UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION (REPORT 05000346/2013006)

Dear Mr.Lieb:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Davis-Besse Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Davis-Besse Nuclear Power Station during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs described in inspection reports 05000346/2012405 and 05000346/2012403 dated November 8, 2012, and September 7, 2012, respectively. This assessment is unchanged from that previously provided to you in our Annual Assessment Letter for Davis-Bess Nuclear Power Station dated March 4, 2013 (ML13063A119).

The NRC plans to conduct a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. This inspection procedure is conducted to provide assurance that the root and contributing causes of risk significant performance issues are understood; to provide assurance that the extent of condition and the extent of cause are identified; and to provide assurance that the corrective actions are sufficient to address the root and contributing causes and prevent recurrence. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. In addition to ROP baseline inspections, the NRC also plans to conduct an inspection in accordance with Inspection Procedure 50001, Steam Generator Replacement Inspection.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ms. Patricia Pelke, Branch 6 Acting Chief, Division of Reactor Projects at 630-829-9868 with any questions you have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth G. OBrien, Acting Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection Plan/Activity Plan cc w/encl:

Distribution via ListServTM

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ms. Patricia Pelke, Branch 6 Acting Chief, Division of Reactor Projects at 630-829-9868 with any questions you have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth G. OBrien, Acting Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection Plan/Activity Plan cc w/encl:

Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Davis-Besse MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concuLettrrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JRutowski:rj/mt PPelke KOBrien DATE 08/23/13 08/23/13 08/28/13 OFFICIAL RECORD COPY

Letter to R. Lieb from K. OBrien dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION (REPORT 05000346/2013006)

DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 08/23/2013 13:56:33 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 09/01/2013 - 12/31/2014 INSP

- SHIELD BLDG LICENSING BASIS -CRACK FLWUP 1

1 IP Problem Identification and Resolution 71152 08/26/2013 09/27/2013 INSP

- STEAM GENERATOR REPLACEMENT INSPECTION 2

1 IP Steam Generator Replacement Inspection 50001 08/26/2013 12/31/2013 OL INSP

- ANNUAL OPS REVIEW AND PARTIAL BIENNIAL 1

1 IP Licensed Operator Requalification Program - Annual Review 7111111A 11/04/2013 11/08/2013 1

IP Licensed Operator Requalification Program 7111111B 11/04/2013 11/08/2013 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/04/2013 11/08/2013 1

IP Occupational ALARA Planning and Controls 71124.02 11/04/2013 11/08/2013 1

IP Reactor Coolant System Activity 71151-BI01 11/04/2013 11/08/2013 1

IP Occupational Exposure Control Effectiveness 71151-OR01 11/04/2013 11/08/2013 1

IP RETS/ODCM Radiological Effluent 71151-PR01 11/04/2013 11/08/2013 BI ISI

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 02/01/2014 04/17/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/10/2014 02/14/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiation Monitoring Instrumentation 71124.05 04/07/2014 04/11/2014 BI EPRTN

- EP ROUTINE INSPECTION / PI VERIFICATION 2

1 IP Alert and Notification System Testing 7111402 05/05/2014 05/09/2014 1

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/05/2014 05/09/2014 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/05/2014 05/09/2014 1

IP Performance Indicator Verification 71151 05/05/2014 05/09/2014 BI HS

- TRIENNIAL HEAT SINK INSPECTION 2

1 IP Heat Sink Performance 7111107T 06/23/2014 06/27/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/07/2014 07/11/2014 BI RP

- RADIATION PROTECTION BASELINE INSPECTION 1

1 IP Radiological Environmental Monitoring Program 71124.07 09/08/2014 09/12/2014 1

IP Reactor Coolant System Activity 71151-BI01 09/08/2014 09/12/2014 1

IP Occupational Exposure Control Effectiveness 71151-OR01 09/08/2014 09/12/2014 1

IP RETS/ODCM Radiological Effluent 71151-PR01 09/08/2014 09/12/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/23/2013 13:56:33 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse Inspection / Activity Plan 09/01/2013 - 12/31/2014 ISFSI

- ISFSI OPERATION AT A REACTOR SITE 1

1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 11/01/2014 11/30/2014 BI MODS

- MODIFICATIONS/50.59 INSPECTION 3

1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/03/2014 11/21/2014 BI OLRQ

- BIENNIAL REQUAL PROGRAM INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 12/01/2014 12/05/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.