Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML102880646 | | | number = ML12065A117 |
| | issue date = 10/15/2010 | | | issue date = 03/05/2012 |
| | title = Ltr. 10/15/10 Davis-Besse - Information Request for the Triennial Permanent Plant Modifications and Evaluations of Changes, Tests, or Experiments (MOD/50.59) Baseline Inspection 05000346-11-007 (DRS) | | | title = Annual Assessment Letter for Davis-Besse Nuclear Power Station Unit 1 (05000346/2011007) |
| | author name = Daley R C | | | author name = West S K |
| | author affiliation = NRC/RGN-III/DRS/EB3 | | | author affiliation = NRC/RGN-III/DRP |
| | addressee name = Allen B | | | addressee name = Allen B |
| | addressee affiliation = FirstEnergy Nuclear Operating Co | | | addressee affiliation = FirstEnergy Nuclear Operating Co |
Line 10: |
Line 10: |
| | license number = NPF-003 | | | license number = NPF-003 |
| | contact person = | | | contact person = |
| | document report number = IR-11-007 | | | case reference number = IR-11-007 |
| | document type = Inspection Report, Letter | | | document type = Inspection Plan, Letter |
| | page count = 8 | | | page count = 6 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532 |
| [[Issue date::October 15, 2010]]
| | -4352 March 5, 2012 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A |
| | -DB-3080 Oak Harbor, OH 43449-9760 |
|
| |
|
| Mr. Barry Allen Site Vice President
| | SUBJECT: ANNUAL ASSESSMENT LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 (05000 346/20 1 1 00 7) |
|
| |
|
| FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
| | ==Dear Mr. Allen:== |
| | On February 15, 201 2, the NRC completed its end |
| | -of-cycle performance review of Davis-Besse Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 1 1 , through December 31, 20 1 1. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. |
| | |
| | The NRC determined that overall, Davis |
| | -Besse operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The NRC determined the performance at Davis-Besse during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance |
| | , and all PIs indicat ed that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plan s to conduct ROP baseline inspections at your facility. |
| | |
| | In addition to the ROP baseline, inspections are planned for Temporary Instruction (TI) 2515/182 Phase I, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping," |
| | TI 2515/177 , "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," and Inspection Procedure (IP) 71007, "Reactor Vessel Head Replacement Inspection." The NRC identifies substantive cross |
| | -cutting issues (SCCIs) to communicate a concern with the licensee's performance in a cross |
| | -cutting area and to encourage the licensee to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme in the Resources component of the Human Performance cross |
| | -cutting area |
| | . Specifically, five findings were identified with the cross |
| | -cutting aspect of Documentation and Procedures [H.2(c)]. The NRC determined that an SCCI exists because the NRC has a concern with your staff's scope of effort and progress in addressing the cross |
| | -cutting theme. In particular, corrective actions taken in 2010 regarding H.2(c) events appear to have been ineffective. Similarly, a limited apparent cause evaluation focusing on H.2(c) completed in August 2011 did not identify any common causes and recommended no additional corrective actions be taken. The human performance substantive cross |
| | -cutting issue in the H.2(c) aspect will remain open until the number of findings in the H.2(c) aspect is reduced and you demonstrate the implementation of effective corrective actions that result in sustained performance improvement in the human performance area. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through June 30, 201 3. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will |
| | |
| | contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
|
| |
|
| Oak Harbor, OH 43449-9760
| | In accordance with 10 CFR 2.390 of the NRC |
| | =s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading |
| | -rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS (MOD/50.59) BASELINE INSPECTION 05000346/2011007(DRS)
| | Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. |
|
| |
|
| ==Dear Mr. Allen:==
| | Sincerely,/RA by Gary L. Shear for/ |
| On January 10, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59 baseline inspection at the Davis-Besse Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedure (IP) 71111.17. The on-site portion of the inspection will take place on January 10-14, 2011, and January 24 - 28, 2011. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In orde r to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available to the inspection team via compact disc and delivered to the Regional Office no later than December 13, 2010. The inspection team will review this information and by December 20, 2010, will request specific items that should be provided for review in the Regional Office by December 27, 2010. The second group of requested documents contains additional items that the inspection team will review, or needs access to, during the inspection. Certain documents contained within this group, i.e., Item (1), will be requested for review in the Regional Office prior to the inspection by December 27, 2010, as identified above. The rema ining documents should be available by the first day of the on-site inspection, January 10, 2011. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. The remaining documents in group three should be available by the first day of the on-site inspection, January 10, 2011. It is requested that this information be provided to the inspection team leader as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The inspection team leader for this inspection is Mr. George M. Hausman. We understand that our regulatory contact for this inspection is Mr. Gerry Wolf, (419) 321-8001 of your organization. If there are any questions about the inspection or the material requested, please contact the inspection team leader at (630) 829-9743 or via e-mail at George.Hausman@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | Steven West, Director Division of Reactor Projects Docket Nos. |
|
| |
|
| Sincerely,/RA/
| | 50-346 License Nos. |
| Robert C. Daley, Chief Engineering Branch 3
| |
|
| |
|
| Division of Reactor Safety Docket No. 50-346 License No. NPF-3
| | NPF-3 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Davis-Besse Mod/50.59 Baseline Inspection Initial Document Request cc w/encl: Distribution via ListServ DAVIS-BESSE MOD/50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST Enclosure 1 Inspection Report: 05000346/2011007(DRS) | | Davis |
| Inspection Dates
| | -Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 01/01/2012 |
| : January 10-14, 2011, and January 24-28, 2011 Inspection Procedure
| | -06/30/2013 TI-182-TI-2515/182 PHASE I - BURIED PIPING 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 01/09/2012 01/11/2012 HEAD-CONTINUATION OF HEAD REPLACEMENT INSPECT 4 IP Reactor Vessel Head Replacement Inspection 71007 01/01/2012 02/29/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Occupational ALARA Planning and Controls 71124.02 01/09/2012 01/13/2012 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/09/2012 01/13/2012 SB R/C-SHIELD BUILDING CRACKING ROOT CAUSE INSP 4 IP Reactor Vessel Head Replacement Inspection 71007 02/21/2012 07/27/2012 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 1 IP A lert and Notification System Testing 7111402 03/26/2012 03/30/2012 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/26/2012 03/30/2012 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/26/2012 03/30/2012 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 BI ISI-INSERVICE INSPECTION 1 IP Inservice Inspection Activities - PWR 7111108P 05/06/2012 06/04/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/11/2012 06/15/2012 IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 IP Reactor Coolant System Activity 71151-BI01 06/11/2012 06/15/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2012 06/15/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 06/11/2012 06/15/2012 BI CDBI-COMPONENT DESIGN BASES INSPECTION 6 IP Component Design Bases Inspection 7111121 08/13/2012 09/14/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/20/2012 08/24/2012 IP Occupational Dose Assessment 71124.04 08/20/2012 08/24/2012 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 10/01/2012 11/30/2012 Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 01/01/2012 |
| : IP 71111.17, "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications" Inspection Team Leader
| | -06/30/2013 TI-177-TI-2515/177 - GAS VOIDING IN ECCS PIPING 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/15/2012 11/02/2012 STRIKE-STRIKE CONTINGENCY - OPS/MAINT/RP 3 IP Licensee Strike Contingency Plans 92709 10/15/2012 11/01/2012 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 IP Licensed Operator Requalification Program 7111111B 11/26/2012 11/30/2012 BI FIRE-FIRE PROTECTION INSPECTION & BAG TRIP 3 IP Fire Protection [Triennial] |
| : George M. Hausman (630) 829-9743 George.Hausman@nrc.gov I. Information Requested For In-Office Preparation Week The following information is requested by December 13, 2010, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspection team will select specific items from the information requested below and submit a list to your staff by December 20, 2010. We will request that certain items be made available to the Regional Office prior to the inspection by December 27, 2010. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection (i.e., January 10, 2011). All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 Inspection on July 28, 2008, to the present. The required information identified below shoul d be provided on compact disc (CD). Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible. (1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications). The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.
| | 7111105T 02/25/2013 03/29/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiation Monitoring Instrumentation 71124.05 01/07/2013 01/11/2013 BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 IP Exercise Evaluation 7111401 05/13/2013 05/17/2013 IP Performance Indicator Verification 71151 05/13/2013 05/17/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Occupational ALARA Planning and Controls 71124.02 05/06/2013 05/10/2013 IP Reactor Coolant System Activity 71151-BI01 05/06/2013 05/10/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 05/06/2013 05/10/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 05/06/2013 05/10/2013 OL PREP-DAVIS-BESSE INIT PREP - 05/2013 3 OL - INITIAL EXAM - 2013 MAY-JUNE - DAVIS-BESSE W90284 05/13/2013 05/17/2013 OL EXAM-DAVIS-BESSE INIT EXAM - 06/2013 3 OL - INITIAL EXAM - 2013 MAY-JUNE - DAVIS-BESSE W90284 06/03/2013 06/14/2013 In particular, corrective actions taken in 2010 regarding H.2(c) events appear to have been ineffective. Similarly, a limited apparent cause evaluation focusing on H.2(c) completed in August 2011 did not identify any common causes and recommended no additional corrective actions be taken. The human performance substantive cross |
| | -cutting issue in the H.2(c) aspect will remain open until the number of findings in the H.2(c) aspect is reduced and you demonstrate the implementation of effective corrective actions that result in sustained performance improvement in the human performance area. |
|
| |
|
| DAVIS-BESSE MOD/50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST Enclosure 2(2) List of all 10 CFR 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine operating configurations, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:
| | The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid |
| a. Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since July 1, 2007; b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained. (3) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). (4) A list of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply. (5) A list of calculation changes that have been issued for use. (6) A list of corrective action documents (open and closed) that address permanent plant modifications or 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation. The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance. (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates. (8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.
| | -cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
|
| |
|
| DAVIS-BESSE MOD/50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST Enclosure 3(9) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal. (10) Electronic copy of the UFSAR and technical specifications, if available. (11) Name(s) and phone numbers for the regulatory and technical contacts.
| | In accordance with 10 CFR 2.390 of the NRC |
| | =s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading |
| | -rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter. |
| | |
| | Sincerely,/RA by Gary L. Shear for/ |
| | Steven West, Director Division of Reactor Projects Docket Nos. 50 |
| | -346 License Nos. NPF |
| | -3 |
| | |
| | ===Enclosure:=== |
| | Davis |
| | -Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ DISTRIBUTION |
| | : See next page DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress |
| | \2012 EOC Letters |
| | \Davis-Besse EOC 2011 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME PSmagacz:dtp JCameron *JBG for SWest *GLS for DATE 0 3/02/12 0 3/02/12 0 3/02/12 OFFICIAL RECORD COP Y |
| | Letter to from S. West dated March 5, 2012 |
|
| |
|
| (12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be Made by December 20, 2010, for Availability of Documents by December 27, 2010, [Item 1]) or on First Day of Inspection (January 10, 2011) [Items 2, 3 and 4] (1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents. (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them. a. Updated Final Safety Analysis Report, if not previously provided; b. Original FSAR Volumes; c. Original SER and Supplements; d. FSAR Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The latest 10 CFR 50.59 UFSAR Update Submittal. (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting
| | SUBJECT: ANNUAL ASSESSMENT LETTER FOR DAVIS |
| | -BESSE NUCLEAR POWER STATION UNIT 1 (05000346/2011007) |
| | DISTRIBUTION: |
| | RidsNrrDorlLpl3 |
| | -2 Resource Breeda Reilly RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Charles Casto Cynthia Pederson |
|
| |
|
| documents are: a. Drawings supporting the modifications; b. Procedures affected by the modifications; and DAVIS-BESSE MOD/50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST Enclosure 4c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. (4) Assessment and Corrective Actions: a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 QA audit and/or self-assessment. III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member). If you have any questions regarding the information requested, please contact the inspection team leader.
| | Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20220062023-03-0101 March 2023 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2022006) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 IR 05000346/20220052022-08-25025 August 2022 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2022005) ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22202A0522022-07-25025 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22130A1802022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000346/20210062022-03-0202 March 2022 Annual Assessment Letter for Davis-Besse Nuclear Power Station, Unit 1 (Report 05000346/2021006) ML22034A6772022-02-0303 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000346/2022002 IR 05000346/20210052021-09-0101 September 2021 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2021005) ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21083A1082021-03-24024 March 2021 Staton, Unit 1 - Information Request to Support Upcoming Temporary Inspection 2515/194 Inspection; Inspection Report 05000346/2021012 IR 05000346/20200062021-03-0404 March 2021 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2020006) IR 05000346/20210402021-01-14014 January 2021 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perfom Inspection 05000346/202140 ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20272A2692020-09-28028 September 2020 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiment) Baseline Inspection IR 05000346/20200052020-09-0101 September 2020 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2020005) IR 05000346/20190062020-03-0303 March 2020 Annual Assessment Letter for Davis-Besse (Report 05000346/2019006) IR 05000346/20190052019-08-28028 August 2019 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2019005) ML19190A1372019-07-0808 July 2019 Ltr. 07/08/19 Davis-Besse Nuclear Power Station, Unit 1 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program; Inspection Report 05000346/2019012 (DRS-N.F ML19095B7262019-04-0505 April 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20180062019-03-0404 March 2019 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2018006 ML19043A8012019-02-12012 February 2019 Ltr. 02/12/19 Davis-Besse Nuclear Power Station, Unit 1 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2019011 (DRS-J.Robbins) ML18264A2832018-09-0606 September 2018 Inspection Plan for Davis-Besse Nuclear Power Station for Inspection Report 05000346/2018011 (DRS-D.Betancourt-Roldan) IR 05000346/20180052018-08-28028 August 2018 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2018005) IR 05000346/20170062018-03-0202 March 2018 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2017006) ML18033A5452018-02-0101 February 2018 Notification of NRC Baseline Inspection and Request for Information (DRS-E.Fernandez) IR 05000346/20170052017-08-28028 August 2017 Updated Inspection Plan for Davis-Beese Nuclear Power Station (Report 05000346/2017005) IR 05000346/20160062017-03-0101 March 2017 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2016006) ML17019A3222017-01-19019 January 2017 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000346/2017001 ML16350A1742016-12-14014 December 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Davis-Besse Nuclear Power Station IR 05000346/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2016005) ML16125A5032016-05-0303 May 2016 Ltr. 05/03/16 Davis-Besse Nuclear Power Station - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) IR 05000346/20150062016-03-0202 March 2016 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Inspection Report 05000346/2015006) ML15355A1962015-12-18018 December 2015 IR 05000346/2016007, March 28, 2016, Davis-Besse; Request for Information for an NRC Post-Approval Site Inspection for License Renewal IR 05000346/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2015005) L-15-186, Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 572015-06-0505 June 2015 Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 57 IR 05000346/20140012015-03-0404 March 2015 Annual Assessment Letter for Davis-Besse Nuclear Power Station, (Report 05000346/2014001) ML15030A2522015-01-28028 January 2015 Scheduling of Initial OL Exam ML14245A1062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Davis-Besse Nuclear Power Station IR 05000346/20130012014-03-0404 March 2014 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2013001) ML13347B1302013-12-12012 December 2013 is Request for Information ML13246A2072013-09-0303 September 2013 2013 Davis Besse MOC Letter Combined IR 05000346/20120012013-03-0404 March 2013 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2012001) ML12318A1592012-11-13013 November 2012 Ltr. 11/13/12 Davis-Besse Cyber Ti 22011 004 Request for Information 2024-08-22
[Table view] Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 March 5, 2012 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A
-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT: ANNUAL ASSESSMENT LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 (05000 346/20 1 1 00 7)
Dear Mr. Allen:
On February 15, 201 2, the NRC completed its end
-of-cycle performance review of Davis-Besse Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 20 1 1 , through December 31, 20 1 1. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Davis
-Besse operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The NRC determined the performance at Davis-Besse during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance
, and all PIs indicat ed that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plan s to conduct ROP baseline inspections at your facility.
In addition to the ROP baseline, inspections are planned for Temporary Instruction (TI) 2515/182 Phase I, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping,"
TI 2515/177 , "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," and Inspection Procedure (IP) 71007, "Reactor Vessel Head Replacement Inspection." The NRC identifies substantive cross
-cutting issues (SCCIs) to communicate a concern with the licensee's performance in a cross
-cutting area and to encourage the licensee to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme in the Resources component of the Human Performance cross
-cutting area
. Specifically, five findings were identified with the cross
-cutting aspect of Documentation and Procedures H.2(c). The NRC determined that an SCCI exists because the NRC has a concern with your staff's scope of effort and progress in addressing the cross
-cutting theme. In particular, corrective actions taken in 2010 regarding H.2(c) events appear to have been ineffective. Similarly, a limited apparent cause evaluation focusing on H.2(c) completed in August 2011 did not identify any common causes and recommended no additional corrective actions be taken. The human performance substantive cross
-cutting issue in the H.2(c) aspect will remain open until the number of findings in the H.2(c) aspect is reduced and you demonstrate the implementation of effective corrective actions that result in sustained performance improvement in the human performance area.
The enclosed inspection plan lists the inspections scheduled through June 30, 201 3. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will
contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter.
Sincerely,/RA by Gary L. Shear for/
Steven West, Director Division of Reactor Projects Docket Nos.
50-346 License Nos.
NPF-3
Enclosure:
Davis
-Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 01/01/2012
-06/30/2013 TI-182-TI-2515/182 PHASE I - BURIED PIPING 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 01/09/2012 01/11/2012 HEAD-CONTINUATION OF HEAD REPLACEMENT INSPECT 4 IP Reactor Vessel Head Replacement Inspection 71007 01/01/2012 02/29/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Occupational ALARA Planning and Controls 71124.02 01/09/2012 01/13/2012 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/09/2012 01/13/2012 SB R/C-SHIELD BUILDING CRACKING ROOT CAUSE INSP 4 IP Reactor Vessel Head Replacement Inspection 71007 02/21/2012 07/27/2012 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 1 IP A lert and Notification System Testing 7111402 03/26/2012 03/30/2012 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/26/2012 03/30/2012 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/26/2012 03/30/2012 IP Performance Indicator Verification 71151 03/26/2012 03/30/2012 BI ISI-INSERVICE INSPECTION 1 IP Inservice Inspection Activities - PWR 7111108P 05/06/2012 06/04/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/11/2012 06/15/2012 IP Radiological Environmental Monitoring Program 71124.07 06/11/2012 06/15/2012 IP Reactor Coolant System Activity 71151-BI01 06/11/2012 06/15/2012 IP Occupational Exposure Control Effectiveness 71151-OR01 06/11/2012 06/15/2012 IP RETS/ODCM Radiological Effluent 71151-PR01 06/11/2012 06/15/2012 BI CDBI-COMPONENT DESIGN BASES INSPECTION 6 IP Component Design Bases Inspection 7111121 08/13/2012 09/14/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/20/2012 08/24/2012 IP Occupational Dose Assessment 71124.04 08/20/2012 08/24/2012 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 10/01/2012 11/30/2012 Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 01/01/2012
-06/30/2013 TI-177-TI-2515/177 - GAS VOIDING IN ECCS PIPING 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/15/2012 11/02/2012 STRIKE-STRIKE CONTINGENCY - OPS/MAINT/RP 3 IP Licensee Strike Contingency Plans 92709 10/15/2012 11/01/2012 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 IP Licensed Operator Requalification Program 7111111B 11/26/2012 11/30/2012 BI FIRE-FIRE PROTECTION INSPECTION & BAG TRIP 3 IP Fire Protection [Triennial]
7111105T 02/25/2013 03/29/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiation Monitoring Instrumentation 71124.05 01/07/2013 01/11/2013 BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION 2 IP Exercise Evaluation 7111401 05/13/2013 05/17/2013 IP Performance Indicator Verification 71151 05/13/2013 05/17/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Occupational ALARA Planning and Controls 71124.02 05/06/2013 05/10/2013 IP Reactor Coolant System Activity 71151-BI01 05/06/2013 05/10/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 05/06/2013 05/10/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 05/06/2013 05/10/2013 OL PREP-DAVIS-BESSE INIT PREP - 05/2013 3 OL - INITIAL EXAM - 2013 MAY-JUNE - DAVIS-BESSE W90284 05/13/2013 05/17/2013 OL EXAM-DAVIS-BESSE INIT EXAM - 06/2013 3 OL - INITIAL EXAM - 2013 MAY-JUNE - DAVIS-BESSE W90284 06/03/2013 06/14/2013 In particular, corrective actions taken in 2010 regarding H.2(c) events appear to have been ineffective. Similarly, a limited apparent cause evaluation focusing on H.2(c) completed in August 2011 did not identify any common causes and recommended no additional corrective actions be taken. The human performance substantive cross
-cutting issue in the H.2(c) aspect will remain open until the number of findings in the H.2(c) aspect is reduced and you demonstrate the implementation of effective corrective actions that result in sustained performance improvement in the human performance area.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid
-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter.
Sincerely,/RA by Gary L. Shear for/
Steven West, Director Division of Reactor Projects Docket Nos. 50
-346 License Nos. NPF
-3
Enclosure:
Davis
-Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ DISTRIBUTION
- See next page DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress
\2012 EOC Letters
\Davis-Besse EOC 2011 Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME PSmagacz:dtp JCameron *JBG for SWest *GLS for DATE 0 3/02/12 0 3/02/12 0 3/02/12 OFFICIAL RECORD COP Y
Letter to from S. West dated March 5, 2012
SUBJECT: ANNUAL ASSESSMENT LETTER FOR DAVIS
-BESSE NUCLEAR POWER STATION UNIT 1 (05000346/2011007)
DISTRIBUTION:
RidsNrrDorlLpl3
-2 Resource Breeda Reilly RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Charles Casto Cynthia Pederson
Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov