulator

examinations.

The clarification does provide additional preparation time for utility

companies and NRC to meet the examination requirements as stated. A study is

under way to consider how similar a nonidentical simulator should be for a

valid examination. In addition, present simulators are fully booked months in advance.

Application of this requirement was stated on June 1, 1980 to applicants where

a simulator is located at the facility. Starting October 1, 1981, simulator

examinations will be conducted for applicants of facilities that do not have

simulators at the site.

NRC simulator examinations normally require 2 to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. Normally, two

applicants are examined during this time period by two examiners.

Utility companies should make the necessary arrangements with an appropriate

simulator training center to provide time for these examinations. Preferably, these examinations should be scheduled consecutively with the balance of the

examination. However, they may be scheduled no sooner than 2 weeks prior to

and no later than 2 weeks after the balance of the examination.

18.1-13 Rev. 0 WOLF CREEK 18.1.6.2 The Operating Agent Response

The Operating Agent has a full scope simulator near the plant site. The

simulator is used as part of the licensing examinations. For further direction

as to the use of the simulator see Section 13.2.

18.1.6.3 Conclusion The Operating Agent has committed to NUREG-0737 guidance with regard to the

NRC's revised scope and criteria for license examinations. In addition, the

Operating Agent has incorporated simulator examinations into it's training program. These commitments comply fully with the NRC guidance as stated in

NUREG-0737 relative to licensing examinations.

18.1.7 EVALUATION OF ORGANIZATION AND MANAGEMENT (I.B.1.2)

18.1.7.1 NRC Guidance Per NUREG-0694 and NUREG-0737 Position

The licensee organization shall comply with the findings and requirements generated in an interoffice NRC review of licensee organization and management.

The review will be based, in part, on an NRC document entitled "Draft Criteria

for Utility Management and Technical Competence." The first draft of this

document was dated February 25, 1980. The current draft was issued for interim

use and public comment in September 1980 as NUREG-0731, "Guidelines for Utility

Management Structure and Technical Resources." These draft guidelines address

the organization, resources, training, and qualifications of plant staff and

management (both onsite and offsite) for routine operations and the resources

and activities (both onsite and offsite) for accident conditions.

The licensee shall establish a group that is independent of the plant staff but is assigned onsite to perform independent reviews of plant operational

activities and a capability for evaluation of operating experiences of nuclear

power plants.

Organizational changes are to be implemented on a schedule to be determined

prior to fuel loading.

Corporate management of the utility-owner of a nuclear power plant shall be

sufficiently involved in the operational phase activities, including plant

modifications, to ensure a continual understanding of plant conditions and

safety considerations. Corporate management shall establish safety standards

for the operation and

18.1-14 Rev. 0

WOLF CREEK

a. Assurance that critical plant parameters are within allowable limits (parameters and allowable limits shall be listed on the checklist).
b. Assurance of the availability and proper alignment of all systems essential to the prevention and mitigation of operational transients and accidents by a check of the control console. What to check and criteria for acceptable status shall be included in the checklist.
c. Identification of systems and components that are in a degraded mode of operation permitted by the Technical Specifications. For such systems and components, the length of time in the degraded mode shall be compared with the Technical Specifications action statement. (This shall be recorded as a separate entry on the checklist.)
2. Checklists or logs shall be provided for completion by the offgoing and oncoming auxiliary operators and technicians. Such checklists or logs shall include any equipment under maintenance or test that by itself could degrade a system critical to the prevention and mitigation of operational transients and accidents or initiate an operational transient (what to check and criteria for acceptable status shall be included on the checklist); and
3. A system shall be established to evaluate the effectiveness of the shift and relief turnover procedures (for example, periodic independent verification of system alignments).

18.1.9.2 The Operating Agent Response Plant administrative procedures define specific shift relief and turnover

procedures for WCGS. Turnover checklists have been developed which include the

following information:

a. Control Room relief and turnover:

- Provides means to review plant system alignment for anomalies via critical plant parameter and control panel checks;

- Provides means to determine that onshift activities impacting Technical Specifications have been appropriately documented;

18.1-23 Rev. 0 WOLF CREEK

- Provides a clear record of transfer of control room command function from Shift Manager and Control Room Supervisor to their successors on the next shift.

b. Nuclear Station Operator relief and turnover:

- Includes procedures which call for a review of equipment on which maintenance or test activities are being performed.

18.1.9.3 Conclusion The Operating Agent has satisfied NRC guidance relative to shift

relief/turnover procedures through it's commitments to implementation of the

described procedures.

18.1.10 SHIFT SUPERVISOR'S RESPONSIBILITIES (I.C.3)

This item is discussed in Section 18.1.2, Shift Supervisor Administrative

Duties.

18.1.11 CONTROL ROOM ACCESS (I.C.4)

18.1.11.1 NRC Guidance Per NUREG-0578 Position

The licensee shall make provisions for limiting access to the control room to those individuals responsible for the direct operation of the nuclear power

plant (e.g., operations supervisor, shift supervisor, and control room

operators), to technical advisors who may be requested or required to support

the operation, and the predesignated NRC personnel. Provisions shall include

the following:

1. Develop and implement an administrative procedure that establishes the authority and responsibility of the person in charge of the control room to limit access.

18.1-24 Rev. 13 WOLF CREEK

2. Develop and implement procedures that establish a clear line of authority and responsibility in the control room in the event of an emergency. The line of succession for the person in charge of the control room shall be established and limited to persons possessing a current SRO's license. The plan shall clearly define the lines of communication and authority for plant management personnel not in direct command of operations, including those who report to stations outside the control room.

18.1.11.2 The Operating Agent Response The Operating Agent has administrative procedures which define the line of

authority in the control room: the Shift Manager is in overall control room

command, and the Control Room Supervisor is in direct control room command.

The Operating Agent has implemented additional administrative procedures which

define lines of communication and authority for WCGS management "who report to

stations both within and outside the control room." During normal plant

operations, access to the control room is controlled in accordance with the

provisions of the WCGS Security Plan.

In addition, the Radiological Emergency Response Plan for the WCGS clearly

indicates that control room access is controlled by the Shift Manager. Access to the Control Room is controlled by the Shift Manager.

18.1.11.3 Conclusion

The Operating Agent has established a procedure which clearly defines the line

of authority in the control room during normal and emergency situations. In

addition, the Operating Agent has established a procedure that clearly defines restrictions on control room access during normal and emergency conditions.

This procedure further defines the authority of the Shift Manager to restrict

control room access at all times. These procedures comply with the NRC

guidance specified in NUREG-0578.

18.1-25 Rev. 14 WOLF CREEK 18.1.12 PROCEDURES FOR FEEDBACK OF OPERATING EXPERIENCE TO

PLANT STAFF (I.C.5)

18.1.12.1 NRC Guidance Per NUREG-0737

Position

In accordance with Task Action Plan I.C.5, Procedures for Feedback of Operating Experience to Plant Staff (NUREG-0660), each applicant for an operating license

shall prepare procedures to ensure that operating information pertinent to

plant safety originating both within and outside the utility organization is

continually supplied to operators and other personnel and is incorporated into

training and retraining programs. These procedures shall:

1. Clearly identify organizational responsibilities for review of operating experience, the feedback of pertinent information to operators and other personnel, and the incorporation of such information into training and retraining programs;
2. Identify the administrative and technical review steps necessary in translating recommendations by the operating experience assessment group into plant actions (e.g., changes to procedures, operating orders);
3. Identify the recipients of various categories of information from operating experience (e.g., supervisory personnel, STAs, operators, maintenance personnel, and health physics technicians) or otherwise provide means through which such information can be readily related to the job functions of the recipients;
4. Provide means to assure that affected personnel become aware of and understand information of sufficient importance that should not wait for emphasis through routine training and retraining programs;
5. Assure that plant personnel do not routinely receive extraneous and unimportant information on operating experience in such volume that it would obscure priority information or otherwise detract from overall job performance and proficiency;
6. Provide suitable checks to assure that conflicting or contradictory information is not conveyed to operators and other personnel until resolution is reached; and

18.1-26 Rev. 0 WOLF CREEK

7. Provide periodic internal audit to assure that the feedback program functions effectively at all levels.

Clarification

Each utility shall carry out an operating experience assessment function that

will involve utility personnel having collective competence in all areas

important to plant safety. In connection with this assessment function, it is

important that procedures exist to assure that important information on

operating experience originating both within and outside the organization is

continually provided to operators and other personnel and that it is

incorporated into plant operating procedures, training, and retraining

programs.

Those involved in the assessment of operating experience will review information from a variety of sources. These include operating information

from the licensee's own plant(s), publications such as IE Bulletins, Circulars, Notices, and pertinent NRC or industrial assessments of operating experience.

In some cases, information may be of sufficient importance that it must be

dealt with promptly (through instructions, changes to operating and emergency

procedures, issuance of special changes to operating and emergency procedures, issuance of special precautions, etc.) and must be handled in such a manner to

assure that operations management personnel would be directly involved in the

process. In many other cases, however, important information will become

available which should be brought to the attention of operators and other

personnel for their general information to assure continued safe plant

operation. Since the total volume of information handled by the assessment

group may be large, it is important that assurance be provided that high-

priority matters are dealt with promptly and that discrimination is used in the feedback of other information so that personnel are not deluged with unimportant and extraneous information to the detriment of their overall

proficiency. It is important, also, that technical reviews be conducted to

preclude premature dissemination of conflicting or contradictory information.

18.1.12.2 The Operating Agent Response Operating experience assessment for WCGS was originally conducted by various

groups within the plant and Wichita office staffs who possessed appropriate

experience within the area of concern. The program utilized the INPO SEE-IN Program, NRC Office of Inspection and Enforcement Issuances and Licensee Event

Reports as input.

18.1-27 Rev. 1 WOLF CREEK The operating experience assessment activities have been upgraded and enlarged

to include the above inputs as well as INPO SOERs, SERs, NPRDS, Nuclear Network

and information received from vendors and contractors. Input received from

these sources is routed to the appropriate coordinator for logging, initial screening and assignment for evaluation. The coordinator also tracks the

information through the evaluation and action phases, if necessary.

The administrative system for control of the handling and evaluation of

appropriate operating experience data is controlled by division procedures.

18.1.12.3 Conclusion The Operating Agent's internal programs for the review, evaluation, and

dissemination of operating experience gained at WCGS and at other operating

facilities fulfill the NRC's NUREG-0737 guidance relative to feedback and evaluation of operating experience.

18.1.13 VERIFY CORRECT PERFORMANCE OF OPERATING ACTIVITIES

(I.C.6)

18.1.13.1 NRC Guidance Per NUREG-0737 Position

It is required (from NUREG-0660) that licensees' procedures be reviewed and revised, as necessary, to assure that an effective system of verifying the

correct performance of operating activities is provided as a means of reducing

human errors and improving the quality of normal operations. This will reduce

the frequency of occurrence of situations that could result in or contribute to

accidents. Such a verification system may include automatic system status

monitoring, human verification of operations and maintenance activities

independent of the people performing the activity (see NUREG-0585, Recommendation 5), or both.

Implementation of automatic status monitoring, if required, will reduce the extent of human verification of operations and maintenance activities but will not eliminate the need for such verification in all instances. The procedures

adopted by the licensees may consist of two phases--one before and one after

installation of automatic status monitoring equipment, if required, in

accordance with Item I.D.3.

18.1-28 Rev. 0 WOLF CREEK Clarification

Item I.C.6 of the U.S. Nuclear Regulatory Commission Task Action Plan (NUREG-

0660) and Recommendation 5 of NUREG-0585 propose requiring that licensees' procedures be reviewed and revised, as necessary, to assure that an effective

system of verifying the correct performance of operating activities is

provided. An acceptable program for verification of operating activities is

described below.

The American Nuclear Society has prepared a draft revision to ANSI Standard

N18.7-1972 (ANS-3.2), "Administrative Controls and Quality Assurance for the

Operational Phase of Nuclear Power Plants." A second proposed revision to

Regulatory Guide 1.33, "Quality Assurance Program Requirements (Operation),"

which is to be issued for public comment in the near future, will endorse the latest draft revision to ANS-3.2 subject to the following supplemental provisions:

1. Applicability of the guidance of Section 5.2.6 should be extended to cover surveillance testing in addition to

maintenance.

2. In lieu of any designated senior reactor operator (SRO),

the authority to release systems and equipment for maintenance or surveillance testing or return-to-service may be delegated to an onshift SRO, provided provisions are made to ensure that the shift supervisor is kept fully informed of system status.

3. Except in cases of significant radiation exposure, a second qualified person should verify correct implementation of equipment control measures, such as the tagging of equipment.
4. Equipment control procedures should include assurance that control room operators are informed of changes in equipment status and the effects of such changes.
5. For the return-to-service of equipment important to safety, a second qualified operator should verify proper system alignment unless functional testing can be performed without compromising plant safety, and can prove that all equipment, valves, and switches involved in the activity are correctly aligned.

18.1-29 Rev. 0 WOLF CREEK Note: A licensed operator possessing knowledge of the systems involved and the relationship of the systems to plant safety would be a "qualified" person. The staff is investigating the level of qualification necessary for other operators to perform these functions.

For plants that have or will have automatic system status monitoring, as

discussed in Task Action Plan Item I.D.3, NUREG-0660, the extent of human

verification of operations and maintenance activities will be reduced.

However, the need for such verification will not be eliminated in all

instances.

18.1.13.2 The Operating Agent Response The Operating Agent has developed specific administrative procedures and

utilizes available status monitoring in the control room to control equipment

status. The procedures describe the control measures and actions such as locking, tagging, notification, and identification of equipment. The

procedures provide for control of equipment to maintain reactor and personnel

safety and to avoid unauthorized or inadvertent operation of equipment. As

suggested by NUREG-0737, administrative procedures provide instructions for

verification of correct performance of operating and surveillance activities.

The status monitoring is in the form of position indication in the control room

of safety-related valves and breakers or logging of valve/breaker position on

the plant computer.

18.1.13.3 Conclusion The Operating Agent's administrative controls for performance of operating

activities satisfy the guidance of NUREG-0737, Item I.C.6.

18.1.14 NSSS VENDOR REVIEW OF PROCEDURES (I.C.7)

18.1.14.1 NRC Guidance Per NUREG-0660 Applicants for near-term operating licenses will be required to obtain NSSS

vendor review of their low-power and power-ascension tests, and emergency

procedures as a further verification of the adequacy of procedures.

18.1.14.2 The Operating Agent Response The Operating Agent committed to a review by Westinghouse of specific low-power

and power-ascension procedures as a means of further verification of their

adequacy. Westinghouse assistance in the preoperational and startup test programs is discussed in

18.1-30 Rev. 0 WOLF CREEK Section 14.2. However, the Operating Agent reserved the right to evaluate any

suggested changes resulting from vendor review and, in light of the Operating

Agent's ultimate responsibility for the safe operation of WCGS, to make the

final determination as to whether any suggested change is warranted.

As discussed in Section 18.1.8.2, the Operating Agent is participating in the

Westinghouse Owner's Group activities in which Westinghouse has developed

guidelines for preparation of emergency operating procedures. The Operating

Agent committed in that section to developing WCGS emergency operating

procedures from the generic guidelines. Westinghouse review of the WCGS

emergency operating procedures was not only limited to Westinghouse's review

and preparation of the generic guidelines. Copies of the emergency procedures

were provided to Westinghouse for review.

18.1.14.3 Conclusion The Operating Agent's actions relative to NSSS vendor review of selected

procedures comply with the guidance of NUREG-0737.

18.1.15 PILOT MONITORING OF SELECTED EMERGENCY PROCEDURES

FOR NEAR-TERM OPERATING LICENSE APPLICANTS (I.C.8)

18.1.15.1 NRC Guidance Per NUREG-0737 Position

The NRC will conduct an interdisciplinary and interoffice audit of selected plant emergency operating procedures (e.g., small-break LOCA, loss of

feedwater, restart of engineered safety features following a loss of ac power, steamline break, or steam-generator tube rupture).

The licensee should correct, before full-power operation, any deficiencies in

the emergency procedures, as necessary, based on the NRC audit.

18.1.15.2 The Operating Agent Response The Operating Agent did not object to a pilot review by the NRC of these

procedures. However, since the NRC has conducted an indepth review of the WOG

guidelines (refer to Section 18.1.8.1), and since the Operating Agent has agreed to use the WOG guidelines, a specific review of the Operating Agent

procedures did not appear to be necessary. Based on this reasoning, the NRC, in Supplement 5 to the WCGS Safety Evaluation Report, concluded that Item I.C.8

was resolved.

18.1-31 Rev. 0 WOLF CREEK 18.1.15.3 Conclusion

The Operating Agent activities associated with Item I.C.1, Section 18.1.8, comply with the objectives of Item I.C.8 of NUREG-0737.

18.1.16 CONTROL ROOM DESIGN REVIEW (I.D.1)

18.1.16.1 NRC Guidance Per NUREG-0737 Position

In accordance with Task Action Plan I.D.1, Control Room Design Reviews (NUREG-0660), all licensees and applicants for operating licenses will be required to

conduct a detailed control room design review to identify and correct design

deficiencies. This detailed control room design review is expected to take

about a year. Therefore, the Office of Nuclear Reactor Regulation (NRR)

requires that those applicants for operating licenses who are unable to

complete this review prior to the issuance of a license make preliminary

assessments of their control rooms to identify significant human factors and

instrumentation problems and establish a schedule approved by the NRC for

correcting deficiencies. These applicants will be required to complete the

more detailed control room reviews on the same schedule as licensees with operating plants.

Clarification

NRR is presently developing human engineering guidelines to assist each

licensee and applicant in performing detailed control room review. A draft of

the guidelines has been published for public comment as NUREG/CR-1580, "Human

Engineering Guide to Control Room Evaluation." The due date for comments on

this draft document was September 29, 1980. NRR will issue the final version

of the guidelines as NUREG-0700, by February 1981, after receiving, reviewing, and incorporating substantive public comments from operating reactor licensees, applicants for operating licenses, human factors engineering experts, and other

interested parties. NRR will issue evaluation criteria, by July 1981, which

will be used to judge the acceptability of the detailed reviews performed and

the design modifications implemented.

Applicants for operating licenses who will be unable to complete the detailed

control room design review prior to the issuance of a license are required to

perform a preliminary control room design assessment to identify significant

human factors problems. Applicants will find it of value to refer to draft

document NUREG/CR-1580, "Human Engineering Guide to Control Room Evaluation,"

in performing the preliminary assessment. NRR will evaluate the

18.1-32 Rev. 0 WOLF CREEK applicants' preliminary assessments, including the performance by NRR of onsite

review/audit. The NRR onsite review/audit will be on a schedule consistent

with licensing needs and will emphasize the following aspects of the control

room:

1. The adequacy of information presented to the operator to reflect plant status for normal operation, anticipated operational occurrences, and accident conditions.
2. The groupings of displays and the layout of panels.
3. Improvements in the safety monitoring and human factors enhancement of controls and control displays.
4. The communications from the control room to points outside the control room, such as the onsite technical support center, remote shutdown panel, and offsite telephone lines, and to other areas within the plant, for normal and emergency operation.
5. The use of direct rather than derived signals for the presentation of process and safety information to the

operator.

6. The operability of the plant from the control room with multiple failures of nonsafety-grade and non-seismic

systems.

7. The adequacy of operating procedures and operator training with respect to the limitations of instrumentation displays in the control room.
8. The categorization of alarms, with unique definition of safety alarms.
9. The physical location of the Shift Supervisor's office, either adjacent to or within the control room complex.

Prior to the onsite review/audit, NRR will require a copy of the applicant's

preliminary assessment and additional information, which will be used in

formulating the details of the onsite review/audit.

18.1.16.2 The Operating Agent Response Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982)

provided guidance and requirements for control room design reviews which

superseded previous NRC guidance.

18.1-33 Rev. 0 WOLF CREEK A Preliminary Design Assessment (PDA) of the WCGS control room was performed

and the results provided to the NRC (SNUPPS letter dated June 26, 1981). As a

result of the PDA activities, four significant actions were undertaken to

improve the operator-control board interface and the decision making process:

1. Extensive rearrangement of switches, recorders and indicators was performed to improve location relationship of equipment controls and associated

indications.

2. The location of all annunciators was reviewed and an extensive hierarchical arrangement by priority was developed to assist the operator in recognizing independently significant and dependent annunciator alarms.
3. Panels of status and permissive lights have been rearranged into functional groups, and methods of designating different plant safeguards modes have been incorporated to improve the operator's ability to understand and respond to these indications.
4. The Operating Agent, in conjunction with several owners of Westinghouse plants, has developed an extensive Safety Parameter Display System with an ability to display critical parameters, both quantitatively and graphically. The Senior Reactor Operators in the control room have these Safety Parameter Display Systems available to them to monitor plant conditions during any incident (refer to Section 18.1.17).

The original control board design had significant Prairie Island and Ginna

plant operating experience input from Northern States Power and Rochester Gas

and Electric during the initial design phases and had more extensive use of

system mimic-layout than most nuclear plant control boards. The above

modifications improved upon one of the better pre-TMI control board designs and

results in the control board supplying relevant, easy to comprehend information

to all control room personnel.

An NRC control room design review audit (CRDR/A) was conducted from July 29 to

July 31, 1981. Additional information to resolve PDA and CRDR/A issues was

submitted to the NRC by SNUPPS letters dated August 12, 1981, January 19, 1982, March 16, 1982 and April 12, 1982. Additional information, addressing panels

specific to WCGS, was submitted to the NRC by Operating Agent letters dated

January 15, 1982, March 10, 1982 and June 29, 1982.

18.1-34 Rev. 0 WOLF CREEK In response to Supplement 1 to NUREG-0737, additional detailed control room

design review (DCRDR) information was provided to the NRC by SNUPPS letters:

April 15, 1983 - Response to Generic Letter 82-33

June 30, 1983 - DCRDR Program Plan November 28, 1983 - Revised DCRDR Program Plan

November 30, 1983 - Responses to PDA Issues

February 2, 1984 - DCRDR Summary Report

March 21, 1984 - Auxiliary Shutdown Panel Issues

June 29, 1984 - Revision to DCRDR Summary Report

October 10, 1984 - Task Analysis Procedure

December 21, 1984 - Human Factors Review

The NRC conducted a second onsite audit in March 1984.

The Operating Agent also addressed the status of resolution of human

engineering discrepancies (HEDs) in a letter to the NRC dated May 11, 1984.

As a result of the DCRDR activities, including Control Room Inventory and

Supplemental Survey and Auxiliary Shutdown Panel review, several significant

activities were undertaken. Some of the major efforts are identified below and

were performed together with the resolution of hundreds of specific human

engineering findings.

1. A standard list of abbreviations was adopted to provide a uniform nomenclature for plant operators. The standard abbreviations were used to update control room equipment labels, annunciator windows, Auxiliary Shutdown Panel labels and plant computer software.
2. Several system mimic displays were extensively revised, e.g., Chemical and Volume Control System, Component Cooling Water System and electrical systems.
3. The J-handles of many control switches used on control boards were engraved with indicating arrows. The engraved arrows were filled with white paint for easy identification of handle position.

18.1-35 Rev. 4 WOLF CREEK

4. Approximately fifty instrumentation/control devices were relocated with attendant panel rewiring. An additional reactor coolant system wide range pressure channel was incorporated into the plant design.
5. Extensive use of demarcation lines was employed to visually isolate indication and control groups for systems and components.
6. Several hundred displays were modified to add tolerance bands to provide plant operators with information regarding range and setpoints.

In Supplement 5, to the WCGS Safety Evaluation Report, the NRC evaluated the DCRDR activities up to that time (March 1985) and concluded that the DCRDR substantially meets the requirements of Supplement 1 to NUREG-0737 except in

the area of System Function Review and Task Analysis (SFR&TA).

The Task Analysis procedure was revised by SNUPPS letter dated April 1, 1985.

By SNUPPS letters dated April 26, 1985 and May 24, 1985, a final report

entitled "Task Analysis and Verification of the SNUPPS Control Room" was

submitted to the NRC. Additional NRC questions regarding the SFR&TA were

addressed by Operating Agent letters dated November 4, 1985 and November 5, 1986. The NRC staff evaluation, documenting resolution of the SFR and TA

issue, was issued by letter dated December 2, 1986.

18.1.16.3 Conclusions Based on the DCRDR activities and NRC staff review results summarized above, the Operating Agent acceptably complies with the regulatory requirements for

control room design review.

18.1.17 PLANT SAFETY PARAMETER DISPLAY SYSTEM (I.D.2)

18.1.17.1 NRC Guidance Per NUREG-0696 The purpose of the safety parameter display system (SPDS) is to assist control

room personnel in evaluating the safety status of the plant. The SPDS is to

provide a continuous indication of plant parameters or derived variables representative of the safety status of the plant. The primary function of the

SPDS is to aid the operator in the rapid detection of abnormal operating

conditions. The functional criteria for the SPDS presented in this section are

applicable for use only in the control room.

It is recognized that, upon the detection of an abnormal plant status, it may

be desirable to provide additional information to

18.1-36 Rev. 1 WOLF CREEK analyze and diagnose the cause of the abnormality, execute corrective actions, and monitor plant response as secondary SPDS functions.

As an operator aid, the SPDS serves to concentrate a minimum set of plant parameters from which the plant safety status can be assessed. The grouping of

parameters is based on the function of enhancing the operator's capability to

assess plant status in a timely manner without surveying the entire control

room. However, the assessment based on SPDS is likely to be followed by

confirmatory surveys of many non-SPDS control room indicators.

Human factors engineering shall be incorporated in the various aspects of the

SPDS design to enhance the functional effectiveness of control room personnel.

The design of the primary or principal display format shall be as simple as

possible, consistent with the required function, and shall include pattern and coding techniques to assist the operator's memory recall for the detection and recognition of unsafe operating conditions. The human-factored concentration

of these signals shall aid the operator in functionally comparing signals in

the assessment of safety status.

All data for display shall be validated where practicable on a realtime basis

as part of the display to control room personnel. For example, redundant sensor

data may be compared, the range of a parameter may be compared to predetermined

limits, or other quantitative methods may be used to compare values. When an

unsuccessful validation of data occurs, the SPDS shall contain means of

identifying the impacted parameter(s). Operating procedures and operator

training in the use of the SPDS shall contain information and provide guidance

for the resolution of unsuccessful data validation. The objective is to ensure

that the SPDS presents the most current and accurate status of the plant

possible and is not compromised by unidentified faulty processing or failed sensors.

The SPDS shall be in operation during normal and abnormal operating conditions.

The SPDS shall be capable of displaying pertinent information during steady-

state and transient conditions. The SPDS shall be capable of presenting the

magnitudes and the trends of parameters or derived variables as necessary to

allow rapid assessment of the current plant status by control room personnel.

The parameter trending display shall contain recent and current magnitudes of

the parameter as a function of time. The derivation and presentation of

parameter trending during upset conditions is a task that may be automated, thus freeing the operator to interpret the trends rather than generate them.

Display of time derivatives of the parameters in lieu of trends to both

optimize operator-process communication and conserve space may be acceptable.

18.1-37 Rev. 0 WOLF CREEK The SPDS may be a source of information to other systems, and the functional

criteria of these systems shall state the required interfaces with the SPDS.

Any interface between the SPDS and a safety system shall be isolated in

accordance with the safety system criteria to preserve channel independence and ensure the integrity of the safety system in the case of SPDS malfunction.

Design provisions shall be included in the interfaces between the SPDS and

nonsafety systems to ensure the integrity of the SPDS upon failure of nonsafety

equipment.

A qualification program shall be established to demonstrate SPDS conformance to

the functional criteria of this [NUREG-0696] document.

18.1.17.2 The Operating Agent Response Supplement 1 to NUREG-0737 (Generic Letter 82-33, dated December 17, 1982)

provided guidance and requirements for the SPDS which superceded previous NRC

guidance.

In response to the NUREG-0696 design criteria guidance, a detailed description

of the SPDS conceptual design was submitted to the NRC by SNUPPS letter dated

June 1, 1981. In response to Generic Letter 82-33, further details were

provided in a SNUPPS letter dated April 15, 1983. By SNUPPS letter dated

January 13, 1984, an analysis of the bases for SPDS parameter selection was

submitted to the NRC.

Based on the NRC review of the submitted information and the results of an NRC

audit of the WCGS SPDS conducted in August 1984, the NRC staff concluded that the SNUPPS utilities were required to address (refer to WCGS Safety Evaluation Report, Supplement 5):

1. A commitment to add or justify not adding containment isolation status to the SPDS,
2. The inclusion of additional events in the SPDS variable validation and verification effort,
3. Involvement of human factors professionals in the design, and
4. Human engineering discrepancies identified during the NRC audit.

By SNUPPS letters dated September 5, 1984 and February 27, 1986, the above issues were addressed and the entire verification and validation program for the SPDS at the SNUPPS plants was reported to be successfully completed.

18.1-38 Rev. 1 WOLF CREEK 18.1.17.3 Conclusions

Based on the above summary of SPDS activities, the WCGS SPDS design agrees

adequately with the requirements established in Supplement 1 to NUREG-0737.

18.1.18 SPECIAL LOW POWER TESTING AND TRAINING (I.G.1)

18.1.18.1 NRC Guidance Per NUREG-0694 NUREG-0694, "TMI-Related Requirements for New Operating Licenses," requires

applicants for a new operating license to define and commit to a special low-

power testing program approved by the NRC staff, to be conducted at power levels no greater than 5 percent, for the purposes of providing meaningful

technical information beyond that obtained in the normal startup test program

and to provide supplemental training. This requirement must be met before fuel

loading.

Position

The staff position was stated in a letter to the applicants dated November 14, 1980. This letter stated that the program should provide for the following:

"Each licensed reactor operator (RO or SRO who performs RO or SRO duties, respectively) should experience the initiation, maintenance, and recovery from natural circulation mode, using nuclear heat to simulate decay heat. Operators should be able to recognize when natural circulation has stabilized, and should be able to control saturation margin, RCS pressure, and heat removal rate without exceeding specified operating limits.

These tests should demonstrate the following plant characteristics: length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, and the ability to uniformly borate and cool down to hot shutdown conditions, using natural circulation. The latter demonstration may be performed using decay heat following power ascension and vendor acceptance tests, and need only be performed at those plants for which the tests has not been demonstrated at a comparable prototype plant."

18.1.18.2 The Operating Agent Response The WCGS natural circulation testing requirements are based on post-Three Mile

Island (TMI) regulatory positions and NRC Branch

18.1-39 Rev. 0 WOLF CREEK Technical Position RSB 5-1. In response to the post-TMI positions, Westinghouse developed a special low-power test program which was approved by

the NRC. In accordance with the test program, prototype natural circulation

testing for 4-loop plants was performed at the Diablo Canyon plant. The prototype testing was performed in 1985 and acceptably demonstrated plant

characteristics important to plant shutdown under natural circulation

conditions, such as, length of time to achieve natural circulation, the ability

to borate the reactor coolant system under natural circulation conditions and

the ability to cool the plant down and depressurize under natural circulation

conditions. The Diablo Canyon test results have been determined to be

applicable to the WCGS design.

Plant-specific natural circulation testing was conducted at one SNUPPS plant (Callaway Plant -- operated by Union Electric Company). Sufficient data was collected during this testing to validate the simulation of natural circulation on the WCGS simulator. All licensed operators for WCGS received natural

circulation training by either participating in the natural circulation testing

or by simulating natural circulation on a validated simulator.

1. Training - Each licensed RO (RO or SRO who performs RO or SRO duties respectively) participates in the initiation, maintenance and recovery from the natural circulation mode during the plant test or on the simulator. Operators are able to recognize when natural circulation has stabilized and will be able to control saturation margin, RCS pressure, and heat removal rates without exceeding specified operating limits.
2. Testing - The prototype and Callaway Plant tests demonstrated the following plant characteristics: Length of time required to stabilize natural circulation, core flow distribution, ability to establish and maintain natural circulation with or without onsite and offsite power, the ability to uniformly borate and cooldown to hot shutdown conditions using natural circulation and the ability to control reactor coolant system subcooling margins.

Thermocouple/Core Cooling Monitor (T/CCM) system performance was not specifically addressed in the natural circulation testing; however, the parameters used by the T/CCM system (see Section 18.2.13.2) for subcooling calculations were monitored and used to control the natural circulation cooldown. Therefore, the capability of the T/CCM system to function during natural circulation conditions is assured.

18.1-40 Rev. 0 WOLF CREEK

3. Procedure Validation - These tests or the simulation make maximum practical use of WCGS written plant procedures to validate the completeness and accuracy of the procedures.

18.1.18.3 Conclusion The Operating Agent testing and training program meets Item I.G.1 of NUREG-

0737.

18.1-41 Rev. 0 WOLF CREEK Table 18.1-1 (Sheet 1 of 2)

ISEG FUNCTION CROSS REFERENCE ISEG Function Implementing Procedures Examining plant operating characteristics, NRC issuances, industry advisories, reportable

events, and other sources of

plant design and operating

experience information, including plants of similar

design, which may indicate

areas of plant safety.

AP 20E-001, "Industry Operating Experience Program"

AP 23-006, "System Engineering

Program"

AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Through the corrective action

program, maintenance rule

program and the self assessment

program, detailed

recommendations are made to the

Vice President Engineering for

revised procedures, equipment

modifications, maintenance

activities, operations

activities, or other means of

improving plant safety.

AP 23-006, "System Engineering

Program"

AP 23M-001, "WCGS Maintenance

Rule Program"

AP 28A-100, "Condition Reports" AP 28D-001, "Self Assessment

Process" Maintaining surveillance of

plant activities to provide

independent verification that

these activities are performed

correctly and that human errors

are reduced as much as

practical.

AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program"

AP 23M-001, "WCGS Maintenance

Rule Program"

AP 28D-001, "Self Assessment

Process" Independent review of plant

activities and operating

experience information.

AP 20E-001, "Industry Operating Experience Program"

AP 23-006, "System Engineering

Program"

AI 17C-006, "Results Engineering Program" Perform independent technical

evaluations of plant

maintenance, modifications, operational problems, operational analysis activities AP 23-006, "System Engineering

Program"

AP 23M-001, "WCGS Maintenance

Rule Program"

AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program"

AP 05-002, "Dispositions and

Change Packages"

Rev. 27 WOLF CREEK Table 18.1-1 (Sheet 2 of 2)

ISEG FUNCTION CROSS REFERENCE ISEG Function Implementing Procedures Develop appropriate detailed recommendations for revisions

to procedures or modifications

to equipment as may be

necessary.

AP 23M-001, "WCGS Maintenance

Rule Program"

AP 28A-100, "Condition Reports" AI 17C-006, "Results Engineering Program" Survey plant maintenance

operations and test activities

to provide verification

independent of the plant in

accordance with established

procedures.

AP 23-006, "System Engineering

Program"

AP 23M-001, "WCGS Maintenance

Rule Program"

AI 17C-006, "Results Engineering Program"

Rev. 27 WOLF CREEK 18.2 SITING AND DESIGN 18.2.1 POSTACCIDENT REACTOR COOLANT SYSTEM VENTING (II.B.1) 18.2.1.1 NRC Guidance Per NUREG0737 Position Each applicant and licensee shall install reactor coolant system (RCS) and reactor vessel head high point vents remotely operated from the control room.

Although the purpose of the system is to vent noncondensible gases from the RCS

which may inhibit core cooling during natural circulation, the vents must not lead to an unacceptable increase in the probability of a lossofcoolant

accident (LOCA) or a challenge to containment integrity. Since these vents

form a part of the reactor coolant pressure boundary, the design of the vents

shall conform to the requirements of Appendix A to 10 CFR Part 50, "General

Design Criteria." The vent system shall be designed with sufficient redundancy

that ensures a low probability of inadvertent or irreversible actuation.

Each licensee shall provide the following information concerning the design and operation of the high point vent system:

1. Submit a description of the design, location, size, and power supply for the vent system along with results of analyses for lossofcoolant accidents initiated by a

break in the vent pipe. The results of the analyses

should demonstrate compliance with the acceptance

criteria of 10 CFR 50.46.

2. Submit procedures and supporting analysis for operator use of the vents that also include the information

available to the operator for initiating or terminating

vent usage.

Clarification

A. General

1. The important safety function enhanced by this venting capability is core cooling. For events

beyond the present design basis, this venting

capability will substantially increase the plant's

ability to deal with large quantities of

noncondensible gas which could interfere with core

cooling. 18.21 Rev. 0 WOLF CREEK

2. Procedures addressing the use of the reactor coolant system vents should define the conditions

under which the vents should be used as well as the

conditions under which the vents should not be

used. The procedures should be directed toward

achieving a substantial increase in the plant being

able to maintain core cooling without loss of

containment integrity for events beyond the design

basis. The use of vents for accidents within the

normal design basis must not result in a violation

of the requirements of 10CFR50.44 or 10CFR50.46.

3. The size of the reactor coolant vents is not a critical issue. The desired venting capability can

be achieved with vents in a fairly broad spectrum

of sizes. The criteria for sizing a vent can be

developed in several ways. One approach, which may

be considered, is to specify a volume of

noncondensible gas to be vented and in a specific

venting time. For containments particularly

vulnerable to failure from large hydrogen releases

over a short period of time, the necessity and

desirability for contained venting outside the

containment must be considered (e.g., into a decay

gas collection and storage system).

4. Where practical, the reactor coolant system vents should be kept smaller than the size corresponding

to the definition of LOCA (10 CFR 50, Appendix A).

This will minimize the challenges to the emergency

core cooling system (ECCS) since the inadvertent

opening of a vent smaller than the LOCA definition

would not require ECCS actuation, although it may

result in leakage beyond technical specification

limits. On PWRs, the use of new or existing lines

whose smallest orifice is larger than the LOCA

definition will require a valve in series with a

vent valve that can be closed from the control room

to terminate the LOCA that would result if an open

vent valve could not be reclosed.

5. A positive indication of valve position should be provided in the control room.
6. The reactor coolant vent system shall be operable from the control room.
7. Since the reactor coolant system vent will be part of the reactor coolant system pressure boundary, 18.22 Rev. 0 WOLF CREEK all requirements for the reactor pressure boundary must be met, and, in addition, sufficient redundancy should be incorporated into the design to minimize the probability of an inadvertent actuation of the system. Administrative procedures may be a viable option to meet the singlefailure criterion. For vents larger than the LOCA definition, an analysis is required to demonstrate compliance with 10CFR50.46.
8. The probability of a vent path failing to close, once opened, should be minimized; this is a new requirement. Each vent must have its power supplied from an emergency bus. A single failure within the power and control aspects of the reactor coolant vent system should not prevent isolation of the entire vent system, when required. On BWRs, block valves are not required in lines with safety valves that are used for venting.
9. Vent paths from the primary system to within containment should go to those areas that provide good mixing with containment air.
10. The reactor coolant vent system (i.e., vent valves, block valves, position indication devices, cable terminations, and piping) shall be seismically and environmentally qualified in accordance with IEEE 3441975 as supplemented by Regulatory Guide 1.100, 1.92 and SEP 3.92, 3.43, and 3.10. Environmental qualifications are in accordance with the May 23, 1980 Commission Order and Memorandum (CLI8021).
11. Provisions to test for operability of the reactor coolant vent system should be a part of the design. Testing should be performed in accordance with the ASME Code.
12. It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A humanfactor analysis should be performed taking into consideration:
a. The use of this information by an operator during both normal and abnormal plant conditions. 18.23 Rev. 20 WOLF CREEK
b. Integration into emergency procedures.
c. Integration into operator training.
d. Other alarms during emergency and need for prioritization of alarms. B. PWR Vent Design Considerations
1. Each PWR licensee should provide the capability to vent the reactor vessel head. The reactor vessel head vent should be capable of venting noncondensible gas from the reactor vessel hot legs (to the elevation of the top of the outlet nozzle) and cold legs (through head jets and other leakage paths).
2. Additional venting capability is required for those portions of each hot leg that cannot be vented through the reactor vessel head vent or pressurizer. It is impractical to vent each of the many thousands of tubes in a Utube steam generator; however, the staff believes that a procedure can be developed that ensures that sufficient liquid or steam can enter the Utube region so that decay heat can be effectively removed from the RCS. Such operating procedures should incorporate this consideration.
3. Venting of the pressurizer is required to ensure its availability for system pressure and volume control. These are important considerations, especially during natural circulation.

18.2.1.2 The Operating Agent Response

The WCGS design provides the capability of venting the RCS to ensure that, if noncondensible gases become present in the RCS, regardless of the means

postulated for generation of such noncondensibles, gases can be vented from the

system, thereby ensuring that the flow paths associated with natural

circulation core cooling capability are maintained. The venting capability is provided by the existing redundant pressurizer poweroperated relief valves (PORVs) and their associated motoroperated isolation valves which can be used

for the venting of the pressurizer and by the reactor vessel head vent system

which provides redundant venting capability of the reactor vessel, RCS hot leg

piping, and RCS cold leg piping via bypass leakage paths to the vessel head.

The design features of these systems are discussed below. 18.24 Rev. 0 WOLF CREEK The capability for venting of the pressurizer and the reactor vessel head is provided via safety grade, Class IE, environmentally qualified, seismic

Category I, redundant systems, which meet the single failure criteria assuring

both vent opening and vent closing capabilities. Block valves are an integral

part of both the pressurizer and reactor vessel head vent system and meet the

same qualification requirements as the vent valves.

The size of the RCS vents is determined as follows:

1. The pressurizer vent was based on the existing PORV (3 inch valve) capabilities. 2. The reactor vessel head vent system incorporates a 3/8 inch orifice to limit the maximum reactor coolant flow

rate to a value less than that which defines a LOCA (see Figure 18.21). The design provides for a motoroperated isolation valve in series with each pressurizer PORV. These PORV isolation valves may be either remotely actuated

from the control room or automatically closed based on an RCS pressure

setpoint. The setpoint is selected based on providing isolation prior to actuation of the safety injection system. Control room indication is provided

for the pressurizer PORVs and PORV isolation valves and for the reactor vessel

head vent valves. Each vent is remotely operable from the control room. An

individual handswitch is provided for each valve.

The design of the RCS venting systems minimizes the probability of an inadvertent opening and consequence of such an opening.

1. The pressurizer vent system:

The pressurizer PORVs are normally closed, Class IE solenoid valves that energize to open. Thus, loss of

power will not actuate these valves. The PORV isolation valves are normally open, motoroperated valves. As

discussed above, assuming an inadvertent opening of the

PORV or its failure to close, a protection grade Class

IE signal is provided to automatically close the

associated block valve.

2. The reactor vessel head vent system:

Each of the redundant vent paths off of the reactor vessel head contains two inseries, normally closed, same safety train, Class IE, environmentally qualified

solenoid valves. The two normally closed valves in

series limit any postulated events which could result in

an inadvertent opening of the vent. 18.25 Rev. 4 WOLF CREEK The pressurizer vents to the pressurizer relief tank. The reactor vessel head vent system valves are located on the CRDM seismic support platform above the

reactor vessel. The discharge from these valves is directed to the open area

of the containment above the refueling pool. This area precludes the potential

for forming stagnant pockets of vented gases. Mixing and cooling of the vented

gases is accomplished using permanent plant systems.

The Westinghouse Owners Group (WOG) has developed a generic reactor vessel head vent guideline. The Operating Agent has considered the generic guidance

developed by the WOG in the development of procedures for use of the head vent

system.18.2.1.3 Conclusion The WCGS design for the postaccident reactor coolant system vent system meets the applicable requirements of item II.B.1 of NUREG0737.

18.2.2 DESIGN REVIEW OF THE PLANT SHIELDING (II.B.2) 18.2.2.1 NRC Guidance Per NUREG0737 Position With the assumption of a postaccident release of radioactivity equivalent to that described in Regulatory Guides 1.3 and 1.4 (i.e., the equivalent of 50

percent of the core radioiodine, 100 percent of the core noble gas inventory, and 1 percent of the core solids are contained in the primary coolant), each licensee shall perform a radiation and shieldingdesign review of the spaces

around systems that may, as a result of an accident, contain highly radioactive

materials. The design review should identify the location of vital areas and

equipment, such as the control room, radwaste control stations, emergency power

supplies, motor control centers, and instrument areas, in which personnel

occupancy may be unduly limited or safety equipment may be unduly degraded by

the radiation fields during postaccident operations of these systems.

Each licensee shall provide for adequate access to vital areas and protection of safety equipment by design changes, increased permanent or temporary

shielding, or postaccident procedural controls. The design review shall

determine which types of corrective actions are needed for vital areas

throughout the facility. 18.26 Rev. 0 WOLF CREEK Clarification The purpose of this item is to ensure that licensees examine their plants to determine what actions can be taken over the shortterm to reduce radiation

levels and increase the capability of operators to control and mitigate the

consequences of an accident. These actions should be taken pending conclusions resulting in the longterm degraded core rulemaking, which may result in a need

to consider additional sources.

Any area which will or may require occupancy to permit an operator to aid in the mitigation of or recovery from an accident is designated as a vital area.

For the purposes of this evaluation, vital areas and equipment are not

necessarily the same vital areas or equipment defined in 10 CFR 73.2 for

security purposes. The security center is listed as an area to be considered

as potentially vital, since access to this area may be necessary to take action

to give access to other areas in the plant.

The control room, technical support center (TSC), sampling station, and sample analysis area must be included among those areas where access is considered

vital after an accident. (See Item III.A.1.2 for discussion of the TSC and

emergency operations facility.) The evaluation to determine the necessary

vital areas should also include, but not be limited to, consideration of the postLOCA hydrogen control system, containment isolation reset control area, manual ECCS alignment area (if any), motor control centers, instrument panels, emergency power supplies, security center, and radwaste control panels. Dose

rate determinations need not be for these areas if they are determined not to

be vital.

As a minimum, necessary modifications must be sufficient to provide for vital system operation and for occupancy of the control room, TSC, sampling station, and sample analysis area.

In order to ensure that personnel can perform the necessary postaccident operations in the vital areas, the following guidance is to be used by

licensees to evaluate the adequacy of radiation protection to the operators:

1. Source Term

The minimum radioactive source term should be equivalent to the source terms recommended in Regulatory Guides

1.3, 1.4, and 1.7 and Standard Review Plan 15.6.5 with

appropriate decay times based on plant design (i.e., you

may assume that the radioactive decay that occurs before

fission products can be transported to various systems). 18.27 Rev. 0 WOLF CREEK a. LiquidContaining Systems: 100 percent of the core equilibrium noble gas inventory, 50 percent of the

core equilibrium halogen inventory, and 1 percent

of all others are assumed to be mixed in the

reactor coolant and liquids recirculated by residual heat removal (RHR), highpressure coolant injection (HPCI), and lowpressure coolant

injection (LPCI), or the equivalent of these

systems. In determining the source term for

recirculated, depressurized cooling water, you may

assume that the water contains no noble gases. b. GasContaining Systems: 100 percent of the core equilibrium noble gas inventory and 25 percent of

the core equilibrium halogen activity are assumed

to be mixed in the containment atmosphere. For vaporcontaining lines connected to the primary

system (e.g., BWR steam lines), the concentration

of radioactivity shall be determined, assuming that

the activity is contained in the vapor space in the

primary coolant system.

2. Systems Containing the Source

Systems assumed in your analysis to contain high levels of radioactivity in a postaccident situation should

include, but not be limited to, containment, residual

heat removal system, safety injection systems, chemical

and volume control system (CVCS), containment spray

recirculation system, sample lines, gaseous radwaste

systems, and standby gas treatment systems (or

equivalent of these systems). If any of these systems

or others that could contain high levels of

radioactivity were excluded, you should explain why such

systems were excluded. Radiation from the leakage of

systems located outside of the containment need not be

considered for this analysis. Leakage measurement and

reduction is treated under Item III.D.1.1, "Integrity of

Systems Outside Containment Likely To Contain

Radioactive Material for PWRs and BWRs." Liquid waste

systems need not be included in this analysis.

Modifications to liquid waste systems will be considered

after completion of Item III.D.1.4, "Radwaste System

Design Features To Aid in Accident Recovery and

Decontamination." 18.28 Rev. 0 WOLF CREEK

3. Dose Rate Criteria The design dose rate for personnel in a vital area should be such that the guidelines of GDC 19 will not be

exceeded during the course of the accident. GDC 19

requires that adequate radiation protection be provided

such that the dose to personnel should not be in excess

of 5 rem whole body, or its equivalent to any part of

the body for the duration of the accident. When

determining the dose to an operator, care must be taken

to determine the necessary occupancy times in a specific

area. For example, areas requiring continuous occupancy

will require much lower dose rates than areas where

minimal occupancy is required. Therefore, allowable

dose rates will be based upon expected occupancy, as

well as the radioactive source terms and shielding.

However, in order to provide a general design objective, we are providing the following dose rate criteria with alternatives to be documented on a casebycase bases.

The recommended dose rates are average rates in the

area. Local hot spots may exceed the dose rate

guidelines. These doses are design objectives and are

not to be used to limit access in the event of an

accident.

a. Areas Requiring Continuous Occupancy: <15 mrem/hr (averaged over 30 days). These areas will require fulltime occupancy during the course of the

accident. The control room and onsite technical

support center are areas where continuous occupancy

will be required. The dose rate for these areas is

based on the control room occupancy factors

contained in SRP 6.4.

b. Areas Requiring Infrequent Access: GDC 19. These areas may require access on an irregular basis, not

continuous occupancy. Shielding should be provided

to allow access at a frequency and duration

estimated by the licensee. The plant radiochemical/

chemical analysis laboratory, radwaste panel, motor

control center, instrumentation locations, and

reactor coolant and containment gas sample stations

are examples of sites where occupancy may be needed

often, but not continuously. 4. Radiation Qualification of SafetyRelated Equipment The review of safetyrelated equipment which may be unduly degraded by radiation during postaccident

operation of this equipment relates to equipment

inside and 18.29 Rev. 0 WOLF CREEK outside of the primary containment. Radiation source terms calculated to determine environmental qualification of safetyrelated equipment consider the

following:

a. LOCA events which completely depressurize the primary system should consider releases of the

source term (100 percent noble gases, 50 percent

iodines, and 1 percent particulates) to the

containment atmosphere.

b. LOCA events in which the primary system may not depressurize should consider the source term (100

percent noble gases, 50 percent iodines, and 1

percent particulate) to remain in the primary

coolant. This method is used to determine the

qualification doses for equipment in close

proximity to recirculating fluid systems inside and outside of the containment. NonLOCA events both

inside and outside of the containment should use 10

percent noble gases, 10 percent iodines, and 0

percent particulate as a source term.

The following table summarizes these considerations:

Containment LOCA Source Term (Noble Gas/Iodine/

Particulate) NonLOCA HighEnergy Line Break Source Term( Noble Gas/Iodine/

Particulate)  %  % Outside (100/50/1) (10/10/0) in RCS in RCS Inside Larger of (10/10/0) (100/50/1) in RCS in containment or (100/50/1) in RCS 18.2.2.2 The Operating Agent Response The shielding design criteria used for WCGS is in accordance with NRC Standard

Review Plan 12.2 and is described in Section 12.3.2 of the USAR. Two basic

plant conditions are the bases of the 18.210 Rev. 0 WOLF CREEK shielding design, normal full power operation, and plant shutdown. The shielding design objectives for these conditions and anticipated operational

occurrences, as stated in Section 12.3.2.1, are:

a. To ensure that radiation exposure to plant operating personnel, contractors, administrators, visitors, and

proximate site boundary occupants are ALARA and within

the limits of 10 CFR 20.

b. To ensure sufficient personnel access and occupancy time to allow normal anticipated maintenance, inspection, and safetyrelated operations required for each plant

equipment and instrumentation area.

c. To reduce potential equipment neutron activation and mitigate the possibility of radiation damage to

materials.

d. The control room is sufficiently shielded, so that the direct dose plus the inhalation dose (calculated in Chapter 15.0) will not exceed the limits of GDC19.

Radiation zones have been established, based on required personnel access during these plant conditions.

18.2.2.2.1 Design Review of Plant Shielding

18.2.2.2.1.1 General

The following discussion provides a description of the design review of plant shielding of spaces around systems that may contain highly radioactive

materials as a result of an accident. Systems required to process reactor coolant outside the containment during postaccident conditions were selected

for evaluation.

The radiation and shielding design review was performed to identify the location of vital areas and equipment such as the control room, sample station, emergency power supplies, motor control centers, and instrument areas, in which

personnel occupancy may be unduly limited or safety equipment may be unduly degraded by the radiation fields during postaccident operations of these

systems. Additionally, the review results ensure that adequate access to vital areas and protection of safetyrelated equipment are provided. As shown in Figures 18.22 through 18.211, a number of radiation zone maps and associated dose rate decay curves have been produced as a result of the design

review. Radiation levels for various areas around contaminated systems for

various times can be found 18.211 Rev. 0 WOLF CREEK on these maps and curves. Operators may refer to the maps and curves to apprise themselves of the locations of potentially high radiation areas for any

time following the postulated accident. These maps and curves are available in the critical postaccident control and support areas, e.g., control room, TSC, etc., for use following postulated DBA's.

18.2.2.2.1.2 Scope of Design Review

18.2.2.2.1.2.1 Systems Engineering Methodology

A. Selection of Systems for Shielding Review

Plant systems considered in the shielding review are classified into the following categories:

Category A (Recirculation Systems)

The first category of systems are those systems designed to mitigate a design basis loss of coolant accident and

which might contain highly radioactive sources. Such

systems include the emergency core cooling systems.

For the shielding review, the ECCS systems were postulated to contain significant additional sources of

radioactivity in excess of the original plant design

basis.

The following systems were selected to ensure the radiation safety concern is adequately addressed by the existing plant shielding design:

1. Those portions of the containment spray systems used to recirculate water from the containment sump back into

the containment.

2. Those portions of the residual heat removal systems used to recirculate water from the containment sump back into

the containment.

3. Those portions of the safety injection system used to recirculate water from the containment sump back into

the containment.

4. Those portions of the Chemical and Volume Control System (CVCS) used to recirculate water from the containment

sump back into the containment. 18.212 Rev. 0 WOLF CREEK Category B (Extensions of Containment Atmosphere)

The second category of systems are the systems or portions of systems which

would contain radioactivity by virtue of their connection to the containment

atmosphere following an accident. These systems would not be expected to

contain a significant level of radioactive sources that are considered in this

shielding review, since proper operation of the emergency core cooling systems

is expected to prevent extensive core damage. Nevertheless, such sources have

been postulated for those portions of the post-accident containment hydrogen analyzer system external to the containment which would contain the atmosphere from the containment. An evaluation was also completed for a post-accident recovery sample should it be needed. (Amendment 137)

Category C (Liquid Samples)

The third category of systems is sampling systems. As discussed in Section

18.2.3, NUREG-0737, Task II.B.3 requires that certain post-accident liquid

samples be obtained from the reactor coolant system or containment systems.

Samples are no longer needed under this requirement. Those portions of the sampling system which must be used have been evaluated to assure that steps can be taken to obtain a post-accident recovery sample should it be needed. (Amendment 137)

B. Radioactive Source Release Fractions

Per NUREG-0737, the following release fractions were

used as a basis for determining the concentrations for

the shielding review:

1. Source A: Containment atmosphere - 100 percent

noble gases, 25 percent halogens

2. Source B: Reactor coolant - 100 percent noble

gases, 50 percent halogens, 1 percent

solids

3. Source C: Containment sump liquid - 50 percent

halogens, 1 percent solids

These release fractions were applied to the total curies

available for the particular chemical species (i.e.,

noble gas, halogens, or solid) for an equilibrium

fission product inventory for the WCGS core.

18.2-13 Rev. 20 WOLF CREEK The release fraction for Cs was assumed to be 1 percent for the purposes of this shielding review. However, a relationship was developed which related the

dose rates calculated, assuming 1 percent Cs, to the dose rate that would be

expected if 50 percent of the Cs was released to the liquid source (as

recommended by Revision 1 to Regulatory Guide 1.89, "Qualification of Class IE

Equipment for Nuclear Power Plants"). This relationship is provided in Figure 18.211. No noble gases were included in the containment sump liquid (Source

C) because Regulatory Guide 1.7 has set this precedent in modeling liquids in

the containment sump.

C. Source Term Models

The preceding section (B) outlines the assumptions used for release fractions for the shielding design review.

However, these release fractions are only the first step

in modeling the source terms for the activity

concentrations in the systems under review. The

important modeling parameters, decay time and dilution

volume, obviously also affect any shielding analysis.

The following sections outline the rationale for the

selection of values for these key parameters.

1. Decay Time

For the first stage of the shielding design review process, no decay time credit was used with the

above releases. The primary reason for this was to

develop a set of normalized accident radiation zone

maps (i.e., no decay) that could be used as a tool

by the plant staff along with a set of decay curves

to quantitatively assess the plant status quickly

following any abnormal occurrence. Decay curves

are provided for the containment atmosphere and

containment sump liquid only. Except for areas

adjacent to the containment, the sump liquid source

will be the dominating contributor.

2. Dilution Volume

The volume used for dilution is important, since it affects the calculations of dose rate in a linear

fashion. The following dilution volumes were used

with the release fractions and decay times listed

above to arrive at the actual source terms used in

the shielding reviews: 18.214 Rev. 0 WOLF CREEK

a. Source A: Containment free volume.
b. Source B: Reactor coolant system volume.
c. Source C: The volume of water present at the time of recirculation (reactor

coolant system + refueling water

storage tank + accumulator tanks).

3. Associated Sources and Systems

For the following systems, the source considered is listed. Note that normally shut valves were

assumed to remain shut. a. Containment spray system At the initiation of recirculation, Source C was used. b. Safety injection system At the initiation of recirculation, Source C was used. c. Residual heat removal system Source C was used for sump recirculation mode. d. Sampling system The sources used in the shielding design review for sampling systems

were as follows: Containment air sample Source A Reactor coolant sample Source B Containment sump sample Source C e. CVCS system The liquid source was Source C.

18.2.2.2.1.2.2 Shielding Design Review Methodology

A. Analytical Shielding Techniques

The previous sections outlined the rationale and assumptions used for the selection of the systems in the

shielding design review, as well as the formulation of

the sources for those systems. The next step in the

review process was to use those sources to estimate dose

rates from those selected systems. The dose rates were determined using a pointkernel computer code developed by Bechtel. This code utilizes the semiempirical

methods developed by Rockwell (Reference 8) for

calculating the direct gamma dose rates. To determine the dose rate contribution from the containment, QADCG

(Reference 9) was used. For corridors outside

compartments, reviews were done to check the dose rate

transmitted into the corridor through the walls of

adjacent 18.215 Rev. 0 WOLF CREEK compartments. Checks were also made for any piping or equipment that could directly contribute to corridor

dose rates, i.e., piping that may be running directly in

the corridor or equipment/piping in a compartment that

could shine directly into corridors with no attenuation

through compartment walls.

B. Accident Radiation Zone Maps

Radiation levels are evaluated using the radiation zone maps, Figures 18.22 through 18.29, and associated decay curves, Figures 18.210 and 18.211, and are

considered in parallel with required operator actions.

The zone boundaries were formulated based on the following rationale:

.

Zone D, Zone Dose Rate Limits

Designation Rationale (Rem/hr)

. AI The first zone is 0 D 0.015 consistent with the personnel radiation

exposure guidelines

of Task II.B.2 of NUREG0737 for vital

areas.

. AII The second zone is con 0.015 D 0.100 sistent with the person nel radiation exposure

guidelines of Task II.B.2 of NUREG0737 for vital

areas requiring infrequent

access or corridors to

these areas. Such zones involve no time and mo

tion evaluations.

. AIII The third zone is con 0.100 < D 5 sistent with the person nel radiation exposure

guidelines of Task II.B.2 of NUREG0737. Zones in

this range required that a

time and motion study be done to ensure that inte

grated exposure was not

greater than 5 Rem as given

in General Design Criteria 19. 18.216 Rev. 0 WOLF CREEK

.

Zone D, Zone Dose Rate Limits

Designation Rationale (Rem/hr)

_______ . AIV 5 < D 50 .

AV 50 < D 500 .

AVI 500 < D 5000 .

AVII 5000 < D 50,000 . AVIII 50,000 < D 500,000 18.2.2.2.1.2.3 Personnel Exposure Limits and Methodology A. Access Operator actions that are required postLOCA were reviewed to ensure that first priority safety actions

can be achieved in the postulated radiation fields.

This review ensures that access is available and

required operator actions can be achieved as discussed

in Section 18.2.2.2.1.3.

B. Personnel Radiation Exposure Guidelines

The general basis for personnel radiation exposure guidelines was 10 CFR 50, Appendix A, GDC 19. The

following additional radiation limit guidelines were

used to evaluate occupancy and accessibility of plant

vital areas. General area dose rates were used rather

than maximum surface dose rates. Contributions from all

sources were considered.

1. Vital areas requiring continuous occupancy

Vital areas such as control room, counting room, laboratory, and the onsite technical support center

were verified to ensure the direct dose rate was

less than 15 mr/hr. The 30 day average direct

radiation dose rate is less than 15 mr/hr for the

SAS room and the control room toilet. 18.217 Rev. 0 WOLF CREEK

2. Vital areas requiring infrequent access or corridors to these vital areas For these areas, the dose rate was verified to be less than 5 R/hr except as noted in Section

18.2.2.2.1.3.

18.2.2.2.1.3 Results of Review

The shielding design criteria and objectives have been met in the design of WCGS. These criteria and objectives have been extended to the areas designated

to be the onsite Technical Support Center and the Operations Support Center, as

required by the expected occupancy of these areas. The following is a discussion of the impact of a postulated LOCA or TMI2 type event on the WCGS

shielding design and is based on the WCGS specific system design capabilities:

A. LOCA

Assuming a DBA LOCA with radiation source terms consistent with Regulatory Guides 1.4 and 1.7, plus the

Cs fraction discussed in Section 18.2.2.2.1.2.1, all safetyrelated equipment and instrumentation will be

qualified for the maximum equipment doses associated

with the time that the equipment must function. All safetyrelated systems operations are performed either

automatically or remote manually from the control room.

Operations within the auxiliary building are not expected following a LOCA. During the longterm

recovery phase, access to sample stations in the

auxiliary building may be limited. Should a sample be requested, conditions will determine what steps will be taken to assure dose is ALARA. Due to Amendment 137, PASS is no longer used. As discussed above, the dose limitations of GDC19 for control room operators are met. B. TMI2 WCGS is designed to preclude events similar to the TMI2 event. For example, the WCGS design includes reactor

coolant system high point vents (as discussed in Section

18.2.1) and the associated Class IE instrumentation

required to detect inadequate core cooling and thus

precludes the degradation of the fuel cladding and any

massive release of activity to the coolant. However, assuming that a TMI2 event does occur, contamination 18.218 Rev. 20 WOLF CREEK of the auxiliary building is precluded by design: 1)

Compliance with containment isolation criteria is

described in Section 6.2.4 and Section 18.2.11 and

precludes contamination of the auxiliary building by

auxiliary systems, and 2) the WCGS design includes a dedicated, safetyrelated letdown system located totally

within the containment which provides controlled letdown

capability to the pressurizer relief tank, eliminating

any operational need to contaminate the chemical and

volume control system in the auxiliary building.

Based on the above, dose rates were not evaluated in the auxiliary building for an undiluted reactor coolant system source term being present in the residual heat removal system. Dose rates inside containment due to the TMI2 type event

have been considered for equipment qualification. Habitability of the TSC is

addressed elsewhere in the USAR.

18.2.2.3 Conclusion The shielding design criteria and objectives for WCGS meets the applicable recommendations of item II.B.2 of NUREG0737 and Amendment 137. Radiation qualification of WCGS safetyrelated equipment is addressed in Section 3.11(B).

18.2.3 POSTACCIDENT SAMPLING SYSTEM (II.B.3) 18.2.3.1 NRC Guidance Per NUREG0737 Position A design and operational review of the reactor coolant and containment atmosphere sampling line systems shall be performed to determine the capability

of personnel to promptly obtain (less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) a sample under accident

conditions without incurring a radiation exposure to any individual in excess of 3 and 183/4 Rem to the whole body or extremities, respectively. Accident

conditions should assume a Regulatory Guide 1.3 or 1.4 release of fission

products. If the review indicates that personnel could not promptly and safely

obtain the samples, additional design features or shielding should be provided

to meet the criteria.

A design and operational review of the radiological spectrum analysis facilities shall be performed to determine the capability to promptly quantify (in less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) certain radionuclides that are indicators of the degree

of core damage. Such radionuclides are noble gases (which indicate cladding

failure), iodines and cesiums (which indicate high fuel temperatures), and

nonvolatile isotopes (which indicate fuel melting). The initial reactor 18.219 Rev. 20 WOLF CREEK coolant spectrum should correspond to a Regulatory Guide 1.3 or 1.4 release.

The review should also consider the effects of direct radiation from piping and

components in the auxiliary building and possible contamination and direct

radiation from airborne effluents. If the review indicates that the analyses

required cannot be performed in a prompt manner with existing equipment, design

modifications or equipment procurement shall be undertaken to meet the

criteria.In addition to the radiological analyses, certain chemical analyses are necessary for monitoring reactor conditions. Procedures shall be provided to

perform boron and chloride chemical analyses, assuming a highly radioactive

initial sample (Regulatory Guide 1.3 or 1.4 source term). Both analyses shall

be capable of being completed promptly (i.e., the boron sample analysis within

an hour and the chloride sample analysis within a shift).

Clarification

The following items are clarifications of requirements identified in NUREG0578, NUREG0660, or the September 13 and October 30, 1979 clarification

letters. The system provides both online isotopic analysis and chemical

analysis with systems designed to operate in the accident environment.

Provisions have also been included for taking undiluted and diluted grab

samples. Accuracies of the online chemical analyzers will be comparable to

those available from commercial grade analyzers.

1. The licensee shall have the capability to promptly obtain reactor coolant samples and containment

atmosphere samples. The combined time allotted for

sampling and analysis should be 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> or less from the

time a decision is made to take a sample.

2. The licensee shall establish an onsite radiological and chemical analysis capability to provide, within the 3

hour time frame established above, quantification of the

following:

a. Certain radionuclides in the reactor coolant and containment atmosphere that may be indicators of

the degree of core damage (e.g., noble gases, iodines and cesiums, and nonvolatile isotopes).

b. Hydrogen levels in the containment atmosphere.
c. Dissolved gases (e.g., H 2), chloride (time allotted for analysis subject to discussion below), and boron concentration of liquids. 18.220 Rev. 0 WOLF CREEK
d. Alternatively, have inline monitoring capabilities to perform all or part of the above analyses.
3. Reactor coolant and containment atmosphere sampling during postaccident conditions shall not require an

isolated auxiliary system [e.g., the letdown system, reactor water cleanup system (RWCUS)] to be placed in

operation in order to use the sampling system.

4. Pressurized reactor coolant samples are not required if the licensee can quantify the amount of dissolved gases

with unpressurized reactor coolant samples. The

measurement of either total dissolved gases or H2 gas in

reactor coolant samples is considered adequate.

Measuring the O2 concentration is recommended, but is

not mandatory.

5. The time for a chloride analysis to be performed is dependent upon two factors: (a) if the plant's coolant

water is seawater or brackish water and (b) if there is

only a single barrier between primary containment

systems and the cooling water. Under both of the above

conditions, the licensee shall provide for a chloride

analysis within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the sample being taken. For

all other cases, the licensee shall provide for the

analysis to be completed within 4 days. The chloride

analysis does not have to be done onsite.

6. The design basis for plant equipment for reactor coolant and containment atmosphere sampling and analysis must

assume that it is possible to obtain and analyze a

sample without radiation exposures to any individual

exceeding the criteria of GDC 19 (Appendix A, 10 CFR

Part 50) (i.e., 5 rem whole body, 75 rem extremities).

[Note that the design and operational review criterion

was changed from the operational limits of 10 CFR Part 20 (NUREG0578) to the GDC 19 criterion (October 30, 1979 letter from H. R. Denton to all licensees).

7. The analysis of primary coolant samples for boron is required for PWRs. (Note that Revision 2 of Regulatory

Guide 1.97, when issued, will likely specify the need

for primary coolant boron analysis capability at BWR

plants.)

8. If inline monitoring is used for any sampling and analytical capability specified herein, the licensee

shall provide backup sampling through grab samples, and

shall demonstrate the capability of analyzing the

samples. 18.221 Rev. 0 WOLF CREEK Established planning for analysis at offsite facilities is acceptable. Equipment provided for backup

sampling shall be capable of providing at least one

sample per day for 7 days following onset of the

accident and at least one sample per week until the

accident condition no longer exists.

9. The licensee's radiological and chemical sample analysis capability shall include provisions to:
a. Identify and quantify the isotopes of the nuclide categories discussed above to levels corresponding

to the source terms given in Regulatory Guide 1.3

or 1.4 and 1.7. Where necessary and practicable, the ability to dilute samples to provide capability

for measurement and reduction of personnel exposure

should be provided. Sensitivity of onsite liquid

sample analysis capability should be such as to

permit measurement of nuclide concentration in the

range from approximately 1 mCi/g to 10 Ci/g.

b. Restrict background levels of radiation in the radiological and chemical analysis facility from

sources, such that the sample analysis will provide

results with an acceptably small error

(approximately a factor of 2). This can be

accomplished through the use of sufficient

shielding around samples and outside sources, and

by the use of ventilation system design which will

control the presence of airborne radioactivity.

10. Accuracy, range, and sensitivity shall be adequate to provide pertinent data to the operator in order to

describe the radiological and chemical status of the

reactor coolant systems.

11. In the design of the postaccident sampling and analysis capability, consideration should be given to the

following items:

a. Provisions for purging sample lines, for reducing plateout in sample lines, for minimizing sample

loss or distortion, for preventing blockage of

sample lines by loose material in the RCS or

containment, for appropriate disposal of the

samples, and for flow restrictions to limit reactor

coolant loss from a rupture of the sample line.

The postaccident reactor coolant and containment

atmosphere samples should be representative of

the reactor 18.222 Rev. 0 WOLF CREEK coolant in the core area and the containment atmosphere following a transient or accident. The

sample lines should be as short as possible to

minimize the volume of fluid to be taken from

containment. The residues of sample collection

should be returned to containment or to a closed

system.

b. The ventilation exhaust from the sampling station should be filtered with charcoal adsorbers and highefficiency particulate air (HEPA) filters.
c. Guidelines for analytical or instrumentation range are given below in Table II.B.31.

18.2.3.2 The Operating Agent ResponseBy Amendment 137 the inline analyzers contained with PASS are no longer used.

During a long term recovery, conditions will determine what steps will be taken to obtain a grab sample from the Nuclear Sample Panel SJ143. Analyses will be done on site by appropriate instruments or shipped offsite as needed. The sample for the containment atmosphere is done using the sample flask on the containment hydrogen monitor as described in Section 6.2.5.2.2.3 and shown on Figure 6.2.51. Guidelines of Table II.B.31 no longer apply. TABLE II.B.31

ANALYSES FOR THE POSTACCIDENT SAMPLING SYSTEM Liquids Ranges Radioisotopic identification 10 3 10 7 Ci/ccBoron 0 6,000 ppm pH 1 13

Hydrogen (Not required or performed.

Reference USQD 59 980071, letter WO 980047 and letter 9801418.) Oxygen 0 20 ppm Chloride 0 20 ppm Conductivity 0.1 1,000 mhos 18.223 Rev. 20 WOLF CREEK Gases Ranges Radioisotopic identification 10 7 10 5 Ci/cc Oxygen 0 50 wt% Hydrogen 0 10 Volume Percent Since the sample panel is located in the auxiliary building, any leakage from the system is filtered through the charcoal adsorber and HEPA filters of the auxiliary building emergency exhaust system (see Section 9.4.3). The nuclear sampling system P&ID (M12SJ01, M12SJ02, M12SJ03) are listed in Table 1.72.

Accessibility of the auxiliary building to obtain a grab sample was addressed in Section 18.2.2.

Core Damage Assessment Methodology (CDAM) was developed and approved by the NRC. WCAP14696, "Westinghouse Owners Group Core Damage Assessment Guidance,"

was developed and submitted to the NRC for review. This Core Damage Assessment Guidance (CDAG) utilizes installed instrumentation, rather than PASS samples to classify core damage accidents. NRC issued an SER on September 2, 1999 to approve the WCAP14696 methodology. Justification for elimination of PASS was submitted to the NRC in WCAP14986A, "Post Accident Sampling System Requirements: A Technical Basis," October 26, 1998, as supplemented by letters dated April 28, 1999, April 10, 2000, and May 22, 2000.

18.2.3.3 Conclusion The postaccident sampling system design for WCGS is not required to meet the recommendations of Item II.B.3 of NUREG0737. A Core Damage Assessment Guidance (WCAP14696) is implemented to provide evaluation and action during an accident. With implementation of WCAP14696, WCAP14986A and evaluations demonstrated that PASS was no longer required. Should contingency sampling be required during recovery, assessments will address taking samples from the Nuclear Sample System and the Containment Hydrogen Monitoring Equipment. No PASS samples are required to be taken. (Reference USQD 59 980071, letter WO 980047 and letter 9801418.) 18.224 Rev. 20 WOLF CREEK 18.2.4 TRAINING FOR MITIGATING CORE DAMAGE (II.B.4) 18.2.4.1 NRC Guidance Per NUREG0737 Position The staff requires that the applicants develop and implement a program to ensure that all operating personnel are trained in the use of installed plant

systems to control or mitigate an accident in which the core is severely

damaged.Clarification

Shift Technical Advisors and operating personnel from the plant manager through the operations chain to the licensed operators shall receive the training

listed below.

The training program shall include the following topics:

a. Incore Instrumentation
1. Use of fixed or movable incore detectors to determine the extent of core damage and geometry

changes.

2. Use of thermocouples in determining peak temperatures; methods for extended range readings;

methods for direct readings at terminal junctions.

3. Methods for calling up (printing) incore data from the plant computer.
b. Excore Nuclear Instrumentation (NIS)

Use of NIS for determination of void formation; void location basis for NIS response as a function of core

temperatures and density changes.

c. Vital Instrumentation
1. Instrumentation response in an accident environment; failure sequence (time to failure, method of failure); indication reliability (actual

versus indicated level). 18.225 Rev. 0 WOLF CREEK

2. Alternative methods for measuring flows, pressures, levels, and temperatures.

(a) Determination of pressurizer level if all level transmitters fail.

(b) Determination of letdown flow with a clogged filter (low flow).

(c) Determination of other reactor coolant system parameters if the primary method of

measurement has failed.

d. Primary Chemistry
1. Expected chemistry results with severe core damage; consequences of transferring small quantities of

liquid outside containment; importance of using

leaktight systems.

2. Expected isotopic breakdown for core damage; for clad damage.
3. Corrosion effects of extended immersion in primary water; time to failure.
e. Radiation Monitoring
1. Response of process and area monitors to severe damage; behavior of detectors when saturated;

method for detecting radiation readings by direct

measurement at detector output (over ranged

detector); expected accuracy of detectors at

different locations; use of detectors to determine

the extent of core damage.

2. Methods of determining dose rate inside the containment from measurements taken outside the

containment.

f. Gas Generation
1. Methods of H 2 generation during an accident; other sources of gas (Xe, Kr); techniques for venting or disposal of noncondensibles.
2. H 2 flammability and explosive limit, sources of 0 2 in containment or reactor coolant system. 18.226 Rev. 0 WOLF CREEK Managers and technicians in the Instrumentation and Control (I&C), health

physics, and chemistry departments shall receive training commensurate with

their responsibilities.

18.2.4.2 The Operating Agent Response

The Operating Agent provided a course in Mitigating Core Damage for licensed

operator candidates. The outline of this course is provided in Table 18.2-1.

The course, in conjunction with other lectures in the reactor operator training

program, covered a minimum of 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> of training in the control or mitigation

of accidents in which the core is severely damaged. A Mitigating Core Damage

course was given to all licensed operators and their supervisors up to and

including the Plant Manager prior to fuel load.

The current Mitigating Core Damage course is discussed in Section 13.2.

Supervisors and technicians in the Instrumentation and Controls, Health Physics

and Chemistry groups were given training, prior to fuel load, commensurate with

their responsibilities during accidents which involve severe core damage.

18.2.4.3 Conclusion

The Operating Agent's training program for mitigating core damage satisfies

NUREG-0737.

NOTE: Section 18.2.5 is historical and reflects conditions at the time of plant licensing. Section 18.2.5 will only be updated when potential hazards not previously analyzed are identified.

18.2.5 PERFORMANCE TESTING OF BOILING-WATER REACTOR AND

PRESSURIZED-WATER REACTOR RELIEF AND SAFETY

VALVES (II.D.1)

18.2.5.1 NRC Guidance Per NUREG-0737

Position

Pressurized-water reactor and boiling-water reactor licensees and applicants

shall conduct testing to qualify the reactor coolant system relief and safety

valves under expected operating conditions for design-basis transients and

accidents.

Clarification

Licensees and applicants shall determine the expected valve operating

conditions through the use of analyses of accidents and anticipated operational

occurrences referenced in Regulatory Guide 1.70, Revision 2. The single

failures applied to these analyses shall be chosen so that the dynamic forces

18.2-27 Rev. 30

WOLF CREEK on the safety and relief valves are maximized. Test pressures shall be the highest predicted by conventional safety analysis procedures. Reactor coolant system relief and safety valve qualification shall include qualification of

associated control circuitry, piping, and supports, as well as the valves

themselves. A. Performance Testing of Relief and Safety ValvesThe following information must be provided in report form by

October 1, 1981 for BWRs and July 1, 1982 for PWRs.

1. Evidence supported by test of safety and relief valve functionability for expected operating and accident (nonATWS) conditions must be provided to

NRC. The testing should demonstrate that the

valves will open and reclose under the expected

flow conditions.

2. Since it is not planned to test all valves on all plants, each licensee must submit to NRC a

correlation of other evidence to substantiate that

the valves tested in the EPRI (Electric Power

Research Institute) or other generic test program demonstrate the functionability of asinstalled

primary relief and safety valves. This correlation

must show that the test conditions used are

equivalent to expected operating and accident

conditions, as prescribed in the Final Safety Analysis Report (FSAR). The effect of asbuilt

relief and safety valve discharge piping on valve

operability must also be accounted for, if it is

different from the generic test loop piping.

3. Test data, including criteria for success and failure of valves tested, must be provided for NRC

staff review and evaluation. These test data should include data that would permit plant

specific evaluation of discharge piping and

supports that are not directly tested. B. Qualification of PWR Block ValvesAlthough not specifically listed as a shortterm lessons learned requirement in NUREG0578, qualification of PWR block valves is required by the NRC Task Action Plan NUREG

0660 under task item II.D.1. It is the understanding of

the NRC that testing of several commonly used block

valve designs is already included in the generic EPRI

PWR safety and relief valve testing program to be

completed by July 1, 1981. By means of this letter, NRC

is establishing July 1, 1982 as the date for

verification 18.228 Rev. 10 WOLF CREEK of block valve functionability. By July 1, 1982, each PWR licensee, for plants so equipped, should provide

evidence supported by test that the block or isolation valves between the pressurizer and each poweroperated

relief valve can be operated, closed, and opened for all

fluid conditions expected under operating and accident

conditions. C. ATWS TestingAlthough ATWS testing need not be completed by July 1, 1981, the test facility should be

designed to accommodate ATWS conditions of approximately

3,200 to 3,500 (Service Level C pressure limit) psi and

700 F with sufficient capacity to enable testing of

relief and safety valves of the size and type used on operating pressurizedwater reactors.

18.2.5.2 The Operating Agent Response The PORVs in the WCGS design are relied on to function to alleviate over pressurization that possibly could occur during startup of the reactor, or

during cold shutdown conditions, and they may be relied on to function during shut down of the reactor, assuming only safetygrade equipment is functioning.

(These functions are described in Section 5.2 and Appendix 5.4(A).) The PORVs are not required to function to mitigate the consequences of any design basis

accident.The PORVs are also designed to limit high pressure during normal operation.

The description of this control function is presented in Sections 5.2 and 7.6.

As discussed below, operability of the PORVs will be demonstrated by

prototypical testing and appropriate analyses.

The safety valves for the WCGS design are relied on to limit primary system pressure following anticipated operational transients. The design basis for

the safety valves is presented in Section 5.2. The valves are required by ASME

Boiler and Pressure Vessel Code to mitigate excessive pressure increases, regardless of their source. As discussed below, operability of the safety

valves was demonstrated by prototypical testing and appropriate analyses.

The reactor coolant system is provided with two PORVs and three code safety valves. Each PORV also has an associated motoroperated block valve. 18.229 Rev. 12 WOLF CREEK The PORVs for WCGS were manufactured by Garrett; the safety valves were manufactured by Crosby. These valves are included in the safety and relief

valve testing program that has been developed by the Electric Power Research

Institute (EPRI). A description of this program entitled "Program Plan for the

Performance Verification of PWR Safety/Relief Valves and Systems," dated

December 13, 1979, was submitted to the NRC on December 17, 1979 (letters from

W. J. Cahill, Jr., Chairman of EPRI Safety and Analysis Task Force, to H.

Denton and D. Eisenhut, NRC). A revision to this program was submitted to the

NRC in July 1980. The NRC staff completed its review of this program and found

it acceptable.

An interim report on these valve tests was submitted by the PWR utilities to the NRC in July 1981. A final report on these tests was submitted in SNUPPS

letter dated October 20, 1982 and a final report on piping and supports was provided by SNUPPS letter dated January 7, 1983 (distributed as 82002).

Preoperational testing of the PORVs included monitoring the dynamic response of the relief valve discharge piping during actuation of the PORVs. These in plant dynamic tests were initiated with a watersolid inlet (loop seal) at the

PORVs and a steam bubble maintained in the pressurizer.

Regarding verification of the block valve functionability, WCGS information on qualification of the block valves was provided by SNUPPS letter dated July 1, 1982.Based on the NRC review of the submittals addressing safety valves, PORVs, PORV block valves and associated piping, the Operating Agent was requested to

provide additional information. SNUPPS letters dated June 30, 1986 and

September 26, 1986 provided responses to the NRC questions.

18.2.5.3 Conclusion The plan to demonstrate the operability of the PORVs and safety valves at WCGS satisfies the guidance of item II.D.1 in NUREG0737. The NRC review of this

issue is continuing.

18.2.6 DIRECT INDICATION OF RELIEF AND SAFETY VALVE POSITION (II.D.3) 18.2.6.1 NRC Requirement Per NUREG0737 Position Reactor coolant system relief and safety valves shall be provided with a positive indication in the control room derived from a 18.230 Rev. 0 WOLF CREEK reliable valveposition detection device or a reliable indication of flow in the discharge pipe.

Clarification

1. The basic requirement is to provide the operator with unambiguous indication of valve position (open or

closed) so that appropriate operator actions can be

taken.

2. The valve position should be indicated in the control room. An alarm should be provided in conjunction with

this indication.

3. The valve position indication may be safety grade. If the position indication is not safety grade, a reliable singlechannel direct indication powered from a vital

instrument bus may be provided if backup methods of

determining valve position are available and are

discussed in the emergency procedures as an aid to

operator diagnosis of an action.

4. The valve position indication should be seismically qualified, consistent with the component or system to

which it is attached.

5. The position indication should be qualified for its appropriate environment (any transient or accident which

would cause the relief or safety valve to lift) and in accordance with Commission Order, May 23, 1980 (CLI20

81).

6. It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed taking into con

sideration:

a. The use of this information by an operator during both normal and abnormal plant conditions.
b. Integration into emergency procedures.
c. Integration into operator training.
d. Other alarms during emergency and need for prioritization of alarms. 18.231 Rev. 0 WOLF CREEK 18.2.6.2 The Operating Agent ResponseSafetygrade position indication is provided for each safety valve and power operated relief valve (PORV) that indicates when the valve is not in its fully

closed position. The position indication is seismically and environmentally

qualified. The position indication for each valve is displayed in the control

room, and an alarm is provided if any of the PORVs or safety valves is not

fully closed. Other, nonsafetyrelated instrumentation is provided on the valve discharge piping and the pressurizer relief tank to provide an alternate means of assessing the status of the safety valves and PORVs (see Figure 5.11, Sheet

2).18.2.6.3 ConclusionThe WCGS design satisfies the guidance of Item II.D.3 of NUREG0737.

18.2.7 AUXILIARY FEEDWATER SYSTEM EVALUATION (II.E.1.1) 18.2.7.1 NRC Guidance Per NUREG0737 Position The office of Nuclear Reactor Regulation is requiring reevaluation of the auxiliary feedwater (AFW) systems for all PWR operating plant licensees and

operating license applications. This action includes:

1. Perform a simplified AFW system reliability analysis that uses eventtree and faulttree logic techniques to

determine the potential for AFW system failure under various lossofmainfeedwatertransient conditions.

Particular emphasis is given to determining potential

failures that could result from human errors, common causes, singlepoint vulnerabilities, and test and

maintenance outages.

2. Perform a deterministic review of the AFW system using the acceptance criteria of Standard Review Plan Section 10.4.9 and associated Branch Technical Position ASB 101

as principal guidance.

3. Reevaluate the AFW system flowrate design bases and criteria. 18.232 Rev. 0 WOLF CREEK ClarificationOperating License Applicants Operating license applicants have been requested to respond to staff letters of March 10, 1980 (W and CE) and April 24, 1980 (B&W). These responses will be reviewed during the normal review process for

these applications.

18.2.7.2 The Operating Agent Response A reliability analysis of the WCGS auxiliary feedwater system (AFS) was submitted to the NRC by SNUPPS letter dated June 8, 1981. A comparison of the design with Standard Review Plan 10.4.9 and Branch Technical Position ASB 101

is provided in Section 10.4.9. An evaluation of the auxiliary feedwater system

flowrate design bases and criteria was submitted by SNUPPS letter dated June 3, 1981.The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.

Based on this review, a confirmatory licensing issue was identified, regarding

physically securing the condensate storage tank manual isolation valve. This

issue was resolved prior to initial fuel load.

18.2.7.3 Conclusion The WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.1 of NUREG0737.

18.2.8 AUXILIARY FEEDWATER SYSTEM AUTOMATIC INITIATION AND FLOW INDICATION (II.E.1.2) 18.2.8.1 NRC Guidance Per NUREG0737Position Part 1: AFS Automatic Initiation

Consistent with satisfying the requirements of General Design Criterion 20 of Appendix A to 10 CFR Part 50 with respect to the timely initiation of the

auxiliary feedwater system (AFS), the following requirements shall be

implemented in the short term:

1. The design shall provide for the automatic initiation of the AFS.
2. The automatic initiation signals and circuits shall be designed so that a single failure will not result in the

loss of AFS function. 18.233 Rev. 0 WOLF CREEK

3. Testability of the initiation signals and circuits shall be a feature of the design.
4. The initiating signals and circuits shall be powered from the emergency buses.
5. Manual capability to initiate the AFS from the control room shall be retained and shall be implemented so that

a single failure in the manual circuits will not result

in the loss of system function. 6. The ac motordriven pumps and valves in the AFS shall be included in the automatic actuation (simultaneous and/or

sequential) of the loads onto the emergency buses.

7. The automatic initiating signals and circuits shall be designed so that their failure will not result in the

loss of manual capability to initiate the AFS from the

control room.

In the long term, the automatic initiation signals and circuits shall be upgraded in accordance with safetygrade requirements.

Clarification

The intent of this recommendation is to ensure a reliable automatic initiation system. This objective can be met by providing a system which meets all the requirements of IEEE Standard 2791971. Position Part 2: AFS Flowrate Indication

Consistent with satisfying the requirements set forth in General Design Criterion 13 to provide the capability in the control room to ascertain the

actual performance of the AFS when it is called to perform its intended

function, the following requirements shall be implemented: 1. Safetygrade indication of auxiliary feedwater flow to each steam generator shall be provided in the control

room.

2. The auxiliary feedwater flow instrument channels shall be powered from the emergency buses consistent with

satisfying the emergency power diversity requirements of

the auxiliary feedwater system set forth in Auxiliary Systems Branch Technical Position 101 of the Standard

Review Plan, Section 10.4.9. 18.234 Rev. 0 WOLF CREEK Clarification The intent of this recommendation is to ensure a reliable indication of AFS performance. This objective can be met by providing an overall indication

system that meets the following appropriate design principles:

For Westinghouse and Combustion Engineering Plants

1. To satisfy these requirements, W and CE plants must provide as a minimum one auxiliary feedwater flow rate indicator and one widerange steamgenerator level

indicator for each steam generator or two flowrate

indicators.

2. The flow indication system should be:
a. Environmentally qualified
b. Powered from highly reliable, batterybacked non Class 1E power source
c. Periodically testable
d. Part of plant quality assurance program
e. Capable of display on command

It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A humanfactor analysis should be performed, taking into consideration:

1. The use of this information by an operator during both normal and abnormal plant conditions.
2. Integration into emergency procedures.
3. Integration into operator training.
4. Other alarms during emergency and need for prioritization of alarms.

18.2.8.2 The Operating Agent Response Automatic initiation of the AFS meets the NRC recommendations, as described in Sections 10.4.9 and 7.3.6. The AFS flowrate indication meets the NRC

recommendations, as described in Sections 10.4.9 and 7.5. 18.235 Rev. 0 WOLF CREEK The NRC staff reviewed the SNUPPS AFS design capabilities against the recommendations of a March 10, 1980 NRC letter (D. Ross, NRC to All Pending W and CE License Applicants) which corresponds to NUREG0737, Item II.E.1.1.

Based on this review a confirmatory licensing issue was identified, regarding

physically securing the condensate storage tank manual isolation valve. This

issue was resolved prior to initial fuel load.

18.2.8.3 Conclusion The WCGS design and analyses for the AFS meet the recommendations of Item II.E.1.2 of NUREG0737.

18.2.9 EMERGENCY POWER SUPPLY FOR PRESSURIZER HEATERS (II.E.3.1) 18.2.9.1 NRC Guidance Per NUREG0737 Position Consistent with satisfying the requirements of General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of loss of offsite

power, the following positions shall be implemented:

1. The pressurizer heater power supply design shall provide the capability to supply, from either the offsite power

source or the emergency power source (when offsite power

is not available), a predetermined number of pressurizer

heaters and associated controls necessary to establish

and maintain natural circulation at hot standby

conditions. The required heaters and their controls

shall be connected to the emergency buses in a manner

that will provide redundant power supply capability.

2. Procedures and training shall be established to make the operator aware of when and how the required pressurizer

heaters shall be connected to the emergency buses. If

required, the procedures shall identify under what

conditions selected emergency loads can be shed from the

emergency power source to provide sufficient capacity

for the connection of the pressurizer heaters.

3. The time required to accomplish the connection of the preselected pressurizer heater to the emergency buses

shall be consistent with the timely initiation and

maintenance of natural circulation conditions. 18.236 Rev. 0 WOLF CREEK

4. Pressurizer heater motive and control power interfaces with the emergency buses shall be accomplished through

devices that have been qualified in accordance with safetygrade requirements.

Clarification

1. Redundant heater capacity must be provided, and each redundant heater or group of heaters should have access

to only Class 1E division power supply.

2. The number of heaters required to have access to each emergency power source is that number required to

maintain natural circulation in the hot standby

condition.

3. The power sources need not necessarily have the capacity to provide power to the heaters concurrently with the loads required for lossofcoolant accident.
4. Any changover of the heaters from normal offsite power to emergency onsite power is to be accomplished manually

in the control room.

5. In establishing procedure to manually load the pressurizer heaters onto the emergency power sources, careful consideration must be given to:
a. Which ESF loads may be appropriately shed for a given situation.
b. Reset of the safety injection actuation signal to permit the operation of the heaters.
c. Instrumentation and criteria for operator use to prevent overloading a diesel generator.
6. The Class 1E interfaces for main power and control power are to be protected by safetygrade circuit breakers

(see also Regulatory Guide 1.75). 7. Being nonClass 1E loads, the pressurizer heaters must be automatically shed from the emergency power sources

upon the occurrence of a safety injection actuation

signal (see item 5.b. above).

18.2.9.2 The Operating Agent Response The total rated capacity of the pressurizer heaters at 480 volts ac is 1800 Kw(Table 5.11). The pressurizer heaters are divided 18.237 Rev. 14 WOLF CREEK into three groups (see Figure 8.31). The rated capacity of each group is as follows: Group A 692 Kw Group B 692 Kw Group C 416 Kw The group C heaters are used for proportional control during power operation.

Groups A and B are the backup heater groups; each of these two groups is powered from a Class lE power source. This power is interrupted by the load

shedder/sequencer following a safety injection or emergency bus undervoltage

signal.The controls for each backup pressurizer heater group are provided from a non Class 1E 125 Vdc power system. The normal power source is from a nonClass 1E 480 Vac through a battery charger. There is a 125 Vdc battery backup to the480 Vac supply (see Figure 8.36). Each battery charger of the 125Vdc systemis supplied from a single separation group of the 4.16kV onsite emergency distribution system. When the 480Vac system is unavailable following a loss ofoffsite power, the dcbacked power supplies will supply the backup

pressurizer heater controls. Similar to the breakers feeding the heater load centers, the circuit breakers supplying the 125Vdc battery chargers are

automatically tripped upon an SIS or emergency bus undervoltage signal. They

may be reclosed from the control room when desired after reset of the breaker

tripping signals. For additional reliability, a crosstie is provided between Separation Groups 5 and 6 of the nonClass 1E 125Vdc system. This will permit operation of

selected loads of both separation groups in the event of a failure of either

battery charger.

All the breakers which function upon SIS and bus undervoltage are seismically qualified isolation devices.

Analysis shows that subcooling would be maintained in the reactor coolant system for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> without heat input from the pressurizer heaters.

Pressure control for the reactor coolant system, as discussed in Section

5.4(A), can be accomplished without pressurizer heaters. If pressurizer

heaters were used for pressure control, analysis indicates that 150 kW is

sufficient to maintain subcooling. Plant procedures have been provided for

manually connecting (from the control room) pressurizer heaters to emergency

power sources following a loss of offsite power. 18.238 Rev. 14 WOLF CREEK 18.2.9.3 ConclusionThe WCGS design satisfies the guidance of item I.E.3.1 of NUREG0737.

18.2.10 DEDICATED HYDROGEN PENETRATIONS (II.E.4.1) 18.2.10.1 NRC Guidance Per NUREG0737 Position Plants using external recombiners or purge systems for postaccident combustible gas control of the containment atmosphere should provide

containment penetration systems for external recombiner or purge systems that are dedicated to that service only, that meet the redundancy and singlefailure

requirements of General Design Criteria 54 and 56 of Appendix A to 10 CFR 50, and that are sized to satisfy the flow requirements of the recombiner or purge

system.The procedures for the use of combustible gas control systems following an accident that results in a degraded core and release of radioactivity to the

containment must be reviewed and revised, if necessary.

Clarification

1. An acceptable alternative to the dedicated penetration is a combined design that is singlefailure proof for containment isolation purposes and singlefailure proof

for operation of the recombiner or purge system. 2. The dedicated penetration or the combined singlefailure proof alternative shall be sized such that the flow

requirements for the use of the recombiner or purge

system are satisfied. The design shall be based on 10

CFR 50.44 requirements.

3. Components furnished to satisfy this requirement shall be safety grade.
4. Licensees that rely on purge systems as the primary means of controlling combustible gases following a loss ofcoolant accident should be aware of the positions taken in SECY80399, "Proposed Interim Amendments to 10

CFR Part 50 Related to Hydrogen Control and Certain

Degraded Core Considerations." This proposed rule, published in the Federal Register on October 2, 1980, would require plants that do not have recombiners to 18.239 Rev. 0 WOLF CREEK have the capacity to install external recombiners by January 1, 1982. (Installed internal recombiners are

an acceptable alternative to the above.)

5. Containment atmosphere dilution (CAD) systems are considered to be purge systems for the purpose of

implementing the requirements of this TMI Task Action

item.

18.2.10.2 The Operating Agent Response The postaccident H 2 control is accomplished by redundant hydrogen recombiners which are permanently installed inside the containment. Therefore, dedicated hydrogen control penetrations are not required, and this item is not applicable

to WCGS. As a backup to the safetyrelated hydrogen control system, a means of purging hydrogen from the containment is provided. Only the containment penetrations and the associated isolation valves are safetyrelated in the hydrogen purge

system. These penetrations are not the subject of this item, since they do not

serve external hydrogen recombiners. Since the hydrogen recombiners are

actuated from the control room, the shielding and personnel exposure

limitations associated with recombiner use and development of procedures for

reduction of doses are not applicable to WCGS.

18.2.10.3 Conclusion Item II.E.4.1 is not applicable to WCGS.

18.2.11 CONTAINMENT ISOLATION DEPENDABILITY (II.E.4.2) 18.2.11.1 NRC Guidance Per NUREG0737 Position

1. Containment isolation system designs shall comply with the recommendations of Standard Review Plan Section

6.2.4 (i.e., that there be diversity in the parameters

sensed for the initiation of containment isolation).

2. All plant personnel shall give careful consideration to the definition of essential and nonessential systems, identify each system determined to be essential, identify each system determined to be nonessential, describe the basis for selection of each essential

system, modify their containment isolation designs accordingly, and report the results of the reevaluation

to the NRC.

3. All nonessential systems shall be automatically isolated by the containment isolation signal. 18.240 Rev. 0 WOLF CREEK
4. The design of control systems for automatic containment isolation valves shall be such that resetting the

isolation signal will not result in the automatic

reopening of containment isolation valves. Reopening of

containment isolation valves shall require deliberate

operator action.

5. The containment setpoint pressure that initiates containment isolation for nonessential penetrations must

be reduced to the minimum compatible with normal

operating conditions.

6. Containment purge valves that do not satisfy the operability criteria set forth in Branch Technical Position CSB 64 or the Staff Interim Position of

October 23, 1979 must be sealed closed as defined in SRP

6.2.4, Item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves must be verified to

be closed at least every 31 days. (A copy of the Staff

Interim Position [was to be] enclosed as Attachment 1

[to NUREG0737].)

7. Containment purge and vent isolation valves must close on a high radiation signal.

Clarification

1. The reference to SRP 6.2.4 in position 1 is only to the diversity requirements set forth in that document.
2. For postaccident situations, each nonessential penetration (except instrument lines) is required to

have two isolation barriers in series that meet the

requirements of General Design Criteria 54, 55, 56, and

57, as clarified by Standard Review Plan, Section 6.2.4.

Isolation must be performed automatically (i.e., no

credit can be given for operator action). Manual valves

must be sealed closed, as defined by Standard Review

Plan, Section 6.2.4, to qualify as an isolation

barrier. Each automatic isolation valve in a

nonessential penetration must receive the diverse

isolation signals.

3. Revision 2 to Regulatory Guide 1.141 will contain guidance on the classification of essential versus

nonessential systems and is due to be issued by June

1981. Requirements for operating plants to review their

list of essential and nonessential systems will be

issued in conjunction with this guide, including an

appropriate time schedule for completion. 18.241 Rev. 0 WOLF CREEK

4. Administrative provisions to close all isolation valves manually before resetting the isolation signals is not

an acceptable method of meeting position 4.

5. Ganged reopening of containment isolation valves is not acceptable. Reopening of isolation valves must be performed on a valvebyvalve basis, or on a lineby

line basis, provided that electrical independence and other singlefailure criteria continue to be satisfied.

6. The containment pressure history during normal operation should be used as a basis for arriving at an appropriate

minimum pressure setpoint for initiating containment

isolation. The pressure setpoint selected should be far

enough above the maximum observed (or expected) pressure

inside containment during normal operation so that

inadvertent containment isolation does not occur during

normal operation from instrument drift or fluctuations

due to the accuracy of the pressure sensor. A margin of

1 psi above the maximum expected containment pressure

should be adequate to account for instrument error. Any

proposed values greater than 1 psi will require detailed

justification. Applicants for an operating license

and operating plant licensees that have operated less

than one year should use pressure history data from

similar plants that have operated more than one year, if

possible, to arrive at a minimum containment setpoint

pressure. 7.) Sealedclosed purge isolation valves shall be under administrative control to ensure that they cannot be

inadvertently opened. Administrative control includes

mechanical devices to seal or lock the valve closed, or

to prevent power from being supplied to the valve

operator. Checking the valve position light in the

control room is an adequate method for verifying every

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the purge valves are closed.

18.2.11.2 The Operating Agent Response The containment isolation system and the containment isolation actuation are described in Sections 6.2.4, 7.3.2, and 7.3.8. All lines penetrating the containment are identified in Figure 6.2.41. This figure also identifies the actuation signal(s) for isolation of those lines

requiring isolation. The logic design for containment isolation is such that

resetting of the containment isolation signal will not result in the loss of

containment 18.242 Rev. 0 WOLF CREEK isolation. Once the initiating signal is reset, individual valves can be opened from the control room, if required. Reopening of isolation valves is performed on a valvebyvalve or linebyline basis. The containment isolation setpoint pressure (Hi1) that initiates containment isolation (CISA) for nonessential penetrations has been reduced to the

minimum compatible with normal operating conditions. Refer to SNUPPS letter

dated March 15, 1984. The Technical Specifications establish a limit for

containment pressure during normal operations. The Technical Specifications also contain the setpoint for Hi1 which is based on the normal operation limit

and instrument drift and accuracy. Table 18.22 identifies systems as either essential or nonessential. Essential systems are those systems required to have isolation valves open for eitherpostaccident safe shutdown or mitigation of the consequences of an accident.

The greatest number of lines are automatically isolated upon initiation of a containment isolation signal, Phase A (CISA). A safety injection signal (SIS) initiates a feedwater isolation signal (FWIS) and a steam generator blowdown isolation signal (SGBSIS). A CISA is initiated when a safety injection signal (SIS) is initiated. The diverse parameters sensed to initiate a SIS are low steam line pressure or low pressurizer pressure or high containment pressure(Hi1). The CISA logic is shown on Figure 7.21, Sheet 8.

The main steam and related lines are automatically isolated upon initiation of a steam line isolation signal (SLIS). The diverse parameters sensed to

initiate an SLIS are either low steam line pressure or high negative steam pressure rate and high containment pressure (Hi2). The SLIS logic is shown on Figure 7.21, Sheet 8.

The lines supplying component cooling water to equipment inside the containment are isolated by CISB. A CISB is initiated by high containment pressure (Hi 3). It is not diverse, and is initiated with initiation of a containment spray actuation, which does utilize diversity. The CISB is shown on Figure 7.21, Sheet 8. The containment purge system is isolated upon initiation of a containment purge isolation signal (CPIS). The diverse parameters sensed to initiate a CPIS are

high containment radiation level and high containment purge exhaust radiation level, or a CISA signal. The CPIS logic is shown in Figure 7.31, Sheet 2. 18.243 Rev. 14 WOLF CREEK The guidelines used for operability of containment purge isolation valves

intended for use during plant operation comply with NRC criteria.

Documentation of operability was provided by SNUPPS letter dated January 16, 1984. (Reference 11). The shutdown purge system isolation valves meet SRP

6.2.4, item II.3.f during operational conditions 1, 2, 3, and 4. Furthermore, these valves are verified to be closed in accordance with NUREG-0737, Item

II.E.4.2.

All containment isolation valves are provided with control switches on the main

control board. Manual actuation switches are provided for initiation of CIS-A, SLIS, and CPIS. In addition to diversity, these systems are redundant and meet

safety-grade (Class 1E) criteria.

18.2.11.3 Conclusion

The design for the containment isolation system satisfies the requirements of

Item II.E.4.2 of NUREG-0737.

NOTE: Section 18.2.12 is historical and reflects conditions at the time of plant licensing. Section 18.2.12 will only be updated when potential hazards not previously analyzed are identified.

18.2.12 ACCIDENT MONITORING INSTRUMENTATION (II.F.1)

18.2.12.1 NRC Guidance Per NUREG-0737

Introduction

Item II.F.1 of NUREG-0660 contains the following subparts:

1. Noble gas effluent radiological monitor.
2. Provisions for continuous sampling of plant effluents

for post-accident releases of radioactive iodines and

particulates and onsite laboratory capabilities (this

requirement was inadvertently omitted from NUREG-0660;

see Attachment 2 that follows, for position).

3. Containment high-range radiation monitor.
4. Containment pressure monitor.
5. Containment water level monitor.
6. Containment hydrogen concentration monitor.

18.2-44 Rev. 30 WOLF CREEK NUREG0578 provided the basic requirements associated with items 1 through 3 above. NRC staff letters issued to All Operating Nuclear Power Plants dated

September 13, 1979 and October 30, 1979 provided clarification of staff

requirements associated with items 1 through 6 above. Attachments 1 through 6

present the staff position on these matters.

It is important that the displays and controls added to the control room as a result of this requirement not increase the potential for operator error. A human factor analysis should be performed (see NUREG0737,Section II.D.2),

taking into consideration:

a. the use of this information by an operator during both normal and abnormal plant conditions, b. integration into emergency procedures,
c. integration into operator training,
d. other alarms during emergency and need for prioritization of alarms. (NOTE: Because of an editorial error, references to NUREG 0737, Appendix A in the following sections should

actually be references to Appendix B.) Noble Gas Effluent Monitor Position Noble gas effluent monitors shall be installed with an extended range designed to function during accident conditions as well as during normal operating

conditions. Multiple monitors are considered necessary to cover the ranges of

interest. 1. Noble gas effluent monitors with an upper range capacity of 10 5 Ci/cc (Xe133) are considered to be practical and should be installed in all operating plants.

2. Noble gas effluent monitoring shall be provided for the total range of concentration extending from normal

conditions (as low as reasonably achievable (ALARA))

concentrations to a maximum of 10 5Ci/cc (Xe133).

Multiple monitors are considered to be necessary to cover the ranges of interest. The range capacity of

individual monitors should overlap by a factor of 10. 18.245 Rev. 0 WOLF CREEK Clarification 1. Licensees shall provide continuous monitoring of high level, postaccident releases of radioactive noble gases

from the plant. Gaseous effluent monitors shall meet the requirements specified in Table II.F.11 [of NUREG

0737, presented below]. Typical plant effluent pathways

to be monitored are also given in the table.

2. The monitors shall be capable of functioning both during and following an accident. System designs shall accommodate a designbasis release and then be capable

of following decreasing concentrations of noble gases.

3. Offline monitors are not required for the PWR secondary side main steam safety valve and atmospheric relief valve discharge lines. For this application, externally mounted monitors viewing the main steam line upstream of the

valves are acceptable with procedures to correct for the

low energy gammas the external monitors would not

detect. Isotopic identification is not required.

4. Instrumentation ranges shall overlap to cover the entire range of effluents from normal (ALARA) through accident

conditions.

The design description shall include the following information.

a. System description, including:

(i) Instrumentation to be used, including range or sensitivity, energy dependence or

response, calibration frequency and

technique, and vendor's model number, if

applicable.

(ii) Monitoring locations (or points of sampling), including description of methods

used to ensure representative measurements

and background correction.

(iii) Location of instrument readout(s) and method of recording including description

of the method or procedure for transmitting

or disseminating the information or data. 18.246 Rev. 13 WOLF CREEK (iv) Assurance of the capability to obtain readings at least every 15 minutes during

and following an accident.

(v) The source of power to be used.

b. Description of procedures or calculational methods to be used for converting instrument readings to

release rate per unit time, based on exhaust air

flow and considering radionuclide spectrum

distribution as a function of time after shutdown. TABLE II.F.11 HIGHRANGE NOBLE GAS EFFLUENT MONITORS REQUIREMENT Capability to detect and measure concentrations of noble gas fission products in plant gaseous

effluents during and following an accident.

All potential accident release paths shall be

monitored.

PURPOSE To provide the plant operator and emergency planning agencies with information on plant

releases of noble gases during and following an

accident.

Design Basis Maximum RangeDesign range values may be expressed in Xe133 equivalent values for monitors employing gamma radiation detectors or in microcuries per cubic centimeter of

air at standard temperature and pressure (STP) for monitors employing beta radiation detectors (Note: 1 R/hr at 1 ft = 6.7 Ci Xe133 equivalent for point

source). Calibrations with a higher energy source are acceptable. The decay of

radionuclide noble gases after an accident (i.e., the distribution of noble

gases changes) should be taken into account.

10 5 Ci/cc Undiluted containment exhaust gases (e.g., PWR reactor building purge, BWR drywell purge through the standby gas treatment system).

Undiluted PWR condenser air removal system exhaust. 18.247 Rev. 0 WOLF CREEK 10 4 Ci/cc Diluted containment exhaust gases (e.g., >10:1 dilution, as with auxiliary building exhaust air).

BWR reactor building (secondary containment) exhaust air.

PWR secondary containment exhaust air.

10 3 Ci/cc Buildings with systems containing primary coolant or primary coolant offgases (e.g. PWR auxiliary building, BWR turbine buildings).

PWR steam safety valve discharge, atmospheric relief valve discharge.

10 2 Ci/cc Other release points (e.g., radwaste building, fuel handling/storage buildings).

REDUNDANCY Not required; monitoring the final release point of several discharge inputs is acceptable.

SPECIFICATIONS (None) Sampling design criteria per ANSI N13.1.

POWER SUPPLY Vital instrument bus or dependable backup power supply to normal ac. CALIBRATION Calibrate monitors using gamma detectors to Xe 133 equivalent (1 R/hr @ 1 ft = 6.7 Ci Xe133

equivalent for point source). Calibrate monitors using beta detectors to Sr90 or similar longlived beta isotope of at least

0.2 MeV. DISPLAY Continuous and recording as equivalent Xe133 concentrations or Ci/cc or actual noble gases.

QUALIFICATION The instruments shall provide sufficiently accurate responses to perform the intended

function in the environment to which they will

be exposed during accidents.

DESIGN Offline monitoring is acceptable for all CONSIDERATIONS ranges of noble gas concentrations.

Inline (induct) sensors are acceptable for 10 2 Ci/cc to 10 5 Ci/cc noble gases. For less than 10 2 Ci/cc, offline monitoring is recommended.

18.248 Rev. 13 WOLF CREEK Upstream filtration (prefiltering to remove radioactive iodines and particulates) is not

required; however, design should consider all

alternatives with respect to capability to

monitor effluents following an accident.

For external mounted monitors (e.g., PWR main steam line), the thickness of the pipe should be taken into account in accounting for lowenergy

gamma radiation. Sampling of Plant Effluents Sampling of Plant Effluents

Position Because iodine gaseous effluent monitors for the accident condition are not considered to be practical at this time, capability for effluent monitoring of

radioiodines for the accident condition shall be provided with sampling

conducted by adsorption on charcoal or other media, followed by onsite

laboratory analysis.

Clarification

1. Licensees shall provide continuous sampling of plant gaseous effluent for postaccident releases of

radioactive iodines and particulates to meet the requirements of the enclosed Table II.F.12 (from NUREG

0737, presented below). Licensees shall also provide

onsite laboratory capabilities to analyze or measure

these samples. This requirement should not be construed

to prohibit design and development of radioiodine and

particulate monitors to provide online sampling and

analysis for the accident condition. If gross gamma

radiation measurement techniques are used, then

provisions shall be made to minimize noble gas

interference. 2. The shielding design basis is given in Table II.F.12 [of NUREG0737]. The sampling system design shall be

such that plant personnel could remove samples, replace

sampling media, and transport the samples to the onsite

analysis facility with radiation exposures that are not in excess of the criteria of GDC19 of 5rem wholebody

exposure and 75 rem to the extremities during the

duration of the accident. 18.249 Rev. 0 WOLF CREEK

3. The design of the systems for the sampling of particulates and iodines should provide for sample

nozzle entry velocities which are approximately

isokinetic (same velocity) with expected induct or

instack air velocities. For accident conditions, sampling may be complicated by a reduction in stack or

vent effluent velocities to below design levels, making

it necessary to substantially reduce sampler intake flow

rates to achieve the isokinetic condition. Reductions

in air flow may well be beyond the capability of

available sampler flow controllers to maintain

isokinetic conditions; therefore, the staff will accept

flow control devices which have the capability of

maintaining isokinetic conditions with variations in

stack or duct design flow velocity of +20 percent.

Further departure from the isokinetic condition need not

be considered in design. Corrections for nonisokinetic

sampling conditions, as provided in Appendix C of ANSI 13.11969, may be considered on an ad hoc basis.

4. Effluent streams which may contain air with entrained water, e.g., air ejector discharge, shall have

provisions to ensure that the adsorber is not degraded

while providing a representative sample, e.g., heaters. TABLE II.F.12SAMPLING AND ANALYSIS OR MEASUREMENT OF HIGHRANGE RADIOIODINE AND PARTICULATE EFFLUENTS IN GASEOUS EFFLUENT STREAMS EQUIPMENT Capability to collect and analyze or measure representative samples of radioactive iodines

and particulates in plant gaseous effluents

during and following an accident. The

capability to sample and analyze for radioiodine

and particulate effluents is not required for

PWR secondary main steam safety valve and dump

valve discharge lines.

PURPOSE To determine quantitative release of radioiodines and particulates for dose

calculation and assessment.

DESIGN BASIS 10 2 Ci/cc of gaseous radioiodine and particu SHIELDING lates, deposited on sampling media; 30 minutes ENVELOPE sampling time, average gamma energy (E) of 0.5

MeV. 18.250 Rev. 0 WOLF CREEK SAMPLING MEDIA Iodine > 90 percent effective adsorption for all forms of gaseous iodine.

Particulates > 90 percent effective retention for 0.3 micron

() diameter particles.

SAMPLING CONSIDERATIONS Representative sampling per ANSI N13.11969.

Entrained moisture in effluent stream should not degrade adsorber.

Continuous collection required whenever exhaust flow occurs.

Provisions for limiting occupational dose to personnel incorporated in sampling systems, in sample handling and transport, and in analysis of samples.

ANALYSIS Design of analytical facilities and preparation of analytical procedures shall consider the design basis sample.

Highly radioactive samples may not be compatible with generally accepted analytical procedures; in such cases, measurement of emissive gamma radiations and the use of

shielding and distance factors should be considered in

design. Attachment 3 Containment HighRange Radiation Monitor Position In containment radiationlevel monitors with a maximum range of 10 8 rad/hr shall be installed. A minimum of two such monitors that are physically separated shall be provided. Monitors shall be developed and qualified to

function in an accident environment.

Clarification

1. Provide two radiation monitor systems in containment which are documented to meet the requirements of Table II.F.13 (of NUREG0737, presented below). 18.251 Rev. 0 WOLF CREEK
2. The specification of 10 8 rad/hr in the above position was based on a calculation of postaccident containment radiation levels that included both particulate (beta)

and photon (gamma) radiation. A radiation detector that

responds to both beta and gamma radiation cannot be qualified to postLOCA (lossofcoolant accident) containment environments, but gammasensitive

instruments can be so qualified. In order to follow the

course of an accident, a containment monitor that

measures only gamma radiation is adequate. The

requirement was revised in the October 30, 1979 letter to provide for a photononly measurement with an

upper range of 10 7 R/hr. 3. The monitors shall be located in containment(s) in a

manner which will provide a reasonable assessment of

area radiation conditions inside the containment. The

monitors shall be widely separated so as to provide

independent measurements and shall "view" a large

fraction of the containment volume. Monitors should not

be placed in areas which are protected by massive

shielding and should be reasonably accessible for

replacement, maintenance, or calibration. Placement

high in a reactor building dome is not recommended

because of potential maintenance difficulties.

4. For BWR Mark III containments, two such monitoring systems should be inside both the primary containment

(drywell) and the secondary containment.

5. The monitors are required to respond to gamma photons with energies as low as 60 keV and to provide an

essentially flat response for gamma energies between 100 keV and 3 MeV, as specified in Table 11.F.13 of NUREG

0737. Monitors that use thick shielding to increase the

upper range will underestimate postaccident radiation

levels in containment by several orders of magnitude

because of their insensitivity to low energy gammas and

are not acceptable. TABLE II.F.13 CONTAINMENT HIGHRANGE RADIATION MONITOR REQUIREMENT The capability to detect and measure the radiation level within the reactor containment

during and following an accident. 18.252 Rev. 0 WOLF CREEK RANGE l rad/hr to 10 8 rads/hr (beta and gamma) or alternatively 1 R/hr to 10 7 R/hr (gamma only).

RESPONSE 60 keV to 3 MeV photons, with linear energy response +20%) for photons of 0.1 MeV to 3

MeV. Instruments must be accurate enough to

provide usable information.

REDUNDANT A minimum of two physically separated monitors (i.e., monitoring widely separated spaces

within containment).

DESIGN AND Category 1 instruments as described in QUALIFICATION Appendix A (of NUREG0737), except as listed

below.

SPECIAL In situ calibration by electronic signal sub CALIBRATION stitution is acceptable for all range decades

above 10 R/hr. In situ calibration for at

least one decade below 10 R/hr shall be by

means of calibrated radiation source. The

original laboratory calibration is not an

acceptable position due to the possible

differences after in situ installation. For highrange calibration, no adequate sources

exist, so an alternate was provided. SPECIAL Calibrate and typetest representative speci ENVIRONMENTAL mens of detectors at sufficient points to

QUALIFICATIONS demonstrate linearity through all scales up to

10 6 R/hr. Prior to initial use, certify calibration of each detector for at least one

point per decade of range between 1 R/hr and

10 3 R/hr. Attachment 4 Containment Pressure Monitor Position A continuous indication of containment pressure shall be provided in the control room of each operating reactor. Measurement and indication capability

shall include three times the design pressure of the containment for concrete, four times the design pressure for steel and 5 psig for all containments. 18.253 Rev. 0 WOLF CREEK Clarification

1. Design and qualification criteria are outlined in Appendix A (of NUREG0737).
2. Measurement and indication capability shall extend to 5 psia for subatmospheric containments.
3. Two or more instruments may be used to meet requirements. However, instruments that need to be

switched from one scale to another scale to meet the

range requirements are not acceptable.

4. Continuous display and recording of the containment pressure over the specified range in the control room is

required.

5. The accuracy and response time specifications of the pressure monitor shall be provided and justified to be

adequate for their intended function. Containment Water Level Monitor Position A continuous indication of containment water level shall be provided in the control room for all plants. A narrow range instrument shall be provided for

PWRs and cover the range from the bottom to the top of the containment sump. A

wide range instrument shall also be provided for PWRs and shall cover the range

from the bottom of the containment to the elevation equivalent to a 600,000

gallon capacity. For BWRs, a wide range instrument shall be provided and cover

the range from the bottom to 5 feet above the normal water level of the

suppression pool.

Clarification 1. The containment widerange water level indication channels shall meet the design and qualification criteria as outlined in Appendix A (of NUREG0737). The narrowrange channel shall meet the requirements of

Regulatory Guide 1.89.

2. The measurement capability of 600,000 gallons is based on recent plant designs. For older plants with smaller

water capacities, licensees may propose deviations from

this requirement, based on the available water supply

capability at their plant. 18.254 Rev. 0 WOLF CREEK 3. Narrowrange water level monitors are required for all sizes of sumps but are not required in those plants that

do not contain sumps inside the containment. 4. For BWR pressuresuppression containments, the emergency core cooling system (ECCS) suction line inlets may be used as a starting reference point for the narrowrange and widerange water level monitors, instead of the

bottom of the suppression pool.

5. The accuracy requirements of the water level monitors shall be provided and justified to be adequate for their

intended function. Containment Hydrogen Monitor Position A continuous indication of hydrogen concentration in the containment atmosphere shall be provided in the control room. Measurement capability shall be provided

over the range of 0 to 10 percent hydrogen concentration under both positive

and negative ambient pressure.

Clarification

1. Design and qualification criteria are outlined in Appendix A (of NUREG0737).
2. The continuous indication of hydrogen concentration is not required during normal operation.

If an indication is not available at all times, continuous indication and recording shall be functioning

within 30 minutes of the initiation of safety injection.

3. The accuracy and placement of the hydrogen monitors shall be provided and justified to be adequate for their

intended function. 18.255 Rev. 0 WOLF CREEK 18.2.12.2 The Operating Agent Response Radiological Noble Gas Effluent Monitors The WCGS design provides a wide range noble gas radiation monitor for each of the release paths listed below. Each monitor includes detectors covering the

range shown below:

MONITOR RANGE Plant unit vent 10 7 to 10+5 Ci/cc (GTRE21B)

Radwaste building effluent 10 7 to 10+5 Ci/Cc (GHRE10B)

The locations of these monitors are shown on Radiation Zone Drawing Figure 12.3.2, sheet 4. Separate monitoring capability for the condenser air removal

system is not provided because this system exhausts through the plant vent.

The WCGS design includes gamma detectors to monitor the plume from the main steam atmospheric relief valves and to monitor the steam discharge from the turbinedriven auxiliary feedwater pump except for a small quantity of steam

vented from the turbine glands. Additional information on this monitoring

system is included in Reference 10.

Continuous indication is provided in the control room for each monitor. Each monitor is recorded in the control room.

The system/methods for monitoring and analysis is described in Reference 10.

The readouts from the wide range monitors are input to the plant computers.

This information is accessible from the Technical Support Center and the

Emergency Operations Facility.

The procedures used to calibrate the instruments and calculate release rates have been incorporated into the WCGS procedures.

The following additional information was provided by Reference 10.

a. System description information, including energy dependence or response, range and sensitivity with respect to Xe133, vendor model number, and methods used

to assure representative measurements and background

correction.

b. The calculational methods or procedures used for converting instrument readings to release rate per unit

time based on exhaust air flow, and considering

radionuclide spectrum distribution as a function of time

after shutdown. 18.256 Rev. 13 WOLF CREEK Provisions for Continuous Sampling of Plant Effluents for Post Accident Releases of Radioiodines and Particulates The WCGS design provides for continuous sampling of effluent radioiodines and particulates. The wide range gas monitors described above include the

capability to obtain grab samples. The sampling accomplished by adsorption of

iodine on charcoal filters or other media has been determined to be within the criteria of GDC19 (see Reference 10). The sampling system criteria for all

airborne monitoring systems are provided in Section 11.5.2.3.1.2. After

collection, laboratory analyzers can be used to quantify iodine or particulates

releases. A backup power source is provided for sample collection and analysis

equipment to ensure operation for a minimum of 7 consecutive days. The WCGS

procedures discuss the methods and counting equipment used to determine

releases. The expected doses from obtaining and counting a sample have been

calculated to range between 750 and 1750 mrem for a sample at the unit vent.

These doses meet the requirements of NUREG0737 and Regulatory Guide 1.97.

Additional information regarding how WCGS meets the recommendations of Table II.F.12 and the provisions for approximate isokinetic sampling was provided by

Reference 10.

Containment Radiation Monitors The WCGS design meets the recommendations of Table II.F.13. The design includes two physically separated Class lE containment radiation monitors. The monitors are designated as 0GTRE59 and 0GTRE60. The detectors are

located inside containment.

Indication is provided in the control room for each monitor, which is powered from a vital class lE power source. One channel is provided with a recorder, which is powered from vital class 1E power sources. Each monitor has a range

up to 10 8 R/hr for gamma radiation. The monitors are sensitive down to 60 keV photons. The energy response of the monitors is linear (+20%) for energies

between .1 Mev and 3 Mev. The equipment is seismically qualified for the

location in which it is installed. The components are environmentally

qualified for the environmental conditions to which they may be subjected.

Calibration of the monitors is addressed in procedures.

Additional information regarding the details of the design is described in Section 11.5.2.3.2.4. 18.257 Rev. 14 WOLF CREEK Containment Pressure Indication The WCGS design provides a dual range, redundant, continuous indication of containment pressure with both ranges (0 to 60 psig and 5 to 180 psig)

indicated and recorded in the control room at the same time. The extended

range indication loops are Class lE. As a minimum, their range is from minus 5

psig to three times the containment design pressure of 60 psig.

The response time of the containment pressure control room indication is 10 seconds for both the narrow and widerange instrument channels. The accuracy

of both the narrow and wide range channels is +4 percent of scale. The

pressure monitor instrumentation meets the design and qualification criteria of NUREG0737, Appendix B.

Containment Water Level Indication

The WCGS design includes in the control room continuous indication of the containment water level. This instrumentation is redundant and designed and

qualified in accordance with Class lE requirements to meet the requirements of NUREG0737, Appendix B. A single range is used to monitor both the containment

normal sump level and the containment water level. The range is 13 feet, which

covers 6 inches from the bottom of the containment normal sump to an elevation

equivalent to 836,000 gallons. The upper limit of the range is greater than the maximum calculated water level. The accuracy of the indication is 4 percent. The switchover of the low pressure safety injection pumps to recirculation is accomplished without the use of the containment water level indication.

A single range for the two RHR sump level indicators is used to measure the RHR sump level. Both RHR sump level indicator ranges are 11' 7" (139") measured from 1994' 6" (30" above sump bottom) to 2006' 11" (equivalent to 626,000 gallons). This indication issued to determine if adequate NPSH is available to the pumps taking suction from the containment.

Containment Hydrogen Concentration Monitor The present design includes redundant safetygrade (Class lE) containment post LOCA hydrogen analyzers with redundant Class lE indication provided in the

control room. These monitors meet the design and qualification requirements of NUREG0737, Appendix B. The hydrogen analyzers have a range of 010 percent

hydrogen volume and are designed to operate under minimum and maximum

containment design pressure.

The hydrogen analyzers are manually initiated following a LOCA. Once initiated, they provide a continuous measurement of hydrogen concentration within 30

minutes. 18.258 Rev. 21 WOLF CREEK The sample points for the containment hydrogen monitors are in the vicinity of the intake of the containment air coolers and the postaccident water level.

18.2.12.3 ConclusionThe WCGS design provides six additional postaccident monitors specified in NUREG0737 for accident diagnosis and mitigation. The Operating Agent has

developed emergency operating procedures which detail use of each instrument

specified during an accident. The WCGS design is consistent with the recommendations of NUREG0737, item II.F.1, for noble gas monitors.

The WCGS design includes features to sample plant effluents under accident conditions. The design of sampling system satisfies the criteria in NUREG

0737, item II.F.1.

The containment radiation monitor design meets the recommendations of item II.F.13.The extended range containment pressure monitor design meets the recommendations of item II.F.13.

The WCGS design for containment water level indication meets the requirements of NUREG0737, item II.F.15.

The WCGS design for the containment hydrogen monitors meet the requirements of NUREG0737, item II.F.16.

18.2.13 INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE COOLING (II.F.2) 18.2.13.1 NRC Guidance Per NUREG0737 Position Licensees shall provide a description of any additional instrumentation or controls (primary or backup) proposed for the plant to supplement existing

instrumentation (including primary coolant saturation monitors) in order to provide an unambiguous, easytointerpret indication of inadequate core cooling (ICC). A description of the functional design requirements for the system

shall also be included. A description of the procedures to be used with the

proposed equipment, the analysis used in developing these procedures, and a

schedule for installing the equipment shall be provided. 18.259 Rev. 0 WOLF CREEK Clarification

1. Design of new instrumentation should provide an unambiguous indication of ICC. This may require new

measurements or a synthesis of existing measurements

which meet design criteria (item 7). 2. The evaluation is to include reactorwaterlevel indication.

3. Licensees and applicants are required to provide the necessary design analysis to support the proposed final

instrumentation system for inadequate core cooling and

to evaluate the merits of various instruments to monitor

water level and to monitor other parameters indicative of corecooling conditions.

4. The indication of ICC must be unambiguous in that it should have the following properties:
a. It must indicate the existence of inadequate core cooling caused by various phenomena (i.e., high void fractionpumped flow as well as stagnant boil

off); and, b. It must not erroneously indicate ICC because of the presence of an unrelated phenomenon.

5. The indication must give advanced warning of the approach of ICC.
6. The indication must cover the full range from normal operation to complete core uncovery. For example, waterlevel instrumentation may be chosen to provide advanced warning of twophase level drop to the top of

the core and could be supplemented by other indicators such as incore and coreexit thermocouples provided that

the indicated temperatures can be correlated to provide

indication of the existence of ICC and to infer the extent of core uncovery. Alternatively, fullrange

level instrumentation to the bottom of the core may be

employed in conjunction with other diverse indicators such as coreexit thermocouples to preclude

misinterpretation due to any inherent deficiencies or

inaccuracies in the measurement system selected. 18.260 Rev. 0 WOLF CREEK

7. All instrumentation in the final ICC system must be evaluated for conformance to Appendix A (to NUREG0737),

"Design and Qualification Criteria for Accident

Monitoring Instrumentation," as clarified or modified by

the provisions of items 8 and 9 that follow. This is a

new requirement. 8. If a computer is provided to process liquidlevel signals for display, seismic qualification is not

required for the computer and associated hardware beyond

the isolator or input buffer at a location accessible for maintenance following an accident. The single

failure criteria of item 2, Appendix A, need not apply

to the channel beyond the isolation device if it is

designed to provide 99 percent availability with respect to functional capability for liquidlevel display. The

display and associated hardware beyond the isolation

device need not be Class IE, but should be energized from a highreliability power source which is battery

backed. The quality assurance provisions cited in

Appendix A, item 5, need not apply to this portion of

the instrumentation system. This is a new requirement.

9. Incore thermocouples located at the core exit or at discrete axial levels of the ICC monitoring system and

which are part of the monitoring system should be

evaluated for conformity with Attachment 1, "Design and Qualification Criteria for PWR Incore Thermocouples,"

which is a new requirement.

10. The types and locations of displays and alarms should be determined by performing a human factors analysis taking

into consideration:

a. The use of this information by an operator during both normal and abnormal plant conditions.
b. Integration into emergency procedures.
c. Integration into operator training.
d. Other alarms during emergency and need for prioritization of alarms. 18.261 Rev. 0 WOLF CREEK ATTACHMENT 1, DESIGN AND QUALIFICATION CRITERIA FOR PRESSURIZEDWATER REACTOR INCORE THERMOCOUPLES
1. Thermocouples located at the core exit for each core quadrant, in conjunction with core inlet temperature

data, shall be of sufficient number to provide

indication of radial distribution of the coolant

enthalpy (temperature) rise across representative

regions of the core. Power distribution symmetry should

be considered when determining the specific number and

location of thermocouples to be provided for diagnosis

of local core problems.

2. There should be a primary operator display (or displays) having the capabilities which follow:
a. A spatially oriented core map available on demand indicating the temperature or temperature

difference across the core at each core exit

thermocouple location.

b. A selective reading of core exit temperature, continuous on demand, which is consistent with

parameters pertinent to operator actions in connecting with plantspecific inadequate core

cooling procedures. For example, the action

requirement and the displayed temperature might be

either the highest of all operable thermocouples or

the average of five highest thermocouples. c. Direct readout and hardcopy capability should be available for all thermocouple temperatures. The

range should extend from 200 F (or less) to 1800

F (or more). d. Trend capability showing the temperaturetime history of representative core exit temperature

values should be available on demand.

e. Appropriate alarm capability should be provided consistent with operator procedure requirements. f. The operatordisplay device interface shall be humanfactor designed to provide rapid access to

requested displays. 18.262 Rev. 0 WOLF CREEK

3. A backup display (or displays) should be provided with the capability for selective reading of a minimum of 16

operable thermocouples, 4 from each core quadrant, all

within a time interval no greater than 6 minutes. The range should extend from 200 F (or less) to 2300 F (or more).

4. The types and locations of displays and alarms should be determined by performing a humanfactors analysis taking

into consideration:

a. the use of this information by an operator during both normal and abnormal plant conditions, b. integration into emergency procedures,
c. integration into operator training, and
d. other alarms during emergency and need for prioritization of alarms.
5. The instrumentation must be evaluated for conformance to Appendix B (to NUREG0737), "Design and Qualification

Criteria for Accident Monitoring Instrumentation," as

modified by the provisions of items 6 through 9 which

follow.

6. The primary and backup display channels should be electrically independent, energized from independent

station Class lE power sources, and physically separated

in accordance with Regulatory Guide 1.75 up to and

including any isolation device. The primary display and

associated hardware beyond the isolation device need not be Class lE, but should be energized from a high

reliability power source, battery backed, where

momentary interruption is not tolerable. The backup

display and associated hardware should be Class lE.

7. The instrumentation should be environmentally qualified as described in Appendix B, Item 1, except that seismic

qualification is not required for the primary display

and associated hardware beyond the isolater/input buffer

at a location accessible for maintenance following an

accident. 18.263 Rev. 0 WOLF CREEK

8. The primary and backup display channels should be designed to provide 99 percent availability for each

channel with respect to functional capability to display

a minimum of four thermocouples per core quadrant. The

availability shall be addressed in Technical

Specifications.

9. The quality assurance provisions cited in Appendix B, item 5, should be applied except for the primary display

and associated hardware beyond the isolation device.

18.2.13.2 The Operating Agent ResponseItem II.F.2 of NUREG0737 specifies the following as required documentation concerning instrumentation for detection of inadequate core cooling (ICC):

1. A description of the proposed final system including:
a. A final design description of additional instrumentation and displays.
b. A detailed description of existing instrumentation system (e.g., subcooling meters and incore thermo

couples), including parameter ranges and displays, which provide operating information pertinent to

ICC consideration.

c. A description of any planned modifications to the instrumentation systems described in item 1.b

above.

2. The necessary design analysis, including evaluation of various instruments to monitor water level, and

available test data to support the design described in

item 1 above.

3. A description of additional test programs to be conducted for evaluation, qualification, and calibration

of additional instrumentation.

4. An evaluation, including proposed actions, of the conformance of the ICC instrument system to this

document, including Attachment 1 and Appendix B. Any

deviations should be justified. 18.264 Rev. 0 WOLF CREEK

5. A description of the computer functions associated with ICC monitoring and functional specifications for

relevant software in the process computer and other

pertinent calculators. The reliability of nonredundant

computers used in the system should be addressed.

6. A current schedule, including contingencies, for installation, testing and calibration, and

implementation of any proposed new instrumentation or

informative displays.

7. Guidelines for use of the additional instrumentation, and analyses used to develop these procedures.
8. A summary of key operator action instructions in the current emergency procedures for ICC and a description

of how these procedures will be modified when the final

monitoring system is implemented.

9. A description and schedule commitment for any additional submittals which are needed to support the acceptability

of the proposed final instrumentation system and

emergency procedures for ICC.

The following is a discussion of each of the above items as they relate to the WCGS instrumentation for detection of ICC:

1. The system used at the WCGS unit to detect ICC consists of a reactor vessel level instrumentation system (RVLIS)

and a thermocouple/core cooling monitor system (T/CCMS).

ICC Defined ICC was defined in WCAP9754, "Inadequate Core Cooling Studies of Scenario With Feedwater Available Using the

NOTRUMP Computer Code," as a high temperature condition

in the core such that the operator is required to take

action to cool the core before significant damage occurs. During the design basis small lossofcoolant

accident, the operator is not required to take any

action to recover the plant other than to verify the

operable status of the safeguards equipment, trip the

reactor coolant pumps (RCPs) when appropriate plant

conditions are met, and initiate cold and hot leg

recirculation procedures as required. In the design

basis small Loss of Coolant Accident (LOCA), a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment. The heatup

period is dependent upon the break size and ECCS

performance. 18.265 Rev. 0 WOLF CREEK For a LOCA equivalent in size to approximately 6 inches diameter or less, an ICC condition can only occur if two

or more failures occur in the ECCS. As indicated in WCAP9754, an ICC condition can be calculated by

hypothesizing the failure of all high head safety

injection (HPSI) for LOCAs of approximately 1 inch in size. For a 4inch equivalentsize LOCA, one can

hypothesize an ICC condition by assuming the failure of

all HPSI as well as the failure of the passive

accumulator system (a truly incredible sequence of

events).

For LOCAs of sizes of 6 inches or less, the approach to ICC is unambiguous to the reactor operators. The first

indication of a possible ICC situation is the indication

that some of the ECCS pumps have failed to start or are

not delivering flow. The second indication of a

possible ICC situation is the occurrence of a saturation

condition in the primary coolant system as indicated on

the subcooling monitor. Shortly after the second

indication, the RVLIS would start to indicate the

presence of steam voids in the vessel. At some point in

time the RVLIS will indicate a collapsed liquid level

below the top of the core. The core exit thermocouples

(T/Cs) will begin to indicate superheated steam

conditions. The RVLIS and core exit T/C behavior

provide unambiguous indications to the operator to

follow the ICC mitigation procedure. WCAP9754 indicates that the selected core exit T/Cs will read 1200 F at approximately 11,000 seconds after the initiation of a 1inch LOCA with the loss of all High Pressure Safety Injection. The Generic

Westinghouse Emergency Operating Procedure (EOP)

Guideline instructs the operator to pursue ICC

mitigation procedures when these conditions are reached. The 4inch LOCA indicates 1200 F at about 1350 seconds. By following the Westinghouse recommended EOPs, the operators have earlier indication of a

possible ICC situation.

Realistically, an indication of an ICC condition would not occur until the primary coolant system has drained

sufficiently for the reactor vessel mixture level to

fall below the top of the core. Westinghouse has

performed analyses which indicate that the upper head

will drain below the top of the guide tubes before ICC

conditions exist. The guide tubes are the only flow path from the upper head to the upper plenum. In WCAP

9754, it was found that ICC situations would not result

for LOCAs equivalent in size to approximately 6

inches or 18.266 Rev. 0 WOLF CREEK less without two or more failures in the ECCS. In both specific scenarios examined in WCAP9754, a 1inch and 4inch small LOCA, the upper head and upper plenum had

completely drained before the onset of an ICC condition.

Large break LOCAs consist of LOCAs in which the fluid behavior is inertially dominated. Small break LOCAs, on

the other hand, have the fluid behavior dominated by

gravitational effects. For LOCAs which are significantly larger than an equivalent 6inch break, the ECCS has the maximum potential for flow delivery, since the primary coolant system is at low pressure.

Analyses for LOCAs in this range indicate ambiguous

behavior of the core exit T/Cs and RVLIS early in the

accident due to dynamic blowdown effects. This behavior

is temporary, and the core exit T/Cs and the RVLIS will

indicate the progress being made by the ECCS in

recovering the core. When the core exit T/Cs and RVLIS

may be temporarily providing ambiguous indications, no

manual action is needed or useful. Later in the

accident when manual action may be useful, the core exit

T/Cs and RVLIS provide an unambiguous indication of ICC

if it exists. This unambiguous indication may be

present as early as 30 seconds after the initiation of

the LOCA for a double ended guillotine rupture of a main

coolant pipe.

It follows from the above discussion that, for ICC considerations, a reasonable definition of large breaks

are breaks that are significantly larger than an equivalent 6inch break. Note: The large and small break LOCA has been redefined as noted in section 6.3 and 15.6.5.

Reactor Vessel Level Instrumentation System The WCGS design provides redundant safetygrade (Class

1E) reactor vessel water level instrumentation. The four reactor vessel water level indicators (LI1311, LI 1312, LI1321, and LI1322) are located on the main control board reactor auxiliaries console, RL021. The

reactor vessel level instrumentation system (Figures 18.213 and 5.11) utilizes two sets of two d/p cells.

These cells measure the pressure differential between

the bottom of the reactor vessel and the top of the

vessel. This d/p measuring system utilizes cells of

differing ranges to cover different flow behavior with

and without pump operation as discussed below: 18.267 Rev. 14 WOLF CREEK a. Reactor Vessel Narrow Range (Pb) This measurement provides an indication of reactor vessel level from the bottom of the reactor vessel

to the top of the reactor during natural

circulation conditions. b. Reactor Vessel Wide Range (Pc) This instrument provides an indication of reactor core and internals pressure drop for any

combination of operating RCPs. Comparison of the measured pressure drop with the normal, single

phase pressure drop provides an approximate

indication of the relative void content or density

of the circulating fluid. The indication of

coolant density is significant only when the

subcooling is near zero. This instrument monitors

coolant conditions on a continuing basis during

forced flow conditions. Calculations were

performed to obtain an estimate of the differential

pressure that the wide range instrument measures

with all pumps operating, from ambient temperature

to operating temperature. The calculations employ

the same methods used to estimate reactor coolant

flow for plant design and safety analysis. These

calculations were used primarily to define the

instrument span and to provide an estimate for the

function that compensates the differential pressure

signal over the full temperature range, i.e., that

results in the wide range display indicating 100

percent over the full temperature range with all

pumps operating, pumping subcooled coolant. During

the initial plant startup following installation of

the instrumentation, wide range differential

pressure data is obtained and used to confirm or revise the compensation function so that a 100

percent output is obtained at all temperatures.

Since the calculated compensation function was

verified by plant operating data, any uncertainties

in the flow and differential pressure estimates are

eliminated. The relationships used in the analogbased RVLIS system to calculate density corrections are from

the ASME Steam Tables, dated 1967. These

relationships are implemented within the system by

means of memory circuits that generate an

output signal 18.268 Rev. 0 WOLF CREEK which is a predetermined function of the input signal. The predetermined functions produce

specific scopes which are added together to obtain the required inputoutput relationships.

To provide the required accuracy for level measurement, temperature measurements of the impulse lines are

provided. These measurements, together with existing reactor coolant temperature measurements and widerange

RCS pressure, are employed to compensate the d/p

transmitter outputs for differences in system density

and reference leg density, particularly during the

change in the environment inside the containment

structure following an accident.

Resistance Temperature Detector (RTD) sensors are installed on every independently run vertical section of

impulse line, to provide a measurement for density

compensation of the reference leg. If the vertical

section of impulse line runs through two compartments

separated by a solid floor, an RTD sensor is installed

in each compartment. The RTD is installed at the

midpoint of each vertical section based on the

assumption that the temperature in the compartment is

uniform or that the temperature distribution is linear

in the vicinity of the impulse line. An allowance for a

5 F difference between the true average impulse line

temperature and the RTD measurement is included in the

measurement uncertainty analysis. This allowance

permits a significant deviation from a linear gradient;

e.g., 20 percent of the impulse line could differ by as

much as 25 F from a linear gradient without exceeding

the allowance. During normal operation, forced

circulation from cooling fans is expected to maintain

reasonably uniform compartment temperatures. During the

LOCA, turbulence within a compartment due to release of

steam would also produce a reasonably uniform

temperature. Note that the impulse lines are protected

from direct jet impingement by metal instrument tubing

channels.

The WCGS design does not include hot leg impulse lines.

The layout of the impulse line from the upper head is

arranged to prevent or minimize the impact of drainage

during an accident. In general, however, the water in

the impulse line is cooler than the water in the

reactor, and there is sufficient subcooling overpressure

in the line so that very little, if any, of the water

would flash to steam during a depressurization or 18.269 Rev. 0 WOLF CREEK containment heatup. Heat conduction along the small diameter piping and tubing would be insufficient to

result in flashing in a significant length of piping.

The connection to the upper head from a spare control rod drive mechanism port drops or slopes down from the

highest point of the vessel connection to the sensor

bellows mounted on the refueling canal wall, so water

would be retained in this piping. Draining of the

vertical section immediately above the reactor vessel

has no effect on the level measurement, since this

section is included in the operating range of the

instrument. Draining of the horizontal portion of

vessel vent piping above the vessel also has no effect

on the measurement, since no elevation head is

involved.

The majority of the impulse line length is in capillary tubing sealed at both ends with a bellows (sensor

bellows at the reactor end, hydraulic isolator at the

containment penetration end), so water would be retained

in the impulse line at all times. The water is

demineralized, deaerated and pressurized by reactor

pressure. In the event of a LOCA, the water in the

capillary lines would not flash since it is in a sealed

system. The lines contain no noncondensible gases and

are not in a radiation environment sufficient for the

dissociation of water.

Since there is no mechanism for concentration of gases at the top of the reactor vessel during normal

operation, the connection to the top of the vessel would

contain, at most, the normal quantity of dissolved gases

in the coolant, and the subcooling pressure during an

accident would maintain this quantity of gas in

solution.

Redundancy of the two instrument trains of the RVLIS is not compromised by having a shared upper reactor vessel

tap since it is not conceivable that the tap will fail

either from plugging or breaking. Freedom from plugging

is enhanced by 1) use of stainless steel connections

which preclude corrosion products, and 2) absence of

mechanisms, such as flow for concentrating boric acid.

It is also inconceivable that the tap will break because

it is in a protected area. Even if the share tap does 18.270 Rev. 0 WOLF CREEK fail, it should be recognized that RVLIS is not a protection system initiating automatic action, but a

monitoring system with adequate backup monitoring such

as by core exit thermocouples for operator correlation.

Additional information (i.e., analyses, evaluations) concerning the Westinghouse generic reactor vessel level

instrumentation system has been submitted to the NRC via

Reference 7. The specific hardware for WCGS is not

exactly as documented in Reference 7, since the WCGS

design does not include a measurement of reactor vessel

level above the hot legs. However, the analyses, evaluations, and conclusions contained in Reference 7

are applicable to WCGS, since they are not sensitive to

the above mentioned design difference.

The RVLIS measurement from top to bottom of the vessel measures the level in the following regions: top of

vessel to top of guide tube; inside guide tube from top

to upper support plate; upper plenum; reactor core; and

lower plenum. During a LOCA, the RVLIS would measure

the water level in the upper head only until the level

drops to the top of the guide tubes; RVLIS would then

measure level reduction in the guide tubes and upper

plenum. The water remaining in the upper head below the

top of the guide tubes is not measured by RVLIS. This

water would eventually drain through small holes into

the guide tubes and downcomer, and this drainage would

be accomplished within a few minutes, depending on the

accident. In any case, the water temporarily retained

in the upper head would have no effect on the RVLIS

indication. (It should be noted that the WFLASH Code, which was used to analyze RVLIS performance, includes

calculation of water mass and pressure in the upper

head, but this water mass is not included in the

calculation of mixture level; hence, the mixture level

is indicated only below the elevation of the upper

support plate.)

Environmental qualification of the reactor vessel level instrumentation system high volume sensor was completed

in accordance with 10 CFR 50.49.

Thermocouple/Core Cooling Monitor System The T/CCMS is a core exit thermocouple/core cooling detection system which provides presentation and display

of the status of the core heat removal capability to

both the plant operators and the technical support 18.271 Rev. 0 WOLF CREEK center. In the control room, the two subcooling

temperature indicators are located immediately above the

four level indicators on the vertical portion of the

control board, RL-022. The core exit thermocouple

display is mounted on the subcooling monitor cabinet, RP-081. The system consists of redundant channels and

output trains of thermocouple measurements, wide-range

hot and cold-leg RTD temperatures, and reactor pressure

signals. These parameters are used by the system to

display thermocouple temperatures and to calculate

saturation temperatures and margin of saturation (Tsat

margin), which is often referred to as subcooling. The

calculations are performed by the system which is based

on Advanced Logic System (ALS) Platform and data handling devices.

Thermocouple Monitor

The core exit thermocouple portion of the ICC system is

arranged as follows:

a. Primary system

The primary system measures all the thermocouples

via isolators located in the qualified backup

system cabinet.

b. Backup system

The backup system consists of two channels, each

monitoring approximately half of the 47 core outlet

thermocouples. The system has separation and

redundancy as well as qualification to comply with

Appendix B of NUREG-0737 (see the discussion of

item 4 below).

Core Cooling Monitor

The core cooling monitor portion of ICC system compares

core outlet thermocouple temperatures and hot and cold

leg RTD temperatures with the saturation temperature

based on the lowest of three pressure signals. This

system has separation and redundancy as well as

qualification to comply with Appendix B of NUREG-0737

(see the discussion of item 4 below).

One of the indicators of an approach to an ICC situation

is the response of the core exit thermocouples (T/Cs) to

the presence of superheated steam. The core exit

thermocouples do not provide an indication of the amount

18.2-72 Rev. 28 WOLF CREEK of core voiding. Response of the core exit T/Cs

provides a direct indication of the existence of ICC, the effectiveness of ICC recovery actions, and

restoration of adequate core cooling. The core is

adequately cooled whenever the vessel mixture level is

above the top of the core, and the core may have a

significant void fraction and still be adequately

cooled.

The thermocouple/core cooling monitor combines the

functions of monitoring for excessive core exit

thermocouple temperatures and monitoring both core exit

thermocouple temperatures and hot and cold leg RTD

temperatures for saturation margin (Tsat meter).

The system consists of two redundant channels, each

monitoring half of the core outlet thermocouples, and

four hot and cold leg RTDs. Three reactor pressure

input signals are used with the auctioneered low

pressure used by the ALS Platform to perform the Tsat margin function. The thermocouple temperatures are

corrected for reference junction temperature with three

reference junction temperature signals input to each

channel. (All of the thermocouples connected to one

channel are from one reference junction unit).

The system's two redundant trains utilize the following

safety-grade equipment:

a. Thermocouples
b. Reference junction boxes
c. RTDs
d. Termination Panel
e. ALS Platform
f. Flat Panel display
g. Analog meters
h. Digital Recorder (Black Box)
i. Power supplies
j. Connections and cabling

18.2-73 Rev. 28 WOLF CREEK The equipment listed above and shown in Figure 18.2-12

has been designed to satisfy the requirements of IEEE

Standard 279. This safety-grade system is isolated from

the non-Class 1E plant computer, technical support

center, and data links by qualified isolation devices.

Details of isolation device qualification for TCCM upgrade can be found in Westinghouse letter LTR-EQ-13-228 "Results of ALS-601 fault and Isolation Barrier Testing for TCCM."

The system can display individual thermocouple

temperatures and provides two levels of alarm when

preset temperatures are exceeded. The display is a flat panel display located at the processing cabinets, behind the main control board.

The thermocouple monitor can calculate and display core

outlet temperature quadrant tilts based on thermocouple

temperatures. The tilts calculated by each unit are

based on half the total number of core thermocouples.

This information is also available to the operator at

the main control board via the plant computer.

The core cooling monitor compares core outlet

thermocouple temperatures and hot and cold leg RTD

temperatures with the saturation temperature based on

the lowest of three pressure signals. Two levels of

alarm are provided for the core cooling (Tsat) monitor

function. The margin to saturation is displayed on two

redundant analog meters on the vertical section of the

main control board and are visible to an operator at the

control console.

The thermocouple/core cooling monitor provides

information to the operator that assists in the

performance of the required manual safety functions

following a Condition II, III, or IV event. This

includes information relative to maintaining the plant

in a Hot Standby condition or to proceeding to a cold

shutdown condition consistent with the Technical

Specification limits.

At WCGS, the core exit T/Cs protrude slightly from the

bottom of the upper core plate support columns. In this

location, they measure the temperature of the fluid

leaving the core region through the flow passages in the

upper core plate. Flow from the upper head must enter

the upper plenum via the control rod drive guide tubes

18.2-74 Rev. 28 WOLF CREEK before being able to enter the upper core plate flow passages. In addition, the LOCA blowdown

depressurization behavior must be such that there is a

flow reversal for the core exit T/Cs to detect the upper

head fluid temperature. The upper head fluid is

expected to mix with the upper plenum fluid as it drains

from the upper head.

The potential for core exit T/C cooling from colder upper head fluid, while the core has an appreciable void

fraction, is not viewed as a potential problem for the

detection of an inadequate core cooling situation.

Although some Semiscale tests indicated core voiding

while the upper head was liquid solid, these tests do

not imply that the core exit T/Cs would give an

ambiguous indication of ICC calculations for a

Westinghouse PWR, and consideration of the core exit T/C

design would not result in ambiguous ICC indications.

Additional information concerning the thermocouple/core cooling monitor system is provided in Table 18.23.

2. Reference 7 provides a design analysis and evaluation of the instrumentation for detection of ICC. Additional

information is provided below.

The reactor coolant pressure and temperature signals originate from the existing widerange pressure and hot

leg RTDs already installed in the plant, and the

uncertainties for these instruments are understood. The pressure uncertainty is 60 psi, and the temperature uncertainty is +/- 6 F, resulting in a maximum RVLIS uncertainty contribution of +/- 2.3 percent when the

vessel is full. This uncertainty is smaller when the

level is at the elevation of the reactor core. This

contribution to the total uncertainty would increase

roughly in proportion to an increase in the pressure or

temperature measurement uncertainty.

A system accuracy of +/- 6 percent water level was a target value established during the conceptual design

and was related to the dimensions of the reactor vessel

(12 percent from nozzles to top of core) and core (30

percent), and the usefulness of the measurement during

an accident. The individual uncertainties, resulting

from random effects, were combined statistically to

obtain the overall instrument system accuracy. Some of 18.275 Rev. 0 WOLF CREEK the individual uncertainties vary with conditions such as system pressure. Table 18.24 identifies the

individual uncertainties for the narrow range

measurement while at a system pressure of 1200 psia.

The statistical combination (square root of the sum of the squares) of the individual uncertainties described

above resulted in an overall system instrumentation

uncertainty of +/- 3.9 percent of the level span for the

narrow range indication of approximately 40 feet, or

+/- 1.5 feet, at a system pressure of 1200 psia. Examples

of the uncertainty at other system pressures are:

Uncertainty = +/- 3.6 percent at 400 psia Uncertainty = +/- 4.2 percent at 2000 psia By letter dated February 20, 1986, (Reference 15)

Westinghouse reported to the NRC the results of an

evaluation relative to the consequences of larger than expected postaccident errors on the T/CCMS. These

errors, which are identified in WCAP 8587 (Reference

16), affected subcooling margin calculations, the use of

T/Cs for ICC indication and the use of T/Cs as

temperature compensation for RVLIS. Based on the

revised error values, restrictions were placed on use of

T/Cs for RVLIS and subcooling margin calculations and

the EOP Guidelines were revised to incorporate new ICC

indication setpoints and revised accuracy requirements

were developed for RVLIS. Modifications to plant

hardware and procedures, required by the larger than

expected T/CCMS errors, have been implemented at WCGS.

An analysis of the RVLIS hydraulics, an independent analysis of the hydraulics by Oak Ridge National

Laboratory (ORNL), and the results of testing at the

Semiscale Test Facility in Idaho generally support a

response time (50 percent response to a step change in

level) of 3 seconds or less for the hydraulics. There

are, however, two types of transients which affect the

RVLIS response: a change in level and a change in

system pressure. The major factors that influence the

RVLIS hydraulics response to these two types of

transients are the fluid volume within the RVLIS system

and the length of capillary tubing connected to the d/p

transmitter. For a level transient, the volume required

to displace the transmitter bellows and the total length

of capillary tubing are the significant parameters.

Although the capillary tubing length (typically 600

feet) and diameter (0.089 inch) represent a significant 18.276 Rev. 0 WOLF CREEK resistance to flow, the volume required for a full span deflection of the transmitter bellows is small (0.1

cubic inch). The sensor and hydraulic isolator bellows

displacement spring constants introduce a small error in

the measured level but do not impact the response time

of the system.

For a system pressure transient, the total fluid volume of the RVLIS system and the difference in length between

the two capillary lines connected to the d/p transmitter

are the significant parameters. In theory, the

transmitter would not respond to a change in pressure if

the two capillary lines were equal in length. In

practice, plant layout requirements result in lengths

differing by as much as 100 feet. During a system

pressure change, the water volume in the RVLIS system

will expand or contract a small amount, but measurable

pressure drops will develop in the capillary lines as

the small volumes move to equalize pressure. The d/p

transmitter will indicate a differential pressure or

offset caused by one line being longer than the other.

For a reasonably rapid transient of 100 psi per second

imposed on an RVLIS system having a difference in line

lengths of 100 feet, the offset or apparent level change

would approach about 2 feet of water, and the offset

would remain until the pressure transient is

terminated. After the initial blowdown from a small

break, the pressure transients would be much slower, and

the level offset would be negligible. Much larger

offsets approaching full scale deflection could occur

(and have been observed during a large break test at

Semiscale) during the initial large break transient, but

an RVLIS output during this short period of less than 2

minutes would not otherwise be useful or required for

actions associated with ICC. In addition to the

hydraulics response characteristics, the RVLIS

electronics incorporate an adjustable lag to filter

hydraulic noise when reactor coolant pumps are

operating. The lag time constant is adjustable up to 10

seconds. The response time associated with the rest of

the electronics has essentially no impact on the total

response time, which is within 10 seconds.

Blockage in the core will increase the frictional pressure drop and increase the total differential

pressure across the vessel. This would be reflected as

a higher RVLIS indication. The increase in the RVLIS is

most significant under forced flow conditions when the

reactor coolant pumps are operating. 18.277 Rev. 0 WOLF CREEK In order for blockage to be present, the core would have to have been uncovered for a prolonged period of time.

A low RVLIS indication along with a high core exit

thermocouple indication would have been indicated during

this time. If the RCPs had been operating throughout

the transient, there would have been sufficient cooling

to prevent significant core damage. Therefore, for

significant blockage to exist during pump operation, the

operator would have restarted the pumps after an ICC

condition had existed for a period of time. Based on

the history of the transient, the operator would know

that the RVLIS would read higher than expected.

Although the RVLIS would read high, it would still

follow the trend in vessel inventory. The operator

would be able to monitor the recovery with the RVLIS.

Under natural circulation conditions, the impact of core blockage is not expected to be large. Although the

RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and

provide useful information for monitoring the recovery

from ICC. ICC will have been indicated at an earlier

time, before a significant amount of core blockage has

occurred. The operator would know that the RVLIS could

read slightly high, based on the history of the

transient.

Reverse flow in the vessel tends to decrease the d/p across the vessel which would cause the RVLIS to

indicate a lower collapsed level than actually exists.

The low indication would not cause the operator to take

unnecessary actions, since an ICC recovery action would

be based on a coincidence of a low level indication and a high core exit thermocouple indication (>700 F). In a reverse flow situation, the core exit thermocouples would be responding to the saturated temperature of the

water flowing from the upper plenum to the core, so a high thermocouple indication of >700 F would not occur.

It is important to note that large reverse flows are not expected to occur for breaks smaller than 6 inches in

diameter during the time that the core is uncovered.

Large reverse flow rates may occur early in the blowdown

transient for large diameter breaks, but, as is

discussed below, it is not necessary to use the RVLIS as

a basis for operator action for breaks in this range. 18.278 Rev. 0 WOLF CREEK During the course of a LOCA transient, the upper plenum will experience voiding before the upper head. The

voids in the upper plenum will be indicated by a lower

RVLIS reading. The RVLIS will not indicate where the

voiding is occurring, but at this point in the

transient, it is not necessary to know the location of

the region of voiding. In the early part of the

transient, when the mixture level is above the top of

the guide tube in the upper head, it is sufficient for

the operator to know that the vessel inventory is

decreasing, irrespective of the region where voiding is

occurring. The fluid in the upper head does not affect

the RVLIS indication after the upper head has drained to

below the top of the guide tubes. The upper head will

drain before the onset of ICC, and there is not an

ambiguous indication during the period of time RVLIS is

used.

Experience in overranging of differential pressure instruments has been obtained in previous applications

of differential pressure capsules similar to those used

in RVLIS. In dual range flow (differential pressure)

applications, the "low flow" transmitter (and/or gauges)

are overranged to 300 percent or greater by normal flow

rates, yet provide reliable metering when required for startup.

Also, test data exist on the basic transmitter design showing about 0.5 percent effect on calibration with 24

hours exposure to 3000 psig overrange. All units are

similarly exposed to this overrange for 5 minutes in

both directions as a part of factory testing.

There have been instances involving accidental overrange of these instruments (including RVLIS) as the result of

leakage or operator errors where full line pressure

overranges have occurred for up to several weeks with

minimal effect on instrument accuracy.

Based upon this experience and test data, it is expected that reliable measurements can be made by the selected overranged instrument designs used for RVLIS. Online

calibration capability is provided if needed to support

gathering of statistical data. 18.279 Rev. 0 WOLF CREEK The following are conditions which could cause the DP level system to give ambiguous indications:

a. When the downcomer is highly voided and the accumulators inject, the cold accumulator water

condenses some of the steam in the downcomer which

causes a local depressurization. The local

depressurization will lower the pressure at the

bottom of the vessel which will lower the

differential pressure across the vessel, causing an

apparent decrease in level indication. The lower

pressure in the downcomer also causes the mixture

in the core to flow to the lower plenum, causing an

actual decrease in level. The period of time when

the RVLIS indication is lower than the actual

collapsed liquid level is brief.

An example of a situation in which this phenomenon may occur is when the reactor coolant pumps have

been running for a long period of time in a small

break transient. After the RCS loops have drained

and the pumps are circulating mostly steam, the

level in the downcomer will be depressed. A large

volume of steam will be present in the downcomer, above the low mixture level, which allows a large

amount of condensation to occur. For most small

break transients, the reactor coolant pumps are

tripped early in the transient, and the downcomer

mixture level will remain high, even in cases where

ICC occurs. When the downcomer level is high, the

effect of accumulator injection on the RVLIS

indication is minor.

b. When the upper head begins to drain, the pressure in the upper head decreases at a slower rate than

the pressure in the rest of the RCS. This is due

to the upper head region behaving much like the

pressurizer. The higher resistance across the

upper support plate relative to the rest of the RCS

prevents the upper head from draining quickly.

This situation only exists until the mixture level

in the upper head falls below the top of the guide

tubes. At this time, steam is allowed to flow from

the upper plenum to the upper head, and the

pressure equilibrates. While the upper head is

behaving like a pressurizer, the vessel

differential pressure is reduced, and the RVLIS

indicates a lower than actual collapsed liquid

level. 18.280 Rev. 0 WOLF CREEK This phenomenon is discussed in the summary report on the Westinghouse RVLIS for Monitoring ICC, December 1980 relative to the 3inch cold leg

break. Since that time, the upper head modeling

has been investigated in more detail. It was found

that the modeling used at that time assumed a flow

resistance that was too high for the guide tubes.

Subsequent analyses have shown that the pressurizer

effect has less impact on the vessel differential

pressure than was originally shown. There is very

little impact on the results after the level drains

below the top of the guide tubes. The pressurizer

effect is still believed to exist, and it becomes

more significant as break size increases. The

interval of time when the upper head behaves like a

pressurizer is brief, and the RVLIS will resume

trending with the vessel level after the top of the

guide tubes uncovers. The reduced RVLIS indication

will not cause the operator to take any nonconservative action, even if a level below the top of the core is indicated, since the core exit

thermocouples are used as a corroborative indication

of the approach to ICC.

c. The normal condition for continuous upper plenum injection (UPI) occurs only with the operation of

the low head safety injection pumps, which does not

occur until a pressure of under 200 psi is

realized. The RVLIS may not accurately trend with

vessel level during the initial start of UPI.

During this short period of time, the cold water

being injected mixes with the steam in the upper

plenum causing condensation. This condensation

will occur faster than the system response. The

system will equilibrate after a short period of

time. Upon equilibrating, the system will continue

to accurately trend with the vessel level.

In the range of break sizes where RVLIS is most useful in detecting the approach to ICC, the system

pressure will equilibrate at a level above the

pressure where UPI will normally occur. It is

important to note that the flow from the low head

pumps is sufficient to recover the core, and no

operator action based on the RVLIS indication will

be necessary. 18.281 Rev. 14 WOLF CREEK For the vast majority of small breaks, the

condition of upper plenum injection does not cause

a significant impact. For the remainder, the

impact is very small and within tolerable limits.

NOTE: Section 18.2.13.2.2.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.2.d will only be updated when potential hazards not previously analyzed are identified.

d. During the time when the distribution of voids in

the vessel is changing rapidly, there can be a

large change in the two-phase mixture level with

very little change in collapsed mixture level. The

use of the RVLIS, in conjunction with the core exit

thermocouples, is still valid for this situation, however. The only event that has been identified

which could cause a large void redistribution is

when the reactor coolant pumps are tripped when the

vessel mixture is highly voided. After the pump

performance has degraded enough that the flow

pressure drop contribution to the vessel

differential pressure is small, the change in RVLIS

indication is very small when the pumps are

tripped. As discussed in the summary report, the

approach to ICC would be indicated when the wide

range indication read 33 percent. If the pumps

were tripped at this time, the core would still be

covered. The operator knows that the core may

uncover if the pumps were tripped with a wide range

indication lower than 33 percent. Prior to pump

trip, the core will remain adequately cooled due to

forced circulation of the mixture. When the pumps

trip, the two-phase level may equilibrate at a

level below the top of the core. The narrow range

indication provides an indication of core

coolability at this time.

A Westinghouse RVLIS was installed at the Semiscale

Test Facility in Idaho. Small break loss-of-

coolant experiments were conducted at this facility

by EG&G for the NRC. The results of these tests

have been used to compare the RVLIS measurements

with Semiscale differential pressure measurements, gamma densitometer data, and core cladding surface

thermocouple indications. To date, after

correcting for difference between PWR reactor

vessel internals and Semiscale modeling, good

correlation between Semiscale level indications and

RVLIS measurements has been observed. In

cooperation with the NRC, EG&G, and ORNL, Westinghouse has prepared a report summarizing the

RVLIS performance during selected Semiscale tests.

The reports are "Westinghouse Evaluation of

RVLIS Performance at

18.2-82 Rev. 30 WOLF CREEK the Semiscale Test Facility for Test 5-2B-1,"

transmitted to the NRC in letter SED-SA-00081 dated

June 28, 1982 from E.P. Rahe, Westinghouse, to

L.E. Phillips, NRC, and "Westinghouse Evaluation of

RVLIS Performance at the Semiscale Test Facility,"

transmitted to the NRC in letter NS-EPR-2526 dated

December 9, 1981 from E.P. Rahe, Westinghouse, to

L.E. Phillips, NRC.

NOTE: Section 18.2.13.2.3 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.3 will only be updated when potential hazards not previously analyzed are identified.

3. Additional testing of the equipment described above has

been completed in order to establish and upgrade

qualification of the equipment to comply with NUREG-

0737.

The test programs were:

a. Qualification tests of core exit thermocouples
b. Qualification tests of reference (temperature

compensation) junction boxes

c. Qualification tests of electronics to add to the

system computer and technical support center

isolators and signal processing equipment.

d. Qualification of isolation devices, cables and

connectors, reference leg RTDs and hydraulic

isolators.

The in-service life of the RVLIS and T/CCM electronics

is dependent upon proper maintenance, including the

replacement of individual component parts when

necessary. The provisions for this maintenance are

included in the technical manual. Based on the

assumption of normal conditions and proper maintenance

of the components, the only limitation to the in-service

life is the availability of replacement parts. It is

estimated that in 20 years, some of the components will

be technically obsolete and no longer produced.

Consequently, the cards may have to be modified in the

future to accommodate the current technology. Thus, any

individual component failures are regarded as

maintenance considerations, and their replacement is

necessary to prolong in-service life.

In-service life, which is different than design life and

qualified life, is dependent upon implementing a

scheduled preventative maintenance program including

periodic overhaul of the equipment. In this manner, the

18.2-83 Rev. 30 WOLF CREEK equipment is restored to a level that ensures continual

operability. In developing the maintenance program, repair costs may necessitate replacement of the

equipment. If the maintenance program is followed, there is no apparent reason that operation of the

equipment cannot be extended. Some of the equipment is

similar to equipment installed in present Westinghouse

plants that have been operating for 10 to 15 years.

The RVLIS valves supplied by Westinghouse were designed

for a service life of 40 years.

4. An evaluation of the conformance of the reactor vessel

level instrumentation system to NUREG-0737 is provided

in Reference 7.

An evaluation of the conformance of the

thermocouple/core cooling monitor system to NUREG-0737

(Attachment l and Appendix B) is as follows:

a. Attachment l, Item (1)

The core exit thermocouples have been qualified so

as to comply with the recommendations of Regulatory

Guides 1.89 and 1.100. The thermocouples are

located at the core exit and in an arrangement such

that each of the redundant systems has core exit temperatures distributed over the entire core, in sufficient number to determine the radial power distribution and so located as to

verify power distribution symmetry among core

quadrants.

b. Attachment 1, Item (2)

The primary operator display is a computer-based

display and calculation system. It provides

information as required by subitems (a) through (f)

of Attachment 1, Item (2) in Section 18.2.13.1.

c. Attachment 1, Item (3)

The backup system to display thermocouple readings

is located in a cabinet which also houses the core

cooling monitor. Backup system display is

accomplished by the Class 1E ICC instrumentation

including the ALS platform, flat panel

18.2-84 Rev. 28 WOLF CREEK displays, analog meters, and digital recorders.

This backup system can display all of the 47 individual thermocouple temperatures within 6 minutes. The range extends from less than 200 F to 2300 F. NOTE: Section 18.2.13.2.4.d is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.d will only be updated when potential hazards not previously analyzed are identified.

d. Attachment 1, Item (4)

Human factors consideration of the types and

locations of displays and alarms is discussed in

Sections 18.1.16 and 18.3.2. The ICC

instrumentation has been considered in the overall

human factors evaluation.

NOTE: Section 18.2.13.2.4.e.1 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.1 will only be updated when potential hazards not previously analyzed are identified.

e. Attachment 1, Item (5)

Conformance to the specific items of Appendix B to

NUREG-0737 is as follows:

1) Appendix B, Item (1)

The thermocouple/core cooling monitor

instrumentation has been tested to establish

environmental qualification in accordance with

Regulatory Guide 1.89 (NUREG-0588). This

qualification requirement applies to the

complete instrumentation channel from

thermocouple to display where display

indicates the remote display, analog meter, and digital recorder. Qualified channel isolation

devices isolate this qualified instrumentation

from the data links, technical support center

display, and plant computer display.

The seismic portion of the environmental

qualification testing has been performed to

comply with Regulatory Guide 1.100. This

seismic qualification provides assurance that

the instrumentation will continue to read

within the required accuracy following, but

not necessarily during, a safe shutdown

earthquake.

18.2-85 Rev. 30 WOLF CREEK Instrumentation whose ranges are required to

extend beyond those ranges calculated in the

most severe design basis accident event for a

given variable has been qualified using the

following criteria.

The qualification environment is based on the

design basis accident events, except the

assumed maximum of the value of the monitored

variable is the value equal to the maximum

range for the variable. The monitored

variable is assumed to approach this peak by

extrapolating the most severe initial ramp

associated with the design basis accident

events. The decay for this variable is

considered proportional to the decay for this

variable associated with the design basis

accident events. No additional qualification

margin needs to be added to the extended range

variable. All environmental envelopes except

that pertaining to the variable measured by

the information display channel are those

associated with the design basis accident

events.

The above environmental qualification

requirement does not account for steady-state

elevated levels that may occur in other

environmental parameters associated with the

extended range variables. For example, a

sensor measuring containment pressure must be

qualified for the measured process variable

range, but the corresponding ambient

temperature is not mechanistically linked to

that pressure. Rather, the ambient

temperature value is the bounding value for

design basis accident events analyzed in

Chapter 15.0. The extended range requirement

ensures that the equipment will continue to

provide information should conditions degrade

beyond those postulated in the safety

analysis. Since variable ranges are

nonmechanistically determined, extension of

associated parameter levels is not justifiable

and has, therefore, not been required.

18.2-86 Rev. 0 WOLF CREEK NOTE: Section 18.2.13.2.4.e.2 is historical and reflects conditions at the time of plant licensing. Section 18.2.13.2.4.e.2 will only be updated when potential hazards not previously analyzed are identified.

2) Appendix B, Item (2)

The purpose for qualifying the thermocouple/

core cooling monitoring system is to generate

evidence that the equipment will maintain and

perform its functions during a design basis

event. It is of special concern during the

qualification effort to uncover common mode

failures.

The single-failure criteria for the computer

and information beyond the isolator does not

apply to this data-based information device as

referred to in NUREG-0737 (clarification item

[8]). In relation to diversification, the use

of reactor vessel level instrumentation adds

diversification to the ICC instrumentation.

Inclusion of the core cooling (Tsat margin)

monitoring functions enhances even further the

capability of the ICC instrumentation.

3) Appendix B, Item (3)

The instrumentation is energized from Class 1E

power sources.

4) Appendix B, Item (4)

Although not specifically recommended by

NUREG-0737, the ICC instrumentation complies

with the applicable portions of IEEE Standard

279. The systems utilize two trains;

therefore, the "Exemption" as defined in

Paragraph 4.11 of IEEE Standard 279 is

applicable here.

5) Appendix B, Item (5)

The ICC equipment falls under the quality

assurance requirements applicable to Class 1E

equipment. Refer to Appendix 3A for a

discussion of the quality assurance regulatory

guides.

6) Appendix B, Item (6)

A flat panel display is provided for thermocouple

readings in the backup system.

18.2-87 Rev. 30 WOLF CREEK The computer-based (primary) thermocouple indication system has continuous (recording) displays.

7) Appendix B, Item (7)

The backup Class 1E system (which is on

demand) includes redundant digital recorders. The computer-based (primary) indication system has

continuous (recording) displays.

8) Appendix B, Item (8)

The instruments are specifically identified on

the control panels so that the operator can

easily discern that they are intended for use

under accident conditions.

9) Appendix B, Item (9)

The WCGS ICC instrumentation complies with

isolation requirements.

10) Appendix B, Item (10)

The WCGS ICC instrumentation is testable as

required.

11) Appendix B, Item (11)

Servicing, testing, and calibrating programs

are specified to maintain the capability of

the monitoring instrumentation.

12) Appendix B, Item (12)

The access to the thermocouple/core cooling

monitor permits removing channels for service

(location is in the main control room). The

testing and/or maintenance is facilitated by

this system location.

13) Appendix B, Item (13)

The design facilitates administrative control

of the access to all setpoint adjustments, module calibration adjustments, and test

points.

18.2-88 Rev. 28 WOLF CREEK

14) Appendix B, Item (14)

The monitoring instrumentation design

minimizes the development of conditions that

would cause meters, annunciators, recorders, alarms, etc., to give anomalous indications

potentially confusing to the operator.

15) Appendix B, Item (15)

The instrumentation is designed to facilitate

the recognition, location, replacement, repair, or adjustment of malfunctioning

components or modules.

16) Appendix B, Item (16)

The instrumentation used in both the reactor

vessel level instrumentation system and

thermocouple monitoring receives input signals

directly from the sensors that measure the

parameters. The core cooling monitor also

derives most of the signals directly from the

sensors except in the case where Tsat

pressures and others are obtained from the

protection set.

17) Appendix B, Item (17)

The instruments used for ICC instrumentation

are also used, with the exception of the

reactor vessel level indication, for

monitoring normal operation of the plant to

the extent that it is practical. No loss of

sensitivity is expected due to this use.

18) Appendix B, Item (18)

Periodic testing is in accordance with the

applicable portions of Regulatory Guide 1.118.

(f) Attachment 1, Item (6)

The instrumentation system power supplies are in

conformance with this requirement. However, the

required circuits to the thermocouples are

separated only to the maximum extent possible.

18.2-89 Rev. 0 WOLF CREEK (g) Attachment 1, Item (7)

The instrumentation qualification is discussed in

item 4.e.1 above.

(h) Attachment 1, Item (8)

The instrumentation system is in conformance with

this requirement.

(i) Attachment l, Item (9)

Quality assurance is discussed in item 4.e.5 above.

5. The nonredundant plant computer performs the

thermocouple and Tsat functions for the primary

display. However, these functions are also performed

independent of the plant computer by the Class 1E ICC

instrumentation. The Class 1E ALS platform performs the calculations and provides the signals to the Class

1E backup display.

6. In general, the system electronics are verified, maintained, and calibrated on-line by placing one of the

redundant trains into a test and calibrate mode while

leaving the other train in operation to monitor

inadequate core cooling.

A general verification was performed before shipment, but plant specific data was not used. The capability

exists for the operator to verify the operation of the

system. This involves disconnecting the sensors at the

RVLIS electronics, providing an artificial input, and

observing the response of the system on the front panel

and remote display.

The "7300" RVLIS incorporates circuit cards that provide

an output proportional to the change in resistance of

the RTD. The card contains a resistance bridge driven

by a power supply to produce a signal proportional to

the changes in resistance of the RTD, and a signal

characterizer which accommodates linear calibration of

non-linear RTDs.

On-line calibration of the system is made possible by

the "card edge" adjustments. The circuit cards were

calibrated at the factory; however, if the function is

changed or a component on the card is replaced, the

calibration procedure is given within the equipment

reference manual.

18.2-90 Rev. 28 WOLF CREEK The RVLIS system requires the normal maintenance given

to other control and protection systems within the

plant. On-line maintenance is accomplished by placing

only one of the two redundant trains into maintenance at

a time; this allows continued monitoring of inadequate

core cooling.

The remote display unit of RVLIS indicates the status of

the input sensors. If any sensors are out of range, regardless of the reason, a symbol allows the affected

level reading on the summary display page. The

particular sensor that is out of range is identified at

the bottom of the summary display page. Due to the

redundant sensors and trains it is possible for the

operator to disable some of the sensors without

affecting the system reliability. The display indicates

which level readings are affected. The disabled sensors

are also displayed at the bottom of the summary page. A

separate sensor status page can be displayed, showing

all sensors that are disabled or out of range and their

affected level readings.

In addition, software programs are provided so that the

front panel controls and display can be used to perform

a functional test, serial data link tests, calibration

tests, and deadman timer tests. These tests are

considered part of the operator maintenance procedures

and are performed monthly. The cabinet-mounted

equipment is designed to facilitate periodic tests to

identify malfunctioning components and to ensure that

the equipment functional operability is maintained

comparable to the original design standards. Component

power supply failure is annunciated in the main control

room. The ICC instrumentation was installed by fuel

load.

NOTE: Sections 18.2.13.2.7, 8, and 9 are historical and reflect conditions at the time of plant licensing. Sections 18.2.13.2.7, 8, and 9 will only be updated when potential hazards not previously analyzed are identified.

7. and 8. The Westinghouse Owners Group has developed ICC

operating guidelines. These guidelines were

developed using the generic ICC analyses discussed

in Section 18.1.8. These generic guidelines were

considered, as appropriate, by The Operating Agent

in developing plant specific operating procedures.

9. No additional submittals are required, with the

exception of emergency operating procedures.

18.2-91 Rev. 30 WOLF CREEK 18.2.13.3 Conclusion The WCGS instrumentation used for detection of ICC adequately meets the guidance of NUREG0737, Item II.F.2.

18.2.14 EMERGENCY POWER FOR PRESSURIZER EQUIPMENT (II.G.1) 18.2.14.1 NRC Guidance Per NUREG0737 Position Consistent with satisfying the requirements for General Design Criteria 10, 14, 15, 17, and 20 of Appendix A to 10 CFR Part 50 for the event of lossofoffsite

power, the following positions shall be implemented:

Power Supply for Pressurizer Relief and Block Valves and Pressurizer Level Indicators 1. Motive and control components of the poweroperated relief valves (PORVs) shall be capable of being supplied

from either the offsite power source or the emergency

power source when the offsite power is not available.

2. Motive and control components associated with the PORV block valves shall be capable of being supplied from

either the offsite power source or the emergency power

source when the offsite power is not available.

3. Motive and control power connections to the emergency buses for the PORVs and their associated block valves

shall be through devices that have been qualified in accordance with safetygrade requirements.

4. The pressurizer level indication instrument channels shall be powered from the vital instrument buses. The

buses shall have the capability of being supplied from

either the offsite power source or the emergency power

source when offsite power is not available.

Clarification

1. Although the primary concern resulting from lessons learned from the accident at TMI is that the PORV block

valves must be closable, the design should retain, to

the extent practical, the capability to also open these

valves. 18.292 Rev. 0 WOLF CREEK 2. The motive and control power for the blockvalve should be supplied from an emergency power bus different from

the source supplying the PORV. 3. Any changeover of the PORV and blockvalve motive and control power from the normal offsite power to the

emergency onsite power is to be accomplished manually in

the control room.

4. For those designs in which instrument air is needed for operation, the electrical power supply should be

required to have the capability to be manually connected

to the emergency power sources.

18.2.14.2 The Operating Agent Response The pressurizer level indication channels are powered from vital, Class lE buses and displayed in the control room. These buses are described in Section

8.3; they are capable of being supplied from onsite emergency power (diesel

generators) or offsite power.

The pressurizer PORVs and block valves are powered from vital, Class lE power sources. The separation group assignment is indicated on system drawings in

Section 5.1.

The pressurizer PORVs are relied on to perform two safety functions:

a. Pressure control during a shutdown concurrent with loss of offsite power b. Overpressure protection at low reactor coolant system pressures These functions are described in Sections 5.2 and 5.4 (A).

The PORV block valve is provided to isolate the PORV should the PORV develop unacceptable leakage during operation.

The pressurizer level indication is used during normal operation to control pressurizer level (see Figure 7.21, sheet 11).

The pressurizer level indication is used for the reactor trip logic and is a displayed parameter for postaccident and postfire safe shutdown control. The safety design basis of the pressurizer level indication is provided in Section

7.2 and Section 7.5. 18.293 Rev. 14 WOLF CREEK 18.2.14.3 Conclusion The WCGS design for the emergency power for pressurizer equipment satisfies Item II.G.1 of NUREG0737. The WCGS design proposes an alternative to the

power supply assignment proposed for the pressurizer PORVs and PORV block

valves. The alternative is justified based on the diversity in power supply assignments for these valves, i.e., motoroperated (AC) block valves and solenoidoperated (DC) PORVs and based on the requirements for PORV use for

overpressure protection.

18.2.15 REQUESTS BY NRC INSPECTION AND ENFORCEMENT BULLETINS (II.K.1) 18.2.15.1 NRC Guidance Per NUREG0694 Position

"(C.1.5) Review all valve positions, positioning requirements, positive controls and related test and maintenance procedures to assure proper ESF functioning. See Bulletins 7906A Item 8, 7906B Item 7, and 7908 Item 6 in Reference 11 [NUREG0560]. (C.1.10) Review and modify, as required, procedures for removing safetyrelated systems from service (and restoring to service) to assure operability status is known. See Bulletins 7905A Item 10, 7906A Item 10, 7906B Item 9, and 7908 Item 8 in Reference 11 [NUREG0560]. (C.1.17) For Westinghousedesigned reactors, trip the pressurizer lowlevel coincident signal bistables, so that safety injection would be initiated when the pressurizer lowpressure setpoint is reached regardless of the pressurizer level. See Bulletin 7906A and Revision 1, Item 3 in Reference 11 [NUREG

0560]." 18.2.15.2 The Operating Agent Response The development and review of procedures for testing, maintenance and system operation for the SNUPPS facilities were carried out as a joint effort between

Union Electric, the Operating Agent, and other consultants. This development

and review effort has considered the concerns of Items C.1.5 and C.1.10 of NUREG0694 and The Operating Agent has performed the actions required by the

applicable I&E Bulletin sections.

The item related to the safety injection logic is not applicable to the WCGS design (see Figure 7.21, Sheet 8). 18.294 Rev. 0 WOLF CREEK 18.2.15.3 Conclusion The Operating Agent has developed and reviewed plant procedures in accordance with the NRC guidance in II.K.1 of NUREG0694.

18.2.16 ORDERS ON FACILITIES WITH BABCOCK & WILCOX NUCLEAR STEAM SUPPLIER SYSTEMS (II.K.2) 18.2.16.1 Control of Auxiliary Feedwater Independent of the Integrated Control System (II.K.2.2)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.2 Auxiliary Feedwater System Upgrading (II.K.2.8)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.3 Failure Mode Effects Analysis on the Integrated Control System II.K.2.9)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.4 SafetyGrade Anticipatory Reactor Trip (II.K.2.10)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.5 Thermal Mechanical ReportEffect of HighPres sure Injection on Vessel Integrity for Small Break LossofCoolant Accident with no Auxiliary Feedwater (II.K.2.13)18.2.16.5.1 NRC Guidance Per NUREG0737

Position A detailed analysis shall be performed of the thermalmechanical conditions in the reactor vessel during recovery from small breaks with an extended loss of

all feedwater.

Clarification

The position deals with the potential for thermal shock of reactor vessels resulting from cold safety injection flow. One aspect that bears heavily on

the effects of safety injection flow is the mixing of safety injection water

with reactor coolant in the reactor vessel. B&W provided a report on July 30, 1980 that discussed the mixing question and the basis for a conservative 18.295 Rev. 0 WOLF CREEK analysis of the potential for thermal shock to the reactor vessel. Other PWR vendors are also required to address this issue with regard to recovery from

small breaks with an extended loss of all feedwater. In particular, demonstration shall be provided that sufficient mixing would occur of the cold highpressure injection (HPI) water with reactor coolant so that significant

thermal shock effects to the vessel are precluded.

18.2.16.5.2 The Operating Agent Response

Westinghouse (in support of the Westinghouse Owners Group) has developed a method and performed analyses for a spectrum of small break lossofcoolant

accidents. The method employs the NOTRUMP computer program to generate the

thermal/hydraulic transients. The thermal transients on the reactor vessel beltline and the inlet nozzle are analyzed based on the thermal/hydraulic data from the NOTRUMP code. The Westinghousedeveloped pressurized thermal shock

evaluation (PTS) methodology has been submitted to the NRC (Reference 13). In

accordance with the Operating Agent's letter to the NRC dated January 23, 1986, the WCGS calculated RTPTS values are well below the screening criterion of 10

CFR 50.61.

18.2.16.6 Effects of Slug Flow on Steam Generator Tubes (II.K.2.15)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.7 Reactor Coolant Pump Seal Damage (II.K.2.16)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.8 Potential for Voiding in the Reactor Coolant System During Transients (II.K.2.17)18.2.16.8.1 NRC Guidance Per NUREG0737

Position Analyze the potential for voiding in the reactor coolant system (RCS) during anticipated transients.

Clarification

The background for this concern and a request for this analysis was originally sent to the Babcock and Wilcox (B&W) licensees in a letter from R. W. Reid, NRC, to all B&W operating plants, dated January 9, 1980. 18.296 Rev. 0 WOLF CREEK 18.2.16.8.2 The Operating Agent Response Westinghouse (in support of the Westinghouse Owners Group) has performed a study which addresses the potential for void formation in Westinghousedesigned

nuclear steam supply systems during natural circulation

cooldown/depressurization transients. This study has been submitted to the NRC

by the Westinghouse Owners Group (Ref. 1) and is applicable to Wolf Creek.

In addition, the Westinghouse Owners Group has developed appropriate modifications to the Westinghouse Owners Group Emergency Response Guidelines (ERGs) to take the results of the study into account so as to preclude void

formation in the upper head region during natural circulation

cooldown/depressurization transients, and to specify those conditions under

which upper head voiding may occur. The Operating Agent has considered the

generic guidance developed by the Westinghouse Owners Group in the development

of plant specific operating procedures.

18.2.16.9 Sequential Auxiliary Feedwater Flow Analysis (II.K.2.19)

Not applicable to Westinghouse pressurized water reactors.

18.2.16.10 SmallBreak LossofCoolant Accident Which Repressurizes the Reactor Coolant System to the PowerOperated Relief Valve Set Point (II.K.2.20)

Not applicable to Westinghouse pressurized water reactors.

18.2.17 RECOMMENDATIONS FROM THE BULLETINS AND ORDERS TASK FORCE (II.K.3) 18.2.17.1 Installation and Testing of Automatic Power Operated Relief Valve Isolation System (II.K.3.1)18.2.17.1.1 NRC Guidance Per NUREG0737

Position All PWR licensees should provide a system that uses the PORV block valve to protect against a smallbreak lossofcoolant accident. This system will

automatically cause the block valve to close when the reactor coolant system

pressure decays after the PORV has opened. Justification should be provided to

ensure that failure of this system would not decrease overall safety by

aggravating plant transients and accidents. 18.297 Rev. 0 WOLF CREEK Each licensee shall perform a confirmatory test of the automatic block valve closure system following installation.

Clarification

Implementation of this action item was modified in the May 1980 version of NUREG0660. The change delays implementation of this action item until after

the studies specified in TMI Action Plan item II.K.3.2 have been completed, if

such studies confirm that the subject system is necessary.

18.2.17.1.2 The Operating Agent Response

Westinghouse, as a part of the response prepared for the Westinghouse Owners Group to address item II.K.3.2 (refer to Section 18.2.17.2), has evaluated the necessity of incorporating an automatic pressurizer poweroperated relief valve

isolation system. This evaluation is documented in Reference 2 and concluded

that such a system should not be required. However, an automatic PORV

isolation capability is part of the WCGS design as discussed in Sections 7.6.6

and 7.6.10.

18.2.17.1.3 Conclusion Based on the above discussion, WCGS meets the guidelines of NUREG0737, Item II.K.3.1.18.2.17.2 Report on Overall Safety Effect of PowerOperated Relief Valve Isolation System (II.K.3.2)18.2.17.2.1 NRC Guidance Per NUREG0737

Position

1. The licensee should submit a report for staff review documenting the various actions taken to decrease the probability of a smallbreak lossofcoolant accident (LOCA) caused by a stuckopen, poweroperated relief

valve (PORV) and show how those actions constitute

sufficient improvements in reactor safety. 2. Safetyvalve failure rates based on past history of the operating plants designed by the specific nuclear steam

supply system (NSSS) vendor should be included in the

report submitted in response to (1) above. 18.298 Rev. 0 WOLF CREEK Clarification Based on its review of feedwater transients and small LOCAs for operating plants, the Bulletins and Orders Task Force in the Office of Nuclear Reactor

Regulation recommended that a report be prepared and submitted for staff review

which documents the various actions that have been taken to reduce the probability of a smallbreak LOCA caused by a stuckopen PORV and show how

these actions constitute sufficient improvements in reactor safety. Action Item II.K.3.2 of NUREG0660, published in May 1980, changed the implementation of

this recommendation as follows: In addition to modifications already

implemented on PORVs, the report specified above should include safety

examination of an automatic PORV isolation system identified in Task Action

Plan item II.K.3.1. Modifications to reduce the likelihood of a stuckopen PORV will be considered sufficient improvements in reactor safety if they reduce the probability of a smallbreak LOCA caused by a stuckopen PORV such that it is not a significant contributor to the probability of a smallbreak LOCA due to all causes.

(According to WASH1400, the median probability of a smallbreak LOCA S2 with a

break diameter between 0.5 inches and 2.0 inches is 10 3 per reactoryear with a variation ranging from 10 2 to 10 4 per reactoryear.) The abovespecified report should also include an analysis of safetyvalve failures based on the operating experience of the pressurizedwaterreactor (PWR) vendor designs. The licensee has the option of preparing and submitting either a plantspecific or a generic report. If a generic report is submitted, each licensee should document the applicability of the generic report to his

own plant.

Based on the above guidance and clarification, each licensee should perform an analysis of the probability of a smallbreak LOCA caused by a stuckopen PORV

or safety valve. This analysis should consider modifications which have been made since the TMI2 accident to improve the probability. This analysis shall

evaluate the effect of an automatic PORV isolation system specified in Task

Action Plan, Item II.K.3.1.

In evaluating the automatic PORV isolation system, the potential of causing a subsequent stuckopen safety valve and the overall effect on safety (e.g.,

effect on other accidents) should be examined. 18.299 Rev. 0 WOLF CREEK Actual operational data may be used in this analysis, where appropriate. The bases for any assumptions used should be clearly stated and justified.

The results of the probability analysis should then be used to determine whether the modifications already implemented have reduced the probability of a smallbreak LOCA due to a stuckopen PORV or safety valve a sufficient amount

to satisfy the criterion stated above, or whether the automatic PORV isolation

system specified in Task Action item II.K.3.1 is necessary.

In addition to the analysis described above, the licensee should compile operational data regarding pressurizer safety valves for PWR vendor designs.

These data should then be used to determine safetyvalve failure rates.

The analyses should be documented in a report. If this requirement is implemented on a generic basis, each licensee should review the appropriate

generic report and document its applicability to his own plant(s). The report

and the documentation of applicability (where appropriate) should be submitted

for NRC staff review by the specified date.

18.2.17.2.2 The Operating Agent Response

As mentioned in item II.K.3.1 above (Section 18.2.17.1), the Westinghouse Owners Group has submitted a Westinghouseprepared report (Ref. 2) which

provides a probabilistic analysis to determine the probability of a PORV LOCA, estimates the effect of the postTMI modifications, evaluates an automatic PORV

isolation concept, and provides PORV and safety valve operational data for

Westinghouse plants. Because of the sensitivity analyses included in the

report, the report is generic and is applicable to the WCGS. The report

identifies a significant reduction in the PORV LOCA probability as a result of postTMI modifications, and the calculations compare favorably with the

operational data for Westinghouse plants (included as an appendix to the

report).18.2.17.2.3 Conclusion

The requirements of this item were resolved by submittal of the Reference 2 analysis report. 18.2100 Rev. 0 WOLF CREEK 18.2.17.3 Reporting Safety and Relief Valve Failures and Challenges (II.K.3.3)18.2.17.3.1 NRC Guidance Per NUREG0694 Assure that any failure of a PORV or safety valve to close will be reported to the NRC promptly. All challenges to the PORVs or safety valves should be

documented in the annual report.

18.2.17.3.2 The Operating Agent Response

The failure of a PORV to close on demand and a failure of a primary system safety valve to close will no longer be reported per the guidance of GenericLetter 9702.

18.2.17.3.3 Conclusion

The Operating Agent's commitment documented above meets the requirements of NUREG0737, II.K.3.3.

18.2.17.4 Automatic Trip of Reactor Coolant Pumps During LossofCoolant Accident (II.K.3.5)18.2.17.4.1 NRC Guidance Per NUREG0737

Position Tripping of the reactor coolant pumps in case of a lossofcoolant accident (LOCA) is not an ideal solution. Licensees should consider other solutions to the smallbreak LOCA problem (for example, an increase in the safety injection

flow rate). In the meantime, until a better solution is found, the reactor coolant pumps should be tripped automatically in case of a smallbreak LOCA.

The signals designated to initiate the pump trip are discussed in NUREG0623. 18.2101 Rev. 13 WOLF CREEK ClarificationThis action item has been revised in the May 1980 version of NUREG0660 to provide for continued study of criteria for early reactor coolant pump trip.

Implementation, if any is required, will be delayed accordingly. As part of

the continued study, all holders of approved emergency core cooling (ECC) models have been required to analyze the forthcoming LOFT test (L36). The

capability of the industry models to correctly predict the experimental

behavior of this test will have a strong input on the staff's determination of

when and how the reactor coolant pumps should be tripped.

18.2.17.4.2 The Operating Agent Response In response to IE Bulletin No. 7906C, Westinghouse, in support of the Westinghouse Owners Group (WOG) performed an analysis of delayed reactor coolant pump (RCP) trip during smallbreak LOCAs. This analysis is documented in Reference 3 and is the basis for the Westinghouse and WCGS position on RCP

trip (i.e., automatic RCP trip is not necessary since sufficient time is

available for manual tripping of the RCPs).

Westinghouse (again in support of the Westinghouse Owners Group) has performed test predictions of the LOFT Experiment L36. The results of these predictions

are documented in References 4 and 5. The results constitute both a best

estimate model prediction with the NOTRUMP computer program and an evaluation

model prediction with the WFLASH computer program, using the supplied set of

initial boundary assumptions. By letter dated February 8, 1983, the NRC issued Generic Letter 8310c. The NRC concluded that each nuclear plant applicant should determine the need to

trip the reactor coolant pumps following an accident or transient. By SNUPPS

letters dated April 22, 1983 and April 13, 1984, responses to Generic Letter 8310c were provided. The responses referenced previous Westinghouse Owner's

Group reports dated December 1, 1983 and March 9, 1984. The NRC has issued Generic Letter 8512 which confirmed the acceptability of the information provided by the Westinghouse Owner's Group, in response to Generic Letter 8310, and requested that plantspecific information be

submitted to the NRC. By letter dated November 27, 1985, the Operating Agent responded to Generic Letter 8512. By letter dated March 21, 1989 (8900605), the NRC staff found that Wolf Creek appropriately referenced the WOG reports and the issue was closed. 18.2102 Rev. 21 WOLF CREEK 18.2.17.5 Evaluation of PORV Opening Probability During Overpressure Transient (II.K.3.7)

Not applicable to Westinghouse pressurized water reactors.

18.2.17.6 Proportional Integral Derivative Controller Modification (II.K.3.9)18.2.17.6.1 NRC Guidance Per NUREG0737

Position The Westinghouserecommended modification to the proportional integral derivative (PID) controller should be implemented by affected licensees.

Clarification The Westinghouserecommended modification is to raise the interlock bistable trip setting to preclude derivative action from opening the poweroperated

relief valve (PORV). Some plants have proposed changing the derivative action

setting to zero, thereby eliminating it from consideration. Either

modification is acceptable to the staff. This represents a newly available

option.18.2.17.6.2 The Operating Agent Response

The WCGS design includes a pressure integral derivative (PID) controller in the poweroperated relief valve control circuit (see Figures 7.74 and 7.21, Sheet

11). The time derivative constant in the PID controller for the pressurizer

PORV will be turned to "OFF" (set to zero) at WCGS. The appropriate plant procedure for calibrating the set points in this nonsafety grade system will

reflect this decision.

Setting the derivative time constant to "OFF," in effect, removes the derivative action from the controller. Removal of the derivative action will

decrease the likelihood of opening the pressurizer PORV since the actuation

signal for the valve is then no longer sensitive to the rate of change of

pressurizer pressure.

18.2.17.6.3 Conclusion The NUREG0737 provisions for the PID controller are met at WCGS. 18.2103 Rev. 14 WOLF CREEK 18.2.17.7 Proposed Anticipatory Trip Modification (II.K.3.10)18.2.17.7.1 NRC Guidance Per NUREG0737 Position The anticipatory trip modification proposed by some licensees to confine the range of use to highpower levels should not be made until it has been shown on a plantbyplant basis that the probability of a smallbreak lossofcoolant accident (LOCA) resulting from a stuckopen poweroperated relief valve (PORV)

is substantially unaffected by the modification.

Clarification

This evaluation is required for only those licensees/applicants who propose the modification.

18.2.17.7.2 The Operating Agent Response

This anticipatory trip modification is included in the WCGS design.

The NRC has raised the question of whether the pressurizer poweroperated relief valves would be actuated for a turbine trip without reactor trip below a power level of 50 percent (P9 set point). An analysis has been performed

using realistic yet conservative values for the core physics parameters (primarily reactivity feedback coefficients and control rod worths), and a

conservatively high initial power, average reactor temperature (TAVG), and

pressurizer pressure level to account for instrument inaccuracies. The transient was initiated from the set point for the P9 interlock, namely 50 percent of the reactor full power level plus 2 percent for power measurement

uncertainty. This is a conservative starting point, and would bracket all

transients initiated from a lower power level. The core physics parameters

used were the ones that would result in the most positive reactivity feedbacks (i.e., highest power levels). The steam dump valves were assumed to be

actuated by the load rejection controller.

Based upon the results from the analysis, the peak pressure reached in the pressurizer would be 2,302 psia. The set point for the actuation of the pressurizer poweroperated relief valves is 2,350 psia. Even including the +20

psi pressure measurement 18.2104 Rev. 0 WOLF CREEK uncertainty, there is still a margin of 28 psi between the peak pressure reached and the minimum activation pressure for the pressurizer poweroperated

relief valves.

An additional analysis has been performed to determine the consequences (specifically the likelihood of the pressurizer poweroperated relief valves

opening) of having a turbine trip due to a loss of condenser vacuum.

The major difference between this analysis and the one presented above is that now the normal steam dump system is unavailable, and the steam relief must be

carried out through the atmospheric relief valves. Since there is a longer

delay time before the atmospheric reliefs reach their set point (in comparison to the normal steam dump system) and their capacity is about onehalf of the

steam dump system, there is an increased likelihood that the pressurizer PORVs

will open. Figure 18.214 shows the plant operating ranges for which the pressurizer PORVs will open for a turbine trip due to a loss of condenser signal. Above 50 percent power, a turbine trip will cause a reactor trip (due to P9 set point),

and the pressurizer PORV set point will not be reached. Below a power level of

35 to 40 percent (depending on fuel burnup), the pressurizer spray rate is

adequate to maintain the pressurizer pressure below the set point. Therefore, only in the narrow band between about 35 and 50 percent power will the

pressurizer PORVs open for a loss of condenser.

Based upon the operating history of current plants, the chances of getting a condenser unavailable signal (and hence a turbine trip) is about 156 out of 10 7operating hours. Assuming 98 percent plant availability and a 40year plant

lifetime, this works out to about four condenser unavailable turbine trips

occurring during the normal life of a plant. Assuming an equal chance of

having the plant operate anywhere between 0 and 100 percent power (an

unrealistic value, since they usually operate either at a full or no load

level), the chances of having a condenser unavailable signal generate a

transient which would result in the opening of the pressurizer PORVs is less

than one per plant lifetime.

18.2.17.7.3 Conclusion

The analysis described above demonstrates an acceptably low probability of a small LOCA caused by a stuck open PORV. 18.2105 Rev. 0 WOLF CREEK 18.2.17.8 Justification for Use of Certain PORVs (II.K.3.11)18.2.17.8.1 NRC Guidance Per NUREG0694 Position Demonstrate that the PORV installed in the plant has a failure rate equivalent to or less than the valves for which there is an operating history.

18.2.17.8.2 The Operating Agent Response The PORVs to be used in the WCGS design are pilotoperated relief valves.

These valves are a new design and were supplied by Garrett. The valve design

was tested in the Electric Power Research Institute (EPRI) valve test program (refer to NUREG0737, Item II.D.1). The performance of the Garrett PORVs was

comparable to other designs tested. In addition, the analysis of PORVs in accordance with NUREG0737, Item III.K.3.2 (Section 18.2.17.2) addresses valve

failure rates.

18.2.17.8.3 Conclusion

Based on the EPRI testing and PORV analysis identified above, failure rates for the WCGS PORV design are adequately addressed.

18.2.17.9 Confirm Existence of Anticipatory Reactor Trip Upon Turbine Trip (II.K.3.12)18.2.17.9.1 NRC Guidance Per NUREG0737

Position Licensees with Westinghousedesigned operating plants should confirm that their plants have an anticipatory reactor trip upon turbine trip. The licensee of

any plant where this trip is not present should provide a conceptual design and

evaluation for the installation of this trip.

18.2.17.9.2 The Operating Agent Response

The WCGS design includes an anticipatory reactor trip upon turbine trip (refer to Figure 7.21). 18.2106 Rev. 0 WOLF CREEK 18.2.17.10 Separation of HighPressure Coolant Injection and Reactor Core Isolation Cooling System Initiation LevelsAnalysis and Implementation (II.K.3.13)

Not applicable to pressurized water reactors.

18.2.17.11 Isolation of Isolation Condensers on High Radiation (II.K.3.14)

Not applicable to pressurized water reactors.

18.2.17.12 Modify BreakDetection Logic to Prevent Spurious Isolation of HighPressure Coolant Injection and Reactor Core Isolation Cooling (II.K.3.15)

Not applicable to pressurized water reactors.

18.2.17.13 Reduction of Challenges and Failures of Relief ValvesFeasibility Study and System Modification (II.K.3.16)

Not applicable to pressurized water reactors.

18.2.17.14 Report on Outages of Emergency CoreCooling Systems Licensee Report and Proposed Technical Specification Changes (II.K.3.17)18.2.17.14.1 NRC Guidance Per NUREG0737

Position Several components of the emergency corecooling (ECC) systems are permitted by technical specifications to have substantial outage times (e.g., 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one dieselgenerator; 14 days for the HPCI system). In addition, there are no

cumulative outage time limitations for ECC systems. Licensees should submit a

report detailing outage dates and lengths of outages for all ECC systems for

the last 5 years of operation. The report should also include the causes of

the outages (i.e., controller failure, spurious isolation).

Clarification

The present technical specifications contain limits on allowable outage times for ECC systems and components. However, there are no cumulative outage time

limitations on these same systems. It 18.2107 Rev. 0 WOLF CREEK is possible that ECC equipment could meet present technical specification requirements but have a high unavailability because of frequent outages within

the allowable technical specifications.

The licensees should submit a report detailing outage dates and length of outages for all ECC systems for the last 5 years of operation, including causes

of the outages. This report will provide the staff with a quantification of

historical unreliability due to test and maintenance outages, which will be

used to determine if a need exists for cumulative outage requirements in the

technical specifications.

Based on the above guidance and clarification, a detailed report should be submitted. The report should contain (1) outage dates and duration of outages;

(2) cause of the outage; (3) ECC systems or components involved in the outage;

and (4) corrective action taken. Test and maintenance outages should be

included in the above listings which are to cover the last 5 years of

operation. The licensee should propose changes to improve the availability of

ECC equipment, if needed.

Applicant for an operating license shall establish a plan to meet these requirements.

18.2.17.14.2 The Operating Agent Response

The Operating Agent provides safety system outage information as required by regulations and WCGS Technical Specifications. In addition, records are

retained of the maintenance, inspections, and surveillance tests of the

principal items related to nuclear safety. These records can be reviewed by

the NRC for additional specific data on component availability. The

documentation will include: 1) outage dates and duration, 2) cause of the

outage, 3) systems or components involved in the outage, and 4) corrective

action taken.

18.2.17.14.3 Conclusion

The WCGS reports safety system outages as required by 10 CFR 50.72, 10 CFR 50.73, The Technical Specifications and other applicable regulations. This reporting ensures that the data requested by Item II.K.3.17 of NUREG0737 is

available.

18.2.17.15 Modification of Automatic Depressurization System LogicFeasibility for Increased Diversity for Some Event Sequences (II.K.3.18)

Not applicable to pressurized water reactors. 18.2108 Rev. 0 WOLF CREEK 18.2.17.16 Interlock on Recirculation Pump Loops (II.K.3.19)

Not applicable to pressurized water reactors. 18.2.17.17 Restart of Core Spray and LowPressure Coolant Injection Systems (II.K.3.21)

Not applicable to pressurized water reactors.

18.2.17.18 Automatic Switchover of Reactor Core Isolation Cooling System SuctionVerify Procedures and Modify Design (II.K.3.22)

Not applicable to pressurized water reactors.

18.2.17.19 Confirm Adequacy of Space Cooling for High Pressure Coolant Injection and Reactor Core Isolation Cooling Systems (II.K.3.24)

Not applicable to pressurized water reactors.

18.2.17.20 Effect of Loss of AlternatingCurrent Power on Pump Seals (II.K.3.25)18.2.17.20.1 NRC Guidance Per NUREG0737

Position The licensees should determine, on a plantspecific basis, by analysis or experiment, the consequences of a loss of cooling water to the reactor

recirculation pump seal coolers. The pump seals should be designed to withstand a complete loss of alternatingcurrent (ac) power for at least 2

hours. Adequacy of the seal design should be demonstrated.

Clarification

The intent of this position is to prevent excessive loss of reactor coolant system (RCS) inventory following an anticipated operational occurrence. Loss

of ac power for this case is construed to be loss of offsite power. If seal

failure is the consequence of loss of cooling water to the reactor coolant pump (RCP) seal coolers for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, due to loss of offsite power, one acceptable

solution would be to supply emergency power to the component cooling water

pump. This topic is addressed for Babcock and Wilcox (B&W) reactors in Section

II.K.2.16. 18.2109 Rev. 0 WOLF CREEK 18.2.17.20.2 The Operating Agent Response During normal operation, seal injection flow from the chemical and volume control system is provided to cool the RCP seals, and the component cooling

water system provides flow to the thermal barrier heat exchanger to limit the

heat transfer from the reactor coolant to the RCP internals. In the event of a

loss of offsite power, the RCP motor is deenergized and both of these cooling

supplies are terminated; however, the diesel generators are automatically

started and both seal injection flow and component cooling water to the thermal

barrier heat exchanger are automatically restored within seconds. Either of

these cooling supplies is adequate to provide seal cooling and prevent seal

failure due to a loss of seal cooling during a loss of offsite power for at

least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

18.2.17.20.3 Conclusion

The WCGS design meets the RCP seal cooling requirements of this item.

18.2.17.21 Provide Common Reference Level for Vessel Level Instrumentation (II.K.3.27)

Not applicable to pressurized water reactors.

18.2.17.22 Verify Qualification of Accumulators on Automatic Depressurization System Valves (II.K.3.28)

Not applicable to pressurized water reactors.

18.2.17.23 Study to Demonstrate Performance of Isolation Condensers with Noncondensibles (II.K.3.29)

Not applicable to pressurized water reactors.

18.2.17.24 Revised SmallBreak LossofCoolant Accident Methods to Show Compliance with 10 CFR Part 50, Appendix K (II.K.3.30)18.2.17.24.1 NRC Guidance Per NUREG0737

Position The analysis methods used by nuclear steam supply system (NSSS) vendors and/or fuel suppliers for smallbreak lossofcoolant accident (LOCA) analysis for

compliance with Appendix K to 10 CFR 18.2110 Rev. 0 WOLF CREEK Part 50 should be revised, documented, and submitted for NRC approval. The revisions should account for comparisons with experimental data, including data

from the LOFT Test and Semiscale Test facilities.

Clarification As a result of the accident at TMI2, the Bulletins and Orders Task Force was formed within the Office of Nuclear Reactor Regulation. This task force was

charged, in part, to review the analytical predictions of feedwater transients and smallbreak LOCAs for the purpose of assuring the continued safe operation

of all operating reactors, including a determination of acceptability of

emergency guidelines for operators.

As a result of the task force reviews, a number of concerns were identified regarding the adequacy of certain features of smallbreak LOCA models, particularly the need to confirm specific model features (e.g., condensation

heat transfer rates) against applicable experimental data. These concerns, as

they applied to each lightwater reactor (LWR) vendor's models, were documented

in the task force reports for each LWR vendor. In addition to the modeling concerns identified, the task force also concluded that, in light of the TMI2 accident, additional systems verification of the smallbreak LOCA model as

required by II.4 of Appendix K to 10 CFR 50 was needed. This included providing predictions of Semiscale Test S0710B and LOFT Test (L31) and providing experimental verification of the various modes of singlephase and twophase natural circulation predicted to occur in each vendor's reactor during smallbreak LOCAs. Based on the cumulative staff requirements for additional smallbreak LOCA model verification, including both integral system and separate effects

verification, the staff considered model revision as the appropriate method for

reflecting any potential upgrading of the analysis methods.

The purpose of the verification was to provide the necessary assurance that the smallbreak LOCA models were acceptable to calculate the behavior and

consequences of small primary system breaks. The staff believes that this

assurance can alternatively be provided, as appropriate, by additional justification of the acceptability of present smallbreak LOCA models with

regard to specific staff concerns and recent test data. Such justification

could supplement or supersede the need for model revision. The specific staff concerns regarding smallbreak LOCA models are provided in the analysis sections of the B&O Task Force reports for each LWR vendor, (NUREG0635, 0565, 0626, 0611, and 18.2111 Rev. 0 WOLF CREEK 0623). These concerns should be reviewed in total by each holder of an approved emergency core cooling system (ECCS) model and addressed in the evaluation as appropriate. The recent tests include the entire Semiscale smallbreak test series and LOFT Tests (L31) and (L32). The staff believes that the present smallbreak LOCA

models can be both qualitatively and quantitatively assessed against these

tests. Other separate effects tests (e.g., ORNL core uncovery tests) and

future tests, as appropriate, should also be factored into this assessment.

Based on the preceding information, a detailed outline of the proposed program to address this issue should be submitted. In particular, this submittal

should identify (1) which areas of the models, if any, the licensee intends to

upgrade, (2) which areas the licensee intends to address by further

justification of acceptability, (3) test data to be used as part of the overall

verification/upgrade effort, and (4) the estimated schedule for performing the

necessary work and submitting this information for staff review and approval.

18.2.17.24.2 The Operating Agent Response

The present Westinghouse Small Break Evaluation Model used to analyze WCGS (refer to Section 15.6.5) is in conformance with 10 CFR Part 50, Appendix K.

Nevertheless, Westinghouse (as documented in Ref. 6) has addressed the specific NRC items contained in NUREG0611 in a model (NOTRUMP) documented in WCAP 10054 (dated 12/28/82) and WCAP 10079 (dated 11/12/82). The NRC approved NOTRUMP as

satisfying II.K.3.30 in a safety evaluation dated May 21, 1985. NOTRUMP was

also found to be in full compliance with Appendix K to 10 CFR 50 and was designated as the new Westinghouse licensing tool for smallbreak LOCA

evaluations to satisfy the provisions of II.K.3.31.

18.2.17.24.3 Conclusion The NOTRUMP Code satisfies the provisions of NUREG0737, Item II.K.3.30.

18.2.17.25 PlantSpecific Calculations to Show Compliance With 10 CFR Part 50.46 (II.K.3.31)18.2.17.25.1 NRC Guidance Per NUREG0737

Position Plantspecific calculations using NRCapproved models for smallbreak lossof coolant accidents (LOCAs), as described in item 18.2112 Rev. 0 WOLF CREEK II.K.3.30 to show compliance with 10 CFR 50.46, should be submitted for NRC approval by all licensees.

18.2.17.25.2 The Operating Agent Response

The present Westinghouse Small Break Evaluation Model and small break LOCA analyses for WCGS (refer to Section 15.6.5) are in conformance with 10 CFR Part

50, Appendix K and 10 CFR Part 50.46. As stated in the response to Item

II.K.3.30 (refer to Section 18.2.17.24.2), the NRC has approved the Westinghouse NOTRUMP Code for smallbreak LOCA analysis. In response to generic letter 8335, the Westinghouse Owners Group has developed a program to demonstrate on a generic basis that the new NOTRUMP

model predicts lower calculated peak clad temperatures than WFLASH. By letter

dated October 6, 1986 (Reference 17), the NRC concluded that the generic study results could be used to resolve NUREG0737, Item II.K.3.31. The Operating

Agent has submitted a letter dated June 26, 1986 to the NRC to verify the

applicability of the generic study results to WCGS.

18.2.17.25.3 Conclusion

Upon submittal of the letter confirming the applicability of the generic results to WCGS, the requirements of NUREG0737, Item II.K.3.31 are met.

18.2.17.26 Evaluation of Anticipated Transients with Single Failure to Verify No Fuel Failure (II.K.3.44)

Not applicable to pressurized water reactors.

18.2.17.27 Evaluation of Depressurization with Other than Automatic Depressurization System (II.K.3.45)

Not applicable to pressurized water reactors.

18.2.17.28 Identify Water Sources Prior to Actuation of Automatic Depressurization System (II.K.3.57)

Not applicable to pressurized water reactors.

18.2.18 REFERENCES

1. Letter OG57, dated April 20, 1981, Jurgensen, R. W.

(Chairman, Westinghouse Owners Group) to Check, P. S. (NRC). 18.2113 Rev. 0 WOLF CREEK

2. Wood, D. C. and Gottshall, C. L., "Probabilistic Analysis and Operational Data in Response to NUREG0737 Item II.K.3.2 for Westinghouse NSSS Plants," WCAP9804, February 1981.
3. "Analysis of Delayed Reactor Coolant Pump Trip During Small Loss of Coolant Accidents for Westinghouse Nuclear Steam Supply Systems," WCAP9584 (Proprietary) and WCAP9585 (Non

Proprietary), August 1979. 4. Letter OG49, dated March 3, 1981, Jurgensen, R. W.

(Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.

(NRC). 5. Letter OG50, dated March 23, 1981, Jurgensen, R. W.

(Chairman, Westinghouse Owners Group) to Ross, D. F., Jr.

(NRC). 6. Letter NSTMA2318, dated September 26, 1980, Anderson, T. M.

(Westinghouse) to Eisenhut, D. G. (NRC). 7. Letter NSTMA2357, dated December 23, 1980, T. M. Anderson (Westinghouse) to D. G. Eisenhut (NRC).

8. Rockwell, T., Reactor Shielding Design Manual , D. Van Nostrand Co., New York, New York, 1956.
9. QADCG: A Combinatorial Geometry Version of QADP5A , Bechtel Power Corporation internal computer code.
10. Letter SLNRC 830048, dated September 1, 1983, N. A. Petrick (SNUPPS) to H. R. Denton (NRC). 11. Letter SLNRC 84004, dated January 16, 1984, N. A. Petrick (SNUPPS) to H. R. Denton (NRC). 12. Letter SLNRC 83002 (distributed as 82002), dated January 7, 1983, N. A. Petrick (SNUPPS) to H. R. Denton (NRC).
13. "A Generic Assessment of Significant Flaw Extension, Including, Stagnant Loop Conditions, From Pressurized Thermal

Shock of Reactor Vessels on Westinghouse Power Plants," WCAP

10319, December 1983. 14. Union Electric Calculation Sheet HPCI8404, dated April 27, 1984, "An Assessment of Personnel Dose to Obtain Gaseous

Effluent and Reactor Coolant System Grab Samples Following a

DBA Loss of Coolant Accident." 18.2114 Rev. 0 WOLF CREEK 15. Letter NSNRC863099, dated February 20, 1986, Rahe, E. P.

(Westinghouse) to Taylor, J. M. (NRC). 16. "Methodology for Qualifying Westinghouse WRDSupplied NSSS SafetyRelated Electrical Equipment," WCAP8587, Rev. 6A, dated November 1983. 17. Safety Evaluation Report, WCAP11145, Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with NOTRUMP

Code, transmitted by NRC letter (C. Rossi) to Westinghouse

Owners Group (L. Butterfield), dated October 6, 1986. 18.2115 Rev. 0 WOLF CREEK TABLE 18.2-1 (Page 1 of 2)

MITIGATING CORE DAMAGE COURSE COURSE DESCRIPTION Westinghouse has performed detailed analysis of numerous situations which could arise in two loop, three loop, and four

loop PWR plants. The Westinghouse program has then been

structured to use the most limiting case for each situation as the

basis for instruction to students.

COURSE INTRODUCTION

- Major Plant Assumptions

- Core Thermal and Linear Power Density Limits INCORE INSTRUMENTATION

- System Functions, Characteristics, and Operations

Including Moveable Incore Detection System and Incore

Thermocouples

- Determination of Core Damage Extent and Core Geometry

Changes

- Determination of Peak Core Temperatures

- Methods of Obtaining Extended Range Readings

- Direct Readings at Terminal Junctions

- System Outputs and Recorders

- Potential Causes of Instrument Failures and Probable Time

to Failure Under Various Degraded Conditions EXCORE INSTRUMENTATION

- Factors Affecting Excore Instrumentation Response During

Various Operational Conditions

- Expected Indications for Various Loss of Coolant

Accidents

- Determination of Void Formation in the Core Region

- Detector Reliability Under Adverse Environmental

Conditions POST ACCIDENT CHEMISTRY

- Expected Changes in Primary Plant Chemistry

- Consequences of Transferring Primary Water Outside of

Containment

- Long Term System Problems Associated with Extended

Immersion in Contaminated Primary Water and Potential

Failure Mechanisms

- Expected Isotopic Breakdowns for Various Conditions of

Fuel and Cladding Rev. 0 TABLE 18.2-1 (Page 2 of 2)

RADIATION MONITORING

- Types of Detectors Utilized in the Radiation Monitoring

System

- Response of Process and Area Monitors to Radioactivity

Release

- Verification of Installed Instrumentation Through

Supplemental Measurements

- Determination of Dose Rates with Nonfunctional or

Nonavailable Instrumentation VITAL PROCESS INSTRUMENTATION

- Specific Applications of Major Types of Transmitters

- Various Failure Methods and Their Reliability

- Pressurizer Pressure Instrumentation

- Steam Generator Level Instrumentation

- Various Temperature Detectors

- Major Flow Indicators

- Alternate Methods to Determine Critical Process Variables

- Use of Plant Computer Stored Information GAS GENERATION

- Physical and Chemical Characteristics and Potential

Sources of Major Gases

- Hydrogen Flammability and Explosion Limits

- Venting, Disposal, and Sampling Methods of Containment

Gases POTENTIALLY DAMAGING SITUATIONS AND COOLING METHODS

- Loss of Feedwater Induced Loss of Coolant Accident

- Heat Removal Paths and Sinks

- Steam and Water Cooling

- Injection Flowpaths - Hot Leg Versus Cold Leg Injection

- Quenching Effects on Clad Material

- Gas or Steam Binding Effects

- Natural Circulation Indications and Controls - One Phase

and Two Phase Fluids Rev. 0 WOLF CREEK TABLE 18.2-2 ESSENTIAL/NONESSENTIAL CONTAINMENT

PENETRATIONS Fig. 6.2.4-1, Essential/

Sheet Penetration Service Nonessential 1 P-1 Main steam/PORV Nonessential/

essential

2 P-2 Main steam/PORV Nonessential/

essential

3 P-3 Main steam/PORV & AFW Nonessential/

steam essential

4 P-4 Main steam/PORV & AFW Nonessential/

steam essential

5 P-5 Main/aux. feedwater Nonessential/

essential

6 P-6 Main/aux. feedwater Nonessential/

essential

7 P-7 Main/aux. feedwater Nonessential/

essential

8 P-8 Main/aux. feedwater Nonessential/

essential

9 P-9 SG blowdown Nonessential

10 P-10 SG blowdown Nonessential

11 P-11 SG blowdown Nonessential

12 P-12 SG blowdown Nonessential

13 P-13 Containment recirc- Essential

ulation sump suction

to containment spray

pump

14 P-14 Containment recirc- Essential

ulation sump suction

to RHR pump

15 P-15 Containment recirc- Essential

ulation sump suc-

tion to RHR pump

16 P-16 Containment recirc- Essential

ulation sump suction

to containment spray

pump

17 P-21 RHR hot leg injection Essential

18 P-22 RCP-B seal water Essential

supply

19 P-23 CVCS letdown Nonessential

20 P-24 RCP seal water return Nonessential Rev. 0 WOLF CREEK TABLE 18.2-2 (Sheet 2)

Fig. 6.2.4-1, Essential/

Sheet Penetration Service Nonessential 21 P-25 Reactor makeup water Nonessential

supply

22 P-26 Reactor coolant drain Nonessential

tank discharge

23 P-27 RHR cold leg injection Essential

loops 3 and 4

24 P-28 ESW supply to contain- Essential

ment air coolers

25 P-29 ESW return from con- Essential

tainment air coolers

26 P-30 Instrument air supply Nonessential

27 P-32 Containment sump pump Nonessential

discharge

28 P-34 Containment ILRT test Nonessential

line

29 P-39 RCP-C seal water supply Essential

30 P-40 RCP-D seal water supply Essential

31 P-41 RCP-A seal water supply Essential

32 P-43 Auxiliary steam supply - Nonessential

decontamination

33 P-44 Reactor coolant drain Nonessential

tank vent

34 P-45 Accumulator nitrogen Nonessential

supply

35 P-48 SI pump-B, discharge to Essential

hot legs 1 and 4

36 P-49 SI pumps to cold legs Essential

1, 2, 3, and 4

37 P-51 ILRT pressure sensing Nonessential

lines

38 P-52 RHR shutdown suction Essential

39 P-53 Fuel pool cooling and Nonessential

cleanup, refueling pool

supply

40 P-54 Fuel pool cooling and Nonessential

cleanup, refueling pool

suction

41 P-55 Fuel pool cooling and Nonessential

cleanup, refueling pool

skimmer suction Rev. 0 WOLF CREEK TABLE 18.2-2 (Sheet 3)

Fig. 6.2.4-1, Essential/

Sheet Penetration Service Nonessential 42 P-56 Post-LOCA hydrogen Essential

analyzer return

42a P-56 Containment Atmosphere Nonessential Monitor 42b P-57 Sample Return - Post Nonessential Accident Sampling System 43 P-58 Accumulator fill line Nonessential

from SI pump

43a P-59,91 RVLIS Sample Line Nonessential Reactor Coolant System 44 P-62 Pressurizer relief tank Nonessential

nitrogen supply

45 P-63 Service air supply Nonessential

45a P-64 RC loop and Pressurizer Nonessential liquid sample 46 P-65 Hydrogen purge Nonessential

47 P-66 Containment spray supply Essential

pump B

48 P-67 Fire protection supply Nonessential

49 P-69 Pressurizer vapor sample Nonessential

50 P-71 ESW supply to contain- Essential

ment air coolers

51 P-73 ESW return from contain- Essential

ment air coolers

52 P-74 CCW supply Essential

53 P-75 CCW return Essential

54 P-76 CCW return RCP thermal Essential

barrier

55 P-78 S.G. drain Nonessential

56 P-79 RHR shutdown suction Essential

57 P-80 CVCS charging Nonessential

58 P-82 RHR discharge to hot Essential

legs loops 1 and 2

59 P-83 S.G. D sample Nonessential

60 P-84 S.G. A sample Nonessential

61 P-85 S.G. B sample Nonessential

62 P-86 S.G. C sample Nonessential

63 P-87 SI pump A discharge to Essential

hot legs loops 2 and 3

64 P-88 Boron injection supply Essential

to cold legs loops 1, 2, 3, and 4

65 P-89 Containment spray supply Essential

pump A

66 P-92 ECCS test line return Nonessential

67 P-93 R.C. loop Nonessential liquid samples 68 P-95 Accumulator tank sample Nonessential Rev. 15 WOLF CREEK TABLE 18.2-2 (Sheet 4)

Fig. 6.2.4-1, Essential/

Sheet Penetration Service Nonessential 69 P-97 Post-LOCA hydrogen Essential

analyzer return

69a P-97 Sample Return - Nonessential Containment Atmosphere Monitor 69b P-98 Breathing Air Supply Nonessential 70 P-99 Post-LOCA hydrogen Essential

analyzer supply

70a P-99 Sample Line - Nonessential Containment Atmosphere Monitor 71 P-101 Post-LOCA hydrogen Essential

analyzer supply

71a P-101 Sample Line - Nonessential Containment Atmosphere Monitor 72 E-256 Containment pressure Essential

P-103/104 sensing monitors

73 V-160 Containment purge Nonessential

exhaust

74 V-161 Containment purge Nonessential

supply Rev. 15 WOLF CREEK TABLE 18.2-3

DETAILS FOR THE THERMOCOUPLE/CORE COOLING MONITOR SYSTEM

Display Information Displayed (T-Tsat, Tsat, P-Psat subcooled-Press, etc.) T-Tsat - superheated Display Type (analog, digital, CRT) Analog (control board) and digital (electronics

package)

Continuous or on Demand Continuous (control board) and on

demand (electronics

package)

Single or Redundant Display Redundant

Location of Display Control board and control room Alarms (include set points) Caution: 5°F subcooled Alarm: 0°F subcooled

Overall uncertainty Digital: 3°F for RTD

Analog: 5°F for RTD

Range of Display Calibrated: 200°F subcooled to

2000°F

superheat

Overall: Never off

scale Qualifications (seismic, environ- Seismic and environmental mental)

Rev. 10 WOLF CREEK TABLE 18.2-3 (Sheet 2)

Calculator Type (process computer, dedicated Dedicated digital digital or analog calc.)

If process computer is used specify NA availability (percent of time)

Single or redundant calculators Redundant

Selection Logic (highest T., Auctioneered high hot lowest press) leg RTD. Auctioneered

low reactor coolant

pressure Qualifications (seismic, environ- Seismic and environmental mental)

Calculational Technical (steam Functional fit - ambient tables, functional fit, ranges) to critical point Input Temperature (RTDs or T/Cs) RTDs, T/Cs, and Tref

Temperature (number of sensors RTDs - 2 hot leg and 2 and locations) cold leg/channel

T/Cs - 25 per channelRange of temperature sensorsRTDs 700°F T/Cs 2300°F

Calibration unit

range 2300°F Uncertainty* of temperature sensors See WCAP 8587

Qualifications (seismic, environ- Seismic and environ-mental) mental as classified in

Section 18.2.13.2 Rev. 0 WOLF CREEK TABLE 18.2-3 (Sheet 3)

Pressure (specify instrument used) Qualified Pressure Transmitter Pressure (number of sensors and 1 wide range - RCS loop locations) 2 narrow range - pres-

surizer Range of pressure sensors Wide range 0-3000 psi narrow range 1700-2500

psi Uncertainty* of pressure sensors See WCAP 8587

Qualifications (seismic, environ- Seismic and environmental mental)

  • Uncertainties must address conditions of forced flow and natural circulation.

Rev. 0 WOLF CREEK TABLE 18.2-4 NARROW RANGE MEASUREMENT UNCERTAINTY FOR

REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM Uncertainty Component and Uncertainty Definition Level, percent

a. Differential pressure transmitter +2.1 calibration and drift allowance

(+1.5 percent of span) multiplied

by the ratio of ambient to

operating water density.

b. Differential pressure transmitter +0.7 allowance for change in calibration due to ambient temperature change

(+0.5 percent of span for +50°F) multiplied by the density ratio.

c. Differential pressure transmitter +0.34 allowance for change in calibration due to change in system pressure

(+0.2 percent of span per 1000 psi change) multiplied by the density

ratio.

d. Differential pressure transmitter +0.7 allowance for change in calibration due to exposure to long-term

overrange (+0.5 percent of span) multiplied by the density ratio.

e. Reference leg temperature instrument +0.64 (RTD) uncertainty of +5°F and/or allowance of +5°F for the difference between the measurement and the true average temperature of

the reference leg, applied to each

vertical section of the reference

leg where a measurement is made.

Stated uncertainty is based on a

maximum containment temperature of

420°F, and a typical reference leg

installation.

Rev. 0 WOLF CREEK TABLE 18.2-4 (Sheet 2)

Uncertainty Component and Uncertainty Definition Level, percent

f. Reactor coolant density based on +

2.3 auctioneering for highest water

density obtained from hot leg

temperature (+

6 F) or system pressure (+6 psi). Magnitude of

uncertainty varies with system

pressure and water level, with

largest uncertainty occurring when

the reactor vessel is full.

g. Sensor and hydraulic isolator bellows +

1.46 displacements due to system pressure

changes or reference leg temperature

changes will introduce minor errors

in the level measurement due to the

small volumes and small bellows

spring constants. The changes, such

as pressure or temperature, tend to

cancel; i.e., the bellows associated

with each measurement move in the

same direction. Maximum expected

error due to differences in

capillary line volume and local

temperatures is equivalent to a

level change of about 5 inches, multiplied by the density ratio.

h. Density function generator output +

0.50 mismatch with ASME Steam Tables

limited to this maximum.

i. Overall uncertainty of electronics +

1.0 system calibration is limited to

less than this amount.

j. Control board indicator resolution. +

0.5 Rev 0

WOLF CREEK 18.3 EMERGENCY PREPARATIONS AND RADIATION PROTECTION

18.3.1 UPGRADE EMERGENCY PREPAREDNESS (III.A.1.1)

18.3.1.1 NRC Guidance per NUREG-0694

Position

Provide an emergency response plan in substantial compliance with NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response

Plans and Preparedness in Support of Nuclear Power Plants," except that only a

description of and completion schedule for the means for providing prompt

notification to the population (App. 3), the staffing for emergencies in

addition to that already required (Table B.1), and an upgraded meteorological

program (App. 2) need be provided. NRC will give substantial weight to Federal

Emergency Management Agency (FEMA) findings on offsite plans in judging the

adequacy against NUREG-0654. Perform an emergency response exercise to test

the integrated capability and a major portion of the basic elements existing

within emergency preparedness plans and organizations. This requirement shall

be met before issuance of a full-power license.

18.3.1.2 The Operating Agent Response

The Operating Agent has prepared and filed with the NRC on April 7, 1981 the "Radiological Emergency Response Plan for the Wolf Creek Generating Station."

This plan and subsequent revisions were prepared to meet the requirements of 10

CFR Part 50, Section 50.47 and Appendix E. The plan has been prepared with

consideration given to additional NRC emergency planning guidance presented in

NUREG-0654. Compliance with NRC requirements has been addressed in Supplement

6 to the WCGS Safety Evaluation Report, NUREG-0881.

18.3.1.3 Conclusion

The Operating Agent has provided the NRC documentation relative to the

emergency planning activities at WCGS which satisfies the requirements of 10

CFR Part 50, Section 50.47 and Appendix E, and the supplementary NRC guidance

in NUREG-0694.

18.3.2 UPGRADE EMERGENCY SUPPORT FACILITIES (III.A.1.2)

18.3.2.1 NRC Guidance Per NUREG-0578 and NUREG-0694

(A) ONSITE TECHNICAL SUPPORT CENTER (NUREG-0578, ITEM 2.2.2.b)

(See Section 18.4 for Updated Information)

18.3-1 Rev. 28 WOLF CREEK Position Each operating nuclear power plant shall maintain an onsite Technical Support Center (TSC) separate from and in close proximity to the control room that has

the capability to display and transmit plant status to those individuals who

are knowledgeable of and responsible for engineering and management support of

reactor operations in the event of an accident. The center shall be habitable

to the same degree as the control room for postulated accident conditions. The

licensee shall revise his emergency plans as necessary to incorporate the role

and location of the technical support center. Records that pertain to the as

built conditions and layout of structures, systems, and components shall be

readily available to personnel in the TSC.

Clarification (NRC Letter dated November 9, 1979)

1. By January 1, 1980, each licensee should meet items ag that follow. Each licensee is encouraged to provide additional upgrading of the TSC (items bg) as soon as practical, but no

later than January 1, 1981.

a. Establish a TSC and provide a complete description.
b. Provide plans and procedures for engineering/ management support and staffing of the TSC.
c. Install dedicated communications between the TSC and the control room, nearsite emergency operations center, and the

NRC.

d. Provide monitoring (either portable or permanent) for both direct radiation and airborne radioactive contaminants. The

monitors should provide warning if the radiation levels in

the support center are reaching potentially dangerous

levels. The licensee should designate action levels to

define when protective measures should be taken (such as

using breathing apparatus and potassium iodide tablets or

evacuation to the control room).

e. Assimilate or ensure access to technical data, including the licensee's best effort to have direct display of plant

parameters necessary for assessment in the TSC.

f. Develop procedures for performing this accident assessment function from the control room should the TSC become

uninhabitable. 18.32 Rev. 0 WOLF CREEK

g. Submit to the NRC a longer range plan for upgrading the TSC to meet all requirements.
2. Location It is recommended that the TSC be located in close proximity to the control room to ease communications and access to technical

information during an emergency. The center should be located

onsite, i.e., within the plant security boundary. The greater

the distance from the control room, the more sophisticated and

complete should be the communications and availability of

technical information. Consideration should be given to

providing key TSC personnel with a means for gaining access to

the control room.

3. Physical Size and Staffing The TSC should be large enough to house 25 persons, necessary engineering data, and information displays (TV monitors, recorders, etc.). Each licensee should specify staffing levels

and disciplines reporting to the TSC for emergencies of varying

severity.

4. Activation The center should be activated in accordance with the "Alert" level as defined in the NRC document "Draft Emergency Action Level Guidelines, NUREG0610" dated September 1979, and

currently out for public comment. Instrumentation in the TSC

should be capable of providing displays of vital plant

parameters from the time the accident began (t = 0 defined as

either reactor or turbine trip). The STA should be consulted

on the "Notification of Unusual Event." However, the

activation of the TSC is discretionary for that class of event.

5. Instrumentation The instrumentation to be located in the TSC need not meet safetygrade requirements but should be qualitatively

comparable (as regards accuracy and reliability) to that in the

control room. The TSC should have the capability to access and

display plant parameters independent from actions in the

control room. Careful consideration should be given to the

design of the interface of the TSC instrumentation to ensure

that addition of the TSC will not result in any degradation of

the control room or other plant functions. 18.33 Rev. 0 WOLF CREEK

6. Instrumentation Power Supply The power supply to the TSC instrumentation need not meet safetygrade requirements, but should be reliable and of a

quality compatible with the TSC instrumentation requirements.

To ensure continuity of information at the TSC, the power

supply provided should be continuous once the TSC is

activated. Consideration should be given to avoid loss of

stored data (e.g., plant computer) due to momentary loss of

power or switching transients. If the power supply is provided from a plant safetyrelated power source, careful attention

should be given to ensure that the capability and reliability of the safetyrelated power source is not degraded as a result

of this modification.

7. Technical Data Each licensee should establish the technical data requirements for the TSC, keeping in mind the accident assessment function

that has been established for those persons reporting to the

TSC during an emergency. As a minimum, data (historical in

addition to current status) should be available to permit the

assessment of:

a. Plant Safety System Parameters for:

(1) Reactor Coolant System

(2) Secondary System (PWRs)

(3) Emergency Core Cooling Systems

(4) Feedwater and Makeup Systems

(5) Containment

b. Inplant Radiological Parameters for:

(1) Reactor Coolant System

(2) Containment

(3) Effluent Treatment

(4) Release Paths 18.34 Rev. 0 WOLF CREEK

c. Offsite Radiological for:

(1) Meteorology

(2) Offsite Radiation Levels

8. Data Transmission In addition to providing a data transmission link between the TSC and the control room, each licensee should review current

technology as regards transmission of those parameters

identified for TSC display. Although there is not a

requirement at the present time, each licensee should

investigate the capability to transmit plant data offsite to

the Emergency Operations Center (EOC), the NRC, the reactor

vendor, etc.

9. Structural Integrity
a. The TSC need not be designed to seismic Category I requirements. The center should be well built in accordance

with sound engineering practice with due consideration to

the effects of natural phenomena that may occur at the site.

b. Since the center need not be designed to the same stringent requirements as the control room, each licensee should

prepare a backup plan for responding to an emergency from

the control room.

10. Habitability The licensee should provide protection for the TSC personnel from radiological hazards, including direct radiation and

airborne contaminants, as per General Design Criterion (GDC) 19

and SRP 6.4.

a. Licensee should ensure that personnel inside the TSC will not receive doses in excess of those specified in GDC19 and SRP 6.4 (i.e., 5 rem wholebody and 30 rem to the thyroid

for the duration of the accident). Major sources of

radiation should be considered.

b. Permanent monitoring systems should be provided to continuously indicate radiation dose rates and airborne

radioactivity concentrations inside the TSC. The monitoring

systems should include local alarms to warn personnel of

adverse conditions. 18.35 Rev. 0 WOLF CREEK Procedures must be provided which will specify appropriate protective actions

to be taken in the event that high dose rates or airborne radioactive

concentrations exist.

c. Permanent ventilation systems which include particulate and charcoal filters should be provided. The ventilation systems need not be qualified as ESF systems. The design and testing guidance of Regulatory Guide 1.52 should be followed, except that the systems do not have to be redundant, seismic, instrumented in the control room, or automatically activated. In addition, the HEPA filters need not be tested as specified in Regulatory Guide 1.52, and the HEPAs do not have to meet the QA requirements of Appendix B to 10 CFR 50. However, spare parts should be readily available and procedures in place for replacing failed components during an accident. The systems should be designed to operate from the emergency power supply.
d. Dose reduction measures such as breathing apparatus and potassium iodide tablets cannot be used as a design basis for the TSC in lieu of ventilation systems with charcoal filters. However, potassium iodide and breathing apparatus should be available.

(B) ONSITE OPERATIONAL SUPPORT CENTER (NUREG-0578, Item 2.2.2.c)

Position

An area to be designated as the onsite Operational Support Center (OSC) shall

be established. It shall be separate from the control room and shall be the

place to which the operations support personnel will report in an emergency

situation. Communications with the control room shall be provided. The

emergency plan shall be revised to reflect the existence of the center and to

establish the methods and lines of communication and management.

(C) NEAR-SITE EMERGENCY OPERATION FACILITY (NUREG-0694)

(See Section 18.4 for Updated Information)

Position

Designate a near-site emergency operations facility with communications with

the plant to provide evaluation of radiation releases and coordination of all

onsite and offsite activities during an accident.

18.3-6 Rev. 28 WOLF CREEK Provide shielding against direct radiation, ventilation isolation capability, dedicated communications with the onsite Technical Support Center, and direct

display of radiological and meteorological parameters.

18.3.2.2 The Operating Agent Response The Operating Agent prepared a detailed description of each emergency response facility: the onsite TSC, the onsite OSC, and the nearsite EOF. This report

submitted by SNUPPS letter dated June 4, 1981, contains a complete functional

system description for each facility which describes the data acquisition display and transmittal systems selected for each facility. The report, in

addition, discusses the size, location, and habitability specifications to

which the facilities have been designed. The design of the emergency

facilities for WCGS has been prepared in consideration of the 10 CFR Part 50, Appendix E legal requirement and the guidance presented in NUREG0696 and NUREG0654.NRC Generic Letter 8233, dated December 17, 1982, provided guidance for meeting regulatory requirements for, among other issues, NUREG0737, Item III.A.1.2. Based on the NRC review of the response to Generic Letter 8233 (SNUPPS letter dated April 15, 1983), a license condition was issued which

required that the TSC and EOF be operational prior to startup following the

first refueling outage at WCGS. As discussed in Supplement 4 to the WCGS Safety Evaluation Report, the NRC will conduct a postimplementation appraisal

of WCGS Emergency Response Facilities.

18.3.2.3 Conclusion The functional description of each emergency response facility at WCGS filed with the NRC on June 1, 1981 detailed the means by which the Operating Agent

meets the appropriate NRC guidance. 18.3.3 IMPROVING LICENSEE EMERGENCY PREPAREDNESS LONGTERM (III.A.2) 18.3.3.1 NRC Guidance Per NUREG0737 Each nuclear facility shall upgrade its emergency plans to provide reasonable assurance that adequate protective measures can and will be taken in the event

of a radiological emergency. Specific criteria to meet this requirement is delineated in NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation

of Radiological Emergency Response Plans and Preparation in Support of Nuclear

Power Plants." 18.37 Rev. 2 WOLF CREEK Clarification In accordance with Task Action Plan Item III.A.1.1, "Upgrade Emergency Preparedness," each nuclear power facility was required to immediately upgrade

its emergency plans with criteria provided October 10, 1979, as revised by NUREG0654 (FEMAREP1, issued for interim use and comment, January 1980). New

plans were submitted by January 1, 1980, using the October 10, 1979 criteria.

Reviews were started on the upgraded plans using NUREG0654. Concomitant to

these actions, amendments were developed to 10 CFR Part 50 and Appendix E to 10 CFR Part 50, to provide the longterm implementation requirements. These new

rules were issued in the Federal Register on August 19, 1980, with an effective

date of November 3, 1980. The revised rules delineate requirements for

emergency preparedness at nuclear reactor facilities. NUREG0654 (FEMAREP1), "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear

Power Plants," provides detailed items to be included in the upgraded emergency

plans and, along with the revised rules, provides for meteorological criteria, means for providing for a prompt notification to the population, and the need for emergency response facilities (see Item III.A.1.2 [of NUREG0737]).

Implementation of the new rules levied the requirement for the licensee to provide procedures implementing the upgraded emergency plans to the NRC for review. Publication of Revision 1 to NUREG0654 (FEMAREP1) which incorporates

the many public comments received is expected in October 1980. This is the

document that will be used by the NRC and FEMA in their evaluation of emergency

plans submitted in accordance with the new NRC rules. NUREG0654, Revision 1; NUREG0696, "Functional Criteria for Emergency Response Facilities;" and the amendments to 10 CFR Part 50 and Appendix E to 10 CFR Part

50 regarding emergency preparedness, provide more detailed criteria for

emergency plans, design, and functional criteria for emergency response

facilities and establishes firm dates for submission of upgraded emergency

plans for installation of prompt notification systems. These revised criteria

and rules supersede previous Commission guidance for the upgrading of emergency

preparedness at nuclear power facilities. Revision 1 to NUREG0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear

Power Plants," provides meteorological criteria to fulfill, in part, the

standard that "Adequate methods, systems, and equipment for assessing and

monitoring actual or potential offsite consequences of a radiological emergency

condition are in 18.38 Rev. 0 WOLF CREEK use" (see 10 CFR 50.47). The position in Appendix 2 to NUREG0654 outlines four essential elements that can be categorized into three functions:

measurements, assessment, and communications.

Proposed Revision 1 to Regulatory Guide 1.23, "Meteorological Measurements Programs in Support of Nuclear Power Plants," has been adopted to provide

guidance criteria for the primary meteorological measurements program

consisting of a primary system and secondary system(s) where necessary, and a

backup system. Data collected from these systems are intended for use in the

assessment of the offsite consequences of a radiological emergency condition. Appendix 2 to NUREG0654 delineates two classes of assessment capabilities to provide input for the evaluation of offsite consequences of a radiological

emergency condition. Both classes of capabilities provide input to decisions

regarding emergency actions. The Class A capability should provide information

to determine the necessity for notification, sheltering, evacuation, and, during the initial phase of a radiological emergency, making confirmatory

radiological measurements. The Class B capability should provide information

regarding the placement of supplemental meteorological monitoring equipment, and the need to make additional confirmatory radiological measurements. The

Class B capability shall identify the areas of contaminated property and

foodstuff requiring protective measures and may also provide information to

determine the necessity for sheltering and evacuation.

Proposed Revision 1 to Regulatory Guide 1.23 outlines the set of meteorological measurements that should be accessible from a system that can be interrogated;

the meteorological data should be presented in the prescribed format. The

results of the assessments should be accessible from this system; this information should incorporate humanfactors engineering in its display to

convey the essential information to the initial decision makers and subsequent

management team. An integrated system should allow the eventual incorporation

of effluent monitoring and radiological monitoring information with the

environmental transport to provide direct dose consequence assessments. Requirements of the new emergencypreparedness rules under Paragraphs 50.47 and 50.54 and the revised Appendix E to Part 50 taken together with NUREG0654 Revision 1 and NUREG0696, when approved for issuance, go beyond the previous

requirements for meteorological programs. To provide a realistic time frame

for implementation, a staged schedule has been established with compensating

actions provided for interim measures. 18.39 Rev. 0 WOLF CREEK 18.3.3.2 The Operating Agent Response See Section 18.3.1.2.

18.3.3.3 Conclusion See Section 18.3.1.3.

18.3.4 INTEGRITY OF SYSTEMS OUTSIDE OF CONTAINMENT (III.D.1.1) 18.3.4.1 NRC Guidance Per NUREG0737 Position Applicants shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to aslowaspractical levels. This program

shall include the following:

1. Immediate leak reduction
a. Implement all practical leak reduction measures for all systems that could carry radioactive fluid outside of

containment.

b. Measure actual leakage rates with system in operation and report them to the NRC. 2. Continuing Leak Reduction Establish and implement a program of preventive maintenance to reduce leakage to as lowaspractical levels. This program shall include periodic

integrated leak tests at intervals not to exceed each

refueling cycle.

Clarification Applicants shall provide a summary description, together with initial leaktest results, of their program to reduce leakage from systems outside the

containment that would or could contain primary coolant or other highly

radioactive fluids or gases during or following a serious transient or

accident. 1. Systems that should be leak tested are as follows (any other plant system which has similar functions or postaccident

characteristics, even though not specified herein, should be

included): 18.310 Rev. 0 WOLF CREEK Residual heat removal (RHR)

Containment spray recirculation

High-pressure injection recirculation

Containment and primary coolant sampling

Reactor core isolation cooling

Makeup and letdown (PWRs only)

Waste gas (includes headers and cover gas system outside of the

containment in addition to decay or storage system)

Include a list of systems containing radioactive materials

which are excluded from program and provide justification for

exclusion.

2. Testing of gaseous systems should include helium leak

detection or equivalent testing methods.

3. Should consider program to reduce leakage potential release

paths due to design and operator deficiencies as discussed in

our letter to all operating nuclear power plants regarding

North Anna and related incidents dated October 17, 1979.

18.3.4.2 The Operating Agent Response

This defines the operating agent's program to reduce leakage from those

portions of systems outside containment that could contain highly radioactive

fluids during a serious transient or accident to as low as practical levels.

The systems considered include the recirculation portion of the containment

spray system, safety injection system, chemical and volume control system,and residual heat removal system. The program is as follows:

1. General Practical Leak Reduction Measures

Operations, via their normal duties and responsibilities, perform routine rounds in the auxiliary and radwaste buildings. These help

assure the integrity of systems which routinely contain radioactive

fluids or gases. Identification of leakage and initiation of

appropriate corrective is one of the objectives of routine operator

rounds, consistent with keeping occupational and routine releases

as low as reasonable achievable.

Maintenance, as directed by the corrective action program, performs repair/rework on all components as needed to correct leaks.

18.3-11 Rev. 29 WOLF CREEK 2. Periodic Visual Inspection

In accordance with administrative procedures, Operations performs a periodic visual inspection, on a refueling cycle basis, of the

recirculation portion of the containment spray system, safety

injection system, chemical and volume control system and residual

heat removal system. These procedures require measurement of leakage rates and initiation of corrective action for any and all

detectable leaks.

3. Additional Programs Resulting in Detection and Reduction of Leakage

WCNOC has a Managed Maintenance Program, which includes preventive maintenance activities based on experience, engineering judgment, inspection, testing and replacement of items which have a specific

lifetime such as wear rings, bearings, seals, and packing.

WCNOC is also committed to ASME Section XI Inservice Inspection Program using the ASME Code.

A description of the WCGS program is documented in KMLNRC 84-46, dated March

30, 1984. Amendment No. 137 eliminated the requirements for PASS. The PASS

system has been abandoned in place.

18.3.4.3 Conclusion

The WCGS design includes provisions to insure the integrity of fluids systems

which are postulated to contain highly contaminated fluids following a design

basis accident. The provision is based on the preservice and inservice tests

required by the ASME Code and programmatic controls implemented by the

Operating Agent. These provisions provide assurance that these systems perform

their intended functions, including leaktightness, following a design basis

accident. This commitment satisfies Item III.D.1.1 of NUREG-0737 and Amendment

No. 137.

18.3.5 IMPROVED INPLANT IODINE INSTRUMENTATION UNDER ACCIDENT

CONDITIONS (III.D.3.3)

18.3.5.1 NRC Guidance Per NUREG-0737

Position

a. Each licensee shall provide equipment and associated training

and procedures for accurately determining the airborne iodine

concentration in areas within the facility where plant

personnel may be present during an accident.

18.3-12 Rev. 29 WOLF CREEK b. Each applicant for a fuelloading license to be issued prior to January 1, 1981 shall provide the equipment, training, and

procedures necessary to accurately determine the presence of

airborne radioiodine in areas within the plant where plant

personnel may be present during an accident.

Clarification

Effective monitoring of increasing iodine levels in the buildings under accident conditions must include the use of portable instruments using sample

media that will collect iodine selectively over xenon (e.g., silver zeolite)

for the following reasons:

a. The physical size of the auxiliary and/or fuel handling building precludes locating stationary monitoring

instrumentation at all areas where airborne iodine

concentration data might be required.

b. Unanticipated isolated "hot spots" may occur in locations where no stationary monitoring instrumentation is located.
c. Unexpectedly high background radiation levels near stationary monitoring instrumentation after an accident may interfere

with filter radiation readings.

d. The time required to retrieve samples after an accident may result in high personnel exposures if these filters are located in highdoserate areas.

After January 1, 1981, each applicant and licensee shall have the capability to remove the sampling cartridge to a lowbackground, lowcontamination area for

further analysis. Normally, counting rooms in auxiliary buildings will not

have sufficiently low backgrounds for such analyses following an accident. In

the low background area, the sample should first be purged of any entrapped

noble gases using nitrogen gas or clean air free of noble gases. The licensee

shall have the capability to measure accurately the iodine concentrations

present on these samples under accident conditions. There should be sufficient

samplers to sample all vital areas. For applicants with fuelloading dates prior to January 1, 1981, provide by fuel loading (until January 1, 1981) the capability to accurately detect the

presence of iodine in the region of interest following an accident. This can be accomplished by using a portable or cartmounted iodine sampler with attached singlechannel analyzer (SCA). The SCA window should be calibrated to the 365 KeV of iodine131, using the SCA. This will give an initial

conservative estimate of presence of iodine and can be used to determine if

respiratory protection is required. Care must be taken to assure that the

counting system is not saturated as a result of too much activity collected on

the sampling cartridge. 18.313 Rev. 12 WOLF CREEK 18.3.5.2 The Operating Agent Response The Operating Agent provides iodine monitoring capability as specified in the following paragraphs.

During accident conditions, sampling cartridges removed from air samplers will be purged with air or nitrogen to remove noble gases. Purging will be done

under an appropriate ventilation hood. Cartridges will then be taken to the

counting room for isotopic analysis using a high purity Germanium detector and

a multichannel analyzer to accurately determine the radioiodine concentrations.

If, due to the accident conditions, the normal counting room is unavailable or

unaccessible, an alternate low background counting room in the shop building

will be used.

Depending upon the conditions at the time of sampling, the sample media may be charcoal or silver zeolite cartridges. The appropriate sample media will be

determined on the basis of sampling environment and the efficiency of the media

for collection of radiohalogens, particulates and noble gases.

Procedures are based on specific equipment purchased by the Operating Agent. A training program has been developed and includes the review of procedures and

demonstration of methods by personnel responsible for air sample collection, preparation and counting/analysis to assure proficiency in determining radioiodine concentrations during accident and postaccident conditions.

18.3.5.3 Conclusion See Section 18.3.1.3.

18.3.6 CONTROL ROOM HABITABILITY (III.D.3.4) 18.3.6.1 NRC Guidance Per NUREG0737 In accordance with Task Action Plan Item III.D.3.4 and control room habitability, licensees shall ensure that control room operators will be

adequately protected against the effects of accidental release of toxic and

radioactive gases and that the nuclear power plant can be safely operated or

shut down under design basis accident conditions (Criterion 19, "Control Room,"

of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR

Part 50).

Clarification

1. All licensees must make a submittal to the NRC regardless of whether or not they met the criteria of the referenced

Standard Review Plans (SRP) sections. The new clarification

specifies that licensees that meet the criteria of the SRPs

should provide the basis for their conclusion that SRP 6.4

requirements are met. Licensees may establish this basis by

referencing past submittals to the NRC and/or providing new

or additional information to supplement past submittals.

2. All licensees with control rooms that meet the criteria of the following sections of the Standard Review Plan: 2.2.12.2.2 Identification of Potential Hazards in Site Vicinity, 2.2.3 Evaluation of Potential Accidents, and

6.4 Habitability System 18.314 Rev. 12 WOLF CREEK shall report their findings regarding the specific SRP sections as explained below. The following documents should be used for

guidance:

a. Regulatory Guide 1.78, "Assumptions for Evaluating the habitability of a Nuclear Power Plant Control Room During a

Postulated Hazardous Chemical Release;" b. Regulatory Guide 1.95, "Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine

Release;" and, c. K. G. Murphy and K. M. Campe, "Nuclear Power Plant Control Room Ventilation System Design for Meeting General Design

Criterion 19," 13th AEC Air Cleaning Conference, August

1974.

Licensees shall submit the results of their findings as well as the basis for those findings by January 1, 1981. In providing

the basis for the habitability finding, licensees may reference

their past submittals. Licensees should, however, ensure

that these submittals reflect the current facility design and that the information requested in Attachment 1, to NUREG0737, item III.D.3.4 is

provided.

3. All licensees with control rooms that do not meet the criteria of the abovelisted references, Standard Review

Plans, Regulatory Guides, and other references.

These licensees shall perform the necessary evaluations and identify appropriate modifications.

Each licensee submittal shall include the results of the analyses of control room concentrations from postulated accidental release of toxic gases and

control room operator radiation exposures from airborne radioactive material and direct radiation resulting from designbasis accidents. The toxic gas

accident analysis should be performed for all potential hazardous chemical releases occurring either on the site or within 5 miles of the plantsite

boundary. Regulatory Guide 1.78 lists the chemicals most commonly encountered

in the evaluation of control room habitability but is not all inclusive. The designbasisaccident (DBA) radiation source term should be for the lossofcoolant accident (LOCA) containment leakage and engineered safety feature (ESF) leakage contribution outside the containment, as described in Appendix A and B of Standard Review Plan Chapter 15.6.5. In addition, boilingwater

reactor (BWR) facility evaluations should add any leakage from the main steam isolation valves (MSIV) (i.e., valvestem leakage, valve seat leakage, main

steam isolation valve leakage control system release) to the containment

leakage and ESF leakage following a LOCA. This should not be construed as

altering the staff recommendations in Section D of Regulatory Guide 1.96 (Rev.

2) regarding MSIV leakagecontrol systems. Other DBAs should be reviewed to determine whether they might constitute a moresevere control room hazard than

the LOCA. 18.315 Rev. 12 WOLF CREEK In addition to the accident-analysis results, which should either identify the possible need for control room modifications or provide assurance that the

habitability systems will operate under all postulated conditions to permit the

control room operators to remain in the control room to take appropriate

actions required by General Design Criterion 19, the licensee should submit

sufficient information needed for an independent evaluation of the adequacy of

the habitability systems. Attachment 1 lists the information that should be

provided along with the licensee's evaluation.

18.3.6.2 The Operating Agent Response The safety design bases for the habitability system for the control room are defined in Section 6.4. This section also discusses the applicable

recommendations of Regulatory Guides 1.78, and 1.95. The results of dose

calculations for a design basis loss-of-coolant accident release are presented

in Section 15.6.5 and 15A.3.

The design of the habitability system for the control room envelope meets the appropriate recommendations of Regulatory Guide 1.78 and 1.95 and requirements

of GDC-19.

18.3.6.3 Conclusion The design of the control room habitability system meets the recommendations of item III.D.3.4 of NUREG-0737.

18.3-16 Rev. 28 WOLF CREEK 18.4 ENHANCEMENTS TO EMERGENCY PREPAREDNESS REGULATIONS 18.4.1 EMERGENCY FACILITIES AND EQUIPMENT 18.4.1.1 10CFR50, Appendix E, Section IV, E Position The NRC updated 10CFR50, Appendix E, Section IV, E, in 2011 providing revised requirements for emergency facilities and associated equipment.

18.4.1.2 The Operating Agent Compliance for EOF and Alternate TSC The Operating Agent has constructed an off-site Emergency Operations Facility and Alternate Technical Support Center (TSC) whuch replaces previously existing facilities in compliance with 10CFR50, Appendix E, Section IV, E.

The building facility is located approximately 11 miles northwest of the plant and approximately 1/4 mile southwest of te intersection fo US Highway 75 and Interstate 35 (locally referred as BETO Junction). This building facility and its operation are intended to fully meet the requirements of the applicable regulations. Details of te facility are provided in the comprehensive emergency plan and applicable site procedures. The facility was declared operational prior to December 23, 2014, as required.

18.4.1.3 Conclusion The Operating Agent has established an operational off-site EOF and Alternate TSC which meets requirements of the applicable regulations.

18.4-1 Rev. 28 Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-1 Rev. 29 License Renewal Application A0 APPENDIX A INTRODUCTION AND LICENSE RENEWAL COMMITMENTS Introduction This appendix provides the information submitted in an Updated Safety Analysis Report Supplement as required by 10 CFR 54.21(d) for the WCGS License Renewal application. Section A1 of this appendix contains summary descriptions of the programs used to manage the effects of aging during the period of extended operation. Section A2 contains summary descriptions of programs used for management of time-limited aging analyses during the period of extended operation.

Section A3 contains evaluation summaries of Time Limited Aging Analyses (TLAAs) for the period of extended operation.

During the review of the WCGS Unit 1 license renewal application (LRA) by the staff of the NRC, WCNOC made commitments related to aging management programs to manage aging effects for structures and components. The following pages list these commitments.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-2 Rev. 30 License Renewal Application A1

SUMMARY

DESCRIPTIONS OF AGING MANAGEMENT PROGRAMS The integrated plant assessment and evaluation of time-limited aging analyses (TLAA) identified existing and new aging management programs necessary to provide reasonable assurance that components within the scope of License Renewal will continue to perform their intended functions consistent with the current licensing basis (CLB) for the period of extended operation. Sections A1 and A2 describe the programs and their implementation activities. Three elements common to all aging management programs discussed in Sections A1 and A2 are corrective actions, confirmation process, and administrative controls. These elements are included in the WCNOC Quality Assurance (QA) Program, which implements the requirements of 10 CFR 50, Appendix B and are applicable to the safety-related and nonsafety-related systems, structures and components that are subject to aging management review activities.

A1.1 ASME SECTION XI INSERVICE INSPECTION, SUBSECTIONS IWB, IWC, AND IWD ASME Section XI Inservice Inspection, Subsections IWB, IWC, & IWD inspections are performed to manage aging in Class 1, 2, and 3 piping and components within the scope of license renewal. The program includes periodic visual, surface, volumetric examinations and leakage tests of Class 1, 2 and 3 pressure-retaining components, including welds, pump casings, valve bodies, integral attachments, and pressure-retaining bolting. WCGS inspections meet ASME Section XI requirements and can manage aging such as cracking, surface and subsurface discontinuities, loss of material, loss of fracture toughness, and physical damage. The WCGS ISI Program is in accordance with 10 CFR 50.55a. In accordance with 10CFR 50.55a (g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest Edition and Addenda of the Code specified twelve months before the start of the inspection interval.

A1.2 WATER CHEMISTRY The Water Chemistry program includes maintenance of the chemical environment in the reactor coolant system and related auxiliary systems containing treated borated water and includes maintenance of the chemical environment in the steam generator secondary side and the secondary cycle systems to limit loss of material and cracking.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-3 Rev. 30 License Renewal Application The Water Chemistry Program is based upon the EPRI primary and secondary water chemistry guidelines.

A1.3 REACTOR HEAD CLOSURE STUDS The Reactor Head Closure Studs p rogram includes periodic visual, surface, and volumetric examinations of reactor vessel flange stud hole threads, reactor head closure studs, nuts, and washers and performs visual inspection of the reactor vessel flange closure during primary system leakage tests. The program implements ASME

Section XI code, Subsection IWB, same Edition and Addenda as the WCGS ISI Program per 10 CFR 50.55a(g)(4)(ii), and detects reactor vessel stud, nut and washer cracking, loss of material due to wear and corrosion, and reactor coolant leakage from the reactor vessel

flange.

A1.4 BORIC ACID CORROSION The Boric Acid Corrosion program manages loss of material due to boric acid corrosion. The program includes provisions to identify, inspect, examine and evaluate leakage, and initiate corrective actions. The program relies in part on implementation of

recommendations of NRC Generic Letter 88-05, "Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR plants." Additionally, the program includes examinations conducted during ISI pressure tests performed in accordance with ASME Section XI requirements. The program addresses operating experience noted in NRC Regulatory Issue Summary 2003, "NRC Review of Responses to Bulletin 2002-01, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity." Prior to the period of extended operation, procedures will be enhanced to state that susceptible components adjacent to potential leakage sources will include electrical components and connectors.

A1.5 NICKEL-ALLOY PENETRATION NOZZLES WELDED TO THE UPPER REACTOR VESSEL CLOSURE HEADS OF PRESSURIZED WATER

REACTORS Wolf Creek's Nickel Alloy Aging Management Program (A1.34) includes the Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-4 Rev. 30 License Renewal Application A1.6 Flow-Accelerated Corrosion The Flow-Accelerated Corrosion (FAC) program manages aging effects of wall thinning due to FAC on the internal surfaces of carbon or

low alloy steel piping, elbows, reducers, expanders, and valve bodies which contain high energy fluids (both single phase and two phases).

The objectives of the FAC program are achieved by (a) identifying system components susceptible to FAC, (b) an analysis using a predictive code such as CHECWORKS to determine critical locations for inspection and evaluation, (c) providing guidance of follow-up inspections, (d) repairing or replacing components, as determined by the guidance provided by the program, and (e) continual evaluation and incorporation of the latest technologies, industry and plant in-house operating experience.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-5 Rev. 29 License Renewal Application Procedures and methods used by the FAC program are consistent with WCGS commitments to NRC Bulletin 87-01, "Thinning of Pipe Wall in Nuclear Power Plants," and NRC Generic Letter 89-08, "Erosion/Corrosion-Induced Pipe Wall Thinning." A1.7 BOLTING INTEGRITY The Bolting Integrity program manages the aging effects of cracking, loss of material, and loss of preload for pressure retaining bolting and ASME component support bolting. The program includes preload control, selection of bolting material, use of lubricants/sealants consistent with EPRI good bolting practices, and performance of periodic inspections for indication of aging techniques. The program also includes the inservice inspection requirements established in

accordance with ASME Section XI, Subsections IWB, IWC, IWD, and IWF for ASME Class bolting. WCGS good bolting practices are established in accordance with plant procedures. These procedures include requirements for proper disassembling, inspecting, and assembling of connections with threaded fasteners. The general practices that are established in this program are consistent with EPRI NP-5067, "Good Bolting Practices, Volume 1 and Volume 2," and EPRI TR-104213, "Bolted Joint Maintenance and Applications Guide." A1.8 STEAM GENERATOR TUBE INTEGRITY The Steam Generator Tube Integrity program includes the preventive measures, condition monitoring inspections, degradation assessment, repair and leakage monitoring activities necessary to manage cracking and loss of material. The aging management measures employed include non-destructive examination, visual inspection, sludge removal, tube plugging, in-situ pressure testing, maintaining the chemistry environment by removal of impurities and addition of chemicals to control pH and oxygen. NDE inspection scope and frequency, and primary to secondary leak rate monitoring are conducted consistent with the requirements of WCGS Unit 1 Technical Specifications. Structural integrity limits

consistent with Regulatory Guide 1.121, Revision 0, "Bases for Plugging Degraded PWR Steam Generator Tubes," are applied. Steam generator management practices are consistent with NEI 97-06 "Steam Generator Program Guidelines". Program deviations from NEI 97-06 Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-6 Rev. 29 License Renewal Application are prepared and approved in accordance with NEI 97-06 and EPRI steam generator management program guidance. A1.9 OPEN-CYCLE COOLING WATER SYSTEM The Open-Cycle Cooling Water (OCCW) System program manages loss of material and reduction of heat transfer for components exposed to

raw water. The program includes chemical treatment and control of biofouling; heat exchanger performance testing; and periodic inspections to ensure that the effects of aging will be managed on the OCCW systems or structures and components serviced by the OCCW systems for the period of extended operation. The program is consistent with commitments as established in WCGS responses to NRC Generic Letter 89-13 "Service Water System Problems Affecting Safety-Related Components." The Open-Cycle Cooling Water System program provides the general requirements for implementation and maintenance of programs and activities which mitigate aging of OCCW systems and components. The various aspects of the WCGS program (control, monitoring, maintenance and inspections) are implemented in station procedures. A1.10 CLOSED-CYCLE COOLING WATER SYSTEM The Closed-Cycle Cooling Water System Program manages loss of material, cracking, and reduction in heat transfer for components in closed cycle cooling water systems. The program includes maintenance of system corrosion inhibitor concentrations and chemistry parameters following the guidance of EPRI TR-107396 to minimize aging, and periodic testing and inspections to evaluate system and component performance. Inspection methods include visual, ultrasonic testing (UT) and eddy current testing (ECT).

Prior to the period of extended operation, a new periodic preventive maintenance activity will be developed to specify performing inspections of the internal surfaces of valve bodies and accessible piping while the valves are disassembled for operational readiness

inspections to detect loss of material and fouling. The acceptance criteria will be specified in this preventive maintenance activity. In addition, visual inspection procedures used for identification of stress corrosion cracking will be enhanced to define cracking, provide additional guidance for detection of cracking and identify specific acceptance criteria relating to "as-found" cracking.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-7 Rev. 29 License Renewal Application A1.11 INSPECTION OF OVERHEAD HEAVY LOAD AND LIGHT LOAD (RELATED TO REFUELING) HANDLING SYSTEMS The Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems program manages the loss of material due to corrosion and the effects of rail wear for all cranes, trolley

structural components and applicable rails within the scope of license renewal. The program is implemented through periodic visual inspections of components. Crane inspection activities verify structural integrity of the crane components required to maintain the crane intended function. Visual inspections assess conditions such as loss of material due to corrosion of structural members, misalignment, flaking, side wear of rails, loose tie down bolts and excessive wear or deformation of monorails. The inspection requirements are consistent with the guidance provided by NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" for load handling systems that handle heavy loads which can directly or indirectly cause a release of radioactive material, applicable industry standards (such as CMAA Spec 70 and ANSI B30.11) for other cranes within the scope of license renewal, and applicable OSHA regulations (such as 29 CFR Volume XVII, Part 1910 and Section 1910.179). Prior to the period of extended operation, procedures will be enhanced to identify industry standards or WCGS specifications that are applicable to the component and to specifically inspect for loss of material due to corrosion or rail wear. A1.12 FIRE PROTECTION The Fire Protection program manages loss of material for fire rated doors, fire dampers, diesel-driven fire pump, and the halon fire suppression system, cracking, spalling, and loss of material for fire barrier walls, ceilings, and floors, hardness and shrinkage due to weathering of fire barrier penetration seals, and hardness - loss of strength for halon fire suppression system flexible hoses.

Periodic visual inspections of fire barrier penetration seals, fire

dampers, fire barrier walls, ceilings and floors, and periodic visual inspections and functional tests of fire-rated doors are performed. The internal surface of the diesel-driven fire pump fuel

oil supply line is managed by the Fuel Oil Chemistry program (A1.14), which utilizes the One-Time Inspection program (A1.16) to verify the effectiveness of the Fuel Oil Chemistry program using a Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-8 Rev. 29 License Renewal Application representative sample of components in systems that contain fuel oil, ensuring that there is no loss of function due to aging of the fuel oil supply line. Drop tests on approximately 10 percent of accessible horizontal and vertical fire dampers are performed on an 18 month basis. Fire dampers that are inaccessible for drop testing are visually inspected to assess integrity/availability. Visual inspections are performed on fire-rated doors at least once per year to verify the integrity of door surfaces and for clearances to detect aging of the fire doors. A visual inspection and function test of the halon fire suppression system is performed every 18 months. Approximately 10 percent of each type (electrical and mechanical as practical) of penetration seal is visually inspected at least once every 18 months. Fire barrier walls, ceilings, and floors including coatings and wraps (structural steel fireproofing, raceway fire wrap and

hatch covers) are visually inspected at least once every 18 months. Prior to the period of extended operation, fire damper inspection and drop test procedures will be enhanced to inspect damper housing for signs of corrosion and to specify fire barriers and doors described in USAR Appendix 9.5A, "WCGS Fire Protection Comparison to APCSB 9.5-1 Appendix A," and WCGS Fire Hazards Analysis. Training for technicians performing the fire door and fire damper visual

inspections will be enhanced to include fire protection inspection requirements and training documentation.

Prior to the period of extended of operation, halon fire suppression system inspection procedures will be enhanced to include visual inspection of halon tank flexible hoses for hardening - loss of strength. Visual inspections would not be required for flexible hoses that have scheduled periodic replacement intervals. A1.13 FIRE WATER SYSTEM The Fire Water System program manages loss of material for water-based fire protection systems. Periodic hydrant inspections, fire main flushing, sprinkler inspections, and flow tests are performed

considering applicable National Fire Protection Association (NFPA) codes and standards. Nuclear Electric Insurance Limited (NEIL) performance based guidance is utilized for fire protection system inspection, testing, and maintenance intervals. The fire water system discharge pressure is continuously monitored such that loss of system pressure is immediately detected and corrective actions Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-9 Rev. 29 License Renewal Application are initiated. The Fire Water System program conducts an air or water flow test through each open head spray/sprinkler head to verify that each open head spray/sprinkler nozzle is unobstructed.

The Fire Water System program tests a representative sample of fire protection sprinkler heads or replaces those that have been in service for 50 years, using the guidance of NFPA 25, 2002 Edition, and tests at 10 year intervals thereafter during the period of extended operation to ensure that signs of aging are detected in a timely manner. Visual inspections of the fire protection system exposed to water, evaluating wall thickness to identify evidence of loss of material due to corrosion, are covered by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (A1.22). A1.14 FUEL OIL CHEMISTRY The Fuel Oil Chemistry program manages loss of material on the internal surface of components in the emergency diesel fuel oil storage and transfer system and diesel fire pump fuel oil system.

The program includes (a) surveillance and monitoring procedures for maintaining fuel oil quality by controlling contaminants in accordance with applicable ASTM Standards, (b) periodic draining of

water from fuel oil tanks, (c) visual inspection of internal surfaces during periodic draining and cleaning of fuel oil tanks in the emergency diesel fuel oil storage and transfer system, (d) ultrasonic wall thickness measurements from external surfaces of fuel oil tanks, (e) one-time ultrasonic (UT) or pulsed eddy current (PEC) thickness examination on the external surface of the diesel fire pump fuel oil tank, (f) inspection of new fuel oil before it is introduced into the storage tanks, and (g) one-time inspections of a representative sample of components in systems that contain fuel oil

by the One-Time Inspection program.

Prior to the period of extended operation, the emergency fuel oil day tanks will be added to the ten year drain, clean, and internal inspection program. Procedures will be enhanced to provide for supplemental ultrasonic thickness measurements if there are indications of reduced cross sectional thickness found during the visual inspection of the emergency fuel oil storage tanks.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-10 Rev. 29 License Renewal Application A1.15 Reactor Vessel Surveillance The Reactor Vessel Surveillance program is consistent with ASTM E 185. Actual reactor vessel coupons are used, but an exemption in the original license permits use of other than beltline weld material for the weld coupons. The surveillance coupons are tested by a qualified offsite vendor, to its procedures. The testing program and reporting conform to requirements of 10 CFR 50 Appendix H. The schedule has been revised by removal of the last two coupon sets to the spent fuel pool, at exposures greater than those expected at the beltline wall at 60 years. This withdrawal therefore meets the ASTM E 185-82 criterion which states that capsules may be removed when the capsule neutron fluence is between one and two times the limiting fluence calculated for the vessel at the end of expected life. Vessel fluence is now determined by ex-vessel dosimetry. This schedule change has been approved by the NRC, as required by 10 CFR 50 Appendix H, "Reactor Vessel Material Surveillance Program

Requirements." A1.16 ONE-TIME INSPECTION The One-Time Inspection program conducts one-time inspections of plant system piping and components to verify the effectiveness of

the Water Chemistry program (A1.2), Fuel Oil Chemistry program (A1.14), and Lubricating Oil Analysis program (A1.23). The aging

effects to be evaluated by the One-Time Inspection program are loss of material, cracking, and reduction of heat transfer. The One-Time Inspection program determines non-destructive examination (NDE)

sample size for each material-environment group using established statistical methodologies and selects piping/component inspection locations within the sample that are based on service period, operating conditions, and design margins. The One-Time Inspection program specifies corrective actions and increased sampling of components if aging effects are found.

This new program will be implemented and completed within the ten year period prior to the period of extended operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-11 Rev. 29 License Renewal Application A1.17 Selective Leaching of Materials The Selective Leaching of Materials program manages the loss of material due to selective leaching for brass (>15% zinc) and gray cast iron components exposed to raw water or closed-cycle cooling water within the scope of license renewal. The Selective Leaching of Materials program is in addition to the Open Cycle Cooling Water

program and the Closed Cycle Cooling Water program in these cases. The program includes a one-time inspection (visual and mechanical methods) of a selected sample of component internal surfaces to determine whether loss of material due to selective leaching is occurring. If indications of selective leaching are confirmed, follow up examinations or evaluations are performed.

The Selective Leaching of Materials program is a new program that will be implemented prior to the period of extended operation. A1.18 BURIED PIPING AND TANKS INSPECTION The Buried Piping and Tanks Inspection program manages loss of material of buried components in the essential service water system, emergency diesel engine fuel oil storage and transfer system, auxiliary feedwater system, high pressure coolant injection system (borated refueling water storage system), and the fire protection system. Visual inspections monitor the condition of protective

coatings and wrappings found on carbon steel, gray cast iron or ductile iron components and assess the condition of stainless steel components with no protective coatings or wraps. The program includes opportunistic inspection of buried piping and tanks as they are excavated or on a planned basis if opportunistic inspections have not occurred. The Buried Piping and Tanks Inspection program is a new program that will be implemented prior to the period of extended of operation.

Within the ten year period prior to entering the period of extended operation, an opportunistic or planned inspection will be performed.

Upon entering the period of extended operation a planned inspection within ten years will be required unless an opportunistic inspection has occurred within this ten year period.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-12 Rev. 30 License Renewal Application A1.19 ONE-TIME INSPECTION OF ASME CODE CLASS 1 SMALL-BORE PIPING The One-Time Inspection of ASME Code Class 1 Small-Bore Piping program manages cracking of stainless steel ASME Code Class 1 piping less than or equal to 4 inches and greater than or equal to 1 inch. This program is a part of the WCGS Risk-Informed Inservice

Inspection (RI-ISI) program.

For ASME Code Class 1 small-bore piping, the RI-ISI program requires volumetric examinations (by ultrasonic testing) on selected weld

locations to detect cracking. Weld locations are selected based on the guidelines provided in EPRI TR-112657. Ultrasonic examinations are conducted in accordance with ASME Section XI with acceptance

criteria from Paragraph IWB-3131 and IWB-2430.

The fourth interval of the ISI program at WCGS will provide the results for the one time

inspection of ASME Code Class 1 small-bore piping. A1.20 EXTERNAL SURFACES MONITORING PROGRAM The External Surfaces Monitoring Program manages loss of material for external surfaces of steel components and hardening and loss of strength for elastomers in ventilation and mechanical systems. The External Surfaces Monitoring Program consists of periodic visual inspections for aging management of loss of material, leakage, elastomer hardening and loss of strength. Loss of material for external surfaces is managed by the Boric Acid Corrosion program (A1.4) for components in a system with treated borated water or reactor coolant environment on which boric acid corrosion may occur, Buried Piping and Tanks Inspection program (A1.18) for buried components, and Structures Monitoring Program (A1.32) for supports, structural items, and electrical components. A1.21 FLUX THIMBLE TUBE INSPECTION The Flux Thimble Tube Inspection program performs wall thickness eddy current testing of all flux thimble tubes that form part of the reactor coolant system pressure boundary.

The pressure boundary includes the length of the tube inside the reactor out to the seal fittings outside the reactor vessel. Eddy current testing is performed on the portion of the tubes inside the reactor vessel.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-13 Rev. 30 License Renewal Application The program implements the recommendations of NRC Bulletin 88-09, "Thimble Tube Thinning in Westinghouse Reactors." During each refueling outage, flux thimble tube wear is evaluated and inspections are performed based on evaluation results. Wall thickness measurements are trended and wear rates are calculated.

If the predicted wear (as a measure of percent through wall) for a given flux thimble tube is projected to exceed the established acceptance criteria prior to the next outage, corrective actions are taken to reposition, cap or replace the tube. A1.22 INSPECTION OF INTERNAL SURFACES IN MISCELLANEOUS PIPING AND DUCTING COMPONENTS The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program manages cracking, loss of material and hardening - loss of strength. Visual inspections of the internal surfaces of piping, piping components, ducting and other components that are not covered by other aging management programs is included

in this program. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program uses the work control process to conduct and document inspections. The program performs visual inspections

during periodic maintenance, predictive maintenance, surveillance testing and corrective maintenance to detect aging effects that could result in a loss of component intended function. For those

systems or components where inspections of opportunity are insufficient, an inspection will be conducted prior to the period of extended operation to provide reasonable assurance that the intended

functions are maintained. The Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program is a new program that will be implemented prior to the period of extended operation. A1.23 LUBRICATING OIL ANALYSIS The Lubricating Oil Analysis program manages loss of material and reduction of heat transfer for components within the scope of license renewal. The program maintains lubricating oil contaminants Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-14 Rev. 29 License Renewal Application Additionally, ferrography is performed on oil samples for trending of wear particle concentrations for the reactor coolant pumps upper and lower bearing oil and other components. Monitoring and trending of lubricating oil analysis results identifies component aging prior

to loss of component intended function. A1.24 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the aging effects of embrittlement, melting, cracking, swelling, surface contamination, or discoloration to ensure that electrical cables and connections not subject to the environmental qualification (EQ) requirements of 10 CFR 50.49 and within the scope of license renewal are capable of performing their intended functions.

Non-EQ cables and connections within the scope of license renewal in accessible areas with an adverse localized environment are inspected. The inspections of Non-EQ cables and connectors in accessible areas are representative, with reasonable assurance, of

cables and connections in inaccessible areas with an adverse localized environment. At least once every ten years, the Non-EQ cables and connections within the scope of license renewal in accessible areas are visually inspected for embrittlement, melting, cracking, swelling, surface contamination, or discoloration. The acceptance criterion for visual inspection of accessible Non-EQ cable jacket and connection insulating material is the absence of anomalous indications that are signs of degradation. Corrective actions for conditions that are adverse to quality are performed in accordance with the corrective action program as part of the QA

program. The Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program is a new program that will be implemented prior to the period of extended operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-15 Rev. 30 License Renewal Application A1.25 ELECTRICAL CABLES AND CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS USED IN INSTRUMENTATION CIRCUITS The scope of this program includes the cables and connections used in sensitive instrumentation circuits with sensitive, high voltage low-level signals within the Ex-core Neutron Monitoring System including the source range, intermediate range, and power range

monitors. This program provides reasonable assurance that the intended function of cables and connections used in instrumentation circuits with sensitive, low-level signals that are not subject to the environmental qualification requirements of 10 CFR 50.49 and are

exposed to adverse localized environments caused by heat, radiation, or moisture are maintained consistent with the current licensing basis through the period of extended operation. In most areas, the actual ambient environments (e.g., temperature, radiation, or moisture) are less severe than the plant design environment for those areas. Cable testing is used to manage the aging of the cable insulation and connections so that instrumentation circuits perform their intended functions. A cable system test for deleting deterioration of the cable insulation and connections will be performed. The test frequency shall be at least once every 10 years with the first test being completed before the period of extended operation. A1.26 INACCESSIBLE MEDIUM VOLTAGE CABLES NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program manages the aging effects of inaccessible medium voltage cables within the scope of license renewal exposed to adverse localized environments caused by significant moisture simultaneously with significant voltage. All cable manholes that contain in-scope Non-EQ inaccessible medium voltage cables will be inspected for water collection. Collected water will be removed as required. This inspection and water removal will be performed based on actual plant experience with the Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-16 Rev. 29 License Renewal Application frequency being at least once every five years for electrical manholes with sump pumps.

The program provides for testing of in-scope Non-EQ inaccessible medium voltage cables to provide an indication of the conductor insulation condition. At least once every ten years, a polarization

index test as described in EPRI TR-103834-P1-2 or other testing that is state-of-the-art at the time of the testing is performed.

The Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 EQ Requirements program is a new program that will be implemented prior to the period of extended operation. A1.27 ASME SECTION XI, SUBSECTION IWE The ASME Section XI, Subsection IWE containment inservice inspection program provides aging management of the steel liner of the concrete containment building, including the containment liner plate, piping and electrical penetrations, access hatches, and the fuel transfer tube. Inspections are performed to identify and manage any

containment liner aging effects that could result in loss of intended function. Acceptance criteria for components subject to Subsection IWE exam requirements are specified in Article IWE-3000.

In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS CISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of

the Code specified twelve months before the start of the inspection interval. A1.28 ASME SECTION XI, SUBSECTION IWL The ASME Section XI, Subsection IWL containment inservice inspection program manages aging of the concrete containment structure (including the tendon gallery ceiling), the concrete dome, and the

post-tensioning system. Inspections are performed to identify and manage any containment concrete aging effects that could result in loss of intended function. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of the Code specified twelve months before the start of the inspection interval.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-17 Rev. 29 License Renewal Application Prior to the period of extended operation, procedures will be enhanced to include two new provisions regarding inspection of

repair/replacement activities. A1.29 ASME SECTION XI, SUBSECTION IWF The ASME Section XI, Subsection IWF program manages aging effects that could result in loss of intended function for Class 1, 2 and 3 component supports. There are no Class MC supports at WCGS. In conformance with 10 CFR 50.55a(g)(4)(ii), the WCGS ISI Program is updated during each successive 120-month inspection interval to comply with the requirements of the latest edition and addenda of

the Code specified twelve months before the start of the inspection

interval. A1.30 10 CFR 50, APPENDIX J The 10 CFR Part 50, Appendix J program monitors leakage rates through the containment pressure boundary, including the penetrations and access openings, in order to detect degradation of containment pressure boundary. Seals, gaskets, and bolted

connections are also monitored under the program.

Containment leak rate tests are performed in accordance with 10 CFR 50 Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors" Option B; Regulatory Guide 1.163, Revision 0, "Performance-Based Containment Leak-Testing Program," NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50 Appendix J; and ANSI/ANS 56.8, "Containment

System Leakage Testing Requirements." Containment leak rate tests are performed to assure that leakage through the primary containment, and systems and components penetrating primary containment does not exceed allowable leakage limits specified in the Technical Specifications. Corrective actions are taken if leakage rates exceed established administrative limits for individual penetrations or the overall containment

pressure boundary. A1.31 MASONRY WALL PROGRAM The Masonry Wall Program, which is part of the Structures Monitoring Program, manages aging of masonry walls, and structural steel Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-18 Rev. 29 License Renewal Application restraint systems of the masonry walls, within scope of license renewal based on guidance provided in IE Bulletin 80-11, "Masonry Wall Design" and NRC Information Notice 87-67, "Lessons Learned from Regional Inspections of Licensee Actions in Response to NRC IE

Bulletin 80-11." The Masonry Wall Program contains inspection Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-19 Rev. 29 License Renewal Application guidelines and lists attributes that cause aging of masonry walls, which are to be monitored during structural monitoring inspections, as well as establishes examination criteria, evaluation requirements, and acceptance criteria. Prior to the period of extended operation, procedures will be enhanced to identify unreinforced masonry in the radwaste building within the scope of license renewal that requires aging management. A1.32 STRUCTURES MONITORING PROGRAM The Structures Monitoring Program manages the cracking, loss of material, and change in material properties by monitoring the condition of structures and structural supports that are within the scope of license renewal. The Structures Monitoring Program implements the requirements of 10 CFR 50.65 and is consistent with

the guidance of NUMARC 93-01, Revision 2 and Regulatory Guide 1.160, Revision 2. The Structures Monitoring Program provides inspection guidelines and walkdown checklists for concrete elements, structural steel, masonry walls, treated wood, structural features (e.g., caulking, sealants, roofs, etc.), structural supports, and miscellaneous components such

as doors. The Structures Monitoring Program includes all masonry walls within the scope of license renewal. The Structures Monitoring Program also inspects supports for equipment, piping, conduit, cable tray, HVAC, and instrument components. The Structures Monitoring Program monitors groundwater for pH, sulfates, and chlorides. Prior to the period of extended operation, procedures will be enhanced to add inspection parameters for treated wood, to add the disconnect enclosure and foundation in the switchyard, and to monitor groundwater for pH, sulfates, and chlorides. Two samples of groundwater will be tested every five years. A1.33 RG 1.127, INSPECTION OF WATER-CONTROL STRUCTURES ASSOCIATED WITH NUCLEAR POWER PLANTS The Regulatory Guide 1.127, Inspection of Water Control Structures Associated with Nuclear Power Plants program manages aging due to extreme environmental conditions and the effects of natural Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-20 Rev. 30 License Renewal Application phenomena that may affect water-control structures. WCGS meets the recommendations of Regulatory Guide 1.127, Revision 1.

This program includes inspection and surveillance activities for dams, slopes, canals, and other water-control structures associated with emergency cooling water systems or flood protection.

The program includes periodic visual inspections of in-scope concrete structures, periodic monitoring of the hydraulic and structural condition of the Ultimate Heat Sink (UHS), as well as associated structures, main dam service spillway, and auxiliary spillway, periodic dredging of the UHS reservoir and channel connecting the reservoir to the essential service water pumphouse, and survey of the UHS dam for vertical movement.

Prior to the period of extended operation, procedures will be enhanced so that the main dam service spillway and the auxiliary

spillway will be inspected in accordance with the same specification, to clarify the scope of inspections for the spillways, to add the 5 year inspection frequency for the main dam

service spillway, and to add cavitation to the list of concrete aging effects for surfaces other than spillways.

A1.34 NICKEL ALLOY AGING MANAGEMENT PROGRAM The Nickel Alloy Aging Management Program manages cracking due to primary water stress corrosion cracking in all plant locations that contain Alloy 600, with the exception of steam generator tubing (aging management of steam generator tubing is performed by the

Steam Generator Tubing Integrity program (B2.1.8)). Aging management requirements for nickel alloy penetration nozzles welded to the upper reactor vessel closure head noted in the Nickel-Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors program (B2.1.5) are included here. This includes reactor coolant system (RCS) pressure boundary, RCS

non-pressure boundary, and ESF locations.

The Nickel Alloy Aging Management Program uses inspections, mitigation techniques, repair/replace activities and monitoring of operating experience to manage the aging of Alloy 600 at WCGS. Detection of indications is accomplished through a variety of examinations consistent with ASME Section XI Subsections IWB and IWC, and ASME Code Cases N-729-1, N-770-1 & N-722-1 with conditions as published in 10 CFR 50.55(a).

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-21 Rev. 30 License Renewal Application Mitigation techniques are implemented when appropriate to preemptively remove conditions that contribute to primary water stress corrosion cracking. Repair/replacement activities are

performed to proactively remove or overlay Alloy 600 material, or as a corrective measure in response to an unacceptable flaw in the

material.

The Wolf Creek Nickel Alloy Aging Management Program will be supplemented with implementation of applicable (1) ASME Code Cases N-729-1, N-770-1 & N-722-1 with conditions as published in 10 CFR 50.55 (a) and (2) staff-accepted industry guidelines, and (3) participation in industry initiatives, such as owners group programs and the EPRI Materials Reliability Program, for managing aging effects associated with nickel alloys. If flaws attributed to PWSCC have been identified, whether acceptable or not for continuous service under paragraph 3130 or 3140 of ASME Code case N-729-1, the re-inspection interval must be each refueling outage instead of re-inspection interval required by Table 1 Note 8 of ASME Code Case N-729-1 commencing from the same outage in which flaw is detected. A1.35 REACTOR COOLANT SYSTEM SUPPLEMENT Section 3.1 of NUREG-1800, "Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants," and 10 CFR 50.55a supplements the aging management programs for the reactor coolant system components with the following additional

requirements.

WCNOC will: A. Reactor Coolant System Nickel Alloy Pressure Boundary Components A final rule updating 10 CFR 50.55a requires following ASME Code Cases N-722-1, N-729-1, and N-770-1 as conditioned by 10 CFR 50.55a, and B. Reactor Vessel Internals Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-22 Rev. 29 License Renewal Application (1) Participate in the industry programs for investigating and managing aging effects on reactor internals; (2) evaluate and implement the results of the industry programs as applicable to the reactor internals; and (3) upon completion of these programs, but not less than 24 months before entering the period of extended operation, WCNOC will submit an inspection plan for reactor internals to the NRC for review and approval. A1.36 ELECTRICAL CABLE CONNECTIONS NOT SUBJECT TO 10 CFR 50.49 ENVIRONMENTAL QUALIFICATION REQUIREMENTS The Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements program manages the effects of loosening of bolted connections due to thermal cycling, ohmic

heating, electrical transients, vibration, chemical contamination, corrosion, and oxidation. A representative sample of electrical cable connections not subject to 10 CFR 50.49 environmental qualification requirements within the scope of license renewal is infrared thermography tested as part of the WCGS predictive maintenance. The sample is based upon application, circuit loading

and environment. Infrared thermography testing is being performed at least once every 10 years. Prior to the period of extended operation, the infrared thermography testing procedure will be enhanced to require an engineering evaluation when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, and the likelihood of recurrence.

A one-time inspection of a representative sample of low voltage low current or low load connections will be performed prior to the period of extended operation. The technical basis for the selected sample will be documented and based upon application (low voltage), circuit loading (low current or low load), and environment (plant indoor air and outdoor air). An engineering evaluation will be

performed when test acceptance criteria are not met. The evaluation will include identifying the extent of condition, the potential root cause for not meeting the test acceptance criteria, the likelihood of recurrence and the need to expand the sample size and/or

frequency of the inspection.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-23 Rev. 29 License Renewal Application A2

SUMMARY

DESCRIPTIONS OF TIME-LIMITED AGING ANALYSIS AGING MANAGEMENT PROGRAMS A2.1 METAL FATIGUE OF REACTOR COOLANT PRESSURE BOUNDARY The WCGS Metal Fatigue of the Reactor Coolant Pressure Boundary program ensures that actual plant ex perience remains bounded by the assumptions used in the deesign calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring results

indicate that none of the design transients should occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and that fatigue usage factors should

remain below the code allowable limit of 1.0, including effects of

the reactor coolant environment as described by NUREG/CR-6260.

Prior to the period of extended operation, the Metal Fatigue of Reactor Coolant Pressure Boundary program will be enhanced to include: A cycle count action limit and corrective actions. An action limit will be established that requires corrective action when the cycle count for any of the critical thermal and pressure transients is projected to reach a stated percentage of the design-specified number of cycles before the end of the next fuel cycle.

If this action limit is reached, acceptable corrective actions include:

1. Review of fatigue usage calculations To determine whether the transient in question

contributes significantly to CUF. To identify the components and analyses that are

affected by the transient in question. To ensure that the analytical bases of the leak-

before-break (LBB) fatigue crack propagation analysis and of the high-energy line break (HELB) locations are maintained. 2. Evaluation of remaining margins on CUF based on cycle-based or stress-based CUF calculations using the WCGS fatigue management program software.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-24 Rev. 29 License Renewal Application

3. Redefinition of the specified number of cycles (e.g., by reducing specified numbers of cycles for other transients and using the margin to increase the allowed number of cycles for the transient that is approaching its

specified number of cycles). A cumulative fatigue usage action limit and corrective actions. An action limit will be established that requires corrective action when calculated CUF (from cycle-based or stress-based monitoring) for any monitored location is projected to reach 1.0 within the next 2 or 3 fuel cycles. If this action limit is reached acceptable corrective actions

include: 1. Determine whether the scope of the monitoring program must be enlarged to include additional affected reactor coolant pressure boundary locations. This determination will ensure that other locations do not approach design limits without an appropriate action. 2. Enhance fatigue monitoring to confirm continued conformance to the code limit. 3. Repair the component. 4. Replace the component.

5. Perform a more rigorous analysis of the component to demonstrate that the design code limit will not be exceeded. 6. Modify plant operating practices to reduce the fatigue usage accumulation rate. 7. Perform a flaw tolerance evaluation and impose component-specific inspections, under ASME Section XI Appendices A or C (or their successors), and obtain required approvals by the NRC. These corrective actions are equally applicable to the WCGS NUREG/CR-6260 locations described in Section A3.2.3, "Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components," including consideration of the effects

of the reactor coolant environment.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-25 Rev. 29 License Renewal Application 10 CFR 50 Appendix B procedural and record requirements. Validation of the presence of absence of charging nozzle thermal sleeves. If sleeves are not present, the fatigue monitoring program analysis for the charging nozzle will be re-performed. A fatigue monitoring program updated baseline for the pressurizer hot leg surge nozzle based on the additional insurge/outsurge cycles accumulated in a pre-MOP environment. Additionally, the fatigue monitoring program baseline for the charging nozzles will be updated with consideration for the

differential contribution of fatigue for each category of charging event. A2.2 ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS The Environmental Qualification (EQ) of Electrical Components program manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f)

qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the

aging limits established in the evaluation. The Environmental Qualification (EQ) of Electrical Components program is consistent with the requirements of 10 CFR 50.49, and the guidance of NUREG-0588, "Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment" and Regulatory Guide 1.89, "Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants", Revision 1 for maintaining qualification of equipment. A2.3 CONCRETE CONTAINMENT TENDON PRESTRESS The Concrete Containment Tendon Prestress program, within the WCGS Creek ASME Section XI Subsection IWL Program, manages the loss of

tendon prestress in the post-tensioning system. The WCGS post-tensioning system consists of inverted U-shaped tendons, extending up through the basemat, through the full height of the cylindrical walls and over the dome; and horizontal circumferential (hoop) tendons, at intervals from the basemat to about the 45-degree elevation of the dome. The basemat is Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-26 Rev. 29 License Renewal Application conventionally reinforced. The tendons are ungrouted, in grease-filled glands. Prior to the period of extended operation, procedures will be revised to extend the list of surveillance tendons to include random samples for the 40, 45, 50, and 55 year surveillances, to explicitly require a regression analysis for each tendon group after every surveillance; and to invoke and describe regression analysis methods used to construct the lift-off trend lines. Surveillance program

predicted force lines for the vertical and hoop tendon groups will be extended to 60 years. Procedure descriptions of acceptance criteria action levels will be revised to conform to the ASME Code, Subsection IWL 3221 descriptions.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-27 Rev. 29 License Renewal Application A3 EVALUATION SUMMARIES OF TIME-LIMITED AGING ANALYSES 10 CFR 54.21(c) requires that an applicant for a renewed license identify time-limited aging analyses (TLAAs) and evaluate them for

the period of extended operation. The following TLAAs have been identified and evaluated for WCGS. A3.1 REACTOR VESSEL NEUTRON EMBRITTLEMENT Ferritic materials of the reactor vessel are subject to embrittlement (loss of fracture toughness) due to high-energy neutron exposure. The following predictions of neutron fluence and of its embrittlement effects are TLAAs: Neutron Fluence, Upper Shelf Energy, Adjusted Reference

Temperature (Fluence, USE, and ART) Pressurized Thermal Shock (PTS) Reactor Vessel Thermal Limit Analysis and Pressure-Temperature (P-T) Limits Low Temperature Overpressure Protection (LTOP) The Reactor Vessel Surveillance program is described in

Section A1.15. A3.1.1 Neutron Fluence, Upper Shelf Energy and Adjusted Reference Temperature (Fluence, USE, and ART)

Fluence Neutron embrittlement depends on lifetime fluence of neutrons with energies greater than 1 MeV. The original design basis estimate for expected end-of-life fluence has been increased to account for increased unit rating and for increased plant capacity factors, but also reduced for low-leakage core loadings. WCGS has evaluated projected fluences and their uncertainties based on the guidance of Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence,"

Revision 0. The 1/4-t and 3/4-t fluences in the vessel wall were also projected consistent with Regulatory Guide 1.99, "Radiation Damage Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-28 Rev. 29 License Renewal Application to Reactor Vessel Materials," Revision 2, Section 1.1, Equation 3, attenuation. The evaluation also projected the alternative displacements-per-iron atom (dpa) measure of embrittlement to 54 EFPY using methods consistent with ASTM E853 and E693, in support of dpa assessments consistent with Regulatory Guide 1.99, Revision 2. Since the W and Z coupon exposure has now exceeded that expected at the end of the extended period of operation, these capsules have been removed to the spent fuel pool, and vessel neutron fluence is now confirmed by ex-vessel dosimetry.

USE and ART For reactor vessel materials, 10 CFR 50 Appendix G requires the predicted end-of-life Charpy impact test upper-shelf absorbed energy (USE) to be at least 50 ft-lb, unless an approved analysis supports a lower value. The 60 year end-of-life USE and adjusted reference temperature (ART) of the limiting material was confirmed from test of the X-capsule coupons, with exposures nearly equal to the projected 54 EFPY, 60-year vessel wall fluence. The examination methods were consistent with 10 CFR 50 Appendices G and H, ASTM E185-82, and Westinghouse procedures. The X-coupon analysis demonstrates more-than-adequate EOL USE, and indicates that ART for the limiting material will remain modest and will permit adequate operating margins to P-T limits until the end of a 60-year period of

extended operation. See Section A3.1.3 for P-T limits. A3.1.2 Pressurized Thermal Shock (PTS)

If the reference temperature for pressurized thermal shock (RT PTS) for each heat of material of the reactor pressure vessel does not exceed 270 ºF for plates, forgings, and axial welds; or 300 ºF for circumferential welds (the PTS screening criteria), only the reactor pressure vessel is "relied on to demonstrate compliance" with the 10 CFR 50.61 PTS rule. RT PTS for the limiting material has been projected to remain well below its screening criterion until the end of a 60-year period of extended operation. The reactor pressure vessel therefore meets the PTS screening criteria and will continue to do so for the period of extended operation. Therefore no safety analysis by Regulatory Guide 1.154, "Format and Content of Plant-Specific Pressurized Thermal Shock Safety Analysis Reports for Pressurized Water Reactors," Revision 0, alternative methods is required, and the vessel is therefore the only component relied upon Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-29 Rev. 29 License Renewal Application to demonstrate compliance with 10 CFR 50.61 throughout the period of extended operation. A3.1.3 Pressure-Temperature (P-T) Limits 10 CFR 50 Appendix G requires a reactor vessel thermal limit analysis to determine operating pressure-temperature limits for heatup, cooldown, criticality, and inservice leakage and hydrostatic testing. The resulting P-T limit curves are operating limits, conditions of the operating license, and are included in the Pressure and Temperature Limits Report (PTLR), as required by Technical Specifications. Because of the relationship between the operating pressure-temperature limits and the fracture toughness transition of the reactor vessel, the thermal limits analysis is valid only up to a

stated vessel fluence limit. The currently-applicable PTLR is valid up to 54 EFPY. A3.1.4 Low Temperature Overpressure Protection (LTOP) LTOP is required by Technical Specifications and is provided (in part) by the cold overpressurization mitigation system (COMS), which opens the power-operated relief valves at a setpoint determined by

the currently-applicable pressure-temperature limits analysis.

The COMS setpoint is established in the Pressure and Temperature Limits Report (PTLR), Section A3.1.3. A3.2 METAL FATIGUE

This section describes: ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure Vessel Internals Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-30 Rev. 29 License Renewal Application Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190 Assumed Thermal Cycle Count for Allowable Secondary Stress

Range Reduction Factor in B31.1 and ASME Section III Class 2

and 3 Piping Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic

Events Fatigue Design and Analysis of Class IE Electrical Raceway

Support Angle Fittings for Seismic Events At WCGS, no vessels, heat exchangers, or pumps were designed to ASME Section III Class 2 or 3, or ASME VIII Division 2 rules that required design for a stated number of load cycles.

Basis of Fatigue Analyses ASME Section III Class 1 design specifications define a design basis set of static and transient load conditions. The design number of

each transient was selected to be somewhat larger than expected to occur during the 40-year licensed life of the plant, based on

operating experience, and on projections of future operation based on innovations in the system designs. Although original design specifications commonly state that the transients are for a 40-year design life, the fatigue analyses themselves are based on the specified number of occurrences of each transient rather than on this lifetime.

Fatigue Management Program The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that actual plant experience remains bounded by the assumptions used in the design calculations, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The more-recent fatigue monitoring cycle counts indicate that none of the design transients will occur more than the currently-specified number of times before the end of a 60-year period of extended operation, and consequently, that the fatigue analysis TLAAs based on those transients will remain valid for the period of extended operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-31 Rev. 29 License Renewal Application A3.2.1 ASME Section III Class 1 Fatigue Analysis of Vessels, Piping, and Components Fatigue analyses exist for ASME Section III Division 1 Class 1 piping, vessels, steam generators, pumps, and valves. The reactor vessel internals are not designed to ASME Section III Class 1 but

are analyzed to ASME Section III Subsection NG. See Section A3.2.2. A3.2.1.1 Reactor Pressure Vessel, Nozzles, Head, and Studs The WCGS reactor vessel is designed to ASME Section III, Subsection NB (Class 1), 1971 Edition with addenda through Winter

1972. The analysis has been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate and

T hot reduction, minor modifications, and possible operating contingencies. See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and reactor vessel. The reactor vessel primary coolant inlet and outlet nozzles and lower-head-to-shell juncture are evaluated for effects of the reactor coolant environment on fatigue behavior of these materials, consistent with the guidance of NUREG/CR-06260. See Section A3.2.3

of this document.

Fatigue usage factors in the reactor vessel pressure boundary do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients and on boltup. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing

basis by other acceptable means. A3.2.1.2 Control Rod Drive Mechanism (CRDM) Pressure Housings, Adapter Plugs, and Canopy Seals The CRDM housings are designed to ASME Section III, Subsection NB (Class 1), 1974 Edition with addenda through Winter 1974. The analysis of pressure-retaining components was reexamined for the power rerate and T hot reduction modification, and for addition of Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-32 Rev. 29 License Renewal Application canopy seal clamp assemblies. The fatigue usage factors for the CRDM pressure housings, adapter plugs, and canopy seals have been evaluated and projected to remain below the ASME Code allowable of 1.0 for 60 years. A3.2.1.3 Reactor Coolant Pump Pressure Boundary Components The pump pressure boundary was designed to ASME Section III, 1971 edition with addenda through Summer 1973. Subarticle NB-3400, "Design of Class 1 Pumps," of this edition and addenda, does not require a fatigue analysis, but the nuclear steam supply vendor specified a fatigue analysis. Low stresses permitted a fatigue

waiver analysis for many pump components. These fatigue and fatigue waiver analyses have been updated to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor modifications. Fatigue usage factors in the reactor coolant pumps do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events, principally on startup and shutdown transients. The WCGS

Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.4 Pressurizer and Pressurizer Nozzles The WCGS pressurizer is designed to ASME Section III, Subsection NB (Class 1), 1974 Edition. The analysis has been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate and Thot reduction, and minor modifications; including the effects of thermal stratification in the lower head, surge nozzle, and surge line discussed in NRC Bulletin 88-11.

The pressurizer surge nozzle and lower head may be subject to significant operating thermal stress cycles due to thermal stratification and insurge-outsurge cycles, and are therefore

expected to be the limiting pressurizer components for fatigue. The fatigue usage factors of these locations are specifically monitored. The expected usage factors in these locations should be acceptable

for 60 years of operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-33 Rev. 29 License Renewal Application With the exception of thermal stratification effects in the surge nozzle, fatigue usage factors in the pressurizer pressure boundary

and support components do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 will ensure that the fatigue usage factors based on those transients will remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable

means. A3.2.1.5 Steam Generator ASME Section III Class 1, Class 2 Secondary Side, and Feedwater Nozzle Fatigue Analyses The steam generators are designed to ASME Section III, Subsection NB (Class 1) and Subsection NC (Class 2), 1971 Edition with addenda through Summer 1973. Although the secondary side is Class 2, all pressure retaining parts of the steam generator satisfy the Class 1

criteria, including the Class 2 secondary side boundaries. Although the steam generator tubes have a Class 1 fatigue analysis, the safety determination for integrity of steam generator tubes now depends on managing aging effects by a periodic inspection program rather than on the fatigue analysis, described in Section A1.8. The code fatigue analysis of the tubes is theefore not a TLAA.

Except for the tubes, fatigue usage factors in the steam generator components do not depend on flow-induced vibration or other effects that are time-dependent at steady-state conditions, but depend only on effects of operational and upset transient events. At the current rate of accumulation of these events the design basis number of events should be sufficient for 60 years of operation. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for steam generator components with fatigue analyses for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.6 ASME Section III Class 1 Valves WCGS Class 1 valves are designed to ASME Section III, Subsection NB, 1974 Edition and later addenda. At WCGS, Class 1 fatigue analyses Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-34 Rev. 29 License Renewal Application are TLAAs only for Class 1 valves with inlets greater than four inches nominal.

For all valves the allowed NB-3545.3 N A normal duty operations far exceed those expected to occur.

The calculated worst-case usage factors I t for Class 1 pressurizer safety valves and for six inch swing check valves indicate that the designs have large margins, and therefore that the pressure boundaries would withstand fatigue effects for at least two of the original design lifetimes. The design of these valves for fatigue

effects is therefore valid for the period of extended operation.

The calculated worst-case usage factors for the 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves exceed 0.4.

However, fatigue usage factors in these valves do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. As discussed in Section A3.2.1.7, the current rate of accumulation of these event cycles for Class 1 piping systems containing valves indicates that the 40-year design basis number of events should be sufficient for 60 years of operation, and that the calculated usage factors should not be exceeded. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that the assumed numbers of transient cycles for 12 inch Class 1 RHR suction gate valves and the 10 inch Class 1 check valves are not exceeded, and consequently, that the fatigue analysis TLAAs based on those transients remain valid for the period of extended operation, or that appropriate corrective measures

maintain the design and licensing basis by other acceptable means. A3.2.1.7 ASME Section III Class 1 Piping and Piping Nozzles Class 1 reactor coolant main-loop piping supplied by Westinghouse is designed to ASME Section III, Subsection NB, 1974 edition with

addenda through Winter 1975. The main loop piping fatigue analysis was performed to the 1974 edition with addenda through Winter 1975.

The fatigue analyses of piping outside the main loop used code addenda through summer 1979 [USAR Table 5.2-1]. These analyses have been updated from time to time to incorporate redefinitions of loads and design basis events, operating changes, power rerate, and minor

modifications.

See Section A3.2.1.8 for fatigue in the pressurizer surge lines.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-35 Rev. 29 License Renewal Application See Section A3.2.1.9 for the evaluation of certain noise events affecting the fatigue analyses of the primary coolant system and

reactor vessel. The evaluation of these noise events found no effect on the primary coolant piping fatigue analysis. The hot leg surge nozzle is subject to possible thermal stratification effects. Fatigue at this location is specifically

monitored, including the stratification effects. Fatigue due to high-cycle vibration has been evaluated in thermowells added at former RTD nozzles. The calculated usage factor has been validated for the period of extended operation and

remains negligible.

With the exception of the hot leg surge nozzle and thermowells, fatigue usage factors in Class 1 piping and nozzles do not depend on effects that are time-dependent at steady-state conditions, but depend only on effects of operational, abnormal, and upset transient events. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 ensures that fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable

means. A3.2.1.8 Bulletin 88-11 Revised Fatigue Analysis of the Pressurizer Surge Line for Thermal Cycling and Stratification NRC Bulletin 88-11 requested that licensees establish and implement a program to confirm pressurizer surge line integrity in view of the occurrence of thermal stratification and required them to inform the staff of the actions taken to resolve this issue. The original surge line fatigue analysis used code addenda through summer 1979.

The surge line design was re-evaluated to the 1986 code in response to the NRC Bulletin 88-11 thermal stratification concerns. This analysis was later reevaluated for effects of snubber removals.

These results have been incorporated into the piping and main-loop nozzle code design reports. The current analysis includes effects of power rerate and T hot reduction. See Section A3.2.1.4 for effects on the pressurizer surge nozzle.

See Section A3.2.1.7 for effects on the hot leg surge nozzle.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-36 Rev. 29 License Renewal Application The maximum calculated CUF at any location in the surge lines, under the current analysis of record, including thermal stratification effects, is less than 0.1. The WCGS Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 monitors fatigue in the surge line and ensures that the fatigue usage factors based on those transients remain within the code limit of 1.0 for the period of extended operation, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. The re-evaluation of the surge line for NRC Bulletin 88-11 under the 1986 code did not retroactively impose Subarticle NF-3330 stress limits for high-cycle fatigue of Class 1 supports. A3.2.1.9 Primary Coolant System Heatup Expansion Noise Events Since 1990, abrupt audible events have been heard inside containment at WCGS toward the end of primary system heatups. They have been attributed to an abrupt release of differential expansion energy, originally believed to be at the crossover piping support saddle shims, later found to have probably also occurred between the

reactor vessel support pads and shoes, under the vessel main loop nozzles. The evaluation of effects of these events found no effect, or only nominal effects, on stress and fatigue analyses of the reactor vessel inlet and outlet nozzles, reactor coolant piping primary loop and component supports, steam generator nozzles, and primary loop leak-before-break analysis.

The heatup noise events have been evaluated and projected to remain within the 330 cycles assumed in the fatigue evaluation. A3.2.1.10 High Energy Line Break Postulation Based on Fatigue Cumulative Usage Factor A leak-before-break analysis (LBB) eliminated large breaks in the main reactor coolant loops. See Section A3.2.1.11. Outside the main loop breaks are selected in accordance with Regulatory Guide 1.46, Revision 0, "Protection Against Pipe Whip Inside Containment," and Branch Technical Positions ASB 3-1 and MEB 3-1.

See USAR Section 3.6.1. The citation of MEB 3-1 means that "intermediate breaks," "between terminal ends," in piping with ASME Section III Class 1 fatigue Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-37 Rev. 29 License Renewal Application analyses are identified at any location where cumulative usage factor is equal to or greater than 0.1, with the stated exception of the reactor coolant system primary loops.

A revised stress analysis of the surge line reduced all intermediate locations below 0.1, and thereby eliminated intermediate breaks in it. Break locations that depend on usage factor, and their absence in the surge line, remain valid as long as the calculated usage factors are not exceeded. The WCGS Metal Fatigue of Reactor Coolant

Pressure Boundary program described in Section A2.1 ensures that the originally calculated maximum usage factors are not exceeded, or that appropriate corrective measures maintain the design and licensing basis by other acceptable means. A3.2.1.11 Fatigue Crack Growth Assessment in Support of a Fracture Mechanics Analysis for the Leak-Before-Break (LBB)

Elimination of Dynamic Effects of Primary Loop Piping Failures USAR Section 3.6.1 describes a leak-before-break analysis that

eliminated the large breaks in the main reactor coolant loops, which permitted omission of evaluations of their jet and pipe whip effects. This permitted omission of large jet barriers and whip restraints. The containment pressurization and equipment

qualification analyses retained the large-break assumptions.

The fracture mechanics analysis depends on a saturated rather than a time-dependent crack initiation energy integral, is therefore not time-dependent, and is therefore not a TLAA. However, the final leak-before-break submittal is also supported by a fatigue crack growth assessment for a 40-year design life, which is a TLAA.

The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is written to confirm that the maximum usage factor in the primary loop piping remains below the number assumed for the existing analysis, and therefore that the basis for the LBB analysis remains valid for the period of extended operation, or that appropriate corrective measures maintain the design and

licensing basis by other acceptable means.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-38 Rev. 29 License Renewal Application A3.2.2 ASME Section III Subsection NG Fatigue Analysis of Reactor Pressure Vessel Internals The WCGS reactor vessel internals were designed after the incorporation of Subsection NG into the 1974 Edition of Section III of the ASME Boiler and Pressure Vessel Code. The design meets the intent of paragraph NG-3311(c); that is, design and construction of core support structures meet Subsection NG in full, and other internals are designed and constructed to ensure that their effects on the core support structures remain within the core support structure code limits.

The current reactor vessel internals design report incorporates effects of power rerate and of hot leg temperature reduction (T hot). It identifies usage factors for the specified set of design basis transient events and for 40 years of high-cycle effects. The greater part of each calculated fatigue usage factor is due to effects of significant transients.

The review and projection of transient events and usage factor accumulation to date indicates that the specified number of each transient should not be exceeded during the 60-year period of extended operation, and the WCGS fatigue management program tracks these events. Therefore, the contribution of these transient events to fatigue usage in the internals will not exceed that originally calculated without the condition being identified, and without an appropriate evaluation

being performed and any necessary mitigating actions being taken. However, some part of fatigue usage in internals is due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transients. High-cycle fatigue must therefore be evaluated separately in order to extend the conclusion of the supplementary design report to the end of the 60-year licensed operating period.

For locations with reported usage factors greater than 0.66, the detailed fatigue calculations were reviewed to determine the contribution of high cycle fatigue to the total usage. In these locations, the review determined that high cycle fatigue was not calculated for the component because either the vibratory stresses are very small compared to thermal transient stresses or the usage from high cycle effects was insignificant. Therefore, the reported usage is from the specified design transients and is proportional to the numbers of transients experienced but not explicitly to time of

operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-39 Rev. 29 License Renewal Application For locations with reported usage factors of less than 0.66, some part of the fatigue usage in internals may be due to the high-cycle effects, and therefore depends on steady-state operating time rather than on the number of transient events. Because these locations have reported usage of less than 0.66, multiplying the reported fatigue usage values by 1.5 to account for 60 years of operation gives fatigue usage results less than the limit of 1.0 and is therefore acceptable. Therefore, the analysis has been projected to the end of the period of extended operation.

Fatigue Analyses of Barrel-to-Former and Baffle-to-Former Bolts Cracked baffle-to-former bolts were found in a few offshore reactors with designs and materials similar to Westinghouse units. The failures have been attributed to a combination of time-dependent effects. Fatigue in these bolts is the subject of an ASME code analysis, which is a TLAA. The high predicted usage factor, the additional aging effects requiring mitigation, and the fact that some of these are synergistic (e.g., fatigue and the other cracking mechanisms) dictate that management of the fatigue usage factor in these bolts will be insufficient by itself, and that an aging management program must be constructed for the bolts which either adequately address all of these effects, or which will ensure their safety function despite these effects. The Wolf Creek aging management program for

reactor vessel internals for the license renewal period has not been determined. See Section A1.35 for the commitment to develop this program. A3.2.3 Effects of the Reactor Coolant System Environment on Fatigue Life of Piping and Components (Generic Safety Issue 190) Concerns with possible effects of elevated temperature, reactor coolant chemistry environments, and different strain rates prompted NRC-sponsored research to assess these effects, culminating in the guidance of NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." Although GSI 190 has been closed for plants with 40-year initial licenses, the NUREG-1800 states that "The applicant's consideration of the effects of coolant environment on component fatigue life for license renewal is an area of review," noting the staff recommendation "-that the samples in NUREG/CR-6260 should be

evaluated considering environmental effects for license renewal."

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-40 Rev. 29 License Renewal Application NUREG/CR-6260 Table 5-82 identifies seven sample locations for newer Westinghouse plants such as WCGS: Reactor Vessel Lower Head to Shell Juncture Reactor Vessel Primary Coolant Inlet Nozzle Reactor Vessel Primary Coolant Outlet Nozzle Surge Line Hot Leg Nozzle Charging Nozzles (Loop 1 and 4 nozzles are separately monitored at WCGS) Safety Injection Nozzles - Boron Injection tank (BIT) or High-

Head Safety Injection (HHSI) Nozzles Residual Heat Removal Line Inlet Transition Degree Accumulator Safety Injection (ACCSI) and RHR Cold Leg Injection Nozzles.

WCGS performed plant-specific calculations for these seven sample

locations using the appropriate F en factors from NUREG/CR-6583 for carbon and low-alloy steels and from NUREG/CR-5704 for stainless

steels, as appropriate for the material at each location. The material-specific worst-case F EN multiplier was calculated for each location, and applied to the fatigue usage factor expected at 60 Years at that location. Strain rate information was not used to determine F EN. All of these locations except the first, the vessel lower head to shell juncture, are included in the Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1. The first location is not monitored because the low projected usage factor, when multiplied by the applicable F EN , remains negligible. At the first location, the expected 60-year fatigue usage factor was determined by multiplying the calculated design basis 40-year usage factor times 1.5. All others were projected from the historical and current rates of accumulation of transient cycles and usage factors. When these projected 60-year usage factors are multiplied by the respective F EN, the results are all less than the code limit of 1.0.

The Metal Fatigue of Reactor Coolant Pressure Boundary program described in Section A2.1 is structured to continue to confirm that this is so, or to initiate appropriate evaluations and corrective

measures.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-41 Rev. 29 License Renewal Application A3.2.4 Assumed Thermal Cycle Count for Allowable Secondary Stress Range Reduction Factor in B31.1 and ASME Section III Class 2 and 3 Piping None of ANSI B31.1 or ASME Section III Subsections NC and ND invokes fatigue analyses. However, if the number of full-range thermal cycles is expected to exceed 7,000, these codes require the application of a stress range reduction factor to the allowable stress range for expansion stresses (secondary stresses). The allowable secondary stress range is 1.0 S A for 7000 equivalent full-temperature thermal cycles or less and is reduced in steps to 0.5 S A for greater than 100,000 cycles. Partial cycles are counted

proportional to their temperature range. A review of ASME Section III Class 2 and 3 and B31.1 piping specifications found no indication of a number of expected lifetime full-range or equivalent full-range thermal cycles greater than 7,000 during the original 40-year plant life. The survey of all plant piping systems found that some of the reactor coolant sample lines may be subject to more than 7,000 but

less than 11,000 full temperature cycles in 60 years requiring a stress range reduction factor (SRRF) of 0.9 times the allowable

stress. The WCGS design analyses of secondary stress ranges are within the limits imposed by the 0.9 SRRF in all line segments. A3.2.5 Fatigue Design of Spent Fuel Pool Liner and Racks for Seismic Events The WCGS spent fuel pool racks were replaced in order to accommodate a larger inventory. The design of the replacement racks included a fatigue analysis of the racks and of high-stress locations in the pool liner. These analyses are described in USAR Section 9.1A.4.3.5.4. The analyses remain valid for any period for which the number of operating basis earthquake events (OBE) has not been and is not expected to be exceeded, assuming an additional safe shutdown earthquake (SSE) might occur. Since the remaining plant life from the present to the end of the period of extended operation (2006 to 2045) is less than that of the original license to which the numbers of OBE and SSE events apply, and since no SSE or significant OBE has occurred, these analyses remain valid for the period of extended

operation.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-42 Rev. 29 License Renewal Application A3.2.6 Fatigue Design and Analysis of Class IE Electrical Raceway Support Angle Fittings for Seismic Events The design of Class IE electrical raceway included a fatigue evaluation of the effects of operating basis and safe shutdown earthquake loads (OBE and SSE loads) on angle fittings used at the connections of strut hangers to overhead supports, or at interhanger locations.

This analysis was extremely conservative, assuming 1000 allowable cycles for a deflection considerably less than the endurance limit. No seismic events have induced significant cyclic loads on these components in the 20-year operating history of the plant to date, so that the design basis number of events remains sufficient for the remainder of the original licensed operating period, plus the period

of extended operation. A3.3 ENVIRONMENTAL QUALIFICATION (EQ) OF ELECTRICAL COMPONENTS Aging evaluations that qualify electrical and I&C components required to meet the requirements of 10 CFR 50.49 are evaluated to

demonstrate qualification for the 40 year plant life are TLAAs. The existing WCGS Environmental Qualification program adequately manages component thermal, radiation, and cyclical aging through the use of aging evaluations based on 10 CFR 50.49(f) qualification methods. As required by 10 CFR 50.49, EQ components not qualified for the

current license term are to be refurbished or replaced, or have their qualification extended prior to reaching the aging limits established in the evaluation.

Continuing the existing 10 CFR 50.49 EQ program ensures that the aging effects are managed and that the EQ components continue to perform their intended functions for the period of extended operation. The Environmental Qualification of Electrical Components

program is described in Section A2.2. A3.4 CONCRETE CONTAINMENT TENDON PRESTRESS The WCGS containment is a prestressed concrete, hemispherical-dome-on-a-cylinder structure, with a steel membrane liner. Post-tensioned tendons compress the concrete and permit the structure to withstand design basis accident internal pressures. The reinforced concrete basemat is conventionally reinforced.

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-43 Rev. 29 License Renewal Application To ensure the integrity of the containment pressure boundary under design basis accident loads, design predictions of loss of prestress demonstrate that prestress should remain adequate for the design life. An inspection program confirms that the tendon prestress

remains within design limits throughout the life of the plant [USAR Section 3.8.1, Technical Specification Surveillance Requirement SR 3.6.1.2]. Continuing the existing ASME Subsection IWL tendon surveillance program ensures that loss of prestress aging effects will be managed and that the containment tendons will continue to perform their intended functions for the period of extended operation. The program

is described in Section A2.3. A3.5 CONTAINMENT LINER PLATE, POLAR CRANE BRACKET, AND PENETRATION LOAD CYCLES Design of the polar crane for a finite number of loads is a TLAA at WCGS (Section A3.6.1). At some plants, though not at WCGS, the supporting crane rail brackets or other supporting structural elements may also have been designed for these cyclic loads.

NUREG-1800 Section 4.6.1 notes that in some designs "Fatigue of the liner plates or metal containments may be considered in the design based on an assumed number of loading cycles for the current

operating term." At WCGS however, the only metallic components of the containment pressure boundary that are designed for a specific number of load cycles in a design lifetime are the main steam penetrations. The containment liner and the remaining penetrations were designed to stress limit criteria, independent of the number of load cycles, and with no fatigue analyses. A3.5.1 Design Cycles for the Main Steam Line Penetrations The BC-TOP-1, "Containment Building Liner Plate Design Report," Part II Section 1.1, describes the main steam penetration design for cyclic loads. The design basis includes 100 lifetime steady state operating thermal gradient plus

normal operating cyclic loads ("Loading Condition V"), and 10 steady state operating thermal gradient plus steam pipe rupture cyclic loads ("Loading Condition IV").

Wolf Creek Appendix A USAR Supplement Wolf Creek Generating Station Page 18A-44 Rev. 29 License Renewal Application The operating history to date indicates that the original design basis 100 operating cycles assumed for main steam penetrations will be adequate for the 60-year extended operating period. For license renewal, an evaluation of an equivalent ASME Section III Class 1 fatigue usage factor found that the penetrations could withstand as many as 2500 lifetime full-range thermal cycles ("Condition V" events), plus the fatigue effects of an end-of-life main steam rupture inside containment (a "Condition IV" event), with a cumulative usage factor of less than 1.0. There is therefore more than sufficient margin in the design for any possible increase in operating cycles above the original estimate. The design of the main steam penetrations is therefore valid for the

period of extended operation. A3.6 PLANT-SPECIFIC TIME-LIMITED AGING ANALYSES A3.6.1 Containment Polar Crane, Fuel Building Cask Handling Crane, Spent Fuel Pool Bridge Crane, and Fuel Handling Machine CMAA-70 Load Cycle Limits The USAR Section 9.1.4 describes design of these lifting machines to Crane Manufacturers Association of America Specification No. 70 (CMAA-70 (1975)). The CMAA-70 crane service classification ("class"

or "design class") for each machine depends, in part, on the assumption that the number of stress cycles at or near the maximum allowable stress will not exceed the number assumed for that design class. In operation, this means the number of significant lifts, i.e. those which approach or equal the design load, should not exceed the number of stress cycles assumed for that design class.

In all cases the design standard number of full-capacity lifts far exceeds the number expected of the machine for a 60-year period of extended operation. The lifting machine designs therefore remain valid for the period of extended operation. A3.7 TLAAS SUPPORTING 10 CFR 50.12 EXEMPTIONS One 10 CFR 50.12 exemption, for use of a leak-before-break analysis for the primary coolant loops, is based in part on a time-limited aging analysis of fatigue effects. See Section A3.2.1.11.