UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
December 18, 2015
Mr. Brian D. Boles
Site Vice President
FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station
5501 N. State Rte. 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION; REQUEST FOR INFORMATION
FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL;
INSPECTION REPORT 05000346/2016007
Dear Mr. Boles:
On March 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval
Site Inspection for License Renewal at your Davis-Besse Nuclear Power Station. This
inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This
inspection will focus on outage related activities to verify license conditions added as part of
your renewed license and a sample of license renewal commitments have been implemented.
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the team will identify as
much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the lead inspector by March 4, 2016.
The second group includes the additional information required for the team to review
the selected activities. This information should be available to the team on-site on
March 28, 2016. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the lead inspector as the documents are
generated.
The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary
contact for this inspection is Mr. Gerald Wolf, of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630) 829-9727, or via e-mail at Stuart.Sheldon@nrc.gov.
B. Boles
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
Enclosure:
Document Request for Post-Approval
Site Inspection for License Renewal
cc: Distribution via LISTSERV
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Enclosure
Inspection Report: 05000346/2016007
Inspection Dates:
March 28, 2016 - April 8, 2016
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License Renewal
Lead Inspector:
Dr. Stuart Sheldon
(630) 829-9727
Stuart.Sheldon@nrc.gov
I.
Information Requested Prior to the On-Site Inspection Week
The following information is requested by March 4, 2016, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the team leader as soon as possible. (Please provide the information electronically in
.pdf files, Excel, or other searchable formats, preferably on some portable electronic
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood by someone who
has knowledge of light water reactor technology).
1.
Provide a list of your license renewal commitments with an approximate
completion status of each.
2.
Provide a list of your Aging Management Programs (AMPs), copies of the
program basis documents for each, and a listing of the action tracking items
for each.
3.
For AMPs that are one-time inspection programs, provide a list of completed
work order numbers for inspections that have been completed. This may be
incorporated with the previous item and should include identification of the
inspected component.
4.
Provide a list of the one-time inspections credited for license renewal that will
be completed during your outage. This list should include at least the system,
component, work order number, and type of inspection.
5.
Provide a list of other planned inspections, which will be conducted during the
outage, that are credited for license renewal. Of particular interest are those that
provide observations of areas that are generally inaccessible at power, e.g., tank
internal inspections, drywell liner inspections and containment coating
inspections. Include work order numbers where applicable.
6.
Provide an outage schedule, sufficiently detailed as to list the work orders noted
in Items 4 and 5.
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
2
7.
Provide current management and license renewal organizational charts.
8.
Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements Manual.
9.
Provide copies of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
II.
Information Requested to be Available When the Inspectors Arrive On-Site on
March 28, 2016
1.
Copies of the work orders requested during the preparation week. This will
include work orders of inspections to be observed and completed work orders
to be reviewed by the team.
2.
Contact information for the Outage Control Center to facilitate inspector
observation of the selected work orders.
3.
Documentation demonstrating completion of license renewal commitments which
are complete as of the inspection date. For example, this may be in the form of a
binder for each commitment which includes the implementing documentation and
references.
III.
Information Requested to be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
If you have questions regarding the information requested, please contact the lead inspector.
B. Boles
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
Enclosure:
Document Request for Post-Approval
Site Inspection for License Renewal
cc: Distribution via LISTSERV
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDavisBesse Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ROPreports.Resource@nrc.gov
ADAMS Accession Number ML15355A196
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
N
RIII
RIII
RIII
NAME
SSheldon:jw
CLipa
DATE
12/16/15
12/18/15
OFFICIAL RECORD COPY