UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 28, 2015 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS, DAVIS-BESSE NUCLEAR POWER STATION
Dear Mr. Lieb:
We have received your corporate letter L-14-184 dated May 30, 2014, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested initial operator licensing examinations be scheduled for June 2016, December 2017, and June 2019.
In response, we have scheduled initial license examinations for the weeks of:
June 13 and 20, 2016, with an on-site validation the week of May 23, 2016.
December 4 and 11, 2017, with an on-site validation the week of November 13, 2017.
June 17 and 24, 2019, with an on-site validation date the week of May 20, 2019.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations, unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately.
The examinations have been individually scheduled for two weeks because your letter indicated that there were more than nine applicants being considered for each of these examinations.
Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
R. Lieb In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV
R. Lieb In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV DISTRIBUTION:
Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15030A252 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw HPeterson DATE 01/23/15 01/28/15 OFFICIAL RECORD COPY