WOLF CREEK TABLE OF CONTENTS CHAPTER 5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS Section Page 5.1
SUMMARY
DESCRIPTION 5.1-1 5.1.1 DESIGN BASES 5.1-1 5.1.2 DESIGN DESCRIPTION 5.1-2 5.1.3 SYSTEM COMPONENTS 5.1-4 5.1.4 SYSTEM PERFORMANCE CHARACTERISTICS 5.1-5 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE BOUNDARY 5.2-1 5.2.1 COMPLIANCE WITH CODES AND CODE CASES 5.2-1 5.2.1.1 Compliance with 10 CFR 50.55a 5.2-1 5.2.1.2 Applicable Code Cases 5.2-1 5.2.2 OVERPRESSURE PROTECTION 5.2-2 5.2.2.1 Design Bases 5.2-2 5.2.2.2 Design Evaluation 5.2-3 5.2.2.3 Piping and Instrumentation Diagrams 5.2-4 5.2.2.4 Equipment and Component Description 5.2-4 5.2.2.5 Mounting of Pressure-Relief Devices 5.2-4 5.2.2.6 Applicable Codes and Classification 5.2-7 5.2.2.7 Material Specifications 5.2-8 5.2.2.8 Process Instrumentation 5.2-8 5.2.2.9 System Reliability 5.2-8 5.2.2.10 RCS Pressure Control During Low Temperature Operation 5.2-8 5.2.2.11 Testing and Inspection 5.2-13 5.2.3 MATERIALS SELECTION, FABRICATION, AND PROCESSING 5.2-13 5.2.3.1 Material Specifications 5.2-13 5.2.3.2 Compatibility with Reactor Coolant 5.2-14 5.2.3.3 Fabrication and Processing of Ferritic Materials 5.2-17 5.2.3.4 Fabrication and Processing of Austenitic Stainless Steel 5.2-18 5.0-i Rev. 29
WOLF CREEK TABLE OF CONTENTS (Continued)
Section Page 5.2.4 INSERVICE INSPECTION AND TESTING OF REACTOR COOLANT PRESSURE BOUNDARY 5.2-25 5.2.4.1 Inspection of Class I Components 5.2-25 5.2.4.2 Arrangement and Accessibility 5.2-26 5.2.4.3 Examination Techniques and Procedures 5.2-29 5.2.4.4 Inspection Intervals 5.2-31 5.2.4.5 Examination Categories and Requirements 5.2-31 5.2.4.6 Evaluation of Examination Results 5.2-32 5.2.4.7 System Leakage and Hydrostatic Tests 5.2-32 5.2.5 REACTOR COOLANT PRESSURE BOUNDARY LEAKAGE DETECTION SYSTEMS 5.2-32 5.2.5.1 Design Bases 5.2-32 5.2.5.2 System Description 5.2-33 5.2.5.3 Safety Evaluation 5.2-43 5.2.5.4 Tests and Inspections 5.2-43 5.2.5.5 Instrumentation Applications 5.2-43 5.
2.6 REFERENCES
5.2-44 5.3 REACTOR VESSEL 5.3-1 5.3.1 REACTOR VESSEL MATERIALS 5.3-1 5.3.1.1 Material Specifications 5.3-1 5.3.1.2 Special Processes Used for Manufacturing and Fabrication 5.3-1 5.3.1.3 Special Methods for Nondestructive Examination 5.3-2 5.3.1.4 Special Controls for Ferritic and Austenitic Stainless Steels 5.3-4 5.3.1.5 Fracture Toughness 5.3-4 5.3.1.6 Material Surveillance 5.3-5 5.3.1.7 Reactor Vessel Fasteners 5.3-16 5.3.2 PRESSURE - TEMPERATURE LIMITS 5.3-17 5.3.2.1 Limit Curves 5.3-17 5.3.2.2 Operating Procedures 5.3-17 5.0-ii Rev. 29
WOLF CREEK TABLE OF CONTENTS (Continued)
Section Page 5.3.3 REACTOR VESSEL INTEGRITY 5.3-18 5.3.3.1 Design 5.3-18 5.3.3.2 Materials of Construction 5.3-19 5.3.3.3 Fabrication Methods 5.3-19 5.3.3.4 Inspection Requirements 5.3-19 5.3.3.5 Shipment and Installation 5.3-19 5.3.3.6 Operating Conditions 5.3-20 5.3.3.7 Inservice Surveillance 5.3-21 5.
3.4 REFERENCES
5.3-24 5.4 COMPONENT AND SUBSYSTEM DESIGN 5.4-1 5.4.1 REACTOR COOLANT PUMPS 5.4-1 5.4.1.1 Design Bases 5.4-1 5.4.1.2 Pump Description 5.4-1 5.4.1.3 Design Evaluation 5.4-4 5.4.1.4 Tests and Inspections 5.4-9 5.4.1.5 Pump Flywheels 5.4-9 5.4.2 STEAM GENERATORS 5.4-11 5.4.2.1 Design Bases 5.4-11 5.4.2.2 Design Description 5.4-12 5.4.2.3 Steam Generator Materials 5.4-14 5.4.2.4 Steam Generator Inservice Inspection 5.4-18 5.4.2.5 esign Evaluation 5.4-20 5.4.2.6 Quality Assurance 5.4-24 5.4.3 REACTOR COOLANT PIPING 5.4-25 5.4.3.1 Design Bases 5.4-25 5.4.3.2 Design Description 5.4-26 5.4.3.3 Design Evaluation 5.4-29 5.4.3.4 Tests and Inspections 5.4-30 5.4.4 MAIN STEAM LINE FLOW RESTRICTOR 5.4-31 5.4.4.1 Design Basis 5.4-31 5.4.4.2 Design Description 5.4-31 5.4.4.3 Design Evaluation 5.4-31 5.4.4.4 Tests and Inspections 5.4-31 5.0-iii Rev. 29
WOLF CREEK TABLE OF CONTENTS (Continued)
Section Page 5.4.5 MAIN STEAM LINE ISOLATION SYSTEM 5.4-31 5.4.6 REACTOR CORE ISOLATION COOLING SYSTEM 5.4-31 5.4.7 RESIDUAL HEAT REMOVAL SYSTEM 5.4-31 5.4.7.1 Design Bases 5.4-31 5.4.7.2 Design Description 5.4-32 5.4.7.3 Performance Evaluation 5.4-43 5.4.7.4 Preoperational Testing 5.4-44 5.4.8 REACTOR WATER CLEANUP SYSTEM 5.4-44 5.4.9 MAIN STEAM LINE AND FEED WATER PIPING 5.4-44 5.4.10 PRESSURIZER 5.4-45 5.4.10.1 Design Bases 5.4-45 5.4.10.2 Design Description 5.4-46 5.4.10.3 Design Evaluation 5.4-47 5.4.10.4 Tests and Inspections 5.4-49 5.4.11 PRESSURIZER RELIEF DISCHARGE SYSTEM 5.4-50 5.4.11.1 Design Bases 5.4-50 5.4.11.2 System Description 5.4-50 5.4.11.3 Design Evaluation 5.4-52 5.4.11.4 Instrumentation Requirements 5.4-53 5.4.11.5 Tests and Inspections 5.4-53 5.4.12 VALVES 5.4-53 5.4.12.1 Design Bases 5.4-53 5.4.12.2 Design Description 5.4-54 5.4.12.3 Design Evaluation 5.4-54 5.4.12.4 Tests and Inspections 5.4-54 5.4.13 SAFETY AND RELIEF VALVES 5.4-55 5.4.13.1 Design Bases 5.4-55 5.4.13.2 Design Description 5.4-55 5.4.13.3 Design Evaluation 5.4-56 5.4.13.4 Tests and Inspections 5.4-56 5.4.14 COMPONENT SUPPORTS 5.4-56 5.4.14.1 Design Bases 5.4-56 5.4.14.2 Description 5.4-57 5.4.14.3 Design Evaluation 5.4-60 5.4.14.4 Tests and Inspections 5.4-60 5.0-iv Rev. 29
WOLF CREEK TABLE OF CONTENTS (Continued)
Section Page 5.4.15 REFERENCES 5.4-60 5.0-v Rev. 29
WOLF CREEK TABLE OF CONTENTS (Continued)
LIST OF TABLES Table No. Title 5.1-1 System Design and Operating Parameters 5.2-1 Applicable Code Addenda for Reactor Coolant System Components 5.2-2 Class 1 Primary Components Material Specifications 5.2-3 Class 1 and 2 Auxiliary Components Material Specifications 5.2-4 Reactor Vessel Internals for Emergency Core Cooling Systems 5.2-5 Recommended Reactor Coolant Water Chemistry Limits 5.2-6 Design Comparison With Regulatory Guide 1.45, Dated May 1973, Titled Reactor Coolant Pressure Boundary Leakage Detection Systems 5.2-7 Deleted 5.3-1 Reactor Vessel Quality Assurance Program 5.3-2 Reactor Vessel Design Parameters 5.3-3 Reactor Vessel Material Properties 5.3-4 Deleted 5.3-5 Deleted 5.3-6 Reactor Vessel Closure Head Bolting Material Properties 5.3-7 Vessel Beltline Region Weld Metal Identification Information 5.3-8 Beltline Region Intermediate Shell Plate Toughness 5.3-9 Beltline Region Lower Shell Plate Toughness 5.3-10 Beltline Region Weld Metal Toughness 5.3-11 Reactor Vessel Material Surveillance Program - Withdrawl Schedule 5.4-1 Reactor Coolant Pump Design Parameters 5.4-2 Reactor Coolant Pump Quality Assurance Program 5.4-3 Steam Generator Design Data 5.0-vi Rev. 32
WOLF CREEK TABLE OF CONTENTS (Continued)
LIST OF TABLES Table No. Title 5.4-4 Steam Generator Quality Assurance Program 5.4-5 Reactor Coolant Piping Design Parameters 5.4-6 Reactor Coolant Piping Quality Assurance Program 5.4-7 Design Parameters Bases for Residual Heat Removal System Operation 5.4-8 Residual Heat Removal System Component Data 5.4-9 Failure Modes and Effects Analysis - Residual Heat Removal System Active Components - Plant Cooldown Operation 5.4-10 Pressurizer Design Data 5.4-11 Reactor Coolant System Design Pressure Settings 5.4-12 Pressurizer Quality Assurance Program 5.4-13 Pressurizer Relief Tank Design Data 5.4-14 Relief Valve Discharge to the Pressurizer Relief Tank 5.4-15 Reactor Coolant System Valve Design Parameters 5.4-16 Reactor Coolant System Valves Nondestructive Examination Program 5.4-17 Pressurizer Valves Design Parameters 5.0-vii Rev. 29
WOLF CREEK CHAPTER 5 - LIST OF FIGURES
- Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.
Figure # Sheet Title Drawing #*
5.1-1 1 Reactor Coolant System M-12BB01 5.1-1 2 Reactor Coolant System M-12BB02 5.1-1 3 Reactor Coolant System M-12BB03 5.1-1 4 Reactor Coolant System M-12BB04 5.1-2 0 Reactor Coolant System Process Flow Diagram 5.2-1 0 Installation Detail for the Main Steam Pressure Relief Devices 5.2-2 0 Primary Coolant Leak Detection Response Time 5.3-1 0 Reactor Vessel 5.3-2 0 Wolf Creek Unit 1 Reactor Vessel Beltline Region Material Identification and Location 5.4-1 0 Reactor Coolant Controlled Leakage Pump 5.4-2 0 Reactor Coolant Pump Estimated Performance Characteristic 5.4-3 0 Westinghouse Model F Steam Generator 5.4-4 0 Westinghouse Model F Steam Generator Mechanical Modification Improvements 5.4-5 0 Westinghouse Model F Steam Generator Design Improvements 5.4-6 0 Quatrefoil Broached Holes 5.4-7 0 Residual Heat Removal System M-12EJ01 5.4-8 0 Residual Heat Removal System Process Flow Diagram 5.4-9 0 Normal Residual Heat Removal Cooldown 5.4-10 0 Single Residual Heat Removal Train Cooldown 5.4-11 0 Pressurizer 5.4-12 0 Pressurizer Relief Tank 5.4-13 0 Reactor Vessel Supports 5.4-14 0 Steam Generator Supports 5.4-15 0 Reactor Coolant Pump Supports 5.4-16 0 Reactor Building Internals Pressurizer Supports 5.4-17 0 Pressurizer Supports 5.4-18 0 Crossover Leg Supports 5.4-19 0 Crossover Leg Vertical Run Restraint (deleted in 5th refueling outage) 5.4-20 0 Hot Leg Restraint 5.4-21 0 Hot and Cold Leg Lateral Restraints C-03BB53 5.0-viii Rev. 29
WOLF CREEK CHAPTER 5.0 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.1
SUMMARY
DESCRIPTION 5.1.1 DESIGN BASES The performance and safety design bases of the reactor coolant system (RCS) and its major components are interrelated. These design bases are listed below:
- a. The RCS has the capability to transfer to the steam and power conversion system the heat produced during power operation and when the reactor is subcritical, including the initial phase of plant cooldown.
- b. The RCS has the capability to transfer to the residual heat removal system the heat produced during the subsequent phase of plant cooldown and cold shutdown.
- c. The RCS heat removal capability under power operation and normal operational transients, including the transition from forced to natural circulation, assures no fuel damage within the operating bounds permitted by the reactor control and protection systems.
- d. The RCS provides the water used as the core neutron moderator and reflector and as a solvent for chemical shim control.
- e. The RCS maintains the homogeneity of the soluble neutron poison concentration and the rate of change of the coolant temperature, so that uncontrolled reactivity changes do not occur.
- f. The RCS pressure boundary is capable of accommodating the temperatures and pressures associated with operational transients.
- g. The reactor vessel supports the reactor core and control rod drive mechanisms.
- h. The pressurizer maintains the system pressure during operation and limits pressure transients. During the reduction or increase of plant load, the pressurizer accommodates volume changes in the reactor coolant.
5.1-1 Rev. 0
WOLF CREEK
- i. The reactor coolant pumps supply the coolant flow necessary to remove heat from the reactor core and transfer it to the steam generators.
- j. The steam generators provide high quality steam to the turbine. The tube and tubesheet boundary are designed to prevent the transfer of radioactivity generated within the core to the secondary system.
- k. The RCS piping contains the coolant under operating temperature and pressure conditions and limits leakage (and activity release) to the containment atmosphere. The RCS piping contains demineralized borated water which is circulated at the flow rate and temperature consistent with achieving the reactor core thermal and hydraulic performance.
- l. The RCS is monitored for loose parts, as described in Section 4.4.6.
5.1.2 DESIGN DESCRIPTION The RCS, shown in Figure 5.1-1, consists of four similar heat transfer loops connected in parallel to the reactor pressure vessel. Each loop contains a reactor coolant pump, steam generator, and associated piping and valves. In addition, the system includes a pressurizer, pressurizer relief and safety valves, interconnecting piping, and instrumentation necessary for operational control. All the above components are located in the containment building.
During operation, the RCS transfers the heat generated in the core to the steam generators where steam is produced to drive the turbine generator. Borated demineralized water is circulated in the RCS at a flow rate and temperature consistent with achieving the reactor core thermal-hydraulic performance. The water also acts as a neutron moderator and reflector and as a solvent for the neutron absorber used in chemical shim control.
The RCS pressure boundary is a barrier against the release of radioactivity generated within the reactor, and is designed to ensure a high degree of integrity throughout the life of the plant.
RCS pressure is controlled by the use of the pressurizer where water and steam are maintained in equilibrium by electrical heaters and water sprays. Steam can be formed (by the heaters) or condensed (by the pressurizer spray) to minimize pressure variations due to contraction and expansion of the reactor coolant.
5.1-2 Rev. 0
WOLF CREEK Spring-loaded safety valves and power-operated relief valves from the pressurizer provide for steam discharge from the RCS. Discharged steam is piped to the pressurizer relief tank, where the steam is condensed and cooled by mixing with water.
The extent of the RCS is defined as:
- a. The reactor vessel, including control rod drive mechanism housings
- b. The portion of the steam generators containing reactor coolant
- c. Reactor coolant pumps
- d. The pressurizer
- e. Safety and relief valves
- f. The interconnecting piping, valves, and fittings between the principal components listed above
- g. The piping, fittings, and valves leading to connecting auxiliary or support systems up to and including the second isolation valve (from the high pressure side) on each line The RCS is shown schematically in Figure 5.1-2. Included on this figure is a tabulation of principal pressures and temperatures and the flow rate of the system under normal steady state full power operating conditions. These parameters are based on the best estimate flow at the pump discharge. RCS volume under the above conditions is presented in Table 5.1-1.
A piping and instrumentation diagram of the RCS is shown in Figure 5.1-1. The diagrams show the extent of the systems located within the containment and the points of separation between the RCS and the secondary (heat utilization) system. Figure 1.2-9 and Figures 1.2-11 through 1.2-18 provide plan and elevation views of the reactor building. These figures show principal dimensions of reactor coolant system components in relationship with supporting and surrounding steel and concrete structures and demonstrate the protection provided to the reactor coolant system by its physical layout.
5.1-3 Rev. 13
WOLF CREEK 5.1.3 SYSTEM COMPONENTS The major components of the RCS are as follows:
- a. Reactor vessel The reactor vessel is cylindrical and has a welded, hemispherical bottom head and a removable, flanged, hemispherical upper head. The vessel contains the core, core-supporting structures, control rods, and other parts directly associated with the core.
The vessel has inlet and outlet nozzles located in a horizontal plane just below the reactor vessel flange but above the top of the core. Coolant enters the vessel through the inlet nozzles and flows down the core barrel-vessel wall annulus, turns at the bottom, and flows up through the core to the outlet nozzles.
- b. Steam generators The steam generators are vertical shell and U-tube evaporators with integral moisture separating equipment.
The reactor coolant flows through the inverted U-tubes, entering and leaving through the nozzles located in the hemispherical bottom head of the steam generator. Steam is generated on the shell side and flows upward through the moisture separators to the outlet nozzle at the top of the vessel. The steam generator design is designated by Westinghouse as Model F.
- c. Reactor coolant pumps The reactor coolant pumps are single speed centrifugal units driven by air-cooled, three-phase induction motors. Heat from the air-cooling system is rejected to the component cooling water. The shaft is vertical with the motor mounted above the pump. A flywheel on the shaft above the motor provides additional inertia to extend pump coastdown. The flow inlet is at the bottom of the pump, and the discharge is on the side.
- d. Piping The reactor coolant piping is seamless stainless steel piping. The hot leg is defined as the piping between the reactor vessel outlet nozzle and the steam generator. The cold leg is defined as the piping between the reactor coolant pump outlet and the reactor vessel. The crossover leg is defined as the piping between the steam generator and the reactor coolant pump inlet.
5.1-4 Rev. 0
WOLF CREEK
- e. Pressurizer The pressurizer is a vertical, cylindrical vessel with hemispherical top and bottom heads. Electrical heaters are installed through the bottom head of the vessel while the spray nozzle and relief and safety valve connections are located in the top head of the vessel.
- f. Safety and relief valves The pressurizer safety valves are of the totally enclosed pop-type. The valves are spring loaded and self activated with back pressure compensation. The power-operated relief valves have electric solenoid actuators. They are operated automatically based on RCS pressure or by remote manual control. Remotely operated valves are provided to isolate the inlet to the power-operated relief valves if excessive leakage occurs. These valves will automatically isolate if the RCS pressure drops below a predetermined value, indicative of a stuck-open, power-operated relief valve.
Steam from the pressurizer safety and relief valves is discharged into the pressurizer relief tank through a sparger pipe under the water level. This condenses and cools the steam by mixing it with water that is near ambient temperature.
5.1.4 SYSTEM PERFORMANCE CHARACTERISTICS Design and performance characteristics of the RCS are provided in Table 5.1-1.
- a. Reactor coolant flow The reactor coolant flow, a major parameter in the design of the system and its components, is established with a detailed design procedure supported by operating plant performance data, by pump model tests and analysis, and by pressure drop tests and analyses of the reactor vessel and fuel assemblies. Data from all operating plants have indicated that the actual flow has been well above the flow specified for the thermal design of the plant. By applying the design procedure described below, it is possible to specify the expected operating flow with reasonable accuracy.
5.1-5 Rev. 0
WOLF CREEK Three reactor coolant flow rates are identified for the various plant design considerations. The definitions of these flows are presented in the following paragraphs.
- b. Best estimate flow The best estimate flow is the most likely value for the actual plant operating condition. This flow is based on the best estimate of the flow resistances in the reactor vessel, steam generator, and piping and on the best estimate of the reactor coolant pump head-flow capacity, with no uncertainties assigned to either the system flow resistance or the pump head. System pressure drops, based on best estimate flow, are presented in Table 5.1-1.
Although the best estimate flow is the most likely value to be expected in operation, more conservative flow rates are applied in the thermal and mechanical designs.
- c. Thermal design flow Thermal design flow is the flow rate used as a basis for the reactor core thermal performance, the steam generator thermal performance, and the nominal plant parameters used throughout the design. The thermal design flow accounts for the uncertainties in flow resistances (reactor vessel, steam generator, and piping), reactor coolant pump head, and the methods used to measure flow rate. The thermal design flow is approximately 9.0 percent less than the best estimate flow. The thermal design flow is confirmed when the plant is placed in operation. Tabulations of important design and performance characteristics of the RCS, as provided in Table 5.1-1, are based on the thermal design flow.
- d. Mechanical design flow Mechanical design flow is a conservatively high flow used in the mechanical design of the reactor vessel internals and fuel assemblies. The mechanical design flow is based on a reduced system resistance and on increased pump head capability. The mechanical design flow is approximately 2.0 percent greater than the best estimate flow.
5.1-6 Rev. 34
WOLF CREEK Pump overspeed due to a turbine generator overspeed of 20 percent results in a peak reactor coolant flow of 120 percent of the mechanical design flow. The overspeed condition is applicable only to operating conditions when the reactor and turbine generator are at power.
- e. Flows with one pump shut down The design procedure for calculation of flows with one pump shut down is similar to the procedure described above for calculating flows with all pumps operating.* For the case where reverse flow exists in the idle loop, the system resistance incorporates the idle loop reverse flow resistance with a stationary pump impeller as a flow path in parallel with the reactor vessel internals.
The thermal design flow uncertainty includes a conservative application of parallel flow uncertainties (reactor internals high, idle loop low) as well as the usual component, pump, and flow measurement uncertainties, thereby resulting in a conservatively low reactor flow rate for the thermal design. The mechanical design flow uncertainty is increased slightly to account for the slightly higher uncertainties at the higher pump flows.
- In reality, WCGS Technical Specifications require a shutdown to hot standby (Mode 3) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of a shutdown of a reactor coolant pump when in Mode 1 or 2. Continuous 3 pump operation is not permitted.
5.1-7 Rev. 13
WOLF CREEK TABLE 5.1-1 SYSTEM DESIGN AND OPERATING PARAMETERS Plant design life, years 40 Nominal operating pressure, psig 2,235 Total system volume, including 12,135 +/-100*
pressurizer and surge line, ft3 System liquid volume, including 11,393 pressurizer water at maximum guaranteed power, ft3 Pressurizer spray rate, maximum, gpm 900 Pressurizer heater capacity, kW 1,800 System Thermal and Hydraulic Data Uprated 4 Pumps NSSS Power Running of 3,651 MWt NSSS power, MWt 3,579 3,651 Reactor power, MWt 3,565 3,637 Thermal design flows, gpm Active loop 90,300** (10% SGTP) 90,300**
Reactor (core flow only) 330,859*** (10% SGTP) 330,859***
Total reactor flow, 106 lb/hr 134.7 134.9 Temperatures, °F Reactor vessel outlet 621.0 621.6 Reactor vessel inlet 555.8 555.2 Steam generator outlet 555.5 554.9 Steam generator steam 537.5 536.4 Feedwater 446.0 448.6
- at a nominal Tavg of 557°F
- Exact value of 90,324 gpm rounded to the nearest hundred gpm.
- Value reflects a TDF of 90,300 gpm/loop and a design core bypass flow of 8.4%.
Rev. 34
WOLF CREEK TABLE 5.1-1 (Sheet 2)
System Thermal and Hydraulic Data Uprated 4 Pumps NSSS Power Running of 3,651 MWt Steam pressure, psia 943 934 Total steam flow, lO6 lb/hr 15.91 16.29 Best estimate flows, gpm+
Active loop 102,200 (0% SGTP) 99,200 (10% SGTP)
Reactor (core flow only) 374,461 (0% SGTP) 363,469 (10% SGTP)
Mechanical design flows, gpm+
Active loop 104,200 (0% SGTP)
Reactor (core flow only) 381,789 (0% SGTP)
System Pressure Drops+
(Tavg = 570.7°F) (Tavg = 588.4°F)
Reactor vessel P, psi 48.7 47.4 Steam generator P, psi 41.3 45.5 Hot leg piping P, psi 1.3 1.2 Crossover leg piping P, psi 3.4 3.1 Cold leg piping P, psi 3.6* 3.3*
Pump head, ft 298 312
+Values applicable to both current power and uprated power of 3,651 MWt
- Includes pump weir P of 2.0 psi.
Rev. 34
WOLF CREEK STEAM GENERATOR STEAM GENERATOR LOOP3 LOOP4 tSEE NOTES ON THE FOLLOWING PAGESt NOTES:
THIS DIAGRAM IS A SIMPLIFICATION OF THE SYSTEM INTENDED TO FACIUATE THE UNDERSTANDING OF THE PROCESS. FOR DETAILS OF THE PIPING, VALVES, INSTRUMENTATION, ETC. REFER TO TH£ ENGINEERING FLOW DIAGRAM. REFER TO PROCESS FLOW DIAGRAM TABLES FOR THE CONDITIONS AT EACH NUMBERED POINT.
WOLF CREEK UPDATED SAFETY ANALYSIS REPORT Figure 5.1-2, REV. 20 REACTOR COOLANT SYSTEM PROCESS FLOW DIAGRAM
WOLF CREEK NOTES TO FIGURE 5.1-2 Mode A Steady State Full Power Operation Key: Basis numbers NSSS 3579 MWt for Thot Maintained @ 10% SG Tube Plugging
( ) numbers NSSS 3579 MWt for 15°F Thot Reduction @ 10% SG Tube Plugging Pressure(2) Temperature Flow Volume Location Fluid (psig) (°F) gpm(1) (cu.ft.)
1 Reactor 2,236.2 618.3 110,871 -
Coolant (2,236.2) (601.4) (109,522) 2 Reactor 2,235.0 618.3 110,875 -
Coolant (2,235.0) (601.4) (109,526) 3 Reactor 2,189.5 558.2 99,310 -
Coolant (2,188.4) (539.7) (99,294) 4 Reactor 2,186.4 558.2 99,315 -
Coolant (2,185.2) (539.7) (99,298) 5 Reactor 2,286.9 558.5 99,200 -
Coolant (2,288.2) (540.0) (99,200) 6 Reactor 2,283.6 558.5 99,205 -
Coolant (2,284.8) (540.0) (99,204) 10-15 Reactor See Loop #1 Specifications Coolant 19-24 Reactor See Loop #1 Specifications Coolant 28-33 Reactor See Loop #1 Specifications Coolant 37 Reactor 2,286.9 558.5 1.0 -
Coolant (2,288.2) (540.0) (1.0) 38 Reactor 2,286.9 558.5 1.0 -
Coolant (2,288.2) (540.0) (1.0) 39 Reactor 2,286.9 558.5 2.0 -
Coolant (2,288.2) (540.0) (2.0)
Rev. 13
WOLF CREEK NOTES TO FIGURE 5.1-2 (Sheet 2)
Mode A Steady State Full Power Operation Location Fluid Pressure(2) Temperature Flow Volume (psig) (F) gpm(1) (cu.ft.)
40 Steam 2,235.0 652.7 720 41 Reactor 2,235.0 652.7 1,080 coolant 42 Reactor 2,235.0 652.7 2.5 -
coolant 43 Reactor 2,235.0 652.7 2.5 -
coolant 44 Steam 2,235.0 652.7 0 -
45 Reactor 2,235.0 <652.7 0 -
coolant 46 N2 3.0 120 0 -
47 Reactor 2,235.0 <652.7 0 -
coolant 48 N2 3.0 120 0 -
49 N2 3.0 120 0 -
50 N2 3.0 120 - 450 51 Pres- 3.0 120 - 1,350 surizer relief tank water 52 Steam/H2 2,235.0 559 0 -
53 Reactor 3.0 120 0 -
coolant 54 Reactor 50 170 0 -
coolant (1) At the conditions specified.
(2) Pressures reflect nonrecoverable losses only (Elevation Ps are not included)
Rev. 13
WOLF CREEK 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE BOUNDARY This section discusses the measures employed to provide and maintain the integrity of the reactor coolant pressure boundary (RCPB) for the plant design lifetime. Section 50.2 of 10 CFR 50 defines the RCPB as extending to the outermost containment isolation valve in system piping which penetrates the containment and is connected to the RCS. This section is limited to a description of the components of the RCS as defined in Section 5.1, unless otherwise noted. Components* which are part of the RCPB (as defined in 10 CFR
- 50) but are not described in this section are described in the following sections:
- a. Section 6.3 - RCPB components which are part of the emergency core cooling system.
- b. Section 9.3.4 - RCPB components which are part of the chemical and volume control system.
- c. Section 3.9(N).1 - Design loadings, stress limits, and analyses applied to the RCS and ASME Code Class 1 components.
- d. Section 3.9(N).3 - Design loadings, stress limits, and analyses applied to ASME Code Class 2 and 3 components.
The phrase RCS, as used in this section, is as defined in Section 5.1. When the term RCPB is used in this section, its definition is that of Section 50.2 of 10 CFR 50.
5.2.1 COMPLIANCE WITH CODES AND CODE CASES 5.2.1.1 Compliance with 10 CFR 50.55a RCS components are designed and fabricated in accordance with 10 CFR 50, Section 50.55a, "Codes and Standards" except as described below. The addenda of the ASME Code applied in the design of each component are listed in Table 5.2-1.
All components located within the reactor coolant pressure boundary (as defined by 10CFR50.2) are classified as required by 10CFR50.55a with the exception of the pressurizer upper level instrument lines, the pressurizer safety valve loop seal drain lines, 3/4 and smaller branch lines connected to the pressurizer relief lines, and the associated components. These lines are Safety Class 2 although a rupture of one of these lines may result in a rapid depressurization of the reactor coolant system and ECCS actuation on low pressurizer pressure.
Relief from the requirements of 10CFR50.55a was authorized by the NRC in accordance with 10CFR50.55a(a)(3)(ii) to allow these lines to remain Safety Class 2 (Reference 11).
5.2.1.2 Applicable Code Cases Regulatory Guides 1.84 and 1.85 are discussed in Appendix 3A.
Code Case 1528 (SA-508, Class 2a) material was used in the manufacture of the WCGS steam generators and pressurizer. At the time of initial application, Regulatory Guide 1.85 reflected a conditional NRC approval of Code Case 1528.
Westinghouse conducted a test program which demonstrated the adequacy of Code Case 1528 material. The results of the test program are documented in Reference 1.
- A component is considered to be any piece or portion of equipment below the system level but above the part level.
5.2-1 Rev. 19
WOLF CREEK Reference 1 was submitted to the NRC by Reference 2.
The specific code cases used for Wolf Creek are:
Steam Generator: 1484 and 1528 Pressurizer: 1528-3 Piping: 1423-2, N-411, N-391, N-392 & N-318-3*, 1606-1 (N-53)
Valves:1649, 1769, 1567 and N-3-10 5.2.2 OVERPRESSURE PROTECTION RCS overpressure protection is accomplished by the utilization of pressurizer safety valves along with the reactor protection system and associated equipment. Combinations of these systems provide compliance with the overpressure requirements of the ASME Boiler and Pressure Vessel Code,Section III, Paragraphs NB-7300 and NC-7300, for pressurized water reactor systems.
Auxiliary or emergency systems connected to the RCS are not utilized for the prevention of RCS overpressurization protection.
Selected overpressure protection measures for the secondary side are also described in these sections.
5.2.2.1 Design Bases Overpressure protection is provided for the RCS by the pressurizer safety valves which discharge to the pressurizer relief tank by means of a common header. The transient which established the design requirements for the primary system overpressure protection is a complete loss of steam flow to the turbine with operation of the steam generator safety valves and maintenance of main feedwater flow. However, for the sizing of the pressurizer safety valves, no credit is taken for reactor trip nor the operation of the following:
- a. Pressurizer power-operated relief valves
- b. Steam line atmospheric relief valve
- c. Steam dump system
- d. Reactor control system
- e. Pressurizer level control system
- f. Pressurizer spray valve For this transient, the peak RCS and peak steam system pressure are limited to 110 percent of their respective design values.
- Code Case N-318-3 provides several conditions for lug attachment evaluation snubber reduction program (Ref. 13) has listed all stress calculation numbers that used N-318-3 in class 2 and 3 pipe lines. Lug locations are available in pipe support drawings.
5.2-2 Rev. 32
WOLF CREEK Assumptions for the overpressure analysis include: 1) the plant is operating at the power level corresponding to the engineered safeguards design rating and
- 2) the RCS average temperature and pressure are at their maximum values. These assumptions are the most limiting with respect to system overpressure.
Overpressure protection for the steam system is provided by steam generator safety valves. The steam system safety valve capacity is based on providing enough relief to remove 105 percent of the engineered safeguards design steam flow. This relief capacity may be provided while limiting the maximum steam system pressure to less than 110 percent of the steam generator shell side design pressure.
Blowdown and heat dissipation systems of the NSSS connected to the discharge of pressure relieving devices are discussed in Section 5.4.11, pressurizer relief discharge system.
Steam generator blowdown systems for the balance-of-plant are discussed in Section 10.4.8.
Postulated events and transients on which the design requirements of the overpressure protection system are based are discussed in Reference 3.
5.2.2.2 Design Evaluation The relief capacities of the pressurizer and steam generator safety valves are determined from the postulated overpressure transient conditions in conjunction with the action of the reactor protection system. An evaluation of the functional design of the system to perform its function is presented in Reference 3. The results of the analysis performed at the uprated power condition also confirm that the design of the overpressure protection system will continue to perform its function under uprated power condition. The analysis showed that when the first reactor protection system trip signal (following a direct reactor trip signal on turbine trip) was ignored, the primary and secondary coolant overpressure protection systems provided sufficient pressure relief to ensure that the peak pressure of both coolant systems remained below the Technical Specification limit of 110% of their respective design pressures. The analysis further demonstrated that, when the second and third trip signals were ignored, the overpressure protection systems maintained the primary and secondary coolant pressures below 110% of their design pressures and thus confirmed adequate safety valve sizing exists under uprated power conditions.
5.2-3 Rev. 8
WOLF CREEK Reference 3 describes in detail the types and number of pressure relief devices employed, relief device description, locations in the systems, reliability history, and the details of the methods used for relief device sizing based on typical worst-case transient conditions and analysis data for each transient condition. The description of the analytical model used in the analysis of the overpressure protection system and the basis for its validity are discussed in Reference 8. An evaluation of the overpressure protection systems design was performed to ensure that the conclusions presented in Reference 3 remain valid under the uprated power conditions. The evaluation followed the methodology presented in Reference 3 utilizing the analytical model described in Reference 8.
A description of the pressurizer safety valves performance characteristics along with the design description of the incidents, assumptions made, method of analysis, and conclusions are discussed in Chapter 15.0.
5.2.2.3 Piping and Instrumentation Diagrams Overpressure protection for the RCS is provided by pressurizer safety valves shown in Figure 5.1-1, Sheet 2.
These discharge to the pressurizer relief tank by means of a common header.
The steam system safety valves are discussed in Section 10.3 and are shown on Figure 10.3-1, Sheet 2.
5.2.2.4 Equipment and Component Description The operation, significant design parameters, number and types of operating cycles, and environmental conditions of the pressurizer safety valves are discussed in Sections 5.4.13, 3.9(N).1, and 3.11(N).
Section 10.3 contains a discussion of the equipment and components of the steam system overpressure system.
5.2.2.5 Mounting of Pressure-Relief Devices The design bases for the assumed loads for the primary and secondary side pressure relief devices of the steam generator are described in Paragraph 3.9(B).3.3.
5.2.2.5.1 Location of Pressure Relief Devices Figure 5.2-1 provides typical design and installation details for pressure relief devices mounted on the secondary side of the steam generator. Pressure relief devices for the reactor coolant system are three pressurizer safety relief valves and two power-operated relief valves. These valves discharge to the pressurizer relief tank via a common header.
5.2-4 Rev. 13
WOLF CREEK 5.2.2.5.2 Pressurizer Safety Relief Valves The pressurizer safety valve discharge piping system is a closed system in which no sustained reaction force from a free discharging jet of fluid can exist. However, transient hydraulic forces are imposed at various points in the piping system from the time a safety valve begins to open until a steady flow is completely developed. Since a water loop seal is applied, transient hydraulic forces caused by the liquid being forced through the safety valve and then accelerated down the piping system does occur.
The pressurizer relief devices are mounted and installed as follows:
- a. Each straight leg of the discharge pipe is supported to take the valve discharge transient force along that leg.
- b. The supports at the valve discharge piping are connected to the adjacent structure.
- c. Snubbers are used to restrain the valve discharge transient forces when thermal movements are of a high magnitude.
Subprogram RVDFT (relief valve discharge flow transients) was used to predict the transient flows resulting from actuation of a safety relief valve under normal operating conditions. It also predicted the resulting piping loads as a function of time to be used as dynamic forcing functions for structural design of discharge piping and its supporting components. The computation was based on finite difference solutions by the method of effluent characteristics. The computed transient forces were then used to calculate loads on pipe bends and on pipe runs.
A static analysis was performed for thermal, weight, and seismic anchor movement loadings on the discharge piping. A dynamic analysis for seismic and valve discharge loadings was also performed to verify the design of the support configuration. The results of these analyses are described below:
- a. For loading combinations see Table 3.9(B)-2.
- b. Material Type Class I Piping 3" Sch. 160, SA-312, TP-304 6" Sch. 160, SA-312, TP-304 B31.1 Piping 3" Sch. 80S, SA-312, TP-304 6" Sch. 80S, SA-312, TP-304 12" Sch. 80S, SA-312, TP-304 5.2-5 Rev. 29
WOLF CREEK
- c. Maximum stress points within piping system Class I Piping Node point - 405 Type - reducer Max. primary stress 18,092 psi Allowable primary stress 24,282 psi B31.1 Piping Node point - 310 Max. primary stress 14,811 psi Allowable primary stress 22,560 psi Node point - 555 Max. primary + secondary stress 33,995 psi Allowable primary +
secondary stress 43,375 psi 5.2.2.5.3 Main Steam Safety Relief Valves Figure 5.2-1 provides design and installation details.
The steady-state flow condition reached after the valve has opened and is exhausting into the stack was considered in the stress analysis of the safety valve installation. With these conditions, the valve moments are balanced due to the split valve discharge design, and the vertical discharge thrust force is reacted by the header supports via the header. The discharge force from the vent stack is reacted by an in-line anchor and the supports near the top of the stack. The effects of thermal expansion, pipe weight, seismic anchor movements, seismic occurrence, and relief valve discharge thrust forces were considered in the stress analysis of the vent stack piping. These effects were also considered in the stress analysis of the main steam header piping in addition to the water hammer effects caused by fast valve closure of the main steam isolation valves.
A 10 percent unbalanced discharge from the two split discharge ports of each safety valve was assumed for the stress analysis of the header piping.
Therefore, one discharge port had an assumed vertical thrust load of 13,574 pounds and the other an assumed thrust load of 12,227 pounds. These values are based on a relief valve discharge from a line pressure of 1,185 psi and a dynamic load factor of 1.2. It was conservatively assumed that each valve opened simultaneously, resulting in the following header stresses and support loads:
- a. For loading combinations see Table 3.9(B)-2 and Table 3.9(B)-10.
5.2-6 Rev. 0
WOLF CREEK
- c. Maximum stress points within system Node point - 83 Maximum primary stress 9,287 psi Allowable primary stress 21,000 psi Node point - 5 Maximum secondary stress 4,112 psi Allowable secondary stress 26,250 psi
- d. Support loads Header Support Loads (vertical supports and Node Point loads only) 5 21,942 lbs 33 187,800 lbs 83 112,700 lbs 85 166,300 lbs 300 33,347 lbs 294 187,800 lbs 282 112,700 lbs 281 166,300 lbs 347 33,362 lbs 341 187,800 lbs 329 112,700 lbs 328 166,300 lbs 397 10,100 lbs 391 184,400 lbs 380 112,800 lbs 379 166,300 lbs 5.2.2.6 Applicable Codes and Classification The requirements of ASME Boiler and Pressure Vessel Code,Section III, Paragraphs NB-7300 (Overpressure Protection Report) and NC-7300 (Overpressure Protection Analysis), are followed and complied with for pressurized water reactor systems.
Piping, valves, and associated equipment used for overpressure protection are classified in accordance with ANS-N18.2, "Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants." These safety class designations are delineated on Table 3.2-1 and shown on Figure 5.1-1.
For further information, refer to Section 3.9(N).
5.2-7 Rev. 0
WOLF CREEK 5.2.2.7 Material Specifications Refer to Section 5.2.3 for a description of material specifications.
5.2.2.8 Process Instrumentation Each pressurizer safety valve discharge line incorporates a control board temperature indicator and alarm to notify the operator of steam discharge due to either leakage or actual valve operation. Safety-related control room positive position indication is provided for the PORVs and safety valves. For a further discussion on process instrumentation associated with the system, refer to Chapter 7.0.
5.2.2.9 System Reliability The reliability of the pressure relieving devices is discussed in Section 4 of Reference 3.
5.2.2.10 RCS Pressure Control During Low Temperature Operation Administrative procedures were developed to aid the operator in controlling RCS pressure during low temperature operation. However, to provide a back-up to the operator and to minimize the frequency of RCS overpressurization, an automatic system is provided to maintain pressures within allowable limits.
Analyses have shown that one pressurizer power-operated relief valve is sufficient to prevent violation of these limits due to anticipated mass and heat input transients. However, redundant protection against an overpressurization event is provided through the use of two pressurizer power-operated relief valves to mitigate any potential pressure transients. The mitigation system is required only during low temperature water solid operation when it is manually armed and automatically actuated.
5.2.2.10.1 System Operation Two pressurizer power-operated relief valves are supplied with actuation logic to ensure that a redundant and independent RCS pressure control back-up feature is provided for the operator during low temperature operations. This system provides the capability for RCS inventory letdown, thereby maintaining RCS pressure within allowable limits. Refer to Sections 5.4.7, 5.4.10, 5.4.13, 7.6.6, and 9.3.4 for additional information on RCS pressure and inventory control during other modes of operation.
5.2-8 Rev. 13
WOLF CREEK The basic function of the system logic is to continuously monitor RCS temperature and pressure conditions whenever plant operation is at low temperatures. An auctioneered system temperature is continuously converted to an allowable pressure and then compared to the actual RCS pressure. The system logic first annunciates a main control board alarm whenever the measured pressure approaches within a predetermined amount of the allowable pressure thereby indicating that a pressure transient is occurring. On a further increase in measured pressure, an actuation signal is transmitted to the pressurizer power-operated relief valves when required to mitigate the pressure transient.
5.2.2.10.2 Evaluation of Low Temperature Overpressure Transients The ASME Code (Section III, Appendix G) establishes guidelines and upper limits for RCS pressure primarily for low temperature conditions less than approximately 350 F. The mitigation system discussed in Section 5.2.2.10.1 addresses these conditions as discussed in the following paragraphs.
Two specific transients: mass input and heat input, with the RCS in a water-solid condition; have been considered as the design basis for the Low Temperature Overpressure Protection (LTOP) system. Each of these scenarios assumes as an initial condition that the RHRS is isolated from the RCS, and thus the relief capability of the RHRS relief valves is not available.
Transient analyses have been performed to determine the maximum pressure for the postulated mass input and heat input events.
The LTOP PORV setpoint limit curve (PTLR Figure 2.2-1) is determined based on the updated heatup and cooldown limit curves, and the analysis results of limiting Low Temperature Over-Pressure (LTOP) transients. The methodology for this determination is given in Reference 10. The limiting LTOP mechanisms analyzed for WCGS under water solid conditions were:
- a. FOR LIMITING MASS ADDITION LTOP MECHANISM Operation of one Centrifugal Charging Pump (CCP) and the Normal Charging Pump (NCP) with instrument air failure resulting in the flow control valve in the letdown line failing closed (letdown isolation) and the flow control valve in the charging line failing open (maximum charging flow), and
- b. FOR LIMITING HEAT ADDITION LTOP MECHANISM Inadvertent start-up of a reactor coolant pump with a maximum 50°F temperature mismatch between the RCS and the hotter steam generators.
These analyses, using the LOFTRAN computer code, take into consideration pressure overshoot and undershoot beyond the PORV open and close setpoints, which can occur as a result of time delays in signal processing and valve stroke times. The maximum expected pressure overshoot and undershoot calculated from the limiting mass input and heat input transients, in conjunction with the 10 CFR 50, Appendix G, pressure limits and reactor coolant pump No. 1 seal pressure limit, are utilized in the selection of the pressure setpoints for the PORV. The mass injection rate assumed in the design basis mass input transient is based on 100% flow capacity of the NCP and one CCP.
The maximum combined pump flow has been assumed in order to envelop the maximum flow possible by the operational configuration that uses the NCP for charging with one CCP remaining operable, or the use of one CCP for charging with the NCP remaining operable, during shutdown modes.
5.2-9 Rev. 23
WOLF CREEK Both the heat input and mass input analyses take into account the single failure criteria and therefore, only one pressurizer power-operated relief valve was assumed to be available for pressure relief. The above events have been evaluated considering the allowable pressure/temperature limits established by the Appendix G guidelines. The evaluation of the transient results concluded that reactor vessel integrity is not impaired.
5.2.2.10.3 Operating Basis Earthquake Evaluation A fluid systems evaluation has been performed considering the potential for overpressure transients following an operating basis earthquake.
The pressurizer power-operated relief valves have been designed in accordance with the ASME Code and seismically qualified under the Westinghouse valve operability program which is discussed in Section 3.9(N).3.2.
Therefore, the overpressurizer mitigation system is available to provide pressure relief following an operating basis earthquake.
5.2.2.10.4 Administrative Procedures Although the system described in Section 5.2.2.10.1 was installed to maintain RCS pressure within allowable limits, administrative procedures minimize the potential for and the consequences of any transient that could actuate the over-pressure relief system. The following discussion highlights these procedural controls, listed in hierarchy of their function in mitigating RCS cold overpressurization transients.
5.2.2.10.4.1 Normal and Transitional Operation Of primary importance is the basic method of operation of the plant. Normal plant operating procedures maximize the use of a pressurizer cushion (steam bubble) during periods of low pressure, low temperature operation. This cushion dampens the plants' response to potential transient generating inputs, providing easier pressure control with the slower response rates.
An adequate cushion substantially reduces the severity of potential pressure transients, such as reactor coolant pump induced heat input, and slows the rate of pressure rise for others. In conjunction with the alarms discussed in Section 7.6, this provides reasonable assurance that most potential transients can be terminated by operator action before the overpressure relief system actuates.
However, for those modes of operation when water solid operation may still be possible, procedures further highlight precautions that minimize the severity of, or the potential for, developing an overpressurization transient. The following precautions or measures were considered in developing the operating procedures:
- a. The residual heat removal inlet lines from the reactor coolant loop are normally open when the RCS pressure is less than 425 psig. This precaution assures that there 5.2-10 Rev. 14
WOLF CREEK is a relief path from the reactor coolant loop to the residual heat removal suction line relief valves when the RCS is at low pressure and is water solid.
- b. Whenever the plant is water solid and the reactor coolant pressure is being maintained by the low pressure letdown control valve, letdown flow normally bypasses the normal letdown orifices. In addition, all three letdown orifices may be open.
- c. If all reactor coolant pumps have stopped for more than 5 minutes during plant heatup and the reactor coolant temperature is greater than the charging and seal injection water temperature, a steam bubble is formed in the pressurizer prior to restarting a reactor coolant pump. This precaution minimizes the pressure transient when the pump is started and the cold water previously injected by the charging pumps is circulated through the warmer reactor coolant components. The steam bubble accommodates the resultant expansion as the cold water is rapidly warmed.
- d. If all reactor coolant pumps are stopped and the RCS is being cooled down by the residual heat exchangers, a nonuniform temperature distribution may occur in the reactor coolant loops. Prior to restarting a reactor coolant pump, a steam bubble is formed in the pressurizer or an acceptable temperature profile is demonstrated.
- e. During plant cooldown, all steam generators are normally connected to the steam header to assure a uniform cooldown of the reactor coolant loops.
- f. At least one reactor coolant pump normally remains in service until the reactor coolant temperature is reduced to 160 F.
These special precautions back-up the normal operational mode of maximizing periods of steam bubble operation so that cold overpressure transient prevention is continued during periods of transitional operations. These precautions do not apply to reactor coolant system hydrostatic testing.
The specific plant configurations of emergency core cooling system testing and alignment also highlight procedural recommendations to prevent developing cold overpressurization transients.
5.2-11 Rev. 13
WOLF CREEK During these limited periods of plant operation, the following precautions/measures were considered in developing the operating procedures:
- a. To preclude inadvertent emergency core cooling system actuation during heatup and cooldown, procedures require blocking the low pressurizer pressure, and low steam line pressure signal actuation logic at 1,900 psig.
- b. During further cooldown, closure and power lockout of the accumulator isolation valves with one centrifugal charging pump and both safety injection pumps rendered incapable of injecting into the RCS in accordance with WCGS Technical Specifications, provide additional back-up to item a above.
- c. The recommended procedure for periodic emergency core cooling system pump performance testing is to test the pumps during normal power operation or at hot shutdown conditions. This precludes any potential for developing a cold overpressurization transient.
Should CSD testing of the pumps be desired, the test is done when the vessel is open to atmosphere, again precluding overpressurization potential.
If CSD testing with the vessel closed is necessary, the procedures require emergency core cooling system pumps discharge valve closure and RHRS alignment to isolate potential emergency core cooling system pump input and to provide back-up benefit of the RHRS relief valves.
- d. SIS circuitry testing, if done during CSD, requires RHRS alignment and one centrifugal charging pump and both safety injection pumps rendered incapable of injecting into the RCS to preclude developing cold overpressurization transients.
The above procedural precautions covering normal operations with a steam bubble, transitional operations where potentially water solid, and specific testing operations provide in-depth cold overpressure preventions or reductions, augmenting the installed overpressure relief system.
5.2.2.10.4.2 Failure of Both PORVs Should both of the PORVs fail closed at a time when the RHR letdown isolation valves for either or both RHR loops are open, the RCS is protected from overpressurization by the RHR inlet relief 5.2-12 Rev. 13
WOLF CREEK valves. Although the valves are only required to relieve the flow of a single centrifugal charging pump delivering at its maximum rate, the valves are each conservatively sized to relieve the combined flow of both centrifugal charging pumps at a setpoint of 450 psig.
During normal startup and shutdown, a pressurizer bubble is maintained whenever the RHR system is isolated. The normal steam bubble volume in this condition would be approximately 1350 ft3. Should normal letdown be isolated, the maximum makeup rate imbalance would be determined by the head/flow curve of the centrifugal charging pump, which could be in operation. This rate would actually be much less as the transient progressed, since the charging flow control system would throttle the flow to try to maintain pressurizer level.
However, even if no credit is taken for the charging control system, and assuming that the pressurizer level is initially at the high level alarm setpoint (i.e., approximately 567 ft3 steam bubble), the plant operator would have greater than 10 minutes to terminate the event to prevent overfill of the pressurizer.
5.2.2.11 Testing and Inspection Testing and inspection of the overpressure protection components are discussed in Section 5.4.13.4 and Chapter 14.0.
5.2.3 MATERIALS SELECTION, FABRICATION, AND PROCESSING 5.2.3.1 Material Specifications Material specifications used for the principal pressure retaining applications in components of the RCPB are listed in Table 5.2-2 for ASME Class 1 primary components and Table 5.2-3 for ASME Class 1 and 2 auxiliary components. Tables 5.2-2 and 5.2-3 also include the material specifications of unstabilized austenitic stainless steel used for components in systems required for reactor shutdown and for emergency core cooling.
The material specifications of unstabilized austenitic stainless steel used for reactor vessel internals which are essential for emergency core cooling and for core structural support are listed in Table 5.2-4.
Table 5.2-3 is not totally inclusive of the material specifications used in the listed applications. However, the listed specifications are representative.
The materials utilized conform to the applicable ASME Code rules.
The welding materials used for joining the ferritic base materials of the RCPB conform to or are equivalent to ASME Material Specifications SFA 5.1, 5.2, 5.5, 5.17, 5.18, and 5.20. They are qualified to the requirements of the ASME Code,Section III.
5.2-13 Rev. 13
WOLF CREEK The welding materials used for joining the austenitic stainless steel base materials of the RCPB conform to ASME Material Specifications SFA 5.4 and 5.9.
They are qualified to the requirements of the ASME Code,Section III.
The welding materials used for joining nickel-chromium-iron alloy in similar base material combination and in dissimilar ferritic or austenitic base material combination conform to ASME Material Specifications SFA 5.11 and 5.14.
They are qualified to the requirements of the ASME Code,Section III.
5.2.3.2 Compatibility With Reactor Coolant 5.2.3.2.1 Chemistry of Reactor Coolant The RCS chemistry specifications are given in Table 5.2-5.
The RCS water chemistry is selected to minimize corrosion. Routinely scheduled analyses of the coolant chemical composition are performed to verify that the reactor coolant chemistry meets the specifications.
The chemical and volume control system provides a means for adding chemicals to the RCS which perform the following functions: 1) control the pH of the coolant during pre-startup testing and subsequent operation, 2) scavenge oxygen from the coolant during heatup, and 3) control radiolysis reactions involving hydrogen, oxygen, and nitrogen during all power operations subsequent to startup. The normal limits for chemical additives and reactor coolant impurities for power operation are shown in Table 5.2-5.
The pH control chemical utilized is lithium hydroxide monohydrate, enriched in the lithium-7 isotope to 99.9 percent. This chemical is chosen for its compatibility with the materials and water chemistry of borated water/stainless steel/zirconium/inconel systems. In addition, lithium-7 is produced in solution from the neutron irradiation of the dissolved boron in the coolant.
The lithium-7 hydroxide is introduced into the RCS via the charging flow. The solution is prepared in the laboratory and transferred to the chemical additive tank. Reactor makeup water is then used to flush the solution to the suction header of the charging pumps. The concentration of lithium-7 hydroxide in the RCS is maintained in the range specified for pH control and is controlled by administrative procedures. If the concentration exceeds this range, the cation bed demineralizer is employed in the letdown line in series operation with the mixed bed demineralizer.
5.2-14 Rev. 32
WOLF CREEK During reactor startup from the cold condition, hydrazine is employed as an oxygen scavenging agent. The hydrazine solution is introduced in accordance with plant operating procedures.
The reactor coolant is treated with dissolved hydrogen to control the net decomposition of water by radiolysis in the core region. The hydrogen also reacts with oxygen and nitrogen introduced into the RCS as impurities under the impetus of core radiation. Sufficient partial pressure of hydrogen is maintained in the volume control tank so that the specified equilibrium concentration of hydrogen is maintained in the reactor coolant. A self-contained pressure control valve maintains a minimum pressure in the vapor space of the volume control tank. This can be adjusted to provide the correct equilibrium hydrogen concentration.
Boron, in the chemical form of boric acid, is added to the RCS for long-term reactivity control of the core.
Suspended solids (corrosion product particulates) and other impurity concentrations are maintained below specified limits by controlling the chemical quality of makeup water and chemical additives and by purification of the reactor coolant through the chemical and volume control system mixed bed demineralizer.
5.2.3.2.2 Compatibility of Construction Materials with Reactor Coolant All of the ferritic low alloy and carbon steels which are used in principal pressure retaining applications have corrosion resistant cladding on all surfaces that are exposed to the reactor coolant. The corrosion resistance of the cladding material is at least equivalent to the corrosion resistance of Types 304 and 316 austenitic stainless steel alloys or nickel-chromium-iron alloy, martensitic stainless steel, and precipitation hardened stainless steel.
The cladding of ferritic type base materials receives a post-weld heat treatment, as required by the ASME Code.
Ferritic low alloy and carbon steel nozzles have safe ends of either stainless steel wrought materials, stainless steel weld metal analysis A-7 (designated A-8 in the 1974 Edition of the ASME Code), or nickel-chromium-iron alloy weld metal F-Number 43. The latter buttering material requires further safe ending with austenitic stainless steel base material after completion of the post-weld heat treatment when the nozzle is larger than a 4-inch nominal inside diameter and/or the wall thickness is greater than 0.531 inches.
5.2-15 Rev. 16
WOLF CREEK All of the austenitic stainless steel and nickel-chromium-iron alloy base materials with primary pressure retaining applications are used in the solution anneal heat treat condition. These heat treatments are as required by the material specifications.
During subsequent fabrication, these materials are not heated above 800 F other than locally by welding operations. The solution annealed surge line material is subsequently formed by hot bending followed by a resolution annealing heat treatment.
Components with stainless steel sensitized in the manner expected during component fabrication and installation will operate satisfactorily under normal plant chemistry conditions in pressurized water reactor systems because chlorides, fluorides, and oxygen are controlled to very low levels.
5.2.3.2.3 Compatibility with External Insulation and Environmental Atmosphere In general, all of the materials listed in Tables 5.2-2 and 5.2-3 which are used in principal pressure-retaining applications and which are subject to elevated temperature during system operation are in contact with thermal insulation that covers their outer surfaces.
The thermal insulation used on the RCPB is either the reflective stainless steel type or made of compounded materials which yield low leachable chloride and/or fluoride concentrations. The compounded materials in the form of blocks, boards, cloths, tapes, adhesives, cements, etc., are silicated to provide protection of austenitic stainless steels against stress corrosion which may result from accidental wetting of the insulation by spillage, minor leakage, or other contamination from the environmental atmosphere. Appendix 3A includes a discussion which indicates the degree of conformance with Regulatory Guide 1.36, "Nonmetallic Thermal Insulation for Austenitic Stainless Steel."
In the event of coolant leakage, the ferritic materials will show increased general corrosion rates. Where minor leakage is anticipated from service experience, such as valve packing, pump seals, etc., only materials which are compatible with the coolant are used. These are as shown in Tables 5.2-2 and 5.2-3. Ferritic materials exposed to coolant leakage can be readily observed as part of the inservice visual and/or nondestructive inspection program to assure the integrity of the component for subsequent service.
5.2-16 Rev. 0
WOLF CREEK 5.2.3.3 Fabrication and Processing of Ferritic Materials 5.2.3.3.1 Fracture Toughness The fracture toughness properties of the RCPB components meet the requirements of the ASME Code,Section III, Paragraphs NB, NC, and ND-2300 as appropriate.
The fracture toughness properties of the reactor vessel materials are discussed in Section 5.3.
Limiting steam generator and pressurizer RTNDT temperatures are guaranteed at 60 F for the base materials and the weldments. These materials meet the 50 ft-lb absorbed energy and 35 mils lateral expansion requirements of the ASME Code,Section III at 120 F. The actual results of these tests are provided in the ASME material data reports which are supplied for each component and submitted to the owner at the time of shipment of the component.
Calibration of temperature instruments and Charpy impact test machines are performed to meet the requirements of the ASME Code,Section III, Paragraph NB-2360.
Westinghouse has conducted a test program to determine the fracture toughness of low alloy ferritic materials with specified minimum yield strengths greater than 50,000 psi to demonstrate compliance with Appendix G of the ASME Code,Section III. In this program, fracture toughness properties were determined and shown to be adequate for base metal plates and forgings, weld metal, and heat affected zone metal for higher strength ferritic materials used for components of the RCPB. The results of the program are documented in Reference 1, which was submitted to the NRC.
The fracture toughness tests for WCGS reactor coolant pressure boundary components were performed by qualified operators in accordance with written procedures.
5.2.3.3.2 Control of Welding All welding is conducted utilizing procedures qualified according to the rules of Sections III and IX of the ASME Code. Control of welding variables, as well as examination and testing during procedure qualification and production welding, is performed in accordance with ASME Code requirements.
Appendix 3A includes discussions which indicate the degree of conformance of the ferritic materials components of the RCPB with Regulatory Guides 1.34, "Control of Electroslag Weld Properties,"
5.2-17 Rev. 0
WOLF CREEK 1.43, "Control of Stainless Steel Weld Cladding of Low-Alloy Steel Components,"
1.50, "Control of Preheat Temperature for Welding of Low-Alloy Steel," and 1.71, "Welder Qualification for Areas of Limited Accessibility."
5.2.3.4 Fabrication and Processing of Austenitic Stainless Steel Sections 5.2.3.4.1 through 5.2.3.4.5 address Regulatory Guide 1.44, "Control of the Use of Sensitized Stainless Steel," and present the methods and controls utilized by Westinghouse to avoid sensitization and prevent intergranular attack of austenitic stainless steel components. Also, Appendix 3A includes a discussion which indicates the degree of conformance with Regulatory Guide 1.44.
5.2.3.4.1 Cleaning and Contamination Protection Procedures Austenitic stainless steel materials used in the fabrication, installation, and testing of nuclear steam supply components and systems is handled, protected, stored, and cleaned according to recognized and accepted methods which are designed to minimize contamination which could lead to stress corrosion cracking. The rules covering these controls are stipulated in Westinghouse process specifications. As applicable, these process specifications supplemented the equipment specifications and purchase order requirements of every individual austenitic stainless steel component or system which Westinghouse procures for the WCGS nuclear steam supply system, regardless of the ASME Code classification.
The process specifications which define these requirements and which follow the guidance of the American National Standards Institute N-45 Committee specifications are as follows:
Process Specification Number 82560HM Requirements for Pressure Sensitive Tapes for Use on Austenitic Stainless Steels 83336KA Requirements for Thermal Insulation Used on Austenitic Stainless Steel Piping and Equipment 83860LA Requirements for Marking of Reactor Plant Components and Piping 84350HA Site Receiving Inspection and Storage Requirements for Systems, Material, and Equipment 5.2-18 Rev. 1
WOLF CREEK 84351NL Determination of Surface Chloride and°Fluoride on Austenitic Stainless Steel Materials 85310QA Packaging and Preparing Nuclear Components for Shipment and Storage 292722 Cleaning and Packaging Requirements of Equipment for Use in the NSSS 597756 Pressurized Water Reactor Auxiliary Tanks Cleaning Procedures 597760 Cleanliness Requirements During Storage Construction, Erection and Start-Up Activities of Nuclear Power System Appendix 3A includes a discussion which indicates the degree of conformance of the austenitic stainless steel components of the RCPB with Regulatory Guide 1.37, "Quality Assurance Requirements for Cleaning of°Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."
5.2.3.4.2 Solution Heat Treatment Requirements The austenitic stainless steels listed in Tables 5.2-2, 5.2-3, and 5.2-4 are utilized in the final heat treated condition required by the respective ASME Code,Section II materials specification for the particular type of grade of alloy.
5.2.3.4.3 Material Testing Program Westinghouse practice is that austenitic stainless steel materials of product forms with simple shapes need not be corrosion tested provided that the solution heat treatment is followed by water quenching. Simple shapes are defined as all plates, sheets, bars, pipe, and tubes, as well as forgings, fittings, and other shaped products which do not have inaccessible cavities or chambers that would preclude rapid cooling when water quenched. When testing is required, the tests are performed in accordance with ASTM A 262, Practice A or E, as amended by Westinghouse Process Specification 84201MW.
5.2.3.4.4 Prevention of Intergranular Attack of Unstabilized Austenitic Stainless Steels Unstabilized austenitic stainless steels are subject to intergranular attack (IGA) provided that three conditions are present simultaneously. These are:
- a. An aggressive environment, e.g., an acidic aqueous medium containing chlorides or oxygen 5.2-19 Rev. 0
WOLF CREEK
- b. A sensitized steel
- c. A high temperature If any one of the three conditions described above is not present, intergranular attack will not occur. Since high temperatures cannot be avoided in all components in the NSSS, reliance is placed on the elimination of conditions a and b to prevent intergranular attack on wrought stainless steel components.
This is accomplished by:
- a. Control of primary water chemistry to ensure a benign environment.
- b. Utilization of materials in the final heat treated condition and the prohibition of subsequent heat treatments in the 800 and 1,500°F temperature range.
- c. Control of welding processes and procedures to avoid heat affected zone sensitization.
- d. Confirmation that the welding procedures used for the manufacture of components in the primary pressure boundary and of reactor internals do not result in the sensitization of heat affected zones.
Further information on each of these steps is provided in the following paragraphs:
The water chemistry in the RCS is controlled by the Technical Requirements Manual and plant procedures to prevent the intrusion of aggressive species.
Reference 5 describes the precautions taken to prevent the intrusion of chlorides into the system during fabrication, shipping, and storage. The use of hydrogen overpressure precludes the presence of oxygen during operation.
The effectiveness of these controls has been demonstrated by laboratory tests and operating experience. The long-time exposure of severely sensitized stainless in early Westinghouse pressurized water reactors to reactor coolant environments has not resulted in any sign of intergranular attack. Reference 5 describes the laboratory experimental findings and reactor operating experience. The additional years of operations since the issuance of Reference 5 have provided further confirmation of the earlier conclusions that severely sensitized stainless steels do not undergo any intergranular attack in Westinghouse pressurized water reactor coolant environments.
5.2-20 Rev. 13
WOLF CREEK In spite of the fact that there never has been any evidence that pressurized reactor coolant water attacks sensitized stainless steels, Westinghouse considers it good metallurgical practice to avoid the use of sensitized stainless steels in the nuclear steam supply system components. Accordingly, measures are taken to prohibit the purchase of sensitized stainless steels and to prevent sensitization during component fabrication. Wrought austenitic stainless steel stock used for components that are part of: 1) the RCPB, 2) systems required for reactor shutdown, 3) systems required for emergency core cooling, and 4) reactor vessel internals (relied upon to permit adequate core cooling for normal operation or under postulated accident conditions) is utilized in one of the following conditions:
- a. Solution annealed and water quenched, or
- b. Solution annealed and cooled through the sensitization temperature range within less than approximately 5 minutes It is generally accepted that these practices prevent sensitization.
Westinghouse has verified this by performing corrosion tests on as-received wrought material.
The heat-affected zones of welded components must, of necessity, be heated into the sensitization temperature range, 800 to 1,500°F. However, severe sensitization, i.e., continuous grain boundary precipitates of chromium carbide, with adjacent chromium depletion, can be avoided by controlling welding parameters and welding processes. The heat input* and associated cooling rate through the carbide precipitation range are of primary importance.
Westinghouse has demonstrated this by corrosion testing a number of weldments.
- Heat input is calculated according to the formula:
(E) (I) (60)
H = S Where:
H = joules/in.
E = volts I = amperes S = travel speed, in./min.
5.2-21 Rev. 0
WOLF CREEK Of 25 production and qualification weldments tested, representing all major welding processes, and a variety of components, and incorporating base metal thicknesses from 0.10 to 4.0 inches, only portions of two were severely sensitized. Of these, one involved a heat input of 120,000 joules, and the other involved a heavy socket weld in relatively thin walled material. In both cases, sensitization was caused primarily by high heat inputs relative to the section thickness. In only the socket weld did the sensitized condition exist at the surface, where the material is exposed to the environment. The component has been redesigned, and a material change has been made to eliminate this condition.
The heat input in all austenitic pressure boundary weldments has been controlled by:
- a. Prohibiting the use of block welding
- b. Limiting the maximum interpass temperature to 350°F
- c. Westinghouse exercising approval rights on all welding procedures 5.2.3.4.5 Retesting Unstabilized Austenitic Stainless Steels Exposed to Sensitization Temperatures As described in the previous section, it is not normal Westinghouse practice to expose unstabilized austenitic stainless steels to the sensitization range of 800 to 1,500°F during fabrication into components. If, during the course of fabrication, the steel was inadvertently exposed to the sensitization temperature range, 800 to 1,500°F, the material could be tested in accordance with ASTM A 262, as amended by Westinghouse Process Specification 84201MW, to verify that it is not susceptible to intergranular attack, except that testing is not required for:
- a. Cast metal or weld metal with a ferrite content of 5 percent or more,
- b. Material with a carbon content of 0.03 percent or less that is subjected to temperatures in the range of 800 to 1,500°F for less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />,
- c. Material exposed to special processing provided the processing is properly controlled to develop a uniform product and provided that adequate documentation exists of service experience and/or test data to demonstrate that the processing will not result in increased susceptibility to intergranular stress corrosion.
5.2-22 Rev. 0
WOLF CREEK If it was not verified that such material is not susceptible to intergranular attack, the material would have been resolution annealed and water quenched or rejected.
5.2.3.4.6 Control of Welding The following paragraphs address Regulatory Guide 1.31, "Control of Ferrite Content in Stainless Steel Weld Metal," and present the methods used, and the verification of these methods, for austenitic stainless steel welding.
The welding of austenitic stainless steel is controlled to mitigate the occurrence of microfissuring or hot cracking in the weld. Although published data and experience have not confirmed that fissuring is detrimental to the quality of the weld, it is recognized that such fissuring is undesirable in a general sense. Also, it has been well documented in the technical literature that the presence of delta ferrite is one of the mechanisms for reducing the susceptibility of stainless steel welds to hot cracking. However, there is insufficient data to specify a minimum delta ferrite level below which the material will be prone to hot cracking. It is assumed that such a minimum lies somewhere between 0- and 3-percent delta ferrite.
The scope of these controls discussed herein encompasses welding processes used to join stainless steel parts in components designed, fabricated, or stamped in accordance with the ASME Code,Section III, Class 1, 2, and core support components. Delta ferrite control is appropriate for the above welding requirements, except where no filler metal is used or for other reasons such control is not applicable. These exceptions include electron beam welding, autogenous gas shielded tungsten arc welding, explosive welding, and welding using fully austenitic welding materials.
The fabrication and installation specifications require welding procedure and welder qualification in accordance with Section III, and include the delta ferrite determinations for the austenitic stainless steel welding materials that are used for welding qualification testing and for production processing.
Specifically, the undiluted weld deposits of the "starting" welding materials are required to contain a minimum of 5-percent delta ferrite* as determined by chemical analysis and calculation, using the appropriate weld metal constitution diagrams in Section III. When new
- The equivalent ferrite number may be substituted for percent delta ferrite.
5.2-23 Rev. 0
WOLF CREEK welding procedure qualification tests are evaluated for these applications, including repair welding of raw materials, they are performed in accordance with the requirements of Section III and Section IX.
The results of all the destructive and nondestructive tests are reported in the procedure qualification record in addition to the information required by Section III.
The "starting" welding materials used for fabrication and installation welds of austenitic stainless steel materials and components meet the requirements of Section III. The austenitic stainless steel welding material conforms to ASME weld metal analysis A-7 (designated A-8 in the 1974 Edition of the ASME Code),
Type 308 or 308L for all applications. Bare weld filler metal, including consumable inserts, used in inert gas welding processes conform to ASME SFA 5.9, and are procured to contain not less than 5-percent delta ferrite according to Section III. Weld filler metal materials used in flux shielded welding processes conform to ASME SFA 5.4 or 5.9 and are procured in a wire-flux combination to be capable of providing not less than 5-percent delta ferrite in the deposit according to Section III. Welding materials are tested, using the welding energy inputs to be employed in production welding.
Combinations of approved heat and lots of "starting" welding materials are used for all welding processes. The welding quality assurance program includes identification and control of welding material by lots and heats as appropriate. All of the weld processing is monitored according to approved inspection programs which include review of "starting" materials, qualification records and welding parameters.
Welding systems are also subject to quality assurance audit including calibration of gages and instruments; identification of "starting" and completed materials; welder and procedure qualifications; availability and use of approved welding and heat treating procedures; and documentary evidence of compliance with materials, welding parameters, and inspection requirements.
Fabrication and installation welds are inspected using nondestructive examination methods according to Section III rules.
To assure the reliability of these controls, Westinghouse has completed a delta ferrite verification program, described in Reference 6, which has been approved as a valid approach to verify the Westinghouse hypothesis and is considered an acceptable alternative for conformance with the NRC Interim Position on Regulatory Guide 1.31. The Regulatory Staff's acceptance letter and topical report evaluation were received on December 30, 1974. The program 5.2-24 Rev. 0
WOLF CREEK results, which do support the hypothesis presented in Reference 6, are summarized in Reference 7.
Appendix 3A includes discussions which indicate the degree of conformance of the austenitic stainless steel components of the RCPB with Regulatory Guides 1.34, "Control of Electroslag Properties," and 1.71, "Welder Qualification for Areas of Limited Accessibility."
5.2.4 INSERVICE INSPECTION AND TESTING OF THE REACTOR COOLANT PRESSURE BOUNDARY Inservice inspection, inservice testing, repair and replacement of pressure-retaining components, such as vessels, piping, pumps, valves, and bolting and supports within the reactor coolant pressure boundary, comply with Section XI of the ASME Code, including addenda, per 10 CFR 50.55a(f) for testing and 10 CFR 50.55a(g) for inspection, repair and replacement, with certain exceptions and alternatives whenever specific written relief is granted by the NRC per 10 CFR 50.55a, or when Section XI or OM Code Cases are used which either have been reviewed by the NRC and found acceptable as documented in 10CFR50.55a(b)(5) or (6) and Regulatory Guide 1.147 or 1.192 or approved for use by the granting of relief requests. The conditions for use of Regulatory Guide 1.147 or 1.192 approved Code Cases are discussed in Appendix 3A. The inservice testing of pumps and valves are discussed in Section 3.9(B).6. The limitations and modifications that the NRC places on the ASME Code in paragraph (b) of 10 CFR 50.55a are adhered to.
In addition, WCGS initially prepared separate preservice and inservice inspection program documents, which complied with "NRC Staff Guidance for Complying with Certain Provisions of 10CFR50.55a(g)--Inservice Inspection Requirements." A description of the preservice inspection program was submitted to the NRC by SNUPPS letter dated May 26, 1981. The initial inservice inspection program document was submitted to the NRC by letter dated December 11, 1985. Subsequent inservice inspection program documents are prepared in accordance with the 10 year update requirements in 10 CFR 50.55a and submitted to the NRC for initial approval. The inspection program documents identify the applicable Section XI edition and addenda and provide the details to the areas subject to examination, method of examination, extent and frequency of examination, and applicable Code Cases. 'Relief Requests' seeking relief from applicable code requirements are submitted to the NRC and become part of the inservice inspection program upon approval by the NRC. The repair and replacement program identifies the applicable Section XI edition and addenda, applicable Code Cases and relief requests, and provides the administrative controls for performing repairs and replacements.
Since the plant is required to meet the requirements of future editions of Section XI, insofar as practicable, an attempt was made during design to allow access for inspections and coverages anticipated to be required by later editions of the Code. The result of this effort increased the areas on RPV available to mechanized inservice inspection. WCGS has attempted to create an inservice inspection program and plant design which concur with the 10 CFR 50 philosophy of upgrading inspections.
5.2.4.1 Inspection of Class 1 Components The system boundary subject to inspection includes all piping and components in quality Group A (ASME Boiler and Pressure Vessel Code,Section III, Class 1).
The reactor pressure vessel (RPV), pressurizer, Class 1 portion of the steam generators, and all Class 1 piping, pumps, and valves are examined except for items exempt from examination in accordance with ASME Section XI IWB-1200 and for those areas where relief has been requested and granted.
5.2-25 Rev. 20
WOLF CREEK The scope of examinations, inspections, and acceptance criteria for initial preservice inspections met the requirements outlined in Section XI of the ASME Boiler and Pressure Vessel Code, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1977 Edition up to and including the Summer 1978 Addenda. The scope of examinations, inspections, and acceptance criteria for inservice inspections and preservice inspections following repair and replacement meet the applicable Edition and Addenda of Section XI, as described at the beginning of section 5.2.4 and documented in the inservice inspection program. In addition, the RPV is examined in accordance with the recommendations of Regulatory Guide 1.150, Rev. 1 (Alternative Method), except for the components required to be examined to Appendix VIII. The ultrasonic examination of ferritic, austenitic, and dissimilar metal piping welds are performed in accordance with IWA-2232. The ultrasonic examination of cast austenitic stainless steel (centrifugal and static cast) piping and component welds may be performed in accordance with IWA-2240.
The extent of selection of piping welds for PSI examination were determined by the requirements of the 1974 Edition of Section XI with Addenda through Summer 1975. The extent of selection of piping welds for ISI examination is determined by the requirements of the applicable Edition and Addenda of ASME Section XI as described at the beginning of section 5.2.4 and documented in the inservice inspection program. Beginning in ISI interval 2, the selection of piping welds for examination is determined under a risk-informed ISI program as an NRC approved alternative to the Section XI requirements. This program is implemented under the Relief Request process as described at the beginning of 5.2.4.
The Inservice Inspection Program requirements are specified in the Technical Requirements Manual.
5.2.4.2 Arrangement and Accessibility 5.2.4.2.1 General Access for the purpose of inservice inspection is defined as the design of the plant with the proper clearances for examination personnel and/or equipment to perform inservice examinations during a nuclear unit shutdown. During system and component arrangement design, careful attention was given to physical clearances to allow personnel and equipment to perform required inservice examinations. Access requirements of the Code were considered in the design of components, weld joint configuration, and system arrangement. An inservice inspection program design review was undertaken to identify any exceptions to the access requirements of the code with subsequent design modifications and/or inspection technique development to ensure Code compliance, as required.
Additional exceptions may be identified and reported to the NRC after plant operations, as specified in 10 CFR 50.55a(g)(5)(iv). Space has been provided to handle and store insulation, structural members, shielding, calibration blocks, and similar material related to the inspection. Suitable hoists and other handling equipment are also provided. Lighting, sources of power, and services for the inspection equipment are provided at appropriate locations.
5.2-26 Rev. 20
WOLF CREEK Access is provided for volumetric examination of the pressure-containing welds from the external surfaces of components and piping by means of removable insulation, removable shielding, and permanent tracks for remote inspection devices in areas where personnel access is restricted. Provisions for suitable access for inservice inspection examinations minimize the time required for these inspections to be performed. Therefore, they reduce the amount of radiation exposure to both plant and examination personnel. Working platforms have been provided at strategic locations in the plant to permit ready access to those areas of the reactor coolant pressure boundary which are designated as inspection points in the inservice inspection program. Areas without permanent platforms are provided with temporary platforms and/or scaffolding, as required.
5.2.4.2.2 Access to Reactor Pressure Vessel Access for inspection of the RPV was provided as follows:
- a. Access to the exterior surface of the RPV below the 2,011-foot-6-inch cavity shelf elevation for inservice inspection is available since an annular space has been provided between the vessel exterior surface and the insulation interior surface. This was designed to permit the insertion of remotely operated inspection devices, if used, between the insulation and the reactor vessel.
Examination personnel could enter the area below the RPV through one approximately 3-foot-square access port in the insulation to install the pole track remote examination device. The bottom head insulation is designed to allow an examiner to walk on the insulation while installing the examination device. Access to the window is provided through the in-core instrumentation tunnel. Use of the remotely operated external inspection devices was abandoned in favor of the standard industry approach of remotely operated internal inspection devices.
- b. A 3-foot annular space between the exterior surface of the RPV and the interior surface of the insulation has been provided from the vessel closure flange elevation to the cavity shelf elevation. The clearance area provides sufficient access for examination personnel and equipment to perform preservice and, if used, inservice examinations on the exterior surfaces of the nozzle-to-shell, safe end, pipe-to-elbow, flange-to-shell, and vertical welds in the upper shell course of the vessel.
These welds may also be examined from the inside surface of the vessel using remotely operated inspection devices.
- c. The vessel flange seal surface is accessible during refueling outages when the closure head is removed. The vessel-to-flange weld can be examined manually or mechanically from the flange seal surface, using ultrasonic techniques. The inside surface of the RPV is 5.2-27 Rev. 12
WOLF CREEK available for a mechanized examination of the vessel-to-flange weld from the vessel side during refueling outages when the core barrel is removed. If examination of the vessel-to-flange weld from the vessel side is required when the core barrel has not been removed, the weld can be examined from the exterior surface of the vessel.
- d. Access to the inner surface of the RPV is available during refueling outages when the portions of vessel core structure are removed. A remotely operated examination device designed to perform ultrasonic examinations from the inner surface of the vessel is used to examine the vessel-to-flange weld, nozzle-to-shell welds, and the vertical, circumferential, and meridional welds of the vessel.
Selected areas of reactor cladding and the internal support attachments welded to the vessel wall are accessible for remote visual examination when the core barrel is removed at the end of the 10-year inspection interval. A camera capable of remote positioning can be inserted into the RPV.
- e. The closure head is dry stored during refueling, which facilitates direct manual examination. Removable insulation allows examination of the head welds from the outside surface. All reactor vessel studs which can be removed, nuts, and washers are removed to dry storage during refueling and are examined as required at that time. Studs which can not be removed are covered with a protective cover. Any stud that cannot be removed is cleaned and visually inspected, in-situ, to the extent possible, prior to placement in service for the next power operation cycle.
5.2.4.2.3 Pressurizer The external surface is accessible for visual and volumetric inspection by removing the external insulation. Manways are provided to allow access for internal visual inspection. The permanent insulation around the pressurizer heaters is provided with a means to identify component leakages during system pressure testing as described in section 5.2.4.7.
5.2.4.2.4 Heat Exchangers and Steam Generators The external surface is accessible for volumetric and visual inspection by removing portions of the vessel insulation. Manways in the steam generator channel head provide access for internal visual examinations and eddy current tests of steam generator tubes.
5.2-28 Rev. 16
WOLF CREEK 5.2.4.2.5 Piping Pressure Boundary The physical arrangement of piping, pumps, and valves has been designed to allow personnel access to welds requiring inservice inspection. Modifications to the initial plant design have been incorporated where practical to provide proper inspection access. Removable insulation has been provided where required by the Code on those piping systems requiring ultrasonic and/or surface examinations. In addition, the placement of pipe hangers and supports with respect to these welds has been reviewed and modified where necessary to reduce the amount of plant support required in these areas during inspection.
Working platforms are provided in areas required to facilitate the servicing of pumps and valves.
Temporary or permanent platforms and ladders are provided, as necessary, to gain access to piping welds. A conscientious effort has been made to minimize the number of fitting-to-fitting welds within the inspection boundary. Welds requiring inspection have been located to permit ultrasonic examinations from at least one side, but, where component geometries permit, access from both sides of the weld is provided. The surfaces of the welds requiring ultrasonic examination by the Code have been prepared to permit effective examination.
Vertical runs of piping are provided with removable insulation or catch basins at the low point for leakage surveillance during system pressure testing as described in section 5.2.4.7.
5.2.4.2.6 Pump Pressure Boundaries The internal pressure-retaining surfaces of the pumps are accessible for visual inspection by removing the pump internals. External surfaces of the pump casing are accessible for visual and volumetric examination by removing component insulation. Internal examinations, when required by ASME Section XI, are performed when the pumps are disassembled for maintenance purposes.
5.2.4.2.7 Valve Pressure Boundaries Class 1 valves over 4-inch nominal size are accessible for disassembly for visual examination of internal pressure boundary surfaces.
5.2.4.3 Examination Techniques and Procedures Techniques and procedures, including any special technique and procedure for visual, surface, and volumetric examinations were written in accordance with the requirements of Subarticle IWA-2200 and Table IWB-2500-1 of Section XI of the ASME Code, applicable year and addenda. The liquid penetrant, magnetic particle or eddy current methods are utilized for surface examinations, radiographic (RT), and/or ultrasonic (UT) methods (either automated or manual) for volumetric examinations.
5.2-29 Rev. 34
WOLF CREEK 5.2.4.3.1 Equipment for Inservice Inspection Procedures governing the use of the following examination devices are qualified prior to examinations in the plant.
5.2.4.3.1.1 Ultrasonic Equipment Although the SNUPPS design provided for remotely operated external inspection equipment for examination of the reactor pressure vessel, such external equipment was abandoned in favor of the standard industry approach of remotely operated internal inspection equipment. The remotely operated device for examination of the vessel and connected piping from their inner surfaces is attached to the RPV at the flange surface. The device is capable of moving the transducers over the surface of the components in any direction.
An electronic system with a receiver or data channel for each ultrasonic transducer is used for acquiring and storing data when using remote automated examination equipment. Reflected signals may be transmitted through an ultrasonic instrument, gated, and multiplexed to initiate a digital recording.
Scanning position is indicated by encoders and subsequently logged by the data acquisition system. The key parameters of each reflector recorded include location, maximum signal amplitude, depth below the scanning surface, and length of reflector. However, similar or compatible systems of data acquisition may be utilized.
5.2.4.3.1.2 Surface Examination Equipment Mechanized surface examination techniques provide results which are at least equivalent to those obtainable by manual surface techniques.
5.2-30 Rev. 34
WOLF CREEK 5.2.4.3.1.3 Visual Examination Equipment Remote visual examination techniques will be in accordance with ASME Section XI requirements.
5.2.4.3.2 Coordination of Inspection Equipment with Access Provisions Access to areas of the plant requiring inservice inspection is provided to allow the use of existing equipment, wherever practicable.
5.2.4.3.3 Manual Examination In areas where manual ultrasonic examination is performed, reportable indications are mapped and records made of maximum signal amplitude, depth below the scanning surface, and length of the reflector. The data compilation format is such as to provide for comparison of data from subsequent examinations. Radiographic techniques may be used where ultrasonic techniques are not applicable. In areas where manual surface or direct visual examinations are performed, reportable indications are mapped with respect to size and location in a manner to allow comparison of data from subsequent examinations.
5.2.4.4 Inspection Intervals The inspection interval, as defined in Subarticle IWA-2400 of Section XI, is a 10 year interval of service. These inspection intervals represent calendar years after the reactor facility has been placed into commercial service. The interval may be extended by as much as one year to permit inspections to be concurrent with plant outages. The inspection schedule is in accordance with IWB-2400. Inservice examinations are performed during normal plant outages, such as refueling shutdowns or maintenance shutdowns occurring during the inspection interval. However, inservice examinations may be performed while the unit is on-line, if radiological and operational conditions permit access to the components. No examinations are performed which require draining of the reactor vessel further than just below the nozzles or removal of the core solely for the purpose of accomplishing the examinations.
5.2.4.5 Examination Categories and Requirements The extent of the examinations performed and the examination methods utilized shall be in accordance with the applicable Edition and Addenda of Section XI, as described at the beginning of section 5.2.4 and documented in the inservice inspection program.
5.2-31 Rev. 14
WOLF CREEK In addition, preservice inspections comply with IWB-2200.
5.2.4.6 Evaluation of Examination Results Evaluation of examination results for Class 1 components preservice inspections were conducted in accordance with the requirements of Article IWB-3000 of the ASME Code,Section XI, 1977 Edition with Addenda through the Summer of 1978.
Evaluation of examination results for Class 1 inservice inspections are conducted in accordance with IWB-3000 in the applicable Edition and Addenda of Section XI, as described at the beginning of section 5.2.4 and documented in the inservice inspection program. In addition, the recording and evaluation of examinations results for reactor pressure vessel (RPV) are done as per Regulatory Guide 1.150, except for the components required to be examined to Appendix VIII.
5.2.4.7 System Leakage and Hydrostatic Tests System pressure tests of the reactor pressure vessel and reactor coolant pressure boundary are conducted in accordance with the requirements of Articles IWA-5000 and IWB-5000. System leakage tests are conducted prior to startup following each reactor refueling outage, in accordance with Paragraph IWB-5221, as required by Article IWB-5000. The system leakage test performed during Inspection Period 3 at or near the end of each 10-year interval is in accordance with the provisions of ASME Code,Section XI, or approved ASME Code Cases, as documented in the ISI program plan.
5.2.5 REACTOR COOLANT PRESSURE BOUNDARY LEAKAGE DETECTION SYSTEMS 5.2.5.1 Design Bases 5.2.5.1.1 Safety Design Bases There is no safety design basis for the reactor coolant pressure boundary leakage detection system.
5.2.5.1.2 Power Generation Design Bases POWER GENERATION DESIGN BASIS ONE - For leaks of 1 gpm or greater, other than identified leakage sources, the reactor coolant boundary leakage detection systems are designed to detect leaks and determine the leakage rate (in accordance with Regulatory Guide 1.45 and 10 CFR 50, Appendix A, General Design Criterion 30). A comparison with the Regulatory Guide requirements is provided in Table 5.2-6.
POWER GENERATION DESIGN BASIS TWO - The leakage detection equipment is designed to continuously monitor the environmental conditions within the containment so that a background level is identified which is indicative of the normal level of leakage from 5.2-32 Rev. 34
WOLF CREEK primary systems and components. Significant upward deviation from normal containment environmental conditions provides positive indication in the control room of increases in leakage rates.
5.2.5.2 System Description 5.2.5.2.1 General Description IDENTIFIED LEAKAGE DETECTION - Certain components of the reactor coolant pressure boundary may have small amounts of leakage and cannot, from a practical standpoint, be made leaktight. These identified sources of leakage are piped to the reactor coolant drain tank whose level is indicated and alarmed in the control room. The annular gap between the O-rings in the reactor vessel head flange is tapped and piped to a temperature indicator and then to the reactor coolant drain tank. Reactor coolant leakage gives a high temperature indication and alarm. Additionally, the controlled leakage shaft seal system for the reactor coolant pumps is monitored by reactor coolant drain tank level indication and alarm.
UNIDENTIFIED LEAKAGE DETECTION - The reactor coolant pressure boundary leakage detection system consists of the sump level and flow monitoring system, the containment air particulate monitoring system, the containment cooler condensate measuring system, and the containment humidity monitoring system.
The sump level and flow monitoring system indicates leakage by monitoring increases in sump level. The containment cooler condensate measuring system and the containment humidity measuring system detect leakage from the release of steam or water to the containment atmosphere. The air particulate gas monitoring system detects leakage from the release of radioactive materials to the containment atmosphere. The containment gaseous radioactivity monitor could provide additional indication of leakage if significant reactor coolant gaseous activity is present from fuel cladding defects.
Primary-to-secondary reactor coolant leakage, if it occurs, is detected by the following radioactivity monitors: the main condenser evacuation, the steam generator liquid, the steam generator blowdown processing, and the steam generator blowdown discharge (Section 11.5.2).
Reactor coolant pressure boundary leakage is also indicated by increasing charging pump flow rate compared with reactor coolant system inventory changes and by unscheduled increases in reactor makeup water usage.
INTERSYSTEM LEAKAGE - Leakage to any significant degree into the auxiliary systems connected to the RCPB is not expected to occur. Design and administrative provisions which serve to limit leakage 5.2-33 Rev. 20
WOLF CREEK include isolation valves designed for low seat leakage, periodic testing of RCPB check valves (see Section 6.3.4.2), and inservice inspection (see Section 6.6). Leakage is detected by increasing the auxiliary system level, temperature, and pressure indications or lifting of the relief valves accompanied by increasing values of monitored parameters in the relief valve discharge path. These systems are isolated from the RCS by normally closed valves and/or check valves.
- a. Residual Heat Removal System (Suction Side) - The RHR system is isolated from the RCS on the suction side by motor-operated valves 8701A/B and 8702A/B. Leakage past these valves is detected by lifting of relief valves 8708A or 8708B, accompanied by increasing pressurizer relief tank level, pressure, and temperature indications and alarms on the main control board.
- b. Safety Injection System/Accumulators - The accumulators are isolated from the RCS by check valves 8948A/B/C/D and 8956A/B/C/D. Leakage, past these valves and into the accumulator subsystem, is detected by redundant control room accumulator pressure and level indications and alarms.
- c. Safety Injection System/RHR Discharge Subsystem - The RHR pump portion of the safety injection system is isolated from the RCS by check valves 8948A/B/C/D, 8818A/B/C/D, 8949B/C, 8841A/B, and normally closed motor-operated valve 8840. Leakage past these valves eventually pressurizes the RHR discharge header and result in lifting of the relief valves 8856A and 8856B or 8842. Relief valve lifting is detected by increasing levels of boron recycle holdup tanks which indicate and alarm in the radwaste control room and provide a general system alarm in the main control room.
- d. Safety Injection System/SI Pump Subsystem - The safety injection pump portion of the safety injection system is isolated from the RCS by check valves 8948A/B/C/D; EP-V010, V020, V030, V040; 8949A/B/C/D; EM-V001, V002, V003, V004; and normally closed motor-operated valves 8802A/B. Leakage past these valves pressurizes the safety injection pump discharge header, resulting in control room indication of increasing pressure and eventually lifting of relief valve 8851 or 8853A/B.
Relief valve lifting is detected by increasing levels of boron recycle holdup tanks which indicate and alarm in the radwaste control room and provide a general system alarm in the main control room.
5.2-34 Rev. 13
WOLF CREEK
- e. Safety Injection System/Charging Pump Subsystem - The charging pump subsystem is isolated from the RCS by check valves BB-V001, V022, V040, V059; and EM-8815; and motor-operated valves EM-8801A/B. Leakage past these valves eventually pressurizes the boron injection tank, resulting in a control room indication of increasing tank pressure. The BIT and associated piping form a closed volume which is designed for charging flow pressure. Lower pressure portions of the SIS are protected by double valve isolation, while single valves isolate the higher pressure charging flow piping.
Leakage past valves EM-V151, V246, and V247 is not possible, since the inlet of each of these valves is pressurized by the operating charging pump.
- f. Waste Processing System - The waste processing system is isolated from the RCS by manual valves BB-V008, V028, V047, V066 and BB-V009, V029, V048, V067. Leakage past these valves results in increasing the control room indication of reactor coolant drain tank level and reactor coolant drain tank pump flow.
- g. Head Gasket Monitoring Connections - Leakage past the reactor vessel head gasket(s) result in temperature indication and alarm in the control room.
- h. Component Cooling Water - Leakage from the reactor coolant system to the component cooling water system, which services all components of the reactor coolant pressure boundary that require cooling, is detected by the component cooling water radioactivity monitoring system and/or increasing surge tank level. (Section 11.5.2).
Leakage to the containment atmosphere from the reactor coolant pressure boundary would cause a change in the containment airborne radioactivity which would be detected by the air particulate monitors. If the reactor is operating with a known rate of leakage, at a constant power level, with a constant reactor coolant activity and a constant purge rate, both the gross particulate and gross noble gas activities reach an equilibrium level. Under these conditions, an abnormal increase in monitored activity are the results of increased leakage. Such leakage is classified as unidentified until its source is determined.
During the expected modes of operation, the reactor coolant activity level fluctuates due to power variations and variations in letdown flow rate.
However, significant increases in leakage can be detected.
5.2-35 Rev. 20
WOLF CREEK Leakage detection systems have been designed to aid operating personnel, to the extent possible, in differentiating between possible sources of detected leakage within the containment and identifying the physical location of the leak.
The containment atmosphere particulate monitoring system provides the primary means of remotely determining the presence of reactor coolant leakage within the containment. Increases in containment airborne activity levels detected by either of the monitors indicate the reactor coolant pressure boundary as the source of leakage. Conversely, if the humidity detector or condensate measuring system detects increased containment moisture without a corresponding increase in airborne activity level, the indicated source of leakage would be judged to be a non-radioactive system, except during times when reactor coolant activity may be low.
Less sensitive methods of leakage detection, such as unexplained increases in reactor plant makeup requirements to maintain pressurizer level, also provide indication of the reactor coolant pressure boundary as a potential leakage source. Increases in the frequency of a particular containment sump pump operation or increases in the level in a particular sump facilitate localization of the source to components whose leakage would drain to that sump. Leakage rates of the magnitude necessary to be detectable by these latter methods are expected to be noted first by the more sensitive radiation and moisture detection equipment.
Normally, unidentified leakage from the reactor coolant pressure boundary is essentially zero. The reactor coolant system is an all welded system, with the exception of the connections on the pressurizer safety valves, reactor vessel head, the pressurizer and steam generator manways, which are flanged, and encapsulation clamps at the capped flange on CRDM penetrations 10, 13, 17, 20, 22, 24, 25, 27, 28, 29. In addition, encapsulation clamps are authorized to be installed on any of the remaining CRDM penetrations. Connections to the reactor coolant system are welded. Isolation or check valves between the reactor coolant system and other systems have been designed for low seat leakage, and reactor coolant pressure boundary check valve backleakage is checked periodically. In general, valves in the reactor coolant system 2 inches and under are of the packless type. Valves larger than 2 inches have graphite packing.
The plant containment has the capability for a continuous purge of 4,000 cfm.
The time to recirculate one containment free air volume through the containment air coolers is 4.57 minutes. The component operation for various leak detection systems, as discussed in Section 5.2.5.2.3, is based on this containment purge and recirculation time.
5.2-36 Rev. 29
WOLF CREEK MAXIMUM ALLOWABLE TOTAL LEAKAGE - The limits for the reactor coolant pressure boundary leakage are: identified, 10 gpm and unidentified, 1 gpm. When leakage is identified, it is evaluated by the operating staff to determine if operation can safely continue. Under these conditions, an allowable total leakage from known sources of 10 gpm has been established. Continued operation of the reactor with identified or unidentified leakage shall be in accordance with the Technical Specifications.
Normal chemical and volume control system operation can consist of either 75 gpm or 120 gpm letdown. This is determined by either operator preference or plant conditions. For example, 120 gpm letdown would normally be employed during periods of increased RCS activity. An additional 12 gpm reactor coolant pump seal return during normal plant operation results in a total flow leaving the reactor of either 87 gpm (75 gpm letdown) or 132 gpm (120 gpm letdown).
Based on the above conditions, the charging pump flow rates of 87 gpm or 132 gpm would be required to makeup for flow leaving the reactor. Considering a normal seal injection flow of 32 gpm; 55 gpm (75 gpm letdown) or 100 gpm (120 gpm letdown) would be supplied through the normal charging line. A single centrifugal charging pump with a 150 gpm rated capacity at 5800 ft of head or the Normal Charging Pump which has a capability of 150 gpm as shown in the preoperational test provides an adequate reserve capacity at normal RCS pressures to easily accommodate a 10 gpm maximum limit on reactor coolant pressure boundary leakage.
The reactor coolant pressure boundary leakage detection system provides ample protection to assure that, in the unlikely event of a failure of the reactor coolant pressure boundary, small cracks are detected prior to becoming large leaks. In particular:
- a. The sensitivity of the detection equipment is such that leaks can be identified when small, and the plant can be shut down. The limit on continued operation for unidentified leakage is l gpm. This is well within the detection capability of the reactor coolant pressure boundary leakage detection system.
- b. The time span for a crack to go from detectable size to critical size varies from 5 to more than 40 years. This assures adequate safety from a major loss-of-coolant accident. Actual conditions are addressed in Reference 9.
5.2-37 Rev. 13
WOLF CREEK The above methods are supplemented by visual and ultrasonic inspections of the reactor coolant pressure boundary during plant shutdown periods, in accordance with the inservice inspection program (Section 5.2.4).
5.2.5.2.2 Component Description CONTAINMENT AIR PARTICULATE MONITOR - An air sample is drawn outside the containment into a closed system by a sample pump and is then consecutively passed through a particulate filter with detectors, an iodine filter with detector, and a gaseous monitor chamber with detector. The sample transport system includes:
- a. A pump to obtain the air sample
- b. A flow control valve to provide flow adjustment
- c. A flow meter to indicate the flow rate
- d. A flow alarm assembly to provide high and low flow alarm signals The particulate filter is continuously monitored by a scintillation crystal with a photo multiplier tube which provides an output signal proportional to the activity collected on the filter. The particulate monitor has a range of 10-12 to 10-7 Ci/cc and a minimum detectable concentration of 10-11 Ci/cc.
The containment and particulate monitoring system is capable of performing its radioactive monitoring functions following an SSE. More details concerning the particulate monitors can be found in Section 11.5.2.3.2.2.
CONTAINMENT GASEOUS RADIOACTIVITY MONITOR - The containment gaseous radioactivity monitor determines gaseous radioactivity in the containment by monitoring continuous air samples from the containment atmosphere. After passing through the gas monitor, the sample is returned via the closed system to the containment atmosphere.
Each sample is continuously mixed in a fixed, shielded volume where its activity is monitored. The monitor has a range of 10-7 to 10-2 Ci/cc and a minimum detectable concentration of 2 x 10-7 Ci/cc.
The containment gaseous radioactivity monitors are fully described in Section 11.5.2.3.2.2.
5.2-38 Rev. 0
WOLF CREEK The containment gaseous radioactivity monitoring system is capable of performing its radioactivity monitoring functions following an SSE.
CONTAINMENT PURGE MONITORS - The containment purge system radioactivity monitors (Section 11.5.2.3.2.3) serve as a backup to the containment air particulate and gaseous airborne radioactivity monitoring system while the purge is in operation.
CONTAINMENT COOLER CONDENSATE MONITORING SYSTEM - The condensate monitoring system permits measurements of the liquid runoff from the containment cooler units. It consists of a containment cooler drain collection header, a vertical standpipe, valving, and standpipe level instrumentation for each cooler.
The condensation from the containment coolers flows via the collection header to the vertical standpipe. A differential pressure transmitter provides standpipe level signals. The system provides measurements of low leakages by monitoring standpipe level increase versus time.
CONTAINMENT HUMIDITY MONITORING SYSTEM - The containment humidity monitoring system, utilizing temperature compensated humidity detectors, is provided to determine the water vapor content of the containment atmosphere.
An increase in the humidity of the containment atmosphere indicates release of water within the containment. The range of the containment humidity measuring system is 10 to 98-percent relative humidity at 80°F with a temperature range of 40 to 120°F.
CONTAINMENT SUMP LEVEL AND FLOW MONITORING SYSTEM - Since a leak in the primary system would result in reactor coolant flowing into the containment normal or instrument tunnel sumps, leakage would be indicated by a level increase in the sumps. Indication of increasing sump level is transmitted from the sump to the control room level indicator by means of a sump level transmitter. The system provides measurements of low leakages by monitoring level increase versus time.
CHARGING PUMP OPERATION - During normal operation, either the normal or other centrifugal charging pump is in operation. If a gross loss of reactor coolant occurs which is not detected by the methods previously described, the flow rate of the operating charging pump indicates the leakage from the reactor coolant system. This leakage must be sufficient to cause a decrease in pressurizer or volume control 5.2-39 Rev. 13
WOLF CREEK tank level that is within the sensitivity range of the level indicators. The charging pump flow would automatically increase to try to maintain pressurizer level. Charging pump discharge flow indication is provided in the control room.
SUMP PUMP OPERATION - Since a leak in the primary system may result in reactor coolant flowing into the containment normal or instrument tunnel sumps, gross leakage can be indicated by an increase in the frequency of operation of the containment normal or the containment instrument tunnel sump pumps. Pump operation can be monitored from the control room.
LIQUID INVENTORY - Larger leaks may also be detected by unscheduled increases in the amount of reactor coolant makeup water which is required to maintain the normal level in the pressurizer. Pressurizer level can be monitored in the control room. Total makeup water flow is also available from the plant computer.
5.2.5.2.3 Component Operation CONTAINMENT AIR PARTICULATE MONITOR - Particulate activity is determined from the containment free volume and the coolant fission and corrosion product particulate activity concentrations. Any increase of more than two standard deviations above the count rate for background would indicate a possible leak.
The total particulate activity concentration above background, due to an abnormal leak and natural decay, increases almost linearly with time for the first several hours after the beginning of a leak. As shown in Figure 5.2-2, with 0.1-percent failed fuel, containment background airborne particulate radioactivity equivalent to 10-4 percent/day, and a partition factor equal to 0.01 (NUREG-0017 assumptions), a 1-gpm leak would be detected in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Larger leaks would be detected in proportionately shorter times (exclusive of sample transport time, which remains constant). The detection capabilities and response times are shown on Figure 5.2-2.
In the discussions with the NRC and in NUREG/CR-6582, the gaseous particulate monitors cannot readily determine the leakage rate because the activity is determined by unsteady conditions, background level, reactor coolant activity and partition factors for particulates. The background activity is dependent upon the power level, percent failed fuel, crud bursts, iodine spiking, and natural radioactivity brought in by the containment purge.
CONTAINMENT GASEOUS RADIOACTIVITY MONITOR - This monitor is less sensitive than the containment air particulate monitors but gives a positive indication of leakage in the event that reactor coolant gaseous activity exists as a result of fuel-cladding defects. Gaseous radioactivity is determined from the containment free volume and the gaseous activity concentration of the reactor coolant. Any increase more than two standard deviations above the count rate for background would indicate a possible leak. The total gaseous activity level above background (after 1 year of normal operation) increases 5.2-40 Rev. 20
WOLF CREEK almost linearly for the first several hours after the beginning of the leak.
As specified in Figure 5.2-2, with 0.1-percent failed fuel, containment background airborne gaseous radioactivity equivalent to 1 percent/day, and a partition factor equal to l (NUREG-0017 assumptions), a 1-gpm leak would be detected within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Larger leaks would be detected in proportionately shorter times (exclusive of the sample transport time which remains constant).
The detection capabilities and response times are shown on Figure 5.2-2.
Evaluations have shown that the pre-existing containment radioactive gaseous background levels for which reliable detection is possible is dependent upon the reactor power level, percent failed fuel and natural radioactivity brought in by the containment purge. With primary coolant concentrations less than equilibrium levels, such as during reactor startup and operation with no fuel defects, the increase in detector count rate due to leakage will be partially masked by 1) the statistical variation of the minimum detector background count rate, and 2) the Ar-41 activation activity rendering reliable detection of a 1 gpm leak uncertain. The containment atmosphere gaseous radioactivity monitors were designed in accordance with the sensitivities specified in Regulatory Guide 1.45, Reactor Coolant Pressure Boundary Leakage Detection Systems, with the alarm setpoint set to indicate a 1 gpm RCS leak based on Regulatory Guide 1.45 assumptions. The monitors are fully functioning in accordance with its design requirements, however they have been removed as part of the reactor coolant pressure boundary leakage detection system due to the inability to promptly detect a 1 gpm RCS leak within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with reduced radioactivity levels in the reactor coolant system. (Reference 12)
CONTAINMENT PURGE MONITORS - The containment purge monitors function the same as the containment air particulate and gaseous radioactivity monitors, except that the purge monitors sample from the containment purge exhaust line.
CONTAINMENT COOLER CONDENSATE MONITORING SYSTEM - The condensate flow rate is a function of containment humidity, essential service water temperature leaving the coolers, and containment purge rate. The water vapor dispersed by a 1 gpm leak is much greater than the water vapor brought in with the outside air. Air brought in from the outside is heated to 50°F before it enters the containment.
After the air enters the containment, it is heated to 100-120°F so that the relative humidity drops. The water vapor brought in with the outside air does not build up in the containment since it is continually purged. The most important factor in condensing the water vapor is the temperature of the essential service water which is provided to the containment coolers. This water can vary between 38 - 100°F on the outlet of the coolers, depending on seasonal conditions.
Level changes of as little as 0.25 inches in the cooler condensate standpipes can be detected. Increases in the condensation rates over normal background are monitored by the plant computer based upon level checks in order to determine the unidentified leakage. Figure 5.2-2 shows the detection capabilities of the system for various seasonal conditions with no airborne identified leakage. Normal background leakage will increase containment humidity to the point where condensation will more readily occur and, thereby, will improve the detection capabilities of this system.
5.2-41 Rev. 21
WOLF CREEK As shown on Figure 5.2-2, a sensitivity of 1 gpm in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> can be achieved with cold essential service water temperature to the containment coolers or with initial background leakage.
The rate of leakage can be determined when the precise essential service water, outside air, and containment air temperatures and the outside relative humidity are known by use of psychrometric charts.
CONTAINMENT HUMIDITY MONITORING SYSTEM - The maximum possible containment humidity under various outside air conditions and no leakage will fall within the extremes shown on Figure 5.2-2. Therefore, a 1-gpm leak can be detected within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by measuring the containment humidity.
The accuracy of the humidity detectors is +3 percent. A rapid increase of humidity over the background level by more than 10 percent can be taken as a probable indication of a leak.
The leak rate can be determined when the outside air temperature and humidity and the containment temperature are known by use of psychrometric charts.
CONTAINMENT SUMP LEVEL AND FLOW MONITORING SYSTEM - The detection capabilities of the containment normal sump and instrument tunnel sump are shown in Figure 5.2-2, assuming that the water from the leak is collected in the sump.
The minimum detectable change in the containment normal sump level is 3 gallons and in the instrument tunnel sump level is 15 gallons.
The actual reactor coolant leakage rate can be established from the increase above the normal rate of change of sump level after consideration of 35 percent of the high temperature leakage which initially evaporates but may be condensed by the containment coolers and then is routed to the sump. A check of other instrumentation would be required to eliminate possible leakage from nonradioactive systems as a cause of an increase in sump level.
CHARGING PUMP OPERATION - The normal charging pump normally delivers 87 or 132 gpm to the reactor coolant system depending on the amount of letdown flow established. Any significant increase in the flow rate is a possible indication of a leak.
The leakage rate can be determined by the amount that the charging pump rate increases above 87 or 132 gpm to maintain constant pressurizer level.
5.2-42 Rev. 29
WOLF CREEK SUMP PUMP OPERATION - Under normal conditions, the containment normal and instrument tunnel sump pumps will operate very infrequently. Gross leakage can be surmised from unusual frequency of pump operation. Sump level and pump running indication are provided in the control room to alert the operators.
The leakage rate can be determined from sump volumes and frequency of sump pump operation.
LIQUID INVENTORY - The operators can surmise gross leakage from changes in the reactor coolant inventory. Noticeable decreases in the pressurizer level not associated with known changes in operation will be investigated. Likewise, makeup water usage information which is available from the plant computer will be checked frequently for unusual makeup rates not due to plant operations.
5.2.5.3 Safety Evaluation Inasmuch as this system has no safety design basis, no safety evaluation is provided. Criteria for the selection of safety design bases are stated in Section 1.1.7.
5.2.5.4 Tests and Inspections Periodic testing of leakage detection systems is conducted to verify the operability and sensitivity of detector equipment. These tests include installation calibrations and alignments, periodic channel calibrations, functional tests, and channel checks. A description of calibration and maintenance procedures and frequencies for the containment radioactivity monitoring system is presented in Section 11.5.2.
The humidity detector and condensate measuring system are also periodically tested to ensure proper operation and verify sensitivity.
Inservice inspection criteria, the equipment used, procedures involved, the frequency of testing, inspection, surveillance, and examination of the structural and leaktight integrity of reactor coolant pressure boundary components are described in detail in Section 5.2.4.
5.2.5.5 Instrumentation Applications The following indications are provided in the control room to allow operating personnel to monitor for leakage:
- a. Containment air particulate monitor - air particulate activity 5.2-43 Rev. 0
WOLF CREEK
- b. Containment gaseous activity monitor - gaseous activity
- c. Containment cooler condensate monitoring system -
standpipe level
- e. Containment humidity measuring system - containment humidity
- f. Gross leakage detection methods - Charging pump flow rate, let-down flow rate, pressurizer level and reactor coolant temperatures are available for the charging pump flow method. Containment sump levels and pump operation are available for the sump pump operation method.
Totalized makeup water flow is available from the plant computer for liquid inventory.
5.
2.6 REFERENCES
- 1. Logsdon, W. A., Begley, J. A., and Gottshall, C. L., "Dynamic Fracture Toughness of ASME SA508 Class 2a and ASME SA533 Grade A Class 2 Base and Heat Affected Zone Material and Applicable Weld Metals," WCAP-9292, March 1978.
- 2. Letter NS-CE-1730, dated March 17, 1978, C. Eicheldinger (Westinghouse) to J. F. Stolz (NRC).
- 3. Cooper, L., Miselis, V. and Starek, R. M., "Over-pressure Protection for Westinghouse Pressurized Water Reactors," WCAP-7769, Revision 1, June, 1972 (also letter NS-CE-622, dated April 16, 1975, C. Eicheldinger (Westinghouse) to D. B. Vassallo (NRC), additional information on WCAP-7769, Revision 1).
- 4. Burnett, T. W. T., et al., "LOFTRAN Code Description," WCAP- 7907, October 1972.
- 5. Golik, M. A., "Sensitized Stainless Steel in Westinghouse PWR Nuclear Steam Supply Systems," WCAP-7477-L (Proprietary), March, 1970 and WCAP-7735 (Non-Proprietary), August 1971.
- 6. Enrietto, J. F., "Control of Delta Ferrite in Austenitic Stainless Steel Weldments," WCAP-8324-A, June 1975.
- 7. Enrietto, J. F., "Delta Ferrite in Production Austenitic Stainless Steel Weldments," WCAP-8693, January 1976.
- 8. W. D. Wagner, et. Al., Transient Analysis Methodology for the Wolf Creek Generating Station, NSAG-006 Rev. 0, March 11, 1991.
- 9. WCAP-7503, Determination of Design Pipe Breaks for the Westinghouse Reactor Coolant System, Supplement 1, February 1972.
- 10. WCAP-14040-A, Methodology Used to Develop Cold Overpressure Mitigation System Setpoints and RCS Heatup and Cooldown Limit Curves, Revision 4, J. Andrachek et. al., May 2004.
- 11. NRC Letter dated May 31, 2005, from Robert A. Gramm to Rick A. Muench Wolf Creek Generating Station - Request for Relief Regarding Classification of Pressurizer Upper level Instrument and Other Lines and Associated components for Wolf Creek Generating Station, Unit 1 (TAC No.
MC5058).
5.2-44 Rev. 23
WOLF CREEK
- 12. NRC Letter dated May 16, 2006, from J. Donohew to R. Muench, Wolf Creek Generation Station - License Amendment Request to change the Reactor Coolant System Leakage Detection Instrumentation Methodology (TAC No.
MC8214).
- 13. Implementation of piping code cases in specification M-200.
- 14. Letter 07-00401, dated July 19, 2007, from USNRC to WCNOC, Authorization of Relief Request 13R-05, Alternatives to Structural Weld Overlay Requirements.
5.2-45 Rev. 21
WOLF CREEK TABLE 5.2-1 APPLICABLE CODE ADDENDA FOR REACTOR COOLANT SYSTEM COMPONENTS Reactor vessel ASME III, 1971 Edition through Winter 1972 Steam generator ASME III, 1971 Edition through Summer 1973 Pressurizer ASME III, 1974 Edition CRDM housing ASME III, 1974 Edition through Winter 1974 CRDM head adapter ASME III, 1971 Edition through Winter 1972 Reactor coolant pump ASME III, 1971 Edition through Summer 1973
- Reactor coolant pipe ASME III, 1974 Edition through Winter 1975
Control ASME III, 1974 Edition through Summer 1975
- The 1974 Edition and Addenda up to and including the Winter 1975 Addenda is the applicable version of the Code for Class 1 piping components designed /
supplied by Westinghouse. In addition, the fatigue stress analysis uses the ASME Code Addend up to Summer 1979.
- The Class 1 piping fatigue stress analysis uses ASME Section III 1986 code.
Rev. 13
WOLF CREEK TABLE 5.2-2 CLASS 1 PRIMARY COMPONENTS MATERIAL SPECIFICATIONS Reactor Vessel Components Shell and head plates (other SA-533, Grade A, B or C, Class 1 than core region) or 2 (vacuum treated)
Shell plates (core region) SA-533, Grade A or B, Class l (vacuum treated)
Shell, flange and nozzle SA-508, Class 2 or 3; SA-182, forgings, nozzle safe ends Grade F304 or F316 CRDM and/or ECCS appurtenances, SB-166 or SB-167 and SA-182, upper head Grade F304 Instrumentation tube SB-166 or SB-167 and SA-182, appurtenances, lower head Grade F304, F304L or F316 Closure studs, nuts, washers, SA-540, Class 3, Grade B23 or B24 inserts, and adaptors (as modified by Code Case 1605)
Core support pads SB-166 with carbon less than 0.10 percent Monitor tubes and vent pipe SA-312 or SA-376, Grade TP304 or TP316 or SB-166 or SB-167 or SA-182, Grade F316 Vessel supports, seal ledge, SA-516, Grade 70 (quenched and and heat lifting lugs tempered) or SA-533, Grade A, B or C, Class 1 or 2 (vessel supports may be of weld metal buildup of equivalent strength of the nozzle material)
Cladding and buttering Stainless Steel Weld Metal Analysis A-8 and Ni-Cr-Fe Weld Metal F-Number 43 Steam Generator Components Pressure Plates SA-533, Grade A, Class 2 Pressure forgings (including SA-508, Class 2a nozzles and tube sheet)
Rev. 0
WOLF CREEK TABLE 5.2-2 (Sheet 2)
Nozzle safe ends Stainless Steel Weld Metal Analysis A-8 Channel heads SA-533, Grade A, B or C, Class l or 2 or SA-216, Grade WCC Tubes SB-163 (Ni-Cr-Fe annealed)
Cladding and buttering Stainless Steel Weld Metal Analysis A-8 and Ni-Cr-Fe Weld Metal F-Number 43 Closure bolting SA-193, Grade B7 Pressurizer Components Pressure plates SA-533, Grade A, Class 2 Pressure forgings
- SA-508, Class 2a Nozzle safe ends
- SA-182, Grade F316L Cladding and buttering
- Stainless Steel Weld Metal Analysis A-8 and Ni-Cr-Fe Weld Metal F-Number 43 Closure bolting SA-193, Grade B7 Reactor Coolant Pump Pressure forgings SA-182, Grade F304, F316, F347 or F348 Pressure casting SA-351, Grade CF8, CF8A or CF8M Tube and pipe SA-213; SA-376 or SA-312, Seam-less, Grade TP304 or TP316 Pressure plates SA-240, Type 304 or 316 Bar material SA-479, Type 304 or 316 Closure bolting SA-193; SA-320; SA-540 or SA-453, Grade 660; SB-637 Gr. N07718 Flywheel SA-533, Grade B, Class 1
- In order to mitigate primary water stress corrosion cracking concerns with the originally installed Alloy 600 (82/182) dissimilar metal welds, full structural weld overlays made of ERNiCrFe-7A (Alloy 52M/UNS N06054) have been installed to cover portions of the Pressurizer nozzles (Surge, Safety, Relief, and Spray),
nozzle weld butter layers, dissimilar metal welds between the butter and the safe end, safe ends, safe end to stainless steel pipe welds, and connecting stainless steel piping.
Rev. 21
WOLF CREEK TABLE 5.2-2 (Sheet 3)
Reactor Coolant Piping Reactor coolant pipe SA-351, Grade CF8A Centrifugal Casting Reactor coolant fittings, SA-351, Grade CF8A and SA-182, branch nozzles (Code Case 1423-2) Grade 316N Surge line SA-376, Grade TP304, TP316 or F304N Auxiliary piping 1/2 through ANSI B36.19 12 inch and wall schedules 40S through 80S (ahead of second isolation valve)
All other auxiliary piping ANSI B36.10 (ahead of second isolation valve)
Socket weld fittings ANSI B16.11 Piping flanges ANSI B16.5 Full Length CRDM Latch housing SA-182, Grade F304 or SA-351, Grade CF8 Rod travel housing SA-182, Grade F304 or SA-336, Class F8 Cap SA-479, Type 304 Welding materials Stainless Steel Weld Metal Analysis A-8 Rev. 0
WOLF CREEK TABLE 5.2-3 CLASS 1 AND 2 AUXILIARY COMPONENTS MATERIAL SPECIFICATIONS Valves Bodies SA-182, Grade F316 or SA-351, Grade CF8 or CF8M Bonnets SA-182, Grade F316 or SA-351, Grade CF8 or CF8M Discs SA-182, Grade F316 or SA-564, Grade 630, or SA-351, Grade CF8 or CF8M Stems SA-182, Grade F316 or SA-564, Grade 630 Pressure-retaining bolting SA-453, Grade 660 Pressure-retaining nuts SA-453, Grade 660 or SA-194 Grade 6 Auxiliary Heat Exchangers Heads SA-240, Type 304 Nozzle necks SA-182, Grade F304 Tubes SA-213, Grade TP304 Tube Sheets SA-182, Grade F304 Shells SA-240 and SA-312, Grade TP304 Auxiliary Pressure Vessels, Tanks, Filters, etc.
Shells and heads SA-240, Type 304 or SA-264 (consisting of SA-537, Class 1 with Stainless Steel Weld Meta Analysis A-8 Cladding)
Flanges and nozzles SA-182, Grade F304 and SA-105 or SA-350, Grade LF2 or LF3 with Stainless Steel Weld Metal Analysis A-8 Cladding Rev. 0
WOLF CREEK TABLE 5.2-3 (Sheet 2)
Piping SA-312 and SA-240, Grade TP304 or TP316 Seamless Pipe fittings SA-403, Grade WP304 Seamless Closure bolting and nuts SA-193, Grade B7 and SA-194, Grade 2H/Grade 7 Auxiliary Pumps Pump casing and heads SA-351, Grade CF8 or CF8M; SA-182, Grade F304 or F316 Flanges and nozzles SA-182, Grade F304 or F316; SA-403, Grade WP316L Seamless Piping SA-312, Grade TP304 or TP316 Seamless Stuffing or packing box cover SA-351, Grade CF8 or CF8M; SA-240, Type 304 or 304L or 316 Pipe fittings SA-403, Grade WP316L Seamless Closure bolting and nuts SA-193, Grade B6, B7 or B8M; SA-194, Grade 2H/Grade 7 or 8M; SA-453 Grade 660, and Nuts, SA-194, Grade 2H, 6 and 8 M Rev. 23
WOLF CREEK TABLE 5.2-4 REACTOR VESSEL INTERNALS FOR EMERGENCY CORE COOLING SYSTEMS Forgings SA-182, Grade F304 Plates SA-240, Type 304 Pipes SA-312, Grade TP304 Seamless or SA-376, Grade TP304 Tubes SA-213, Grade TP304 Bars SA-479, Type 304 and 410 Castings SA-351, Grade CF8 and CF8A Bolting SA-193, Grade B8M (65 MYS/90 MTS)
Code Case 1618 Inconel-750; SA-461, Grade 688 Nuts SA-193, Grade B8 Locking devices SA-479, Type 304 Rev. 0
WOLF CREEK TABLE 5.2-5 RECOMMENDED REACTOR COOLANT WATER CHEMISTRY LIMITS (g)
Electrical conductivity Determined by the concentration of boric acid and alkali present.
Expected range is 1 to 40 mhos/cm at 25°C.
Solution pH Determined by the concentration of boric acid and alkali present.
Expected values range between 4.2 (high boric acid concentration) to 10.5 (low boric acid concentration at 25°C. Values will be 5.0 or greater at normal operating temperatures.
Oxygen (a) 0.005 ppm, maximum Chloride (b) 0.15 ppm, maximum Fluoride (b) 0.15 ppm, maximum Hydrogen (c) 25 to 50 cc (STP)/kg H2O Suspended solids (d) 1.0 ppm, maximum pH control agent (Li7OH) Lithium Control Program Boric acid Variable from 0 to ~4000 ppm as B Silica (f) 1.0 ppm, maximum Aluminum (f) 0.05 ppm, maximum Calcium (f) 0.05 ppm, maximum Magnesium (f) 0.05 ppm, maximum NOTES:
(a) Oxygen concentration should normally be controlled by scavenging with hydrazine to less than 0.1 ppm in the reactor coolant prior to exceeding a temperature of 250°F. During power operation with the specified hydrogen concentration maintained in the coolant, the residual oxygen concentration does not exceed 0.005 ppm.
(b) Halogen concentrations are maintained below the specified values at all times regardless of system temperature.
Rev. 32
WOLF CREEK TABLE 5.2-5 (Sheet 2)
(c) Hydrogen is maintained in the reactor coolant for all plant operations with nuclear power above 1 MWt. The normal operating range should be 30 to 40 cc/kg H2O.
` Twenty four hours prior to a scheduled shutdown, when the reactor coolant system is intended to be cooled down, the hydrogen concentration may be reduced below the normal operating range to facilitate degassification, but hydrogen levels of at least 15cc H2/KgH2O should be maintained.
(d) Solids concentration determined by filtration through filter having 0.45 micron pore size.
(e) Deleted (f) These limits are included in the table of reactor coolant specifications as recommended standards for monitoring coolant purity. Establishing coolant purity within the limits shown for these species is judged desirable with the current data base to minimize fuel clad crud deposition which affects the corrosion resistance and heat transfer of the clad.
(g) Refer to the Technical Requirements Manual for required reactor coolant chemistry limits.
Rev. 32
WOLF CREEK TABLE 5.2-6 DESIGN COMPARISON WITH REGULATORY GUIDE 1.45, DATED MAY 1973, TITLED REACTOR COOLANT PRESSURE BOUNDARY LEAKAGE DETECTION SYSTEMS Regulatory Guide 1.45 Position WCGS C. REGULATORY POSTION The source of reactor coolant leakage should be identifiable to the extent practical. Reactor coolant pressure boundary leakage detection and collection systems should be selected and designed to include the following:
- 1. Leakage to the primary reactor containment from 1. Complies. Flow to the RCDT can be identified sources should be collected or otherwise established, is monitored, and is isolated so that: separated from unidentified leakage.
- a. the flow rates are monitored separately from unidentified leakage, and
- b. the total flow rate can be established and monitored.
- 2. Leakage to the primary reactor containment from 2. Complies. The instrumentation unidentified sources should be collected and the flow provided is such that over a period of rate monitored with an accuracy of one gallon per time (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or more), the collected flow minute (gpm) or better. rate can be determined with an accuracy of better than 1 gallon per minute.
- 3. At least three separate detection methods 3. Complies. The methods provided are should be employed and two of these methods should sump-level and flow (level versus time) be (1) sump level and flow monitoring and monitoring, airborne particulate Rev. 0
WOLF CREEK TABLE 5.2-6 (Sheet 2)
Regulatory Guide 1.45 Position WCGS (2) airborne particulate radioactivity monitoring. Radioactivity monitoring, The third method may be selected from the containment cooler condensate monitoring, following: and containment atmosphere humidity monitoring.
- a. monitoring of condensate flow rate from air coolers,
- b. monitoring of airborne gaseous radio-activity.
Humidity, temperature, or pressure monitoring of the containment atmosphere should be considered as alarms or indirect indication of leakage to the containment.
- 4. Provisions should be made to monitor systems 4. Complies. Refer to Sections connected to the RCPB for signs of intersystem 5.2.5.2.1, 9.3.3, and 11.5.
leakage. Methods should include radioactivity monitoring and indicators to show abnormal water levels or flow in the affected area.
- 5. The sensitivity and response time of each 5. Complies, as described in Section leakage detection system in regulatory position 5.2.5.2.3 and as shown on Figure 5.2-2.
- 3. above employed for unidentified leakage should be adequate to detect a leakage rate, or its equivalent, of one gpm in less than one hour.
- 6. The leakage detection systems should be 6. Complies. The airborne particulate capable of performing their functions following radioactivity system is designed to seismic events that do not require plant shutdown. remain functional when subjected to the The airborne particulate radioactivity monitoring SSE. Refer to Sections 11.5.2.3.2.2 and system should remain functional when subjected to 11.5.2.3.2.3. The remaining leakage the SSE. detection systems can reasonably be Rev. 20
WOLF CREEK TABLE 5.2-6 (Sheet 3)
Regulatory Guide 1.45 Position WCGS expected to remain functional following seismic events of lesser severity than the SSE. However, no special qualifica-tion program is used to assure operabil-ity under such conditions.
- 7. Indicators and alarms for each leakage 7. Complies, as described in Sections detection system should be provided in the main 5.2.5.2.3 and 5.2.5.5.
control room. Procedures for converting various indications to a common leakage equivalent should be available to the operators. The calibration of the indicators should account for needed independent variables.
- 8. The leakage detection systems should be 8. Complies. Refer to Section 5.2.5.4.
equipped with provisions to readily permit testing for operability and calibration during plant operation.
- 9. The technical specifications should include 9. Complies. Refer to Technical Specifications.
the limiting conditions for identified and The Containment Atmosphere Particulate unidentified leakage and address the availability Radioactivity Monitor, Containment Sump of various types of instruments to assure adequate Level and Flow Monitoring System, and coverage at all times. the Containment Air Cooler Condensate Monitoring System are specified in the Limiting Conditions for operation to monitor and detect leakage from the reactor coolant pressure boundary.
Rev. 20
WOLF CREEK Table 5.2-7 This table has been deleted Rev. 32
I WOLF CREEK I
3'11"+3'11" I N
0
.,.... tO I I v ~
co I")
21 tiB"' 2, ,,...
- 18 VENT STACK 83/4" I" EXTRUDED OUTL.ET
- 28" .128.38 O.D.I WINEcfif~NGE REV. 3 r* *toOtt WOLF CREEK
_______ __L,Qf~A(liGI ------------- UPHAT-BD- AFE-T¥ -A-N-AlrY.SIS -R:SP0RT Figure 5.2-1 INSTALLATION DETAIL FOR THE MAIN STEAM PRESSURE RELIEF DEVICES
------..J
WOLF CREEK
.----------------r--------------------------------------------------------,
w 100
~ NOTE - THESE CURVES ARE BASED 75 1-UPON A CONTINUOUS CONTAINMENT z 60 0 PURGE RATE OF 4000 CFM.
...J
- > 40 u
a::
u w
a::
a:: 25
<t 1-z 10 w
z
<t 1-z 0
u 8
4 w
f-z w AIR 97"F 45XRH
~
f- (/)
4: z 0:::
0
_J
_J OUTSIDE AIR 97" F 45:1. RH 4:
<...?
COOLANT INVENTORY BACKGROUND FACTOR
- 1 5
' ' I MINIMUM TIME TO DETECT LEAKAGE OF 1 GPM REV . 23 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.2-2 PRIMARY COOLANT LEAK DETECTION RESPONSE TIME
WOLF CREEK 5.3 REACTOR VESSEL 5.3.1 REACTOR VESSEL MATERIALS 5.3.1.1 Material Specifications Material specifications are in accordance with the ASME Code requirements and are given in Section 5.2.3.
The ferritic materials of the reactor vessel beltline are restricted to the following maximum limits of copper, phosphorous, and vanadium to reduce sensitivity to irradiation embrittlement in service:
Base Metal As Deposited Weld Element (percent) Metal (percent)
Copper 0.10 (Ladle) 0.10 0.12 (Check)
Phosphorous 0.012 (Ladle) 0.015 0.017 (Check)
Vanadium 0.05 (Check) 0.05 (as residual)
Figure 5.3-2 identifies the location of the beltline materials and welds for the WCGS reactor vessel. Table 5.3-7 contains weld identification information for these welds. Information concerning the fabrication and post-weld heat treatment of the surveillance test specimen weld is identified in WCAP-10015 for WCGS. The test weldment is fabricated as a separate weld, not as an extension of a longitudinal weld seam.
5.3.1.2 Special Processes Used for Manufacturing and Fabrication
- a. The vessel is Safety Class 1. Design and fabrication of the reactor vessel is carried out in strict accordance with ASME Code,Section III, Class l requirements. The head flanges and nozzles are manufactured as forgings.
The cylindrical portion of the vessel is made up of formed plates joined by full penetration longitudinal and girth weld seams. The hemispherical heads are made from dished plates. The reactor vessel parts are joined by welding, using the single or multiple wire submerged arc and the shielded metal arc processes.
5.3-1 Rev. 1
WOLF CREEK
- b. The use of severely sensitized stainless steel as a pressure boundary material has been prohibited and has been eliminated by either choice of material or programming the method of assembly.
- c. The control rod drive mechanism head adapter threads and surfaces of the guide studs are chrome plated to prevent possible galling of the mated parts.
- d. At all locations in the reactor vessel where stainless steel and Inconel are joined, the final joining weld beads are Inconel weld metal in order to prevent cracking.
- e. The location of full penetration weld seams in the upper closure head and vessel bottom head are restricted to areas that permit accessibility during inservice inspection.
- f. The stainless steel clad surfaces are sampled to assure that material composition requirements are met.
- g. Freedom from underclad cracking is assured by special evaluation of the procedure qualification for cladding applied on low alloy steel (SA-508, Class 2).
- h. Minimum preheat requirements have been established for pressure boundary welds, using low alloy material. The preheat is maintained until either an intermediate or full post-weld heat treatment is completed or until the completion of welding.
5.3.1.3 Special Methods for Nondestructive Examination The nondestructive examination of the reactor vessel and its appurtenances is conducted in accordance with ASME Code,Section III requirements; also numerous examinations are performed in addition to ASME Code,Section III requirements.
Nondestructive examination of the vessel is discussed in the following paragraphs and the reactor vessel quality assurance program is given in Table 5.3-1.
5.3.1.3.1 Ultrasonic Examination
- a. In addition to the required ASME Code straight beam ultrasonic examination, angle beam inspection over 100 percent of one major surface of plate material is performed during fabrication to detect discontinuities that may be undetected by the straight beam examination.
5.3-2 Rev. 0
WOLF CREEK
- b. In addition to the ASME Code,Section III nondestructive examination, all full penetration ferritic pressure boundary welds in the reactor vessel are ultrasonically examined during fabrication. This test was performed upon completion of the welding and intermediate heat treatment but prior to the final post-weld heat treatment.
- c. After hydrotesting, all full penetration ferritic pressure boundary welds in the reactor vessel, as well as the nozzle to safe end welds, are ultrasonically examined. These inspections are also performed in addition to the ASME Code,Section III nondestructive examinations.
5.3.1.3.2 Penetrant Examinations The partial penetration welds for the control rod drive mechanism head adapters and the bottom instrumentation tubes were inspected by dye penetrant after the root pass, in addition to code requirements. Core support block attachment welds were inspected by dye penetrant after the first layer of weld metal and after each 1/2 inch of weld metal. All clad surfaces and other vessel and head internal surfaces were inspected by dye penetrant after the hydrostatic test.
5.3.1.3.3 Magnetic Particle Examination The magnetic particle examination requirements below are in addition to the magnetic particle examination requirements of Section III of the ASME Code.
All magnetic particle examinations of materials and welds were performed in accordance with the following:
- a. Prior to the final post-weld heat treatment - Only by the prod, coil, or direct contact method.
- b. After the final post-weld heat treatment - Only by the yoke method.
The following surfaces and welds were examined by magnetic particle methods.
The acceptance standards are in accordance with Section III of the ASME Code.
Surface Examinations
- a. Magnetic particle examine all exterior vessel and head surfaces after the hydrostatic test.
5.3-3 Rev. 0
WOLF CREEK
- b. Magnetic particle examine all exterior closure stud surfaces and all nut surfaces after final machining or rolling. Continuous circular and longitudinal magnetization is used.
- c. Magnetic particle examine all inside diameter surfaces of carbon and low alloy steel products that have their properties enhanced by accelerated cooling. This inspection is performed after forming and machining (if performed) and prior to cladding.
Weld Examination Magnetic particle examination of the weld metal build-up for vessel support welds, the closure head lifting lugs, and the refueling seal ledge to the reactor vessel after the first layer and each 1/2 inch of weld metal is deposited. All pressure boundary welds are examined after back chipping or back grinding operations.
5.3.1.4 Special Controls for Ferritic and Austenitic Stainless Steels Welding of ferrite steels and austenitic stainless steels is discussed in Section 5.2.3. Section 5.2.3 includes discussions which indicate the degree of conformance with Regulatory Guide 1.44. Appendix 3A discusses the degree of conformance with Regulatory Guides 1.43, 1.50, 1.71, and 1.99.
5.3.1.5 Fracture Toughness Assurance of adequate fracture toughness of ferritic materials in the reactor coolant pressure boundary (ASME Code,Section III, Class 1 components) is provided by compliance with the requirements for fracture toughness testing included in NB-2300 to Section III of the ASME Code and Appendix G of 10 CFR 50.
The initial Charpy V-notch minimum upper shelf fracture energy levels for the reactor vessel beltline (including welds) are 75 foot-pounds, as required per Appendix G of 10 CFR 50. Materials having a section thickness greater than 10 inches with an upper shelf of less than 75 foot-pounds are evaluated with regard to effects of chemistry (especially copper content), initial upper shelf energy, and fluence to assure that a 50-foot-pound shelf energy, as required by Appendix G of 10 CFR 50 is maintained throughout the life of the vessel. The specimens are oriented as required by NB-2300 of Section III of the ASME Code.
The vessel fracture toughness data is provided in Table 5.3-3.
5.3-4 Rev. 0
WOLF CREEK Charpy V-notch test data for the heat-affected zone of the limiting beltline region plate is presented in WCAP 10015 for WCGS. Complete Charpy test results for each weld and plate are provided in Tables 5.3-8 through 10. There are no other heat-affected zones which require impact testing per paragraph NB-4335.2 of the 1977 ASME Code. There are no ferritic base metals other than in the vessel in the reactor coolant pressure boundary.
5.3.1.6 Material Surveillance In the surveillance program, the evaluation of radiation damage is based on preirradiation testing of Charpy V-notch and tensile specimens and postirradiation testing of Charpy V-notch, tensile, and 1/2 T (thickness) compact tension (CT) fracture mechanics test specimens. The program is directed toward evaluation of the effect of radiation on the fracture toughness of reactor vessel steels based on the transition temperature approach and the fracture mechanics approach. The program conforms with ASTM E-185 "Recommended Practice for Surveillance Tests for Nuclear Reactor Vessels," and 10 CFR 50, Appendix H.
The reactor vessel surveillance program prior to Refuel 14 used six specimen capsules. The capsules are located in guide baskets welded to the outside of the neutron shield pads and positioned directly opposite the center portion of the core. The capsules can be removed when the vessel head is removed and can be replaced when the internals are removed. The six capsules contain reactor vessel steel specimens, oriented both parallel and normal (longitudinal and transverse) to the principal rolling direction of the limiting base material located in the core region of the reactor vessel and associated weld metal and weld heat-affected zone metal. The six capsules contain 54 tensile specimens, 360 Charpy V-notch specimens (which include weld metal and weld heat-affected zone material), and 72 CT specimens. Archive material sufficient for two additional capsules is retained.
Dosimeters, as described below, are placed in filler blocks drilled to contain them. The dosimeters permit evaluation of the flux seen by the specimens and the vessel wall. In addition, thermal monitors made of low melting point alloys are included to monitor the maximum temperature of the specimens. The specimens are enclosed in a tight-fitting stainless steel sheath to prevent corrosion and ensure good thermal conductivity. The complete capsule is helium leak tested. As part of the surveillance program, a report of the residual elements in weight percent to the nearest 0.01 percent is made for surveillance material and as-deposited weld metal.
5.3-5 Rev. 19
WOLF CREEK Each of the six capsules contains the following specimens:
Number of Number of Number of Material Charpys Tensiles CTs Limiting base material* 15 3 4 Limiting base material** 15 3 4 Weld metal*** 15 3 4 Heat-affected zone 15 - -
- Specimens oriented in the major rolling or working direction.
- Specimens oriented normal to the major rolling or working direction.
The following dosimeters and thermal monitors are included in each of the six capsules:
Dosimeters Iron Copper Nickel Cobalt-aluminum (0.15 percent Co)
Cobalt-aluminum (cadmium shielded)
Np-237 (cadmium shielded)
Thermal Monitors 97.5 percent Pb, 2.5 percent Ag (579°F melting point) 97.5 percent Pb, 1.75 percent Ag, 0.75 percent Sn (590°F melting point) 5.3-6 Rev. 0
WOLF CREEK The fast neutron exposure of the specimens occurs at a faster rate than that experienced by the vessel wall, with the specimens being located between the core and the vessel. Since these specimens experience accelerated exposure and are actual samples from the materials used in the vessel, the transition temperature shift measurements are representative of the vessel at a later time in life. Data from CT fracture toughness specimens are expected to provide additional information for use in determining allowable stresses for irradiated material.
Correlations between the calculations and measurements of the irradiated samples in the capsules, assuming the same neutron spectrum at the samples and the vessel inner wall, are described in Section 5.3.1.6.1. The anticipated degree to which the specimens perturb the fast neutron flux and energy distribution is considered in the evaluation of the surveillance specimen data.
Verification and possible readjustment of the calculated wall exposure is made by the use of data on all capsules withdrawn. The schedule for removal of the capsules for postirradiation testing is shown in Table 5.3-11 and conforms with ASTM E-185 and Appendix H of 10 CFR 50. Changes to the schedule for removal of the capsules is required to be approved by the NRC in accordance with appendix H of 10 CFR 50. The results of the reactor vessel material irradiation surveillance specimens are used to update the RCS pressure/temperature limits for heatup, cooldown, inservice hydrostatic and leak testing, criticality and PORV lift setting figures in the PTLR.
WCAP 10015 provides the location withdrawal schedule and lead factors for each capsule and the estimated reactor vessel end of life fluence at the 1/4 wall thickness as measured from the ID.
5.3.1.6.1 Measurement of Integrated Fast Neutron (E > 1.0 MeV) Flux at the Irradiation Samples In order to effect a correlation between fast neutron (E > 1.0 MeV) exposure and the radiation-induced properties changes observed in the test specimens, a number of fast neutron flux monitors are included as an integral part of the reactor vessel surveillance program. In particular, the surveillance capsules contain detectors employing the following reactions.
Fe54 (n,P) Mn54 Ni58 (n,P) Co58 Cu63 (n, ) Co60 Np237(n,f) Cs137 U 238(n,f) Cs137 In addition, thermal neutron flux monitors, in the form of bare and cadmium shielded Co-Al wire, are included within the capsules to enable an assessment of the effects of isotopic burnup on the response of the fast neutron detectors.
5.3-7 Rev. 18
WOLF CREEK The use of activation detectors such as those listed above does not yield a direct measure of the energy dependent neutron flux level at the point of interest. Rather, the activation process is a measure of the integrated effect that the time and energy dependent neutron flux has on the target material. An accurate estimate of the average neutron flux level incident on the various detectors may be derived from the activation measurements only if the parameters of the irradiation are well known. In particular, the following variables are of interest:
- a. The operating history of the reactor
- b. The energy response of the given detector
- c. The neutron energy spectrum at the detector location The procedure for the derivation of the fast neutron flux from the results of the Fe54(n,P) Mn54 reaction is described below. The measurement technique for the other dosimeters, which are sensitive to different portions of the neutron energy spectrum, is similar.
The Mn54 product of the Fe54(n,P) Mn54 reaction has a half-life of 314 days and emits gamma rays of 0.84 MeV energy, which are easily detected using a NaI scintillator. In irradiated steel samples, chemical separation of the Mn54 may be performed to ensure freedom from interfering activities. This separation is simple and very effective, yielding sources of very pure Mn54 activity. In some samples, all of the interferences may be corrected for by the gamma spectrometric methods without any chemical separation.
The analysis of the sample requires that two procedures be completed. First, the Mn54 disintegration rate per unit mass of sample and the iron content of the sample must be measured as described above. Second, the neutron energy spectrum at the detector location must be calculated.
For this analysis, the DOT (Ref. 1), two-dimensional multigroup discrete ordinates transport code is employed to calculate the spectral data at the location of interest. Briefly, the DOT calculations utilize a 21 group energy scheme, an S8 order of angular quadrature, and a P1 expansion of the scattering matrix to compute neutron radiation levels within the geometry of interest.
The reactor geometry employed here includes a description of the radial regions internal to the primary concrete (core barrel, neutron pad, pressure vessel, and water annuli) as well as the surveillance capsule and an appropriate reactor core fuel loading 5.3-8 Rev. 0
WOLF CREEK pattern and power distribution. Thus, distortions in the fission spectrum due to the attenuation of the reactor internals are accounted for in the analytical approach.
Having the measured activity, sample weight, and neutron energy spectrum at the location of interest, the calculation of the threshold flux is as follows:
The induced Mn54 activity in the iron flux monitors may be expressed as:
No n D = fi EV(E)I(E) F(1 j - e- OtJ)e- Otd A j=1 where:
D = induced Mn54 activity (dps/gm Fe)
No = Avogadro's number (atoms/gm-atom)
A = atomic weight of iron (gm/gm-atom) fi = weight fraction of Fe54 in the detector V(E) = energy dependent activation cross-section for the Fe54 (n,p)Mn54reaction (barns)
I(E) = energy dependent neutron flux at the detector at full reactor power (n/cm2 sec)
O = decay constant of Mn54 (1/sec)
FJ = fraction of full reactor power during the Jth time interval, J Wj = length of the Jth irradiation period (sec)
Wd = decay time following the Jth irradiation period (sec)
The parameters FJ, WJ, and Wd depend on the operating history of the reactor and the delay between capsule removal and sample counting.
The integral term in the above equation may be replaced by the following relation:
5.3-9 Rev. 1
WOLF CREEK f
V S E IS E
- - 0 -
V(E)(E)
I = V I E TH = f IETH IS E E TH where:
V = effective spectrum average reaction cross-section for neutrons above energy, ETH IETH = average neutron flux above energy, ETH VS(E) = multigroup Fe54(n,P)Mn54 reaction cross-sections compatible with the DOT energy group structure IS(E) = multigroup energy spectra at the detector location obtained from the DOT analysis ETH = threshold energy for damage correlation
- Thus, No n D = Ii-V -
IETH FJ (1 - e- OWJ ) e- OW d A j=1 or, solving for the threshold flux:
- D IETH = n No fi-V FJ (1 - e- OtJ e- Otd A j=1 The total fluence above energy ETH is given by:
where FJ WJ represents the total effective full power seconds of j=1 reactor operation up to the time of capsule removal.
5.3-10 Rev. 1
WOLF CREEK Because of the relatively long half-life of Mn54 the fluence may be accurately calculated in this manner for irradiation periods up to about 2 years. Beyond this time, the calculated average flux begins to be weighted toward the later stages of irradiation, and some inaccuracies may be introduced. At these longer irradiation times, therefore, more reliance must be placed on Np237 and U238 fission detectors with their 30 year half-life product (Cs137).
No burnup correction was made to the measured activities, since burnout of the Mn54 product is not significant until the thermal flux level is about 1014 n/cm2-sec.
The error involved in the measurement of the specific activity of the detector after irradiation is estimated to be r5 percent.
5.3.1.6.2 Calculation of Integrated Fast Neutron (E > 1.0 MeV) Flux at the Irradiation Samples The energy and spatial distribution of neutron flux within the reactor geometry is obtained from the DOT (Ref. 1) two-dimensional Sn transport code. The radial and azimuthal distributions are obtained from an R,R computation wherein the reactor core as well as the water and steel annuli surrounding the core are modeled explicitly. The axial variations are then obtained from an R,Z DOT calculation, using the equivalent cylindrical core concept. The neutron flux at any point in the geometry is then given by:
I(E,R,T,Z) = í(E,R,T) F(Z)
Where f(E,R,T) is obtained directly from the R,T calculation and F(Z) is a normalized function obtained from the R,Z analysis. The core power distributions used in both the R,T and R,Z computations represent the expected average over the life of the station.
Having the calculated neutron flux distributions within the reactor geometry, the exposure of the capsule as well as the lead factor between the capsule and the vessel may be determined as follows:
The neutron flux at the surveillance capsule is given by:
Ic = (E,Rc,Tc,Zc) and the flux at the location of peak exposure on the pressure vessel inner diameter is:
Iv-max = I(E,RvTv-max,Zv-max) 5.3-11 Rev. 1
WOLF CREEK The lead factor then becomes:
Ic LF =
Iv - max Similar expressions may be developed for points within the pressure vessel wall; and, thus, together with the surveillance program dosimetry, serve to correlate the radiation induced damage to test specimens with that of the reactor vessel.
5.3.1.6.3 Ex-vessel surveillance program The Reactor Cavity Neutron Measurement Program at Wolf Creek after Refuel 14 is designed to provide a verification of fast neutron exposure distributions within the reactor vessel wall and to establish a mechanism to enable long term monitoring of those portions of the reactor vessel and vessel support structure that could experience significant radiation induced increases in reference nil ductility transition temperature (RTNDT) over the service lifetime of the plant.
When used in conjunction with dosimetry from internal surveillance capsules and with the results of neutron transport calculations, the reactor cavity neutron measurements allow the projection of embrittlement gradients through the reactor vessel wall with a minimum uncertainty. Minimizing the uncertainty in the neutron exposure projections will, in turn, help to assure that the reactor can be operated in the least restrictive mode possible with respect to x 10CFR50 Appendix G pressure/temperature limit curves for normal heat up and cool down of the reactor coolant system, x Emergency Response Guideline (ERG) pressure/temperature limit curves, and x Pressurized thermal shock (PTS) RTNDT screening criteria.
In addition, an accurate measure of the neutron exposure of the reactor vessel and support structure can provide a sound basis for requalification should operation of the plant beyond the current design and/or licensed lifetime prove to be desirable.
The reactor cavity neutron dosimetry is installed in the annular air gap between the reactor vessel insulation and the primary concrete shield wall.
The reactor cavity neutron dosimetry consist of aluminum dosimeter capsules connected to and supported by stainless steel bead chain. Each dosimetry chain is attached to and hangs from a stainless steel spring hook mounting plate.
The local attachment plates are affixed to the horizontal portion of the reflective insulation below the reactor vessel nozzles (plant elevation 2012'+0.5") using four No. 14 x 3/4-long self-tapping sheet metal screws. The attachment plates are located in the vicinity of the Loop 1 outlet nozzle (at Reactor Angles of 5°, 15°, 30°, and 40°).
In some pressurized water reactor designs (like Wolf Creek) the neutron exposure rate at the surveillance capsule locations is much greater than that at the peak location on the reactor vessel. The ratio of these exposure rates is referred to as the surveillance capsule lead factor. Lead factors of three to five are not uncommon. With a high lead factor the reactor vessel material samples in a surveillance capsule may, if left in the reactor, receive neutron damage well beyond any projected end-of-life condition, thus rendering them useless. For example, a capsule with a lead factor of five would receive a 60-year exposure in as little as 12 years. This issue is particularly important for those plants planning for license renewal. The recently issued Generic Aging Lessons Learned (GALL) Report (NUREG-1801, April 2001),Section XI.M31 Reactor Vessel Surveillance, provides the following guidance for surveillance capsule management.
5.3-12 Rev. 19
WOLF CREEK A plant with a surveillance program containing capsules with projected fast neutron fluence exceeding a 60-year fluence at the end of 40 years, i.e., a lead factor greater than 1.5, should remove the capsules when they reach the 60-year exposure. One of these capsules should be tested to meet the requirements of ASTM E185 and the remaining capsules should be placed in storage without material testing. Subsequently, an alternative dosimetry program will need to be instituted to monitor reactor vessel neutron exposure through the license renewal period.
The NRC staff has recognized the importance of preserving the material specimens within the surveillance capsules. Any capsules that are to be left in the reactor vessel are to provide meaningful metallurgical data. For a high lead factor plant, if the remaining surveillance capsules are left in place, the material specimens will be irradiated well beyond the predicted end-of-life fast neutron exposure. At a projected end-of-life of 40 years, a surveillance capsule with a lead factor of three will have experienced the equivalent of a reactor vessel exposure of 120 years. Thus the material specimens would be damaged to such an extent that they would be unable to provide any useful data.
With passive neutron sensors located in the reactor cavity the neutron exposure of the reactor vessel can be continuously monitored throughout plant life, as required by Appendix H, and the surveillance capsules can be removed and stored on site thus preserving this critical, irreplaceable material for future use.
Thus the material specimens would:
Monitor important azimuthal and axial exposure gradients over the entire beltline region of reactor vessel (unavailable with surveillance capsules) and provide measurements in proximity to critical areas on the reactor vessel.
Provide long term monitoring that permits continuous evaluation of the effect of changes in reactor operation and changing fuel management schemes on the reactor vessel exposure, and Minimize the uncertainty in reactor vessel exposure projections using a combination of measurements and analytical predictions.
Within the nuclear industry it has been common practice to base estimates of the fast neutron exposure of reactor vessels either directly on the results of neutron transport calculations or on the analytical results normalized to measurements obtained from internal surveillance capsules. There are potential drawbacks associated with both of these approaches to exposure assessment.
In performing neutron transport calculations for pressurized water reactors, using the DORT code or similar NRC approved code, several design and operational variables have an impact on the magnitude of the analytical prediction of fast neutron exposure rates within the reactor vessel wall.
Particularly important are cycle-to-cycle variations in core power distributions (especially with the implementation of low leakage loading patterns), variations of water temperature (density) in the peripheral fuel assemblies and the downcomer regions of the reactor internals, and deviations in as-built versus design dimensions for the reactor internals and vessel.
Treatment of these important variables in the analysis leads to an increased uncertainty in the exposure predictions for the reactor vessel and may well result in the use of overly conservative estimates of reactor vessel embrittlement in the assessment of pressure / temperature limitations as well as of the expected lifetime of the components.
With the addition of supplementary passive neutron sensors in the reactor cavity annulus between the reactor vessel wall and the biological shield, the deficiencies in both surveillance capsule dosimetry and analytical prediction can be alleviated and the uncertainties associated with exposure estimates for the reactor vessel can be minimized. With state of the art neutron sensors deployed to establish the 5.3-13 Rev. 31
WOLF CREEK absolute magnitude of the azimuthal and axial exposure rate distributions in the reactor cavity, the burden placed on the neutron transport calculation is reduced.
An ex-vessel neutron dosimetry program can also provide additional data to support license renewal. As a comprehensive system to characterize the neutron exposure of the reactor vessel, it has the flexibility Studies have shown that the operational and design variables cited above (that have a strong impact on the calculated magnitude of exposure rates) have only a minor effect on both the interpretation of reactor cavity measurements and on the extrapolation of measurement results to key reactor vessel locations. It is possible, therefore, to employ reactor cavity neutron measurements and plant specific calculations to produce reactor vessel exposure projections with a reduced uncertainty and without the excess conservatism inherent in an approach based on analysis alone. Furthermore, since the reactor cavity neutron measurements are not directly tied to the materials surveillance program, measurement intervals can be chosen to easily provide integral reactor vessel exposure over plant lifetime.
When the last surveillance capsule is removed for analysis, it is highly desirable to also analyze the Ex-Vessel Neutron Dosimetry. This provides a simultaneous in-vessel and ex-vessel measurement that results in the lowest uncertainty in the projected reactor vessel fluence and provides the most direct link between the existing in-vessel measurements and the ex-vessel measurements that will be used to monitor the neutron exposure of the vessel once the remaining surveillance capsules are withdrawn and placed in storage.
The use of fast (E > 1.0 MeV) neutron fluence to correlate measured materials properties changes to the neutron exposure of the material for light-water reactor applications has traditionally been accepted for the development of damage trend curves as well as for the implementation of trend curve data to assess reactor vessel condition. In recent years, however, it has been suggested that an exposure model that accounts for differences in neutron energy spectra between surveillance capsule locations and positions within the reactor vessel wall could lead to an improvement in the uncertainties associated with damage trend curves as well as to a more accurate evaluation of damage gradients through the reactor vessel wall.
Because of this potential shift away from a threshold fluence toward an energy dependent damage function for data correlation, ASTM Standard Practice E853, Analysis and Interpretation of Light-Water Reactor Surveillance Results, recommends reporting displacements per iron atom (dpa) along with fast neutron fluence (E > 1.0 MeV) to provide a data base for future reference. The energy dependent dpa function to be used for this evaluation is specified in ASTM Standard Practice E693, Characterizing Neutron Exposures in Iron and Low Alloy Steels in Terms of Displacements Per Atom. The application of the dpa parameter to the assessment of embrittlement gradients through the thickness of the reactor vessel wall has already been promulgated in Revision 2 to Regulatory Guide 1.99, Radiation Damage to Reactor Vessel Materials.
With the aforementioned views in mind, the Ex-Vessel Neutron Dosimetry Program was established to meet the following objectives:
Determine azimuthal and axial gradients of fast neutron exposure over the beltline region of the reactor vessel, Provide measurement capability sufficient to allow the determination of exposure parameters in terms of both fast (E > 1.0 MeV) neutron fluence and iron displacements per atom (dpa), and Provide a long-term monitoring capability for the beltline region of the reactor vessel and vessel support structure.
5.3-14 Rev. 19
WOLF CREEK Technical Description To achieve the goals of the Ex-Vessel Neutron Dosimetry (EVND) Program, two types of measurements are made. Comprehensive sensor sets including radiometric monitors (RM) are employed at discrete locations within the reactor cavity to characterize the neutron energy spectrum variations axially and azimuthally over the beltline region of the reactor vessel. In addition, stainless steel gradient chains are used in conjunction with the encapsulated dosimeters to complete the mapping of the neutron environment between the discrete locations chosen for spectrum determinations.
In choosing sensor set locations for the Ex-Vessel Neutron Dosimetry Program, advantage is taken of the octant symmetry typical of pressurized water reactors. That is, subject to access limitations, spectrum measurements are concentrated to obtain azimuthal flux distributions in a single forty-five degree sector. Placement of the discrete sensor sets is such that spectrum determinations are made at various locations (5, 15, 30, and 40 degrees) on the midplane of the active core to measure the spectrum changes caused by the varying amounts of water located between the core and the reactor vessel. These thickness changes are due to the stair step shape of the reactor core periphery relative to the cylindrical geometry of the reactor internals and vessel and to the local nature of the neutron pads. The remaining sensor sets may be positioned opposite the top and bottom of the active core or opposite key reactor vessel welds at particular azimuthal angles of interest. Here the intent is to measure axial variations in neutron spectrum over the core height, particularly near the top of the fuel where back scattering of neutrons from primary loop nozzles and reactor vessel support structures can produce significant differences. At each of the azimuthal locations selected for spectrum measurements, stainless steel gradient chains extend over the full height of the active fuel.
Sensor Sets The Ex-Vessel Neutron Dosimetry Program employs advanced sensor sets that are recommended by and are designed to the latest ASTM neutron dosimetry standards.
The sensor sets consist of the following encapsulated dosimeters and gradient chains. Table 1 lists the neutron reactions that are of interest.
- 1. Radiometric Monitors (RM) - these include cadmium-shielded foils of the following metals: copper, titanium, iron, nickel, niobium, and cobalt-aluminum.
Cadmium shielded fast fission reactions include 238U and 237Np in vanadium encapsulated oxide detectors. Bare iron and cobalt monitors are also included.
- 2. Gradient Chains - These stainless steel bead chains connect and support the dosimeter capsules containing the radiometric monitors. These segmented chains provide iron, nickel, and cobalt reactions that are used to complete the determination of the axial and azimuthal gradients. The high purity iron, nickel, and cobalt-aluminum foils contained in the multiple foil sensor sets provide a direct correlation with the measured reaction rates from these gradient chains. These crosscomparisons permit the use of the gradient measurements to derive neutron flux distributions in the reactor cavity with a high level of confidence.
5.3-15 Rev. 31
WOLF CREEK Material Reaction of Neutron Product Dosimeter Gradient Interest Energy Half-Life Capsule Chain(c)
Response(a) Position(b)
Copper 63 Cu(n,)60Co 4.53-11 MeV 5.271 yr 2-Cd No 46 46 Titanium Ti(n,p) Sc 3.70-9.43 MeV 83.79 d 2-Cd No 54 54 Iron Fe(n,p) Mn 2.27-7.54 MeV 312.3 d 1-B & 2-Cd Yes 58 58 Nickel Ni(n,p) Co 1.98-7.51 MeV 70.82 d 2-Cd Yes 238 (d, e) 238 137 U U(n,f) Cs 1.44-6.69 MeV 30.07 yr 3-Cd No 93 Niobium Nb(n,n1)93mNb 0.95-5.79 MeV 16.13 y 3-Cd No 237 Np(d,e) 237 Np(n,f) 137 Cs 0.68-5.61 MeV 30.07 yr 3-Cd No Cobalt-Al 59 Co(n,) 60 Co Thermal 5.271 yr 1-B & 2-Cd Yes Notes:
a) Energies between which 90% of activity is produced (235U fission spectrum).
b) B denotes bare and Cd denotes cadmium shielded c) Determined with additional radiochemical analysis d) For the fission monitors 95Zr (64.02 d) and 103Ru (39.26 d) activities are also reported e) Fission monitors have been discontinued and are replaced by niobium.
5.3.1.7 Reactor Vessel Fasteners The reactor vessel closure studs, nuts, and washers are designed and fabricated in accordance with the requirements of the ASME Code,Section III. The closure studs are fabricated of SA-540, Class 3, Grade B24. The closure stud material meets the fracture toughness requirements of the ASME Code,Section III and 10 CFR 50, Appendix G. Compliance with Regulatory Guide 1.65, "Materials and Inspections for Reactor Vessel Closure Studs," is discussed in Appendix 3A.
Nondestructive examinations are performed in accordance with the ASME Code,Section III.
Refueling procedures require that the studs, nuts, and washers be removed from the reactor closure and be placed in storage racks or suspended in the reactor vessel head belt ring holes while the head is removed to its storage stand during preparation for refueling. The storage racks are then removed from the refueling cavity and stored at convenient locations in containment or their cleaning location prior to removal of the reactor closure head and refueling cavity flooding. When a stud cannot be removed from the reactor vessel flange, it is covered with a protective cover. Therefore, the reactor closure studs are never exposed to the borated refueling cavity water. Additional protection against the possibility of incurring corrosion effects is assured by the use of a manganese base phosphate surfacing treatment.
The stud holes in the reactor flange are sealed with special plugs prior to flooding the reactor cavity, thus preventing leakage of the borated refueling water into the stud holes. When a stud cannot be removed, the protective cover installed over the stud also protects the stud hole from the borated refueling water.
5.3-16 Rev. 31
WOLF CREEK 5.3.2 PRESSURE - TEMPERATURE LIMITS 5.3.2.1 Limit Curves Startup and shutdown operating limitations are based on the properties of the reactor pressure vessel beltline materials. Actual material property test data are used. The methods outlined in Appendix G to Section III of the ASME Code are employed for the shell regions in the analysis of protection against nonductile failure. The initial operating curves are calculated, assuming a period of reactor operation such that the beltline material is that the beltline material is limiting. The heatup and cooldown curves are given in the Pressure and Temperature Limits Report. Beltline material properties degrade with radiation exposure, and this degradation is measured in terms of the adjusted reference nil-ductility temperature, which includes a reference nil-ductility temperature shift ('RTNDT).
Predicted 'RTNDT values are derived using two curves: the effect of fluence and copper content on the shift of RTNDT for the reactor vessel steels exposed to 550°F temperature curve and the maximum fluence at 1/4 T (thickness) and 3/4 T location (tips of the code reference flaw when flaw is assumed at inside diameter and outside diameter locations, respectively) curve. These curves are presented in the PTLR. For a selected time of operation, this shift is assigned a sufficient magnitude so that no unirradiated ferritic materials in other components of the reactor coolant system (RCS) is limiting in the analysis.
The operating curves including pressure-temperature limitations are calculated in accordance with 10 CFR 50, Appendix G and ASME Code,Section III, Appendix G, requirements.
The results of the material surveillance program described in Section 5.3.1.6 is used to verify that the 'RTNDT predicted from the effects of the fluence and copper content curve is appropriate and to make any changes necessary to correct the fluence and copper curves if 'RTNDT determined from the surveillance program is greater than the predicted 'RTNDT. Temperature limits for preservice hydrotests and inservice leak and hydrotests are calculated in accordance with Appendix G of the ASME Code,Section III.
Compliance with Regulatory Guide 1.99 is discussed in Appendix 3A.
5.3.2.2 Operating Procedures The transient conditions that are considered in the design of the reactor vessel are presented in Section 3.9(N).1.1. These transients are representative of the operating conditions that should prudently be considered to occur during plant operation. The transients selected form a conservative basis for evaluation of the RCS to insure the integrity of the RCS equipment.
Those transients listed as upset condition transients are given in Table 3.9(N)-1. None of these transients result in pressure-temperature changes which exceed the heatup and cooldown limitations, as described in Section 5.3.2.1 and in the PTLR.
5.3-17 Rev. 19
WOLF CREEK 5.3.3 REACTOR VESSEL INTEGRITY 5.3.3.1 Design The reactor vessel is cylindrical with a welded hemispherical bottom head and a removable, bolted, flanged, and gasketed hemispherical upper head. The reactor vessel flange and head are sealed by two hollow metallic 0-rings. Seal leakage is detected by means of two leakoff connections: one between the inner and outer ring and one outside the outer 0-ring. The vessel contains the core, core support structures, control rods, and other parts directly associated with the core. The reactor vessel closure head contains head adapters. These head adapters are tubular members, attached by partial penetration welds to the underside of the closure head. The upper end of these adapters contains Acme threads for the assembly of control rod drive mechanisms or instrumentation adapters. The seal arrangement at the upper end of these adapters consists of a welded flexible canopy seal. Inlet and outlet nozzles are located symmetrically around the vessel. Outlet nozzles are arranged on the vessel to facilitate optimum layout of the RCS equipment. The inlet nozzles are tapered from the coolant loop vessel interfaces to the vessel inside wall to reduce loop pressure drop.
The bottom head of the vessel contains penetration nozzles for connection and entry of the nuclear incore instrumentation. Each nozzle consists of a tubular member made of either an Inconel or an Inconel-stainless steel composite tube.
Each tube is attached to the inside of the bottom head by a partial penetration weld.
Internal surfaces of the vessel which are in contact with primary coolant are weld overlay with 0.125 inch minimum of stainless steel or Inconel.
The reactor vessel is designed and fabricated in accordance with the requirements of the ASME Code,Section III. Principal design parameters of the reactor vessel are given in Table 5.3-2. The reactor vessel is shown in Figure 5.3-1.
There are no special design features which would prohibit the in-situ annealing of the vessel. If the unlikely need for an annealing operation was required to restore the properties of the vessel material opposite the reactor core because of neutron irradiation damage, a metal temperature greater than 650°F for a period of 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> maximum would be applied. Various modes of heating may be used, depending on the temperature required.
5.3-18 Rev. 19
WOLF CREEK The reactor vessel materials surveillance program is adequate to accommodate the annealing of the reactor vessel. Sufficient specimens are available to evaluate the effects of the annealing treatment.
Cyclic loads are introduced by normal power changes, reactor trips, and startup and shutdown operations. These design base cycles are selected for fatigue evaluation and constitute a conservative design envelope for the projected plant life. Vessel analysis results in a usage factor that is less than 1.
The design specifications require analysis to prove that the vessel is in compliance with the fatigue and stress limits of the ASME Code,Section III.
The loadings and transients specified for the analysis are based on the most severe conditions expected during service. The analyzed heatup and cooldown rates imposed by plant operating limits are 100°F in any one hour except for cooldown of the pressurizer, which is limited to 200°F in any one hour. In practice, these operations occur more slowly. These rates are reflected in the vessel design specifications.
5.3.3.2 Materials of Construction The materials used in the fabrication of the reactor vessel are discussed in Section 5.2.3.
5.3.3.3 Fabrication Methods The WCGS reactor vessel manufacturer is Combustion Engineering Corporation.
The fabrication methods used in the construction of the reactor vessel are discussed in Section 5.3.1.2.
5.3.3.4 Inspection Requirements The nondestructive examinations performed on the reactor vessel are described in Section 5.3.1.3.
5.3.3.5 Shipment and Installation The reactor vessel is shipped in a horizontal position on a shipping sled with a vessel-lifting truss assembly. All vessel openings are sealed to prevent the entrance of moisture, and an adequate quantity of desiccant bags is placed inside the vessel. These are usually placed in a wire mesh basket attached to the vessel cover. All carbon steel surfaces, except for the vessel support surfaces and the top surface of the external seal ring, are painted with a heat-resistant paint before shipment.
5.3-19 Rev. 19
WOLF CREEK The closure head is also shipped with a shipping cover and skid. An enclosure attached to the ventilation shroud support ring protects the control rod mechanism housings. All head openings are sealed to prevent the entrance of moisture, and an adequate quantity of desiccant bags is placed inside the head.
These are placed in a wire mesh basket attached to the head cover. All carbon steel surfaces are painted with heat-resistant paint before shipment. A lifting frame is provided for handling the vessel head.
5.3.3.6 Operating Conditions Operating limitations for the reactor vessel are presented in Section 5.3.2, as well as in the PTLR.
In addition to the analysis of primary components discussed in Section 3.9(N).1.4, the reactor vessel is further qualified to ensure against unstable crack growth under faulted conditions. Actuation of the emergency core cooling system (ECCS) following a loss-of-coolant accident produces relatively high thermal stresses in regions of the reactor vessel which come into contact with ECCS water. Primary consideration is given to these areas, including the reactor vessel beltline region and the reactor vessel primary coolant nozzle, to ensure the integrity of the reactor vessel under this severe postulated transient.
The principles and procedures of linear elastic fracture mechanics (LEFM) are used to evaluate thermal effects in the regions of interest. The LEFM approach to the design against failure is basically a stress intensity consideration in which criteria are established for fracture instability in the presence of a crack. Consequently, a basic assumption employed in LEFM is that a crack or crack-like defect exists in the structure. The essence of the approach is to relate the stress field developed in the vicinity of the crack tip to the applied stress on the structure, the material properties, and the size of defect necessary to cause failure.
The elastic stress field at the crack tip in any cracked body can be described by a single parameter designated as the stress intensity factor, K. The magnitude of the stress intensity factor K is a function of the geometry of the body containing the crack, the size and location of the crack, and the magnitude and distribution of the stress.
The criterion for failure in the presence of a crack is that failure will occur whenever the stress intensity factor exceeds some critical value. For the opening mode of loading (stresses 5.3-20 Rev. 19
WOLF CREEK perpendicular to the major plane of the crack), the stress intensity factor is designated as KI and the critical stress intensity factor is designated KIC.
Commonly called the fracture toughness, KIC is an inherent material property which is a function of temperature and strain rate. Any combination of applied load, structural configuration, crack geometry, and size which yields a stress intensity factor KIC for the material will result in crack instability.
The criterion of the applicability of LEFM is based on plasticity considerations at the postulated crack tip. Strict applicability (as defined by ASTM) of LEFM to large structures where plane strain conditions prevail requires that the plastic zone developed at the tip of the crack does not exceed 2.25 percent of the crack depth. In the present analysis, the plastic zone at the tip of the postulated crack can reach 20 percent of the crack depth. However, LEFM has been successfully used to provide conservative brittle fracture prevention evaluations, even in cases where strict applicability of the theory is not permitted due to excessive plasticity.
Recently, experimental results from the Heavy Section Steel Technology (HSST)
Program intermediate pressure vessel tests have shown that LEFM can be applied conservatively as long as the pressure component of the stress does not exceed the yield strength of the material. The addition of the elastically calculated thermal stresses, which results in total stresses in excess of the yield strength, does not affect the conservatism of the results, provided that these thermal stresses are included in the evaluation of the stress intensity factors. Therefore, for faulted conditions analyses, LEFM is considered applicable for the evaluation of the vessel inlet nozzle and beltline region.
In addition, it has been well established that the crack propagation of existing flaws in a structure subjected to cyclic loading can be defined in terms of fracture mechanics parameters. Thus, the principles of LEFM are also applicable to fatigue growth of a postulated flaw at the vessel inlet nozzle and beltline region.
Additional details on this method of analysis of reactor vessels under severe transients are given in Reference 2.
5.3.3.7 Inservice Surveillance The internal and external surfaces of the reactor vessel are accessible for periodic inspection. Visual and/or nondestructive techniques are used. During refueling, the vessel cladding is capable of being inspected in certain areas between the closure flange and the primary coolant inlet nozzles, and, if deemed necessary, the core barrel is capable of being removed, making the entire inside vessel surface accessible.
5.3-21 Rev. 19
WOLF CREEK The closure head is examined visually during each refueling, Optical devices permit a selective inspection of the cladding, control rod drive mechanism nozzles, and the gasket seating surface. The knuckle transition piece, which is the area of highest stress of the closure head, is accessible on the outer surface for visual inspection, dye penetrant or magnetic particle, and ultrasonic testing. The closure studs and nuts can be inspected periodically using visual, magnetic particle, and ultrasonic techniques.
The closure studs, nuts, washers, and the vessel flange seal surface, as well as the full penetration welds in the following areas of the installed reactor vessel, are available for nondestructive examination:
- a. Vessel shell - from the inside and outside surfaces
- b. Primary coolant nozzles - from the inside and outside surfaces*
- c. Closure head - from the inside and outside surfaces.
Bottom head - from the inside and outside surfaces.
- d. Field welds between the reactor vessel nozzle safe ends and the main coolant piping - from the inside and outside surfaces.
The design considerations which have been incorporated into the system design to permit the above inspection are as follows:
- a. All reactor internals are completely removable. The tools and storage space required to permit these inspections are provided.
- b. The closure head is stored dry on the reactor operating deck during refueling to facilitate direct visual inspection.
- c. Reactor vessel studs, nuts, and washers can be removed to dry storage during refueling. Studs which cannot be removed are covered to protect from borated refueling pool water, subsequently cleaned and inspected in-situ.
- d. Access is provided to the reactor vessel nozzle safe ends. The insulation covering the nozzle-to-pipe welds may be removed.
- Only partial outside diameter coverage is provided.
5.3-22 Rev. 19
WOLF CREEK
- e. Reactor cavity is designed to allow access to the outside surface of the vessel. Tracks are installed to allow mechanical equipment to inspect the vessel surface.
The reactor vessel presents access problems because of the radiation levels and remote underwater accessibility to this component. Because of these limitations on access to the reactor vessel, several steps have been incorporated into the design and manufacturing procedures in preparation for the periodic nondestructive tests, which are required by the ASME inservice inspection code. These are:
- a. Shop ultrasonic examinations are performed on all internally clad surfaces to an acceptance and repair standard to assure an adequate cladding bond to allow later ultrasonic testing of the base metal from inside surface. The size of cladding bond defect allowed is 1/4 inch by 3/4 inch with the greater direction parallel to the weld in the region bounded by 2T (T = wall thickness) on both sides of each full penetration pressure boundary weld. Unbounded areas exceeding 0.442 square inches (3/4 inch diameter) in all other regions are rejected.
- b. The design of the reactor vessel shell is an uncluttered cylindrical surface to permit future positioning of the test equipment without obstruction.
- c. The weld deposited clad surface on both sides of the welds to be inspected is specifically prepared to assure meaningful ultrasonic examinations.
- d. During fabrication, all full penetration ferritic pressure boundary welds are ultrasonically examined in addition to Code examinations.
- e. After the shop hydrostatic testing, all full penetration ferritic pressure boundary welds, as well as the nozzle to safe end welds, are ultrasonically examined from both the inside and outside diameters in addition to ASME Code,Section III requirements.
The vessel design and construction enable inspection in accordance with the ASME Code,Section XI. The reactor vessel inservice inspection program is in accordance with ASME Section XI as described in the Inservice Inspection Program and PTLR.
5.3-23 Rev. 19
WOLF CREEK 5.
3.4 REFERENCES
- 1. Soltesz, R. G., et al., "Nuclear Rocket Shielding Methods, Modification, Updating, and Input Data Preparation, Volume 5 -
Two-Dimensional Discrete Ordinates Techniques,"
WANL-PR-(LL)-034, August, 1970.
- 2. Bachalet, C., Bamford, W. H., and Chirigos, J. N., "Method for Fracture Mechanics Analysis of Nuclear Reactor Vessels Under Severe Thermal Transients," WCAP-8510, December 1975.
- 3. Singer, L. R. Kansas Gas and Electric Company Wolf Creek Generating Station Unit No. 1 Reactor Vessel Radiation Surveillance Program, WCAP-10015, June 1982.
5.3-24 Rev. 19
WOLF CREEK TABLE 5.3-1 REACTOR VESSEL QUALITY ASSURANCE PROGRAM RT* UT* PT* MT*
Forgings Flanges Yes Yes Studs and nuts Yes Yes CRD head adapter flange Yes Yes CRD head adapter tube Yes Yes Instrumentation tube Yes Yes Main nozzles Yes Yes Nozzle safe ends Yes Yes Plates Yes Yes Weldments Main seam Yes Yes Yes CRD head adapter to clos-ure head connection Yes Instrumentation tube to bottom head connection Yes Main nozzle Yes Yes Yes Cladding Yes Yes Nozzle to safe ends Yes Yes Yes CRD head adapter flange to CRD head adapter tube Yes Yes All full penetration ferri-tic pressure boundary welds accessible after hydrotest Yes Yes Full penetration nonferri-tic pressure boundary welds accessible after hydrotest
- a. Nozzle to safe ends Yes Yes
WOLF CREEK TABLE 5.3-1 (Sheet 2)
RT* UT* PT* MT*
Seal ledge Yes Head lift lugs Yes Core pad welds Yes
Base metal weld repairs as a result of UT, MT, RT, and/or PT indications are cleared by the same NDE technique/procedure by which the indications were found. The repair meets all Section III requirements.
In addition, UT examination per the in-process/post-hydro UT requirements is performed on the following:
- 1. Base metal repairs in the core region.
- 2. Base metal repairs in the ISI zone (1/2 T).
Rev. 0
WOLF CREEK TABLE 5.3-2 REACTOR VESSEL DESIGN PARAMETERS Design/operating pressure, psig 2,485/2,317*
Design temperature, F 650 Overall height of vessel and closure head, bottom head outside diameter to top of control rod mechanism adapter, ft-in. 43-10 Thickness of RPV head insulation, minimum, in. 3 Number of reactor closure head studs 54 Diameter of reactor closure head/studs, minimum shank, in. 6-13/16 Outside diameter of flange, in. 205 Inside diameter of flange, in. 167 Outside diameter at shell, in. 190-1/2 Inside diameter at shell, in. 173 Inlet nozzle inside diameter, in. 27-1/2 Outlet nozzle inside diameter, in. 29 Clad thickness, minimum, in. 1/8 Lower head thickness, minimum, in. 5-3/8 Vessel beltline thickness, minimum, in. 8-5/8 Closure head thickness, in. 7 Nominal water volume, ft3 3,700
- The operating pressure used to control the plant is 2,235 psig and is measured in the pressurizer.
Rev. 0
WOLF CREEK TABLE 5.3-3 REACTOR VESSEL MATERIAL PROPERTIES Avg. Upper Shelf MATERIAL Cu P TNDT RTNDT NMWD** MWD*
COMPONENT CODE NO. SPEC. NO. (%) (%) (F) (F) (FT-LB) (FT-LB)
Closure Head Dome R2516-1 A533B, CL.1 0.12 0.010 -40 0 112 -
Closure Head Torus R2515-1 A533B, CL.1 0.11 0.009 -20 -20 119 -
Closure Head Flange R2504-1 A508 CL. 2 - 0.013 20 20 139 -
Vessel Flange R2501-1 A508 CL. 2 - 0.012 20 20 102 -
Inlet Nozzle R2502-1 A508 CL. 2 - 0.010 -20 -20 147 -
Inlet Nozzle R2502-2 A508 CL. 2 - 0.009 -20 -20 137 -
Inlet Nozzle R2502-3 A508 CL. 2 0.11 0.010 -20 -20 156 -
Inlet Nozzle R2502-4 A508 CL. 2 0.11 0.010 -30 -30 156 -
Outlet Nozzle R2503-1 A508 CL. 2 - 0.006 -10 -10 126 -
Outlet Nozzle R2503-2 A508 CL. 2 - 0.009 0 0 129 -
Outlet Nozzle R2503-3 A508 CL. 2 - 0.007 0 0 136 -
Outlet Nozzle R2503-4 A508 CL. 2 - 0.007 0 0 114 -
Nozzle Shell R2004-1 A533B, CL. 1 0.05 0.010 -40 10 118 -
Nozzle Shell R2004-2 A533B, CL. 1 0.04 0.011 -40 20 121 -
Nozzle Shell R2004-3 A533B, CL. 1 0.04 0.008 -50 0 133 -
Inter. Shell R2005-1 A533B, CL. 1 0.04 0.008 -20 -20 127 156 Inter. Shell R2005-2 A533B, CL. 1 0.04 0.007 -30 -20 127 143 Inter. Shell R2005-3 A533B, CL. 1 0.05 0.007 -30 -20 135 164 Lower Shell R2508-1 A533B, CL. 1 0.09 0.009 -40 0 87 118 Lower Shell R2508-2 A533B, CL. 1 0.06 0.008 -10 10 100 127 Lower Shell R2508-3 A533B, CL. 1 0.07 0.008 -20 40 86 127 Bottom Head Torus R2517-1 A533B, CL. 1 0.11 0.010 -80 -30 92 -
Bottom Head Dome R2518-1 A533B, CL. 1 0.12 0.009 -60 -60 154 -
Inter. and lower shell G2.06 SAW 0.04 0.006 -50 -50 150 -
long. weld seams Inter. to lower shell E3.16 SAW 0.05 0.007 -50 -50 98 -
girth weld seam Weld HAZ - - - - -80 -80 171 -
- Major working direction
- Normal to major working direction Rev. 0
WOLF CREEK TABLE 5.3-4 HAS BEEN DELETED REV. 0
WOLF CREEK TABLE 5.3-5 IS DELETED REV. 0
TABLE 5.3-6 Deleted Rev. 14
WOLF CREEK TABLE 5.3-7 VESSEL BELTLINE REGION WELD METAL IDENTIFICATION INFORMATION Weld Weld Procedure Weld Wire Flux Weld Seam Identification Control No. Qual. No. Type Heat No. Type Lot No.
Int. shell long weld seam 101-124A, B, and C G2.06 SAA-SMA-12.12-102 B4 90146 Linde 0091 0842 Lower shell long weld seam 101-142A, B, and C G2.06 SAA-SMA-12.12-102 B4 90146 Linde 0091 0842 Inter. to lower shell girth seam 101-171 E3.16 SAA-SMA-3.3-118 B4 90146 Linde 124 1061 Surveillance test weld E3.16 SAA-SMA-3.3-118 B4 90146 Linde 124 1061 Weld Metal Chemical Composition (Wt. %)
C M P S S C N M C V Weld Control No. n i r i o u G2.06 .15 1.16 .006 .011 .18 .05 .04 .51 .04 .005 E3.16 .097 1.27 .007 .011 .52 .09 .05 .50 .05 .004 NOTES
- 1. The test weld was fabricated from plates R2508-1 and R2508-3.
- 2. The test weldment was stress relieved at 1150°F for 10.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> - furnace cooled.
Rev. 0
WOFL CREEK TABLE 5.3-8 BELTLINE REGION INTERMEDIATE SHELL PLATE TOUGHNESS Plate R2005-1 Plate R2005-2 Plate R2005-3 Temp. Energy Shear Lat. Exp. Temp. Energy Shear Lat. Exp. Temp. Energy Shear Lat. Exp.
(F) (ft lb) (%) (mils) (F) (ft lb) (%) (mils) (F) (ft lb) (%) (mils)
-60 6 0 2 -60 10 0 4 -60 6 0 2
-60 7 0 3 -60 11 0 6 -60 7 0 3
-60 7 0 2 -60 8 0 3 -60 6 0 2
-20 20 5 14 -20 25 5 18 -20 20 5 10
-20 27 10 17 -20 48 20 32 -20 11 0 4
-20 14 0 8 -20 37 15 24 -20 12 0 4 40 72 30 48 30 39 15 28 30 49 20 35 40 62 25 40 30 65 30 46 30 55 25 38 40 58 25 39 30 70 35 48 30 59 30 41 60 73 30 46 40 69 35 49 40 65 30 44 60 56 25 36 40 79 40 55 40 58 30 40 60 69 30 44 40 82 40 56 40 84 40 58 100 95 40 65 60 78 30 51 60 65 25 45 100 96 50 64 60 89 30 53 60 87 30 52 100 89 50 63 60 80 30 52 60 86 30 57 160 122 100 77 100 105 70 69 100 94 40 62 160 126 100 76 100 102 70 70 100 97 40 61 160 132 100 80 100 108 70 75 100 108 50 72 160 128 100 84 160 140 100 81 160 125 100 78 160 136 100 74 160 127 100 79 160 129 100 77 T -20°F T -30°F T -30°F NDT NDT NDT RTNDT -20°F RTNDT -20°F RTNDT -20°F Rev. 0
WOLF CREEK TABLE 5.3-9 BELTLINE REGION LOWER SHELL PLATE TOUGHNESS Plate R2508-1 Plate R2508-2 Plate R2508-3 Temp. Energy Shear Lat. Exp. Temp. Energy Shear Lat. Exp. Temp. Energy Shear Lat. Exp.
(F) (ft lb) (%) (mils) (F) (ft lb) (%) (mils) (F) (ft lb) (%) (mils)
-40 12 0 5 -30 22 5 11 -40 5 0 2
-40 12 0 6 -30 17 0 8 -40 4 0 1
-40 13 0 6 -30 23 5 13 -40 5 0 1 0 28 10 22 10 28 10 15 0 19 5 15 0 29 10 22 10 31 10 19 0 15 0 12 0 27 10 22 10 29 10 17 0 16 0 12 20 32 10 26 50 41 15 26 40 34 15 23 20 37 15 30 50 52 25 36 40 29 10 19 20 40 20 32 50 49 20 32 40 27 10 16 50 53 30 40 60 48 20 34 90 54 25 44 50 52 35 38 60 47 20 34 90 48 25 38 50 46 30 33 60 45 20 33 90 53 25 42 60 58 40 42 70 56 25 39 100 52 25 41 60 65 50 51 70 55 25 40 100 57 30 43 60 56 40 41 70 60 30 42 100 58 30 47 100 84 80 61 100 63 40 45 160 93 100 71 100 74 70 58 100 59 30 42 160 79 100 68 100 78 70 60 100 76 50 53 160 86 100 74 160 87 100 62 160 96 90 68 212 85 100 66 160 88 100 65 160 96 90 64 212 80 100 64 160 87 100 66 160 97 90 68 212 87 100 66 212 100 100 68 212 96 100 64 212 104 100 71 TNDT -40°F TNDT -10°F TNDT -20°F RT 0°F RT 10°F RT 40°F NDT NDT NDT Rev. 0
WOLF CREEK TABLE 5.3-10 BELTLINE REGION WELD METAL TOUGHNESS Weld Control No. G2.06 Weld Control No. E3.16 Temp. Energy Shear Lat. Exp. Temp. Energy Shear Lat. Exp.
(°F) (ft lb) (%) (mils) (°F) (ft lb) (%) (mils)
-60 20 0 12 -80 11 0 9
-60 23 5 10 -80 8 0 4
-60 26 5 14 -80 7 0 6
-40 39 20 23 -40 45 20 33
-40 31 15 16 -40 42 20 30
-40 43 20 26 -40 32 15 27
-20 75 40 50 10 58 30 41
-20 108 60 63 10 52 25 37
-20 58 30 38 10 60 40 46 10 102 60 61 60 106 80 69 10 128 80 79 60 92 90 64 10 120 70 71 60 97 90 61 20 125 80 77 100 97 95 73 20 119 70 78 100 95 95 68 20 123 70 68 100 103 95 72 60 151 100 88 160 99 100 71 60 150 100 87 160 96 100 72 60 148 100 87 160 95 100 79 100 148 100 80 100 155 100 85 100 145 100 81 TNDT -50°F T NDT -50°F RTNDT -50°F RT NDT -50°F Rev. 0
WOLF CREEK TABLE 5.3-11 REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM - WITHDRAWAL SCHEDULE CAPSULE VESSEL LEAD NUMBER LOCATION FACTOR WITHDRAWAL TIME U 58.5° 4.25 1.07 EFPY(b)
Y 241° 3.93 4.79 EFPY(b)
V 61° 4.02 9.78 EFPY(b)
X 238.5° 4.30 13.83 EFPY(b)
W 121.5° 4.11 14th Refueling (Storage)
Z 301.5° 4.11 14th Refueling (Storage)
(a) Updated in Capsule X dosimetry analysis.
(b) Capsule withdrawn and analyzed.
NOTE: Changes to the schedule for removal of the capsules is required to be approved by the NRC in accordance with Appendix H of 10CFR50.
Rev. 18
I~ I 0
t 2
. =
Ill
=~
Ill I
==
u.,. ...
1.1) a:
a:
\\1$.
.. li 0 i~ ..."' ...<
=>
Ill ~
a:
i
~Do lr Cl I
)
II l.
I' II I
i I
i I
I i
I j
I II I i I
I I
I II i
\
I
\ '
I
WOLF CREEK 101-124A R2005-1
-l
-l w
I (I) ex:
w 1-2 101-1248 CORE 270°
-l goo 101-142A
-l R2508-2 w
I (I) ex: r-----------~~
w
~
0
-l 101-142C 101-1428 R2508-1 270° Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.3-2 WOLF CREEK UNIT 1 REACTOR VESSEL BELTLINE REGION MATERIAL IDENTIFICATION AND LOCATION
WOLF CREEK 5.4 COMPONENT AND SUBSYSTEM DESIGN 5.4.1 REACTOR COOLANT PUMPS 5.4.1.1 Design Bases The reactor coolant pump provides an adequate core cooling flow rate for heat transfer to maintain a departure from nucleate boiling ratio (DNBR) greater than the Safety Analysis Limit DNBR as defined in the COLR within the parameters of operation. The required net positive suction head is by conservative pump design always less than that available by system design and operation. Sufficient pump rotation inertia is provided by a flywheel, in conjunction with the impeller and motor assembly, to provide adequate flow during coastdown. This forced flow following an assumed loss of pump power, and the subsequent natural circulation effect provides the core with adequate cooling flow.
The reactor coolant pump motor is tested, without mechanical damage, at overspeeds up to and including 125 percent of normal speed. The retention of integrity of the flywheel during a LOCA is demonstrated in Reference 1.
Steam/water tests planned jointly by Westinghouse, Framatome, and the French Atomic Energy Commission (CEA) are discussed in Reference 2. The ultimate use of the data from this testing will be to develop an empirical two-phase flow pump performance model. It is expected that this new model will confirm that the present pump model conservatively predicts performance in all LOCA conditions and thus increase the safety margin available in the emergency core cooling system (ECCS) and reactor coolant pump overspeed analyses.
The pump/motor system is designed for the SSE at the site.
5.4.1.2 Pump Description 5.4.1.2.1 Design Description The reactor coolant pump is shown in Figure 5.4-1. The reactor coolant pump design parameters are given in Table 5.4-1. Code and material requirements are provided in Section 5.2.
The reactor coolant pump is a vertical, single stage, controlled leakage, centrifugal pump designed to operate at high temperatures and pressures.
The pump consists of three major sections. They are the hydraulics, the seals, and the motor.
5.4-1 Rev. 13
WOLF CREEK
- a. The hydraulic section consists of the casing, thermal barrier, flange, impeller/diffuser, and diffuser adapter.
- b. The shaft seal section consists of three primary devices. They are the number 1 controlled leakage, film riding face seal, and the number 2 and number 3 rubbing face seals. These seals are contained within the thermal barrier heat exchanger assembly and seal housing.
Collectively, they provide a pressure breakdown from the reactor coolant system (RCS) pressure to ambient conditions. A fourth sealing device called a shutdown seal is housed within the No. 1 seal area and is passively actuated by high temperature if seal cooling is lost.
- c. The motor is a drip-proof squirrel cage induction motor with a vertical solid shaft, an oil lubricated double-acting Kingsbury type thrust bearing, upper and lower oil lubricated radial guide bearings, and a flywheel.
Additional components of the pump are the shaft, pump radial bearing, thermal barrier heat exchanger, coupling, spool piece, and motor stand.
5.4.1.2.2 Description of Operation Reactor coolant enters the suction nozzle, is directed to the impeller by the diffuser adapter, is pumped through the diffuser, and exits through the discharge nozzle.
Seal injection flow, under slightly higher pressure than the reactor coolant, enters the pump through a connection of the thermal barrier flange and is directed into the plenum between the thermal barrier housing and the shaft.
The flow splits with a portion flowing down the shaft through the radial bearing and into the RCS; the remainder flows up the shaft through the seals.
Component cooling water is provided to the thermal barrier heat exchanger.
During normal operation, the thermal barrier limits the heat transfer from hot reactor coolant to the radial bearing and to the seals. In addition, if a loss of seal injection flow should occur, the thermal barrier heat exchanger cools reactor coolant to an acceptable level before it enters the bearing and seal area.
Reactor coolant pump operation with either seal water injection or component cooling water alone is acceptable for an unlimited time. As described in Sections 9.2.2 and 9.3.4 the component cooling water and the injection paths provide diverse cooling means which precludes seal failures due to any single failure or due to the effects of an SSE.
5.4-2 Rev. 27
WOLF CREEK The reactor coolant pump motor bearings are of conventional design. The radial bearings are the segmented pad type, and the thrust bearing is a double-acting Kingsbury type. All are oil lubricated. Component cooling water is supplied to the external upper bearing oil cooler and to the integral lower bearing oil cooler. The reactor coolant pump motor bearings are qualified for 10 minutes operation without component cooling water with no resultant damage.
The motor is a water/air cooled, Class F thermalastic epoxy insulated, squirrel cage induction motor. The rotor and stator are of standard construction and are cooled by air.
Six resistance temperature detectors are imbedded in the stator windings to sense stator temperature. The top of the motor consists of a flywheel and an antireverse rotation device.
The internal parts of the motor are cooled by air. Integral vanes on each end of the rotor draw air in through cooling slots in the motor frame. This air passes through the motor with particular emphasis on the stator end turns. It is then routed to the external water/air heat exchangers, which are supplied with component cooling water. Each motor has two such coolers, mounted opposite each other . In passing through the coolers, the air is cooled to below 122°F so that little heat is rejected to the containment from the motors.
Each of the reactor coolant pumps is equipped for continuous monitoring of reactor coolant pump shaft and frame vibration levels. Shaft vibration is measured by two relative shaft probes mounted on top of the pump seal housing; the probes are located 90 degrees apart in the same horizontal plane and mounted near the pump shaft. Frame vibration is measured by two velocity seismoprobes located 90 degrees apart in the same horizontal plane and mounted at the top of the motor support stand. The converter's output, which linearizes the probe output, and proximeter output is displayed in the control room. The displays automatically indicate the highest output from the relative probes and seismoprobes; manual selection allows the monitoring of individual probes. Indicator lights display caution and danger limits of vibration.
A removable shaft segment, the spool piece, is located between the motor coupling flange and the pump coupling flange; the spool piece allows removal of the pump seals with the motor in place. The pump internals, motor, and motor stand can be removed from the casing without disturbing the reactor coolant piping. The flywheel is available for inspection by removing the cover.
5.4-3 Rev. 1
WOLF CREEK Parts of the pump in contact with the reactor coolant are austenitic stainless steel, except for seals, bearings, and special parts.
5.4.1.3 Design Evaluation 5.4.1.3.1 Pump Performance The reactor coolant pumps are sized to deliver flow at rates which equal or exceed the flow rates required for core cooling. Initial RCS tests confirm the total delivery capability. Thus, assurance of adequate forced circulation coolant flow is provided prior to initial plant operation.
The estimated performance characteristic is shown in Figure 5.4-2. The "knee" at about 45-percent design flow introduces no operational restrictions, since the pumps operate at full flow.
The reactor trip system assures that pump operation and core cooling capability are within the assumptions used for loss of flow analyses (See Chapter 15.0).
In addition, in the event that a reactor coolant pump is taken out of service during operation, adequate core cooling is provided, and continued plant operation without a reactor trip can be accommodated if the reactor coolant pump is stopped following an orderly reduction in power. The WCGS Technical Specifications require shutdown to hot standby within six hours after a reactor coolant pump stops.
Long-term tests have been conducted on less than full scale prototype seals, as well as on full size seals. Operating plants continue to demonstrate the satisfactory performance of the controlled leakage shaft seal pump design.
The support of the stationary member of the number 1 seal ("seal ring" ) is such as to allow large deflections, both axial and tilting, while still maintaining its controlled gap relative to the seal runner. Even if all the graphite were removed from the pump bearing, the shaft could not deflect far enough to cause opening of the controlled leakage gap. The "spring-rate" of the hydraulic forces associated with the maintenance of the gap is high enough to ensure that the ring follows the runner under very rapid shaft deflections.
Testing of pumps with the number 1 seal entirely bypassed (full system pressure on the number 2 seal) shows that small (approximately 4 to 12 gpm) leakage rates would be maintained for a period of time sufficient to secure the pump.
Even if the number 1 seal were to fail entirely during normal operation, the number 2 seal would maintain these small leakage rates if the proper action is 5.4-4 Rev. 0
WOLF CREEK taken by the operator. An increase in number 1 seal leakoff rate will warn the plant operator of number 1 seal damage. Following warning of excessive seal leakage conditions, the plant operator will take corrective actions. Gross leakage from the pump does not occur if these procedures are followed.
Loss of offsite power causes loss of power to the pump and causes a temporary stoppage in the supply of seal injection flow to the pump and also of the component cooling water flow to the pump and motor. The emergency diesel generators are started automatically due to loss of offsite power so that seal injection flow is provided by the charging pumps. Component cooling water flow is subsequently restored automatically, within 2 minutes. Load shedding and sequencing is discussed in Section 8.3.
In the event of a loss of all AC power and/or loss of all seal cooling, the shutdown seal (SDS) will actuate on high seal cooling temperature to limit leakage from the RCP seal package. Leakage is limited when a thermal actuator retracts and causes the SDS piston ring and polymer ring to clamp down around the pump shaft 5.4.1.3.2 Coastdown Capability It is important to reactor protection that the reactor coolant flow is maintained for a short time after a pump trip in order to remove heat stored in the fuel elements of the core. In order to provide this flow after interruption of power to the pumps, each reactor coolant pump is provided with a flywheel. The rotating inertia of the pump, motor, and flywheel is employed during the coastdown period to continue the reactor coolant flow. An inadvertent early actuation of the SDS on the pump shaft, with the shaft still rotating, will not adversely impact RCP coastdown. The coastdown flow transients are provided in the figures in Section 15.3. The coastdown capability of the pumps is maintained even under the most adverse case of a blackout coincident with the SSE. Core flow transients and figures are provided in Sections 15.3.1 and 15.3.2.
5.4.1.3.3 Bearing Integrity The design requirements for the reactor coolant pump bearings are primarily aimed at giving an accurate alignment and smooth operation over long periods of time in order to ensure a long life with negligible wear. The surface-bearing stresses are held at a very low value, and even under the most severe seismic transients remain below stress values that can be adequately carried for short periods of time.
Because there are no established criteria for short-time stress-related failures in such bearings, it is not possible to make a meaningful quantification of such parameters as margins to failure, safety factors, etc.
A qualitative analysis of the bearing design, embodying such considerations, gives assurance of the adequacy of the bearing to operate without failure.
5.4-5 Rev. 27
WOLF CREEK Low oil levels in the lube oil sumps signal alarms in the control room and require shutting down of the pump. Each motor bearing contains embedded temperature detectors and so initiation of failure, separate from loss of oil, is indicated and alarmed in the control room as a high bearing temperature.
This, again, requires pump shutdown. If these indications are ignored, and the bearing proceeded to failure, the low melting point of Babbitt metal on the pad surfaces ensures that sudden seizure of the shaft will not occur. In this event, the motor continues to operate, as it has sufficient reserve capacity to drive the pump under such conditions. However, the high torque required to drive the pump will require high current which will lead to the motor being shutdown by the electrical protection systems.
5.4.1.3.4 Locked Rotor It may be hypothesized that the pump impeller might severely rub on a stationary member and then seize. This constitutes a loss-of-coolant flow in the loop. Analysis has shown that under such conditions, assuming instantaneous seizure of the impeller, the pump shaft fails in torsion just below the coupling to the motor, thus disengaging the flywheel and motor from the shaft. Following such a postulated seizure, the motor continues to run without any overspeed, and the flywheel maintains its integrity, as it is still supported on a shaft with two bearings. Flow transients are provided in the figures in Section 15.3.3 for the assumed locked rotor.
There are no credible sources of shaft seizure other than impeller rubs. A sudden seizure of the pump bearing is precluded by graphite in the bearing.
Any seizure in the seals results in a shearing of the antirotation pin in the seal ring. An inadvertent actuation of the shutdown seal on the shaft will not interrupt core cooling flow provided by the RCP. The motor has adequate power to continue pump operation even after the above occurrences. Indications of pump malfunction in these conditions are initially by high temperature signals from the bearing water temperature detector and excessive number 1 seal leakoff indications, respectively. Following these signals, pump vibration levels are checked. Excessive vibration indicates mechanical trouble and the pump is shut down for investigation.
5.4.1.3.5 Critical Speed The reactor coolant pump shaft is designed so that its operating speed is below its first critical speed. This shaft design, even under the most severe postulated transient, gives low values of actual stress.
5.4-6 Rev. 27
WOLF CREEK 5.4.1.3.6 Missile Generation Precautionary measures taken to preclude missile formation from primary coolant pump components assure that the pumps do not produce missiles under any anticipated accident condition. Each component of the primary pump motors has been analyzed for missile generation. Any fragments of the motor rotor would be contained by the heavy stator. The same conclusion applies to the pump impeller because the small fragments that might be ejected would be contained in the heavy casing. Further discussion and analysis of missile generation is contained in Reference 1 and Section 3.5.
5.4.1.3.7 Pump Cavitation The minimum net positive suction head required by the reactor coolant pump at running speed is approximately a 192-foot head (approximately 85 psi). In order for the controlled leakage seal to operate correctly, it is necessary to require a minimum differential pressure of approximately 200 psi across the number 1 seal. This corresponds to a primary loop pressure at which the minimum net positive suction head is exceeded, and no limitation on pump operation occurs.
5.4.1.3.8 Pump Overspeed Considerations For turbine trips actuated by either the reactor trip system or the turbine protection system, the generator and reactor coolant pumps are maintained connected to the external network for 30 seconds to prevent any pump overspeed condition. The overspeed condition is prevented by the dynamic braking action of the pump motor. In case a generator trip de-energizes the pump busses, the reactor coolant pump motors are transferred to offsite power within 6 to 10 cycles. Further discussion of pump overspeed considerations and missile generation is contained in Reference 1 and Section 3.5.
5.4.1.3.9 Antireverse Rotation Device Each of the reactor coolant pumps is provided with an antireverse rotation device in the motor. This antireverse mechanism consists of pawls mounted on the outside diameter of the flywheel, a serrated ratchet plate mounted on the motor frame, a spring return for the ratchet plate, and two shock absorbers.
5.4-7 Rev. 1
WOLF CREEK At an approximate forward speed of 70 rpm, the pawls drop and bounce across the ratchet plate; as the motor continues to slow, the pawls drag across the ratchet plate. After the motor has slowed and come to a stop, the dropped pawls engage the ratchet plate and, as the motor tends to rotate in the opposite direction, the ratchet plate also rotates until it is stopped by the shock absorbers. The rotor remains in this position until the motor is energized again. When the motor is started, the ratchet plate is returned to its original position by the spring return. As the motor begins to rotate, the pawls drag over the ratchet plate. When the motor reaches sufficient speed, the pawls are bounced into an elevated position and are held in that position by friction resulting from centrifugal forces acting upon the pawls. While the motor is running at speed, there is no contact between the pawls and ratchet plate.
Considerable plant experience with the design of the antireverse rotation device has shown high reliability of operation.
5.4.1.3.10 Shaft Seal Leakage During normal operation, leakage along the reactor coolant pump shaft is controlled by three shaft seals arranged in series so that reactor coolant leakage to the containment is essentially zero. Injection flow is directed to each reactor coolant pump via a seal water injection filter. It enters the pumps through a connection of the thermal barrier flange and flows to an annulus around the shaft inside the thermal barrier. Here the flow splits: a portion flows down the shaft to cool the bearing and enters the RCS; the remainder flows up the shaft through the seals. This flow provides a backpressure on the number 1 seal and a controlled flow through the seal.
Above the seal, most of the flow leaves the pump via the number 1 seal discharge line. Minor flow passes through the number 2 seal and leakoff line.
A back flush injection from a head tank flows into the number 3 seal between its "double dam" seal area. At this point, the flow divides with half flushing through one side of the seal and out the number 2 seal leakoff while the remaining half flushes through the other side and out of the number 3 seal leakoff. This arrangement assures essentially zero leakage of reactor coolant or trapped gases from the pump.
In the event of a loss of all AC power and/or loss of all seal cooling, reactor coolant begins to travel along the RCP shaft and displace the cooler seal injection water. The shutdown seal (SDS) actuates once the No. 1 seal package temperature reaches the SDS actuation temperature. SDS actuation controls shaft seal leakage and limits the loss of reactor coolant through the RCP seal package.
5.4.1.3.11 Seal Discharge Piping The number 1 seal reduces the coolant pressure to that of the volume control tank. Water from each pump number 1 seal is piped to a common manifold, through the seal water return filter, and through the seal water heat exchanger where the temperature is 5.4-8 Rev. 27
WOLF CREEK reduced to that of the volume control tank. The number 2 and number 3 leakoff lines dump number 2 and 3 seal leakage to the reactor coolant drain tank and the containment sump, respectively.
5.4.1.4 Tests and Inspections The reactor coolant pumps can be inspected in accordance with the ASME Code,Section XI, for inservice inspection of nuclear reactor coolant systems.
The pump casing is cast in one piece, eliminating welds in the casing. Support feet are cast integral with the casing to eliminate a weld region.
The design enables disassembly and removal of the pump internals for usual access to the internal surfaces of the pump casing.
The reactor coolant pump quality assurance program is given in Table 5.4-2.
5.4.1.5 Pump Flywheels 5.4.1.5.1 Pump Flywheel Integrity The integrity of the reactor coolant pump flywheel is assured on the basis of the following design and quality assurance procedures.
5.4.1.5.2 Design Basis The calculated stresses at operating speed are based on stresses due to centrifugal forces. The stress resulting from the interference fit of the flywheel on the shaft is less than 2,000 psi at zero speed, but this stress becomes zero at approximately 600 rpm because of radial expansion of the hub.
The primary coolant pumps run at approximately 1,190 rpm and may operate briefly at overspeeds up to 109 percent (1,295 rpm) during loss of load. For conservatism, however, 125 percent of operating speed was selected as the design speed for the primary coolant pumps. The flywheels were given a preoperational test of 125 percent of the maximum synchronous speed of the motor.
5.4.1.5.2.1 Fabrication and Inspection The flywheel consists of two thick plates bolted together. The flywheel material is produced by a process that minimizes flaws in the material and improves its fracture toughness properties, such as vacuum degassing, vacuum melting, or electroslag remelting. Each plate is fabricated from SA-533, Grade B, Class 1 steel.
5.4-9 Rev. 0
WOLF CREEK Supplier certification reports are available for all plates and demonstrate the acceptability of the flywheel material on the basis of the requirements of Regulatory Guide 1.14.
Flywheel blanks are flame-cut from the SA-533, Grade B, Class 1 plates with at least 1/2 inch of stock left on the outer and bore radii for machining to final dimensions. The flywheel plates, both before and after assembly, are subjected to magnetic particle or liquid penetrant examination. Included in this examination are all surfaces within a minimum radial distance of 4 inches beyond the final machined bore. This includes the bore surface and the keyways. The finished flywheels, as well as the flywheel material (rolled plate), are subjected to 100-percent volumetric ultrasonic inspection, using procedures and acceptance standards specified in Section III of the ASME Code.
5.4.1.5.2.2 Material Acceptance Criteria The reactor coolant pump motor flywheel conforms to the following material acceptance criteria:
- a. The nil-ductility transition temperature (NDTT) of the flywheel material is obtained by two drop weight tests (DWT) which exhibit "no-break" performance at 20°F in accordance with ASTM E-208. The above drop weight tests demonstrate that the NDTT of the flywheel material is no higher than 10°F.
- b. A minimum of three Charpy V-notch impact specimens from each plate are tested at ambient (70°F) temperature in accordance with the specification ASME SA-370. The Charpy V-notch (CV) energy in both the parallel and normal orientation with respect to the rolling direction of the flywheel material is at least 50 foot pounds at 70°F, and, therefore, RTNDT of 10°F can be assumed. An evaluation of flywheel overspeed has been performed which concludes that flywheel integrity will be maintained (Ref. 1).
As stated in reference 1, the normal operating temperature is 120°F. The charpy V-notch and dropweight tests confirm that the normal operating temperature is in excess of 100°F above the RTNDT of the flywheel material.
Thus, it is concluded that flywheel plate materials are suitable for use and can meet Regulatory Guide 1.14 acceptance criteria on the bases of the suppliers' certification data. The degree of compliance with Regulatory Guide 1.14 is further discussed in Appendix 3A.
5.4-10 Rev. 1
WOLF CREEK 5.4.1.5.2.3 Accessibility The reactor coolant pump motors are designed so that, by removing the cover to provide access, the flywheel is available to allow an inservice inspection program in accordance with requirements of Section XI of the ASME Code and the recommendations of Regulatory Guide 1.14.
5.4.1.5.2.4 Spin Testing Each flywheel assembly is spin tested at the design speed of the flywheel, i.e., 125 percent of the maximum synchronous speed of the motor.
5.4.1.5.3 Preservice Inspection Post spin testing of reactor coolant pump flywheels is discussed in Appendix 3A under the response to Regulatory Guide 1.14.
5.4.1.5.4 Inservice Inspection The reactor coolant pump flywheels are inservice inspected in accordance with the recommendations given in Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity," Revision 1, August 1975. The Administrative Controls portion of the Technical Specifications provides specific information on the commitment to the inspection requirements of Regulatory Guide 1.14.
5.4.2 STEAM GENERATORS 5.4.2.1 Design Bases Steam generator design data are given in Table 5.4-3. Code classifications of the steam generator components are given in Section 3.2. Although the ASME classification for the secondary side is specified to be Class 2, all pressure-retaining parts of the steam generator, and thus both the primary and secondary pressure boundaries, are designed to satisfy the criteria specified in Section III of the ASME Code for Class 1 components. The design stress limits, transient conditions, and combined loading conditions applicable to the steam generator are discussed in Section 3.9(N).1. Estimates of radioactivity levels anticipated in the secondary side of the steam generators during normal operation and the bases for the estimates are given in Chapter 11.0. The accident analysis of a steam generator tube rupture is discussed in Chapter 15.0.
5.4-11 Rev. 10
WOLF CREEK The internal moisture separation equipment is designed to ensure that moisture carryover does not exceed 0.25 percent by weight under the following conditions:
- a. Steady state operation up to 100 percent of full load steam flow, with water at the normal operating level.
- b. Loading or unloading at a rate of 5 percent of full power steam flow per minute in the range from 15 to 100 percent of full load steam flow.
- c. A step load change of 10 percent of full power in the range from 15 to 100 percent full load steam flow.
The water chemistry on the reactor side is selected to provide the necessary boron content for reactivity control and to minimize corrosion of RCS surfaces.
The water chemistry of the steam side and its effectiveness in corrosion control are discussed in Chapter 10.0. Compatibility of steam generator tubing with both primary and secondary coolants is discussed further in Section 5.4.2.3.2.
The steam generator is designed to prevent unacceptable damage from mechanical or flow-induced vibration. Tube support adequacy is discussed in Section 5.4.2.5.3. The tubes and tube sheet are analyzed and confirmed to withstand the maximum accident loading conditions as they are defined in Section 3.9(N).1. Further consideration is given in Section 5.4.2.5.4 to the effect of tube wall thinning on accident condition stresses.
Access is provided to the primary side channel heads of the steam generator in order to permit inservice inspection and tube plugging, when required. Access is provided to the shell side of the steam generator in the region of the tube sheet and flow distribution baffle in order to permit inservice inspection and removal of accumulated sludge.
5.4.2.2 Design Description The steam generator is a Westinghouse Model F, vertical shell and U-tube evaporator, with integral moisture separating equipment. Figure 5.4-3 illustrates the design, indicating several of its design features which are described in the following paragraphs.
The Model F steam generator is similar in configuration to the Model 51 steam generators in Westinghouse-supplied plants that are in operation. The Model F incorporates several improved features that have been developed through modification programs in operating steam generators. These features are illustrated in Figure 5.4-12 Rev. 0
WOLF CREEK 5.4-4 and include: preferential distribution of feedwater to the hot leg portion of the tube bundle, removal of downcomer resistance, blockage of the tube lane, and improvements to the primary and secondary steam separators. The net effect of these changes, as has been demonstrated with the use of special instrumentation at Prairie Island, is to increase the flow velocities within the tube bundle, to reduce the tendency for deposition of sludge where it cannot be removed by the continuously operating blowdown system, to reduce the tendency for vapor generation at the tube sheet, and, to reduce moisture carryover with the steam.
The Model F steam generator incorporates several other improved features.
These features are illustrated in Figure 5.4-5. A sealed thermal sleeve and J-nozzles on the feedring prevent the draining of water from the feedring inside the steam generator, and, together with a short horizontal length of feedwater piping to the feedring, have been incorporated to prevent water hammer.
The holes in the tube support plates of the Model F generator have a four-lobe shape that provides four lands to support the tube laterally. The holes are fabricated by drilling, followed by broaching. Figure 5.4-6 is an illustration of the "quatrefoil" broached holes.
The tubes are seal welded to the tube sheet cladding. Fusion welds are performed in compliance with Sections III and IX of the ASME Code and are dye penetrant inspected and leakproof tested. After welding, each tube is hydraulically expanded for the full depth of the tube sheet to the secondary surface to eliminate crevices between the tube and tube sheet.
On the primary side, the reactor coolant flows through the inverted U-tubes, entering and leaving through nozzles located in the hemispherical bottom head of the steam generator. The head is divided into inlet and outlet chambers by a vertical divider plate extending from the apex of the head to the tube sheet.
Steam is generated on the shell side, flows upward, and exits through the outlet nozzle at the top of the vessel. Feedwater enters the steam generator at an elevation above the top of the U-tubes, through a feedwater nozzle. The water is distributed circumferentially around the steam generator by means of a feedwater ring and then flows downward through an annulus between the tube wrapper and shell. The feedwater enters the ring via a welded thermal sleeve connection and leaves it through inverted "J" tubes located at the flow holes, which are at the top of the ring. These features are designed to prevent a condition which 5.4-13 Rev. 0
WOLF CREEK can result in water hammer occurrences in the feedwater piping. At the bottom of the wrapper, the water is directed toward the center of the tube bundle by a flow distribution baffle. This baffle arrangement serves to minimize the tendency of relatively low velocity fluid to deposit sludge in the tube bundle.
Flow blockers, installed on the tube lane, restrict feedwater from flowing through the tube lane and bypassing the tubes. The steam-water mixture from the tube bundle rises into the steam drum section, where 16 individual centrifugal moisture separators remove most of the entrained water from the steam. The steam continues to the secondary separators, which remove most of the remaining moisture and provide a quality of at least 99.75 percent. The separated water is combined with entering feedwater to flow back down the annulus between the wrapper and shell for recirculation through the steam generator. The dry steam exits from the steam generator through the outlet nozzle which is provided with a steam flow restriction, described in Section 5.4.4.
5.4.2.3 Steam Generator Materials 5.4.2.3.1 Selection and Fabrication of Materials Pressure boundary materials used in the steam generator are selected and fabricated in accordance with the requirements of Section III of the ASME Code.
A general discussion of materials specifications is given in Section 5.2.3, with types of materials listed in Tables 5.2-2 and 5.2-3. Fabrication of reactor coolant pressure boundary materials is also discussed in Section 5.2.3, particularly in Sections 5.2.3.3 and 5.2.3.4.
The steam generator materials are carbon steel, except for the U and J tubes, tube support plates, flow distribution baffle, antivibration bars, and the channel head divider plate. The interior surfaces of the reactor coolant channel head, nozzles, and manways are clad with austenitic stainless steel.
The primary side of the tube sheet is weld clad with Inconel (ASME SFA-5.14).
The U and J tubes are Inconel-600, a nickel-chromium-iron alloy (ASME SB-163).
The channel head divider plate is Inconel (SB-168). Tube support plates and the flow distribution baffle are ferritic stainless steel (Type 405). The antivibration bars are Inconel-600, which is chrome plated to improve wear resistance.
The Inconel tubing has been subjected to a thermal treatment process, which has been defined on the basis of laboratory tests and which provides increased resistance to stress corrosion cracking.
5.4-14 Rev. 0
WOLF CREEK Code cases used in material selection are discussed in Section 5.2.1. The extent of conformance with Regulatory Guides 1.84 and 1.85 is discussed in Appendix 3A.
During manufacture, cleaning is performed on the primary and secondary sides for the steam generator, in accordance with written procedures which follow the guidance of Regulatory Guide 1.37 and the ANSI Standard N45.2.1-1973, "Cleaning of Fluid Systems and Associated Components for Nuclear Power Plants." Onsite cleaning and cleanliness control also follow the guidance of Regulatory Guide 1.37, as discussed in Appendix 3A. Cleaning process specifications are discussed in Section 5.2.3.4.
The fracture toughness of the materials is discussed in Section 5.2.3.3.
Adequate fracture toughness of ferritic materials in the reactor coolant pressure boundary is provided by compliance with Appendix G of 10 CFR 50 and with Paragraph NB-2300 of Section III of the ASME Code. As discussed in Section 5.4.2.1, consideration of fracture toughness is only necessary for materials in Class 1 components.
5.4.2.3.2 Compatibility of Steam Generator Tubing with Primary and Secondary Coolants As mentioned in Section 5.4.2.3.1, corrosion tests, which subjected the steam generator tubing material, Inconel-600 (ASME SB-163), to simulated steam generator water chemistry, have indicated that the loss due to general corrosion over the 40-year plant life is insignificant, compared to the tube wall thickness. Testing to investigate the susceptibility of heat exchanger construction materials to stress corrosion in caustic and chloride aqueous solutions has indicated that Inconel-600 has excellent resistance to general and pitting type corrosion in severe operating water conditions. Many reactor years of successful operation have shown the same low general corrosion rates as indicated by the laboratory tests.
Recent operating experience, however, has revealed areas on secondary surfaces where localized corrosion rates were significantly greater than the low general corrosion rates. Both intergranular stress corrosion and tube wall thinning were experienced in localized areas, although not at the same location nor under the same environmental conditions (water chemistry, sludge composition).
Adoption of the all volatile treatment (AVT) chemistry control program eliminates the possibility for recurrence of the tube wall thinning phenomenon related to phosphate chemistry control. Successful AVT operation requires maintenance of low concentration of impurities in the steam generator water, thus reducing the potential for formation of highly concentrated solutions in low 5.4-15 Rev. 1
WOLF CREEK flow zones, which is the precursor of corrosion. By restriction of the total alkalinity in the steam generator and prohibition of extended operation with free alkalinity, the AVT control program minimizes the possibility for occurrence of intergranular corrosion in localized areas due to excessive levels of free caustic.
Laboratory testing has shown that the Inconel-600 tubing is compatible with the AVT environment. Isothermal corrosion testing in high purity water has shown that commercially produced Inconel-600 exhibiting normal microstructures tested at normal engineering stress levels does not suffer intergranular stress corrosion cracking in extended exposure to high temperature water. These tests also showed that no general type of corrosion occurred. A series of autoclave tests in reference secondary water with planned excursions have produced no corrosion attack after 1,938 days of testing on any as produced Inconel-600 tube samples.
AVT chemistry control has been employed successfully in plant operations for considerable periods. Plants with stainless steel tubes which have demonstrated successful AVT operation include Selni, Sena, and Yankee-Rowe.
Selni has operated with AVT since 1964, Sena since 1966, and Yankee-Rowe since 1967. Approximately 20 plants with Inconel tubes have operated with AVT or limited phosphate exposure for periods up to 4 to 4-1/2 years. There have been only a few tube leaks, and annual eddy current inspections have revealed no tube thinning and virtually no corrosion-induced cracking.
Additional extensive operating data are presently being accumulated with the conversion to AVT chemistry. A comprehensive program of steam generator inspections, including the recommendations of NEI 97-06, with the exceptions as stated in Appendix 3A, will ensure detection and correction of any unanticipated degradation that might occur in the steam generator tubing.
Another corrosion-related phenomenon, termed tube denting, was first discovered during the April 1975 steam generator inspection at the Surry Unit No. 2 plant.
This discovery was evidenced by eddy current signals resembling those produced by scanning dents and by difficulty in passing the standard eddy current probe through the tubes at the intersections with the support plates. Subsequent to the initial finding, steam generator inspections at other operating plants revealed indications of denting to various degrees.
5.4-16 Rev. 24
WOLF CREEK An intensive program of investigations, which has included removal of dented tubes and tube/support plate samples from affected steam generators and laboratory tests of heated crevices and model boilers, has revealed that the source of tube denting is corrosion of the carbon steel tube support plate (TSP) in the crevices between the tube and TSP. The corrosion rate in these locations is apparently accelerated by deposition of impurities from the secondary fluid, caused by low flow velocity and superheated fluid in the crevice. The corrosion product has a larger volume than the base metal. The results are simultaneous reduction of the tube diameter, dilation of the hole in the TSP, and secondary effects (e.g., TSP distortions) related to dilation of the TSP holes. Denting has been most pronounced in plants having a history of chloride contamination resulting from condenser leakage. The presence of acid chloride has been found to be a common factor in tube denting produced in laboratory tests. Measures to inhibit denting concentrate on providing a more corrosion resistant TSP material and on eliminating conditions conducive to corrosion at the tube support locations (e.g., chemical impurities in the secondary fluid and localized superheat).
The tube support plates and flow distribution baffle used in the Model F steam generator are Type 405 ferritic stainless steel which has been shown in laboratory tests to be resistant to corrosion in the AVT environment. When corrosion of ferritic stainless steel does occur, the volume of the corrosion products is equivalent to the volume of the parent material. Thus, substitution of Type 405 ferritic stainless steel for carbon steel used in previous steam generators substantially reduces the potential for tube denting.
Other features of the Model F generator further reduce the potential for tube denting. The quatrefoil geometry of the tube support plates is less susceptible to the accumulation of corrosion products which cause tube denting.
The quatrefoil geometry also results in a reduced fluid pressure drop across the tube support plates and, therefore, a higher recirculation ratio and higher fluid velocities in the tube bundle. The flow distribution baffle serves to provide higher cross-flow velocity immediately above the tube sheet and to sweep sludge to the center of the tube bundle, where the intakes to the blowdown pipes are located. Increased capacity (90 gpm per steam generator) blowdown pipes have been added. High volume blowdown provides protection against inleakage of impurities from the condenser and feedwater system.
Blocking devices located adjacent to the downcomer region and at the innermost U-bend tube row, at the tube sheet, minimize bypass flow, promoting flow into the central regions of the bundle.
5.4-17 Rev. 0
WOLF CREEK Operating experience, verified in numerous steam generator inspections, indicates that the tube degradation associated with phosphate water treatment is not occurring where only AVT has been utilized. Adherence to the AVT chemical specifications and close monitoring of the condenser integrity will assure the continued good performance of the steam generator tubing.
5.4.2.3.3 Control of Secondary-Side Impurities Several provisions exist in the WCGS plants to limit the accumulations of impurities in the steam generator, either by limiting ingress or by facilitating removal. The materials of construction of the secondary system are such as to minimize the formation of corrosion products. The materials include stainless steel tubing in all feedwater heaters and Corten tubing in the moisture-separator-reheaters. A full-flow condensate demineralizer system is provided. A piping connection is provided from the feedwater heater, ahead of the steam generators, to the condenser hot well. During startup, this connection is used to circulate secondary system water through the condensate demineralizers. The flow circulation removes suspended corrosion products that may have accumulated during extended shutdowns.
For removal of impurities, the blowdown system has a capacity slightly in excess of 1 percent of full-load feedwater flow. As described in Section 5.4.2.2 and 5.4.2.3.2, the design of the Model F steam generator is expected to result in an increased efficiency of impurity removal by the blowdown system.
The feedwater system materials are discussed in Section 10.4.7, the steam generator blowdown system is discussed in Section 10.4.8, and the condensate demineralizer system is discussed in Section 10.4.6. Instrumentation to monitor secondary side water chemistry is described in Section 9.3.2.
During shutdowns, sludge lancing may be used to remove accumulated material.
In sludge lancing, a hydraulic jet is inserted through an access opening (handhole) to loosen sludge deposits, which are removed by means of a suction pump.
5.4.2.4 Steam Generator Inservice Inspection The steam generator and associated insulation is designed to permit inspection of Class 1 and 2 parts, including individual tubes. The design includes a number of openings to provide access to both the primary and secondary sides of the steam generator, and the inspection program followed complies with Section XI of the ASME Code, including addenda per 10 CFR 50.55a (g) with certain exceptions whenever specific written relief is granted by the 5.4-18 Rev. 0
WOLF CREEK NRC per 10 CFR 50.55a (g) (6). These openings include four manways, two for access to both chambers of the reactor coolant channel head inlet and outlet sides and two in the steam drum for inspection and maintenance of the moisture separators, and six 6-inch handholes, three located just above the tube sheet secondary surface and three located just above the flow distribution baffle.
Access to the tube U-bend is provided through each of the three deck plates.
For proper functioning of the steam generator, some of the deck plate openings are covered with welded, but removable, hatch plates. Inspection/access to the primary side is provided by two 16-inch manways located in the channel head.
In addition, a separate preservice and inservice inspection document which complies with the recommendations of Regulatory Guide 1.83 and "NRC Staff Guidance for complying with certain provisions of 10 CFR 50.55a (g) Inservice Inspection Requirements" was submitted to the NRC. This document provided the details to the areas subject to examination, method of examination, extent of examination, and frequency. WCGS now uses the guidance set forth in NEI 97-06 to monitor Steam Generator integrity.
The insulation in the area of longitudinal and circumferential welds, including tube-sheet-to-head or shell welds, primary nozzle-to-vessel head welds and nozzle-to-head inside radiused sections; primary nozzle-to-safe end welds; integrally welded vessel supports, circumferential butt welds, and nozzle-to-vessel welds on the secondary side is removable. The pressure-retaining bolting can be removed for examination. Manways in the primary head allow direct visual examination of the head cladding. The manways allow sufficient access for the installation of the remotely operated eddy current equipment capable of performing inservice inspections in accordance with the recommendations given in NEI 97-06.
5.4.2.4.1 Compliance with Section XI of the ASME Code Eddy current examinations of steam generator tubing are performed in accordance with Section XI of the ASME Code per 10 CFR 50.55a(g), with certain exceptions whenever specific written relief is granted by the NRC per 10 CFR 50.55a, and the WCGS Technical Specifications.
Other Class l and Class 2 components of the steam generators are examined in accordance with the inservice inspection program. The inservice inspection program of Class l components of the steam generators is described in Section 5.2.4. The inservice inspection of Class 2 components of the steam generators is discussed in Section 6.6.
5.4-19 Rev. 24
WOLF CREEK 5.4.2.4.2 Program for Inservice Inspection of Steam Generator Tubing Steam generator tubing is inspected in accordance with the recommendations given in NEI 97-06, as discussed in Appendix 3A. This guide covers the inspection equipment, baseline inspections, tube selection, sampling and frequency of inspection, methods of recording, and required actions based on findings. Variations in the type of equipment and calibration material are approved for use through utilization of ASME Section XI Code Cases. The Cases utilized are included in the inservice inspection subtier program document addressing steam generator tubing inspection, as discussed in USAR Appendix 3A for Regulatory Guide 1.147. The design of the steam generators permits inservice inspection and/or plugging, if required, of each tube. Regulatory Guide 1.121 provides recommendations concerning tube plugging.
The eddy current examination equipment and procedures are capable of detecting and locating defects with a penetration of 20 percent or more of the wall thickness. The remotely operated equipment is capable of examining the entire length of the tubes.
All original examination data, results, and reports are stored in a fireproof facility and in an atmosphere controlled to minimize deterioration. The data is stored in a limited-access facility and retained for the operating life of the plant.
Standards consisting of similar as-manufactured steam generator tubing with known imperfections are used to establish sensitivity and to calibrate the equipment. Where practical, these standards include reference flaws that simulate the length, depth, and shape of actual imperfections that are characteristic of past experience.
Personnel engaged in taking or interpreting data are tested and qualified in accordance with American Society for Nondestructive Testing Standard SNT-TC-lA and supplements designated by the Edition and Addenda of Section XI used during the examination. Procedures governing the above examinations are qualified prior to examination in the plant.
All of the tubes in the steam generators are inspected by eddy current prior to service to establish a baseline condition of the tubing.
The sample selection and testing of tubes, the inspection intervals, and the actions to be taken if defects are identified follow the recommendations of NEI 97-06.
5.4.2.5 Design Evaluation Seismic and LOCA loads are discussed in Section 3.9(N).
5.4-20 Rev. 24
WOLF CREEK 5.4.2.5.1 Forced Convection of Reactor Coolant The limiting case for heat transfer capability is the "nominal 100-percent design" case. The steam generator effective heat transfer coefficient is based on the coolant conditions of temperature and flow for this case. The best estimate for the heat transfer coefficient applied in steam generator design calculations and plant parameters selection is 1503 Btu/hr-ft2-F. The coefficient incorporates a specified fouling factor resistance of 0.00005 hr-ft2-F/Btu, which is the value selected to account for the differences in the measured and calculated heat transfer performance as well as provide the margin indicated above. Although margin for tube fouling is available, operating experience to date has not indicated that steam generator performance decreases over a long-time period. Adequate tube area is selected to ensure that the full design heat removal rate is achieved.
5.4.2.5.2 Natural Circulation of Reactor Coolant The driving head created by the change in coolant density as it is heated in the core and rises to the outlet nozzle initiates convection circulation. This circulation is enhanced by the fact that the steam generators, which provide a heat sink, are at a higher elevation than the reactor core, which is the heat source. Natural circulation is sufficient for the removal of decay heat during hot shutdown and cooldown in the event of a loss of forced circulation.
5.4.2.5.3 Mechanical and Flow-Induced Vibration Under Normal Operation The possibility of vibratory failure of tubes due to either mechanical or flow-induced excitation has been thoroughly evaluated. This evaluation includes detailed analysis of the tube support systems as well as an extensive research program with tube vibration model tests.
In evaluating possible failure due to vibration, consideration is given to such sources of excitation as those generated by the primary fluid flowing within the tubes. The effects of these as well as any other mechanically induced vibrations are considered to be negligible and should cause little concern.
Another source of possible vibratory failure in heat exchanger components is hydrodynamic excitation by the secondary fluid on the outside of the tubes.
5.4-21 Rev. 0
WOLF CREEK Consideration of secondary flow-induced vibration involves two types of flow, parallel and cross, and it is evaluated in three regions:
- a. At the entrance of the downcomer feed to the tube bundle (cross flow)
- b. Along the straight sections of the tube (parallel flow)
- c. In the curved tubed section of the U-bend (cross flow)
For the case of parallel flow, analysis is done to determine the vibratory deflections in order to verify that the flow velocities are sufficiently below those required for damaging fatigue or impacting vibratory amplitude. Thus, the support system is deemed adequate to preclude parallel flow excitation.
For the case of cross-flow excitation, several possible mechanisms of tube vibration exist. For the Model F steam generator design and conditions, only two of these mechanisms are deemed significant enough to merit extensive consideration: 1) Von Karman vortex shedding and 2) fluidelastic vibration.
The steam generator is analyzed to ensure that the tube natural frequency is well above the anticipated vortex shedding frequency and that unstable fluidelastic vibration does not exist. In order to achieve this, adequate tube supports must be provided. An evaluation using the specific parameters for the Model F steam generator confirms the integrity of the support system.
To provide added strength as well as resistance to vibration, the quatrefoil tube support plate thickness has been increased. In addition, 12 peripheral supports also provide stability to the plates so that tube fretting or wear due to flow-induced plate vibrations at the tube support contact regions is abated.
Assurance against damaging flow induced tube vibration has been accomplished by a combination of analysis and testing. Cross and parallel flow velocities were calculated from thermal-hydraulic analysis of the secondary flow. Three possible vibrational mechanisms, vortex shedding, fluid-elastic excitation, and turbulence were studied.
For vortex shedding, resonance conditions were conservatively assumed, and amplitudes for different resonant modes were computed.
5.4-22 Rev. 0
WOLF CREEK For fluidelastic excitation, tubes that are unsupported by an anti-vibration bar (AVB) and contrary to design requirements, or tubes that are subject to significant flow peaking due to non-uniform insertion of the AVBs, were evaluated to determine if they are subject to possible fatigue failure during the lifetime of the steam generators. The analysis methodology is the same as the methodology used to satisfy the analysis requirements of NRC Bulletin 88-
- 02. The analysis is described in WCAP-17990-P, Wolf Creek U-Bend Vibration and Fatigue Assessment. Seventeen tubes were identified in the analysis that may be subject to fatigue failure based on the pinned and non-occuluded case.
These 17 tubes were all plugged (removed from service) during Refuel 20. All other tubes were shown to be acceptable for a 60 year operating lifetime of Wolf Creek (40 years, plus period of extended operation).
The amplitudes of turbulence-induced vibration are one order of magnitude less than those from vortex-shedding induced vibration. Therefore, vortex shedding is considered the predominant mechanism of flow-induced tube vibration.
Combining both vortex shedding and turbulence effects in a conservative manner, the maximum predicted local tube wear depth over 40 years of operational life is less than 0.006 inches. This value is considerably below the limiting wall thickness reduction for a Model F steam generator tube.
5.4.2.5.4 Allowable Tube Wall Thinning Under Accident Conditions An evaluation is performed to determine the extent of tube wall thinning that can be tolerated under accident conditions. The worst-case loading conditions are assumed to be imposed upon uniformly thinned tubes, at the most critical location in the steam generator. Under such a postulated design basis accident, vibration is of short enough duration that there is no endurance problem to be considered. The steam generator tubes, existing originally at their minimum wall thickness and reduced by a conservative general corrosion and erosion loss, can be shown to provide an adequate safety margin, that is, sufficient wall thickness, in addition to the minimum required for a maximum stress less than the allowable stress limit, as it is defined by the ASME Code.
The results of a study made on "D series" (0.75 inch nominal diameter, 0.043 inch nominal wall thickness) tubes under accident loadings are discussed in Reference 3. These results demonstrate that a minimum wall thickness of 0.026 inches would have a maximum faulted condition stress (i.e., due to combined LOCA and SSE loads) that is less than the allowable limit. This thickness is 0.010 inch less than the minimum "D series" tube wall thickness of 0.039 inch, which is reduced to 0.036 inch by the assumed general corrosion and erosion rate. Thus, an adequate safety margin is exhibited. The corrosion rate is based on a conservative weight loss rate for Inconel tubing in flowing 650 F primary side reactor coolant fluid. The weight loss, when equated to a thinning rate and projected over a 40-year plant life with appropriate reduction after initial hours, is equivalent to 0.083 mil thinning. The assumed corrosion rate of 3 mils leaves a conservative 2.917 mils for general corrosion thinning on the secondary side.
5.4-23 Rev. 29
WOLF CREEK The Model F steam generator is analyzed, using similar assumptions of general corrosion and erosion rates. The overall similarity between the tubes studied and the Model F tubes makes it reasonable to expect the same general results, that is, to conclude that the ability of the Model F steam generator tubes to withstand accident loading is not impaired by a lifetime of general corrosion losses. The results of the specific analysis are presented in WCAP 10043, "Steam Generator Tube Plugging Analysis for the Westinghouse Standardized Nuclear Unit Power Plant System (SNUPPS)." Wolf Creek uses the SNUPPS design.
5.4.2.6 Quality Assurance The steam generator nondestructive examination program is given in Table 5.4-4.
Radiographic inspection and acceptance standards are in accordance with the requirements of Section III of the ASME Code.
Liquid penetrant inspection is performed on weld deposited tube sheet cladding, channel head cladding, divider plate to tube sheet and to channel head weldments, tube-to-tube sheet weldments, and weld deposit cladding. Liquid penetrant inspection and acceptance standards are in accordance with the requirements of Section III of the ASME Code.
Magnetic particle inspection is performed on the tube sheet forging, channel head casting, nozzle forgings, and the following weldments:
- a. Nozzle to shell
- b. Support brackets
- c. Instrument connection (secondary)
- d. Temporary attachments after removal
- e. All accessible pressure retaining welds after hydrostatic test Magnetic particle inspection and acceptance standards are in accordance with the requirements of Section III of the ASME Code.
Ultrasonic tests are performed on the tube sheet forging, tube sheet cladding, secondary shell and head plate, and nozzle forgings.
5.4-24 Rev. 0
WOLF CREEK The heat transfer tubing is subjected to eddy current testing and ultrasonic examination.
Hydrostatic tests are performed in accordance with Section III of the ASME Code.
5.4.3 REACTOR COOLANT PIPING 5.4.3.1 Design Bases The RCS piping is designed and fabricated to accommodate the system pressures and temperatures attained under all expected modes of plant operation or anticipated system interactions. Stresses are maintained within the limits of Section III of the ASME Code. Code and material requirements are provided in Section 5.2.
Materials of construction are specified to minimize corrosion/ erosion and ensure compatibility with the operating environment.
The piping in the RCS is Safety Class 1 and is designed and fabricated in accordance with ASME Code,Section III, Class 1 requirements.
Stainless steel pipe conforms to ANSI B36.19 for sizes 1/2 inch through 12 inches and wall thickness Schedules 40S through 80S. Stainless steel pipe outside of the scope of ANSI B36.19 conforms to ANSI B36.10.
The minimum wall thicknesses of the loop pipe and fittings are no less than those calculated using the ASME Code,Section III, Class 1 formula of Paragraph NB-3641.1(3) with an allowable stress value of 17,550 psi. The pipe wall thickness for the pressurizer surge line is Schedule 160. The minimum pipe bend radius is 5 nominal pipe diameters, and ovality does not exceed 6 percent.
Butt welds, branch connection nozzle welds, and boss welds are of a full penetration design.
Processing and minimization of sensitization are discussed in Section 5.2.3.
Flanges conform to ANSI B16.5.
Socket weld fittings and socket joints conform to ANSI B16.11.
Inservice inspection is discussed in Section 5.2.4.
5.4-25 Rev. 0
WOLF CREEK 5.4.3.2 Design Description The RCS piping includes those sections of piping interconnecting the reactor vessel, steam generator, and reactor coolant pump. It also includes the following:
- a. Charging line and alternate charging line from the system isolation valve up to the branch connections on the reactor coolant loop
- b. Letdown line and excess letdown line from the branch connections on the reactor coolant loop to the system isolation valve
- c. Pressurizer spray lines from the reactor coolant cold legs to the spray nozzle on the pressurizer vessel
- d. Residual heat removal lines to or from the reactor coolant loops up to the designated check valve or isolation valve
- e. Safety injection lines from the designated check valve to the reactor coolant loops
- f. Accumulator lines from the designated check valve to the reactor coolant loops
- g. Loop fill, loop drain, sample*, and instrument* lines to or from the designated isolation valve to or from the reactor coolant loops
- h. Pressurizer surge line from one reactor coolant loop hot leg to the pressurizer vessel inlet nozzle
- i. Resistance temperature detector scoop element, pressurizer spray scoop, sample connection* with scoop, reactor coolant temperature element installation boss, and the temperature element well itself
- Lines with a 3/8-inch (liquid service), 3/4-inch (steam service), or less flow restricting orifice qualify as Safety Class 2.
5.4-26 Rev. 19
WOLF CREEK
- j. All branch connection nozzles attached to reactor coolant loops.
- k. Pressure relief lines* from nozzles on top of the pressurizer vessel up to and through the power operated pressurizer relief valves and pressurizer safety valves
- l. Seal injection water lines to the reactor coolant pump from the designated check valve (injection line)
- m. Auxiliary spray line from the isolation valve to the pressurizer spray line header
- n. Sample lines* from pressurizer to the isolation valve
- o. Reactor vessel head vent lines* to the isolation valves Principal design data for the reactor coolant piping are given in Table 5.4-5.
Details of the materials of construction and codes used in the fabrication of reactor coolant piping and fittings are discussed in Section 5.2.
The reactor coolant piping and fittings which make up the loops are austenitic stainless steel. Pipe and fittings are cast, seamless without longitudinal or electroslag welds, and comply with the requirements of the ASME Code,Section II (Parts A and C),Section III, and Section IX. All smaller piping which is part of the RCS, such as the pressurizer surge line, spray and relief line, loop drains and connecting lines to other systems, are also austenitic stainless steel. The nitrogen supply line for the pressurizer relief tank is carbon steel. All joints and connections are welded, except for the pressurizer code safety valves, where flanged joints are used. A thermal sleeve is installed on the pressurizer spray line nozzle.
All piping connections with auxiliary systems are above the horizontal centerline of the reactor coolant piping, with the exception of:
- Lines with a 3/8-inch (liquid service), 3/4-inch (steam service), or less flow restricting orifice qualify as Safety Class 2.
5.4-27 Rev. 19
WOLF CREEK
- a. Residual heat removal pump suction lines, which are 45 degrees down from the horizontal centerline. This enables the water level in the RCS to be lowered in the reactor coolant pipe while continuing to operate the residual heat removal system, should this be required for maintenance.
- b. Loop drain lines and the connection for temporary level measurement of water in the RCS during refueling and maintenance operation as shown on Figure 5.1-1, Sheet 1.
- c. The differential pressure taps for flow measurement, which are downstream from the steam generators of the first 90-degree elbow as shown on Figure 5.1-1, Sheet 1.
- d. The pressurizer surge line, which is attached at the horizontal centerline is shown on Figure 5.1-1, Sheet 2.
- e. Two of the three scoops in each resistance temperature detector hot leg connection.
- f. The hot leg sample connections, the loop 3 thermowell, and the loop 4 boron injection tank injection connection, all located on the horizontal center-line.
Penetrations into the coolant flow path are limited to the following:
- a. The spray line inlet connections extend into the cold leg piping in the form of a scoop so that the velocity head of the reactor coolant loop flow adds to the spray driving force.
- b. The reactor coolant sample system taps protrude into the main stream to obtain a representative sample of the reactor coolant.
- c. The hot leg connections to the resistance temperature detectors have scoops which extend into the reactor coolant to collect a representative temperature sample for the individual hot leg resistance temperature detector.
- d. The wide range temperature detectors are located in resistance temperature detector wells that extend into both the hot and cold legs of the reactor coolant pipes.
One hot leg and one cold leg temperature reading are provided from each coolant loop to use for protection. Narrow range, thermowell-mounted Resistance Temperature Detectors (RTDs) are provided for each coolant loop. In the hot legs, sampling scoops are used because the flow is stratified. That is, the fluid temperature is not uniform over a cross section of the hot leg.
5.4-28 Rev. 14
WOLF CREEK One dual element RTD is mounted in a thermowell in each of the three sampling scoops associated with each hot leg. The scoops extend into the flow stream at locations 120° apart in the cross sectional plane. Each scoop has five orifices which sample the hot leg flow along the leading edge of the scoop.
Outlet ports are provided in the scoops to direct the sampled fluid past the sensing element of the RTDs. One of each of the RTD's dual elements is used while the other is an installed spare. Three readings from each hot leg are averaged to provide a hot leg reading for that loop.
One dual element RTD is mounted in a thermowell associated with each cold leg.
One RTD element is used while the other is an installed spare.
The thermowells are pressure boundary parts which completely enclose the RTD.
They have been shop hydrotested to 1.25 times the RCS design pressure. The external design pressure and temperature are the RCS design temperature and pressure. The RTD is not part of the pressure boundary. The scoop, thermowell, and thermowell/scoop assembly have been analyzed to the ASME Boiler and Pressure Vessel Code,Section III, Class 1. The effects of seismic and flow-induced loads were considered in the design.
Signals from the temperature detectors are used to compute the reactor coolant T (temperature of the hot leg, THOT minus the temperature of the cold leg, TCOLD) and an average reactor coolant temperature (TAVG). The TAVG for each loop is indicated on the main control board.
5.4.3.3 Design Evaluation Piping load and stress evaluation for normal operating loads, seismic loads, blowdown loads, and combined normal, blowdown, and seismic loads is discussed in Section 3.9(N).
5.4.3.3.1 Material Corrosion/Erosion Evaluation The water chemistry is selected to minimize corrosion. A periodic analysis of the coolant chemical composition is performed to verify that the reactor coolant quality meets the specifications (see Section 5.2.3).
5.4-29 Rev. 9
WOLF CREEK Periodic analysis of the coolant chemical composition is performed to monitor the adherence of the system to desired reactor coolant water quality listed in Table 5.2-5. Maintenance of the water quality to minimize corrosion is accomplished, using the chemical and volume control system and sampling system which are described in Chapter 9.0.
Components in the Reactor Coolant System were designed to provide access to permit inservice inspection inaccordance with the ASME Code,Section XI.
Pursuant to this, all pressure containing welds out to the second valve that delineates the RCS boundary are accessible for examination and are fitted with removable insulation.
5.4.3.3.2 Sensitized Stainless Steel Sensitized stainless steel is discussed in Section 5.2.3.
5.4.3.3.3 Contaminant Control Contamination of stainless steel and Inconel by copper, low melting temperature alloys, mercury, and lead is prohibited. Thread lubricants are approved in accordance with applicable procedures. Prior to application of thermal insulation, the austenitic stainless steel surfaces are cleaned and analyzed to halogen limits as defined by Westinghouse Process Specifications.
5.4.3.4 Tests and Inspections The RCS piping quality assurance program is given in Table 5.4-6.
Volumetric examination is performed throughout 100 percent of the wall volume of each pipe and fitting in accordance with the applicable requirements of Section III of the ASME Code for all pipe 27-1/2 inches and larger. All unacceptable defects are eliminated in accordance with the requirements of the same section of the code.
A liquid penetrant examination is performed on both the entire outside and inside surfaces of each finished fitting, in accordance with the criteria of the ASME Code,Section III. Acceptance standards are in accordance with the applicable requirements of the ASME Code,Section III.
The pressurizer surge line conforms to SA-376, Grade 304, 304N, or 316 with supplementary requirements S2 (transverse tension tests) and S6 (ultrasonic test). The S2 requirement applies to each length of pipe. The S6 requirement applies to 100 percent of the piping wall volume.
5.4-30 Rev. 12
WOLF CREEK The end of pipe sections, branch ends, and fittings are machined back to provide a smooth weld transition adjacent to the weld path.
5.4.4 MAIN STEAM LINE FLOW RESTRICTOR 5.4.4.1 Design Basis The outlet nozzle of the steam generator is provided with a flow restrictor designed to limit steam flow in the unlikely event of a break in the main steam line. A large increase in steam flow will create a backpressure which limits further increase in flow. The flow restrictor performs the following functions: rapid rise in containment pressure is prevented, the rate of heat removal from the reactor coolant is such as to keep the cooldown rate within acceptable limits, thrust forces on the main steam line piping are reduced, and stresses on internal steam generator components, particularly the tube sheet and tubes, are limited. The restrictor is configured to minimize the unrecovered pressure loss across the restrictor during normal operation.
5.4.4.2 Design Description The flow restrictor consists of seven Inconel (ASME SB-163) venturi inserts which are installed in holes in an integral low alloy steel forging. The inserts are arranged with one venturi at the centerline of the outlet nozzle and the other six equally spaced around it. After insertion into the low alloy steel forging holes, the Inconel venturi inserts are welded to the Inconel cladding on the inner surface of the forging.
5.4.4.3 Design Evaluation The flow restriction design has been analyzed to assure its structural adequacy. The equivalent throat diameter of the steam generator outlet is 16 inches, and the resultant pressure drop through the restrictor at 100-percent steam flow is approximately 3.4 psig. This was based on a design flow rate of 3.79E6 lb/hr. Materials of construction and manufacturing of the flow restrictor are in accordance with Section III of the ASME Code.
5.4.4.4 Tests and Inspections Since the restrictor is not a part of the steam system boundary, no tests and inspection beyond those during fabrication are anticipated.
5.4.5 MAIN STEAM LINE ISOLATION SYSTEM The main steam line isolation system is discussed in Section 10.3.
5.4.6 REACTOR CORE ISOLATION COOLING SYSTEM This section is not applicable to WCGS.
5.4.7 RESIDUAL HEAT REMOVAL SYSTEM 5.4.7.1 Design Bases The residual heat removal system (RHRS) functions to remove heat from the RCS when RCS pressure and temperature are below approximately 425 psig and 350°F, respectively. Heat is transferred from the RHRS to the component cooling water system.
5.4-31 Rev. 26
WOLF CREEK The design of the RHRS includes two motor-operated isolation valves that are closed during normal operations. They are provided with both a prevent-open interlock and RHRS-Iso-Valve-Open alarm which are designed to prevent possible exposure of the RHRS to normal RCS operating pressure.
The isolation valves are opened for residual heat removal during a plant cooldown after the RCS temperature is reduced to approximately 350°F and RCS pressure is less than approximately 360 psig in accordance with plant procedures. During a plant startup, the inlet isolation valves are shut after drawing a bubble in the pressurizer and prior to increasing RCS pressure above approximately 425 psig (alarm setpoint).
Portions of the RHRS also serve as portions of the ECCS during the injection and recirculation phases of a LOCA (see Section 6.3).
The RHRS also is used to transfer refueling water between the refueling cavity and the refueling water storage tank at the beginning and end of the refueling operations. The RHRS is designed to be isolated from the RCS whenever the RCS pressure exceeds the RHRS design pressure.
5.4.7.2 Design Description 5.4.7.2.1 Functional Design RHRS design parameters are listed in Table 5.4-7. Nuclear plants employing the same RHRS design as the WCGS unit are given in Section 1.3.
During normal approaches to cold shutdown, the RHRS is placed in operation approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after reactor shutdown when the temperature and pressure of the RCS are approximately 350°F and 360 psig, respectively. Only one train of RHR is placed into operation initially to reduce the RCS temperature from 350°F to 225°F when the other train of RHR is utilized. This sequence is necessary to safeguard a train of RHR for ECCS requirements when shutdown.
This sequence and temperature restriction is due to limiting the temperature of RCS fluid allowed in the RHR pump suction piping. The temperature of RCS fluid allowed in at least one train of RHR suction piping is conservatively kept by plant procedures below the saturation temperature for the static head pressure of the RWST to avoid vaporization should the train be realigned to the RWST for shutdown LOCA mitigation. Assuming both trains of RHR operating in accordance with this sequence with a maximum service water temperature of 90°F, plant cooldown is completed in 17.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> following reactor shutdown (RCS temp
<140°F). This cooldown rate is based on throttling RHR flow, as necessary, to maintain a maximum 120°F component cooling water to the shell side of the RHR heat exchangers and to limit the RCS cooldown rate to a maximum of 50°F/hr.
The heat load handled by the RHRS during the cooldown transient includes residual and decay heat from the core and reactor coolant pump heat. The design heat load is based on the decay heat fraction that exists at 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> using the ANSI/ANS-5.1-1979 Decay heat standard, following reactor shutdown from an extended run at full power.
5.4-32 Rev. 26
WOLF CREEK Assuming that only one heat exchanger and pump are in service and that the heat exchanger is supplied with component cooling water at design flow and temperature, the RHRS is capable of reducing the temperature of the reactor coolant from 350°F to 200°F within 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> after shutdown.
The RHRS is isolated from the RCS on the suction side by two motor-operated valves in series on each suction line. Each motor-operated valve is interlocked to prevent its opening if RCS pressure is greater than approximately 360 psig. During plant startup, operator action is required to close the RHRS suction-isolation valves. An alarm will actuate on the Main Control Board if RHRS isolation valves are not fully closed in conjunction with RCS high pressure. The alarm setpoint pressure will be within the range of open permissive setpoint pressure, and RHR system design pressure minus RHR pump head pressure. P (open permissive setpoint) < P (alarm setpoint) < [P (RHR system design pressure - P (pump discharge head)]. This interlock and alarm function is described in more detail in Sections 5.4.7.2.5 and 7.6.2.
The RHRS is isolated from the RCS on the discharge side by two check valves in each return line. Also provided on the discharge side is a normally open, motor-operated valve downstream of each RHRS heat exchanger. (These check valves and motor-operated valves are not considered part of the RHRS. They are shown as part of the ECCS, see Figures 5.1-1, 5.4-7, and 6.3-1.)
Each inlet line to the RHRS is equipped with a pressure relief valve designed to relieve the combined flow of all the charging pumps at the relief valve set pressure. These relief valves also protect the RHRS system from inadvertent overpressurization during plant cooldown or startup. Each discharge line from the RHRS to the RCS is equipped with a pressure relief valve designed to relieve the maximum possible backleakage through the valves isolating the RHRS from the RCS.
The RHRS is provided for WCGS which is a single nuclear power unit.
The RHRS is designed to be fully operable from the control room for normal operation. Manual operations required of the operator are: opening the suction isolation valves, positioning the flow control valves downstream of the RHRS heat exchangers, and starting the residual heat removal pumps. By nature of its redundant two-train design, the RHRS is designed to accept major component single failures with the only effect being an extension in the required cooldown time. For two low probability electrical system single failures, i.e., failure in the suction isolation valve interlock circuitry or diesel generator failure in conjunction with loss of offsite power, operator action outside the control room is required to open the suction isolation valves. Manual actions are discussed in further detail in Sections 5.4.7.2.7 and 5.4.7.2.8. The motor-operated valves in the RHRS are not subject to flooding. Spurious operation of a single motor-operated valve can be accepted without loss of function, as a result of the redundant two-train design.
5.4-33 Rev. 13
WOLF CREEK Missile protection, protection against dynamic effects associated with the postulated rupture of piping, and seismic design are discussed in Sections 3.5, 3.6, 3.7(B), and 3.7(N) respectively.
5.4.7.2.2 Piping and Instrumentation Diagrams The RHRS, as shown in Figures 5.4-7 (piping and instrumentation diagram) and 5.4-8 (process flow diagram), consists of two residual heat exchangers, two residual heat removal pumps, and the associated piping, valves, and instrumentation necessary for operational control. The inlet lines to the RHRS are connected to the hot legs of two reactor coolant loops, while the return lines are connected to the cold leg of each of the reactor coolant loops.
These return lines are also the ECCS low head injection lines (see Figure 6.3-1).
The RHRS suction lines are isolated from the RCS by two motor-operated valves in series located inside the containment. Each discharge line is isolated from the RCS by two check valves in series located inside the containment and by a normally open motor-operated valve located outside the containment. (The check valves and the motor-operated valve on each discharge line are shown as part of the ECCS, see Figures 5.1-1, 5.4-7, and 6.3-1.)
During RHRS operation, reactor coolant flows from the RCS to the residual heat removal pumps, through the tube side of the residual heat exchangers, and back to the RCS. The heat is transferred to the component cooling water circulating through the shell side of the residual heat exchangers.
Coincident with operation of the RHRS, a portion of the reactor coolant flow may be diverted from downstream of the residual heat exchangers to the chemical and volume control system (CVCS) low pressure letdown line for cleanup and/or pressure control. By regulating the diverted flowrate and the charging flow, the RCS pressure may be controlled. Pressure regulation is necessary to maintain the pressure range dictated by the fracture prevention criteria requirement of the reactor vessel, by the number 1 seal differential pressure, and by net positive suction head requirements of the reactor coolant pumps.
The RCS cooldown rate is manually controlled by regulating the reactor coolant flow through the tube side of the RHR heat exchangers. The flow control valve in the bypass line around each RHR heat exchanger automatically maintains a constant return flow to the RCS. Instrumentation is provided to monitor system pressure, temperature, and total flow.
5.4-34 Rev. 13
WOLF CREEK The RHRS may be used for filling the refueling cavity before refueling. After refueling operations, water is pumped back to the refueling water storage tank until the water level is brought down to two feet above the flange of the reactor vessel. The remainder of the water is removed via a drain connection at the bottom of the refueling canal.
When the RHRS is in operation, the water chemistry is the same as that of the reactor coolant. Provision is made for the nuclear sampling system to extract samples from the flow of reactor coolant downstream of the residual heat exchangers. A local sampling point is also provided on each residual heat removal train between the pump and heat exchanger.
The RHRS functions in conjunction with the high head portion of the ECCS to provide direct injection of borated water from the refueling water storage tank into the RCS cold legs during the injection phase following a LOCA. During normal operation, the RHRS is aligned to inject borated water upon receipt of a safety injection signal.
In its capacity as the low head portion of the ECCS, the RHRS also provides long-term recirculation capability for core cooling following the injection phase of a LOCA. This function is accomplished by aligning the RHRS to take fluid from the containment sump, cool it by circulation through the residual heat exchangers, and supply it to the core directly as well as via the centrifugal charging pumps and safety injection pumps.
The use of the RHRS as part of the ECCS is more completely described in Section 6.3.
The RHR pumps, in order to perform their ECCS function, are interlocked to start automatically on receipt of a safety injection signal (see Section 6.3).
The RHR suction isolation valves are also interlocked to prevent their being opened unless the isolation valves in the following lines are closed:
- a. Recirculation lines from the residual heat exchanger outlets to the suctions of the safety injection pumps and centrifugal charging pumps
- b. RHR pump suction lines from the refueling water storage tank
WOLF CREEK The motor-operated valves in the RHR miniflow bypass lines are interlocked to open when the RHR pump discharge flow is less than approximately 816 gpm at 300°F (783 gpm at 68°F) and close when the flow exceeds approximately 1650 gpm at 300°F (1582 gpm at 68°F).
5.4.7.2.3 Equipment and Component Descriptions The materials used to fabricate RHRS components are in accordance with the applicable code requirements. All parts of the components in contact with borated water are fabricated or clad with austenitic stainless steel or equivalent corrosion-resistant material. Component parameters are given in Table 5.4-8.
Residual Heat Removal Pumps Two pumps are installed in the RHRS. The pumps are sized to deliver reactor coolant flow through the RHR heat exchangers to meet the plant cooldown requirements. The availability of two separate RHR trains assures that cooling capacity is only partially lost should one pump become inoperative.
The RHR pumps are protected from overheating and loss of discharge flow by miniflow bypass lines. A valve located in each miniflow line is regulated by a signal from the flow transmitters located in each pump discharge header. The control valves open when the residual pump discharge flow is less than approximately 816 gpm at 300°F (783 gpm at 68°F) and close when the flow exceeds approximately 1650 gpm at 300°F (1582 gpm at 68°F).
A pressure sensor in each pump discharge header provides a signal for an indicator in the control room. A high pressure alarm is also actuated by the pressure sensor.
The two pumps are vertical, centrifugal units with mechanical seals on the shafts. All pump surfaces in contact with reactor coolant are austenitic stainless steel or equivalent corrosion resistant material.
The RHR pumps also function as the low head safety injection pumps in the ECCS (see Section 6.3 for further information and for the residual heat removal pump performance curves).
Residual Heat Exchangers Two residual heat exchangers are installed in the system. The heat exchanger design is based on heat load and temperature differences between reactor coolant and component cooling water 5.4-36 Rev. 26
WOLF CREEK existing 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> after reactor shutdown when the temperature difference between the two systems is small.
The availability of two heat exchangers in separate and independent residual heat removal trains assures that the heat removal capacity of the system is only partially lost if one train becomes inoperative.
The residual heat exchangers are of the shell and U-tube type. Reactor coolant circulates through the tubes, while component cooling water circulates through the shell. The tubes are welded to the tube sheet to prevent leakage of reactor coolant.
The residual heat exchangers also function as part of the ECCS (see Section 6.3).
Residual Heat Removal System Valves Valves that perform a modulating function are equipped with graphite packing.
Manual and motor-operated valves have backseats to facilitate repacking and to limit stem leakage when the valves are open. Leakage connections are provided where required by valve size and fluid conditions.
Encapsulation The RHR suction lines from the containment recirculation sumps are each provided with a single motor-operated gate valve outside the containment. This valve, including its operator, is encapsulated in a pressure vessel which is leaktight at containment design pressure. The piping from the sump to the valve is also encapsulated in a concentric guard pipe which is leaktight. A leaktight seal is provided such that the ambient inside the pressure vessel and outside the process line and enclosed within the guard pipe is not directly connected with the containment sump or containment atmosphere. Component parameters for the encapsulation tank are given in Table 5.4-8.
The valve provides a barrier outside the containment to prevent loss of sump water should a leak develop in the recirculation loop. Should a leak develop in the valve body or in the pipe between the valve and the sump, the sump fluid is contained by the leaktight seal and/or by the guard pipe.
With this system, no single failure of either an active or a passive component will prevent the recirculation phase or adversely affect the integrity of the containment.
5.4-37 Rev. 26
WOLF CREEK 5.4.7.2.4 System Operation Reactor Startup Generally, while at cold shutdown condition, decay heat from the reactor core is being removed by the RHRS. The number of pumps and heat exchangers in service depends upon the heat load at the time.
At initiation of the plant startup, the RCS is completely filled, and the pressurizer heaters are energized. The RHRS is operating and is connected to the CVCS via the low pressure letdown line for purification and/or to control reactor coolant pressure. During this time, the RHRS acts as an alternate letdown path. The manual valves downstream of the residual heat exchangers leading to the letdown line of the CVCS are opened. The control valve in the line from the RHRS to the letdown line of the CVCS is then manually adjusted in the control room to permit letdown flow.
After the reactor coolant pumps are started, pressure control via the RHRS and the low pressure letdown line is continued until the pressurizer steam bubble is formed. Indication of steam bubble formation is provided in the control room by the damping out of the RCS pressure fluctuations and by pressurizer level indication. The RHRS is then isolated from the RCS, the residual heat removal pumps are stopped, and the system pressure is controlled by normal letdown and the pressurizer spray and pressurizer heaters.
Power Generation and Hot Standby Operation During power generation and hot standby operation, the RHRS is not in service but is aligned for operation as part of the ECCS.
Normal Reactor Cooldown Reactor cooldown is defined as the operation which brings the reactor from no-load temperature and pressure to cold conditions.
The initial phase of reactor cooldown is accomplished by transferring heat from the RCS to the steam generators then to the steam and power conversion system.
The heat is removed by dumping steam to the condenser (turbine bypass system),
or to the atmosphere (atmospheric relief valves).
When the reactor coolant temperature and pressure are reduced to approximately 350°F and 360 psig, approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after reactor shutdown, the second phase of cooldown starts and the RHRS may be placed in operation. The steam and power conversion system may continue to be used to cool the steam generators and establish refueling or maintenance conditions in a more expedient time frame.
5.4-38 Rev. 13
WOLF CREEK Startup of the RHRS includes a warmup period of one train of RHR at 350°F followed by the other train of RHR at 225°F. During the warmup time reactor coolant flow through the heat exchanger is limited to minimize thermal shock.
The rate of heat removal from the reactor coolant is manually controlled by regulating the coolant flow through the residual heat exchangers. By adjusting the control valves downstream of the residual heat exchangers, the mixed mean temperature of the return flows is controlled. Coincident with the manual adjustment, each heat exchanger bypass valve is automatically regulated to give the required total flow. The reactor cooldown rate is limited by RCS equipment cooling rates based on allowable stress limits, as well as the operating temperature limits of the component cooling water system and steam dump cooldown/atmospheric relief valve position. To maintain reactor cooldown rates as the reactor coolant temperature decreases, the reactor coolant flow through the residual heat exchangers is increased by adjusting the control valve in each heat exchanger's tube side outlet line and/or opening the steam dump cooldown/atmospheric relief valves further.
As cooldown continues, the pressurizer is filled with water, and the RCS is operated in the water solid condition.
At this stage, pressure control is accomplished by regulating the charging flow rate and the rate of letdown from the RHRS to the CVCS.
After the reactor coolant pressure is reduced and the temperature is 140°F or lower, the RCS may be opened for refueling or maintenance.
Refueling One of the two residual heat removal pumps may be utilized during refueling to pump borated water from the refueling water storage tank to the refueling cavity. During this operation, the RHRS isolation valve in the suction line from the RCS is closed, and the suction isolation valve from the refueling water storage tank is opened.
After the water level reaches the normal refueling level, the RHRS suction isolation valve for the RCS is opened, the refueling water storage tank supply valve is closed, and residual heat removal is resumed if needed for RCS cooling.
5.4-39 Rev.33
WOLF CREEK During refueling, the RHRS is maintained in service with the number of pumps and heat exchangers in operation required by the heat load.
Following refueling, the RHR pumps are used to drain the refueling cavity down to two feet above the top of the reactor vessel flange by pumping water from the RCS to the refueling water storage tank. The vessel head is then replaced and the normal RHRS flowpath re-established. The remainder of the water is removed from the refueling canal via a drain connection in the bottom of the canal.
5.4.7.2.5 Control Each inlet line to the RHRS is equipped with a pressure relief valve conservatively sized to relieve the combined flow of all the charging pumps at the relief valve set pressure; however, maximum flow through the valves is expected to be the flow of one centrifugal charging pump at its maximum delivery rate. These relief valves also protect the system from inadvertent overpressurization during plant cooldown or startup. Each valve has a relief flow capacity of 986 gpm at a set pressure of 450 psig.
Each discharge line from the RHRS to the RCS is equipped with a pressure relief valve to relieve any backleakage through the valves separating the RHRS from the RCS. Each valve has a relief flow capacity of 20 gpm at a set pressure of 600 psig. These relief valves are located in the RHRS (see Figure 5.4-7).
The fluid discharged by the suction side relief valves is collected in the pressurizer relief tank. The fluid discharged by the discharge side relief valves is collected in the recycle holdup tank of the boron recycle system.
The design of the RHRS includes two motor-operated gate isolation valves in series on each inlet line between the high pressure RCS and the lower pressure RHRS. They are closed during normal operations, and are provided with both a prevent-open interlock and RHRS-Iso-Valve-Open alarm which are designed to prevent possible exposure of the RHRS to normal RCS operating pressure.
The isolation valves on one train of RHR are opened for residual heat removal during a plant cooldown after the RCS temperature is reduced to below 350°F and at 225°F the other train valves are opened. The isolation valves are separately and independently interlocked with pressure signals to prevent their being opened whenever the RCS pressure is greater than approximately 360 psig.
During a plant startup, the inlet isolation valves are shut after drawing a bubble in the pressurizer and prior to increasing RCS pressure above approximately 425 psig (alarm setpoint). Each inlet isolation valve will provide alarm indication on the main control board if the valve remains open above the alarm setpoint.
5.4-40 Rev. 26
WOLF CREEK The use of two independently powered, motor-operated valves in each of the two inlet lines, along with two independent pressure interlock signals for each function, assures a design which meets applicable single failure criteria. Not only more than one single failure but also different failure mechanisms must be postulated to defeat the function of preventing possible exposure of the RHRS to normal RCS operating pressure. These protective interlock designs and alarms, in combination with plant operating procedures and alarms, provide diverse means of accomplishing the protective function. For further information on the instrumentation and control features, see Section 7.6.2.
The RHR inlet isolation valves are provided with red-green position indicator lights on the main control board.
Isolation of the low pressure RHRS from the high pressure RCS is provided on the discharge side by two check valves in series. These check valves are located in the ECCS and RCS, and their testing is described in Section 6.3.4.2.
5.4.7.2.6 Applicable Codes and Classifications The entire RHRS is designed as Safety Class 2, with the exception of the suction isolation valves, which are Safety Class 1. Class 1 discharge valves are discussed in Section 6.3. Component codes and classifications are given in Section 3.2.
5.4.7.2.7 System Reliability Considerations General Design Criterion 34 requires that a system to remove residual heat be provided. The safety function of this required system is to transfer fission product decay heat and other residual heat from the core at a rate sufficient to prevent fuel or pressure boundary design limits from being exceeded. Safety grade systems are provided in the plant design, both nuclear steam supply system (NSSS) scope and balance-of-plant (BOP) scope, to perform this function. The NSSS scope safety grade systems which perform this function for all plant conditions except a LOCA are: the RCS and steam generators, which operate in conjunction with the auxiliary feedwater system and the steam generator safety and Atmospheric Relief Valves; and the RHRS, which operates in conjunction with the component cooling water and service water systems. The BOP scope safety grade systems which perform this function for all plant conditions, except a LOCA, are: the auxiliary feedwater system; the steam generator safety and Atmospheric Relief Valves, which operate in conjunction with the RCS and the steam generators; and the component cooling water and service water systems, which operate in conjunction with the RHRS. For LOCA conditions, the safety grade system which performs 5.4-41 Rev. 13
WOLF CREEK the function of removing residual heat from the reactor core is the ECCS, which operates in conjunction with the component cooling water system and the essential service water system.
The auxiliary feedwater system, along with the steam generator safety and Atmospheric Relief Valves, provides a completely separate, independent, and diverse means of performing the safety function of removing residual heat, which is normally performed by the RHRS when RCS temperature is less than 350°F.
The auxiliary feedwater system is capable of performing this function for an extended period of time following plant shutdown.
The RHRS is provided with two residual heat removal pumps and heat exchangers arranged in two separate, independent flow paths. To assure reliability, each residual heat removal pump is connected to a different vital bus. Each train is isolated from the RCS on the suction side by two motor-operated valves in series with each valve receiving power via a separate motor control center and from a different vital bus. Each suction isolation valve is also provided with "open-prevent" interlock and "RHRS-Iso-Valve-Open" alarm to prevent exposure of the RHRS to the normal operating pressure of the RCS (see Section 5.4.7.2.5).
RHRS operation for normal conditions and for major failures is accomplished completely from the control room. The redundancy in the RHRS design provides the system with the capability to maintain its cooling function even with major single failure, such as failure of a residual heat removal pump, valve, or heat exchanger without impact on the redundant train's continued heat removal.
Although such major system failures are within the system design basis, there are other less significant failures which can prevent opening of the residual heat removal suction isolation valves from the control room. Since these failures are of a minor nature, improbable to occur, and easily corrected outside the control room, with ample time to do so, they have been realistically excluded from the engineering design basis. Such failures are not likely to occur during the limited time period in which they can have any effect (i.e., when opening the suction isolation valves to initiate residual heat removal operation). However, even if they should occur, they have no adverse safety impact and can be readily corrected. In such a situation, the auxiliary feedwater system and the steam generator Atmospheric Relief Valves can be used to perform the safety function of removing residual heat and, in fact, can be used to continue the plant cooldown below 350°F, until the RHRS is made available.
5.4-42 Rev. 11
WOLF CREEK One example of this type of a failure is the interlock circuitry which is designed to prevent exposure of the RHRS to the normal operating pressure of the RCS (see Section 5.4.7.2.5). In the event of such a failure, RHRS operation can be initiated by defeating the failure interlock through corrective action at the solid state protection system cabinet or at the individual affected motor control centers.
The other type of failure which can prevent opening the residual heat removal suction isolation valves from the control room is a failure of an electrical power train. Such a failure is extremely unlikely to occur during the few minutes out of a year's operating time during which it can have any consequence. If such an unlikely event should occur, several alternatives are available. The most realistic approach would be to obtain restoration of offsite power, which can be expected to occur in less than 1/2 hour. Other alternatives are to restore the emergency diesel generator to operation or to bring in an alternative power source.
The only impact of either of the above types of failures is some delay in initiating residual heat removal operation, while action is taken to open the residual heat removal suction isolation valves. This delay has no adverse safety impact because of the capability of the auxiliary feedwater system and steam generator atmospheric relief valves to continue to remove residual heat, and, in fact, to continue plant cooldown.
A failure mode and effects analysis of the RHRS for normal plant cooldown is provided as Table 5.4-9.
5.4.7.2.8 Manual Actions The RHRS is designed to be fully operable from the control room for normal operation. Manual operations required of the operator are: opening the suction isolation valves, positioning the flow control valves downstream of the RHRS heat exchangers, and starting the residual heat removal pumps.
Manual actions required outside the control room, under conditions of single failure, are discussed in Section 5.4.7.2.7.
5.4.7.3 Performance Evaluation The performance of the RHRS in reducing reactor coolant temperature is evaluated through the use of heat balance calculations on the RCS, and the component cooling water system at stepwise intervals following the initiation of RHR operation. Heat removal through the RHR and component cooling water heat exchangers is calculated at each interval by use of standard water-to-water heat 5.4-43 Rev. 13
WOLF CREEK exchanger performance correlations. The resultant fluid temperatures for the RHRS and component cooling water system are calculated and used as input to the next interval's heat balance calculation.
Assumptions utilized in the series of the heat balance calculations describing plant RHR cooldown are as follows:
- a. RHR operation is initiated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after reactor shutdown.
- b. RHR operation begins at a reactor coolant temperature of 350°F.
- c. Thermal equilibrium is maintained throughout the RCS during the cooldown.
- d. Component cooling water heat exchanger outlet temperature during cooldown is limited to a maximum of 120°F.
- e. Expected cooldown rates of 50°F per hour are not exceeded.
- f. Service water temperature is 90°F.
- g. RCS heat input from one reactor coolant pump is maintained until RCS temperature reaches 160°F.
- h. Auxiliary CCW heat loads are (x 106 Btu/hr) 1 (350 to 225°F) 2 (225 to 140°F)
Auxiliary CCW heat loads Train RHR 1-Train RHR 4 hrs. after shutdown 15.5 15.5 20 hrs. after shutdown 15.5 15.5 Cooldown curves calculated using this method are provided for the case when using both trains of residual heat removal cooldown (Figure 5.4-9) and for the case of a single train residual heat removal cooldown (Figure 5.4-10).
5.4.7.4 Preoperational Testing Preoperational testing of the RHRS is addressed in Chapter 14.0.
5.4.8 REACTOR WATER CLEANUP SYSTEM This section is not applicable to WCGS.
5.4.9 MAIN STEAM LINE AND FEED WATER PIPING Discussion pertaining to the main steam line and feedwater piping are contained in the following sections:
- a. Main Steam Line Piping - Section 10.3.
- b. Main Feedwater Piping - Section 10.4.7.
- c. Auxiliary Feedwater Piping - Section 10.4.9.
- d. Inservice Inspection of a, b, and c - Section 6.6.
5.4-44 Rev. 26
WOLF CREEK 5.4.10 PRESSURIZER 5.4.10.1 Design Bases The pressurizer provides a point in the RCS where liquid and vapor are maintained in equilibrium under saturated conditions for control of pressure of the RCS during steady state operations and transients.
The volume of the pressurizer is equal to, or greater than, the minimum volume of steam, water, or total of the two which satisfies all of the following requirements:
- a. The combined saturated water volume and steam expansion volume is sufficient to provide the desired pressure response to system volume changes.
- b. The water volume is sufficient to prevent the heaters from being uncovered during a step load increase of 10 percent at full power.
- c. The steam volume is large enough to accommodate the surge resulting from a 50-percent reduction of full load with automatic reactor control and a 40-percent steam dump without the water level reaching the high level reactor trip point.
- d. The steam volume is large enough to prevent water relief through the safety valves following a loss of load with the high water level initiating a reactor trip, without reactor control or steam dump.
- e. The pressurizer does not empty following reactor trip and turbine trip.
- f. The emergency core cooling does not activate because of a reactor trip and turbine trip.
The surge line is sized to minimize, to an acceptable value, the pressure drop between the RCS and the safety valves with maximum discharge flow from the safety valves.
The surge line and the thermal sleeves are designed to withstand the thermal stresses resulting from volume surges of water of different temperatures, which occur during operation.
5.4-45 Rev. 0
WOLF CREEK 5.4.10.2 Design Description 5.4.10.2.1 Pressurizer and Surge Line The pressurizer is a vertical, cylindrical vessel with hemispherical top and bottom heads constructed of carbon steel, with austenitic stainless steel cladding on all internal surfaces exposed to the reactor coolant. Stainless steel is used on all surfaces in contact with the reactor coolant.
The general configuration of the pressurizer is shown in Figure 5.4-11. The design data of the pressurizer are given in Table 5.4-10. Codes and material requirements are provided in Section 5.2.
The pressurizer surge line connects the pressurizer to one reactor hot leg, thus enabling continuous coolant volume pressure adjustments between the RCS and the pressurizer.
The surge line nozzle and removable electric heaters are located in the bottom of the pressurizer. The heaters are removable for maintenance or replacement.
The pressurizer surge line nozzle diameter is given in Table 5.4-10, and the pressurizer surge line diameter is shown in Figure 5.1-1, Sheet 2.
A thermal sleeve is provided in the surge line nozzle to minimize thermal stresses. A retaining screen is located above the nozzle to prevent foreign matter from entering the RCS. Baffles in the lower section of the pressurizer prevent an insurge of cold water from flowing directly to the steam/ water interface and assist in mixing.
Spray line nozzles, relief and safety valve connections are located in the top head of the pressurizer vessel. Spray flow is modulated by automatically controlled air-operated valves. The spray valves also can be operated manually by a switch in the control room.
A small continuous spray flow is provided through a manual bypass valve around the power-operated spray valves to assure that the boron concentration in the pressurizer is not dissimilar from that in the reactor coolant and to prevent excessive cooling of the spray piping.
During an outsurge of water from the pressurizer, flashing of water to steam and generation of steam by automatic actuation of the heaters keep the pressure above the minimum allowable limit.
5.4-46 Rev. 14
WOLF CREEK During an insurge from the RCS, the spray system, which is fed from two cold legs, condenses steam in the vessel to prevent the pressurizer pressure from reaching the setpoint of the power-operated relief valves for normal design transients. Heaters are energized on high water level during insurge to heat the subcooled surge water that enters the pressurizer from the reactor coolant loop.
Material specifications are provided in Table 5.2-2 for the pressurizer, pressurizer relief tank, and the surge line. Design transients for the components of the RCS are discussed in Section 3.9(N).1. Additional details on the pressurizer design cycle analysis are given in Section 3.9(N).1.
5.4.10.2.2 Pressurizer Instrumentation Refer to Chapter 7.0 for details of the instrumentation associated with pressurizer pressure, level, and temperature.
Temperatures in the spray lines from the cold legs of two loops are measured and indicated. Alarms from these signals are actuated to warn the operator of low spray water temperature or indicate insufficient flow in the spray lines.
Temperatures in the pressurizer safety and relief valve discharge lines are measured and indicated. An increase in a discharge line temperature is an indication of leakage or relief through the associated valve.
5.4.10.3 Design Evaluation 5.4.10.3.1 System Pressure Whenever a steam volume is present within the pressurizer, the RCS pressure is governed by conditions in the pressurizer.
A design basis safety limit is that RCS pressure does not exceed the maximum transient value allowed under the ASME Code,Section III.
Evaluation of plant conditions of operation, which follow, indicate that this safety limit is not reached.
During startup and shutdown, the rate of temperature change in the RCS is controlled by the operator. Heatup rate is controlled by energy input from the reactor coolant pumps and by the pressurizer electrical heating capacity. This heatup rate takes into account the continuous spray flow provided to the pressurizer. When the 5.4-47 Rev. 13
WOLF CREEK reactor core is in cold shutdown, the pressurizer heaters are de-energized except when establishing or maintaining a pressure bubble.
When the pressurizer is filled with water, i.e., during initial system heatup, and near the end of the second phase of plant cooldown, RCS pressure is maintained by the letdown flow rate via the RHRS.
5.4.10.3.2 Pressurizer Performance The normal operating water volume at full load conditions is given in Table 5.4-10.
5.4.10.3.3 Pressure Setpoints The RCS design and operating pressure, together with the safety, power relief, and pressurizer spray valves setpoints and the protection system pressure setpoints, are listed in Table 5.4-11. The design pressure allows for operating transient pressure changes. The selected design margin considers core thermal lag, coolant transport times and pressure drops, instrumentation and control response characteristics, and system relief valve characteristics.
5.4.10.3.4 Pressurizer Spray Two separate, automatically controlled spray valves with remote manual overrides are used to initiate pressurizer spray. In parallel with each spray valves is a manual throttle valve which permits a small continuous flow through both spray lines to reduce thermal stresses and thermal shock when the spray valves open and to help maintain uniform water chemistry and temperature in the pressurizer. Temperature sensors with low alarms are provided in each spray line to alert the operator to insufficient bypass flow. The layout of the common spray line piping routed to the pressurizer forms a water seal which prevents the steam buildup back to the control valves. The spray rate is selected to prevent the pressurizer pressure from reaching the operating setpoint of the power relief valves during a step reduction in power level of 10 percent of full load.
The pressurizer spray lines and valves are large enough to provide the required spray flow rate under the driving force of the differential pressure between the surge line connection in the hot leg and the spray line connection in the cold leg. The spray line inlet connections extend into the cold leg piping in the form of a scoop in order to utilize the velocity head of the reactor coolant loop flow to add to the spray driving force. The spray valves and 5.4-48 Rev. 0
WOLF CREEK spray line connections are arranged so that the spray will operate when one reactor coolant pump is not operating. The line may also be used to assist in equalizing the boron concentration between the reactor coolant loops and the pressurizer.
A flow path from the CVCS to the pressurizer spray line is also provided. This path provides auxiliary spray to the vapor space of the pressurizer during cooldown when the reactor coolant pumps are not operating. The thermal sleeves on the pressurizer spray connection and the spray piping are designed to withstand the thermal stresses resulting from the introduction of cold spray water.
5.4.10.4 Tests and Inspections The pressurizer is designed and constructed in accordance with the ASME Code,Section III.
To implement the requirements of the ASME Code,Section XI the following welds are designed and constructed to present a smooth transition surface between the parent metal and the weld metal. The weld surface is ground smooth for ultrasonic inspection.
- a. Support skirt to the pressurizer lower head
- b. Surge nozzle to the lower head
- c. Nozzles safe ends to the surge, safety, relief, and spray lines *
- e. All girth and longitudinal full penetration welds
- f. Manway attachment welds The liner within the safe end nozzle region extends beyond the weld region to maintain a uniform geometry for ultrasonic inspection.
Peripheral support rings are furnished for the removable insulation modules.
The pressurizer quality assurance program is given in Table 5.4-12.
- In order to mitigate primary water stress corrosion cracking concerns with the originally installed Alloy 600 (82/182) dissimilar metal welds, full structural weld overlays made of ERNiCrFe-7A (Alloy 52M/UNS N06054) have been installed to cover portions of the Pressurizer nozzles (Surge, Safety, Relief, and Spray), nozzle weld butter layers, dissimilar metal welds between the butter and the safe end, safe ends, safe end to stainless steel pipe welds, and connecting stainless steel piping.
5.4-49 Rev. 21
WOLF CREEK 5.4.11 PRESSURIZER RELIEF DISCHARGE SYSTEM 5.4.11.1 Design Bases The pressurizer relief discharge system collects, cools, and directs for processing the steam and water discharged from safety and relief valves in the containment. The system consists of the pressurizer relief tank, the safety and relief valve discharge piping, the relief tank internal spray header and associated piping, the tank nitrogen supply, the vent to containment, and the drain to the waste processing system.
The system design is based on the requirement to absorb a discharge of steam equivalent to 110 percent of the full power pressurizer steam volume. The steam volume requirement is approximately that which would be experienced if the plant were to suffer a complete loss of load accompanied by a turbine trip but without the resulting reactor trip. A delayed reactor trip is considered in the design of the system.
The minimum volume of water in the pressurizer relief tank is determined by the energy content of the steam to be condensed and cooled, by the assumed initial temperature of the water, and by the desired final temperature of the water volume. The initial water temperature is assumed to be 120°F, which corresponds to the design maximum expected containment temperature for normal conditions. Provision is made to permit cooling the tank should the water temperature rise above 120°F during plant operation. The design final temperature is 200°F, which allows the content of the tank to be drained directly to the waste processing system without cooling.
A safety-related flowpath downstream of the excess letdown heat exchanger is provided to direct a cooled flow to the PRT. This flow path may be used if the normal and excess letdown paths are unavailable or if it is desired to contain the reactor coolant inside the containment. Another flowpath is provided for the controlled release of fluid from the PRT to the containment normal sump.
The vessel saddle supports and anchor bolt arrangement are designed to withstand the loadings resulting from a combination of nozzle loadings acting simultaneously with the vessel seismic and static loadings.
5.4.11.2 System Description The piping and instrumentation diagram for the pressurizer relief discharge system is given in Figure 5.1-1, Sheet 2.
5.4-50 Rev. 0
WOLF CREEK Codes and materials of the pressurizer relief tank and associated piping are given in Section 5.2. Design data for the tank are given in Table 5.4-13.
The steam and water discharged from the various safety and relief valves inside the containment is routed to the pressurizer relief tank if the discharged fluid is of reactor grade quality. Table 5.4-14 provides an itemized list of valves discharging to the tank, together with references to the corresponding piping and instrumentation diagrams.
The tank normally contains water and a predominantly nitrogen atmosphere. In order to obtain effective condensing and cooling of the discharged steam, the tank is installed horizontally with the steam discharged through a sparger pipe located near the tank bottom and under the water level. The sparger holes are designed to ensure a resultant steam velocity close to sonic. The water in the tank may be discharged to allow increased capacity for RC letdown via the excess letdown path. In this mode, the water is cooled before it enters the tank.
The tank is also equipped with an internal spray and a drain which are used to cool the water following a discharge. Cold water is drawn from the reactor makeup water system, or the contents of the tank are circulated through the reactor coolant drain tank heat exchanger of the waste processing system and back into the spray header.
The nitrogen gas blanket is used to control the atmosphere in the tank and to allow room for the expansion of the original water plus the condensed steam discharge. The tank gas volume is calculated, using a final pressure based on an arbitrary design pressure of 100 psig. The design discharge raises the worst case initial conditions to 50 psig, a pressure low enough to prevent fatigue of the rupture discs. Provision is made to permit the gas in the tank to be periodically analyzed to monitor the concentration of hydrogen and/or oxygen.
The contents of the tank can be drained to the waste holdup tank in the waste processing system or the recycle holdup tank in the boron recycle system via the reactor coolant drain tank pumps in the waste processing system. Under emergency conditions, the tank contents can be drained to the containment normal sump.
5.4.11.2.1 Pressurizer Relief Tank The general configuration of the pressurizer relief tank is shown in Figure 5.4-12. The tank is a horizontal, cylindrical vessel with elliptical dished heads. The vessel is constructed of 5.4-51 Rev. 0
WOLF CREEK austenitic stainless steel, and is overpressure protected in accordance with the ASME Code,Section VIII, Division 1, by means of two safety heads with stainless steel rupture discs. The PRT saddle supports are designed to withstand the loadings resulting from a combination of nozzle loadings acting simultaneously with the vessel seismic and static loadings.
A flange nozzle is provided on the tank for the pressurizer discharge line connection to the sparger pipe. The tank is also equipped with an internal spray connected to a cold water inlet and with a bottom drain, which are used to cool the tank following a discharge.
5.4.11.3 Design Evaluation The pressurizer relief discharge system does not constitute part of the reactor coolant pressure boundary per 10 CFR 50, Section 50.2, since all of its components are downstream of the RCS safety and relief valves. Thus, General Design Criteria 14 and 15 are not applicable. Furthermore, complete failure of the auxiliary systems serving the pressurizer relief tank will not impair the capability for safe plant shutdown.
The design of the system piping layout and piping restraints is consistent with the hazards protection requirements indicated in Appendix 3.B. The safety and relief valve discharge piping is restrained so that the integrity and operability of the valves are maintained in the event of a rupture. Regulatory Guide 1.67 is not applicable, since the system is not an open discharge system.
The pressurizer relief discharge system is capable of handling the design discharge of steam without exceeding the design pressure and temperature of the pressurizer relief tank.
The volume of water in the pressurizer relief tank is capable of absorbing the heat from the assumed discharge, maintaining the water temperature below 200°F.
If a discharge exceeding the design basis should occur, the relief device on the tank would pass the discharge through the tank to the containment.
The rupture discs on the relief tank have a relief capacity equal to or greater than the combined capacity of the pressurizer safety valves. The tank design pressure is twice the calculated pressure resulting from the design basis safety valve discharge described in Section 5.4.11.1. The tank and rupture discs holders are also designed for full vacuum to prevent tank collapse if the contents cool following a discharge without nitrogen being added.
5.4-52 Rev. 1
WOLF CREEK The discharge piping from the pressurizer safety and relief valves to the relief tank is sufficiently large to prevent backpressure at the safety valves from exceeding 20 percent of the setpoint pressure at full flow.
5.4.11.4 Instrumentation Requirements The pressurizer relief tank pressure transmitter provides an indication of pressure relief tank pressure. An alarm is provided to indicate high tank pressure.
The pressurizer relief tank level transmitter supplies a signal for an indicator with high and low level alarms. The temperature of the water in the pressurizer relief tank is indicated, and an alarm actuated by high temperature informs the operator that cooling of the tank contents is required.
5.4.11.5 Tests and Inspections The system components and piping are subject to nondestructive and hydrostatic testing during construction, in accordance with Section VIII, Division 1 of the ASME Code and ANSI B31.1, respectively.
During plant operation, periodic visual inspections and preventive maintenance are conducted on the system components according to normal industrial practice.
5.4.12 VALVES 5.4.12.1 Design Bases As noted in Section 5.2, all valves out to and including the second valve normally closed or capable of automatic or remote closure, larger than 3/4 inch, are ANS Safety Class 1, and ASME III, Code Class 1 valves. All 3/4-inch or smaller valves in lines connected to the RCS are Class 2, since the interface with the Class l piping is provided with suitable orificing for such valves. Design data for the RCS valves are given in Table 5.4-15.
For a check valve to qualify as part of the RCS, it must be located inside the containment system. When the second of two normally open check valves is considered part of the RCS (as defined in Section 5.1), means are provided to periodically assess back-flow leakage of the first valve when closed, if required.
To ensure that the valves will meet the design objectives, the materials of construction minimize corrosion/erosion and ensure compatibility with the environment. Leakage is minimized to the extent practicable by design.
5.4-53 Rev. 32
WOLF CREEK 5.4.12.2 Design Description All manual and motor-operated valves of the RCS which are larger than 2 inches are provided with graphite packing. Throttling control valves are provided with graphite packing. Leakage to the atmosphere is essentially zero for these valves.
Gate valves at the engineered safety features interface are wedge design and are essentially straight through. The wedges are flex-wedge or solid. Gate valves have backseats. Globe valves are "T" and "Y" styles. Check valves are swing type for sizes 2-1/2 inches and larger. All check valves which contain radioactive fluid are stainless steel, and do not have body penetrations other than the inlet, outlet, and bonnet. The check hinge is serviced through the bonnet. All operating parts are contained within the check valve body. The disc has limited rotation to provide a change of seating surface and alignment after each check valve opening.
5.4.12.3 Design Evaluation The design requirements for Class 1 valves, as discussed in Section 5.2, limit stresses to levels which ensure the structural integrity of the valves. In addition, the testing programs described in Section 3.9(N) demonstrate the ability of the valves to operate, as required, during anticipated and postulated plant conditions.
Reactor coolant chemistry parameters are specified in the design specifications to assure the compatibility of valve construction materials with the reactor coolant. To ensure that the reactor coolant continues to meet these parameters, the chemical composition of the coolant is analyzed periodically.
The above requirements and procedures, coupled with the previously described design features for minimizing leakage, ensure that the valves perform their intended functions, as required during plant operation.
5.4.12.4 Tests and Inspections The tests and inspections discussed in Section 3.9(B).6 are performed to ensure the operability of the active valves.
There are no full-penetration welds within the valve body walls. Valves are accessible for disassembly and internal visual 5.4-54 Rev. 13
WOLF CREEK inspection, to the extent practical. Plant layout configurations determine the degree of inspectability. The valve nondestructive examination program is given in Table 5.4-16. Inservice inspection is discussed in Section 5.2.4.
5.4.13 SAFETY AND RELIEF VALVES 5.4.13.1 Design Bases The combined capacity of the pressurizer safety valves can accommodate the maximum pressurizer surge resulting from complete loss of load, without reactor trip or any operator action and by the opening of the steam generator safety valves when steam pressure reaches the steam side safety setting.
The pressurizer power-operated relief valves are designed to limit pressurizer pressure to a value below the fixed high pressure reactor trip setpoint. They are designed to fail to the closed position on loss of power.
5.4.13.2 Design Description The pressurizer safety valves are of the pop type. The valves are spring loaded, open by direct fluid pressure action, and have backpressure compensation features.
The pipe connecting each pressurizer nozzle to its safety valve is shaped in the form of a loop seal. Condensate resulting from normal heat losses accumulates in the loop. The water prevents any leakage of hydrogen gas or steam through the safety valve seats. If the pressurizer pressure exceeds the set pressure of the safety valves, they start lifting, and the water from the seal discharges during the actuation period.
The pressurizer power-operated relief valves are solenoid actuated valves which respond to a signal from a pressure sensing system or to manual control.
Motor-operated valves are provided to isolate the power-operated relief valves if excessive leakage develops or if the PORV fails to close.
Temperatures in the pressurizer safety and relief valve discharge lines are measured and indicated. An increase in a discharge line temperature is an indication of leakage or relief through the associated valve.
Liquid flow rates assumed in the analysis are based on the homogeneous equilibrium saturated flow model which gives the most conservative relief rate.
Accident analysis demonstrates that water relief through the pressurizer valves occurs only during the 5.4-55 Rev. 0
WOLF CREEK feedline rupture event. The results of the WCGS feedline rupture analysis show that there is no water relief through the pressurizer valves at any time during the event.
The power-operated relief valves provide the safety-related means for reactor coolant system depressurization to achieve cold shutdown.
Design parameters for the pressurizer safety and power relief valves are given in Table 5.4-17.
5.4.13.3 Design Evaluation The pressurizer safety valves prevent RCS pressure from exceeding 110 percent of system design pressure, in compliance with the ASME Code,Section III.
The pressurizer power relief valves prevent actuation of the fixed reactor high pressure trip for design transients up to and including the design step load decreases with steam dump. The relief valves also limit undesirable opening of the spring loaded safety valves.
5.4.13.4 Tests and Inspections Safety and relief valves are subjected to hydrostatic tests, seat leakage tests, operational tests, and inspections, as required. For safety valves that are required to function during a faulted condition, additional tests are performed. These tests are described in Section 3.9(N). There are no full penetration welds within the valve body walls. Valves are accessible for disassembly and internal visual inspection.
Each pressurizer power-operated relief valve is demonstrated operable every 18 months by performing a channel calibration of the actuation instrumentation.
5.4.14 COMPONENT SUPPORTS 5.4.14.1 Design Bases Component supports allow essentially unrestrained lateral thermal movement of the loop during plant operation except for a minor thermal restriction at the steam generator upper lateral supports as the system approaches operating temperature, and provide restraint to the loops and components during accident and seismic conditions. The loading combinations and design stress limits are discussed in Section 3.9(N).1.4. Support design is in accordance with the ASME Code,Section III, Subsection NF. The design maintains the integrity of the RCS boundary for normal, seismic, and accident conditions and satisfies the requirements of the piping code. Results of piping and supports stress evaluation are presented in Section 3.9(N).
5.4-56 Rev. 13
WOLF CREEK 5.4.14.2 Description The support structures are welded structural steel sections. Linear type structures (tension and compression struts, columns, and beams) are used in all cases, except for the reactor vessel supports, which are plate-type structures.
Attachments to the supported equipment are nonintegral types that are bolted to or bear against the components. The supports-to-concrete attachments are either anchor bolts or embedded fabricated assemblies.
The supports permit essentially unrestrained thermal growth of the supported systems but restrain vertical, lateral, and rotational movement resulting from seismic and pipe break loadings. This is accomplished using spherical bushings in the columns for vertical support and girders, bumper pedestals, and tie-rods for lateral support.
To compensate for manufacturing and construction tolerances, adjustment in the support structures is provided to ensure proper erection alignment and fit-up.
This is accomplished by shimming or grouting at the supports-to-concrete interface and by shimming at the supports-to-equipment interface.
The supports for the various components are described in the following paragraphs.
5.4.14.2.1 Reactor Pressure Vessel Supports for the reactor vessel (Figure 5.4-13) are individual air cooled rectangular box structures beneath the vessel nozzles bolted to the primary shield wall concrete. Each box structure consists of a horizontal top plate that receives loads from the reactor vessel shoe, a horizontal bottom plate which transfers the loads to the primary shield wall concrete, and connecting vertical plates which bear against an embedded support. The supports are air cooled to maintain the supporting concrete temperature within acceptable levels.
5.4.14.2.2 Steam Generator As shown in Figure 5.4-14, the steam generator supports consist of the following elements:
- a. Vertical support Four individual columns provide vertical support for each steam generator. These are bolted at the top to the steam generator and at the bottom to the concrete structure. Spherical ball bushings at the top and 5.4-57 Rev. 11
WOLF CREEK bottom of each column allow unrestrained lateral movement of the steam generator during heatup and cooldown. The column base design permits both horizontal and vertical adjustment of the steam generator for erection and adjustment of the system.
- b. Lower lateral support Lateral support is provided at the generator tube sheet by fabricated steel girders and struts. These are bolted to the compartment walls and include bumpers that bear against the steam generator but permit unrestrained movement of the steam generator during changes in system temperature.
Stresses in the beams caused by wall displacement during compartment pressurization are considered in the design.
- c. Upper lateral support The upper lateral support of the steam generator is provided by a ring band at the operating deck. One-way acting compression struts restrain sudden seismic or blowdown induced motion, but permit essentially unrestrained thermal movement of the steam generator. Movement perpendicular to the thermal growth direction of the steam generator is prevented by struts.
5.4.14.2.3 Reactor Coolant Pump Three individual columns, similar to those used for the steam generator, provide the vertical support for each pump. Lateral support for seismic and blowdown loading is provided by three lateral tension tie bars. The pump supports are shown in Figure 5.4-15.
5.4.14.2.4 Pressurizer The supports for the pressurizer, as shown in Figures 5.4-16 and 5.4-17, consist of:
- a. A steel ring between the pressurizer skirt and the supporting concrete slab. The ring serves as a leveling and adjusting member for the pressurizer, and may also be used as a template for positioning the concrete anchor bolts.
5.4-58 Rev. 11
WOLF CREEK
- b. The upper lateral support consists of struts cantilevered off the compartment walls that bear against the "seismic lugs" provided on the pressurizer.
5.4.14.2.5 Pipe Restraints
- a. Crossover leg Restraint at each elbow of the reactor coolant pipe between the pump and the steam generator (crossover leg) was provided in the original design to prevent excessive stresses on the system resulting from postulated breaks in this pipe. The support includes pipe bumpers with straps and steel thrust blocks, as shown in Figure 5.4-18, and concrete. Also, a whip restraint strut, as shown in Figure 5.4-19, was originally provided to prevent whipping of the crossover leg pipe following a postulated break at the steam generator outlet nozzle. This restraint was attached to the secondary shield wall and extended horizontally to the vertical run of the crossover leg pipe.
Using leak-before-break technology, as allowed by revised GDC-4 (see USAR Section 3.6), the crossover leg whip restraints have been deactivated. The shims have been removed from between the saddle blocks and backup structures at the elbow restraints, and for the vertical run restraints, the tie rods and pipe clamp assemblies have been removed.
- b. Hot leg A restraint located near the 50-degree elbow in the hot leg was provided in the original design to prevent excessive displacement of the hot leg following a postulated guillotine break at the steam generator inlet nozzle. This restraint consists of structural steel members which transmit loads to the concrete structure. This restraint is shown in Figure 5.4-20. Using leak-before-break technology as allowed by revised GDC-4, the hot leg elbow whip restraint has been deactivated. The shims between the pipe saddle and the backup structure have been removed.
- c. Hot leg and cold leg lateral restraints A restraint on each reactor coolant system hot leg and cold leg is located near the reactor vessel safe-end to reactor coolant system piping weld with the reactor vessel primary shield wall to prevent excessive displacement of either the hot leg or the cold leg following a postulated guillotine break at the reactor vessel safe-end to piping weld. These restraints are shown in Figure 5.4-21.
5.4-59 Rev. 13
WOLF CREEK 5.4.14.3 Design Evaluation Detailed evaluation ensures the design adequacy and structural integrity of the reactor coolant loop and the primary equipment supports system. This detailed evaluation is made by comparing the analytical results with established criteria for acceptability. Structural analyses are performed to demonstrate design adequacy for safety and reliability of the plant in case of a large or small seismic disturbance and/or LOCA conditions. Loads which the system is expected to encounter often during its lifetime (thermal, weight, and pressure) are applied, and stresses are compared to allowable values as described in Section 3.9(N).1.4.
The safe shutdown earthquake and design basis LOCA, resulting in a rapid depressurization of the the system, are required design conditions for public health and safety. The methods used for the analysis of the safe shutdown earthquake and LOCA conditions are given in Sections 3.9(N).1.4.
5.4.14.4 Tests and Inspections Nondestructive examinations are performed in accordance with the procedures of the ASME Code,Section V, except as modified by the ASME Code,Section III, Subsection NF.
5.4.15 REFERENCES
- 1. "Reactor Coolant Pump Integrity in LOCA," WCAP-8163, September, 1973.
- 2. Eggleston, F. T., "Safety-Related Research and Development for Westinghouse Pressurized Water Reactor, Program Summaries
- Winter 1977 - Summer 1978," WCAP-8768, Revision 2, October, 1978.
- 3. DeRosa, P., et al., "Evaluation of Steam Generator Tube, Tube Sheet, and Divider Plate Under Combined LOCA Plus SSE Conditions," WCAP-7832, January, 1974.
- 4. Structural Analysis of the Reactor Coolant Loop for the Standard Nuclear Unit Power Plant System, Volume 2, Analysis of the Primary Equipment Supports, WCAP 9728 Rev. 3, January, 1993.
- 5. Letter 07-00401, dated July 19, 2007, from USNRC to WCNOC, Authorization of Relief Request 13R-05, alternatives to Structural Weld Overlay Requirements.
5.4-60 Rev. 21
WOLF CREEK TABLE 5.4-1 REACTOR COOLANT PUMP DESIGN PARAMETERS Unit design pressure, psig 2,485 Unit design temperature, F 650 (a)
Unit overall height, ft 26.93 Seal water injection, gpm 8 Seal water return, gpm 3 Cooling water flow, gpm 366 Maximum continuous cooling water inlet temperature 105 Pump Capacity, gpm 100,600 Developed head, ft 288 NPSH required, ft Figure 5.4-2 Suction temperature, F 558.2 Pump discharge nozzle, inside diameter, in. 27-1/2 Pump suction nozzle, inside diameter, in. 31 Speed, rpm 1,185 Water volume (casing), ft3 78.6
- Weight total (including 204,035 (with bolts) pump casing, motor, and 205, 696 (with studs) motor supports), dry, lb Motor Type Drip proof, squirrel cage induction, water/air cooled Power, hp 7,000 Voltage, Volts 13,200 Phase 3 Frequency, Hz 60 Insulation class Class F, thermalastic epoxy insulation (a) Design temperature of pressure-retaining parts of the pump assembly exposed to the reactor coolant and injection water on the high pressure side of the controlled leakage seal is assumed to be the temperature determined for the parts for a primary loop temperature of 650°F.
- Total pump weights between values shown are bounded by existing analyses.
Rev. 17
WOLF CREEK TABLE 5.4-1 (Sheet 2)
Starting Current 1,750 amp @ 13,200 Volts Input, hot reactor coolant 253 + 5 amp Input, cold reactor coolant 336 + 7 amp Pump moment of inertia, maximum (lb-ft2)
Flywheel 64,000 Shaft 745 Impeller 1,980 Rotor core 27,700 Runner 675 Coupling 190 Rev. 0
WOLF CREEK TABLE 5.4-2 REACTOR COOLANT PUMP QUALITY ASSURANCE PROGRAM RT* UT* PT* MT*
Castings Yes Yes Forgings Main shaft Yes Yes Main studs Yes Yes Flywheel (rolled plate) Yes Weldments Circumferential Yes Yes Instrument connections Yes
WOLF CREEK TABLE 5.4-3 STEAM GENERATOR DESIGN DATA Design pressure, reactor coolant side, psig 2,485 Design pressure, steam side, psig 1,185 Design pressure, primary to secondary, psi 1,600 Design temperature, reactor coolant side, F 650 Design temperature, steam side, F 600 Design temperature, primary to secondary, F 650 Total heat transfer surface area, ft2 55,000 Maximum moisture carryover, wt percent 0.25 Overall height, ft-in. 67-8 Number of U-tubes 5,626 U-tube nominal diameter, in. 0.688 Tube wall nominal thickness, in. 0.040 Number of manways 4 Inside diameter of manways, in. 16 Number of handholes 6 Design fouling factor, ft2-hr-F/Btu 0.00005 Steam flow (per unit), lb/hr 3.785 x 106 Nominal primary side water volume, ft3 No load 962 Full load 962 Nominal secondary side water volume, ft3 No load 3,559.6 Full load 2,212.3 Rev. 0
WOLF CREEK TABLE 5.4-4 STEAM GENERATOR QUALITY ASSURANCE PROGRAM (a) (a) (a) (a) (a)
RT UT PT MT ET Tube Sheet Forging Yes Yes (b)
Cladding Yes Yes Channel Head (if fabricated)
(c) (d)
Fabrication Yes Yes Yes Cladding Yes Secondary Shell and Head Plates Yes Tubes Yes Yes Nozzles (Forgings) Yes Yes Weldments Shell, longitudinal Yes Yes Shell, circumferential Yes Yes Cladding (channel head-tube sheet joint clad-ding restoration) Yes Primary nozzles to fab head Yes Yes Manways to fab head Yes Yes Steam and feedwater nozzle to shell Yes Yes Support brackets Yes Tube to tube sheet Yes Rev. 0
WOLF CREEK TABLE 5.4-4 (Sheet 2)
(a) (a) (a) (a) (a)
RT UT PT MT ET Instrument connections (primary and secondary) Yes Temporary attachments after removal Yes After hydrostatic test (all major presssure boundary welds and complete cast channel head - where accessible) Yes Nozzle safe ends (if weld deposit) Yes Yes (a) RT - Radiographic UT - Ultrasonic PT - Dye penetrant MT - Magnetic particle ET - Eddy Current (b) Flat surfaces only (c) Weld deposit (d) Base material only Rev. 0
WOLF CREEK TABLE 5.4-5 REACTOR COOLANT PIPING DESIGN PARAMETERS Reactor inlet piping, inside diameter, in. 27-1/2 Reactor inlet piping, nominal wall thickness, in. 2.32 Reactor outlet piping, inside diameter, in. 29 Reactor outlet piping, nominal wall thickness, in. 2.45 Coolant pump suction piping, inside diameter, in. 31 Coolant pump suction piping, nominal wall thickness, in. 2.60 Pressurizer surge line piping, nominal pipe size, in. 14 Pressurizer surge line piping, nominal wall thickness, in. 1.406 Nominal water volume, all four loops including surge line, ft3 1,225 Reactor Coolant Loop Piping Design/operating pressure, psig 2,485/2,235 Design temperature, F 650 Pressurizer Surge Line Design pressure, psig 2,485 Design temperature, F 680 Pressurizer Safety Valve Inlet Line Design pressure, psig 2,485 Design temperature, F 680 Pressurizer (Power-Operated) Relief Valve Inlet Line Design pressure, psig 2,485 Design temperature, F 680 Rev. 0
WOLF CREEK TABLE 5.4-6 REACTOR COOLANT PIPING QUALITY ASSURANCE PROGRAM RT* UT* PT*
Fittings and Pipe (Castings) Yes Yes Fittings and Pipe (Forgings) Yes Yes Weldments Circumferential Yes Yes Nozzle to runpipe Yes Yes (except no RT for nozzles less than 6 inches)
Instrument connections Yes Castings Yes Yes (after finishing)
Forgings Yes Yes (after finishing)
WOLF CREEK TABLE 5.4-7 DESIGN PARAMETERS FOR RESIDUAL HEAT REMOVAL SYSTEM OPERATION Residual heat removal system startup, hours after ~4 reactor shutdown Reactor coolant system initial pressure, psig ~360 Reactor coolant system initial temperature, F ~350 Component cooling water design temperature, F 105 Cooldown time, hours after initiation of residual <20 heat removal system operation Reactor coolant system temperature at end of 140 cooldown, F Decay heat generation at 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> after reactor 75.2 x 106 shutdown, Btu/hr Rev. 14
WOLF CREEK TABLE 5.4-8 RESIDUAL HEAT REMOVAL SYSTEM COMPONENT DATA Residual Heat Removal Pumps Number 2 Design pressure, psig 600 Design temperature, F 400 Design flow, gpm 3,800 Design head, ft 350 NPSH required at 3,800 gpm, ft 17 Power, hp 500 Residual Heat Exchangers Number 2 Design heat removal capacity, Btu/hr 39.0 x lO6 Estimated UA, Btu/hr FLMTD 2.3 x 106 Tube Side Shell Side Design pressure, psig 600 150 Design temperature, F 400 200 Design flow, lb/hr 1.9 x 106 3.8 x 106 Inlet temperature, F 140 105 Outlet temperature, F 119.4 115.2 Material Austenitic Carbon stainless steel steel Fluid Reactor Component coolant cooling water RHR Isolation Valve Encapsulation Tank (TEJ01A & B)
Manufacturer Richmond Eng.
Quantity 2 Height ft-in. 12-6 Diameter ft-in. 5-6 Design Pressure, psig 75 Design Temperature, F 400 Material Austenitic stainless steel Codes and Standards ASME Section III, Class 2 Seismic Category I Rev. 0
WOLF CREEK TABLE 5.4-9 (Sheet 1 of 5)
FAILURE MODES AND EFFECTS ANALYSIS - RESIDUAL HEAT REMOVAL SYSTEM ACTIVE COMPONENTS - PLANT COOLDOWN OPERATION Component Failure Mode Effect on System Operation* Failure Detection Method** Remarks
- 1. Motor-operated a. Fails to open Failure blocks reactor coolant Valve position indication 1. Valve is electri-gate valve 8701A on demand (open flow from hot leg of RC loop 1 (closed to open position cally interlocked (8701B analogous) manual mode CB through train "A" of RHRS. change) at CB; RC loop 1 with the contain-switch selec- Fault reduces redundancy of hot leg pressure indica- ment sump isola-tion) RHR coolant trains provided. tion (PI-405) at CB; RHR tion valves 8811A No effect on safety for system train "A" discharge flow and 8812A, with operation. Plant cooldown indication (FI-618) and RHR to charging requirements will be met by low flow alarm at CB; and pump suction line reactor coolant flow from hot RHR pump discharge pres- isolation valve leg of RC loop 4 flowing sure indication (PI-614) 8804A and with through train "B" of RHRS. at CB. a "prevent-open" However, time required to pressure inter-reduce RCS temperature will lock (PB-405A) of be extended. RC loop 1 hot leg. The valve cannot be opened remotely from the CB if one of the indicated isola-tion valves is open or if RC loop pressure exceeds 360 psig.
- 2. If both trains of RHRS are unavail-able for plant cooldown due to multiple compo-nent failures, the auxiliary feedwater system and SG atmospheric relief
- See list at end of table for definition of acronyms and abbreviations used.
- As part of plant operation; periodic tests, surveillance inspections, and instrument calibrations are made to monitor equipment and performance. Failures may be detected during such monitoring of equipment, in addition to detection methods noted.
Rev. 13
WOLF CREEK TABLE 5.4-9 (Sheet 2 of 5)
Component Failure Mode Effect on System Operation* Failure Detection Method** Remarks valves can be used to perform the safety func-tion of removing residual heat.
- 2. Motor-operated Same failure Same effect on system operation Same methods of detection Same remarks as gate valve modes as those as that stated for item 1. as those stated for item 1. those stated for 8702A (8702B stated for item 1, except analogous) item 1. for pressure interlock (PB-403A) control.
- 3. RHR pump 1, Fails to Failure results in loss of Open pump switchgear The RHRS shares APRH (RHR deliver work- reactor coolant flow from hot circuit breaker indication components with pump 2 ing fluid. leg of RC loop 1 through train at CB; circuit breaker the ECCS. Pumps analogous) "A" of RHRS. Fault reduces close position monitor are tested as redundancy of RHR coolant light for group monitoring part of the ECCS trains provided. No effect on of components at CB; testing program safety for system operation. common breaker trip alarm (see Section Plant cooldown requirements at CB; RC loop 1 hot leg 6.3.4). Pump will be met by reactor coolant pressure indication (PI-405) failure may also flow from hot leg or RC loop 4 at CB; RHR train "A" dis- be detected flowing through train "B" of charge flow indication during ECCS test-RHRS. However, time required (FI-618) and low flow alarm ing.
to reduce RCS temperature will at CB; and pump discharge be extended. pressure indication (PI-614) at CB.
- 4. Motor-operated a. Fails to open Failure blocks miniflow line Valve position indication Valve is auto-gate valve FCV- on demand (open to suction of RHR pump "A" (closed to open position matically con-610 (FCV-611 manual mode CB during cooldown operation of change) at CB. trolled to open analogous) switch selec- checking boron concentration when pump dis-tion). level of coolant in train "A" charge is less of RHRS. Circulation through than ~816 gpm and miniflow line is not available. close when the If the operator does not secure discharge exceeds RHR pump A before cavitation ~1650 gpm. The occurs, failure will reduce the valve protects redundancy of RHR coolant trains. the pump from No effect on safety for system dead-heading operation. during ECCS oper-ation. CB switch set to Auto Rev. 16
WOLF CREEK TABLE 5.4-9 (Sheet 3 of 5)
Component Failure Mode Effect on System Operation* Failure Detection Method** Remarks position for automatic control of valve posi-tioning.
- b. Fails to close Failure allows for a portion Valve position indication on demand of RHR heat exchanger "A" dis- (open to closed position
("Auto" mode charge flow to be bypassed to change) and RHRS train "A" CB switch suction of RHR pump "A." RHRS discharge flow indication selection). train "A" is degraded for the (FI-618) at CB.
regulation of coolant tempera-ture by RHR heat exchanger "A."
No effect on safety for system operation. Cooldown of RCS with-in established specification cooldown rate may be accomplished through operator action of throttling flow control valve HCV-606 and controlling cooldown with redundant RHRS train "B".
- 5. Air diaphragm- a. Fails to open Failure prevents coolant dis- RHR pump "A" discharge Valve is designed operated butter- on demand charged from RHR pump "A" from flow temperature and RHRS to fail "closed" fly valve FCV- ("Auto" mode bypassing RHR heat exchanger train "A" discharge to RCS and is electri-618 (FCV-619 CB switch "A" resulting in mixed mean cold leg flow temperature cally wired so analogous) selection) temperature of coolant flow to recording (TR-612) at CB; that electrical RCS being low. RHRS train "A" and RHRS train "A" dis- solenoid of the is degraded for the regulation charge to RCS cold leg air diaphragm of controlling temperature of flow indication (FI-618) operator is coolant. No effect on safety at CB. energized to open for system operation. Cooldown the valve. Valve of RCS within established is normally specification rate may be "closed" to align accomplished through operator RHRS for ECCS action of throttling flow con- operation during trol valve HCV-606 and plant power oper-controlling cooldown with ation and load redundant RHRS train "B." follow.
- b. Fails to close Failure allows coolant dis- Same methods of detec-on demand charged from RHR pump "A" to tion as those stated
("Auto" mode bypass RHR heat exchanger "A", for item 5.a.
CB switch resulting in mixed mean tem-selection). perature of coolant flow to RCS being high. RHRS train "A" is degraded for the regulation of Rev. 0
WOLF CREEK TABLE 5.4-9 (Sheet 4 of 5)
Component Failure Mode Effect on System Operation* Failure Detection Method** Remarks controlling temperature of coolant. No effect on safety for system operation. Cooldown of RCS within established specification rate may be accom-plished through operator action of throttling flow control valve HCV-606 and controlling cool-down with redundant RHRS train "B." However, cooldown time will be extended.
- 6. Air diaphragm- a. Fails to close Failure prevents control of Same methods of detection Valve is designed operated butter- on demand for coolant discharge flow from as those stated for item 5. to fail "open."
fly valve flow reduction. RHR heat exchanger "A," resul- In addition, monitor light and Valve is nor-HCV-606 ting in loss of mixed mean tem- and alarm (valve closed) for mally "open" to (HCV-607 perature coolant flow adjust- group monitoring of components align RHRS for analogous) ment to RCS. No effect on at CB. ECCS operation safety for system operation. during plant Cooldown of RCS within estab- power operation lished specification rate may and load follow.
be accomplished by operator action of controlling cooldown with redundant RHRS train "B."
- b. Fails to open Same effect on system operation Same methods of detection on demand for as that stated for item 6.a. as those stated for increased flow. item 6.a.
- 7. Manual globe Fails closed. Failure blocks flow from train CVCS letdown flow indi- Valve is normally valve V001 "A" of RHRS to CVCS letdown cation (FI-132) at CB. "closed" to align (V002 analo- heat exchanger. Fault prevents RHRS for ECCS gous) (during the initial phase of operation during plant cooldown) the adjustment plant power oper-of boron concentration level of ation and load coolant in lines of RHRS train follow.
"A" so that it equals the con-centration level in the RCS, using the RHR cleanup line to CVCS.
No effect on safety for system operation. Operator can balance boron concentration levels by cracking open flow control valve HCV-606 to permit flow to cold leg of loop 1 of RCS in order to balance levels using normal CVCS letdown flow.
Rev. 0
WOLF CREEK TABLE 5.4-9 (Sheet 5 of 5)
Component Failure Mode Effect on System Operation* Failure Detection Method** Remarks
- 8. Air diaphragm Fails to open Failure blocks flow from trains Valve position indication 1. Same remark as operated globe on demand "A" and "B" of RHRS to CVCS (degree of openings) at that stated above valve HCV-128 letdown heat exchanger. Fault CB and CVCS letdown flow for item 7.
prevents use of RHR cleanup indication (FI-132) at line to CVCS for balancing CB. 2. Valve is a com-boron concentration levels of ponent of the RHR trains "A" and "B" with RCS CVCS that per-during initial cooldown opera- forms an RHR tion and later in plant cooldown function during for letdown flow. No effect on plant cooldown safety for system operation. operation.
Operator can balance boron con-centration levels with similar actions, using pertinent flow control valve HCV-606 (HCV-607),
as stated for item 7. Normal CVCS letdown flow can be used for purification if RHRS cleanup line is not available.
- 9. Motor-operated Fails to close Failure reduces the redundancy Valve position indication Valve is a compo-gate valve on demand. of isolation valves provided to (open to closed position nent of the ECCS 8812A isolate RHRS train "A" from change) at CB and valve that performs a (8812B RWST. No effect on safety for (closed) monitor light RHR function analogous) system operation. Check valve and alarm at CB. during plant 8958A in series with motor cooldown. Valve operated valve provides the is normally primary isolation against the "open" to align bypass of RCS coolant flow from RHRS for ECCS the suction of RHR pump "A" to operation during-RWST. plant power oper-ation and load follow.
List of acronyms and abbreviations Auto - Automatic CB - Control board CVCS - Chemical and volume control system ECCS - Emergency core cooling system RC - Reactor coolant RCS - Reactor coolant system RHR - Residual heat removal RHRS - Residual heat removal system RWST - Refueling water storage tank SG - Steam generator Rev. 0
WOLF CREEK TABLE 5.4-10 PRESSURIZER DESIGN DATA Design pressure, psig 2,485 Design temperature, F 680 Surge line nozzle diameter, in. 14 Heatup rate of pressurizer using heaters only, F/hr 55 Internal volume, ft3 1,800 Normal conditions at 100% rated load Steam volume, ft3 720 Water volume, ft3 1,080 Rev. 0
WOLF CREEK TABLE 5.4-11 REACTOR COOLANT SYSTEM DESIGN PRESSURE SETTINGS Psig Hydrostatic test pressure 3,107 Design pressure 2,485 Safety valves (begin to open) 2,460 High pressure reactor trip 2,385 High pressure alarm 2,310 Power-operated relief valves 2,335*
Pressurizer spray valves (full open) 2,310 Pressurizer spray valves (begin to open) 2,260 Proportional heaters (begin to operate) 2,250 Operating pressure 2,235 Proportional heater (full operation) 2,220 Backup heaters on 2,210 Low pressure alarm 2,210 Pressurizer power-operated relief and iso-lation valve interlock - auto closure 2,185 Low pressure reactor trip 1,940
- At 2,335 psig, a pressure signal initiates actuation (opening) of these valves. Remote manual control is also provided.
Rev. 16
WOLF CREEK TABLE 5.4-12 PRESSURIZER QUALITY ASSURANCE PROGRAM (a) (a) (a) (a)
RT UT PT MT Heads Plates Yes Cladding Yes Shell Plates Yes Cladding Yes Heaters (b)
Tubing Yes Yes Centering of element Yes (c) (c)
Nozzle (Forgings) Yes Yes Yes Weldments Shell, longitudinal Yes Yes Shell, circumferential Yes Yes Cladding Yes Nozzle safe end Yes Yes Instrument connection Yes Support skirt, longi- Yes Yes tudinal seam Support skirt to lower Yes Yes head Temporary attachments Yes (after removal)
All external pressure Yes boundary welds after shop hydrostatic test (a) RT - Radiographic UT - Ultrasonic PT - Dye Penetrant MT - Magnetic Particle (b) Or a UT and ET (Eddy Current)
WOLF CREEK TABLE 5.4-13 PRESSURIZER RELIEF TANK DESIGN DATA Design pressure, psig 100 Normal operating pressure, psig 3 Final operating pressure, psig 50 Rupture disc release pressure, psig Nominal 91 Range 86 to 100 Normal water volume, ft3 1,350 Normal gas volume, ft3 450 Design temperature, F 340 Initial operating water temperature, F 120 Final operating water temperature, F 200 Total rupture disc relief 1.6 x 106 capacity at 100 psig, lb/hr Cooling time required following maximum discharge approximately, hr Spray feed and bleed l Utilizing RCDT heat exchanger 8 Rev. 0
WOLF CREEK TABLE 5.4-14 RELIEF VALVE DISCHARGE TO THE PRESSURIZER RELIEF TANK Reactor Coolant System 3 Pressurizer safety valves Figure 5.1-1, Sheet 2 2 Pressurizer power-operated Figure 5.1-1, Sheet 2 relief valves Residual Heat Removal System 2 Residual heat removal pump Figure 5.4-7 suction lines from the reactor coolant system hot legs Chemical and Volume Control System 1 Seal water return line Figure 9.3-8, Sheet 1 1 Letdown line Figure 9.3-8, Sheet 1 Rev. 0
WOLF CREEK TABLE 5.4-15 REACTOR COOLANT SYSTEM VALVE DESIGN PARAMETERS Design/normal operating pressure, psig 2,485/2,235 Preoperational plant hydrotest, psig 3,107 Design temperature, F 650 Rev. 0
WOLF CREEK TABLE 5.4-16 REACTOR COOLANT SYSTEM VALVES NONDESTRUCTIVE EXAMINATION PROGRAM (a) (a) (a)
RT UT PT Boundary Valves, Pressurizer Relief and Safety Valves Castings (larger than 4 inches) Yes Yes (b)
(2 inches to 4 inches) Yes Yes Forgings (larger than 4 inches) (c) (c) Yes (2 inches to 4 inches) Yes (a) RT - Radiographic UT - Ultrasonic PT - Dye Penetrant (b) Weld ends only (c) Either RT or UT Rev. 0
WOLF CREEK TABLE 5.4-17 PRESSURIZER VALVES DESIGN PARAMETERS Pressurizer Safety Valves Number 3 Maximum relieving capacity, ASME rate flow, 415,764 lb/hr Set pressure, psig 2,460 Design temperature, F 650 Fluid Saturated steam Transient condition, F (Superheated steam) 680 Backpressure Normal, psig 3 to 5 Expected during discharge, psig 500 Environmental conditions Ambient temperature (F) 50 to 120 Relative humidity (%) 0 to 100 Pressurizer Power-Operated Relief Valves Number 2 Design pressure, psig 2,485 Design temperature, F 650 Relieving capacity at 2,335 psig, per valve, 210,000 lb/hr Fluid Saturated steam Transient condition, F (Superheated steam) 680 Rev. 16
WOLF CREEK Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-1 REACTOR COOLANT CONTROLLED LEAKAGE PUMP
WOLF CREEK 14113-5 600 500 (1)
~ 400
- r:::
(f) c..
z
-g Ctl 300
"'0 Ctl (1)
- r:::
Ctl 0 200 1-100 Required Net Positive Suction Head 0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Flow (Thousands of GPM)
Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-2 REACTOR COOLANT PUMP ESTIMATED PERFORMANCE CHARACTERISTIC
WOLF CREEK 14113-1 Steam Nozzle ---------1,.,
with Flow Restrictor Positive Entrainment Steam Dryers Secondary Manway Swirl Vane Moisture Separators r-----
I Upper Shell 1 Feed water Ring with Feedwater Nozzle Inverted "J" Tubes Antivibration Bars Transition Cone Tube Support Plate Tube Bundle I
~ Lower Shell I
Support Ring Flow Blockers Divider Plate Tube Sheet Reactor Coolant Outlet Nozzle Reactor Coolant-----~ Rev. 0 Inlet Nozzle WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-3 WESTINGHOUSE MODEL F STEAM GENERATOR
WOLF CREEK 14113-2 Perforated Plates on Secondary Separators Deckplate Relief Reduced Swirl Vane Orifice Offset Feedwater Removal of Downcomer-Resistance Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-lt WESTINGHOUSE MODEL F STEAM GENERATOR MECHANICAL MODIFICATION IMPROVEMENTS
TI WOLF CREEK 14113*3 Wet Layup Connection Upgraded Primary Separators Faadwatar Nozzle J-Nozzle Type in Upper Shall-~::t::l Faadwater Ring Sealed Thermal Sleeve lncraasad Number of Antivibration Bars Quatrefoil Tuba Support Plate&
Flow Distribution Baffle REV.13 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT Figure 5.4-5 WESTINGHOUSE MODEL F STEAM GENERATOR DESIGN IMPROVEMENTS
--- . -- . ------------------------------------------------------------------------------------------------------------...1'
WOLF CREEK 14113-4 Support Plate Section Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-6 QUATREFOIL BROACHED HOLES
lliD'iJ£1JN(OWAfEII SlOIU.Gt r*""'
0 (SE! NOTI!S ON f'OLLOWINQ PAft!)
Rev. 14 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-8 RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM
WOLF CREEK NOTES TO FIGURE 5.4-8 MODES OF OPERATION MODE A - INITIATION OF RHR OPERATION When the reactor coolant temperature and pressure are reduced to 350 F and 360 psig, approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after reactor shutdown, the second phase of plant cooldown starts with one train of RHR being placed in operation. Before starting the pump, the inlet isolation valves are opened, the heat exchanger flow control valve is set at minimum flow, and the outlet valve is verified open. The automatic miniflow valve is open and remains so until the pump flow exceeds the close setpoint at which time it closes. Should the pump flow drop below the open setpoint, the miniflow valves open automatically.
The other train of RHR is in the ECCS standby made of operation from 350°F to 225°F. At 225°F this train is then allowed to operate in the shutdown cooling mode.
Startup of the RHRS includes a warmup period during which time reactor coolant flow through the heat exchangers is limited to minimize thermal shock on the RCS. The rate of heat removal from the reactor coolant is controlled manually by regulating the reactor coolant flow through the residual heat exchangers. The total flow is regulated automatically by control valves in the heat exchanger bypass line to maintain a constant total flow. The cooldown rate is limited to 50 F/hr, based on equipment stress limits and a 120 F maximum component cooling water temperature.
MODE B - END CONDITIONS OF NORMAL COOLDOWN This situation characterizes the RHRS operation at lower RCS temperatures. As the reactor coolant temperature decreases, the flow through the residual heat exchanger is increased until all of the flow is directed through the heat exchanger to obtain maximum cooling.
Note:
For the safeguards functions performed by the RHRS, refer to Section 6.3, ECCS.
Rev. 26
WOLF CREEK NOTES TO FIGURE 5.4-8 (Sheet 2)
VALVE ALIGNMENT CHART Valve No. Operational Mode A B 2 C C 3 O* C 10 O O 11 C* O 12 C C 13 C C 14 C C 15 O* C 16 P C 17 C* C 18 P O 19 O* O 20 C C 21 C C 22 C* O 23 C* O 24 O O 26 O O O = Open C = Closed P = Partially Open
Rev. 26
WOLF CREEK NOTES TO FIGURE 5.4-8 (Sheet 3)
MODE A - INITIATION OF RHR OPERATION Pressure Temperature Flow Location Fluid (psig) (F) (gpm)(a) (lb/hr) 24 Reactor 360 350 3,800 1.60 x 106 coolant 25 Reactor 367 350 3,800 1.60 x 106 coolant 26 Reactor 502 350 3,800 1.60 x 106 coolant 27 Reactor 501 350 1,259 0.56 x 106 coolant 31 Reactor 499 140 1,259 0.56 x 106 coolant 29 Reactor 456 350 2,541 1.13 x 106 coolant 32 Reactor 456 280 3,800 1.69 x 106 coolant 28 Reactor 440 280 3,690 1.64 x 106 coolant 19 Loop 4 Reactor 364 280 1,992 0.885 x 106 coolant 19 Loop 3 Reactor 379 280 1,698 0.755 x 106 coolant 34* RHR Static Head Ambient 0 0 35* RHR Static Head Ambient 0 0 36* RHR Static Head Ambient 0 0 37* RHR Static Head Ambient 0 0 41* RHR Static Head Ambient 0 0 39* RHR Static Head Ambient 0 0 42* RHR Static Head Ambient 0 0 38* RHR Static Head Ambient 0 0 20 Loop 1* RHR Static Head Ambient 0 0 20 Loop 2* RHR Static Head Ambient 0 0 (a)
At reference conditions 350 F and 360 psig
- RHR train in ECCS standby mode 350F to 225F Rev. 27
WOLF CREEK NOTES TO FIGURE 5.4-8 (Sheet 4)
MODE B - END CONDITIONS OF A NORMAL COOLDOWN Pressure Temperature Flow Location Fluid (psig) (F) (gpm)(a) (lb/hr) 24 Reactor 0 140 3,800 1.87 x 106 coolant 25 7 140 3,800 1.87 x 106 26 156 140 3,800 1.87 x 106 27 149 140 3,800 1.87 x 106 31 129 120 3,800 1.87 x 106 20 93 120 0 0 32 93 120 3,800 1.87 x 106 28 75 120 3,800 1.87 x 106 19 2 120 1,900 0.935 x 106 34 0 140 3,800 1.87 x 106 35 7 140 3,800 1.87 x 106 36 156 140 3,800 1.87 x 106 37 149 140 3,800 1.87 x 106 41 129 120 3,800 1.87 x 106 39 93 120 0 0 42 93 120 3,800 1.87 x 106 38 75 120 3,800 1.87 x 106 20 2 120 1,900 0.935 x 106 (a)
At reference conditions 140 F and 0 psig Rev. 0
Wolf Creek NSSS Power 3579 MWt Normal Plant Cooldown - One Train from 350 - 225 °F then both Trains 380 360 90 F Lake 340 55 F Lake 320 300 280 260 240 220 RCS Temperatu 200 180 160 140 120 1 2 3 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 9.7 10 10.4 10.9 11.4 11.9 12.4 12.9 13.4 13.9 14.4 14.9 15.4 15.9 16.4 16.9 17.4 17.9 Tim e after Shutdow n hrs Rev. 26 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-9 NORMAL RESIDUAL HEAT REMOVAL COOLDOWN
Wolf Creek NSSS Power 3579 MWt Plant Cooldown Single Train 4oo I 350 ~ ------........
I ~
u...
0 I ~
t) 300
- J 0
I) n.
E I)
!- 250 I I l
"'u 0::
I I
I I
200 1-150 ~~~~~~~~~~~~~~~~~~~~-L~~~~~~~~~~~-L~
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Time After Reactor Shutdown (hrs.) Rev. 7 WOLF CREEK UPDATED SAFETY ANALYSiS REPORT FiGURE 5.4-10 SINGLE RESIDUAL HEAT REMOVAl TRAIN COOLDOVVN
"WOLF CREEK SPRAY NOZZLE SAFETY NOZZLE UPPER HEAD LIFTING TRUNNION SHELL LOWER HEAD HEATER SUPPORT PLATE INSTRUMENTATION NOZZLE ELECTRICAL HEATER SUPPORT SKIRT SURGE NOZZLE WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-11 PRESSURIZER Rev. 0
WOLF CREEK DISCHARGE LIME CONNECTION SPRAY WATER INLET SAFETY HEADS VENT CONNECTION 51-=--=-----=--=~ -=--=g ==--=-===::::~
I I
I l ~
INTERNAL SPRAY J
I I
I I
I I I r-1
\' ' 'T----
' I
'--l----
VESSEL SUPPORT ~ DRAIN CONNECTION VESSEL SUPPORT Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-12 PRESSURIZER RELIEF TANK
1299~1 l
RFACTOR VESSEL SUPPORT
(~ RFQ'D)
PLAN VIEW G_ REACTOR SECTION B @
- WOLF c UPDATED SAFE REEK Rev. 0
-1 TY ANALYSIS REPORT FIGURE 5.4-13 -
REACTOR VESSEL SUPPORTS SECTION
r-- ---------------------------------------------------------------- --~ ------------------------------------------------------------------ --;
! I I :
I I
~UPPER LATERAL SUPPORT I I II I~
fr.....t\~lr*
~~ I
~
I VI I ~~
~~..,-LOWER l
I r "'/
~~
LATERAL SUPPORT l
,~!
-WI DE FLANGE COLUMNS US AR FIG. 5. 4 - 14 REV. 9 w*[brr ©wa~~oc NUCLEAR OPERATING CORPORATION DiRECTtOH OF THERMAL EXPANSiON II STEAM GENERATOR SUPPORTS II I '-~ I _.A#bc@. I~~ . I_ , I
.--- -------- ----- ----- ------------------------------- ~-- ------------------- --------- --------- ---- ---- --------*- -P$~~1~:7~ ~:~[- ----
WOLl? CREEK LEG TIE RODS CROSS-OVER LEG WIDE FLANGE COLUMNS Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-15 REACTOR COOLANT PUMP SUPPORTS
WOLF CREEK
/~'
( '~ PR<SSURIZU
_r--SUPPORT I I
I I
11-Dl
,. SHIELD WALL CONCRETE SLAB I:::J
{ ANCHOR BOLTS r* ;*1 II II I
I r:
II II
- I u
I PLAN AT SUPPORT SKIRT III
--L.f-L I I
SKIRT BOLT ( TYP.l Rev. 0 SUPPORT ifOi.F ~...:RISBII.
FRAMING OPDAT!D SAFETY ANALYSIS REPORT FIGURE 5.1.f-16 SECTION@
REACTOR BUILDING INTERNALS PRESSURIZER SUPPORTS
WOLF CREEK PRESSURIZER SKIRT BEARING PLATE GROUT Rev. 0 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-17 PRESSURIZER SUPPORTS
WOLF CREEK I
SADDLE BLOCK
,~
SHIMS HAVE BEEN REMOVED Rev. 7 WOLF CREEK UPDATED SAFETY ANALYSIS REPORT FIGURE 5.4-18 CROSSOVER LEG SUPPORTS
WOLF CREEK STEAM GENFRATOR TO R.C.
~----